Indian Oil Corporation Limited (IOC) Earnings Call Transcript & Summary

February 2, 2021

National Stock Exchange of India IN Energy Oil, Gas and Consumable Fuels earnings 56 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning, everyone, and welcome to Indian Oil Corporation Limited's 3Q FY 2021 conference call, arranged by Batlivala & Karani Securities India Private Limited. Right now every participant is in listen-only mode. Afterward, we'll hold a question and answer session. When that begins, if you'd like to ask something, just press star and one. I'll now hand the conference over to Mr. Harshraj Aggarwal. Thanks, and the floor is yours, sir.

Harshraj Aggarwal

analyst
#2

Good morning, everyone. I’m speaking on behalf of Batlivala & Karani Securities, and I’d like to welcome all of you to this conference call with Indian Oil Corporation’s management following the results. It’s a real pleasure for us to host the management once again for this discussion after the results. At this point I’ll turn the call over to the management for their opening remarks, and after that we will open the floor for questions and answers. Over to you, sir.

Avinash Singhal

executive
#3

Thank you, Mr. Harshraj. We’re glad to have you join this post-results conference call. On the management side, we have Mr. Sandeep Kumar Gupta, Director of Finance at Indian Oil, and Mr. Matthew Thomas, Executive Director of Corporate Finance and Treasury. Joining them are Mr. Rohit Kumar Agrawal, General Manager of Corporate Finance, Mr. Prabhat Himmatsingka, DGM Treasury, and myself, Avinash, Chief Manager of Treasury. To start things off, the Director of Finance will give a brief overview of the quarterly performance highlights, and after that he’ll take your questions. Now I’ll ask the Director of Finance, Indian Oil, to address the meeting.

Sandeep Kumar Gupta

executive
#4

Good morning, everyone. I'd like to take this chance to welcome all of you to this conference call following the announcement of our Q3 results. To start, I'll go over a few highlights to give you added clarity and insight. As all of you know, during the two preceding quarters, demand for petroleum products saw volatility from month to month driven by intermittent lockdowns. In Q3, demand for petroleum products rebounded in a sustained way. Refineries operated at full capacity, and capacity utilization came in close to 102% in the third quarter. Turning to demand for a few of the major products, the preference for personal mobility has pushed up consumption of gasoline — that is, motor spirit or petrol. In October 2020, gasoline demand reached roughly 103% of last year's volume. It climbed further to approximately 108% of last year's volume in December. On the gas oil, or diesel, side, sales in October 2020 came in at about 103% of last year's sales. Even so, we saw some softening in gasoline demand, to roughly 91% and 95% in November and December 2020, respectively. ATF remains the hardest hit, with sales of only 53% in October 2020 compared with last year's volume.

Sandeep Kumar Gupta

executive
#5

Even so, in December 2020 it had recovered to roughly 61% of the volume seen a year earlier. Now, turning to a few of the new business initiatives in petroleum retailing. Indian Oil launched XP100 in December 2020 — India's highest octane gasoline, which delivers improved engine power and efficiency for high-end cars while cutting greenhouse gas and tail pipe emissions. I'm pleased to report that XP100 is now being produced at all our refineries and can be bought in 26 cities across India. We intend to keep widening that network. Also, in December 2020, the 5 kg free trade LPG cylinder, FTL, was brought back under a new brand name, Chhotu. Buyers may purchase Chhotu cylinders straight from distributors or from any appointed point of sales such as Kirana stores, local supermarkets, retail outlets, and so on. A couple of days ago you may also have seen in the newspaper that we are now launching aviation gas as well, which flying clubs use and which until now was imported — but going forward we will make it at our own refineries. Management's focus is now on differentiating products, whether through new offerings or existing ones built to higher specifications. Over the calendar year 2020, IOC added 296 km to its pipeline network: specifically 102 km on the Siwan-Baitalpur section of the Patna-Motihari-Baitalpur pipeline, plus the 193 km Durgapur-Banka section of the augmentation of the Paradip-Haldia-Durgapur LPG pipeline project.

Sandeep Kumar Gupta

executive
#6

So with that, Indian Oil's pipeline network now totals 14,864 km. Even with the lockdown, we managed 1,435 km of pipeline lowering over calendar year 2020. On the numbers, the crude Indian basket averaged $44.65 per barrel for the quarter. That's up 4% versus the average in the quarter right before it, Q2 FY 2021. Crack spreads for gasoline and gas oil stayed weak, and that's what drove refining margins lower. As you can see, even the Singapore GRM came in at $1.22 per barrel in the third quarter. That said, lately MS cracks have reached $3 per barrel and HSD cracks are approaching $4.5 per barrel, which really points to a solid recovery ahead. Over in petrochemicals, spreads improved during the quarter. Polymer spreads this quarter, at roughly $651 per ton, came in 20% above the prior quarter's $541 per ton, and about 54% above the same quarter of FY 2020, when they were $423 per ton. For PTA, the quarterly spread of $146 per ton was roughly 25% above the previous quarter.

Sandeep Kumar Gupta

executive
#7

That figure was 21% below the same quarter in FY 2020. Turning to MEG, the spread this quarter rose roughly 33% versus the prior quarter and 69% versus the matching quarter of FY 2020. In this quarter, IOC recorded a profit after tax of INR 4,917 crore. We are in a stretch where refining margins sit at unprecedented low levels. Stronger marketing margins on petroleum and petrochemicals alike have helped cushion the impact of the weak refining margin environment. An additional inventory gain of INR 2,630 crore also contributed to lifting profitability this quarter. Looking at nine months, profit after tax stands at INR 13,055 crore, compared with INR 6,499 crore in the same nine months of FY 2020. Larger inventory gains across the nine months, together with higher petchem volumes and improved margins, have driven the rise in profits during the first nine months of this fiscal. Revenue from operations this quarter is INR 1,46,599 crore, versus INR 1,15,749 crore in the preceding quarter of this year. Let me now briefly cover how the major verticals performed in Q3. Starting with refineries: throughput for the quarter was 17.86 million metric ton, with capacity utilization at 101.7%.

