Indigrid Infrastructure Trust (540565) Earnings Call Transcript & Summary

May 16, 2025

BSE Limited IN Utilities Electric Utilities earnings 56 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, ladies and gentlemen, and welcome to the IndiGrid Infrastructure Trust Q4 FY25 earnings conference call, hosted by Nuvama Wealth Management. Please note that all participant lines will remain in listen-only mode, and following the conclusion of the presentation there will be an opportunity for you to ask questions. If you require assistance at any point during this conference call, please reach an operator by pressing star then zero on your. Kindly be aware that this conference is being recorded. I will now hand the conference over to Mr. Vikram Datwani from Nuvama Wealth Management. Thank you, and over to you, Sir.

Vikram Datwani

analyst
#2

Thank you, and good evening to all of you. Speaking for Nuvama Wealth Management, I'm glad to welcome each of you to this conference call covering IndiGrid Infrastructure Trust's results for the fourth quarter of FY25. With us on the line today are Mr. Harsh Shah, our Managing Director, along with the other members of the senior management team. At this point, I'll pass the call to Mr. Harsh Shah so he can give his opening remarks. The floor is yours, sir.

Harsh Shah

executive
#3

Good evening, everyone, and thanks for being on the call today. Following the same approach we've used previously, we'll walk through the presentation flow, with me and the team covering the quarter's highlights, and after that we'll move into the question-and-answer session. Starting on slide number three: our vision is to become Asia's most admired deal vehicle, and we're convinced that by concentrating on our business model, on value-accretive growth, on predictable distribution, and on an optimal capital structure, we can get there. Slide four gives a quick snapshot of our portfolio as it stands today. We hold roughly $9.6 billion of capital, or assets under management, spanning 20 states and two union territories. We own approximately 87 separate distinct revenue-generating elements across transmission lines, substations, and battery storage. Our transmission lines number 52 and cover 9,000 km, circuit kilometers. Our substation assets total 15, with a size of roughly 22,550 megawatts of capacity. Solar generation stands at around a gigawatt peak. And our BESS projects — many of them still under development — come to three projects at about 900 megawatt hours. Moving to slide number six, we'll begin with the highlights for — sorry, the highlights for the quarter.

Harsh Shah

executive
#4

During this quarter, one particularly notable development was the commissioning of our inaugural utility-scale battery energy project. It's called Kilokri BESS. This stands as India's first regulated utility-scale standalone project in Delhi, and we brought it online right on schedule despite extremely challenging conditions, since we were operating in a very, very densely populated part of Delhi within a very tight timeframe. The IndiGrid teams completed this project in record time, with superb quality, and a first-time-right approach. VRPL, the bidding authority — which is Delhi Discom — backed this project, along with GEAPP, meaning the Global Energy Alliance for People and Planet, which supplied concessional financing for it. Over the quarter, we also successfully commissioned our augmentation projects — PTCL, Column One, Column Two — which were awarded on an RTM basis. With these commissionings plus the commissioning of KDPL, IndiGrid has now commissioned six projects under PBCD and RTM combined. There's one important metric worth monitoring, because three years back, when we launched our first PBCD project, we had stated that we possessed adequate capability to build, and now we're demonstrating that we've consistently delivered projects for growth, and we've assembled a sizable pipeline.

Harsh Shah

executive
#5

Moving to my next point. This quarter, we secured the Ratle-Thiru power transmission project via the PBCD route, and it will evacuate power from Ratle-HEP and Thiru-HEP on a route basis. I believe both of these names appeared in the news lately because of the concept we are witnessing in India's renewed emphasis on constructing and operationalizing hydropower projects. Construction on this project will span 24 months, and once commissioned it will carry an annual transmission charge of roughly INR 195 crore. Turning to financial performance, quarter four reported revenue and EBITDA growth of 11.3% and 11.2% year-on-year, respectively. My colleagues will speak to the gap between reported revenue and operational revenue, while operational revenue grew 1.6% and 9.9% year-on-year, respectively. At quarter end, AUM stood at INR 29,600 crores and net debt to AUM at 59.1%, which leaves us considerable headroom to grow further and invest in projects. Collections in quarter four 2025 were unprecedented. We saw 115% collections for transmission assets and 89% for solar, and that has given a boost to our NDCF for the quarter, which is why you are seeing quarter four distribution up at INR 4.1, approximately INR 0.93 above the guidance we had provided.

Harsh Shah

executive
#6

Guidance for DPU has also been raised, now at INR 16 per unit versus INR 15 per unit previously — that works out to roughly 6.7% growth compared with the prior guidance. On operating performance, transmission availability averaged 98.4 for the quarter, a touch lower, and the operating slides will walk you through why. The solar CUF availability factor stands at 98.2% as well. Moving to slide number seven, we're simply walking through the PDPL event showcase — both the inauguration and the project showcase — which drew participation from many dignitaries and from our partners, and was hosted by GEAPP, VRPL, and ourselves; the Chairman of CEA Grace took the opportunity to speak, and spoke highly of the vision for battery energy storage in India. Slide number eight carries a very important update on future and management team changes at IndiGrid. As we communicated before, EnerGrid is a strategic initiative through which IndiGrid grows its assets, with us acting as a minority investor, and alongside partners such as BII and Northbank, EnerGrid will build fresh pipelines and new growth assets that will be sold to IndiGrid. Accordingly, two senior leaders on IndiGrid's side — Satish Talmale, who served as COO at IndiGrid, and Navin Sharma, who served as CFO of IndiGrid — are moving into newer roles at EnerGrid as CEO and CFO of EnerGrid, and we have strong confidence that, with this expanded role and by drawing on their expertise, they will ultimately deliver meaningful growth for EnerGrid and, in turn, for IndiGrid.

