JK Lakshmi Cement Limited (500380) Earnings Call Transcript & Summary
November 5, 2026
Earnings Call Speaker Segments
Operator
operatorGood afternoon, everyone, and thank you for joining us for the JK Lakshmi Cement Ltd. earnings conference call covering both the quarter and the half year that closed on 30th September 2026. This session is being hosted by PhillipCapital India Pvt. Ltd. <<operator_script>> At this point, I'll turn things over to Mr. Vaibhav Agarwal of PhillipCapital. Thanks very much, and the floor is yours, sir.
Executive
executiveThank you, Operator. Good evening, everyone. On behalf of PhillipCapital India Pvt. Ltd., we welcome you to the Q2 and H1 FY '27 call of JK Lakshmi Cement Ltd. Joining us on this call from JK Lakshmi Cement are Mr. Arun Shukla, President and Director; and Mr. Sudhir Bidkar, Executive Director, Corporate Affairs and CFO of the company. I would like to mention on behalf of JK Lakshmi Cement Ltd and its management that certain statements that may be made or discussed on this conference call may be forward-looking statements based on current management expectations and also something that relates to future expected business developments by JK Lakshmi Cement management. Such statements are subject to a number of risks, uncertainties and other important factors, which may cause the actual developments and results to differ materially from any management projections made on this call. JK Lakshmi Cement Ltd and the management of the company assumes no obligation to publicly update or alter these forward-looking statements, whether as a result of new business information or future events or otherwise. Also the participants on the call can download a copy of the Q2 FY '27 results presentation from the company website. I will now hand over the floor to the management of JK Lakshmi Cement for their opening remarks, which will be followed by interactive Q&A.
Executive
executiveThanks, and the floor is yours, sir.
Arun Shukla
executiveYes. Thank you, Vaibhav. Good afternoon, and good afternoon to everyone joining this JK Lakshmi Cement call for quarter 2 and H1 2026-'27. The presentation is already up on the website, and I believe all of you have it with you. Before we go further, though, I'd like to offer some background for this call. JK Lakshmi Cement operates across geographies in the North, West, and part of the East. The July-September quarter 2 is usually affected by cyclicity. In our geographies, especially places like Gujarat and Chhattisgarh, rainfall tends to be far heavier than in other parts of India. So yes, Chhattisgarh was particularly flooded owing to rain, heavy rains during July, September. The same happened in the coastal part of Gujarat, which is south part of Gujarat. On cost, I think all of you know that every one of us is battling through cost, an increase in cost due to fuel, particularly coal, pet coke. Also, during this July, September, we undertake shutdowns, since we plan our shutdowns so they coincide with fuel demands. So that is what we have done. That likewise affects our cost, right? Although we try to mitigate the cost increase by changing our fuel mix at our integrated plant in the North, even so, the kind of cost increase which has happened, industry has not been able to pass it on to customers.
Arun Shukla
executiveThe reason, of course, was that I think we had gone through the low-demand months of July and September — September, particularly its latter portion, and October — and now we're seeing demand pick up, with prices also trending higher. So that's why I wanted to frame this call around JK Lakshmi Cement. All the other details are in the presentation, which you can go through. And if you have any questions, please ask — all of us are here to answer them as best we can. Thank you.
Operator
operatorWe're going to start the Q&A portion now. <<operator_script>> Our first question comes from Amit Murarka at Axis Capital. Please go ahead.
Amit Murarka
analystTo start off with your opening remarks, it's understood that the second quarter tends to be seasonally weak, yet this is also happening against the backdrop of rather soft results over the past few quarters. In that sense, EBITDA per tonne falling to roughly INR 500, INR 520 per tonne during the quarter honestly still looks a bit soft, even considering the seasonally weak 2Q. So I just wanted to get a handle on that, and on top of it there's additional cost inflation hitting the sector. Given that, just two things. First, what's your outlook on fuel cost for the third quarter and the fourth quarter? How much further inflation do you anticipate? And second, what are you expecting for NSRs, again considering the recent price increases as well as your geographic mix? I'll begin with that, and then I have a few more.
Arun Shukla
executiveYes. Thank you, Amit, for posing those questions. And yes, certainly, I believe the sector has gone through such cost pressure owing to fuel, and the same applies to us too. If you look at what we paid for fuel in quarter 2, it stood at 1.82 per kilocalorie, up from 1.54. So you can grasp the scale of the increase we are facing. Moving to the second -- in quarter 3 we expect this to reach 2, or perhaps slightly above 2 kilocalorie. <<inaudible>> Providing any projection and returns is extremely hard since matters are so uncertain and volatile that forecasting is very difficult, to put it that way. Even so -- should the kind of situation we are in persist, then this could climb to roughly 2.05, 2.15 to 2.20, right? So for quarter 3 we foresee about 2, and for quarter 4 about 2.15 to 2.2. Given this situation, we have undertaken many steps when it comes to altering the fuel mix, especially at our North plant subsidiary and Udaipur. Yet even there, a limitation exists, because in that portion of the process there is something involving ash content and sulfur and such things, right?
