Good morning, everyone, and welcome to the Second Quarter 2025 Analyst Teleconference for Hydro One Limited. Right now, all participants are in listen-only mode. Following the speaker's presentation, we'll hold a question-and-answer session. If you'd like to ask a question during that session, just press Star, one, one on your phone. An automated message will then tell you to hand a phrase. Should you wish to withdraw your question, press Star, one, one once more. Please be reminded that this call is being recorded. I'd now like to introduce your host for today's conference, Mr. Wassem Khalil, Director of Investor Relations at Hydro One. Please go ahead.

Wassem Khalil

executive
#2

Good morning, and thanks for being with us on Hydro One's quarterly earnings call. With us today are our President and CEO, David Lebeter, along with our Chief Financial and Regulatory Officer, Harry Taylor. During this call, we'll give you an overview of the quarterly results, and afterward we'll take as many of your questions as time allows. Today's discussion will probably include estimates and other forward-looking information. We'd ask listeners to review the cautionary language in today's earnings release and in our MD&A, both of which we filed this morning, covering the various factors, assumptions, and risks that could cause our actual results to differ, as all of them apply to this call. With that, I'll hand the call over to our President and CEO, David Lebeter.

David Lebeter

executive
#3

Thank you, Wassem. Good morning, and I appreciate everyone joining us for the second quarter 2025 earnings call. This morning, I'll share an update on what we've been doing and what we've accomplished over the quarter. Harry will walk you through the financial results. Before we begin, I want to mention safety. Safety sits at the heart of what we do and will always remain a priority for us. That priority, tied to safety, extends past our everyday work and encompasses contributions to public safety. Not long ago, Hydro One, working alongside the Advanced Coronary Treatment or ACT Foundation and other partners, delivered training to over 25,000 high school students in local area communities around Lindsay in critical CPR and AED lifesaving skills that will help them care for fellow community members. To date, more than 3 million students across the province have received training through ACT's High School CPR and AED program. We take great pride in being part of this achievement and in our partnership with the ACT Foundation. Formed in 2000, the long-standing partnership between ACT and Hydro One has offered ongoing access to CPR, AED, and now OPS-associated emergency training for teachers and students across Ontario. Turning to the quarter, the damage caused by the March 2025 ice storm was severe and widespread, with three days of ice accumulation causing uprooted trees, downed power lines, and more than 2,700 broken poles across the province.

David Lebeter

executive
#4

Hydro One teams, together with 30 community utility partners and contractors, labored safely around the clock through freezing rain, snow, and wind to bring power back to our communities and everyone hit by the storms. The storm-related costs — including those run up by third-party contractors and other local distribution companies that pitched in on restoration — come to roughly $225 million. As we mentioned on our earlier call, because the storm was so severe, we're seeking to recover that cost via a debt factor application to the Ontario Energy Board. That process lets utilities facing a significant, unforeseen event outside their control request cost recovery. We anticipate submitting the application soon. To assist with cleanup and recovery work, Hydro One named 50 recipients, among them Indigenous communities and municipalities, each set to get as much as $10,000 through the Ice Storm 2025 Recovery Grant. These grants form part of our pledge to back recovery efforts and initiatives in local communities that the storm hit hard. Ontario's energy demand keeps rising throughout the province, and it's projected to climb by 70% by 2050. Hydro One is glad to be part of that growth and remains central to meeting the higher demand and advancing the province's electrification objectives.

