Ivanhoe Mines Ltd. (IVN) Earnings Call Transcript & Summary

July 31, 2025

Toronto Stock Exchange CA Materials Metals and Mining earnings 61 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning, everyone, and thank you for joining the Q2 earnings call for Ivanhoe Mines Limited. <<operator_script>> Today is Thursday, July 31, 2025, and this call is being recorded. At this point I'll hand things over to Matthew Keevil, our Director of Investor Relations and Corporate Communications. Matthew, the floor is yours.

Matthew Keevil

executive
#2

Thank you so much, operator, and a good morning or afternoon to all of you. I'm delighted to welcome everyone to the conference call covering Ivanhoe Mines' financial results for the second quarter of 2025. My name, as the operator noted, is Matthew Keevil, and I serve as Director of Investor Relations and Corporate Communications at Ivanhoe Mines. Joining us on today's line from the company are Founder and Executive Co-Chairman Robert Friedland; President and Chief Executive Officer Marna Cloete; Chief Financial Officer David Van Heerden; Chief Operating Officer Mark Farren; and Executive Vice President, Corporate Development and Investor Relations, Alex Pickard. Today's event will wrap up with a question-and-answer session. Questions can be submitted through the Q&A box on the webcast or via the conference operator using your phone line. If your question doesn't get addressed during the call, please reach out to our Investor Relations team directly — we'd be glad to follow up on anything left unanswered. Before we start, I want to remind everybody that forward-looking statements will be part of today's event, and those statements carry risks and uncertainties that might cause actual results to differ materially from what the forward-looking statements describe. You can find details of these forward-looking statements in our news release dated July 30th, and also on SEDAR at www.ivanhoemines.com.

Matthew Keevil

executive
#3

At this point I’m glad to hand things over to Robert Friedland, the founder and executive co-chairman of Ivanhoe Mine, for his opening remarks. Robert, the floor is yours.

Robert Martin Friedland

executive
#4

Thank you, and all the best to everyone from Switzerland. It’s a lovely day here, and first off I’d like to express my gratitude to the entire operating team at Kamoa-Kakula — they hit a rough patch and got straight to work making Ivanhoe Mine the fastest-growing and best new major mining company anywhere in the world. I also very much want to thank the folks in our Chinese office and our partners at <<inaudible>> and <<inaudible>>, who moved quickly on a big push to have world-class public systems up and running at the site, and already in record time. We’ll be sharing more with you about that pumping and our future plans very soon, but I have never witnessed such a tremendous effort from such a varied group of people rising to a challenge and moving fast to get past it. So with that, and without further delay, let’s turn to the management team. Thank you.

Martie Cloete

executive
#5

Thank you, Robert. It's Marna here. Perhaps we could return to that earlier slide, the one showing Robert speaking. There's the team visible. That's the initial <<inaudible>> pump that reached the site. It was transported by Boeing aircraft. So all of us are flying in four of these pumps, and in addition we're shipping in an <<inaudible>> pump by sea. Quite an impressive achievement from our team. If we could move on to my highlights, this image, I believe, conveys a significant story. We've now been operating for 5 years, and that old truck visible at the rear was part of the first fleet deployed underground at Kamoa-Kakula. We've since successfully completed a rebuild of this fleet. And you can see the maintenance crew positioned in front of it. They're very proud of this first rebuild. We also used this exercise as a way to transfer skills. And it further demonstrates how the mine is gradually maturing into one of the largest copper mines globally. So with that as background, I'll briefly walk you through the quarter's highlights. So notwithstanding our operational difficulties — I mean, it feels as though I've been in contact with most of you, and certainly our team in London and Vancouver as well, continuously, and Robert, over the last 2, 3 months.

Martie Cloete

executive
#6

For the second quarter, we generated positive net cash flow of roughly $169 million. We also discussed the dewatering work — every one of those dewatering ordering activities remains on schedule, and dewatering should be finished by year-end. Both of our <<inaudible>> concentrators are running at 80% to 85% capacity. Phase 3, meanwhile, is running above 30% capacity. So that's genuinely one of the success stories. We still intend to launch a smelter in September. What's really exciting for us is that, as we move nearer to production at Platreef in Africa, sentiment around PGM-Swiss appears to be shifting, with Platinum and <<inaudible>> prices at a high. So Platreef comes online at exactly the right moment. We're also in the last stages of finishing the Kipushi de-bottlenecking project, which ought to let us raise our production capacity by approximately 20%. You can see the statistics on the left side of the slide. I won't go into those — David Van Heerden, our CFO, will walk you through the financials. Moving to the next slide, I think it would be remiss of me not to mention the site achievements we delivered during the quarter.

Martie Cloete

executive
#7

I think when a company goes through the kind of event we had in May and comes out of it with no lost <<inaudible>> injuries, that's a significant accomplishment. And I'd like to commend the team at Kamoa-Kakula for handling the situation with absolute maturity and professionalism and for looking after all our people. And it's a team effort. It's not just one person that makes a mine safe. It's a culture of safety, and it's everybody working together to make sure that we look after each other. But also another significant achievement that shouldn't go unnoticed is that the Kipushi project engineering team has not recorded a single lost time injury since the construction of the Kipushi concentrator and throughout the de-bottlenecking program. So that's also a significant milestone and something we're very proud of. And then I'm going to the next slide just on our sustainability efforts, and there's a little deck we produced with our quarterly news releases where you can see what we are up to. But <<inaudible>> to we decided to showcase Kipushi. I think we really show the photos of what we achieved at Kipushi. But what we've done over the years is we've <<inaudible>> what we've done in Kamoa-Kakula at Kipushi a slightly smaller sale.

