operator
#1

Good morning, everyone, and thank you for joining the First Quarter 2025 Analyst Teleconference for Hydro One Limited. <<operator_script>> Please note that this call is being recorded. At this point, I'd like to hand things over to today's host, Mr. Wassem Khalil, Director of Investor Relations at Hydro One.

Wassem Khalil

executive
#2

Good morning, everyone, and thanks for being with us on Hydro One's quarterly earnings call. With us today are David Lebeter, our President and CEO, and Harry Taylor, our Chief Financial and Regulatory Officer. During this call, we'll walk through an overview of the quarterly results, and after that we'll take as many questions as time allows. Discussions today will probably include estimates and other forward-looking information. Please take a look at the cautionary language in today's earnings release and in our MD&A, both of which we filed this morning, covering the various factors, assumptions and risks that could cause actual results to differ, as all of them apply to this call. With that, I'll hand the call over to our President and CEO, David Lebeter.

David Lebeter

executive
#3

Thank you, Wassem. Good morning, and thanks for being with us on our first quarter 2025 earnings call. Today I'll give you an update on what we've been doing and what we've achieved over the quarter. After that, Harry will walk you through the financial results. As plenty of people in Ontario are aware, this past winter proved to be the harshest in recent years, and it ended at the close of March with an ice storm of a generational scale that tore across Central and Eastern Ontario. The storm's ferocity caused major harm to power infrastructure and led to Hydro One carrying out more than 1.1 million service restorations. A number of our longtime service employees described it as worse than — or on par with — the ice storm of 1998. As ever, our teams stand by our customers at the moments that matter most. Crews from throughout Hydro One came forward to safely bring power back to homes, businesses, hospitals, schools and infrastructure. In short, to restore normal life. We're deeply thankful for the help we got from New Brunswick Power, Hydro-Quebec, 27 local distribution companies across Ontario and 26 contractors from Ontario, Quebec, New Brunswick and Saskatchewan, who answered our request for assistance and laboured side by side with Hydro One's teams to get the power back on faster.

David Lebeter

executive
#4

When the effort was at its height, more than 4,800 dedicated and eager people were brought in for the restoration work, putting in relentless effort to get the lights back on for our customers. Everyone's effort and commitment in reacting to the ice storm fills me with immense pride. It was a wonderful example of a community rallying to assist people who needed help. The toll from the ice storm has been worse, inflicting enduring effects on trees, infrastructure, and the communities we consider our home. We are still working out the final expenses, including those run up by third-party contractors and other local distribution companies that backed our restoration work. Because the storm was so severe, we anticipate the cost will be substantial. Consequently, we will seek to recoup expenses by filing a Z-Factor application with the Ontario Energy Board. That filing lets utilities that have gone through a major unanticipated event request recovery of costs. We recognize and value that cleanup will go on well past the point when power comes back. As part of how we are committed to backing recovery work, we launched the Ice Storm 2025 Recovery Grant. This grant lets indigenous communities and municipalities hit directly by the storm seek grants of as much as $10,000 to help with relief and rebuilding work.

David Lebeter

executive
#5

Safety remains our number one priority no matter what we do. Given the kind of work we perform, that simply has to be true. Our dedication and focus on safety keeps raising the bar across the industry, and the Electricity Distributors Association recently acknowledged those efforts. Hydro One received the Public Electrical Safety Excellence Award. That award recognizes exceptional contributions to keeping the public safe around electrical activities, along with meaningful progress in avoiding accidents and encouraging safe behavior. The recognition stemmed from our public safety campaign titled "10 meters away, your life depends on it." The campaign leveraged a range of media channels to boost public safety awareness and encourage changes in behavior. Back in December, we announced an agreement to acquire a 48% interest in the East-West Tie Transmission Line. I'm pleased to say that Hydro One closed that transaction successfully on March 4, 2025, and we now hold an equity stake in the line alongside the remaining owners, the Bamkushwada Limited Partnership — a consortium of 6 First Nations — and affiliates of NextEra Energy Canada. As a reminder, this line is a 450-kilometer 230 KV double-circuit transmission line running from Wawa to Thunder Bay, with an OEB-approved rate base of roughly $880 million.

