i-80 Gold Corp. (IAU) Earnings Call Transcript & Summary

August 13, 2025

Toronto Stock Exchange CA Materials Metals and Mining earnings 35 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, and thanks for being with us on the 2025 Second Quarter Conference Call and Webcast for i-80 Gold. <<operator_script>> Today is Wednesday, August 13, 2025, and this session is being recorded. With us to present are Richard Young, i-80 Gold's President and Chief Executive Officer; Paul Chawrun, Chief Operating Officer; and Ryan Snow, Chief Financial Officer. Before we go further, please be aware that certain remarks made today may include forward-looking statements involving risks and uncertainties. Actual outcomes may differ materially. Everyone is asked to turn to Slide 2 of the presentation, which can be found on i-80 Gold's website, to review the cautionary notes about forward-looking statements made during this call as well as the risk factors tied to those statements. Once today's formal presentation concludes, we will open the line for your questions. I'll now hand things over to Richard.

Richard Young

executive
#2

Alright, thanks, Michael, and good morning to everyone, and we appreciate you being with us today. Let's begin on Slide 3. This second quarter was a decisive one for the company. Back in May, we closed an equity raise, which represented a significant milestone in our recapitalization plan — it strengthened the balance sheet, enhanced liquidity, and put the company in position to move ahead with the development plan we outlined last November. That financing lets us do four things: first, advance technical studies, which include feasibility studies as well as the Class III engineering study for the Lone Tree autoclave processing facility; second, proceed with underground development at our committees; third, kick off infill drill programs; and fourth, carry on permitting work across all 5 gold projects in the portfolio. Additionally, in the second quarter, Paul Chawrun came aboard as our new Chief Operating Officer. Paul brings decades of operating experience along with deep technical knowledge — an ideal match for the technical work that lies ahead. In just over 3 months, Paul has assumed a key role overseeing various work streams, spotting opportunities for improvement, and identifying areas that need extra focus and personnel as we expand. There is a great deal happening on every front. The opportunities across this pipeline of assets offer a clear route to establishing i-80 as a Nevada-focused mid-tier gold producer.

Richard Young

executive
#3

Now if you’ll go with me to Slide 4, that slide shows a distinct three-stage ramp-up in average yearly target output, reaching more than 600,000 ounces of gold by the early 2030s. To reach that level, our priority in the first stage is advancing our high-grade underground projects, beginning with Granite Creek underground and our committees, together with refurbishing the Lone Tree autoclave so it can act as a central processing hub. In that first stage, average annual gold production should rise from under 50,000 ounces a year to a target of 150,000 to 200,000 ounces by 2028. Soon after that, Phase 2 calls for bringing in Cove underground and Granite Creek open pit, and those are expected to lift gold output to between 300,000 and 400,000 ounces of gold by 2030. Phase 3 represents the largest step change, as Mineral Point comes online and pushes production past a target of 600,000 ounces a year by 2032. Mineral Point open pit is a big heap leach project, comparable to several of the large-scale operating mines in Nevada. Delivering organic growth on this scale, on our timeline, is unusual. In our view, this ranks among the strongest organic growth stories in the industry, and it is located in Nevada.

Richard Young

executive
#4

I'll now hand things over to Paul.

Paul Chawrun

executive
#5

Thank you, Richard, and greetings everyone. Now moving to Slide 5. Over my initial 3 months at i-80, I've been able to assess both our operations and our development projects. We're figuring out their technical standing, what extra work is needed, and spotting chances to optimize how we execute, scale up staffing, and possibly speed up timelines. A few early observations really stand out. Our geological grasp of the assets is solid, backed by high-grade resources that carry meaningful upside for growth. The technical work needed to support this is comparatively low risk, which puts us in a good position to move our projects forward confidently. We hold a substantial resource base: 6.5 million ounces of measured and indicated gold resources plus 7.5 million ounces of inferred resources, the result of extensive drilling over prior years, along with roughly 100 million ounces of silver in each of the 2 categories. The 2025 drill program is coming along nicely, centered on infill drilling to push technical studies ahead. Beyond that, we can draw on a deep bench of seasoned operating and technical mining talent. Our people bring decades of technical and operating experience from other major mining operations in Nevada. Lately, we've brought on more staff in Reno and at the operations to deliver on our growth plan.