Martie Cloete

executive
#8

We have, however, launched community initiatives in aquaculture and agriculture. At Kipushi there are roughly 53 fish ponds, along with 21 hectares given over to crop farming, plus poultry operations comparable to those we run at Kamoa-Kakula. These efforts have genuinely left their mark on the entire town. They deliver food security as well as business openings for community members in the area who do not work at the mine. With those opening remarks in place, I'll pass things to David Van Heerden, who will walk you through the financials for the quarter.

David van Heerden

executive
#9

Thanks, Marna, and good morning — good day to everyone who's on the call with us today. Let's go right to the following slide. Despite what the seismic activity in May did, Kamoa-Kakula moved nearly 102,000 tonnes of copper during the second quarter. That's only 8% below the 110,000 tonnes we sold in Q1. Contained copper sitting in concentrate inventory rose to 53,600 tonnes, compared with 48,000 tonnes held when Q1 ended. Roughly <<inaudible>> of those tonnes sit at the Kamoa-Kakula on-site copper smelter as a buffer while ramp-up proceeds, and 18,500 tonnes of the leftover unsold copper were restored at the nearby Lualaba copper smelter, where they await cold treatment. We anticipate that figure will come down steadily over the coming few months, meaning those tonnes would surpass tonnes produced in upcoming quarters. Kamoa-Kakula posted revenue of $175 million for the second quarter of 2025, at a realized copper price of $4.34 per pound of payable copper. Revenue contained a $6 million gain on the mark-to-market of provisioning price sales, whereas Q1 results had included a gain of $51 million. Onto the next slide. Kamoa-Kakula posted EBITDA of $325 million for Q2, which the lower tones sold, lower growth process and abnormal costs stemming from the seismic activity affected — but there's more on that on a later slide.

David van Heerden

executive
#10

Cash costs for Q2 came in at $1.89 per pound of payable copper, while year-to-date cash costs are sitting at <<inaudible>> per pound of payable copper. The higher <<inaudible>> cost in Q2 2025 was mainly due to a lower grade of ore processed, which included stockpiled ore, and that's since May. The quarter's results really demonstrate just how diversified and resilient Kamoa-Kakula is as a mining complex, with its various mines, contractors and ample infrastructure. Moving to the next slide, we illustrate Kamoa-Kakula's EBITDA waterfall. The EBITDA waterfall highlights what drove the quarter-on-quarter EBITDA change; the decrease in tonnes sold contributed $49 million to the quarter-on-quarter EBITDA decrease, which you can sort of see in red there on the right-hand side of your screen. And while they were favorable to changes on the copper price and logistics and treatment and refining charges. And in Q1, as I mentioned earlier, we recognized a $51 million gain on the mark-to-market of -- and provisionally priced sales, which was only $6 million in Q2, and that resulted in a $45 million delta when comparing the two quarters. Realization costs were slightly up from Q1.

David van Heerden

executive
#11

Then the major highlight was the abnormal cost stemming from seismic activity. So in Q2, any costs from May onward that weren't contributing to production were pinpointed, ring-fenced, and labeled as abnormal cost. Under accounting standards, those costs don't go into inventory—they're expensed directly into cost of sales. Put simply, the abnormal cost removes the quarter's costs tied to the downtime at Kakula. As an illustration—and I'll elaborate a bit since there have been some analyst questions regarding abnormal costs—all costs at Kakula as a business unit were classified as abnormal from when mining halted until it restarted. So abnormal costs consequently take in the dewatering response costs, covering both permanent and temporary underground pumps plus infrastructure needed to restore lost pumping capacity, stabilize water levels, and get limited mining going again in the west, and naturally they'd include the electricity for the dewatering work. They also take in the cost of idle crews until we could deploy them at Kakula West or at Kamoa, along with similar costs that weren't contributing to production.

David van Heerden

executive
#12

So the abnormal cost treatment was applied to Kakula mine operations — both East and West — up until operations restarted on the west side. After that, it was applied to the East and to dewatering only. So with mining crews now back and no longer idle, we do expect that the abnormal cost for Q3 and Q4 will only be the cost linked to dewatering, and likely only the electricity costs, because the funds are already procured — still new and limited maintenance is required. So essentially it's not a recurring item. And of course, the seismic activity resulted in additional inefficiencies beyond those normal costs, and that produced a further quarter-on-quarter impact on cost of sales, which also affected C1, where I'll go into a bit more detail on the following slide. And Kamoa-Kakula recorded an impairment of $59 million in Q2 2025, where specific assets — including fleet, pumps and other assets affected by the seismic activity and the resulting water inflow — were identified that may be lost or irrecoverable. And this included a full assessment of assets that the team believes are completely unrecoverable, as well as an impairment charge on the assets that are potentially recoverable using a probability assessment.

