operatorGood morning, everyone, and thank you for joining the second quarter 2024 analyst teleconference for Hydro One Limited. Right now, every participant is in a listen-only mode. Following the speaker's presentation, we will hold a question-and-answer session. If you would like to ask a question during that session, please press star one one on your telephone. An automated message will then confirm that your hand has been raised. Should you wish to withdraw your question, simply press star one one once more. Please be aware that this call is being recorded. I would now like to introduce the host for today's conference, Mr. Omar Javed, Vice President of Investor Relations at Hydro One. Please go ahead.
Omar Javed
executiveGood morning, everyone, and thanks for being with us on Hydro One's quarterly earnings call. With us today are our President and CEO, David Lebeter, along with our Chief Financial and Regulatory Officer, Harry Taylor. During this call, we'll walk through an overview of the quarterly results, and then, as time permits, we'll spend some time taking your questions. Today's discussions will probably include estimates and other forward-looking information. Please take a look at the cautionary language in today's earnings release and our MD&A, both of which we filed this morning, covering the various factors, assumptions and risks that could cause our actual results to differ, as all of them apply to this call. With that, I'll hand the call over to our President and CEO, David Lebeter.
David Lebeter
executiveThanks, Omar. Good morning, everyone, and I appreciate you being here for our Q2 2024 earnings call. It's a pleasure to welcome our new Executive Vice President and Chief Financial and Regulatory Officer, Harry Taylor, who joins me today. Harry came on board at Hydro One in early June after a thorough search that looked both outside and inside the company. He's a strategic executive held in high regard, with proven accomplishments spanning several industries centered on customers. With our refreshed strategy as our guide, his skill at bringing stability and producing financial results through periods of growth and expansion will assist us in serving customers, partners, stakeholders, investors, and all Ontarians. At Hydro One, safety is always the top priority, and our culture has safety deeply embedded in it. That emphasis showed clearly in our 2023 results, when we bettered our yearly recordable injury rate, reaching 0.56 per 200,000 hours worked — a figure that stays well under the industry benchmark of 1.0. That accomplishment makes us quite proud, yet we also recognize the need to stay vigilant and committed to our aim of a workplace with no life-altering injuries or fatalities. There is nothing more important than making sure our colleagues get home safely. Now let me move to our update.
David Lebeter
executiveOur strategy remains focused on investing in transmission and distribution infrastructure so the grid can be modernized, strengthened, and expanded — all in service of economic development and growing electrification throughout the province. On May 28th, we submitted a Leave to Construct application — commonly called a Section 92 — to the Ontario Energy Board, seeking approval to build our St. Clair Transmission Line. This will be a new double-circuit, 230-kilovolt transmission line running between the Lambton Transmission Station in St. Clair Township and the Chatham Switching Station in the municipality of Chatham-Kent, Southwestern Ontario. Pending the Ontario Energy Board's final decision, we anticipate finishing the line in 2028 at a cost of CAD 472 million. When complete, the project will deliver an extra 450 megawatts of power to the region, which will support economic and community growth for years ahead. The St. Clair Transmission Line forms part of a broader set of electricity infrastructure projects designed to bolster economic growth and enhance both the reliability and the resiliency of the grid in Southwestern Ontario. While we develop and construct these projects, we stay mindful of the commitment we have made to our relationship with Indigenous communities. We recognize that their continued participation and collaboration over the entire life of a project matters greatly.
David Lebeter
executiveWe take pride in the fact that the transmission line portion of the St. Clair project will be jointly owned with five nearby First Nations, moving the project forward in genuine partnership. I'm also happy to share that our Chatham to Lakeshore Transmission Line, where construction got underway in spring 2023, is still on schedule to enter service by the end of 2024. As we've said before, this schedule means the line will be finished 1 year early. Along with the faster timeline, we anticipate achieving an extra CAD 16 million in cost savings through optimizing our construction work. The overall cost of the project is now projected at CAD 237 million, reduced from the initial estimate of CAD 268 million — a saving of CAD 31 million. Excellent project execution is a key reason Hydro One remains the transmitter of choice for developing, building and operating priority projects in Ontario. Hydro One keeps playing an essential part in fostering long-term, sustainable economic growth in Ontario. Via our investments in transmission and distribution systems, we are making electrification of Ontario possible, supplying power that fuels growth and prosperity throughout the province. Turning now to LDC consolidation.