David Lebeter

executive
#5

Back in early June, the Ontario government in our province put out its first Integrated Energy Plan, or IEP, which is called Energy for Generations. This plan lays out a long-term roadmap through 2050 aimed at energy that is diligent, clean, affordable, secure, and reliable. It brings planning together across electricity, natural gas, hydrogen, and emerging fuels in order to support economic growth, jobs, and energy security, so as to meet the growth in demand and give Ontario affordable, secure, reliable, and clean energy. Under this plan, the government announced that development of transmission infrastructure would be accelerated and that the distribution grid would be modernized, which will give Hydro One additional growth opportunities. The new transmission project included the Barrie to Sudbury Transmission Line, a new single-circuit 500 kV line running between the Essa Transformer Station and the Hanmer Transformer Station. There was also early development work on a second 500 kV line, the Bowmanville to the Greater Toronto Area Transmission Line, a new double-circuit 500 kV line going from Bowmanville Switching Station to an existing 500 kV station in the GTA. The Greenstone Transmission Line, a new 230 kV transmission line between Longlac Transformer Station and Geraldton to Nipigon Transformer Station, connecting to the East-West Tie Transmission Line near Nipigon Bay. The Windsor to Lakeshore Transmission Line, a new 230 kV transmission line from Lauzon Transformer Station in Windsor to Lakeshore Transformer Station in Lakeshore.

David Lebeter

executive
#6

The report additionally mentioned the Orangeville to Barrie Reconductor Project, which entails reconductoring Hydro One's current 230 kV transmission lines running between the Orangeville Transformer Station and the Essa Transformer Station, with both located in Barrie. Pending necessary approval and a 60-day consultation period, the Ministry of Energy and Environment sought to declare these projects priority projects and assign the new transmission lines to Hydro One. Back in March of 2022, the Windsor to Lakeshore Transmission Line had already been designated to Hydro One. Once this project was declared a priority project, though, it shifted out of early development and into delivery so it could satisfy the region's growing demand. Completed and energized at the end of 2024, our Chatham to Lakeshore Transmission Line project stands as a major milestone, since it was the first project finished under the industry-leading 50 to 50 First Nations equity partnership model. We're pleased to share that both First Nations partners have obtained the financing required, which lets them make their equity investments in the transmission line. This marks the first instance of us moving this project forward — it is the first advancement under the 50 to 50 partnership model — and it further opens the door for First Nation investment in the electricity system, delivering generational own-source revenues for Indigenous communities.

David Lebeter

executive
#7

We take pride in these fresh partnerships and in the work we keep doing to further reconciliation. As our remaining First Nations partners finalize their investment and financing decisions, we remain engaged with them and anticipate wrapping up this effort by the close of 2025. Earlier this year we arrived at tentative settlements on two collective agreements with the Power Workers’ Union — the main collective agreement and the customer service and operations agreement — and I am pleased to say that Union members have now ratified both. These agreements take in employees in front-line and customer-facing roles throughout the company’s operations and run from October 1st, 2025 to March 31st, 2028. Talks with the Society of United Professionals are ongoing, with the parties aiming to secure an agreement before existing contracts expire on September 30, 2025. As is customary in steering bargaining, and out of respect for the bargaining process between the scenes, we will not offer any additional comment on that process. In May, we published our 2024 Sustainability Report. That report gives a balanced picture of how we performed on a range of sustainability measures and underscores the progress we are making toward enabling Ontario’s energy transition, which leads to a better and brighter future for everyone.

David Lebeter

executive
#8

The 2024 report shines a light on what we've achieved in terms of long-term progress and key initiatives. That includes cutting operations-driven greenhouse gas emissions — Scope 1 and Scope 2 operations-driven emissions — by roughly 41% against a 2018 baseline year. Since announcing the initiative in July of 2021, we've converted about 44% of our sedans and SUVs to electric vehicles and hybrids. We spent more than $158 million, which works out to 5.5% of our total perishable spend in 2024, on materials and supplies from Indigenous businesses — ahead of our target of 5% by 2026. We invested approximately $3.1 billion of capital in 2024 to expand and renew Ontario's grid, and we created over 60 hectares of pollinator habitat in 2024. These achievements show the alignment that exists between our strategy and sustainability, leading to a better and brighter future for all. Our actions reflect our purpose and commitment, and I am pleased that our actions continue to be recognized. For the 10th year in a row, we are part of Corporate Knights' annual list of 50 Best Corporate Citizens in Canada. This award recognizes those entities that are committed to doing business differently and are committed to sustainability and environmental stewardship. We're also proud to be recognized by the Forbes inaugural ranking of Canada's best employers for company culture.