David van Heerden

executive
#13

All right, so all things considered, that's a pretty modest figure relative to how big the incident was, I'd say. Let's go to the following slide. Our 2025 cash cost guidance range has been revised to $1.90 to $2.20 per pound of payable copper. What pushed this above our earlier guidance is the effect of the lower expected feed grade of ore going into the concentrators for the rest of 2025. Before the seismic activity, grade mined at Kakula stood at about 5%, and at present we anticipate average fee grades into the Phase I, Phase II concentrator of roughly 3% copper through year-end, with material coming from both surface stockpiles and the western side of the Kakula mine. And I want to emphasize that this is -- that this higher cash cost level is only temporary, while the Kakula mine goes through the turnaround, and we will return to the higher portions of Kakula later this year, and then cash costs will clearly come down again. It's also worth noting that we will, of course, capture the cash cost reduction benefits of the smelter starting very early next year. And as we've said before, this will at the very least cut the logistics cost in half, which came to $0.49 in Q2, as the breakdown on the right shows.

David van Heerden

executive
#14

The drop here comes from the smelter cutting the volumes it will ship to the anodes in half, while the grade of the copper concentrate we're currently producing and transporting is more than twice as high. Moving on to Kipushi on the following slide. Once again, Kipushi made a positive contribution to our EBITDA, and the ramp-up toward optimal levels is still underway. Mark will take you through the production results, which have been positive since the first de-bottlenecking step was finished, and we're expecting better financial results once Step 2 wraps up later this year. Cash costs at Kipushi have been kept nicely in check, sitting right in the middle of our 2025 guidance range. We also anticipate that mining support services and processing costs will decline as production rises over the rest of the year. Now to Ivanhoe Mines' consolidated profit and EBITDA on the next slide. Ivanhoe posted quarterly adjusted EBITDA of $123 million in this year's second quarter. That figure is lower than the EBITDA, reflecting the reduced attributable EBITDA from Kamoa-Kakula for the reasons I've already laid out. Adjusted EBITDA for the year's first 6 months came to $353 million. Despite the seismic activity at Kamoa-Kakula during the quarter, Ivanhoe still delivered a profit of $35 million in Q2 and a profit of $158 million for the first 6 months of the year.

David van Heerden

executive
#15

Now, let's look at the liquidity picture on the following slide. This slide makes it quite evident, I think, that Ivanhoe held $672 million in cash and cash equivalents at the close of June, and Kamoa's cash on hand stood at $246 million. So we're in a strong position to bridge this brief period of refer. Then, if you turn to the revision of Kamoa's CapEx guidance on the slide after that. Following a thorough examination of the capital expenditure needs tied to the recovery and optimization work at Kamoa. We brought down the upper bound of our 2025 guidance range. This adjustment involves pushing back some nonessential capital projects, while the funding needed for the Phase I and Phase II pumping, together with a new box cut, an additional decline at <<inaudible>>, and the decline at Kamoa 2, has been folded in. We've likewise refreshed our 2026 guidance to reflect the most recent mine plans and to capture the share of this recovery capital that gets spent in the coming year. The range has been set wide enough to give generous contingency for further work while the plans get firmed up, though the upper end could well come down once these plans are finalized.

David van Heerden

executive
#16

Moving on to the next slide, let's discuss our CapEx plan for Platreef and Kipushi. Our growth-plan spending has stayed on track throughout Q2, and guidance remains as it was. At Platreef, expenditure is coming in toward the bottom of our 2025 guidance range, and Phase 1 is nearly finished. During the quarter, we drew another $30 million from Platreef's senior debt facility. We're also continuing to push ahead with Phase II development and with negotiations on a $700 million senior project finance facility for Phase 2 — that's expected to close in the first quarter of 2026, and it is going well. The first phase of Kipushi's program wrapped up in June, with phase two on schedule for completion in August, and Mark will cover that in more detail later in the presentation. Now, looking at our pro rata financial ratios on the following slide. Our leverage ratio has risen slightly compared with where it stood at the close of Q1, but it's still relatively low, even after the successful completion of our $750 million notes in January. Our target net leverage ratio through the cycle stays at 1x. And while, on a backward-looking basis, it currently sits above the target we set ourselves, it should decline quite rapidly once the Kakula recovery plan is finished.

David van Heerden

executive
#17

As I noted earlier, our pro rata cash position is quite healthy. At June's close, pro rata cash on hand stood at $774 million. With that, I'll turn things over to Alex Pickard, our Executive Vice President, Corporate Development and Investor Relations, who along with Mark Farren, our COO, will walk through the exciting operations and project updates.

Alex Pickard

executive
#18

Thanks, David, and hello everyone joining us today. Alex Pickard speaking first, and then I'll split this part of the presentation with Mark Farren, our Chief Operating Officer. As you can see in the photograph here, two of our mine superintendents were recently underground at Kakula. That should make it clear to you that the mine is still very much there. But just so there's no confusion, neither Mark nor I appear in that picture, and let's go to the next slide, please. This slide gives the customary review of production at Kamoa-Kakula across the second quarter of 2025. As David mentioned, the quarter-on-quarter production decline overall was really not all that dramatic. Still, we benefited from a record month in April, the first month in which we ran above 50,000 tonnes of copper production, equivalent to more than 600,000 tonnes of copper on an annualized basis. That represented a major milestone before the seismic events started to unfold. Those events, as noted, got underway in mid-May, and from that point on they had a substantial effect on mining and processing at the Kakula operation. All told, we lost roughly 3 weeks of operations at Kakula because of stoppages.