David Lebeter
executiveAfter OEB approval came through in early May for buying Chapleau Hydro, our teams worked hard to make sure every procedure and filing needed to get the deal closed was finished. I'm pleased to say the transaction has now closed successfully, and we'll begin integration and officially become the township of Chapleau's local electricity provider. We're eager to energize the lives of our new customers, employees, and the community. Investment in this community is already happening. In May, we announced that Chapleau Cree First Nation was one of 35 recipients receiving CAD 25,000 in funding through Hydro One's Energizing Life Community Fund. Hydro One's dedication to energizing life in Ontario through reliable, sustainable solutions guarantees a brighter future for everyone. To us, sustainability means running our business in a manner that benefits the environment, community, and society. Our sustainable business strategy centers on a broad range of environmental, economic, and social factors, so our decisions and activities leave a lasting positive impact... That covers building resilient infrastructure and intelligent operation, optimizing our supply chain so we can meet customers' needs, working to cut greenhouse gas emissions, and actively investing in the communities where we live and work.
David Lebeter
executiveBeyond that, we’re dedicated to creating and deepening partnerships with Indigenous communities and to advancing our diversity efforts. We recognize that long-term performance and viability require sustainability to be integrated throughout every part of our operations. This morning, our 2023 Sustainability Report was published. It gives a balanced picture of how we performed on a variety of sustainability metrics and underscores the progress we’ve made toward enabling Ontario’s energy transition, which supports a better and brighter future for everyone. The 2023 report calls attention to achievements tied to key initiatives, including: cutting our Scope 1 greenhouse gas (GHG) emissions by roughly 24% against our 2018 baseline, directing about CAD 2.5 billion of capital toward expanding and renewing Ontario’s grid, linking the 10th remote community to the grid and giving that community a reliable and clean energy source, switching 34% of our sedans and SUVs to electric vehicles and hybrids, issuing roughly CAD 2.4 billion in sustainable and green bonds through our Sustainable Financing Framework, allocating 5.7% of total sourceable spend on materials and supplies to Indigenous businesses, and fostering a culture of diversity and inclusion, with female representation at 45% at the board level and 36% at the VP level and above.
David Lebeter
executiveWhat we've accomplished really shows how solid our sustainability base is, and it shows in our people too—they come to work with a sense of purpose and the confidence to take action, helping build a better world for everyone. You can see that purpose in what we do, and it makes me glad that what we do is getting noticed. It's an honor to be named once more to the Corporate Knights Annual List of 50 Best Corporate Citizens in Canada. That honor goes to organizations that take a different approach to business and that stay dedicated to sustainability and caring for the environment. With that said, I'll hand things over to Harry so he can walk us through the financial results. Harry, the floor is yours.
Harry Taylor
executiveThank you, David. It's great to be here, and I'm eager to collaborate with the entire Hydro One team in seizing the substantial growth opportunities before us while serving the needs of all our stakeholders. Moving on to our second quarter financial results, we posted basic earnings per share of CAD 0.49, versus CAD 0.44 in the second quarter of 2023. The main factors driving that year-over-year difference were greater revenues, net of purchased power, partly offset by increased income tax expense once adjusted for net income neutral items, along with higher depreciation, amortization, and asset removal costs, plus greater financing charges. As a reminder, both the transmission and distribution segments recorded net income-neutral items in revenue. These consist of the deferred tax asset recovery that expired at the end of June 2023, along with normal course regulatory adjustments, such as OEB-approved recovery of historical cost deferrals. Corresponding offsets for these items appear in tax expense and in OM&A, which makes them net income neutral. Revenue for the second quarter, net of purchased power, rose 3% year-over-year. That gain stems primarily from higher revenues driven by changes in OEB-approved rates across both segments, together with a 4.1% increase in average monthly peak demand for the transmission segment and 2.3% higher energy consumption in the distribution segment, backed by a larger customer base.