David Lebeter

executive
#9

This ranking involved over 40,000 workers based in Canada at organizations with a minimum of 500 employees, and it covered various culture-related subjects at those companies, such as fairness, inclusivity, and opportunity. Also, Hydro One earned a spot on Time Magazine and Statista's inaugural Canadian Best Companies list for 2025. That list positions the leading Canadian companies out of more than 2,000 eligible firms, judged on metrics including employee satisfaction, sustainability transparency, and continuous revenue growth across the last three years. Such honors strengthen what motivates us daily and powerfully mirror our values, our promises, and the commitment each of us brings to work every day. Before handing the call over to the area, I'd like to briefly update you on some recent executive changes. I'm delighted to announce that Megan Telford will become Chief Operating Officer and will oversee Safety, Operations, and Customer Experience, Capital Portfolio Delivery, Strategy, Growth, Planning of Hydro One Remote Communities, Inc. Megan came to Hydro One in 2020 and has earlier held leadership positions including responsibility for Health and Safety and Environment, Human Resources, Indigenous Relations, Corporate Affairs, and Customer Care Change. She’s appearance and will take on the role of Executive Vice President, Corporate Affairs.

David Lebeter

executive
#10

Ever since Lisa came to Hydro One in 2024, she has been tasked with forging the trusted partnerships that create value for customers and shareholders. Beyond the mandate she holds now, she is also going to head up the Indigenous Relations, Sustainability, and Energy Policy Consultants at Hydro One. Through these changes we are positioning ourselves for what lies ahead and getting support to reach our strategic objectives, all while fueling economic growth throughout Ontario. So with that, I will pass things to Harry so he can walk us through the financial results. Harry, the floor is yours.

Harry Taylor

executive
#11

Thank you, David. Good morning, everyone, and thanks for being with us today. For the second quarter, we posted basic EPS of $0.54, up against $0.49 in Q2 of 2024. What drove that year-over-year movement were greater revenues, net of purchase power, reflecting the higher 2025 OEB-approved rates, along with increased energy consumption. Those gains were partly offset by greater depreciation, amortization, and asset removal costs stemming from storm restoration work and expansion of our capital assets. We also saw higher interest expense, largely from more long-term debt outstanding, as well as greater income tax expense, mainly on higher pre-tax earnings. Our Q2 revenues, net of purchase power, rose 7% year-over-year. Transmission revenues were up 6.7% year-over-year, chiefly because of the 2025 OEB-approved rate changes, together with contributions from our Chatham to Lakeshore Transmission Line after it went into service in Q4 2024, and contributions as well from Hydro One's investment in the East West Tide Limited Partnership. Turning to distribution, distribution revenues, net of purchase power, grew 7.9% year-over-year, mainly on the 2025 OEB-approved rate changes and greater energy consumption. Revenue also included certain net income neutral items tied to third-party storm recovery costs, for which matching offsets appear in OM&A, keeping them net income neutral.

Harry Taylor

executive
#12

Turning to costs, operating maintenance and administration expenses rose 0.3% for the quarter. Within transmission, costs climbed 14.2%, largely because of corporate support costs tied to reduced capitalized overheads, insurance proceeds coming in below what we received in 2024, and greater asset write-offs. Distribution costs declined 10.4%, primarily from reduced work program spending, vegetation management among them, lower corporate support costs stemming from increased capitalized overheads, and a reduced allowance for debt to account. Depreciation, amortization, and asset removal expenses came in 9.5% above the prior year for the second quarter. That reflected greater asset removal costs driven by storm restoration work as well as increased depreciation from capital asset growth as we keep putting new assets into service. On financing activities, interest expense was up 7.6% year-over-year. The main drivers were a larger long-term debt balance and a higher weighted average interest rate on long-term debt. That said, we remain pleased with the strength of our balance sheet and our creditworthiness. Our current annualized FFO to net debt metrics of 13.6% is still comfortably above the threshold limits rating agencies apply when determining our credit rating.

