HydrogenPro ASA (HYPRO) Earnings Call Transcript & Summary

August 21, 2026

Oslo Bors NO Industrials Machinery earnings 24 min

Earnings Call Speaker Segments

Jarle Dragvik

executive
#1

Good morning. My name is Jarle Dragvik, and I'll be giving you an update covering the highlights, the technology, and the market. Joining me today is our CFO, Martin Holtet, who will take you through the financials. Let me start with a general introduction to HydrogenPro. At its core, HydrogenPro's business involves developing technology, manufacturing, and delivering key components for a green hydrogen plant. Those components are the electrolyzer that splits water — what we refer to as cell stacks — along with the separation skid handling the two gases, hydrogen and oxygen. Since customers want an end-to-end delivery, we have partnered with strategic EPC partners to offer full-scope turnkey solutions. Our technology fits well with renewable energy sources where the energy load varies, like solar and wind. We target markets aimed at decarbonizing selected large-scale industry segments that already use gray hydrogen, or where cutting emissions through electrification is difficult — for example, refinery, fertilizer and ammonia, and steel production. Synthetic fuels are also emerging now as a significant market opportunity, driven by EU regulations on reducing emissions from road and air transportation. I won't go into all the details of the pros and cons among the most common technologies, but I will highlight HydrogenPro's focus on the technology that brings down the total levelized cost of hydrogen, which I'll return to later in my presentation.

Jarle Dragvik

executive
#2

The projects we've installed rank among the biggest green hydrogen projects globally. Not many OEMs can point to comparable references, and that's one of the first questions prospective customers raise. Our partnership strategy is one where partners give us broader reach and a wider offering of projects, along with bankability on large-scale projects. Through these partnerships, we offer full scope with a local presence. What all partners share is their commitment to the energy transition and to hydrogen. They bring a broader delivery scope, provide bankability toward customers, and have strong technical and engineering resources. Now to the quarterly update, which is recognized through four major milestones: 1, technology improvements on optimized stack design and electrode improvements; launch of a strategic review and completed a capital raise in July, although the strategic review process continues; restructuring in China, where we made an OEM agreement with LONGi and are now adapting organization and asset base to a much leaner structure; and pipeline conversion, as earlier announced, there are projects where HydrogenPro is selected as supplier, where the final contract award is now pending on a regulatory approval and a technical review. 2026 has demonstrated a slower market than we expected, and overall, few FIDs have been taken up to now.

Jarle Dragvik

executive
#3

Even with that slowness, is there a pipeline expanding in absolute terms and receiving fresh requests? Projects are maturing, and development keeps moving through the funnel. At the same time, we are seeing delays in expected FIDs, as the customers originally communicated. Even with those delays, we are not seeing many cancellations, particularly among projects in the mature portion of the funnel. We maintain our outlook, as stated earlier, on the basis of a pool of projects now under negotiation of commercial and technical terms, and target FID again provided by the customers across 2026 and 2027, where some face competition from one to three competitors and some are on a pure exclusive basis. Among the near-term projects where we are selected as supplier, we progressed toward finalization during this quarter, but final contracts remain subject to a regulatory approval and certain technical reviews. We remain confident on these projects and ready to execute based on the customer's final go. I will now hand the word to Martin.

Martin Holtet

executive
#4

Thanks, Jarle. Next, I'll take you through the Q2 2026 financials. We're still delivering on the Salzgitter order and are also carrying out some on-site work at the ACES site in Utah, US. During the second quarter, we brought in revenues of 15 million from those two projects, with the bulk coming from Salzgitter. Direct materials were negative at 9 million for the quarter, driven by a reversal of some 12 million that had been recognized in the prior year. Payroll was 25 million in the quarter compared with 30 million in the first quarter, which reflects downsizing, primarily in our Chinese operations. Now let's turn to other operating expenses. The accounted costs rose from 11 million in the first quarter to 15 million in the second quarter. Keep in mind that the first quarter included a reversal of prior-year provisions. In addition, we incurred roughly 2 million kroner tied to the capital raise during the quarter. So the underlying trend is a continued reduction in other operating costs. All told, EBITDA came in at -16 million. After deciding to outsource production to LONGi, we are now in the process of divesting the equipment and machinery in Tianjin.