Harsh Shah

executive
#7

Meghana Pandit, who's been with us for quite a while, is also stepping into a senior position as Chief Financial Officer. Across this broad portfolio, she'll oversee the whole finance and compliance function on top of the CIO role she holds today. I want to congratulate Meghana on her leadership and her unwavering faith in IndiGrid and what it stands for. I'm quite certain that this management team reshuffle — as I'd put it — has brought sharper focus to the growth areas where we expect IndiGrid to see growth and efficiency over the years ahead. Moving to slide number nine, the industry update: power demand has risen steadily, and this quarter we're again witnessing an upward trend. Installed capacity reached 475 gigawatts as of the end of March 2025, with roughly 46% of that representing renewable energy. The major development we're observing in the TNB space is that close to INR 9 lakh crores of opportunities are being generated under the NEP over the next seven to eight years, and we're highly confident that a good number of these projects will materialize thanks to the demand growth we're seeing from EV adoption, data centers, and electrification across sectors.

Harsh Shah

executive
#8

We're quite confident that a lot of these pipelines will genuinely come to fruition over the next decade, and as we read the middle of this considerable investment taking place in the country, we hope to be able to capitalize on a reasonable chunk of it. Slide 10 simply showcases the immediate opportunities and availabilities right now for pipeline across both the transmission and BESS sector, which we're targeting. Moving to slide 11, the quarter four FY25 operating performance, we've seen zero incidents on medical treatment and first aid cases and ATI. Performance has been at 19.4, going to two assets, GPTL and JKPTL, which have failures and disruptions, and we're in the process of restoring that, and in a quarter or so, they'll be back to their original levels. On the solar generation side, we generated 439.6 million units, which is about 23.8% CUF. The reliability of our lines has been consistent, with drift per line at 0.06 per substation, drift per element at 0.01, and in terms of our availability and plant availability on solar, we are at <<inaudible>>. In terms of our quarter four 2025 financial performance, I'd like to invite Navin to take us through that, please.

Navin Sharma

executive
#9

Thank you, Harsh, and good evening to all of you. We're now on slide 12. During Q4 of FY25, revenue and EBITDA came in at INR 874 crores and INR 729 crores, which works out to 11% growth year on year. The revenue and EBITDA as reported include INR 76 crores and INR 8 crores, respectively, tied to construction revenue for 200 construction assets in line with India's 115. A cost of INR 68 crores that we incurred on building these service transmission assets appears separately in the financial results. Once adjusted, operational revenue and EBITDA were INR 799 crores and INR 721 crores, up 1.6% and 9.9% year on year. EBITDA margin for both the quarter and the full year falls in the range of 90%. NDCF for the quarter came to INR 434 crores, and the board approved a distribution of INR 4.1 per unit. That is a 9.3% rise from the previously carried amount of INR 3.75 per unit, and it amounts to a 15.5% year-on-year increase in DPU. On quarterly collections, we hit 115% in the transmission business and 89% in solar. Across the trailing 12 months, collection performance at the entity level held at 103%, with both business segments displaying comparable strength. As of March 31, DSO stood at 38 days for transmission and 48 days for solar.

Navin Sharma

executive
#10

That represents a significant improvement compared with a year earlier in both of our segments. If we go to slide 13, the DPU for this quarter is INR 4.1 per unit. The distribution will be paid out as interest, dividend, capital repayment, and other income, which come to INR 2.63, INR 0.14, INR 1.27, and INR 0.06, in that order. With 83.45 crore units outstanding as of the record date, the gross distribution across all unit holders adds up to INR 342 crore. The record date is May 20, and unit holders should get their distribution by May 27. As of March 31, NAV per unit stood at INR 144.11. Once this quarter's distribution is done, IndiGrid will have paid out INR 101.32 per unit. That adds up to INR 6,208 crore. Over on the right, you can see the distribution trend year over year, which shows steady, scalable growth of 6% across the years. Now to slide 14, where we have a waterfall chart that lays out how we go from EBITDA to NDCF generation and distribution. At the SPV level, consolidated EBITDA came in at INR 728 crore. Once we account for finance income, working capital changes, CapEx, and taxes at the SPV level, NDCF generation works out to INR 783 crore.

Navin Sharma

executive
#11

Once you factor in trust-level expenses, finance costs, DESRA, working capital changes, taxes, and debt repayment, NDCF comes to INR 434 crore. During Q4 FY25, we put INR 92 crore into reserves, so closing reserves now stand at INR 602 crore — more than one quarter's DPU under our current guidance. That covers everything from my end. I'll pass things over to Meghana now to take us through the next slide. Meghana, over to you.