Harry Taylor

executive
#13

Now on taxes — for the quarter, income tax expense came in at $61 million, versus $57 million during the same quarter a year ago. That rise mostly reflected greater pre-tax earnings, partly offset by larger deductible timing differences relative to last year. Our effective tax rate for this quarter stood at 15.6%, compared with 16.2% a year earlier. This current rate aligns with the 13%-16% effective tax rate we expect across the rest of the JRAF period. Switching to capital expenditures: during the second quarter we put $913 million to work, up 11.6% over 2024. That growth came within the distribution segment, driven by greater spending on storm-related asset replacements as well as investments in Ontario's broadband initiative. The total rise in capital investment was partly offset by fewer wood pole replacements and reduced spending on system capacity reinforcement projects in the distribution segment. Within the transmission segment, capital expenditures declined slightly, mainly because of fewer station refurbishments and less equipment replacement, reduced spending on major development projects, fewer line refurbishments and less wood pole replacement, along with lower spending on spare transformer purchases.

Harry Taylor

executive
#14

Investments tied to the Chatham to Lakeshore Transmission Line during the quarter partly offset those figures. Turning to in-service additions, during the second quarter we put $591 million of assets into service for our customers — a rise of 12.4% versus the prior year. Within transmission, we recorded a 49.3% year-over-year decline, driven mainly by the timing of assets placed in service for station refurbishments and replacements, along with a smaller volume of line refurbishments. Partly offsetting that were investments placed in service for our distribution warehouse. On the distribution side, in-service additions climbed 88.4% from the prior year, reflecting a larger volume of storm-related asset replacements, chiefly tied to the March ice storm and the restoration work that followed. Investments placed in service for the same Aurelia Distribution Warehouse also contributed to the increase, as did investments in the advanced metering infrastructure known as the AMI 2.0 system. Going forward, we still expect earnings per share to grow at a rate of 6% to 8% each year through 2027, with the normalized 2022 EPS of $1.61 serving as the base. Lastly, I'm happy to share that our Board of Directors has declared a dividend of $0.3331 per share, payable to common shareholders of record on September 10th, 2025.

Harry Taylor

executive
#15

Having said that, we'll now open up the phone lines and would be glad to take your questions.

Wassem Khalil

executive
#16

Thanks, David and Harry. At this point we'll begin the session for questions. We've asked the operator to walk everyone through how the Q&A polling works. Please keep your questions to one question plus one follow-up. Should you have more questions, we'd ask you to get back in the queue. If we aren't able to get to your questions today, my team and I are always around to answer follow-ups. Please go ahead, Shannon.

Operator

operator
#17

Thanks. Just a quick reminder that if you'd like to ask a question, hit Star, one, one on your phone and hold on until your name is called. If you want to pull your question, just hit Star, one, one once more. Stay on the line while we put together the Q&A roster. Our first question is from Benjamin Pham at BMO. Your line is open now.

Ben Pham

analyst
#18

Hello, and thanks — good morning to everyone. Perhaps you could bring us up to date. I recall that on the last occasion you mentioned a possible regulatory filing, maybe slipping into next year and into the following JRAF program. Could you give us an update on when that might happen? Are you still planning a single combined submission, and one that spans several years too?

Harry Taylor

executive
#19

Absolutely, Brad. Harry speaking here. We're still working intensely on getting all the analysis and customer engagement ready so we can file our next joint rate application. Our expectation for filing remains unchanged — the fall of 2026 — which gives us enough time for settlement discussions and to complete everything before the new rate period starts on January 1st, 2028.

Ben Pham

analyst
#20

Your report also referenced several ROA transmission projects extending all the way to 2032. From where you sit, it sounds like you're hoping to gain solid visibility so that, once the JRAF is approved, you can roll forward guidance suggesting the rate could come in quite close to what you have now — a multi-year figure through 2032.