Martin Holtet

executive
#5

In Q2, the accounting effect is a 32 million impairment, primarily against intangible assets tied to the Tianjin operations. Depreciation came in at roughly 5 million. And we’ve now begun depreciating our Denmark investment in the second quarter as well. So the bottom line, net result, was -51 million. Now, turning to how liquidity moved during the quarter: net cash rose by 3 million, from 56 million at the close of Q1 to 59 million at the close of Q2, helped by positive working capital movements — mainly some customer payments coming in. We also completed a private placement in June. Cash movement broke down like this: EBITDA of -16, net working capital changes of +10, and financing cash flow contributing a positive 14 million, of which the private placement accounted for 15 million, offset by leasing costs of about 1 million. Then in July, we finished a subsequent offering that brought in roughly 6 million NOK on top of that. 3 million went into investments during the quarter, and the manufacturing line is, naturally, now fully operational. Lastly, backlog ended the quarter at 262 million, rising from 252 million the quarter before.

Martin Holtet

executive
#6

Because our model relies on strong partners, our cost structure stays quite lean, and we work to adjust both the company's size and its total expense side to match the activity level in the industry. There is a great deal of highly valuable expertise within our organization, but we have to ensure we demonstrate cost discipline, and we continually review where our costs stand, with any additional steps to be put in place as the market develops. I'll now hand things back to Jarle for an update on technology and market developments.

Jarle Dragvik

executive
#7

In this quarter, as in earlier ones, we've kept advancing our stack design and electrode technology in line with what customers want: electrolyzers that are light, efficient, and cost-effective, pushing costs down on the CapEx side and in operation as well. The stack is lighter, containing less steel, which means substantially reduced stack weight, along with a lighter separation skid too. We're reducing transport and installation costs. All of this fits into our delivery model for a modular system that's easy to install on the ground. Efficiency is optimized through both better electrodes, which I'll return to, and a new design for lye flow, or energy passing through the electrolyzer by producing heat rather than hydrogen, which we call shunt currents, that can cause efficiency loss when present. With both improved electrode efficiency and reduced shunt currents, less cooling is needed, leading to even more energy savings. Although our products already rank among the best on the market, we keep pursuing every percentage point of improvement, since it will set us apart with lower CapEx and better efficiency. This results in more cost-effective project operation and lowers the cost per kilo of hydrogen for customers.

Jarle Dragvik

executive
#8

Moving forward on the stack development path, the next milestone is finishing a pilot electrolyzer rated for 30 bar pressure, and that work is being carried out together with Thermax over in India. As I noted earlier, two factors affect how efficiently energy is used: first, energy that is lost through shunt currents; and second, electrode efficiency, which stems from sophisticated metallurgical expertise. A third factor is degradation — the ordinary wear and tear on the electrodes that will, as the years pass, affect performance. So beyond the initial energy efficiency at beginning of life, testing the electrode over time matters as well. That is why at our R&D center in Aarhus, Denmark, we have built an extensive test facility operating 24/7, running test programs for the coatings we develop in-house. These programs are run to simulate both continuous and dynamic operation so we can verify that degradation is reduced. It has now been running for more than a year and modeled into full-scale operation. The degradation equation matters commercially since it underpins the lifetime and performance guarantees we are able to offer. Electrode efficiency sets the cell voltage and is measured through the stack. The lower that cell voltage is, the better — obviously within the boundaries of physics.

Jarle Dragvik

executive
#9

By continuing to optimize the electrode coating, we're now getting energy use under 4.5 kWh per normal cubic meter. Grasping the physics and materials science behind it helps us create coatings that last longer and degrade less across their lifetime. A figure that shifts customer economics — the actual breakthrough here, though, is that we're now making this, our newest generation, reliably at full scale on our new production line. In June, I visited the Salzgitter plant with colleagues from ANDRITZ to watch our electrolyzer being installed. It's always impressive to see real life, and reassuring to watch a plant move forward. The last stacks currently in production will carry our newest electrode technology, which will show the further improvements, as I just mentioned, in efficiency within a real production setup. The green hydrogen market right now depends on regulatory incentive regimes. These frameworks keep taking shape, with six policies approved by the EU, which target the biggest emission sectors that need to transition to greener solutions and drive demand where green hydrogen is a significant part of the solution. Take one of these sectors, ReFuel aviation, to illustrate how these policies drive demand for green hydrogen: the European ReFuel aviation policy is mandated and in force.