Harry Taylor
executiveThose were partly offset by the revenue effect of the net income–neutral items I mentioned earlier. Turning to costs, operating, maintenance, and administration expenses for the quarter fell roughly 5.1% versus a year ago. In transmission, we got one-time insurance proceeds tied to replacing a transformer at the Gage Transmission Station and had lower corporate support costs, partly offset by greater work program spending on stations and line maintenance. The distribution segment's variance came from lower work program expenditures, including costs for emergency power restoration, information technology initiatives, and vegetation management. Beyond that, we had net income–neutral items in both segments as well, offset within revenue. Depreciation expense rose 6.5% year-over-year in the second quarter. That reflected growth in fixed assets and higher asset removal costs, partly offset by reduced amortization of regulatory assets. On financing, financing charges were up 9% year-over-year, driven mainly by a higher weighted average interest rate on our long-term debt and additional long-term debt from issuances in the second half of 2023 and the first quarter of 2024. Those charges were partly offset by greater capitalized interest from a higher average balance of assets under construction and by volume variance in short-term notes and short-term investments.
Harry Taylor
executiveA key differentiator for us is how strong and stable our balance sheet is, and our creditworthiness as well. S&P underscored this on June 10th by lifting our long-term debt rating to A from A-. To give our liquidity further support and add more financial flexibility, on June 1st of this year we raised our operating credit facilities by CAD 750 million, bringing them to CAD 3.3 billion. The maturity date on those facilities was also pushed out, from 2028 to 2029. We're very grateful for the strong backing we keep getting from all of our banking partners. These facilities mainly serve as a backstop for our commercial paper program. As of June 30, 2024, nothing had been drawn on the facilities. Lastly, during the quarter we updated our Sustainable Financing Framework so it better matches best practices. The revised framework reflects the most recent Green Bond Principles and now covers expenditures for direct connections to new nuclear generation. This adjustment is in line with the sustainable and green bond frameworks of the Government of Canada, the Government of Ontario, and various peers. The complete updated document can be found on our website. On taxes, income tax expense for the quarter came in at CAD 57 million, versus CAD 65 million in the same quarter a year ago.
Harry Taylor
executiveBut once you strip out the net income neutral items, the adjusted income tax expense came in higher. Two things drove that increase: smaller deductible timing differences than we had a year ago, and stronger adjusted pretax earnings. Our effective tax rate for the quarter stood at 16.2%, while last year the effective tax rate was 19.6%. For the six months, the effective tax rate was 15.5%, against 19% during the first six months of last year. That figure lines up with what we expect for the effective tax rate — 13%-16% — across the rest of the JRAP period. Turning now to investing activities. During the second quarter, we put CAD 526 million of assets in service for our customers, up 27.4% from last year. Within the transmission segment, we recorded a 36.2% year-over-year increase, driven mainly by the timing of assets placed in service for station refurbishments and replacements, along with a larger volume of line refurbishments, partly offset by assets placed in service for development work at the Lennox Transmission Station in last year's second quarter. In the distribution segment, in-service additions rose 20.7% over the prior year, reflecting greater spend on wood pole replacements, a larger volume of storm-related asset replacements, and the timing of IT investments.