Meghana Pandit

executive
#12

Thanks, Navin, and good evening to everyone. I'm turning to slide 15, where you can see a snapshot of IndiGrid's balance sheet. All three rating agencies still rate us AAA, and we closed out the year with an average cost of debt at roughly 7.67% against gross borrowings of approximately INR 19,900 crore. The cash balance as recorded on 31st March came to around INR 2,595 crore, and that figure includes roughly INR 340 crore earmarked for distribution plus about INR 470 crore in DESRA. Roughly INR 1,200 crore of debt raised during March — which was used for repayment in April — shows up in that cash balance, so it gets adjusted right after the year end. What remains is the cash balance, the free cash balance, on the balance sheet. Fixed-rate borrowing accounts for almost 90% of that INR 19,900 crore in gross borrowings. Net debt to AUM, or the leverage ratio, for IndiGrid came in at 59.1%, alongside a very robust interest coverage ratio of roughly 2.01 times. During the quarter, we also concluded a tie-up with International Finance Corporation for debt funding of Gujarat Dev Private Limited amounting to almost INR 460 crore. Splitting gross borrowings between NCDs and bank loans, the mix is almost 54% and 46%, respectively.

Meghana Pandit

executive
#13

When it comes to the NCD side, there's a healthy blend across various investor classes — mutual funds, banks, financial institutions, retail HNI — and on the loan side as well, funding has come from pretty much every reputed private and public sector bank. The chart at the bottom covers our repayment or refinancing schedule. For FY26, roughly INR 2,570 crore of refinancing is coming up, and of that, partial repayment has already happened — refinancing has already taken place. About INR 978 crore of ECB, as one of the SPVs, will also be refinanced in the next quarter, and the remainder is spread over the other quarters of this financial year. Looking at the next few years, you can see the refinancing schedule is fairly balanced and represents 11%-12% of gross borrowing, no more than that. Turning to the next slide, slide number 16, this covers the total returns we've given investors since we got listed in 2017, so that's a period of almost nine years. Total returns consist of the distribution, the DPU, plus the price change that has occurred. As you can see, we have delivered a total return of about 143%, which translates into a CAGR of 12%, and we compare ourselves with pure play debt securities — that is the G-Sec bond, 10 and 30 years — and also with pure play equity securities in terms of indices.

Meghana Pandit

executive
#14

When you look at Pure Debt and Pure Equity on a risk-adjusted basis — the way Vita depicts it — it's clear IndiGrid has produced better returns than both the debt indices and the Pure Equity indices. Turning to slide number 17, which covers the business outlook for FY26: at the portfolio strategy level, I'd say our focus remains on making sure the existing assets operate stably, and that lets us pursue predictable, sustainable distribution while also looking at value-operated acquisitions using the debt headroom we already hold. As for the greenfield development we've taken on, we're concentrating on executing the augmentation work the project has already won, along with the new ones that will come out, and on executing the battery storage projects in Gujarat and Rajasthan. Beyond that, through EnerGrid — the development platform that's been formed — the idea is to take part in synergistic greenfield opportunities spanning power transmission and battery energy projects. The DPU guidance of INR 16 for FY 2026 is something we keep focusing on, and we'll make sure we deliver it alongside disciplined capital deployment. Along with that, balance sheet strength remains another area of focus — making sure interest costs stay optimized, whether for refinancing or for funding future acquisitions — and making sure the tenor of these refinancings is as elongated as possible, while at the same time maintaining prudent leverage with adequate headroom to enable organic and inorganic growth.

Meghana Pandit

executive
#15

Resilience in asset management is another really key area we're examining, given the larger portfolio we now need to keep running at no less than 99.5% availability across it. Beyond that, although we already possess self-reliant O&M capabilities, our current emphasis is on deploying an AI-powered image analyzer so we can push further on predictive maintenance of assets. Upholding and enhancing world-class EHS and ESG practices likewise stays a priority. On industry stewardship, we've taken part in and led a range of policy advocacy efforts on the InvIT side via Bharat InvIT Association, and in the power sector through various other forums, and that too remains a priority. Turning to slide number 18, it covers our foray and the approach we've taken to DPU accretive acquisitions. Each color on the chart basically represents the DPU we've been raising on the strength of value-accretive acquisitions we've completed. As you can see, the guidance given for FY 2026 of INR 16 also carries a minimum life of five years, which can be sustained absent any further asset acquisitions should that not occur.

Meghana Pandit

executive
#16

That said, I’ll stop there with the presentation, and then we can go into the question-and-answer session. Thank you.

Operator

operator
#17

Thanks a lot. At this point we move into the question-and-answer portion. If you'd like to pose a question, you can hit star and one on your touch-tone phone. Should you want to take yourself out of the queue, just press star and two. We ask that participants speak through their handsets when asking. Ladies and gentlemen, please hold for a moment while we put the queue together. Participants, you may press star and one to ask a question. Our first question comes from Sunil, an individual investor. Please go ahead.

Sunil Kolangara

executive
#18

Good afternoon, and thanks for joining. To begin with, well done on yet another excellent quarter. I've been an investor. Essentially, I'll start by.

Operator

operator
#19

We’re recording your interview, but your audio is dropping out. Could you please verify that you’ve got a proper signal where you are?

Sunil Kolangara

executive
#20

Yeah. Hi there. Are you able to hear me?