Arun Shukla
executiveSo there's also a cap on how much domestic coal we can use, but we've made a decent effort there and gained some benefit from it. The problem now, though, is that Indian coal — domestic coal — prices are climbing enormously. If you look at the latest auction, the auction price went above 200%, correct? So domestic coal is becoming scarcer as we move forward too. Still, I'd like to think I'm being optimistic. I believe matters might stabilize given the geopolitical developments that are unfolding. Even so, this is how I see it today: roughly 2.10 in quarter 3 and 2.15 to 2.2 in quarter 4 under the current circumstances. Should anything shift, then of course we would adjust our approach accordingly as well. That covers part one of your question, Amit.
Amit Murarka
analystAnd what about the pricing?
Arun Shukla
executiveOn pricing, like I mentioned during my opening comments, in July and September we typically hadn’t been seeing any increase. This time, though, from September onward, I think we’ve seen prices move up somewhat, especially in the non-trade segment. In October as well, we’ve observed that prices rose in both trade and non-trade. My hope is that once Diwali finishes, prices will edge upward, since demand will improve too. So I’m hopeful that we will definitely recover part of this cost increase from the market. We’re going to see solid demand as well as pricing momentum going forward, because after Diwali there’s no — I’d say — obstacle from external factors. There are no major festivities, the rain has ended. Typically, I think we’re heading into a strong demand month. If you’ve looked at earlier historical data, H2 has consistently been strong on demand and prices. If you check FY '25 and '26 as well, you’ll see that same pattern. So I think we’re now moving into some strong months for both demand and price. Of course, cost is something unpredictable, and we simply have to deal with it as it comes.
Amit Murarka
analystGot it. And on capital expenditures as well, what amount has been spent on Durg up to this point?
Arun Shukla
executiveRegarding the Durg expansion, during the current 6 months we've spent roughly INR 200 crores. That said, in total, we've spent approximately INR 450 crores.
Amit Murarka
analystSo what's the planned CapEx projection right now? Has it changed at all, or is it staying the same?
Arun Shukla
executiveOverall, that's basically unchanged. For this year, we're looking at roughly INR 1,000 crores — sorry, INR 1,500 crores in the current year — and then INR 2,000 crores for each of the next 2 years.
Amit Murarka
analystThat covers the whole company, correct?
Arun Shukla
executiveSort of.
Operator
operator<<operator_script>> Our following question comes from Nileshi Sharma at Monama Capital. Kindly proceed.
Analyst
analyst<<inaudible>>.
Arun Shukla
executiveYour voice isn't coming through clearly, but I did catch your question about how we'll get to 700-plus. I believe we're on track, and price momentum is there as well. On price, from September — the latter part of September into early October — I think we'll probably get there. So whatever we had in quarter 2, that's what we'll be looking at <<inaudible>>.
Analyst
analystWhat are you planning to do about <<inaudible>>?
Arun Shukla
executive<<inaudible>>.
Analyst
analystFinal question. Regarding volume — <<inaudible>> — so what amount of volume are we aiming for over the next 6 months?
Arun Shukla
executiveRegarding H1, we expect volume growth of roughly 7%. I also mentioned that we operate in 3 major geographies: Gujarat, Rajasthan, and Chhattisgarh. The worst impact has occurred in our regions, where heavy monsoon conditions hit. And we're confident that within the coming 6 months we will match the industry's growth.
Operator
operator<<operator_script>> Our following question comes from Rajesh Ravi at HDFC Securities. You may proceed.
Rajesh Ravi
analystFirst, on capital expenditure. You said that during H1 you had spent INR 500 crores <<inaudible>>, and asked whether things look better now. So my opening question is about CapEx. In H1, you spent roughly INR 500 crores. You also noted that out of that amount, INR 200 crores went toward <<inaudible>>. I just want to understand how this H1 CapEx breaks down, particularly since you are targeting INR 1,500 crores in FY '27. The run rate has been muted in H1 at INR 500 crore. What are the plans? How does CapEx shape up <<inaudible>> in Q4? And likewise, what is the guidance by FY28 <<inaudible>>?
Arun Shukla
executiveAs I said when answering the earlier question, we're looking at capital expenditure of INR 1,500 crores this year, and close to roughly INR 2,000 crores. So of that INR 1,500 crores, close to INR 1,000 crores goes to Durg, while the rest covers our farmland purchases for the Northeast project along with some routine CapEx.