David Lebeter

executive
#6

The total cost of the acquisition came to $261 million, once closing adjustments were factored in. That purchase added to earnings right away, with the complete benefit kicking in from our second quarter. This line is a strategic asset that strengthens our standing as Ontario's transmitter of choice and further boosts our capacity to back electrification efforts in Northern Ontario. The OEB released its decision and order regarding the generic cost of capital review on March 27, 2025. That decision and order came after a thorough review process involving oral hearings as well as written submissions. Hydro One, local distribution companies, industry associations and interveners each took part in that process. The OEB kept the foundational elements of its 2009 cost of capital framework, among them the formulaic return on equity annual adjustment. Even so, the OEB did change the values of the cost of capital parameters used to set rates, such as the base ROE and the base reference parameters for the long bond yield forecast and utility credit spreads. These updates take effect beginning in 2026. Beyond that, the OEB reset the deemed long and short-term debt rates and brought in a new index for calculating short-term debt rates. The deemed capital structure stayed the same, at 40% equity and 60% debt, for most utilities.

David Lebeter

executive
#7

The OEB has likewise verified that revised cost of capital parameters will apply starting with the utility's following rebasing rate application, and it indicated plans to examine the cost of capital policy once more in 5 years. None of the announced modifications will affect the terms of Hydro One's settlement agreement covering the 2023 to 2027 Joint Rate Application, nor the outcomes of partnership rate applications that were previously submitted based on 2025 rates. The OEB did observe that utilities confronting unique circumstances can present evidence in their subsequent rate application and suggest changes to the generic ruling. We are examining ways to offset the effects of the cost capital parameters within our next rate application, which we expect to file in the fall of 2026. As all our peers do, we keep watching the shifting tariff situation and the uncertainty it generates. Given this fast-moving environment, we stay agile while also maintaining a long-term view. To achieve long-term stability and certainty, we need to cut the amount of materials we procure from U.S.-based manufacturers and to diversify our supplier base further. We have already taken multiple steps in this direction, among them starting a strategic sourcing initiative centered on broadening our supply base by weighing alternative designs, standards and technical specifications.

David Lebeter

executive
#8

We’re able to bring on more supply sources, and that lets us get a bigger share of goods and services from manufacturers based outside the U.S. We’re putting priority on partnerships for buying materials, equipment, and services from Indigenous communities and businesses, and that means more spending in Ontario. Along with our suppliers, we keep working to lessen tariff effects across the whole supply chain. Near term, that involves shifting to Canadian alternatives when they’re available, and at the same time building long-term Canadian-sourced solutions that cut trade risk further. Under this effort, we’re using our buying power with suppliers to encourage more manufacturing in Canada. By giving key suppliers longer-term forecasts for material and labor demand, we’ll help them invest in capacity growth and scaling so a Canadian-sourced solution can be developed. Finally, we’re looking at combining our purchasing power with other Canadian utilities to lower costs and, once more, support manufacturing inside Canada. We’ll keep reviewing how we procure and find additional steps to further curb our tariff exposure and effects. Our employees are the driving force behind our organization, and what they contribute is a valuable resource for our success. I’m pleased to report that we’ve reached tentative agreements for 2 collective agreements.

David Lebeter

executive
#9

We have the main collective agreement plus the customer service operations agreement with the Power Workers' Union, or the PWU. Those agreements address costs for frontline and customer-facing positions throughout the company's operations. I'd like to thank the teams on both sides for bargaining in good faith while seeking a deal that satisfied what employees, our customers, and Hydro One need. Out of respect for the bargaining process between the teams, we won't comment on the agreement's details until the Power Workers' Union has ratified it. Along with earning a Public Safety Excellence Award from the Electrical Distributors Association, Hydro One also received recognition for our sustainable financing initiatives. We're proud that the Electrical Distributors Association Sustainability Excellence Award recognized us for leadership in sustainable finance. Through our sustainable financing initiatives, Hydro One has become one of Canada's largest issuers of sustainable corporate bonds. With that, I'll hand the call to Harry to talk through our financial results. Harry, over to you.