Sandeep Kumar Gupta

executive
#8

A sustained rebound in petroleum product demand during the third quarter helped our refineries reach full capacity utilization. In Q3, distillate yield came in at 79.5%, while fuel and loss stood at 9.1%. IOCL refineries posted a GRM of $2.19 per barrel in the current quarter. After stripping out inventory impacts and factoring in the price lag for the quarter, the normalized GRM is $1.24 per barrel. Our refineries performed in line with the Singapore benchmark margin, which was $1.22 per barrel. Turning to pipelines, capacity utilization across our pipeline network was about 92.2% this quarter, versus 73.4% in Q2 of FY 2021. Economic activity resuming after COVID lockdowns were lifted drove higher fuel demand and, as a result, better pipeline capacity utilization. Our pipelines keep delivering a stable return, with EBITDA of about INR 1,699 crore this quarter, higher than the preceding quarter thanks to greater throughput. On the marketing side, petroleum product sales this quarter were 21.23 million metric ton, compared with 17.22 million metric ton in the preceding quarter. As we mentioned at the start of the call, with economic activity nearly back to normal, gasoline and gas oil demand has picked up.

Sandeep Kumar Gupta

executive
#9

If we look at the nine-month period, petroleum product sales in FY 2021 came in roughly 15% lower — but that's only when measured against the same nine months of FY 2020. For this quarter, marketing EBITDA was INR 7,130 crore. That figure includes an inventory gain of roughly INR 1,700 crore. Now turning to petrochemicals: during the quarter, that business posted EBITDA of INR 1,954 crore, compared with INR 1,211 crore in the quarter before. In the same way, if you set the current nine-month performance next to the equivalent period a year earlier, EBITDA rose by around 77%. Petchem profitability is improving thanks to a mix of higher production volumes and better margins. On borrowings: as of 31st of December 2020, the level stood at INR 72,451 crore, versus INR 91,505 crore on 30th of September 2020 and INR 116,545 crore on 31st of March 2020. Those numbers include a lease obligation of INR 7,760 crore as of 31st of December 2020, which is classified as borrowing. The drop in borrowings over the quarter was driven in part by a decrease in government dues for LPG and kerosene. Government receivables outstanding at the start of the third quarter were about INR 9,100 crore, and by the end of the quarter they had fallen to INR 4,300 crore.

Sandeep Kumar Gupta

executive
#10

We feel confident that the remaining balance receivable will be settled, maybe by the close of this year, given that enough budget is available. The rest of the decrease comes mainly from a lower working capital requirement. That concludes my briefing, and we'll now take your questions. Thank you very much.

Operator

operator
#11

Absolutely, sir. Ladies and gentlemen, the question and answer session is starting now. Should you have a question, kindly press star and one on your phone, then wait until I guide you for your turn to ask. In case your question gets answered before your turn arrives and you'd like to withdraw it, just press star and one once more. In addition, we ask participants to limit themselves to two questions at a time. Our first question comes from Mr. Pinakin Parekh of JPMorgan. Please go ahead.

Pinakin Parekh

analyst
#12

Thanks a lot, sir. Sir, my first question concerns making sense of the petchem business. Yes, those spreads were quite high for naphtha crackers, but we've also witnessed a sharp rise in volumes across several petchem facilities. Could you give us a sense of how petchem volumes ought to pick up over the coming few quarters, and which product categories that would involve? My second question is about the new refinery that the board has-

Sandeep Kumar Gupta

executive
#13

My apologies for cutting in, Pinakin. The audio isn't coming through clearly at all, so could you please repeat the first question as well?

Pinakin Parekh

analyst
#14

Certainly, sir. Sir, my first question is this: looking at the petrochemicals segment, there has been a pronounced upturn in both volumes and margins. Margins came in quite strong for the naphtha crackers. Sir, I was hoping to get a clearer read on the volume outlook, particularly since IOCL has several petrochemical facilities currently being built. How should petchem volumes progress through the coming quarters, and in which product categories will that show up? Second, sir, I'd like more clarity regarding the new refinery the board has approved. When would the CapEx begin? Will it be solely a refinery, or could petchem eventually be part of it? Would the company consider bringing in partners from the Middle East into the refinery?

Sandeep Kumar Gupta

executive
#15

First question. Right now our petrochemical facilities are mostly unchanged, with the one exception that the polypropylene plant at Paradip is operating at only about 50% to 55% of capacity. What we're doing is recovering the volumes we had last year, and healthy cracker spreads on polymers are helping with that as well. Looking forward, since our PP at Paradip is underutilized owing to a feed shortage, we're also looking at importing propylene so that capacity utilization at that facility can be raised. For the most part, the product slate is unchanged. Our new projects at the various refineries, whether Barauni or Gujarat, still need some time before commissioning. Broadly, these facilities will carry on as they are. The one change is that MEG at Paradip will most likely arrive in October 2021. It gets added in the 2021/2022 year, and its capacity is 357 KTA. On your question about the new refinery: that one is a 9 million metric ton refinery, and we have roughly 5.5% petrochemical integration there. The polypropylene facility is coming up in phases at present. We also intend to raise the petrochemical integration at that refinery, perhaps in a second phase, though that will definitely entail more CapEx. We are looking to increase the petrochemical integration at that refinery in future.