Jarle Dragvik

executive
#10

There's no alternative for airlines other than e-SAF, and producing e-SAF requires hydrogen electrolysis. An e-SAF plant usually calls for 100 to 500 MW of electrolysis capacity, and the fairly modest 1.2% blend in 2030 works out to 3 GW — which is again equivalent to the capacity of 600 electrolyzers from HydrogenPro. To meet these requirements, electrolyzer orders will need to be placed during 2027 and 2028. Airlines could opt out of complying, but doing so would trigger penalties amounting to twice the cost of the green premium. Through the remainder of 2026, we are keeping our focus on three main priorities: converting the pipeline into orders and building backlog; delivering and handing over the reference projects, including electrode development; and, as Martin pointed out, maintaining financial discipline. We stay optimistic and are keeping our outlook unchanged. At this point I'd also like to ask Martin to join me for the Q&A session.

Operator

operator
#11

Thank you. That brings our quarterly update to a close. So with that, we'd like to open things up for questions. First question: where does the strategic review currently stand, and should shareholders expect the outcome to be a financing transaction, a strategic partnership, an asset sale, or perhaps a broader strategic transaction involving the company?

Jarle Dragvik

executive
#12

Regarding the strategic review, we aren’t sharing specifics beyond what’s implied by a review. That process remains underway. We’ve completed one transaction, and further information will be provided in due course. To follow up on that question:

Operator

operator
#13

What does HydrogenPro prefer? Would HydrogenPro rather bring in a strategic industrial investor able to contribute capital as well as commercial and technology capabilities, or would it prefer to rely solely on a conversion or equity financing?

Jarle Dragvik

executive
#14

Go ahead.

Martin Holtet

executive
#15

Oh, I'll jump in first, Jarle. What we've observed, I think, is that in this industry it's really all about sort of building an industry now, and that takes some patience. I think we have seen that things take a bit of time. We believe that sort of combining the funding side with, call it, the strategic or commercial part of it makes sense. Again, it's a combination, right? We want to invite all types of investors, but to take a more long-term view, it could make more sense with, call it, a type of strategic investor, yes.

Operator

operator
#16

Thanks. A further question concerns manufacturing in China. HydrogenPro has left equipment production there and shifted to an OEM arrangement with LONGi. If you're essentially just an intermediary reselling stacks from China that use HydrogenPro's own electrodes, what gross margin do you earn, and does that margin cover the company's cost base?

Martin Holtet

executive
#17

Given our lean setup and strong partners, I believe the OEM agreement we just signed with LONGi accelerates that model further—we intend to hold our cost base as low as possible while still maintaining delivery capabilities. With this change, we also see lower fixed costs and even lower variable costs thanks to the LONGi partnership, compared with building the electrolyzers ourselves at our Tianjin factory. You could describe it as, I'd say, a more commodity-style approach to producing the stacks. What we genuinely contribute is, naturally, our high technology—our electrode technology in Denmark—of which we retain 100% ownership. That's the direction we're taking: call it teaming up with partners who handle much of the work in the field as well as the manufacturing of the stacks, while we concentrate on our high technology with higher margins in Europe.

Jarle Dragvik

executive
#18

I'll keep this brief, but I want to add one point and stress it: even though the steel parts are produced through our partnership, the technology and its development stay with us. That covers the electrolyzer technology, the electrode technology, and the gas separation technology. All of those elements are under our control, and that's where the company's true value lies.

Operator

operator
#19

Thanks. That brings the Q&A part to a close this time — it was a brief one. Thanks to everyone for being with us today, and we appreciate your ongoing interest in HydrogenPro. Should any follow-up questions come up, please don't hesitate to get in touch. We look forward to bringing you another update next quarter. Have a good day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete HydrogenPro ASA transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to HydrogenPro ASA earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in HydrogenPro ASA or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.