Rajesh Ravi
analystRegarding that IND 800 crore you're aiming to spend in the second half? <<inaudible>> You said your goal is to spend INR 1,000 crores, and you also said that INR 200 crores has been spent by you so far in H1.
Arun Shukla
executiveThis is IND 400 crore. In the quarter, it's IND 200 crore, while the previous quarter saw INR 200 crores. For the current year, it's INR 400 crores. Before that, we had spent INR 200 crores. So on this project, we've already spent close to roughly INR 600 crores to INR 650 crores.
Rajesh Ravi
analystGot it. So INR 400 crore has already been spent on IND, and the target is an additional INR 600 crore. That clarifies things. Okay, understood. And sir, I realize I can see that your cost is already <<inaudible>>. So what steps are being taken to close that gap against the market leader?
Arun Shukla
executiveSo Rajesh, we've taken some steps, especially in the eastern part of India, where our gap isn't that large. And even with Gujarat, we've really closed in on the leader, right? Yes, there are a few markets we still need to work on, and we do have actions in place to narrow that gap. The gap has come down from before. But yes, I agree with you that in some markets it hasn't. I think the gap is bigger than in the East and West, which we have in them. So we're taking some actions. And one of the main actions we're taking is improving our premiumization, selling more of a premium product and hence trying to kind of anchor our mother product price with the right taking of premium product. So this is what the strategy which we have.
Rajesh Ravi
analystApologies, I didn’t catch your comment. Regarding the price increases that took place in September and October — if those were to hold through November and December, or really based on where average pricing stands right now, and focusing on the September and October increases, how do those compare with your average realization in Q2?
Arun Shukla
executiveLooking at November after Diwali, I definitely think a price rise of about INR 10 will take place, driven again by the demand present in the market, plus another INR 10 to INR 15 or so in December. In October, non-trade prices increased across nearly every market. Trade prices rose less, though they too went up in most markets. On average, that works out to roughly INR 10 in October, INR 10 in November, and then INR 15 in December. That's my view.
Rajesh Ravi
analystAll right. So at this point, you're looking at the October price improvement of roughly INR 10 higher compared with the Q2 average, correct?
Arun Shukla
executiveYes.
Rajesh Ravi
analystAnd could you give me the non-cement revenue figures along with the RMC revenue and margin numbers? Sorry — not nontrade, non-cement.
Arun Shukla
executiveDuring the previous quarter, our revenue came in at INR 183 crore.
Rajesh Ravi
analystAll right. What was the figure for RMC? RMC and the other one?
Arun Shukla
executiveINR 86 crore.
Rajesh Ravi
analystWhat does INR 86 crores in RMC and AAC come to? And what about the rest?
Arun Shukla
executiveThe small numbers are in there, <<inaudible>>, and possibly around INR 80 crore, close to INR 70 crores.
Rajesh Ravi
analystSo that's INR 70 crores — and sir, what would the blended margin be on that?
Arun Shukla
executiveThe blended margin comes in at 5%.
Operator
operatorThanks. We'll take our next question from Parth Bhavsar at Investec. Parth, the line is yours.
Parth Bhavsar
analystSir, I have a couple of questions regarding your expansion in the Northeast. First, what is the target date for commissioning this plant?
Arun Shukla
executiveOur target is approximately 2029.
Parth Bhavsar
analystAnd sir, what would the CapEx be for this expansion? INR 1,500 crores, if I'm not mistaken?
Arun Shukla
executiveRoughly INR 1,800 crores.
Parth Bhavsar
analystINR 1,800 crores. Understood. And sir, what kind of incentives have been approved for the North as part of this expansion?
Arun Shukla
executiveOn this, I believe it might be worth having a separate conversation. So let's — reach out to me, and I'll fill you in.
Parth Bhavsar
analystAll right, and sir, when it comes to competition, how do you view it, given that plenty of players are ramping up capacity? So do you figure everybody will pull through? I believe Ambuja has likewise announced a new one — and has begun groundwork. So how do you expect competition to take shape in that region?
Arun Shukla
executiveAs I mentioned on my previous call as well, I think North in particular is a supplier market. Whatever supplier capacity <<inaudible>> in Rajasthan <<inaudible>> is heading to the central part of India too, correct? So if you truly examine that whole geography of India where you're going to establish the plant, where is limestone found? The major limestone resources are located there. One is Rajasthan, and the second is Chhattisgarh. But if you go to Andhra, <<inaudible>>. I believe in all other locations, limestone isn't available. So going forward too, you'll see that these are the areas where you will find some capacity being added. And if you look at the capacity of all those major players, we have announced that. These are the locations where we intend to put up the capacity. So I think <<inaudible>> to really sort of grasp where we stand and how we're going to really steer our market, our channel and our market share. And if you look at our strategy, we aren't demonstrating ourselves well. So, we are confident <<inaudible>> that, where we are consolidating ourselves or not. We are consolidating in East. We have consolidated in the rest as well <<inaudible>> we have expanded and we are going to come up with.