Sandeep Kumar Gupta

executive
#16

Is that a full answer to what you asked?

Pinakin Parekh

analyst
#17

Absolutely, sir. Thank you so much, sir.

Operator

operator
#18

Thanks. Our following question comes from Sabri with Emkay Global. Please proceed.

Sabri Hazarika

analyst
#19

Morning, and nice work on those results. Three things from me. First, on your petrochemical segment: you posted roughly INR 2,000 crore of EBITDA in Q3. Spreads have recovered somewhat, yet petrochemical deltas still look like they're around the middle of the cycle. Is it reasonable to think that petrochemicals, on a sustainable footing — global conditions will of course carry risk — given how things stand today, is it reasonable to think you could deliver something like INR 8,000 crore to INR 9,000 crore in petrochemical EBITDA annually?

Sandeep Kumar Gupta

executive
#20

I mean, that comes down to the spreads. If today's spreads hold, then sure, that could turn out to be a fair assumption. What we're concentrated on is driving higher utilization across our facilities, and after that, the profit is a function of the cracks that are out there.

Sabri Hazarika

analyst
#21

Okay, so the second question concerns this hydrogen policy. It’s going to be put into effect. In yesterday’s budget, they said implementation will begin in FY 2022. You’ve also begun some pilot work involving hydrogen CNG as well as hydrogen manufacturing. From what I can see, IOCL is taking a serious look at this. Is there anything you’d like to add here about what you plan to do in this new hydrogen business?

Sandeep Kumar Gupta

executive
#22

Our plan is quite ambitious, since hydrogen is viewed as the cleanest fuel out there. Our R&D center — a flagship facility within the oil industry and even across Asia — has a range of initiatives under way, and it is doing a great deal of work on hydrogen. Maybe it is too early to share further specifics about that. Maybe it is also too early given that there will be some gestation period, and hydrogen's profits might not be captured right away within a year or two.

Sabri Hazarika

analyst
#23

Alright, sir. The third question concerns the LPG subsidy situation. At present, prices have risen considerably. I believe Arab Gulf prices have hit roughly $600 per metric ton. Up until about six or seven months ago, LPG prices — both subsidized and non-subsidized — were more or less in line. Once again, some divergence seems to have emerged, though naturally the subsidized prices are no longer reflected. What is the situation as of now? Have you begun incurring any under-recovery on the LPG side relative to six months ago? At this point, what share of total consumers receives the subsidy? To put it another way, if you have roughly 10, 12 crore customers, how many of them would qualify for this subsidy, given that LPG prices have climbed?

Sandeep Kumar Gupta

executive
#24

At first, after the pandemic, prices had eased along with crude prices as well. As you’re aware, LPG prices tend to firm up during the winter months. That’s the reason this firming occurred in recent months, and it will likely persist for perhaps one more month. We expect prices to ease in the months ahead. Since May of this year, in Delhi, there has been no subsidy, and similarly, in many locations, no subsidy was in place. Subsidy existed only in distant, far-flung areas, and for that the Government is compensating us fully. There has been no under-recovery on the LPG side. Given the small subsidy volume, there is no concern that it will remain unpaid for a very long time. As I said, we are hopeful that our GOI receivables may perhaps be liquidated by the end of this year.

Sabri Hazarika

analyst
#25

Also, you're saying there wasn't any major subsidy in January, correct?

Sandeep Kumar Gupta

executive
#26

In Delhi, that is not the case. Nor is it the case in comparable markets. In those far-off locations, the subsidy exists alone, and it is for that subsidy that we file the claims and record the receivables — and we have strong confidence that we will recover it very quickly at this point.

Sabri Hazarika

analyst
#27

So, this is just a very rough cut—

Operator

operator
#28

Mr. Sabri, I'd like to ask you to

Sabri Hazarika

analyst
#29

No, that's the same question — just one final item. Just a really rough ballpark: out of your total LPG customers, what share would be the subsidy-eligible ones, roughly how much in percentage terms?

Sandeep Kumar Gupta

executive
#30

That figure isn’t available to me at the moment, though we can get it to you on a separate basis.

Sabri Hazarika

analyst
#31

Alright. Thanks a lot, and best of luck.

Operator

operator
#32

Thank you. Our next question comes from Mr. Sumeet Rohra of Smartsun Capital Limited. You may proceed.

Sumeet Rohra

analyst
#33

Good morning to you, sir. It's truly encouraging, sir, to see that our marketing performance has delivered a very solid set of figures — INR 7,130 crore. Even after stripping out the inventory gain, we still posted strong numbers of INR 5,400 crore. Sir, could you shed some light on marketing — how do you see this performance carrying forward, especially in an environment where people are quite worried about the government not reducing excise? That would really help our investors grasp our marketing performance. Sir, second, just picking up on the point the finance minister raised in yesterday's budget about the asset sale of IOC's pipeline business and other companies. Sir, it's very encouraging to see that you actually added 350-odd kilometers, as you mentioned, taking it to 14,800 km. Sir, could you help us understand this asset pipeline plan? Is my understanding right that the value of 4 kilometers of pipeline could be roughly INR 6 crore to INR 7 crore, which effectively means INR 100,000 crore could be the value of our pipeline — which equals our market cap today. Your thoughts on this would be very helpful to us, sir.

Sumeet Rohra

analyst
#34

Thank you so much.