Harry Taylor
executiveRegarding capital expenditures, we invested CAD 818 million during the second quarter, marking a 26% rise compared with 2023. That growth showed up in both the transmission and distribution segments, driven by more refurbishments and replacements, additional customer connections, and investments in new transmission and distribution infrastructure. A reduced spend on system capability reinforcement projects partly offset those increases. Turning to broadband, we're still collaborating with internet service providers to speed up the pace of orders so that high-speed internet reaches roughly 700,000 rural Ontarians. Orders keep arriving, but the pace hasn't picked up meaningfully, so we still anticipate those orders will produce between CAD 300 million and CAD 700 million of completed work. That work will occur within our distribution segment and will be additive to our rate base. Going forward, we still anticipate 5%-7% growth in earnings per share through 2027, measured from the normalized 2022 earnings per share of CAD 1.61 as the base. This EPS guidance range leaves out growth from broadband, LDC consolidation, and any of the transmission lines awarded to us that remain unfinished, as well as any amounts from externally driven variance accounts.
Harry Taylor
executiveAnd to wrap up, I'm glad to share that our board of directors has declared a dividend of CAD 0.3142 per share, which will be paid to common shareholders of record on September 11, 2024. That said, I'll now hand things over so we can open the phone lines for questions.
Omar Javed
executiveThank you, David and Harry. We'd like the operator to walk us through how they want the Q&A polling process organized. If we aren't able to get to your questions today, my team and I are always available to answer follow-up questions. We ask that you keep your questions to one question and one follow-up. Should you have additional questions, we request that you rejoin the queue. Please go ahead.
Operator
operatorThanks. Just a reminder — if you’d like to ask a question, hit star one one on your phone and hold for your name to be called. If you want to pull your question, just press star one one once more. Our first question is from Maurice Choy at RBC Capital Markets. Your line is open now.
Maurice Choy
analystThanks, Ann. Morning, all. I wanted to briefly address the cost situation when it comes to transmission lines. In your prepared remarks, you noted that some savings emerged on the Chatham to Lakeshore line. Could you talk about just where those savings are coming from and what they might mean for the remaining lines, such as St. Clair and the Waasigan Lines?
David Lebeter
executiveMorning, Maurice. This is David Lebeter, and I appreciate the question. Several elements combined to let us deliver that line a full year ahead of schedule and well below the budgeted cost. To start, the partnerships we formed with the Indigenous communities in that region, along with the municipalities there, let the project move forward more quickly. In addition, by revising how we handled land acquisition and the acquisition of land rights, we managed to achieve voluntary agreements with every landowner along the route, which once more took substantial risk out of the project and let it progress at a faster rate. The province of Ontario has made its environmental legislation more efficient, and that let us secure our environmental assessment and our permits at a much quicker pace. They have aligned the Ontario process with the federal one. So instead of going through two processes, you now go through one. Then there is the experience our teams and contractors are gaining from having constructed transmission. That line was constructed by a contractor who assembled a team with experience throughout North America, and they contributed their best ideas.
David Lebeter
executiveA combination of different elements made it possible for us to achieve that outcome. As I mentioned, that feed is arriving twelve months ahead of schedule and CAD 31 million below the budgeted figure. We look forward to carrying that achievement forward from here.
Maurice Choy
analystDo you expect that the St. Clair CAD 472 million could potentially capture some savings too, or is all of that already captured in terms of best practices?
David Lebeter
executiveYou know, no two transmission lines or projects are ever the same—each one is unique and different. Sure, you always wish you could just repeat the last one, but since everything differs and is unique, you have to take the lessons from the previous one and apply them as best you can to the one you're currently working on. And we'll certainly keep investors and yourself updated on progress as that line moves forward.
Maurice Choy
analystThank you. And perhaps for the remaining projects where a Section 92 application has been filed, could you talk a little about approximately where each of those stands, and, more significantly, at a high level, when you expect them to come into service?
David Lebeter
executiveSo yes, our tables list the dates by which we've been requested to place those into service. Regarding when Section 92s might be moved up, we'll inform you as that situation develops. Naturally, that depends on how far we've gotten with engineering, choosing routes, and consulting the public. Therefore, I would—foolish is the word I want—be unwise to offer any forecast at this point, given the process that has to be completed.
Maurice Choy
analystUnderstood. And to wrap up on all these extra lines: regarding how this gets funded, and the broadband work too — I realize that's likely nearer the end of the decade, but when would you expect to begin getting your balance sheet ready for the CapEx that could come through, maybe with some of these requirements going beyond what your balance sheet can manage at present?