Operator

operator
#21

Yeah, that’s an improvement.

Sunil Kolangara

executive
#22

Alright, great quarter again — congratulations. I first got involved around 2018 to 2019, and back then nobody was interested in it. That was likely the wisest move I've ever made. Sure, I might have earned higher returns in equities, but nothing has been as satisfying on a risk-adjusted basis as this. Well done to the whole team. I don't actually have a question — just a couple of points. A year or two back, you made a change to senior management compensation. What I'd like to know is whether that pay is fully in cash, or whether some portion is deferred units, so that management has a stake in how the index performs going forward. My second point relates to something in your valuation report, on page number 107. I'm not sure whether you're able to address it, but I'd be glad if you could. There's a note there on financial projections for solar assets, in the revenue section, about tariff upside. You've shown the parent tariff upside. If you could expand on that a little, it would be helpful.

Harsh Shah

executive
#23

Absolutely. Thanks very much for your question. On that first item, a meaningful portion of our long-term incentives, along with incentive payments tied to acquisitions, gets deferred, and a number of us have wound up putting that money into unit ownership. You may have come across certain disclosures made over a period of time regarding unit ownership among most senior team members. We have not put the current UBEB framework into effect — that's the unit-based incentive framework approved by SEBI — since implementing it is somewhat difficult because it is not yet enabled in a manner that makes implementation sufficient. That said, considerable ownership has built up with the senior management team over a period of time. Regarding valuation and tariff upside, I would ask that Navin, if you could just share the perspective on what we are trying to indicate.

Navin Sharma

executive
#24

Yeah. Hi. Regarding that valuation report you provided — it's right there on the slide.

Harsh Shah

executive
#25

Oh, my apologies.

Navin Sharma

executive
#26

My apologies — that was page 107.

Harsh Shah

executive
#27

Yes. Three of them exist.

Navin Sharma

executive
#28

Tariffs could give us some upside.

Harsh Shah

executive
#29

Several of the acquisitions we complete carry three additional, specific elements with future potential that isn't reflected yet. Take SolarEdge: one of its assets involves a GST annuity conversion that will occur because of a change in the GST law. When that happens, it could deliver upside. GGL has a comparable modest upside of roughly INR 4, since an outstanding matter with the regulators exists there. With the TANGEDCO Assets, certain penalties were imposed previously regarding PLF, prior to our acquisition. Should we prevail in those matters, upside could come from that. Some upside could also arise from CER valuation once it becomes tradable and the price is sizable. It's a range of factors, correct, that may contribute additional upside on the solution.

Sunil Kolangara

executive
#30

Thanks so much. Congrats once more on an outstanding quarter. Really appreciate it.

Harsh Shah

executive
#31

Thanks.

Operator

operator
#32

Thank you. Participants, you can press star and one if you'd like to ask a question. Our next question comes from Amit Singhi, an individual investor. Please go ahead.

Amit Singhi

analyst
#33

Hi sir — congrats on the fantastic result. Hello? Hello sir, can you hear me? Yeah, I hear you. Huh. So I have one question. When it comes to tariff-based competitive bidding projects, does any provision exist for escalation or an increase in transmission fees if operating expenses for transmission rise extraordinarily because of inflation — perhaps due to war or an extraordinary depreciation of the rupee? That's my question.

Harsh Shah

executive
#34

Kind of yes, kind of no. Model concession agreements include change-in-law provisions, and those are publicly available. You can simply pull them from the Ministry of Power's website, and they address what happens when the law changes. There's specific language defining change in law. Inflation doesn't count as a change in law. I don't believe even a shift in the dollar, the dollar-rupee exchange rate, qualifies as change in law either. You'd have to apply it to particular items, I think, but it isn't the case that our operating expenses have risen because of change in law. If GST gets revised and that has a material impact, then that is a change in law.

Amit Singhi

analyst
#35

All right, thanks.

Harsh Shah

executive
#36

I appreciate that.

Operator

operator
#37

Thanks. Our next question comes from Sahil, an individual investor. You're up.

Analyst

analyst
#38

Hello there. Can you hear me okay?

Operator

operator
#39

Yeah, we're not getting much audio through the line. Could you address the handset?

Analyst

analyst
#40

Has the situation improved at this point?

Operator

operator
#41

Yeah, that's an improvement.

Analyst

analyst
#42

Yeah, so I want to ask about taxes. I was going through the valuation report, and on page, I believe 127, on page 135, it lists tax rates for various SPVs, which come in around 15%-20%. When I look at your reports, I think you're paying only about 6%-7% in taxes. Why is this GEAPP here?

Harsh Shah

executive
#43

I'd say what you're looking at is the tax rate for an individual SPV, as opposed to comparing, on a consolidated basis, the tax actually paid. Those could be two separate points. I mean, I hope you mean the financials, right — or not the financials, or?

Analyst

analyst
#44

Yeah, yeah.

Harsh Shah

executive
#45

Financials, correct?

Analyst

analyst
#46

Yeah.

Harsh Shah

executive
#47

The average tax rate and what’s actually paid in each SPV aren’t the same thing. I don’t believe you can directly reconcile those, because.