Sandeep Kumar Gupta

executive
#35

Starting with marketing margin. Right now, prices have firmed up somewhat, since there was a steep rise recently after Saudi Aramco announced a voluntary reduction of 1 million barrels per day through March. Our expectation is that this firmness in prices probably won't hold once March is over, given that crude oil demand fundamentals are weak.

Operator

operator
#36

Could you tell me your company name, Mr. Mark Smith? Hello. Kindly unmute your line. Mr. Mark Smith, can you hear me? Please unmute your line. Hello, Mr. Mark Smith. Please give me your company name. Hello? Hello?

Sandeep Kumar Gupta

executive
#37

Unlocking the true value of what we own. Along those lines, this idea of monetizing assets through the pipeline has been raised. At the start, we'll try it out, maybe by offloading a small stake via the asset monetization path. This is only at a preliminary stage. I certainly share your view that our assets hold enormous potential, and plenty of investors are interested in putting money into our pipeline assets.

Sumeet Rohra

analyst
#38

So, sir—

Sandeep Kumar Gupta

executive
#39

We need to realize the value that our assets hold.

Sumeet Rohra

analyst
#40

Sir, if I've got this right, my estimate puts the value of every kilometer of pipeline somewhere in the range of INR 6 crore to INR 8 crore. Is that understanding correct, sir?

Sandeep Kumar Gupta

executive
#41

I don't want to assign any value to that right now. Certainly, even if you were to apply, let's say, an EBITDA multiple to our pipeline and EBITDA earnings, you might be able to estimate what our assets are worth.

Sumeet Rohra

analyst
#42

All right, sir, absolutely. Many thanks — that's really useful, and all the best to you, sir.

Sandeep Kumar Gupta

executive
#43

I appreciate that.

Operator

operator
#44

Thanks, Mr. Rohra. Our next question comes from Mr. Avadhoot Sabnis at CIMB. The line is yours.

Avadhoot Sabnis

analyst
#45

Yes. Can you hear me?

Sandeep Kumar Gupta

executive
#46

Yes.

Avadhoot Sabnis

analyst
#47

Right, so once again, the question has to do with the new refinery.

Sandeep Kumar Gupta

executive
#48

Could you speak up a bit, please?

Avadhoot Sabnis

analyst
#49

Two things. Are you able to hear me at this point?

Sandeep Kumar Gupta

executive
#50

Right.

Avadhoot Sabnis

analyst
#51

Right, as I mentioned, there are two aspects to this. I believe the press release noted that you might have to obtain approvals from NITI Aayog and similar bodies before work begins. Could you clarify precisely which approvals are needed, who has to grant them, and what timeline you expect before you actually start working on the project?

Avinash Singhal

executive
#52

Apologies, Mr. Avadhoot. Your voice still isn't coming through very clearly, actually. Could you speak up a bit?

Sandeep Kumar Gupta

executive
#53

A bit sluggish.

Avinash Singhal

executive
#54

A bit sluggish as well.

Avadhoot Sabnis

analyst
#55

To start with, as I mentioned, I believe the press release noted that you might have to obtain approvals from NITI Aayog, correct, before beginning work on the refinery. Could you clarify precisely which approvals are needed, and from which bodies, for setting up that refinery, and when you expect to have all of those approvals in hand, and, as you said, when exactly you would actually begin work.

Operator

operator
#56

Hello there, Mr. Mark Smith. Can you hear me?

Avadhoot Sabnis

analyst
#57

Honestly, if the goal is to get this finished, my guess is that the quickest route would be to carry it on your own balance sheet. As for bringing Chennai Petroleum in, I can see the sentimental reasoning, given that they hold the land and that sort of thing. But even a quick glance at Chennai's financials shows pretty plainly that coming up with their share of the contribution would be a real struggle for them, and that might create issues for you down the road. That ties back to the second question — namely, what's the rationale for placing this in a JV instead of on your own balance sheet. I'll leave it there.

Sandeep Kumar Gupta

executive
#58

Let me start with the approvals. Because this refinery is a joint venture, a public sector unit needs both DIPAM and NITI Aayog's sign-off to set up such a JV. Those approvals will be necessary. On the other statutory clearances, the environmental clearance is already in hand, and we expect consent to establish very shortly. Perhaps the only approvals needed are from DIPAM and NITI Aayog, and since this is a public sector project, we believe there should be no problem there. You are also right that CPCL perhaps could not have built a project of this magnitude on its own balance sheet. That is the reason we formed a JV with CPCL. The debt-equity split is two-thirds, one-third, and the equity portion will be contributed 25% each by CPCL and IOCL. For the remaining 50%, we will scout for a strategic or financial partner. Until such a partner is identified, the balance equity will also be funded through quasi-equity instruments. Bringing in a partner will take its own time in the future. Does that answer your question?

Avadhoot Sabnis

analyst
#59

Perhaps my question is a bit more philosophical—why are you seeking a partner at all?

Sandeep Kumar Gupta

executive
#60

The reason we're seeking a partner is that this project is definitely on our books, and there may be additional projects ahead as well—not only refining, but petrochemical and renewable pipelines too. We have a very large CapEx program coming up. We're working to preserve as much of our cash as we can, while at the same time not halting the company's CapEx plans. Those are broadly the reasons for doing this.

Avadhoot Sabnis

analyst
#61

Thanks a lot. If I could just jump in — is there any chance you could share the broad CapEx numbers right now, just to restate them, for both this year and next year? At least the rough figures.