David Lebeter
executiveMaurice, I'll have Harry address that question.
Harry Taylor
executiveHi, Maurice. Yeah, we believe that we do not need to issue any equity, certainly before this rate period is up, absent any significant LDC acquisition. We are preparing, as you saw from our disclosures this morning, we upsized our credit facility, so we have CAD 3.3 billion. That's on the debt side. Our FFO to debt is still well north of the 11% bright line test that S&P uses. We're monitoring it and getting ready, but it's not in the short term. We want to maintain the healthy credit metrics that we have and the strength of the balance sheet, but it is outside this rate period right now.
Maurice Choy
analystGot it — thanks.
Operator
operatorThanks. The next question is from Mark Jarvi at CIBC. Your line is open now.
Mark Jarvi
analystGood morning, everyone. Harry, I want to follow up on what you were saying at the end there regarding funding. You mentioned the greater credit capacity and the favorable terms available on a debt deal. Now that you've had some time to settle in, are you considering any adjustments to the funding plan — perhaps the timing of debt raising, where the debt comes from, anything you're weighing that might represent a subtle evolution from how funding was handled previously?
Harry Taylor
executiveNo — that's the short answer. As we work through this, we've got a strong program in place here, and obviously we're being quite tactical about the timing of debt issuance. Our aim is to hold the weighted average rate down while pushing maturity up into the double digits. So the rate environment has now returned to a point that's certainly more favorable for where we'd like to be on issuing, but there's no change to the practice we've built up over the last couple of years.
Mark Jarvi
analystGot it. Then, regarding the OEB proceedings on cost of capital, do you have any refreshed perspectives on how that is tracking, what you are advocating for, and how you expect that to progress over the coming months and the year ahead?
David Lebeter
executiveHey Mark, appreciate the question. As far as I can tell, things are going well with the proceedings. Of course, the OEB doesn't give us any indication. They're posing their questions, running their panels, and gathering their information. But we're still optimistic that once we come out of this process, Ontario will remain a favorable jurisdiction — one with predictability, one that works well for investors while also protecting ratepayers.
Mark Jarvi
analystDo you think a thicker equity layer is something you'd want to push for, or could it emerge on its own through this process?
David Lebeter
executiveWhat I can say is that we have pushed for a larger equity layer to offset this growth phase, in which our expansion has outpaced capital spending, with capex running ahead of in-service additions during a period of rapid growth. A number of the other LDCs across the province have sought a higher return rate. So people are feeding various items into that proceeding, but as I noted, we stay confident that the OEB will arrive at a decision preserving how appealing this market is to investors.
Mark Jarvi
analystSo at first there wasn’t any resistance—nothing suggesting that option wouldn’t even be considered? You aren’t picking up anything about equity thickness that would indicate you might not see that emerge through this proceeding?
David Lebeter
executiveNo — like I was saying when this question first came up, Mark, the OEB works through gathering its evidence and its answers, and no signal comes from them until a ruling is brought forward.
Mark Jarvi
analystGot it. All right, I appreciate you making room in your schedule for this today.
Operator
operatorThanks. The next question is from Robert Hope at Scotiabank. Your line is open now.
Robert Hope
analystMorning, everyone. This is a follow-up to Mark's question, and it's for Harry. You've now been in the role for a couple of months, so it appears the funding plan is unchanged. But as you examine other parts of your responsibilities, both as CFO and as regulatory officer, are there any changes there, or anything you'd like to flag?
Harry Taylor
executiveRob, again, the answer is no. My view is that this company's underlying strengths are genuinely excellent when you look at growth and the opportunities ahead, and the team here has done a wonderful job on two fronts: managing the balance sheet and building a strong operation that delivers for our residential, commercial, and industrial customers. They've also succeeded in locking in long-term transmission line projects, and I'd say the future looks incredibly bright. We trade at an attractive multiple, and from a stock perspective, the balance sheet is solid, so the priority is to keep this going. I've joked with quite a few investors that I've taken the Hippocratic Oath — first, do no harm — and keep up this remarkable record of success, and that's exactly what I intend to do.