Harry Taylor

executive
#21

Every one of those transmission lines is going to sit in its own separate partnership. When we file for rates covering 2028 through 2032, that application will be made for Hydro One Networks Inc. Then, as each transmission line gets ready for energization, it will receive a rate application of its own. Whenever we give updates during our quarterly calls, the guidance we share at the Hydro One Limited level will capture all associated capital expenditures, OM&A expectations, and earnings guidance, pulling those together on a consolidated basis. The rate applications themselves remain separate. We'll refresh our capital guidance and timing after we obtain our Section 92 — that is, once we submit what we call our Section 92 Leave to Construct applications. At that point we'll have enough engineering work and cost estimates in hand. For that base, we already hold a reasonable range for capital expenditures, and that's the moment when we'll revise our tables and refresh our CapEx guidance.

Ben Pham

analyst
#22

Perfect. Thanks, Harry. Just to clarify that point, regarding the last question and what I'm thinking about: are you expecting — you didn't expect at some point that once you get through post-2027, you could see an acceleration of EPS growth. Does that language include the potential ROA transmission projects that you put in the earnings report?

Harry Taylor

executive
#23

Absolutely.

Ben Pham

analyst
#24

All right, understood. Fine, thanks.

Operator

operator
#25

Thanks. We now have a question from Maurice Choy of RBC Capital Markets. Your line is open.

Maurice Choy

analyst
#26

Thank you, Shannon. Morning, everyone. I'd like to briefly address the Ontario Integrated Energy Plan. In your prepared remarks, you laid out several projects within that plan. Considering how successful we've been lately at landing transmission projects, is there any cause to think we wouldn't once more achieve a strong win rate? Along those lines, at what point do you expect those projects to be awarded?

David Lebeter

executive
#27

Yes, Maurice — it's David here, and thanks for raising that. There are a few points to make. A number of those transmission lines I mentioned are going to be awarded to us, though in all likelihood — barring significant pushback while the consultation period runs — no competitive process will apply to them. Under the Integrated Energy Plan, the client does intend to run competitive procurement for transmission lines inside the province. The lines involved will be ones with longer lead times, where timing isn't critical and economic development isn't being held up. Our confidence remains strong that if and when that happens on a transmission line congruent, exactly as we managed 2 years ago, we will come out as the successful proponent and be able to secure those. This is our backyard. Nobody knows the territory better than we do. More than 92% of the transmission assets are already owned and operated by us. We're highly confident of succeeding if and when that takes place.

Maurice Choy

analyst
#28

Do you have any sense of when those awards will need to take place?

David Lebeter

executive
#29

No, I don’t have any information on that. That’s something being discussed between the Independent Electric System Operator and the Ministry of Energy and Mines. As I mentioned, we currently have 13 transmission lines assigned to us, and that includes Chatham to Lakeshore. My conclusion is that once the 60-day consultation period ends, no objections will have come up regarding those three extra lines, and the one in early development will be awarded to us.

Maurice Choy

analyst
#30

Got it. As a quick follow-up, I guess when you consider every one of the transmission lines you've won so far, cost estimates for certain of them haven't been released yet. As Harry mentioned, the Section 92 applications are still to come. With the environment as it is today, are you noticing any greater cost pressure? And if that's the case, do you expect the timing on some projects to be pushed out? Even with those cost pressures, do you think the Ontario government will still want to hold to the existing schedule and ensure that schedule doesn't slip, for the sake of economic growth?

David Lebeter

executive
#31

I mean, my sense is Ontario's provincial government won't be inclined to let those schedules slide. Ontario's economy keeps growing. You know, it still accounts for 40% of Canada's GDP, and 40% of the country's population resides there. These transmission projects are priorities, so they'll hold to the timelines we've laid out. On the first part of your question, cost pressures: yes, some cost pressures have emerged from the pandemic. Tariffs are creating a bit of pressure too, but nothing major and nothing that worries us right now. The procurement group, which sits within Harry Taylor's portfolio, has done a fantastic job of onshoring, boosting our Canadian purchases somewhat, seeking alternatives, standardizing. We're kicking off a lot of initiatives now that we've been developing for quite a while, and those are offsetting the tariff impacts.