Sandeep Kumar Gupta

executive
#62

This year's CapEx came to roughly INR 26,233 crore, and that figure includes our JV subsidiaries. Up through December, though, we've probably only completed around 64% of it. We'll see how it goes. We're making a very strong effort to finish that CapEx for this year. One thing's certain: we won't go over it this year. As for next year, we'd expect CapEx to land, perhaps, inside that band of INR 25,000 crore to INR 30,000 crore.

Avadhoot Sabnis

analyst
#63

Thanks a lot, sir. I appreciate it.

Operator

operator
#64

Thanks. The next question comes from Vivekanand S. at Ambit Capital. Your line is open.

Vivekanand Subbaraman

analyst
#65

Hello, and thanks for taking my question. Could you discuss ethanol blending in fuel as well as biodiesel blending, given that the government has moved the targets forward? What are the implications for us? Is this purely a passthrough, or does it affect our CapEx and working capital, particularly where government receipts are concerned? Thank you.

Sandeep Kumar Gupta

executive
#66

Sir, even under the current blending requirements, this is a pass-through, and the same will hold true even if blending norms rise. There's no impact on the company itself.

Vivekanand Subbaraman

analyst
#67

Just to make sure I understand, sir — are we recovering the CapEx and the OpEx both, or only one of the two, the CapEx or the OpEx?

Sandeep Kumar Gupta

executive
#68

When it comes to ethanol blending, we aren't putting up any CapEx at all. We buy ethanol and simply blend it with our fuel. That involves no CapEx whatsoever, and as for the price differential, that is definitely a pass-through, or a surrender, depending on how the case may be.

Vivekanand Subbaraman

analyst
#69

Right. The 2G biorefineries we put money into — those are small projects, I get that, 2G ethanol. For those too, we receive recovery from the government, is that right?

Sandeep Kumar Gupta

executive
#70

No, there's no government recovery on those projects. But those projects are being advanced based on their own viability or for strategic reasons.

Vivekanand Subbaraman

analyst
#71

All right. In what way do we generate a return on that CapEx? I just can’t grasp it. Sorry to push on this.

Sandeep Kumar Gupta

executive
#72

Like I mentioned, this comes down to both viability and a strategic choice on our part to diversify into the energy basket and capture every potential that's out there. Given the size of our volume, those projects are quite small in scale.

Vivekanand Subbaraman

analyst
#73

All right, I’ve got it. Thanks.

Operator

operator
#74

Much appreciated. We have a question coming from Mr. S. Ramesh of Nirmal Bang Equities. Kindly proceed.

Ramesh Sankaranarayanan

analyst
#75

Morning, and thanks a lot. First question from me: could you share some sense of how things are going with your compressed biogas projects, and when the benefits will start showing up? On the pricing and economics side, how will the margins you make on that bio-CNG work out?

Sandeep Kumar Gupta

executive
#76

I think you began with CBG, compressed biogas.

Ramesh Sankaranarayanan

analyst
#77

Yes.

Sandeep Kumar Gupta

executive
#78

Right now, we're getting compressed biogas from plants that entrepreneurs have set up. We have a plant of our own in a JV. That plant belongs to IOT, our joint venture at Namakkal. We're sourcing CBG from that one as well. At the moment, we're retailing from 15 retail outlets, and we're the only company retailing CBG through retail outlets. We're also building our own CBG plant at Gorakhpur, and that will take a while to come up. As of now, there's no major CapEx on CBG plants as such. On viability, we've guaranteed a price of INR 46 per kg for the CBG we source from CBG plants. That works.

Ramesh Sankaranarayanan

analyst
#79

Now, regarding the figures we’re hearing — what’s the ultimate count of CBG plants you’ll be sourcing from? Can you give us a sense of the CBG volume you’ll be sourcing, let’s say, across the next 3 to 5 years? And how much margin will you earn, say, per kg?

Sandeep Kumar Gupta

executive
#80

The timing on that is going to hinge on how quickly the CBG plants get built. Right now, the number of plants that have actually been set up is fairly small. Across the industry, IOC has handed out over 500 LOIs, and beyond that, more than 300 LOIs have been issued. Getting CBG plants up and running will take time on its own. We aren't anticipating any abrupt jump in CBG volumes over a brief period.

Ramesh Sankaranarayanan

analyst
#81

To build a bit on what was said about renewable energy: regarding your city gas distribution projects, the annual report references some large figures. At what point do you expect the advantages from your direct investments and the JVs in the CGD projects to begin appearing in your P&L and balance sheet? Could you give us a sense of the volumes you anticipate reaching, for instance, across the coming 3 to 5 years in the CGD?

Sandeep Kumar Gupta

executive
#82

When you say CGD, I think you mean CGD rather than CBG, correct?

Ramesh Sankaranarayanan

analyst
#83

This is on the city gas distribution side, where the licenses came from PNGRB.

Sandeep Kumar Gupta

executive
#84

On City Gas Distribution: we hold 17 GAs ourselves, and another 23 through joint ventures as of the 10th round. Our CapEx outlay comes to roughly INR 15,000 crore. Around INR 16,000 crore of CapEx. CGD penetration, at least on the domestic side, takes a fair amount of time. As with CBG, we don't anticipate these CGD utilities contributing anything meaningful right away, in such a short span.

Ramesh Sankaranarayanan

analyst
#85

Alright, just one final point regarding monetizing the pipeline assets. Has any preparatory work been done on your side? GAIL already has a subsidiary that accounts for the pipelines. If you're looking to bring in financial investors there to test a stake sale — do you have comparable plans to move some of your pipeline assets into a subsidiary? In terms of laying the groundwork, or a stake sale in any of your pipeline assets, how do you intend to proceed?