Robert Hope
analystThanks for that. Now, circling back to broadband, you cited CAD 300 million to CAD 700 million of work within the distribution business. Could you talk about how that figure has shifted across the months and quarters, and what pace of spending we should expect going forward?
Harry Taylor
executiveWell, I'd say we're fully prepared and set to move forward. So at this point, we're dependent—to put it plainly—on the internet service providers picking up the pace of their orders. Orders are coming in, but they aren't arriving as quickly as we had anticipated. We're collaborating very closely with them, along with our government partners, to meet that significant policy goal they've set. However, absent and until we witness a rise in orders, acceleration won't happen. That's among the reasons we lowered the guidance—I believe it was during the prior quarter that we reduced it—purely because of how fast orders have been coming in.
Robert Hope
analystI appreciate that.
Harry Taylor
executiveGlad to have you with us.
Operator
operatorThank you. Just a reminder — if you'd like to ask a question right now, press star one one on your touchtone phone. Our next question is from Patrick Kenny at National Bank Financial. Your line is open.
Patrick Kenny
analystMorning, everyone. I'd like to hear your perspective on labor unions. As you know, this summer in Canada we've witnessed rising tensions in other sectors, with strikes and similar actions. My understanding is that your contract with the Power Workers' Union remains in effect for roughly another year, but I'm curious how you're planning to stay ahead of the kinds of dynamics that are impacting other industries.
David Lebeter
executiveMorning, Patrick. Good to hear from you today. You know, labor is truly vital for any organization's success, and that holds just as true for Hydro One. So we keep a close eye on what's happening across the country, and we also watch closely what's going on within our unions. And I'm glad to say we enjoy very solid relationships with all of our unions — the Power Workers being just one of them, but also the Society of Professionals, as well as EPSCA and a couple of other unions. And you're right, our Power Workers Union contract, and their society's too, doesn't expire for another year. It's actually in October of 2025. And we don't anticipate — certainly we aren't looking at a strike. We don't expect one. I believe we have a very constructive relationship. We've always treated them fairly, and their requests have always been reasonable, so I don't expect any labor dispute like the one you're seeing elsewhere in the country. And we're in contract discussions with the unions. So you might think the only time we actually work with the unions is during collective bargaining, but that's far from true. We actually work with our unions throughout the period between bargaining and during bargaining.
David Lebeter
executiveWhat you do in the time between bargaining rounds actually matters more, since that is what sets things up for bargaining. So I will take a bit of a risk here and say that those who end up in difficulty, that can sometimes stem from failing to do that work in the stretch from the previous contract to the present one.
Patrick Kenny
analystAll right, thank you, David. Now, turning to the LDC consolidation topic, and returning to the credit rating upgrade along with the broader decline in interest rates: I’m simply wondering whether you view this setting of cheaper financing—you know—as helping to move along some deal activity, maybe even some bigger-ticket opportunities, that might not have existed, you know, say, 6 to 12 months back?
David Lebeter
executiveSo yes, there's growing interest coming from LDCs who want to talk about divesting their assets. That said, I don't think the lower interest is what's driving it. What's really behind it is that they have other financing needs, or they simply can't fund what their LDC needs in order to accomplish its goals. So a lower financing rate definitely helps, but other factors are what actually push this forward. And as I mentioned, we've seen more interest, with more people getting in touch and asking questions during the last six months. So we stay optimistic that we'll deliver on our plan across the rate period.
Harry Taylor
executiveAll right, that's excellent. I'll stop at that point.
Operator
operatorThanks. The final question we have is from Benjamin Pham at BMO. Your line is open now.
Ben Pham
analystHello, thank you. Morning to everyone. I wanted to ask whether you could speak to how quickly electrification is moving in Ontario and what kinds of trends you are observing when it comes to power demand, perhaps broken out by region? Also, has anything shifted regarding data center connections?