Alex Pickard

executive
#19

However, ever since we resumed underground operations on June 7, we've been running at a reduced mining rate, with the stockpiles making up the difference — and Mark will go into far greater detail on how we intend to fix that over the coming slides. If you look at Phase II on its own — I believe Marna touched on this — the Kamoa operations delivered an outstanding quarter. We achieved record throughput of 1.6 million tonnes out of Kamoa, or Phase III, which annualizes to very nearly 6.5 million tonnes. And that came without spending anything further on de-bottlenecking. Grade was a record as well, at 2.93%, again extremely close to 3%. Then recovery came in at 86%, essentially approaching the <<inaudible>> parameter ahead of any of the Project 95 or Project 92 optimization work. So Phase III by itself accounted for more than 41,000 tonnes of copper output in the quarter. I'll now hand over to Mark Farren, who will walk you through the following slides covering dewatering progress on the mining side.

Mark Farren

executive
#20

Thank you, Alex. Perhaps I could look back a bit at what Robert called the bump in the road. It isn't a brick wall — it's a bump. A large bump, yes, but still a bump. So because the seismic activity took place in May, we needed to carry out two phases of dewatering. The first was to get water levels stable, since water was flowing into the mine at 3,700 liters per second — every second, continuously, at the mine. All of the vertical pumping infrastructure is still intact, so really it was about working out how to feed that vertical pumping infrastructure from various areas inside the mine. If you look at the dotted lines on the eastern side — essentially at the top of your page, on the left-hand side — those dotted lines represent the areas currently being mined, and that basically indicates whether the water levels sit in a saddle between the East and the West. Stage two then is really about bringing that water all the way down across all the red areas, basically on the West and the East.

Mark Farren

executive
#21

And after we complete that step, the dewatering of the mine would be fully finished. I'll spend a moment on this when we get to the next slide. Let's move to the next slide, please. So, taking a look at where things stand, the first pump has in fact been delivered and is on site right now. Four of these large units — each rated at 650 liters per second and 2,000 kilowatts — are going to be installed, and they'll be arranged in pairs. That comes to roughly 150 tonnes of steel and pump equipment placed deeper down, two of the <<inaudible>>. One location is the old multi-stage pump area, and the other is a main shaft that runs more or less into the middle of the footprint. If you picture it, these are submersible multistage pumps. Essentially they get lowered through the water down to the base of <<inaudible>>, to the bottom of the mine, and then they're turned on. With that infrastructure pumping at roughly 2,600 liters per second, and with your other infrastructure positioned further down, the mine will dewater quickly. Our plan is in fact for full dewatering by December. That's the plan we have in place. As we progress downward, though, we'll gain access along the western side of the mine, which also happens to be the higher grade zones that Alex mentioned a moment ago.

Mark Farren

executive
#22

Moving to the next slide, please. If you could all look at this slide, at 1, the 2 and the 2 — those are the regions where you're currently mining. The dark red section in the center is the east-to-west area, east to west, where your high-grade mining zone is located. It also happens to sit at the bottom of the mine. As for where we stand, we've completed stability work. We've been able to establish stability. In other words, all the water flowing into the mine is being pumped out within the mine, and it's stable. We've begun mining on the west with a number of crews, at roughly between 10,000 and 15,000 tonnes per day, though obviously those aren't the grades we want to mine over the longer term. So at 10,000 to 15,000, we need about 15,000 tonnes a day, which you'll run to one of those concentrators, one of the two concentrators. So the remainder needed to reach 80%, 85% production or feed is currently being supplied from stockpiles. Then there's a plan on the eastern side to develop new mining in areas beyond the zone that was affected by the seismic activity.

Mark Farren

executive
#23

That work is already in motion, and it's progressing well. Then we determined that we can <<inaudible>> the mine. The target date is August. So the initial batch of pumps — a pair of large multistage pumps — will be turned on near the end of August, and the following phase will go in during September, and after that we'll be dewatering the mine. A full geotechnical assessment gets completed, and then essentially a redesign from that point. We've carried out substantial work alongside David Beck, and we've brought in other — some of the top geo-tech specialists globally to examine what took place. First point. Second point, they're also examining how we will lay out the mines going forward, not just this mine but clearly the remainder of the mining footprint at Kamoa and Kakula and <<inaudible>>. We're pretty enthusiastic about what we're seeing, and I'll get to that when I referred to it on the next slide. Next slide, please. So if you look at this slide on the right-hand side of the East, we are carrying out redevelopment. We're planning it, and we've begun executing that redevelopment to open up the footprint on the other side of where the seismic activity occurred.

Mark Farren

executive
#24

Until we've fully dewatered the eastern workings—which, as I mentioned, will happen by December—we won't be able to assess the damage in the mined areas completely. There's a very good chance we'll get through portions of those areas and restore mining on the other side. The fallback, though, is the black redevelopment you see. That redevelopment will be finished by next year. Following that, we'll be back inside the footprint on the East. On the Western side, the key issue really is bringing the water levels down. As I said earlier, we're in on the South and the North. But to get those water levels down, what matters is returning to the plus 5% copper. As we lower the water levels—which should occur this year, starting in quarter 4—we ought to begin seeing better mine grade on the western side. So overall, I think it's really about getting the water levels down, reestablishing the East as a worst-case scenario, and then getting the mine up and running—and we're talking about this mine only. As for where we stand, I think our next milestone will be returning to the market and to everyone listening on this call to explain how things look for the future—the short-term future.