Analyst

analyst
#48

So wouldn't that end up having an impact on the valuation? Because when you carry out a valuation, the multiple that gets set depends on the tax rate shown on this slide.

Harsh Shah

executive
#49

Alright. So the valuation report and the actual tax differ, since the valuation report is put together on the basis that this asset is held by someone other than IndiGrid as well. The approach used for valuation goes by the name STSF method. Under the STSF method, what happens is a theoretical tax computation is drawn up on the basis of a particular leverage backing. That formula has already been laid out in the value report. On that basis, if anybody else also owned this asset, what ought the value of this asset to have been? That is how the valuation gets worked out. Whereas what you actually see in the financials is what genuinely sits in the financials, and so under InvIT the financial structuring differs, and so the actual cash flow could differ, correct? These two things are separate.

Analyst

analyst
#50

All right, so in each SPV, what would the average tax we end up paying be? Any estimate on that?

Harsh Shah

executive
#51

No, I can't really provide an estimate on that. For certain SPVs, the figure will be zero. For others, it will be 2%. Some will land at 15%, since each SPV carries its own depreciation schedule and carry forward losses. As a result, the asset life differs. Providing an average is difficult, but at a fundamental level, you can assume that if you examine the cash outflow attributable to tax across the last five, six, seven year period, it will come to a very small amount, right? Calculated as a percentage of our revenue, it will be a single-digit percentage of revenue or lower than that.

Analyst

analyst
#52

Right, that's exactly it. Yes.

Harsh Shah

executive
#53

Alright, thanks.

Navin Sharma

executive
#54

Also, Sahil, the average rate for Index does show up in Index Rate Consolidated Exponentials as well. Your point that we pay marginal tax, or say minimum tax, on Index — that's correct. As Harsh said, because the enterprise value of each SPV had to be calculated regardless of its capital structure, that's why these tax rates are reflected in these SPVs.

Analyst

analyst
#55

Got it. Thanks.

Operator

operator
#56

Thanks. Our next question comes from Deeresh Dave at Sanmat Financial. The line is yours — go ahead.

Analyst

analyst
#57

Hi there. Are you able to hear me?

Operator

operator
#58

Yeah.

Analyst

analyst
#59

Yes, congratulations to Harsh and to IndiGrid.

Harsh Shah

executive
#60

Apologies, we lost you there. Your voice is very faint.

Operator

operator
#61

Deeresh, would you mind covering the handset for us?

Analyst

analyst
#62

Yes. Yes. Is this coming through now?

Operator

operator
#63

That's a lot better. Thanks.

Analyst

analyst
#64

Yeah. Yeah. Many thanks. Harsh and the IndiGrid team, congratulations on backing investors with a fantastic distribution. As a happy investor, first of all, congratulations. My second point, the question I had, is basically this: we're distributing INR 4.10 for the current quarter. We have a reserve that's almost equivalent — if I heard the call correctly, in the management comment, we said we have nearly one quarter's distribution in hand. If I assume, say, roughly INR 4 as the reserve, then why aren't we able to give guidance of INR 4.10 or something? Aren't we being somewhat conservative? Because we're guiding INR 15 distribution while one quarter's reserve is already available.

Harsh Shah

executive
#65

Yeah, no, I think to put it plainly in response to what you asked, we're conservative, correct? IndiGrid has conservative management.

Analyst

analyst
#66

Yeah. Yeah. No, I get it. I hear what you're saying.

Harsh Shah

executive
#67

That’s what we’re aiming to do, I believe.

Analyst

analyst
#68

Sure, I'd rather be caught off guard in a good way.

Harsh Shah

executive
#69

Yeah.

Analyst

analyst
#70

No, but yeah — isn't that being a bit too conservative? That's how I'd put it.

Harsh Shah

executive
#71

No — each individual makes decisions differently. Our perspective, I'd say, is that this is a long-term enterprise, and there are positives, there are negatives, there are things that may go wrong. So a quarter to a quarter and a half of distribution is an adequate requirement to make sure our DPU isn't affected by short-term volatility of any sort, correct? Whether it's war, whether it's COVID, whether it's a capital market freeze, refinancing — a variety of risks can play out, right, across a large portfolio. A quarter and a half of distribution is a very modest figure relative to the overall scheme of things. I think we do keep that in, if I can put it this way, in the firepower to handle whatever volatility might come up, right? Because obviously, I can't forecast what will go wrong over the next four, eight, ten quarters, but all we can do is be prepared.

Analyst

analyst
#72

Yeah. Just one thing I wanted to check — we aren't aware of any negative, basically, with collections at 110% or something like that. Is there any sort of one-time element, and if there is, is that INR 10 or INR 15 that we should factor in this time, or has everything simply worked well for us, and that's what we hope stays that way? Is there any kind of one-time impact in this distribution? Collections have been very high.

Harsh Shah

executive
#73

There's a one-time effect here. What I think has happened is that during the past 2 years, our collections have run very strong. Over those 2 years, we've seen collections at 103%, or above 100%, correct? And that is also what this reflects.