David Lebeter
executiveAppreciate the question, Ben. The pace of electrification does fluctuate. We all follow the news, and what we've observed is that EV buying has decelerated. It hasn't halted—only decelerated—and that's likely part of the economic cycle. We'll work through those things. We keep seeing substantial interest from companies that want both to establish new operations in Ontario and to electrify the operations they already run in the province of Ontario. So I'm not worried about it. It's progressing at a very good pace. I believe your question had a second part, and my apologies, I forgot it. Could you please ask that again? Oh, data centers, sorry. Data centers—we keep seeing growing interest in the province of Ontario. Canada trails the U.S. when it comes to data center penetration, and we see the large data centers wanting to fix that. I think when we spoke last quarter, we knew of roughly 4,000 MW of data centers in the queue. I think that figure now stands closer to 6,000. So we are seeing the penetration.
David Lebeter
executiveWe've got construction happening at a couple of data centers, and I know the province is definitely keen to show it's open for business and would love to give the green light to every data center that sets up here. And I think part of what the new minister's mandate will involve is this: how do we draw these businesses in, while also making certain they've got enough energy and a connection in a timely way, so that they see Ontario as an appealing place to locate?
Ben Pham
analystAll right, that's excellent. And then perhaps regarding the First Nations angle and the partnerships you're announcing there, could you remind me again — is there any cap on First Nations participation that stems from the guarantees, or does that operate on a different wavelength altogether?
David Lebeter
executiveI want to make sure I've got this right. When you say cap, do you mean a limit on the equity percentage, or a limit on who's allowed to take part?
Ben Pham
analystSimply the overall participation figure expressed in raw dollar terms.
David Lebeter
executiveNo, there isn't a cap. What we've done is use 50% equity ownership for the transmission line portion. Naturally, on the Waasigan Transmission Line, with total capitalization of CAD 1.2 billion, that figure will be larger than for the St. Clair Transmission Line, at CAD 472 million. We've held to that 50% since it mirrors — if you look back at the treaties — the wording found there, which referred to a partnership, to sharing, to equality. That's the reason we've kept to 50/50.
Ben Pham
analystYeah. And can I just clarify something there — so, let's say the loan guarantee comes to CAD 2 billion. Does that have any influence at all on how much First Nations are able to invest in your projects?
Harry Taylor
executiveOkay, Ben, I want to make that point clear. Financing for the First Nations isn’t something we guarantee. Our role is to support them, and Arthur Kacprzak and our treasury team work hard to help them obtain low-cost funding, but neither the First Nations nor the partnership of the First Nations has any guarantee from us on their debt.
Ben Pham
analystRight, but my understanding is that when First Nations put money in, they're partly receiving a government-backed loan guarantee, aren't they?
David Lebeter
executiveThere are programs out there that can supply that kind of support. To this point, federal loan guarantees haven't come through for them. Our belief is that they will secure some at the provincial level. We are definitely advocating alongside them — not for them, but together with them. In our view, they ought to be eligible under the Indigenous Loan Guarantee Program that the federal government introduced in the most recent budget. Still, given how these projects have been set up, we've taken a great deal of risk out of them on their side, and that is exactly what makes them appealing to investors.
Ben Pham
analystAll right, I've got it. That's clear. Fine, thanks.
Operator
operatorThank you. That brings today’s Q&A session to a close. I’d now like to hand the call back to Omar Javed for any additional remarks.
Omar Javed
executiveThank you, Ann. Everyone on the Hydro One management team appreciates all of you spending time with us this morning during such a busy stretch. We're grateful for your interest and for your ongoing support. Should anything remain unanswered from today's call, don't hesitate to get in touch, and we'll make sure you receive an answer. Thanks once more, and have a good rest of your day.
Operator
operatorThank you, everyone, for joining us on today's call. That brings us to the end of today's program, so you're all free to disconnect now. Have a wonderful day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Hydro One Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Hydro One Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hydro One Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.