Maurice Choy

analyst
#32

Much appreciated, and thanks.

Operator

operator
#33

Thanks. The next person in the queue is Mark Jarvi of CIBC, and your line is live now.

Mark Jarvi

analyst
#34

Thank you. To follow up on the Integrated Energy Plan, it seems pretty clear and obvious how the transmission business stands to gain from what was set out. But what about distribution? Is there anything within that plan or discussion that you believe is, I suppose, shaping the outlook for distribution, through the next phase of JRAF and then on into the 2030s?

David Lebeter

executive
#35

Morning, Mark — David here. How's your day going? From where we sit, the Integrated Energy Plan mattered a great deal. This marks the initial occasion on which the ministry has recognized that investment is needed in the distribution system. It references the distribution system operator. It references integrated planning alongside natural gas. Both of those point squarely at the distribution sector. We expect this will let us proceed with modernizing the distribution grid and acknowledge how vital that grid is for underpinning economic growth. Merely having the transmission system flow and backflow isn't sufficient — what's required are the arteries delivering power out to the businesses, industries, homes, and restaurants that people depend on in their day-to-day existence.

Mark Jarvi

analyst
#36

So David, does that mean, given the way the framework has been set out, that some fresh investment opportunities in distribution now become available? Or does it mostly just affirm what you already believed about where those opportunities lay?

David Lebeter

executive
#37

It certainly points to innovation, and there ought to be some opportunities in that area. We're trying to figure out what those could be. What it mainly does is create a very favorable setup for us when we appear before the Ontario Energy Board with JRAF 28, our upcoming five-year filing. That gives us a strong position to say, "Look, the investments we intend to make line up with the Integrated Energy Plan, line up with the direction the government wants us to move in, and line up with economic growth, backing economic growth in the province." This is a significant document with a broad laser foundation, and it deliberately does not name any new investments, since we are already making our advanced metering infrastructure investment and are already upgrading our distribution automation system. We had already begun moving toward becoming a DSO, and this offers further proof of that ahead of filing our rate application.

Mark Jarvi

analyst
#38

Understood. A quick follow-up for Harry. There have been some remarks regarding when the joint rate application will come next fall. You'll be giving something like a CapEx plan tied to that. I'm also curious whether, at that stage, you would share somewhat more about financing requirements and the timing of equity, as opposed to something you think you could offer between now and then, in the form of just updated views on equity needs. Or do we hold off until the fall of 2026?

Harry Taylor

executive
#39

Mark, unfortunately that won't be until the fall of 2026. After the rate application is filed, we'll be doing quite a bit of communication. Without a doubt, we're seeing CapEx speed up. We'll propose an acceleration in CapEx and assets placed in service, and that will create added funding requirements. It's no secret that during the next rate period, we'll need to issue equity as well as keep issuing debt. We're already considering that and working on it at this moment, but no specifics can be shared right now, and it will come together. We do want to be careful. We don't want to judge the outcome in advance or prejudice the discussion. Our communication has to be as wholesome as possible without creating any challenges for us in the settlement discussions as we proceed. We're going to kind of thread a needle here when it comes to expectations for the 2028 through 2032 period.

Mark Jarvi

analyst
#40

Got it. All right, Harry, thanks — appreciate it.

Operator

operator
#41

Thanks. We’ll take our next question from John Mould at TD Cowen. Your line is open now.

John Mould

analyst
#42

Hello, everyone. Perhaps one additional point regarding the Integrated Energy Plan. You mentioned a particular transmission initiative that had been pinpointed as relevant, pardon me, to Hydro One. It touched on certain elements of competitive transmission procurement, and you referred to the wider distribution implications. I am simply curious whether you noticed any further takeaways or larger strategic implications for the company arising from that plan.