Analyst

analyst
#74

So if that's the case, Harsh, how does that come about? You invoice INR 100, and the most you ought to get is INR 100. What does it mean if, in the prior year, you're collecting or you're receiving something at year-end,

Harsh Shah

executive
#75

So what happens? There’s a receivable date, correct? Suppose you operate the business on a 60-day receivable. When people have extra money, they’ll pay you sooner, so that receivable date turns into 40. It isn’t that you received more than INR 100. You received INR 100, but you can also manage the next quarter with it. And that’s one of the parameters—what does that lead to? Can anyone always pay you more than 100%? No. Next quarter, it might be lower, right? Because of that, we need to account for some fluctuation up and down.

Analyst

analyst
#76

Alright. Alright. I was only attempting to grasp the concept. That represents 60 days, or whatever the working capital cycle happens to be, that ends up frozen as a result of the incentive. Many thanks for responding to the question, and I wish each of you the very best. We're looking forward to a wonderful period ahead for everyone.

Harsh Shah

executive
#77

I appreciate that.

Operator

operator
#78

Thanks. Our next question comes from Arun at ABDS Capital. Your line is open.

Analyst

analyst
#79

Hello there. Can everyone hear me okay?

Operator

operator
#80

Right, sir.

Analyst

analyst
#81

Great. So from what I understand, when it comes to EnerGrid, that entity will locate and develop new projects and afterward sell them on to IndiGrid. Is that right?

Harsh Shah

executive
#82

Yes.

Analyst

analyst
#83

So in that case, what's the reason for setting this up as its own separate entity, given that IndiGrid could have handled it — and in fact is already handling it — on its own?

Harsh Shah

executive
#84

Yeah. That's a solid question. So IndiGrid, as I mentioned before, is an InvIT, and as I said earlier, Investor, we tend to be fairly conservative. Our appetite for risk is smaller when it comes to project size and the sums we're able to put into under-construction projects, correct? First, there are statutory caps on what we can do — 10% of our AUM, and another 20% of our AUM. Second, we don't want to carry big under-construction risk on IndiGrid's balance sheet, because we're conservative. By doing this through EnerGrid, we're limiting how much money goes into under-construction projects. EnerGrid can still take on large projects, since it has the right investors who are comfortable putting money into large projects. So in the end, we at IndiGrid benefit by acquiring those large projects once commissioned, without bearing risk that isn't appropriate for us to take.

Analyst

analyst
#85

All right. And after that, every one of these projects is meant to go to IndiGrid, or might they also be sold to other buyers?

Harsh Shah

executive
#86

No. Every project EnerGrid is working on is being done jointly with IndiGrid, so it will go to IndiGrid.

Analyst

analyst
#87

And finally, how can we at IndiGrid guarantee that we aren't leaving excessive money on the table for EnerGrid, and that we secure fair value?

Harsh Shah

executive
#88

I think this is a debate that never really ends, right? The key thing is that IndiGrid and EnerGrid are collaborating in order to secure the project. So if there's a healthy degree of tension between the investors of IndiGrid and EnerGrid — if IndiGrid attempts to purchase at a value that's too low, the bid's overall cost of capital goes up, and we could end up losing the bid. Conversely, if EnerGrid's investors get too conservative, we lose the bid in that case as well. In the end, as a partner, we see this relationship as a partnership aimed at winning the project. On the day we win it, our numbers are already locked in. There's no negotiation on the bid day. We already know the return at which we'll be buying the project.

Analyst

analyst
#89

Alright, that's a reasonable observation. Congrats on a fantastic run of quarters. Thanks a lot.

Harsh Shah

executive
#90

Thanks.

Operator

operator
#91

Thanks. Our next question comes from Harshada at Indra Singh and Sons Limited. Go ahead, please.

Analyst

analyst
#92

Hi there. Can you hear me okay?

Operator

operator
#93

Yes, ma'am.

Analyst

analyst
#94

Hi there. Congrats to the whole team on delivering another quarter. My question is this: are you open to any equity dilution? And if so, how do you plan to handle the effect on the shares that already exist?

Harsh Shah

executive
#95

Right now, dilution isn't something we're contemplating at all. I'd say we aren't weighing anything on that front at present. Should we do so down the road, the main reason would be to bring in a long-term investor, whether through a preference or charity route into the business, or as an alternative to the rights issue. If it happens via a rights issue regardless, dilution wouldn't be a factor, since every investor would hold an equal right to take part. As I mentioned, there's currently no equity-side capital raising in the plan, so no dilution is planned.

Analyst

analyst
#96

Alright, thanks. And nice work getting this put together.

Harsh Shah

executive
#97

Thanks.

Operator

operator
#98

Thanks. Our next question comes from Rushal at Pravin Ratilal Share and Stock — go ahead, please.

Analyst

analyst
#99

Yeah. Can you hear me okay?

Operator

operator
#100

Yes, sir.

Analyst

analyst
#101

Yes. Congrats on a fantastic quarter. I have a few questions. For the first one, apologies — I missed the distinction between reported revenue and operational revenue. Could you expand on that?

Harsh Shah

executive
#102

Navin, would you mind handling that?