Sandeep Kumar Gupta

executive
#86

With GAIL, the split was talked about for over 2 years, maybe longer, and now it's actually happening. For us, it's still very early, honestly, and we'll start working on that now. The thinking was simply that our assets' potential needs to be unlocked, and after that we'll assess how far we go in monetizing those assets. It's at a very preliminary stage.

Ramesh Sankaranarayanan

analyst
#87

That was useful. Thanks a lot. I'll get in line. Thank you.

Operator

operator
#88

Thanks, Mr. Ramesh. Our next question comes from Mr. Amit Rustagi at UBS. Go ahead, please.

Amit Rustagi

analyst
#89

Yes. Thank you, sir, for the chance to speak. Sir, my question concerns monetizing the pipeline. We have viewed pipeline assets as a core element underpinning the strength of our business. If some of these pipelines are monetized, wouldn't you agree that the business's strength would suffer, and competitors would gain the same advantage that we hold today? Second, what do we intend to do with the proceeds? Will that money go back to shareholders as dividends, or would it be put back into the refining business?

Sandeep Kumar Gupta

executive
#90

Like I mentioned, we're at a really early stage here, and we haven't yet figured out which model we'll use. InvIT is one possibility, and we don't have to sell a 100% stake in these assets, nor do all the pipelines need to be bundled together. We might start with just one or two pipelines. Either way, we'll keep operating and controlling the pipelines. That won't slip out of our hands. On top of that, most of our pipelines are dedicated — running from our facilities to the market in the case of product, and from ports to our refineries in the case of crude. We don't see how it would be of any use to the competition, since the call on supplying products from our refineries rests with us alone. From a competition standpoint, we don't expect any adverse impact.

Amit Rustagi

analyst
#91

Sir, how will we use the cash that we generate through this route?

Sandeep Kumar Gupta

executive
#92

Asset monetization exists so that CPSEs can increase their CapEx. That will assist us in raising our own capital expenditure. If we go with the InvIT model, yes, at the start, any monetization we carry out will be accessible to us for further CapEx. The choice belongs to us — how much we hold back for CapEx and how much we distribute.

Amit Rustagi

analyst
#93

Sir, isn’t it possible that selling off pipeline assets and then directing those proceeds into the refineries could turn out to be another poor call, given how the refining operations have been performing?

Sandeep Kumar Gupta

executive
#94

We haven't said anything about building refineries. No — what I said is that we're looking at a wide range of projects, everything from petrochemicals to renewables to hydrogen, et cetera. For sure, we'd want to commit that capital only to projects that are more viable or more profitable.

Amit Rustagi

analyst
#95

All right. Thanks, sir.

Operator

operator
#96

Thanks. The next question comes from Mr. Varatharajan Sivasankaran at Systematix Shares and Stocks Limited. You have the floor.

Varatharajan Sivasankaran

analyst
#97

Thanks. I’ve got three questions. First, on LPG. Usually, in the past, when international prices rise, the subsidy cap for the year gets used up, and after that retail prices go up. What we saw this time is that the subsidy provision is still there, and you’ve already begun raising retail prices. Has there been a shift in how the policy is being thought about?

Sandeep Kumar Gupta

executive
#98

I apologize, but I can't hear you clearly.

Varatharajan Sivasankaran

analyst
#99

So, is that an improvement at this point, sir?

Sandeep Kumar Gupta

executive
#100

Yes, that's an improvement.

Varatharajan Sivasankaran

analyst
#101

Yeah. Normally, with LPG in the past, what we saw was that when prices internationally rise, the subsidy limit for the year is nearly used up, and then you increase retail prices. This time, what we're seeing is that the subsidy is still in place, but you've already begun raising retail prices. Has there been a shift in policy or in thinking?

Sandeep Kumar Gupta

executive
#102

The price at which LPG is issued is actually set by the Government of India. On a month-to-month basis they let us know what that issue price ought to be, and it's based on the market-determined price, using the formula that exists. As I mentioned, from May 20 onward there has been zero subsidy in Delhi and comparable markets. In other locations where the deficit incidence is perhaps greater, some subsidy is available that can be claimed from the Government of India. Any month-to-month movement in the issue price is a matter for the government, and that gets communicated to us.

Varatharajan Sivasankaran

analyst
#103

All right, so the second question is about the LNG import contracts that you had previously. At Ennore right now, is everything you're bringing in solely through those contracts, or are you also bringing in spot?

Sandeep Kumar Gupta

executive
#104

Sorry, I didn’t catch that.

Varatharajan Sivasankaran

analyst
#105

About LNG imports at Ennore — you had signed some contracts. What does the import mix look like right now? Is it entirely those contracts, or does it also include what you've got as well?

Sandeep Kumar Gupta

executive
#106

We do have some long-term contracts in place, and we're drawing gas under those long-term agreements. Are you referring to customers, or are you referring to where the gas is sourced from?

Varatharajan Sivasankaran

analyst
#107

Sourcing, sir.

Sandeep Kumar Gupta

executive
#108

On sourcing — yes, we're taking gas under those contracts. I didn't quite follow your question.

Varatharajan Sivasankaran

analyst
#109

Also, are there any spot volumes at Ennore as well, sir?

Sandeep Kumar Gupta

executive
#110

Excuse me?

Varatharajan Sivasankaran

analyst
#111

Do you have any spot volumes in Ennore?

Sandeep Kumar Gupta

executive
#112

Spot volumes — how about at Ennore?

Varatharajan Sivasankaran

analyst
#113

Yeah.

Sandeep Kumar Gupta

executive
#114

Okay, I don't think so. The volume under that long-term contract is enough to meet what Ennore requires.