Henry Taylor

executive
#10

Thank you, David. Good morning, and thanks for being with us today. During the first quarter, basic earnings per share came in at $0.60, up from $0.49 in the first quarter of 2024. Several factors drove that year-over-year difference: revenues net of purchased power were higher, reflecting the 2025 approved OEB rates and greater average monthly transmission peak demand. Those gains were partly offset by increased income tax expense, largely because pretax earnings were higher, along with greater OM&A from a rise in work program expenditures, including information technology-related spending, as well as higher interest expense and increased depreciation, amortization and asset removal costs. Revenues net of purchased power for the first quarter rose 11% year-over-year. Transmission revenues were up 15%, mainly on the higher average monthly peak demand and the changes in OEB-approved rates for 2025. Another factor lifting revenues in the quarter was the addition of revenue from the Chatham by Lakeshore transmission line, which was energized in December of 2024. Distribution revenues net of purchased power grew 6.3% year-over-year, driven by the changes in OEB approved rates for 2025 and greater energy consumption. Turning to costs, operating, maintenance and administration expenses for the quarter were 3.1% higher.

Henry Taylor

executive
#11

Looking at transmission, our costs rose 6.6%, driven primarily by increased work program spending, which includes the information technology expenditures I mentioned earlier. For distribution, costs came in roughly flat versus the prior year, edging up just 0.6%. Depreciation expense in the first quarter climbed 3.9% year-over-year, reflecting growth in capital assets as we keep putting new assets into service. On the financing side, interest expense increased 10.1% compared with a year ago, largely because of a higher weighted average interest rate on our long-term debt and a larger long-term debt balance following the additional issuances completed in 2024. We remain pleased with the strength of our balance sheet and our creditworthiness. Our current annualized FFO to net debt metric sits at 13.4%, which is still well above the threshold limits rating agencies apply when determining our credit rating. Now to taxes. Income tax expense for the quarter was $68 million, versus $51 million in the same quarter a year earlier. That increase stemmed mainly from higher pretax earnings, partly offset by larger deductible timing differences than we had last year. The effective tax rate came in at 15.9% this quarter, compared with 14.7% a year ago.

Henry Taylor

executive
#12

That rate aligns with what we expect for our effective tax rate — 13% to 16% — across the rest of the JRAP period. Now turning to investing activities. During the first quarter, we put $423 million of assets into service for customers. That marked a 76.3% rise versus last year. Within transmission, we recorded a 192% year-over-year increase, driven mainly by the timing of assets placed in service for station refurbishments and replacements, along with investments placed in service for transmission stations. On the distribution side, in-service additions rose 33.7% from the prior year, reflecting investments placed in service for the Orillia Operation Center and a larger volume of storm-related asset replacements earlier in the quarter than the storm David mentioned. Turning to capital expenditures: in the first quarter we invested $735 million, up 9.2% over 2024. That increase showed up in both transmission and distribution, stemming from greater investments in new transmission infrastructure, investments in Ontario's broadband initiative, a higher spend on storm-related asset replacements, and a larger volume of work on transmission customer connections. Partly offsetting these were a lower spend on station refurbishment and equipment replacement in the transmission segment and a smaller volume of work on distribution customer connections.

Henry Taylor

executive
#13

As we look forward, our expectation remains that earnings per share will increase at a yearly rate of 6% to 8% through 2027, with the normalized 2022 earnings per share figure of $1.61 serving as the base. Last, I'm happy to share that a dividend of $0.3331 per share has been declared by our Board of Directors, payable to common shareholders of record on June 11, 2025. With that, we'll open up the phone lines and will be glad to take your questions.