Mark Farren

executive
#25

So by September we'll have something that examines what's left of '25 — already forecast — plus '26 and '27, and then I'd probably want to see what steady state looks like. Personally, I'm fairly optimistic that we'll get there in the year '27. We'll be up around the figures we were targeting previously. That's where I stand personally, and we'll need to get back to you on those points. Then by quarter 1, 2026, we'll finish a full life-of-mine integrated development plan, with the proper building blocks and the proper sequencing across all these mines for the next 40 years. It's still a fantastic ore body — the best ore body anywhere in the world. We've been able to examine quite a few opportunities, particularly around Kamoa, one in two and <<inaudible>> as well, which create more openings for us both near term and long term. And clearly, we'll have to take a completely fresh technical look at how we've been mining at Kakula. But overall, the long-term prognosis, as far as I'm concerned, is solid — solid, just as you'd want to see.

Mark Farren

executive
#26

Appreciate it. Moving on to the following slide. Alex, would you like to cover the processing strategy?

Alex Pickard

executive
#27

Yes. Thanks, Mark. I believe this one comes back to me. So we're discussing the concentrators here, and we did present a comparable slide during an earlier conference call. What this really lays out is the processing plan for the rest of 2025. So on the right-hand side, in the bar charts, first, if you look at the left-hand bar, that represents the Phase I and II concentrators, which have 9.2 million tonnes of nameplate capacity. Essentially, our goal, and where we stand today, is to fill those concentrators at approximately 80% to 85% of total capacity, or perhaps higher if we can somehow achieve it. So as of now, about 50% of that capacity is being supplied from the old stockpiles we hold, at a grade of 2% to 2.5% copper. And the other 50% is being supplied from the successful restart of mining operations at Kakula West, though within that somewhat limited footprint until dewatering progresses. So that's roughly a 3% grade, which will hopefully become a 4% grade before long, and then climb back toward 5% grade by the end of the year. As the year goes on, you'll begin to notice some shift in this balance, likely favoring more ore coming from the run of mine, both from Kakula and then potentially supplemented by <<inaudible>> ore coming from the Kamoa side.

Alex Pickard

executive
#28

And of course, that contribution from the stockpile is going to begin declining as well. Regarding those stockpiles, we actually have sufficient material to keep operations going essentially until they run out in Q1 of next year. And by then, we should have increased output at other mining areas to feed the concentrator. The bar on the right illustrates Phase II, which, as I said, remains the standout performer. Basically, we intend to operate Phase III at 6.5% capacity, which is significantly above its nameplate, and really extract as many tonnes as possible from that portion of the mining operation. So we're very much on track to achieve the revised 2025 production guidance of 370,000 to 420,000 tonnes of copper in concentrate. But do note that year-to-date, just through the end of June, we've already produced 245,000 tonnes of copper and concentrates. Next slide, please. So turning to the direct <<inaudible>> smelter, and this is really probably the most exciting development coming in the next quarter. The smelter is now essentially mechanically complete. And you can see a great photo here with the blending facility in the foreground and the smelter in the background.

Alex Pickard

executive
#29

We're now in the last phases of commissioning, and the furnace heat-up is scheduled for September. That's going to be a major milestone for Kamoa-Kakula, essentially transforming it into a fully integrated underground mine feeding a copper or anode copper operation. We're eager to bring you an update on that with our next set of results. As David noted, we currently hold substantial copper inventory — 31,500 tonnes of copper sits at the smelter, ready to support startup. We're looking forward to drawing that down to approximately 17,000 tonnes, which represents the working capital in the circuit at the smelter rating at a given point in time. We've also discussed on many occasions the dramatic decrease in C1 costs that the smelter will deliver. If anything, that effect is even more pronounced right now, because when we generate ore from lower-grade sources, the concentrate produced is slightly lower grade than what we'd normally obtain from Kakula, which carries higher logistics and realization charges. From that perspective, the smelter truly cannot arrive soon enough to help, as David was saying, in bringing those cash costs back down again.

Alex Pickard

executive
#30

Turning to power on the next slide. Power availability was truly the major issue we used to talk about in earlier quarters. Compared with some of the operational problems we dealt with in the second quarter, it now feels almost trivial. Still, I believe a defining trait of this world-class team is how we've demonstrated the capacity to tackle key challenges over time, put together a plan, and then carry it out very successfully. And on power, I think the results of our efforts will become visible very soon, since the giant <<inaudible>> turbine #5 is now mechanically complete. That's what this image shows you. Pre-commissioning work has already begun, and wet commissioning of that turbine remains on schedule for early next quarter, which will begin supplying 178 megawatts of clean energy to the grid. Regarding getting that energy to Kolwezi and ultimately Kamoa-Kakula, a major milestone comes in Q1 of next year, when we will finish a new static compensator at the substation. That will essentially enable far more stable voltage coming from <<inaudible>> to arrive at Kamoa-Kakula.

Alex Pickard

executive
#31

So I think it's quite realistic to state that come early next year, we'll have overcome the worst of our power difficulties, and that ties in rather well with the slide that follows. The extra power we'll be producing from <<inaudible>>, which comes to nearly 180 megawatts, will also be followed soon after by the finishing of a 60-megawatt battery solar energy project. That one is now being executed. Site clearance and early earthworks are in progress. It's actually constructed in two modules of 30 megawatts apiece, and both are separate independent power providers funding that CapEx, and we'll finish that project by mid-2026. So Kamoa-Kakula will be the offtaker of that power. And that power will supply as much as 25% of Kamoa-Kakula's total energy requirements, coming from a captive and very green source. The project is highly scalable as well. So we intend to go up to 120 megawatts. There's no reason we can't keep going past that. And so we're now actually confronting a realistic possibility. It didn't look realistic a few years back, but we may in fact have a power surplus by this time next year. So with that, that essentially wraps up Kamoa-Kakula, and then I'll hand it back to Mark Farren to walk you through some of the progress we've been making at Kipushi.