Varatharajan Sivasankaran

analyst
#115

Understood, sir.

Sandeep Kumar Gupta

executive
#116

Across different ports, we have a mix of spot and contract business. That's something we evaluate from time to time, and it can be advantageous to take it at whichever port.

Varatharajan Sivasankaran

analyst
#117

Understood. One final question from me regarding working capital, sir. Crude prices did rise during the previous quarter. Does that also hold for product prices? We saw a decrease in working capital. Did significant destocking occur somewhere?

Sandeep Kumar Gupta

executive
#118

Varatharajan, I think you ought to ask that question once more, since it isn't coming through clearly.

Varatharajan Sivasankaran

analyst
#119

We saw crude prices climb incrementally during the last quarter, and product prices rose as well. You mentioned at the start that there's been a decline in working capital. Is there substantial destocking going on — has your volume inventory been reduced meaningfully somewhere as a consequence of crude?

Sandeep Kumar Gupta

executive
#120

You're correct. For both crude and products, our inventory levels are below those as of 31st of March 2020, and that is also assisting us in lowering the working capital.

Varatharajan Sivasankaran

analyst
#121

Could you provide a volume figure, sir?

Sandeep Kumar Gupta

executive
#122

Could you say that again?

Varatharajan Sivasankaran

analyst
#123

Could you provide us with an inventory volume figure?

Sandeep Kumar Gupta

executive
#124

Is it volume that you're after?

Varatharajan Sivasankaran

analyst
#125

Yes, that is correct.

Sandeep Kumar Gupta

executive
#126

By the end of December 31, 2020, our total stood at 15 million tons, compared with 19 million tons as of March 31, 2020.

Varatharajan Sivasankaran

analyst
#127

Is that crude, or products? Or both?

Sandeep Kumar Gupta

executive
#128

All right, that's combined. If you'd prefer a breakdown, we can provide that as a separate item.

Varatharajan Sivasankaran

analyst
#129

Alright, Sandeep, thank you very much, sir.

Operator

operator
#130

Thanks. Our following question comes from Manikantha Garre at Axis Capital. The line is yours.

Manikantha Garre

analyst
#131

Good afternoon, sir. Thank you for giving me the chance to ask. I have two questions. The first one concerns the new Nagapattinam refinery, 9 million tons, for which INR 31,500 crores of CapEx was mentioned. Could you please tell us how much of that INR 31,500 crores is for dismantling the existing 1 million tons refinery, and what share of it is going toward the petchem unit? That is my first question.

Sandeep Kumar Gupta

executive
#132

Manikantha, I believe it would be worth revisiting that question once more. The point isn’t especially clear.

Manikantha Garre

analyst
#133

All right, sir. You mentioned INR 31,500 crore as the CapEx tied to the 9 million ton refinery. Does that figure take in the expense of dismantling the refinery that's already there, and what share of the..

Sandeep Kumar Gupta

executive
#134

Are you referring to taking the current refinery apart?

Manikantha Garre

analyst
#135

Yes.

Sandeep Kumar Gupta

executive
#136

It's possible that falls under site development expenses. I don't have that figure at the moment. It might be a very small amount.

Manikantha Garre

analyst
#137

And how much of that relates to the petchem unit that sir brought up?

Sandeep Kumar Gupta

executive
#138

On petchem integration, I said 5.5%, but the cost of that is separate — we can give you that separately.

Manikantha Garre

analyst
#139

The reason I'm raising this, sir, is that when I look at what Paradip cost for a 15 million ton refinery, as of FY 2016, it comes to roughly INR 35,000 crores for us. I'm simply trying to get a sense of what differs in configuration between Paradip and the Nagapattinam refinery that they're currently envisaging.

Sandeep Kumar Gupta

executive
#140

Alright, the approval for the Paradip refinery came through roughly 10 years ago.

Manikantha Garre

analyst
#141

Sir, the final cost comes to INR 35,000 crores.

Sandeep Kumar Gupta

executive
#142

The final cost came to INR 35,000 crore, and what that final cost looks like after 5 years might be something different. If we compare approval to approval, this stood against INR 30,000 crore for Paradip. As of now, after 10 years, it is INR 31,500 crore. We can give you these details separately.

Manikantha Garre

analyst
#143

Yes, sir. For the second question, could you tell us where things stand with the Ennore-Tuticorin pipeline?

Sandeep Kumar Gupta

executive
#144

Our plan is to have the full pipeline commissioned by February 2022.

Manikantha Garre

analyst
#145

Got it. If there's room for a single question, I noticed LNG volumes ticked up slightly on a quarter-on-quarter basis. Did any new customers come on board during the quarter?

Sandeep Kumar Gupta

executive
#146

That's actually a regular feature. If your question is about Ennore, there is no fresh customer.

Manikantha Garre

analyst
#147

Got it, sir. Nothing further from me. Thanks, sir.

Operator

operator
#148

Thanks. Next up we have a question from Vinit Joshi at Goldman Sachs. Go right ahead.

Vinit Joshi

analyst
#149

Hello, sir. Can you hear me okay?

Sandeep Kumar Gupta

executive
#150

Yes.

Vinit Joshi

analyst
#151

Thanks a lot for taking my questions. First off, on petrochemicals: could you share your current capacities and how they split across the different products? And what would that look like, say, two or three years out?

Sandeep Kumar Gupta

executive
#152

Maybe that was also the opening question of this conference call. As I said, the lineup of products we offer remains unchanged from what it was a year ago, with the single addition being this MEG, which will come on stream at Paradip in October 2021, and as we noted, the capacity is 367 KTA.