Wassem Khalil

executive
#14

Thank you, David and Harry. On that note, we'd like the operator to walk us through how they'd prefer to arrange the Q&A polling process. If there are questions we aren't able to get to today, my team and I are always around to answer any follow-ups. <<operator_script>> Shannon, please go ahead.

Operator

operator
#15

<<operator_script>> The initial question will be from Robert Hope at Scotiabank.

Robert Hope

analyst
#16

One element of the election platform involved expanding the East-West Canadian transmission grid. What's your view on adding incremental connections to Manitoba and Quebec? And are those even necessary, considering that the bulk of power gets exported north to south?

David Lebeter

executive
#17

Robert, it's David here, and I appreciate you being on the call and raising that question. Ontario, as you're aware, already has ties to Quebec over on the eastern side and to Manitoba out west, and those interconnections serve energy trading. When we examine this, we see a chance to get more out of what our eastern and western neighbours possess — namely big reservoirs that could function as valuable batteries while Ontario expands its generation fleet. Linking those 3 provinces more tightly, or boosting capacity between them, would open up some intriguing trading possibilities and let us maximize the worth of the resources on both sides — in Ontario's case, the sizable generation resource, and I'm thinking especially of the nuclear build-out and the renewable build-out now underway. And for the 2 provinces flanking us, it's their water reservoirs, which, as I mentioned, amount to massive batteries.

Robert Hope

analyst
#18

Okay, thanks for that. And maybe staying on transmission for a moment. If industrial demand does slow down somewhat, how would you view the speed of transmission investment and how the government allocates those additional lines?

David Lebeter

executive
#19

My view is that this rate of activity will probably persist rather than slow, even if there's a mild downturn in the economy. The basis for that view is that we see numerous bottlenecks throughout the province. On top of that, the economy continues to expand. Ontario is still receiving a substantial inflow of immigrants. If anything, the tariffs could lead to higher spending in the agricultural sector for the sake of food stability. So those bottlenecks need to be addressed if you want to grow the mining operations up north or, as you asked earlier, build stronger connections to Ontario, Quebec, or Manitoba.

Operator

operator
#20

The next person to ask a question is Maurice Choy from RBC Capital Markets.

Maurice Choy

analyst
#21

I’d like to briefly address the equity partnership structure, which gives First Nations a 50% equity interest—or an option to obtain that interest—in any new transmission line above $100 million. During the federal election campaign, the Liberal government that is now in office discussed not only keeping the loan guarantee program for First Nations in place but also broadening that program’s scale and reach. With that in mind, I’m wondering whether you expect this equity partnership approach could be used somewhat more often, in a way that lets you put those proceeds to work and lower your new capital requirements for the upcoming regulatory period?

David Lebeter

executive
#22

Let me start on that, and Harry, you can fill in anything I miss. Appreciate the question, Maurice. It was encouraging to watch the federal government, during the election campaign, put forward a plan to double the indigenous loan guarantee program's size. For our partners, that program matters a great deal when it comes to securing financing at reasonable prices. So I doubt we'll see more uptake of our partnership model, since it's already the case that each one is fully subscribed. Our indigenous partners have a strong appetite to take part. What I expect this to do is smooth the path for them in arranging cost-effective financing and let us get through the partnership development phase faster. Harry, is there anything you want to add?

Henry Taylor

executive
#23

Absolutely. I want to reinforce what Maurice said about how this lets us redeploy capital. So we fully back our partners in getting the most out of their investment in our transmission lines, which frees up the capital that comes from that. Both sides benefit. And we're making solid headway on our Chatham by Lakeshore lines, and more details will come as they become available. But having greater funding available simply makes it easier for First Nations to access competitive sources of capital.