Paul Chawrun

executive
#6

Following that, we have environmental, health and safety systems and controls that lead the industry. And finally, i-80 enjoys a well-established footprint in the local community along with trusted ties to regulatory agencies, which fosters pride and dedication among our workforce. Turning to Slide 6, we look at Granite Creek underground. Mining volumes in the second quarter came in above the same period a year earlier. We mined roughly 24,000 tons of oxide mineralized material grading 11.4 grams per tonne of gold, along with about 11,200 tons of sulfide material at a gold grade of 7.4 grams per ton, plus another 16,000 tons of incremental low-grade oxide material grading 3 grams per ton of gold. During the quarter, slightly fewer than 6,000 ounces of gold were sold, and roughly 1/4 of those ounces came from leaching and sales at the Lone Tree heap leach facility. About 28,000 tons, or 7,000 ounces, of sulfide mineralized material went into stockpiles for processing at a third-party facility. At Granite Creek underground, we are seeing oxide mineralized material at levels above what we expected relative to our March 2025 PEA. On the dewatering program, the team has moved to a longer-term approach that is more proactive and keeps upgrading the infrastructure. Those upgrades include the planned addition of 2 more surface dewatering wells — one more than originally planned at the start of the year, based on the new predictive groundwater model.

Paul Chawrun

executive
#7

This covers enlarging the water treatment plant as well as improvements to the underground water management systems already in place. For the foreseeable future, we anticipate groundwater inflows will stay at or close to present ingress rates. That said, through the installation of these mitigation steps, we don't expect water inflows to hold back our long-term development planning. Once proper dewatering infrastructure is installed, with ongoing drilling and additional technical work across the next 6 to 12 months, Granite Creek could become an excellent asset for us. At Lone Tree and Ruby Hill, we keep on recovering gold from the leach pads that already exist, with roughly 2,400 gold ounces recovered and sold during the second quarter. Across the company, we anticipate extracting 30,000 to 40,000 ounces of gold in 2025, consistent with guidance. That figure includes 20,000 to 30,000 ounces of gold from Granite Creek plus approximately 10,000 ounces from the heap leach pads. At Granite Creek underground, we finished the underground exploration drift, which gives access for infill drilling in the prospective South Pacific zone. Right now we have 2 rigs underground in total and 3 at surface, with more than 40 holes planned totaling roughly 46,000 feet. The program is intended to upgrade the mineral resource and serve as the foundation for the upcoming feasibility study, which is planned for completion in the first quarter of 2026.

Paul Chawrun

executive
#8

Moving on to Slide 7, where we'll give you an update on the second of our planned underground mines. At Archimedes, permitting for the upper level is almost finished — that covers mining above the 5,100 foot level — and meanwhile our attention is on geochemistry and technical studies that will underpin the permits required for the lower levels. Surface infrastructure supporting the portal is now done, and we expect to begin developing the underground exploration drift within the next several weeks. Infill drilling at the Upper Zone should get underway in the fourth quarter, with the lower zone at Ruby Deeps following in the first quarter of 2026. All told, the program will involve more than 175 holes and 197,000 feet, and those results will feed a feasibility study we're targeting for the first quarter of 2027. Our committees are making good progress, so let's move to Slide 8 for the status at Cove. At Cove, we're actively pushing major permit applications forward in anticipation of an EIS, which we plan to have completed by the end of 2027. After a 145,000 foot infill drilling campaign wrapped up in the first quarter, we now intend to deliver an updated mineral resource estimate this quarter, with a feasibility study targeted for the first quarter of 2026 to follow.