Vinit Joshi

analyst
#153

Right.

Sandeep Kumar Gupta

executive
#154

We have 357 KTA. Beyond that, right now we operate LAB in Gujarat, linear alkyl benzene in Gujarat, PX/PTA in Paradip, and polypropylene polymer — that naphtha cracker in Panipat. Those capacities stay as they are. PP in Paradip — again, its utilization is lower, and we intend to bring in propylene so that capacity utilization goes up. MEG arrives in October 2021.

Vinit Joshi

analyst
#155

Okay. Thanks a lot for this. Regarding the plan to monetize the pipeline, what sort of tax implication would that involve with respect to capital gains? If you could give us some directional color on whether that's how you're thinking about it as a way to drive this monetization.

Sandeep Kumar Gupta

executive
#156

The provisions already exist, and you know about the tax provision. Those are going to be triggered. Right now, I don't have a number for how much we'll do, which pipeline we'll do it for, what the value will be, or what capital gain tax will apply on that. I can't provide you with more details beyond that. Certainly, whatever tax provisions are in place must be complied with.

Vinit Joshi

analyst
#157

Alright, last question, sir. Regarding your EV charging rollout, could you give us some detail on the number of stations where EV charging is already available, and what our plan looks like going forward?

Sandeep Kumar Gupta

executive
#158

On EV charging, I don’t have the precise station count at the moment — we can provide that to you separately. That remains a very small share of what we do. From a financial-analysis perspective, in the very near term, maybe not a major item.

Vinit Joshi

analyst
#159

Do you have a medium-term goal — say, looking out 5 or 10 years — for what percentage you'd aim to electrify?

Sandeep Kumar Gupta

executive
#160

I don’t have that right now. We’ll provide it to you separately.

Vinit Joshi

analyst
#161

Alright, thank you very much, sir.

Operator

operator
#162

Thank you. For our final question, we have Mr. Vidyadhar Ginde from ICICI Securities on the line. Sir, please go ahead.

Vidyadhar Ginde

analyst
#163

Yeah, thanks. First question from me: could you tell us what the crude inventory cost was in December?

Sandeep Kumar Gupta

executive
#164

When it came to December valuation, the closing rate stood at $47.42 per barrel.

Vidyadhar Ginde

analyst
#165

Right, and I believe back in September you mentioned crude inventories of roughly 9 million tons. Would that figure be about the same, or is it lower now?

Sandeep Kumar Gupta

executive
#166

It's lower. The earlier speaker also wanted that. You can take it down. As of 31st December, crude stands at roughly 7 million tons, which is below the prior level.

Vidyadhar Ginde

analyst
#167

Yes, quite a bit lower, yes. On the second question about this polypropylene: when do you see these problems getting worked out, and when do you think you'll be running those plants at full capacity? Is the reason that propylene yield at the refinery is below what was expected, or even at the expected yield, is the plant unable to operate at full capacity?

Sandeep Kumar Gupta

executive
#168

Yes. One factor was that a portion of feedstock got redirected into the gasoline pool, given how strong gasoline demand is. Second, we also had an FCC unit shutdown at Paradip, and that contributed. Even with those issues resolved, we still have some unused PP capacity, and for that we're looking at entering long-term contracts for propylene imports.

Vidyadhar Ginde

analyst
#169

What's your expected timeline for it to be operating at full capacity?

Sandeep Kumar Gupta

executive
#170

We placed our first parcel order yesterday. Yesterday we also ordered the first test parcel, though that one involves only a small volume. Drawing on that experience, we'll then go about lining up our long-term contracts.

Vidyadhar Ginde

analyst
#171

Alright, sure. Yeah, the final question concerns the pipeline. Are you certain that you want to go the InvIT route, or might you instead list the pipeline within a subsidiary and sell a minor stake while keeping a majority equity holding? Is that possible, or is it fairly certain that the InvIT option is the one you'll pursue?

Sandeep Kumar Gupta

executive
#172

As I said, nothing's set in stone at this point. We're still at a preliminary stage.

Vidyadhar Ginde

analyst
#173

Alright.

Sandeep Kumar Gupta

executive
#174

We’ll take a look at the different models that are on offer.

Vidyadhar Ginde

analyst
#175

Alright. Would you also think about possibly separating your petrol stations into a subsidiary and perhaps selling 26%? I believe that's likely your strongest asset — your most important asset, in fact, which holds value even in the current climate, especially when the longer-term refining outlook carries some question marks too. We have observed a few deals take place in the U.S. in which 7-Eleven paid an enormous sum for roughly 3,900 petrol stations, although the majority of those are probably owned. They paid a massive amount. Might that be a possibility at some point? Separating your petrol stations into subsidiaries.

Sandeep Kumar Gupta

executive
#176

Right now it isn’t on our radar, but we can’t rule out the possibility that something like that could unlock the value.

Vidyadhar Ginde

analyst
#177

All right, many thanks. I really appreciate it.

Operator

operator
#178

Appreciate that, Mr. Ginde. At this point I'd like to pass the call along to the management team so they can offer their closing remarks. Sir, the floor is yours.

Avinash Singhal

executive
#179

Appreciate everyone joining this conference call. We can’t wait to see all of you once the next quarterly results are out. Thanks so much.

Operator

operator
#180

That wraps up today’s conference, everyone. We appreciate your taking part and using iJunxion Conference Service. Please go ahead and disconnect your lines at this time. Thanks again, and have a wonderful day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Indian Oil Corporation Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Indian Oil Corporation Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Indian Oil Corporation Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.