Navin Sharma

executive
#103

Okay, look — regarding transmission booth projects, as I mentioned at the close of, well, basically through last quarter, we'd been booking revenue, transmission revenue. This quarter, we've had construction underway on two booth projects that are under construction. For transmission booth projects, as I noted at the conclusion of the construction period — which is typically 35 years — those are required to be handed over to CTO. So in this instance, there's a particular accounting requirement under NDS that calls for splitting the revenue into three streams. Because here the assets must be built for transfer when the construction period ends, during the construction phase, whatever under-construction revenue needs to be recorded, we've recorded that revenue along with the related margins. So a revenue of INR 76 crore and a margin of INR 1 crore have been recorded. Therefore, purely to reflect operational performance, we've taken out this revenue and EBITDA and presented adjusted revenue. Broadly, for your understanding, historically we've been delivering a 90% EBITDA margin. If we adjust for these two line items, our adjusted margin for the quarter and for the full year sits in the high eighties.

Analyst

analyst
#104

Alright. Alright. Let me ask one more thing about the debt profile. Looking at where the debt stands right now, it's closer to INR 199 billion, and 90% of that is fixed-rate borrowing. Only a quarter ago, the borrowing stood at INR 193 billion, with 75% fixed. I'd just like to get a sense of why there's such a stark 15% gap in the fixed borrowing. What led to that?

Meghana Pandit

executive
#105

So essentially, whenever a debt tranche reaches refinancing, we choose based on the opportunities on offer — either we take a fixed-rate borrowing, whether that's a three-year fixed, five-year fixed, or seven-year fixed, through NCD or bank borrowings. When those opportunities come along, we aim to optimize both the tenor bid and the interest rate bid. That's why you'll notice it in the refinancing schedule we've also provided. Whenever refinancing comes due, we look at our preference, which of course is fixed-rate borrowing. Of course, there's also a portion of the debt that we consider locking in on the floating bid. The variation you observe between quarters is essentially the refinancing that has come up, which we've secured through fixed-rate borrowing.

Analyst

analyst
#106

Alright, alright. One particular question again about EnerGrid. I still can't grasp the reasoning, because we've built a great many assets solely within EnerGrid. Why is there actually a need for an entirely separate entity? I'm still failing to see that logic.

Harsh Shah

executive
#107

Okay, so let me walk through that. As things stand right now, IndiGrid's size is INR 29,600 crore. That's roughly, say, INR 30,000 crore in assets under management, correct? Per InvIT regulations, no more than 10% of our assets under management may sit in under-construction projects, correct? What that means is we're able to take on INR 3,000 crore of construction projects, right? A typical project runs about two to three years, so if we deploy that INR 3,000 crore, we'd probably add INR 1,000 crore of growth annually, which works out to 2 to 3% of size, right, on a runway basis. That's the ceiling for what we can do inside IndiGrid. In light of the opportunity we're seeing, we think that's far too little. So if we can set up a development partnership along the lines of the one we set up for EnerGrid, the limit rises considerably. Take EnerGrid today — it has committed capital of $300 million, which could grow, and that's give or take INR 2,500 crore. They're able to do INR 10,000 crore of projects, right? Through EnerGrid, we've currently lifted our capacity to do projects to almost 3x, right? We're also in conversations with other investors about growing this $300 million to a larger figure.

Harsh Shah

executive
#108

If we handle this outside of IndiGrid, the cap that projects under construction would otherwise hit within IndiGrid no longer applies. So that lets us take on development projects of a much bigger scale — not only at each individual site, but across all projects combined — and that gives IndiGrid a stronger growth trajectory ahead, something we weren't in a position to achieve while staying inside IndiGrid.

Analyst

analyst
#109

Alright, just a few quick follow-ups on that. How large are the projects under construction right now, and where do you expect that figure to be in March 2026? Another question: who are the investors in EnerGrid at present? I mean in the newer entity.

Harsh Shah

executive
#110

So who exactly are the investors in the newer entity, right? Is that what you're asking?

Analyst

analyst
#111

Yeah. Yeah.

Harsh Shah

executive
#112

Sure. So on your first question, I'd say we don't have precise projections, but from what I can tell you, it will be under 10% in March 2026. That figure is going to rise in March 2026. As of today, it's probably in the low single digits. It may go past 5%, but based on the projects we've already secured, it will stay below 10% in March 2026. As for investors at EnerGrid, there are 2 of them. The first is Norfund, which handles capital from the Norwegian government and pension funds. The second is BII — British International Investment — which is essentially the U.K. government's vehicle for putting money into infrastructure assets. Those 2 funds are, I'd describe them as long-term development institutions that are working with us as partners at EnerGrid.

Analyst

analyst
#113

Right. So only for those currently being built, perhaps during FY 2026, we'll likely see something nearer 6 to 7%, and that's going to sit comfortably under the 10% statutory limit we have to stick to. Possibly by March 2027 or 2028, our view is that it will be considerably higher. Have I got that right?

Harsh Shah

executive
#114

No, I don’t believe that’s right, since it shifts, correct? The projects currently being built will finish, say, during the following fiscal year. By March 2027, it could decline as well, right? To forecast that, you really must have precise project projections in hand. It’s not as though those numbers always rise exclusively. They will fall too. Take, for instance, a project we just commissioned at Kilokri BESS, which came online now. That will alter things, right? The profile shifts according to every project and its schedule.

Analyst

analyst
#115

Alright. Alright. There are a few additional questions I'd like to ask. Perhaps I'll follow up with the management team outside this call.