Paul Chawrun

executive
#9

I should note that the current mineral resource estimate for Cove doesn't yet take into account drilling done over the past few years. The results we've seen so far have been encouraging and align with traditional Nevada Carlin-style mineralized systems, which typically show high conversion rates from resources to reserves. Now let's turn to Slide 9 and take a look at our Lone Tree processing facility. We expect the study on refurbishing Lone Tree's plant and autoclave to come out in Q4. That refurbishment is very achievable given the small number of construction hours, minimal long-lead equipment, and the strong local contractors we have available in Northern Nevada. On top of that, Hatch — an industry leader in autoclave plant technology — is carrying out the engineering. We're also in the process of recruiting the owner's team to oversee engineering and execution, and we're reviewing the schedule for early works opportunities so we can accelerate the time line. Commissioning the Lone Tree plant gives us processing capacity for refractory material fed directly from our operations. It lifts the payability on refractory material from a range of 55% to 60% up to roughly 92% recovery, which works out to a range of approximately an additional $1,000 per ounce compared with toll milling, depending on the grades processed and the price of gold. That's why Lone Tree is a cornerstone of our plan and is being prioritized.

Paul Chawrun

executive
#10

Turning now to Slide 10. Work at the Mineral Point open pit got underway in June, when 2 surface core rigs drilled roughly 5,800 feet, gathering baseline technical data that will back initial permitting along with the following stage of technical studies. Strategic reviews are presently in progress covering the technical work finished so far, aimed at establishing when a pre-feasibility or feasibility level study would take place. At this point I'll hand things to Ryan for the financial review.

Ryan Snow

executive
#11

Thank you, Paul, and good morning to all of you. I'll begin my review on Slide 11. For the quarter, gold sales came to roughly 8,400 ounces, an increase compared with the prior year period. Revenue from gold sales rose to about $28 million in the quarter, reflecting both higher ounces sold and a higher average realized gold price of $3,301 per ounce. We finished the quarter with a net loss of $0.05 per share, largely because our operations are still in the ramp-up and development stage. At the close of the second quarter, our cash position stood at approximately $134 million, a significant increase over the previous quarter, thanks to net proceeds from the bought deal public offering and private placement, partly offset by settling the gold and silver deliveries under the prepaid instruments for approximately $42 million. Turning to Slide 12. We remain focused on executing our recapitalization strategy, which centers on strengthening the balance sheet and funding our development plan. In May, we raised gross proceeds of $186 million through the bought deal offering and private placement, aligning our balance sheet with the scale of asset development ahead. If fully exercised, the warrants tied to this offering could bring the company up to approximately $130 million in additional proceeds.

Ryan Snow

executive
#12

Looking at 2025, our target remains $40 million to $50 million of growth spending, spread across 3 priorities: permitting, feasibility studies, and developing Archimedes underground. Between now and mid-2026, we anticipate allocating a bit more than $90 million to fund our 12 to 15-month growth plans covering all 5 gold projects plus the Lone Tree processing facility. By then, we expect to have secured a new senior debt facility somewhere in the $350 million to $400 million range, which would let us advance our development plans past 2026. We're also still working on selling our noncore FAD project and on a possible royalty sale involving Mineral Point. I'm happy to say that the conversations we've been having with debt providers so far have been encouraging. With that, I'll hand the call back to Richard.

Richard Young

executive
#13

Thanks, Ryan. Moving on to Slide 13, where we lay out a number of important catalysts ahead. When it comes to project development, we expect to reach steady-state production at our first mine, start construction at our second planned mine, finish the feasibility study for the Lone Tree refurbishment, and push forward infill drill programs that will back 5 upcoming feasibility studies. All of this will happen alongside our continued work on the recapitalization plan. Broadly speaking, we believe the coming 12 to 18 months will be transformational for this company. In my view, it will be a game changer for our shareholders. With that, Michael, let's go ahead and open the line for questions.

Operator

operator
#14

Thanks, operator. Our first question comes from Justin Chan at SCP.

Justin Chan

analyst
#15

Congrats on the progress. There's definitely been some notable progress at Granite Creek, and I'm curious about the rest of the year — are you expecting tons and grades to keep trending upward? That's my first question. Second, I noticed you started production — or processing — of some sulfide ore. Can I ask whether that schedule is up to you, or does it kind of depend on the timing of your full processor? And what guidance, if any, can you give us for the second half on that?