David Lebeter

executive
#43

Morning, John. Appreciate you being on today's call. One thing I neglected to bring up in my earlier answer: the plan does recognize LDC consolidation, since consumers would benefit through lower rates. It would also let grid modernization proceed more quickly. We're monitoring the situation and awaiting a chance to take part in that process and help shape how it might come about. That's the extra item I left out.

John Mould

analyst
#44

All right, understood. Appreciate the context. Three months ago, you raised the difficulty of directing manufacturing capacity for equipment. I’d like to hear how that situation has changed since then. And please also discuss what you’re doing to keep broadening your supplier base.

Harry Taylor

executive
#45

John, I’ll take that one. Our procurement group has been putting in a lot of effort not just with the vendors we already use but also alongside other Canadian utilities, since we’re trying to move—in certain cases—where we source supplies from and lessen our exposure to U.S. dollars, and definitely lessen exposure to U.S. suppliers wherever possible, and credible alternatives do exist. Securing manufacturing slots for long lead time items, especially transformers, has not been a problem for us. We’re quite pleased with the early gains that have come from identifying Canadian sources, particularly for items such as wood poles, which is somewhat of a natural fit, so to speak. Shifting some supply sources there is delivering some genuine benefits. It’s still early days. As David said, we haven’t observed any meaningful cost increases. We’ve been working through inventory and acting proactively. We have no concerns, but the team is pursuing this fairly aggressively together with partner utilities across the country to make sure our supply base is diversified.

John Mould

analyst
#46

All right, that's all from me. Many thanks for answering my questions.

Operator

operator
#47

Thank you. Just a reminder that if you'd like to pose a question right now, you can do so by pressing Star, one, one on your touch-tone phone. We now have our next question from Patrick Kenny at National Bank Financial. Your line is open.

Patrick Kenny

analyst
#48

Thanks. Morning, everyone. I'm just wondering whether we could get a brief update on the Ring of Fire development opportunity in the province. Maybe what kind of milestone we ought to be watching for, whether that's on the policy side or tied to industry activity. And perhaps you could just remind us what the critical minerals opportunity, broadly speaking for the province, might mean for your growth outlook.

David Lebeter

executive
#49

Morning, Pat. I appreciate you waking up early to be with us on today's call. The Ring of Fire is genuinely fascinating. What we've done with the Ring of Fire is sit down with the Indigenous Nations that will be affected by this project as that region gets developed, learn what they need, and work on building a relationship with them. That approach has worked out very well for us. I'm pretty happy with how far we've come there. Sadly, in the past, Ontario's Bill 5 and the federal Bill C5 have introduced a bit of a complication, since some of the nations believe those bills could affect their rights and their capacity to be properly consulted and to have influence and take part in these projects. I'm still confident and optimistic that the federal government and the provincial government, together with the nations, can resolve those difficulties. That's going to take some time, so I'd expect progress to come a little more slowly than maybe some folks would have preferred at the outset. It's an extremely rich mineral region. There are plenty of critical minerals up there. Since I'm not a miner, I won't attempt to describe just how rich and how significant it is.

David Lebeter

executive
#50

Based on everything I’ve read and from my conversations with mining companies that have interest there, that is a world-class mineral resource up there, and everyone wants to get in there. People recognize this has to be done in the right way. It has to be done in partnership with the communities and the people that live in that area. It has to be done in a way that respects the environment. It will be perhaps different than developments we’ve seen in the past. As I said, I remain optimistic we’ll move forward, but there is some work that has to be done to build those bridges as a result of Bill C-5 and Bill 5 in Ontario.

Patrick Kenny

analyst
#51

Got it — that’s useful. When it comes to possible opportunities that could arise outside the province, I’m not certain whether anything has shifted in how you’re viewing bolt-on acquisitions in, say, neighboring jurisdictions that could have a net positive effect on customer affordability for Ontarians, or perhaps bring other strategic advantages to your platform. I’m just wondering whether you could provide an update on the current market dynamics beyond the province.