Mark Farren

executive
#32

Thanks, Alex. Alright, so the push here, in short, holds no real surprises. We're occupied with essentially two major shutdowns across the year, and we're set to complete the de-bottlenecking plus a modest upgrade so the circuit can deliver roughly 250,000 tonnes of zinc annually. That project plan has progressed very well. As you'll notice in the first half, we essentially produced 84,000 tonnes of zinc, and our forecast is 182,400 tonnes of zinc, I believe. And guidance stays unchanged, which means it's somewhat weighted to the back end. We've got — if you move to the following slide, that's probably clearer. So one more significant shutdown is coming in August. After that we wrap up the de-bottlenecking, and that essentially frees up another 20% of capacity. During this first half, we've had several shutdowns. So roughly 11 days of output were lost, and I believe around 5 days of shutdowns remain in August. Then we ought to be operating above 20,000 tonnes of zinc each month in the near term, and over the longer term probably 25,000 tonnes of zinc. So overall, at Kipushi, no surprises on feed grades, and no surprises on the mining side.

Mark Farren

executive
#33

The strong outcome from the work completed on the concentrator. That final shutdown is the last one, in August, and I think we're going to — it's going to shoot the lines out, and it's going to go well as a zinc mine. It really is one of the world's major zinc mines. Can you believe it? And the next slide. I think I've covered this. No, sorry. Yes, Platreef — if you cast your minds back, we planned the small Phase 1 concentrator that you see there in the foreground. And that was going to be fed by the Shaft 1 mine, which at the start was really a bulk sample shaft. And then last year we made a decision to do Shaft #3, to equipment for <<inaudible>>, and to move quickly into, let's call it, Phase I, into Phase II, and then schedule the Phase II concentrator to go along with that. So the Phase 1 concentrator is ready. We're all mining in reef at the moment, and we will feed that first concentrator in quarter 4, which is exciting for us. Right now, we are mining development ore, we're stockpiling on surface. And we will — and we will begin commissioning that concentrator in quarter 4 this year.

Mark Farren

executive
#34

Simultaneously, we're finishing up building Shaft #3, and that truly changes everything for us. It lifts the <<inaudible>> capacity up to 5 million tonnes per annum. And alongside that, we intend to speed things up, and we've made a commitment to accelerate Phase 2, which essentially unlocks Platreef. Moving to the next slide. So this shaft you see, the one right here in front of you in blue, Robert, the roof is now on. That's shaft #2. It has a 10-meter diameter. It can handle some of that work, but in fact it's the Phase III expansion shaft. The shaft can <<inaudible>> -- so should you include that, you can include 5% <<inaudible>>. So a huge quantity of booking capacity comes in once the shaft is finished. As we proceed with Phase I and Phase II we will likewise be scheduling Phase III. That's the study now published that we've put out. Thank you. Next slide. I believe the tailwinds for <<inaudible>> on the platinum side really revolve around pricing. There's been an enormous shift in platinum and palladium prices this year by itself, it has an enormous effect on our new net present value, flowing through IRFS and our Phase II PEA.

Mark Farren

executive
#35

If you look at the sensitivities, NPV moves between 1.7% and 3.8%, and reaching <<inaudible>> requires a lengthy lead time. So I think we're at this point as we head into quarter 4 of the year, and we'll begin producing PGMs and selling them. And I think the major shift starts in quarter 1, when shaft #3 is running. So in quarter 1 next year, with Shaft #3 running, we can speed up Phase 2 development. And in my view, at that point you get the right kind of scale you're after. Another very important point here is our $599 per ounce fee. I believe it will be the lowest in the industry. I'm not sure anyone will be able to beat that cost. Thank you. Next slide. Alex, are you going to cover this?

Alex Pickard

executive
#36

Absolutely, and thanks, Mark. As is our custom, I'll wrap up the presentation by giving you an exploration update, beginning with the Western <<inaudible>>. Back in mid-May during the second quarter — which now seems quite distant — we announced a highly significant increase in resources at the combined Motoko district, and you can view that in the right-hand image. Essentially, over roughly 18 months of drilling, we came close to doubling the overall results, and we're rapidly approaching 10 million tonnes of contained copper. To give you a sense of how efficiently we're operating in the Western <<inaudible>>, achieving that — adding another 4 million or 5 million tonnes of contained copper — likely cost us in the neighborhood of $30 million to $40 million. That makes the strike rate extraordinarily high. On the right-hand plan, you can observe the enlarged extent of the new resource base. In red — it's a bit <<inaudible>> — you can see the inferred resource outline from the 2023 update. And what we've now added to that footprint at <<inaudible>> are the new discoveries at <<inaudible>> West at <<inaudible>>.