Paul Chawrun

executive
#16

Thanks. I'll begin with production at Granite Creek. The water has not impacted our ore tons. What it's really about is development for 2026 and beyond. We're getting ahead of the water issues. It still takes us a bit of time to get going on that. And then at that point, we'll accelerate the underground waste development and then get back on track to increasing the ore tons. But nothing is affecting that in the shorter term through to the rest of the year. I hope that answers your question, because then I'm going to hand it over to Ryan to answer the sulfide question.

Justin Chan

analyst
#17

Okay, since you're on the line, let me ask about that. When do you think you'll reach the dewatering position you're aiming for, and then move on to development?

Paul Chawrun

executive
#18

Yes. The key is staying ahead of the issue. So at this point we can handle the water. We're improving at building longer-term infrastructure so we can deal with contact water. But meaningful progress will come only after the dewatering wells are installed and the water treatment facility is in place. That lands closer to the end of the year. Still, we keep making improvements and are getting a firmer grip on handling it in day-to-day operations.

Justin Chan

analyst
#19

Understood. And actually, before you pass it along, I was just wondering — sorry to jump in on this — you brought up additional oxides again. Do those oxides show up in the same places where you've modeled the sulfides, or are they entirely additive to the model? Could you share a little detail on what you're observing?

Paul Chawrun

executive
#20

Yeah. So the thing is, the model itself didn’t account for as much as it could have on the fault structures. And so when we’re intercepting those — and that’s where a lot of the mineralization occurs — we get more oxide than what was originally modeled. And that’s all it is. But we’re getting the grades. And in fact, the oxide ore is beneficial.

Richard Young

executive
#21

Okay, Justin — and before we hand things over to Ryan: our guidance for the year came out before the predictive model had been finalized. So now that the predictive water model is finalized, as Paul mentioned, a second dewatering well is needed that wasn't originally planned in the budget, and we're also moving forward a much larger water treatment plant so we can properly handle the water. So I think — Paul, correct me if I'm wrong — once that infrastructure and the underground infrastructure are in place, water won't be an issue.

Paul Chawrun

executive
#22

That won't pose a problem. And it wouldn't have been—it would simply have been known in advance. Resolving the long-term matter will require roughly 6 to 12 months for us to have this infrastructure in place. Over the nearer term, though, we have—we're building new infrastructure to handle the contact water that we're currently observing underground.

Richard Young

executive
#23

Absolutely, Justin. Regarding your question about the oxides, we've consistently exceeded the model ever since we began mining. And we're hopeful that, as we now transition into the South Pacific zone, we'll encounter improved grades and greater latitude and longitude when it comes to the width of the ore body, which ought to help with the mining. At this point I'll hand things over to Ryan to address the toll milling question.

Ryan Snow

executive
#24

Justin, regarding the sulfide processing agreement, under the new terms our partner gets as many as 120 days from receipt of the material to process it. Turnaround times we've seen so far have been quicker than that, and we're planning on roughly 90 days between the material arriving at their facility and its being processed.

Justin Chan

analyst
#25

Understood. And since they already have material with them now, I suppose, just for modeling each quarter going forward, do you expect fairly steady volume at this point for sulfide, or how should we think about the process for Q3 and Q4?

Ryan Snow

executive
#26

We do. My expectation is that Q3 will come in slightly above Q4, since we'll be working through part of the stockpile built up while we were negotiating this new agreement, but continuous sulfide processing is what we'll see going forward.

Richard Young

executive
#27

Justin, perhaps just one final question, since I realize your attention is on the modeling. At the beginning we had given guidance of 58% payability, and that is genuinely the level this toll milling agreement was built around. In practice, though, what you will observe going forward is that we will achieve recoveries by means of the autoclave of approximately 92%, and then a cost structure that is higher, bringing us back to that 55% to 60% net payability, depending on the grade of the material we send across.