Maurice Choy

analyst
#24

Got it. Let me wrap up with a bigger-picture point. When you look at some of your U.S. competitors, at least, there's plenty of talk about costs going up, especially because of tariffs. My sense is that here in Canada the effect is clearly somewhat different for you. Still, I'm curious whether you're noticing any increase in capital costs, including on some of the RFPs you've issued, and how that might affect affordability for customers if those costs get passed along?

David Lebeter

executive
#25

Yes. Tariffs clearly introduce a great deal of uncertainty, as I noted in my remarks, and they do raise costs for certain pieces of equipment—especially anything sourced from the U.S., which is actually our biggest issue at the moment, rather than the material cost increases we've experienced. So far we've managed that through some of the sourcing efforts I mentioned, and also by building up our inventory. So in the near term, we're fine on that front. The larger difficulty is really securing manufacturing slots so we can be sure materials are on hand when needed, so that neither our construction work nor our maintenance work gets affected. To that end, our supply chain team has been looking further ahead, locking in manufacturing capacity and also, again, seeking supplier diversity so we can obtain additional manufacturing capacity. That's one of the elements that will drive affordability. We will certainly need to consider that carefully as we prepare our next rate application, the Joint Rate Application '28 as we call it, and demonstrate—which is one reason we place a big emphasis on cost takeout—demonstrate that we're doing everything possible to manage affordability for our customers and deliver excellent service, which is 1 of the 4 key pillars in our strategy, which we revised about 18 months ago.

Henry Taylor

executive
#26

And Maurice, like David mentioned, nothing is showing up right away, though we do expect some higher costs. Everyone on our supply chain and procurement teams is working as hard as they can to keep those effects as small as possible and soften them. On top of that, we have fairly aggressive productivity efforts in place so that, wherever we can't dodge certain increases, we can counterbalance their effect. That way, in the end, our customers won't have to absorb the entire burden of any increases tied to tariffs or a trade war. And regarding those productivity efforts, you're familiar with our history of delivering. We're looking to speed up whatever we can, not only to achieve the productivity but also to counterbalance some of these unexpected increases that could arise.

Maurice Choy

analyst
#27

Just a quick follow-up on that. Could it be that a few of the projects meant to be completed during this five-year window end up costing somewhat more and slipping into the following five-year period?

Henry Taylor

executive
#28

No, I don’t believe any of the major projects would involve that. We have substantial spending on refurbishment, replacement, and similar work. So we evaluate the condition and state of our assets, and then we make decisions — replacement decisions — according to where they stand. Of course, anything nearing end of life or that is breaking, we repair. But for the rest, we do have some flexibility, since the OEB does expect us to redirect expenditures so that we don’t exceed our approved envelopes.

Operator

operator
#29

Julien Dumoulin-Smith of Jefferies LLC has our next question.

Jamieson Ward

analyst
#30

Actually, this is James Ward sitting in for Julien. Perhaps we could start with those large transmission projects that have longer timelines — what's your thinking on the possibility of further announcements of this kind?

David Lebeter

executive
#31

Okay, James — whenever transmission lines get awarded to us, we do make announcements about them, and we make sure you're kept informed. What we're waiting on at this moment is that integrated energy plan everyone has been anticipating for a long time, the one the Ministry of Energy and Mines has been developing together with the independent electric system operator. We're still optimistic it will come out soon. My guess is it won't be May — perhaps early June is when we'd see it released. That ought to tell us something about which additional transmission lines the province intends to push ahead with. As I mentioned earlier on this call, there's a great deal of congestion across the province. We've pinpointed those congested areas. Over the past year we've completed plenty of regional studies, collaborating with the independent electric system operator to determine where those areas are and which potential solutions could work around the problem. Now, clearly, we'll first be pursuing non-wire solutions. Typically those come at a lower cost, though there does need to be additional build-out. And the moment we gain further insight, we'll share it with you.