Alex Pickard

executive
#37

And then we have substantially filled in the ground between <<inaudible>> West and <<inaudible>>. So these aren't truly new discoveries at this point. They're actually developing into what looks like a new combined, fairly cohesive copper district—which we now sort of call <<inaudible>>—and that already stands comparison in scale with, say, a <<inaudible>> mine. So it really does feel quite close to that discovery story starting from 2008 onward. The mineralization remains open in several directions, south included. And so you can see a zone we intend to infill, which sits essentially between the lower edge of the <<inaudible>> shell and then there's a step-out holder labeled KTK 48 that you can see, which is well mineralized. That is 2 kilometers to the south. So there's considerable potential to keep adding to this resource. It was really a technical cut off at a given point in time, to update and QP <<inaudible>> that we have kept drilling since then. If I move to the next slide. This is really just looking at the Western <<inaudible>>, what we've found alongside Kamoa-Kakula on a global scale. And I think you can already see it is certainly one of the largest discoveries of the past decade or more.

Alex Pickard

executive
#38

We count #5, but it's still growing quite a bit. And the stars, as always, are highlighting the grade we have at the Western <<inaudible>>, which closely resembles Kamoa-Kakula at between 2.5% and 3% copper, and honestly it's sort of unsurpassed on a global scale. Just to repeat, I'm looking at the number — the resource number again. So we now have more than 500 million tonnes of resource <<inaudible>>. So this already truly has the scale to become a major development and a stand-alone mine — in fact, multiple stand-alone mines. But we're by no means done. Drilling is underway. We're in the middle of the dry season right now. We have 9 rigs turning in the West <<inaudible>>, and we're focusing on some new licenses that we acquired in the Western <<inaudible>>. So I'll be watching this space very carefully over the next quarter and beyond. The final slide in the presentation, and moving to our new exploration horizon. So the logo of Ivanhoe Mines did use those same new horizons, but we dropped it at a point in time. But we're now very active in our neighboring countries, Angola and Zambia, as well as much further afield in Kazakhstan, but all of this follows a similar thesis, which is chasing sedimentary <<inaudible>>, which we know as much as anybody in the world about from what we've done at Kamoa-Kakula and in the Western <<inaudible>>.

Alex Pickard

executive
#39

In Angola, we're seeing consistent headway across a very large land package. This is exploration at a truly greenfield stage. Even so, a first-ever contract has now been granted for drilling beyond 6,000 meters, which is set to get underway later in the year and carry through into 2026. Turning to Kazakhstan, you may remember that back in January we told you about a vending exploration partnership we signed covering a substantial basinal position within the <<inaudible>> belt there. That belt is regarded as the third biggest sedimentary copper belt globally. Since January, we've therefore been moving ahead at real speed alongside our joint venture partner. Within just 6 months, licenses covering nearly 17,000 square kilometers have already been granted to us. That gives us a license position around 7x the size of the Western <<inaudible>>. It's fairly comparable, in fact, to what Ivanhoe Mine began with in the DRC back in the late 1990s. As ever, our approach is to concentrate heavily on drilling as much as our budget allows. Drilling therefore got started this month of July, with 17,500 meters planned and some exciting initial targets for us to concentrate on.

Alex Pickard

executive
#40

That brings the presentation to a close, I believe, and I'll hand things over to Matthew Keevil, who will chair our Q&A.

Matthew Keevil

executive
#41

Thank you, Alex. Yes, at this point we'll open things up for questions and answers. To start us off, I'll return the call to the operator so we can take whatever inquiries are queued up from analysts on the phone line. After that, should any time remain at the close, we'll address web-submitted questions as long as the schedule permits. So, operator, please go ahead and begin with the questions from the phone.

Operator

operator
#42

<<operator_script>> Our first question is from Daniel Major of UBS.

Daniel Major

analyst
#43

Yes, so I have a few questions. Starting with the first one, I'm just thinking about the timeline for information regarding guidance at Kamoa-Kakula. My understanding is that you'll be providing the market with an update in September in connection with a site visit. Could you give us a sense of what you expect to share with the market at that point, and then in Q1, as you're sort of working through the dewatering and the work involved in redesigning the geotechnical aspects?

Mark Farren

executive
#44

Perhaps I can offer something on that. So the market would need some direction from us regarding '26 and '27. That comes with the September guidance. Then, once Q1 wraps up, we'll have a complete life-of-mine plan together with the 43-101 in March of next year. A fresh full life-of-mine plan.

Daniel Major

analyst
#45

All right. Just one question about the guidance for '22, '26, and '27 — what makes you confident that you'll be able to have conviction in that, given that you haven't actually fully dewatered the mine or redesigned the mine plan yet?

Mark Farren

executive
#46

That's a fair question. So the assumptions — you could take them as conservative, if I put it that way.

Martie Cloete

executive
#47

I’ll add a point here as well. Another thing we intended to do is separate out the area we still can’t reach and give some sensitivities for it. Even so, it will show you how our future plans look under the new mining method. What remains uncertain after that would be the central block, and we’ll be able to share that once dewatering is done. So that’s the part where you’ll need to make some assumptions. For everything else, though, I believe our confidence will be quite strong, and I think it will feed into the life-of-mine plans we’ll publish earlier in 2026.

Daniel Major

analyst
#48

Moving to the second question: if you step back and consider what caused that seismic problem, and how it could affect mining method productivity and costs down the road? In other words, should we view this in terms of smaller blocks? And ultimately, less productive, in order to keep these issues from arising going forward and having a knock-on effect on the cost outlook for the operation across the life of mine?