Harry Taylor

executive
#52

Pat, Harry here. David, I'll kick things off with a few cleanups. If I miss anything or get something wrong — well, the good news is that our domestic opportunities, or Ontario opportunities for want of a better phrase, are pretty significant, and that's where our main focus lies. We're open to other opportunities that would bring us new and diversified avenues of growth, provided it doesn't detract from what we're doing in Ontario. It has to serve Ontarians' interests, which it could — to your point about helping with affordability by spreading cost over bigger bases, etc. With both federal and the First Ministry priority around nation-building projects, we're certainly interested to see what can come from that, where we can add some value and create some value for our shareholders and for our customers, if you will, without detracting from the agenda we have in front of us. As long as it's an adder and we can do it and feel we have the capabilities to add some value, we're certainly open to it, and we'll look at and evaluate the opportunities.

David Lebeter

executive
#53

Pat, to add to what Harry said, the Province of Ontario—our biggest shareholder—backs us in expanding beyond Ontario, as long as we don't harm any of the work underway inside the province, which matters greatly, as Harry just explained. That's fine as long as it lets us bring some extra profit back to the Province of Ontario. Our largest shareholder supports this, and opportunities may well be out there, but nothing we do will jeopardize the strong growth rate we're seeing in Ontario or the duties we've taken on to develop and deliver those priority projects that sustain economic growth in Ontario. Yeah, that's great. I appreciate the clarity. I'll leave it there, guys. Thanks.

Operator

operator
#54

Thanks. The final question is from Robert Hope at Scotiabank. Your line is open now.

Robert Hope

analyst
#55

Good morning, everyone. Congratulations on securing the lease for the new positions. Perhaps we could begin with the longer-term outlook for Ontario transmission and the regulatory framework. In light of your earlier remarks about surpassing most of the transmission assets, even in cases where they are put up for a competitive bid, might we envision a scenario in which greater competition could end up putting pressure on certain returns from those projects over a longer-term basis?

Wassem Khalil

executive
#56

Rob, good morning. If and when the IESO or the province decides to issue something for competition, we are glad to take part. We believe we can stack up favorably and perform strongly. I'm not convinced that a competitive process would lead to reduced returns. Competition is structured so that the lowest cost for customers is achieved, and returns would then be determined by the formula and the metrics underpinning the ROE formula that exists when the application is submitted. For us, I think it comes down to making sure we present our strongest case whenever a competitive process occurs, and that we bring every bit of our expertise and all our capabilities to it, so that we deliver the greatest value to the province and to customers.

Robert Hope

analyst
#57

Thanks for that. Perhaps just a quick follow-up to tidy things up. The MD&A mentions that work programs came in somewhat lower during Q2. What's the outlook for the remainder of the year, particularly considering that summer has gotten off to a very warm start, and also that there may be some pickup in business activity linked to earlier work?

Wassem Khalil

executive
#58

My sense is that storm restoration work on a large scale was the main driver of the Q2 difference, since it pulled us away from normal course. It took the place of some work, but it was concentrated in one area rather than spread across the province. Now that the storm restoration work is finished, we'll get back to more normal levels and proceed from there.

Robert Hope

analyst
#59

I appreciate that.

Operator

operator
#60

Appreciate it. That brings today's question-and-answer portion to a close. Now I'll hand things back to Wassem Khalil in case he has any closing comments.

Wassem Khalil

executive
#61

Thanks, Shannon. Everyone on the Hydro One management team appreciates you spending part of your morning with us. We're grateful for your interest and for the support you keep giving us. Should anything remain unanswered from today's call, don't hesitate to get in touch, and we'll make sure you receive an answer. Thanks once more, and have a good rest of your day.

Operator

operator
#62

Ladies and gentlemen, we appreciate your joining today's conference. That brings today's program to a close, and everyone is free to disconnect now. Have a wonderful day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Hydro One Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Hydro One Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hydro One Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.