Jamieson Ward

analyst
#32

Thanks for that. The reason I raised it is simply that the latter portion of that same question was this: once we put it together with your upcoming JRAP 2.0 filing, how would you expect the blended construction profile over the coming few years to compare with the OEBs and the higher equity layer they successfully applied for? That covers the whole question.

David Lebeter

executive
#33

Yeah. Harry, would you mind taking that question about the cost of capital and the equity thickness, and how we're approaching it?

Henry Taylor

executive
#34

Yes. The OEB's decision was a one-size-fits-all kind of ruling. And the majority of utilities that the OEB regulates aren't investor-owned. Equity thickness does differ somewhat from one utility to another as well. And all the way through — if you go through that ruling from start to finish, they ask utilities that feel they face unique or specific circumstances to file an application explaining why something ought to be different. So if our view is that equity thickness ought to be higher for our transmission business, that's something we should propose in the application. If certain other parameters seem to us not relevant or not as applicable to our business as an investor-owned utility that competes globally for capital to fund the investments we're going to make, we'll bring that up in our application. So the door is open for tailored parameters in a rate application. Now the application has to go through the settlement process and, God forbid, litigation, but through to an approval. And we fully intend to put in an application that fits — what we believe our circumstances and needs are, so that we can serve Ontarians with the lowest cost investments to deliver the infrastructure that's required to support the electrification of the province.

Jamieson Ward

analyst
#35

Understood. Sorry—just to make sure that was clear, in case it didn’t come across: I meant that in relation to OPG’s successful application, because obviously they succeeded at what you’re aiming to do here. So perhaps somewhat separate from the cost of capital piece on the ROE, but more connected to the higher equity layer.

Henry Taylor

executive
#36

Yes. Well, that precedent works in our favor, as do other capital structures and regulatory jurisdictions. OPG will also return before our application is filed, but all of these help support our argument for transmission — the long-lived transmission projects we're putting money into during this rate period and the one after.

David Lebeter

executive
#37

James, as we've discussed at conferences, we expect to see additional transmission line construction moving into JRAP '28. Some of that construction extending out to 2031 and 2032 is already visible today, and we anticipate it will reach beyond those years. That bigger buildout is precisely why OPG carries a higher equity thickness as it entered its nuclear refurbishment. So we're confident that in our next rate application, we'll be able to secure that.

Operator

operator
#38

Mark Jarvi of CIBC is up next with a question.

Mark Jarvi

analyst
#39

Let me just build on what you said last, David. Is it your point that the equity layer—or going after a thicker equity layer, or perhaps other tools such as AFUDC—would mostly apply to the transmission part of the business and not so much to distribution? Or would you go after that across both segments?

David Lebeter

executive
#40

Let's take a look at — go ahead, Harry.

Henry Taylor

executive
#41

Yes. On transmission, Mark, it's most evident, though I wouldn't rule out applying it to, or weighing it for, distribution. We simply need to be confident we have a solid case backing that up, one that's in place. The need on transmission sits somewhere between obvious and apparent, I'd say; somewhat less so for distribution, but not absent, considering how large the investments are and the need for equity so that equity thickness comes out appropriate in both of the major segments.

Mark Jarvi

analyst
#42

Got it. Returning to the tariff topic — you mentioned being well prepared with inventory, though even securing slots remains difficult. What feedback are you receiving from smaller utilities, and does the present environment intensify strain on small LDCs? Also, do you see this positioning you for additional consolidation in the coming year?

David Lebeter

executive
#43

Let me take that question. Sure, smaller utilities will face a tougher time than a bigger one. They simply lack buying power. They lack scale. But conversely, they aren't seeing the same growth we are. So a few of them have municipalities expanding quickly or distribution systems being built out. They don't have transmission. So the pressures differ. Whenever prices do rise, though, it does put pressure on them. Their capacity to raise capital for investments is limited. So I think that will support some LDC consolidation. And while we'd certainly like to see that become sales, it could also become mergers of other LDCs with one another, but we're definitely hoping it becomes sales.