Operator

operator
#28

Don DeMarco from National Bank has our next question.

Don DeMarco

analyst
#29

To start, congratulations on working down your liabilities and on the substantial quarter-over-quarter revenue growth. My first question: I noticed you referenced a target of 30,000 to 40,000 ounces for 2025, mostly from Granite Creek. Could you give more detail on what that means for Q3 and Q4, and do you anticipate revenue continuing to climb in those quarters? And could this output eventually become a meaningful source of additional liquidity?

Richard Young

executive
#30

Right. So, since we don't have reserves in the U.S. under U.S. GAAP, we can't call it production. But we're talking about 30,000 to 40,000 ounces of production for the year. And we're certainly proceeding well. We're on plan. So certainly, we would expect total production for the year between 30,000 and 40,000 ounces. And keep in mind that we don't — anything that is an inventory as part of the toll milling, we don't include this production for the year. But we feel confident that we're well on track to meeting that 30,000 to 40,000 ounces of gold sales and revenue for the year, if that's helpful.

Don DeMarco

analyst
#31

It looks like that would result in a year weighted somewhat more heavily toward the back half. When I add up Q1 and Q2 production, I get roughly 15,000 ounces or so. So is that — am I understanding that correctly, that we should expect a step change in production?

Richard Young

executive
#32

There's a slight impact on margin there, and as Ryan said, we're holding 7,000 ounces in inventory — sulfide inventory plus some oxide inventory — that will be processed during Q3. That's the reason Ryan described Q3 as somewhat lumpier than Q4.

Don DeMarco

analyst
#33

Alright, great, thanks. So for my second question, I’m seeing that you’re targeting completion of the recapitalization by mid-2026. And Ryan, I believe I heard you reference a facility in the range of $350 million to $400 million. Taking the entire recapitalization together — whether that includes the facility or other alternatives — would it potentially deliver sufficient liquidity to handle the current liabilities as well as EG, such as fully funding the autoclave refurbishment?

Ryan Snow

executive
#34

Yes. What we intend is that using the equity we brought in earlier this year along with this potential debt facility worth $350 million to $400 million, we would be in a strong position both to push forward the balance sheet recapitalization and to retire the liabilities that exist today, as well as to move our development plan ahead. We are likewise examining other places to get cash or liquidity, by way of the noncore FAD asset sale and a potential royalty on Mineral point. All of these we are moving forward at the same time.

Richard Young

executive
#35

On top of that, we hold a certain amount of restricted cash plus other warrants, and those could potentially bring in an additional $100 million. So, Don, our aim is to raise more than we strictly need. Look, executing the plan through the end of the decade has been costing us roughly $800 million, and what we're seeking is $900 million to $950 million, which ensures we're strongly positioned to push forward and speed up certain activities and thereby deliver the greatest value to shareholders across the remainder of the decade.

Don DeMarco

analyst
#36

All right, and as a last question, you brought up selling off the noncore FAD property as one option, and Mineral Point has come up as well now. In the event of a disposition, what do you figure each of those assets could bring in?

Ryan Snow

executive
#37

Yeah, so for the noncore Fed asset sale, we’re thinking in the range of $50 million to $100 million. As for the possible royalty tied to Mineral Point, that might come to roughly $100 million as well, which would help us reach the figures Richard brought up.

Operator

operator
#38

<<operator_script>> Harrison Reynolds from RBC Capital Markets has our next question.

Harrison Reynolds

analyst
#39

It's really encouraging to see the continued progress. I just have a couple of questions. First, since the autoclave refurbishment is nearly finished, can you share any revised bookends for what that refurbishment might cost in CapEx?

Paul Chawrun

executive
#40

Yes. We're looking at somewhere between $350 million and $400 million, and that covers everything. Final figures should be ready in roughly a couple of months, and we've actually begun work on a few of the early-stage items.

Harrison Reynolds

analyst
#41

Okay, that's good to know. And when you mention possibly speeding up that schedule — do you mean deploying that money? Or are you referring to the engineering effort progressing more smoothly than anticipated? What exactly would drive a faster schedule?