Harsh Shah

executive
#116

Absolutely.

Analyst

analyst
#117

Thanks. Thanks a lot. Again, congratulations and all the best.

Operator

operator
#118

Thanks. The next question comes from Mahir Moondra at Nuvama. Go ahead, please.

Mahir Moondra

analyst
#119

Yeah. Hello. Can you hear me?

Harsh Shah

executive
#120

Right.

Mahir Moondra

analyst
#121

Yeah. First off, congratulations on a solid set of numbers. I had a couple of questions. The first one is, of all the projects we currently have under development, if you could quantify it, what would the overall CapEx spend be on all of them? Second, on the capital structure, aside from what we already have, do we see more debt borrowing that we might carry on the books down the road?

Harsh Shah

executive
#122

Right, so on your second question, the answer is yes — borrowing is going to rise going forward, whether that comes through buying assets that we pursue or through putting money into the projects we're developing at the moment. So yes, there will be borrowings. As for the precise figure, I think every press release will carry a number, but roughly speaking, our total CapEx for the projects we currently have underway will land around INR 3,000 crore.

Mahir Moondra

analyst
#123

Alright, understood. Understood. Appreciate it. That’s all from me.

Operator

operator
#124

Thanks. Our next question comes from Saieswari Vedula at Value Partners Group. Please go ahead.

Saieswari Vedula

analyst
#125

Hello, and thanks for the question. Within the portfolio of assets that are under construction, which projects are expected to come online in FY 2026 and FY 2027?

Harsh Shah

executive
#126

Fiscal years 2026 and 2027 — that is, March 2027.

Saieswari Vedula

analyst
#127

So, essentially, March 26 of next year. Essentially.

Harsh Shah

executive
#128

I mean, every project in our current portfolio has its SCOD falling between March and May 2027. I think that would mean — and I'm taking the liberty here of stretching it to June 2027 — by June 2027, all the projects we currently hold will be commissioned.

Saieswari Vedula

analyst
#129

Got it. And that INR 3,000 crore CapEx figure covers all six through 2027?

Harsh Shah

executive
#130

No — the six, yeah, a few of those are already commissioned. So what's still outstanding is 3 transmission projects, 4 transmission projects, 2 BESS. Yeah, 6 projects. You're right.

Saieswari Vedula

analyst
#131

Yeah, got it. And on the BESS project — so the battery agreement is finished, and has battery procurement already begun?

Harsh Shah

executive
#132

Yeah. We've already handled the battery procurement.

Saieswari Vedula

analyst
#133

Alright. Alright. That's all.

Harsh Shah

executive
#134

I apologize if I can get my details right. My guess is that figure will exceed INR 3,000 crore. The overall capex being initiated comes in a bit above that — nearer to INR 4,000 crore.

Saieswari Vedula

analyst
#135

Got it.

Operator

operator
#136

Saieswari, is there anything else you’d like to ask?

Saieswari Vedula

analyst
#137

Nope, that's all I had. Thanks.

Harsh Shah

executive
#138

Appreciate it.

Operator

operator
#139

Thanks. Our next follow-up comes from Sahil, an individual investor. You have the floor.

Analyst

analyst
#140

Yeah. First off, I want to thank management for fielding questions from individual investors and responding to them with patience. Again, I was looking at the tax situation of Power Grid Corporation — not the InvIT, but Power Grid Corporation — and they're paying taxes at roughly 20%. I wanted to.

Operator

operator
#141

That participant’s connection was lost. We’ll proceed to the following participant. Our next follow-up question comes from Sunil, an individual investor, on the line. Please go ahead.

Analyst

analyst
#142

Hello again. I just wanted to follow up with some questions about EnerGrid’s current project wins in the pipeline — specifically, how many there are and what they’re worth.

Harsh Shah

executive
#143

Regarding the 4,000 crore projects EnerGrid has secured, EnerGrid is putting capital into them. However, on an incremental basis, EnerGrid has not yet won any projects independently as of right now, since we only signed the agreements during the last quarter. Starting this quarter, EnerGrid will move forward and compete for new projects.

Analyst

analyst
#144

Alright. Thanks a lot. That's everything from me. Thanks.

Operator

operator
#145

Thank you very much. A quick reminder for everyone on the line: remember to star and one if you'd like to ask a question. Since no further questions have come in, I'll hand the conference back to management for their closing remarks.

Harsh Shah

executive
#146

Thank you. I want to express appreciation to every investor who has been with us on this call today, and I appreciate your involvement and backing for IndiGrid as well as the management team. I'd like to offer congratulations to Satish, Navin, and Meghana on their long-standing careers at IndiGrid and on stepping into new positions — CEO of EnerGrid, CFO of EnerGrid, and CFO of IndiGrid, in that order. With this fresh emphasis on each business, we feel sure that we can look toward a bigger future and stronger growth for IndiGrid as we move ahead. Thanks to all of you, and we look forward to connecting with you next quarter. Thank you.

Operator

operator
#147

Much appreciated. That brings this conference to a close on behalf of Nuvama Wealth Management. We’re grateful you could join us, and you can go ahead and disconnect your lines at this point. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Indigrid Infrastructure Trust transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Indigrid Infrastructure Trust earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Indigrid Infrastructure Trust or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.