Mark Jarvi

analyst
#44

Are there any early signs that those discussions are picking up pace?

David Lebeter

executive
#45

I believe you've already witnessed a portion of that strain. The LDCs are pressing the Ontario Energy Board to adjust certain parameters that control them. I'll be observing more of that. There's been a rise in curiosity from parties exploring options, contemplating a sale. So activity on that front has picked up. Therefore, yes, some of those pressures are beginning to show.

Operator

operator
#46

The final question we have is from Patrick Kenny at National Bank Financial.

Patrick Kenny

analyst
#47

Given the robust opening we've seen this year, partly because demand peaked higher during the quarter, I'm wondering whether you'd consider pulling forward some OM&A into the summer months — say, to help manage how quickly earnings build for the year and the overall EPS growth rate — or maybe moving up any bigger maintenance projects planned for 2026 so the system gets further hardened?

David Lebeter

executive
#48

I'll begin with that, and then hand things over to Harry. First off, Patrick, that phrase "over-earning" really doesn't sit well with me. What I'd rather say is that we've beaten the target earnings, or hit the target, or something along those lines. Regardless, we're going to stay fully focused on the approved budget envelopes that came to us in the most recent rate filing from the OEB. Our task will be holding the line — keeping ourselves inside those limits. We think that shows sound fiscal prudence. We think we're able to accomplish that while also managing the health of our assets. So there won't be any adverse effects on reliability, public safety or employee safety. And we think that positions us very well when we file our next rate application for JRAP '28, to show that we can be trusted to do what we said we would do, live within our envelopes, and deliver the results we promised.

Henry Taylor

executive
#49

Patrick, the one thing I would add is that storm David mentioned in his remarks—for those who don't reside in Central Ontario, the severity and damage are quite considerable. As a result, we've taken on significant costs. We don't yet have everything compiled and added up, and that is exactly why we're submitting the Z-Factor application, since it satisfies every requirement for it. Still, that represents a substantial overspend, so to speak, compared with what we had budgeted for the year. We're highly confident that we satisfy all the criteria and will secure recovery, but we are not in a situation where our spending is anywhere near our envelopes at this point.

Patrick Kenny

analyst
#50

Understood. All right, so with such significant interest in the sector and solid valuations, how might you consider bringing in some equity capital somewhat sooner than originally anticipated? Clearly, considerable growth remains ahead for us here. Still, I'm curious whether you're contemplating an ATM opportunistically, or other approaches for handling longer-term equity capital requirements?

Henry Taylor

executive
#51

Right now, Patrick, it is tempting. One investor sent me a note saying, hey, think about it, given where the stock is trading. But number one, we're trying to manage dilution, number two, need, and timing well. So it's something we're very conscious of. We don't need the equity now, given our strong credit profile and the room we've got on the borrowing side. And we do want to manage dilution. So we will work through that as we go. But at this point, we don't have any change in our funding plans. We will continue to borrow to fund all the CapEx that is required, keeping a watch on FFO to debt. And then looking at the right time to raise some equity. We do not want to surprise you or our investors. And so we will -- as we develop our strategy, we'll communicate so that we don't bring anything to market that creates any unexpected and unintended consequences.

Operator

operator
#52

Thank you. That brings our question-and-answer portion for today to a close. I'll now hand things back to Wassem Khalil in case he has any closing comments.

Wassem Khalil

executive
#53

Thanks, Shannon. Everyone on the Hydro One management team appreciates all of you spending part of your morning with us at such a hectic time. We're grateful for the interest you've shown and for your ongoing backing. Should anything you wanted to ask go unanswered during this call, don't hesitate to contact us, and we'll make sure you get an answer. Thanks once more, and have a great rest of your day.

Operator

operator
#54

Thank you, everyone, for joining us on this call today. That brings today's session to a close, so you're welcome to hang up now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Hydro One Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Hydro One Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hydro One Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.