Paul Chawrun

executive
#42

Yes. So, this is kind of like what we've done on other big projects. What we're contemplating, though, is giving Hatch a limited notice to proceed, which would let them start putting a team together for basic engineering, plus handle some of the basic engineering on the procurement side. On top of that, there's engineering work needed for what we simply refer to as normal course permits, since certain air quality standards have shifted. So those have to be completed well in advance. After that, we're examining construction approaches in which we'd handle a portion of the demolition work ourselves and collaborate with Hatch on it. Taken together, all of that can shorten the overall schedule. And none of it requires much capital.

Richard Young

executive
#43

Harrison, in the development plan I believe we discussed commissioning getting underway on January 1, '28. With Paul joining the team, the aim is to speed things up and see whether we can finish that commissioning during '27.

Harrison Reynolds

analyst
#44

Excellent. No, that is fantastic news. Wonderful to see. And perhaps just one final item from me. Changing topics back to Granite Creek, could you speak about — I realize it is early days for the underground drilling at the South Pacific zone, but do those initial results confirm roughly what you had anticipated? Or are there any fresh interpretations or new learnings emerging from that portion of the deposit?

Paul Chawrun

executive
#45

On visual controls, I can address that from the core side. We are still at a very early stage in getting assay results back, although the results are highly consistent, and this is infill drilling. So we feel comfortable. And we hope — I won't make a commitment on this — but we do hope to have certain very preliminary results for Beaver Creek in early September.

Operator

operator
#46

The next person to ask something is Justin Chan at SCP.

Justin Chan

analyst
#47

Perhaps just one about the timelines and the recapitalization. So is it fair to describe it this way: finishing those studies in Q4 effectively provides you with solid, bankable studies to use as part of the recap, and that is the reason Cove has been moved forward? Or might there be some other reason, and perhaps I am reading too much into it?

Richard Young

executive
#48

Justin, thanks for that question. So if you go the traditional bank financing route, those feasibility studies need to be completed. The aim, then, is to have 3 of the 5 feasibility studies finished by Q2 of next year, and also to have substantial work wrapped up at our committees that backs a borrowing. At the same time, though, the team is chasing a range of recapitalization opportunities. Justin, for those familiar with the group at Teranga, we've never been blessed with a lot of cash sitting on the balance sheet. So alongside Ryan, we have Dave Savory in Catarina, our GC, plus our VP Finance and Lilly strategy, who together have probably done roughly 12 different deals, though not all of them got completed in the past. But we are actively going after different sources of capital. The debt markets are extremely liquid right now, and there are various sources out there. There are various capital providers. Some infrastructure groups might be available for the autoclave. So while our target is to get that work done by the end of the second quarter next year, since that's when the Orion facility matures, we are actively examining different options today, and we'll keep doing that through the balance of the year and into the next year to find the best recapitalization for the company as we move forward with the most flexibility that lets us execute on the plan.

Operator

operator
#49

That seems to be the final question we have. At this point, I'll hand the conference back to Richard Young in case he has any further comments.

Richard Young

executive
#50

Thanks, Michael. There are a few things to cover. First, Beaver Creek: we're planning for our VPX to present there on the exploration that's underway. We expect to announce the updated resource at Cove. We think that will be very positive, and also, if we have some of the assay results, we can talk about what's happening at Granite Creek and discuss the plans for our committees as well as Mineral Point. So that's Beaver Creek, and then for the Denver Gold Show, Paul will take the lead and give a further update on the development plan as it progresses. So turning to our final slide: looking ahead, we are building a gold company with real scale, robust project economics, and the capability to deliver sustainable growth and long-term value for shareholders. So thank you for your continued support and for joining us on the call today. Michael, that should wrap it up. Thank you.

Operator

operator
#51

Ladies and gentlemen, that brings us to the end of today's conference call. We appreciate everyone for joining in. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete i-80 Gold Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to i-80 Gold Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in i-80 Gold Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.