Martie Cloete

executive
#49

From our vantage point—and this echoes what Mark mentioned before—we're feeling fairly positive about how much we'll produce. That said, it's premature to determine whether crew scheduling remains necessary. Phase scheduling is still required. Consequently, a cost estimate can realistically be formed only after that effort is complete. So regrettably, you'll need to hold off until we release the information.

Daniel Major

analyst
#50

And just one more question about Kamoa-Kakula, if I may. When I look at the sort of implied C1 cost versus the gap between revenue and EBITDA, it looks like there's a pretty big — a much bigger adjustment this quarter. In terms of reconciling the costs. Is that — are those costs kind of extra costs tied to the incident? Could you give us a bit more color on that?

David van Heerden

executive
#51

The reconciliation of EBITDA appears in our MD&A. If you review it and questions remain about any of those line items, please get in touch. Still, the effect of the abnormal costs is what has mattered most, since that ultimately gets added back for C1 <<inaudible>>.

Daniel Major

analyst
#52

That wasn't really meant to address consolidated group EBITDA. I was referring to the specific EBITDA figure — the $325 million for Kamoa-Kakula. But yes, there are extra costs tied to the incident that the C1 doesn't capture. Should those be expected to continue in Q3 and Q4? I'd expect that to be the case too.

David van Heerden

executive
#53

So no, we don’t anticipate those extra costs carrying on into Q3 and Q4, apart from possibly a modest amount of unusual costs tied to the dewatering. But I mean, at present we estimate that this would come to approximately $10 million for the rest of the year. So that won’t shift the needle much.

Operator

operator
#54

Our following question is from Andrew Mikitchook with BMO Capital Markets.

Andrew Mikitchook

analyst
#55

Let me go back to what I believe was Slide 24, if I'm reading it right, where you're supposed to have refreshed the long-term mine plans. I suppose if we look closely at that, I'm sure portions of it are still being worked through, and there's another ramp there. Would that ramp have been driven regardless in order to reach the secular West section, not the West part of Kakula? Or is it something being carried out purely to tweak tonnages over the near to medium term?

Mark Farren

executive
#56

That wraps up logistics for the minute. Essentially — I believe it's a belt section. It may not be the sole solution; that line is something we're also examining, along with increased borrowing in the central block of the west. So it's mostly logistics.

Andrew Mikitchook

analyst
#57

All right. And then I just wanted to verify something, because you provided some numbers that I understand to represent a dewatered section of Kakula East, and you noted in the press release that certain areas had modest continued wording of that with the current pumping capacity. Based on what you've observed so far, have there been any surprises or any material damage dewatered to this point?

Mark Farren

executive
#58

Right now, no. So our approach has been to bring the pump trains down gradually as we advance. But we really can't move quickly until those big pumps are installed, and that's the situation we're in. Over on the West side, we aren't seeing any damage -- none whatsoever. And on the east, we've been rehabilitating those top drifts as we descend. So yes, that's where things stand. It's actually looking okay.

Andrew Mikitchook

analyst
#59

All right, that’s encouraging to hear. And I suppose everyone’s anticipating the September update, when we’ll get something like the medium term. Under the very near-term plan as it stands, I think — again, I was working from a press release comparable to the prior disclosures about the stockpiles in Q2. Is that — is it Q1? Would that be early Q1, or mid-to-late? What’s the best-case scenario?

David van Heerden

executive
#60

I can't give you an exact figure on that, Andrew, because predicting it with precision is hard — how much tonnage we can actually push out of the Western section as dewatering continues is something of a moving target. Dewatering, of course, is a linear process. So as we dewater, there's a good chance we'll be able to open up additional areas of the mine. And it also depends somewhat on how fast we can push more tonnage coming from the Kamoa side of the mine. So it's hard to say precisely how we'll manage that stockpile within Q1.

Andrew Mikitchook

analyst
#61

Alright, just a final quick question, if I may. Once dewatering begins on the west side — say, on Kakula's east side, this Stage 2 — would that in principle unlock certain sections of the upper portion enough for mining to restart? Or does everything essentially stay on hold until dewatering is fully complete?

Mark Farren

executive
#62

Once those big pumps are operating, the dewatering work itself will move along pretty fast. So essentially you install the initial two, get them going, then install the following two, and after that the level drops fairly rapidly. So I suppose you'd be evaluating them over on the eastern side. What we're indicating, though, is that come December the dewatering will be finished entirely, and then a full geotechnical assessment of the East can be carried out. Within that window, some mining and so forth may take place. Still, we'll ensure the geotechnical assessment is likely complete before we go back into the east.

Operator

operator
#63

There are no more questions coming in from the line. I'll hand the call back to Matthew Keevil now.

Matthew Keevil

executive
#64

Much appreciated, operator. There aren't any questions pending on the webcast side either, and we're approaching the top of the hour, so we'll go ahead and close things out now. Once more, I want to stress that should anything remain unanswered, don't hesitate to get in touch with our team — Alex, Tommy, Matt, or myself — regarding anything that needs a follow-up. But thanks again for joining today's event, and we genuinely look forward to connecting with all of you and bringing you updates on the numerous exciting milestones management laid out here over the rest of the year and beyond. With that, enjoy the rest of your day, and we'll speak with you soon. Thank you, operator. You can close it out.

Operator

operator
#65

That brings today’s conference call to a close, ladies and gentlemen. We appreciate everyone taking part, and we ask that you kindly hang up your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ivanhoe Mines Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ivanhoe Mines Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ivanhoe Mines Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.