Arun Shukla
executiveSo we’re not stretching ourselves too thinly. In any market where we still hold share, we intend to stay relevant there. So instead of focusing on the competition that’s arriving, we’re strengthening where we stand and working to position ourselves so that we can meet them with our capacity channel and our sales approach.
Parth Bhavsar
analystSo basically, sir, what you're saying is that you'll be selling beyond the Northeast as well?
Arun Shukla
executiveNot right away, in my view, but maybe the Northeast will serve as a supply hub for India's eastern region — especially North Bengal and even Bihar, North Bihar, North Bengal. I think it becomes that supplier because look at Bengal, Bihar and Jharkhand — where do they obtain cement or clinker? Clinker comes either from Chhattisgarh or from the empty part of it. And you don't really have much clinker available, correct? So those supply points are all getting somewhat depleted. So going forward the Northeast becomes a supply point — not immediately, but definitely, perhaps after 7, 8, 10 years onward, I think you'll see people setting up in the Northeast and supplying to that region. Also, where else can supply come from — either MP or you go from the North or <<inaudible>>. Let's see how this pans out. Fortunately, I think we hold a good reserve. We now have 4 mines in the Northeast. And yes, we are quite optimistic about our Northeast strategy.
Parth Bhavsar
analystSir, if I could jump in here — what would clinker's landed cost be in the Northeast compared with the North or with the existing plant?
Arun Shukla
executiveI don't believe we've run those numbers. <<inaudible>> So it may be that this calculation, along with an operating plan, still needs to be put together. But at this point, what we've observed is that, yes, having a presence in the Northeast is going to make that particular player competitive, and it will also give them access to some—in the land of the Northeast.
Operator
operatorThanks, operator. Our next question comes from Shravan Shah at Dolat Capital. Shravan, please go ahead.
Shravan Shah
analystHi there. To start, I have a couple, 3 data points. For this quarter, do you see the ratio and the lead distance?
Arun Shukla
executive<<inaudible>>
Shravan Shah
analystAll right, so it's up from 1.4% in the prior quarter, 1Q.
Arun Shukla
executiveYeah, the blended figure has risen, and it now sits at a somewhat higher percentage.
Shravan Shah
analystAnd what's that gap at the front?
Arun Shukla
executive<<inaudible>>
Shravan Shah
analystUnderstood. And we mentioned that during the back half, our aim is to keep pace with the industry's growth where volume is concerned. So that would mean — we're seeing the industry growing at something like 7%, 8%.
Arun Shukla
executiveRight. We're seeing 7% or 8%.
Shravan Shah
analystUnderstood. And from what we laid out in the presentation, for FY '28 I understand the Durg expansion is 4.6 million tonnes, then in FY '29 an additional 1 million tonnes comes in, and 1.5 million tonnes in FY '30, bringing it to 25.1. That 1 million tonnes in FY '29 will be the Northeast one, and the 1.5 million in FY '30 will be with the plant.
Arun Shukla
executiveThere are a couple of facilities we're looking at — that's '29 and '30. The first is in the Northeast, the one I referenced, at 1.5. 1 million tonnes <<inaudible>>. So those are the two — 1.5 plus 20.5 million, arriving in '29 and '30. Of course, it hinges on which one lands first; possibly a gap of 3 or 4 months either way — but the two of them should land roughly in that window.
Shravan Shah
analystUnderstood. So, beyond the pet coke increase we noted for the third quarter, what other costs do you expect? Clearly, operating leverage will be a factor, and lower shutdown costs in the third quarter should help as well. I just want to understand whether it's the packing bag or some other cost where we might see either a rise or a decline in the third quarter.
Arun Shukla
executiveSo, there are 2 things I won’t say anything about, since the situation is just too uncertain. The first is pet coke, and the other is back cost, because that once again hinges on how matters are developing in that petroleum space, correct? But with the rest, I think I clearly do see some improvement. First is the renewable energy side. Second, now that our shutdown has ended, our power cost should come down. So WHRS is going to get better. Third is all those solar installations already in place, because in July and September you don’t get that much output. So now that the rainy season is finished, I think we’ll also get solid output there from all the solar we’ve installed. And probably, I think, in the last quarter, we’ll have some -- our solar power plant, the one we’ve put money into on a captive basis. That too will come in partly during quarter 4 of this year. So all of these are going to help us. Naturally, our power cost, and specifically power, will also fall, because at this point there’s no shutdown, no switching on and off of generic consumption <<inaudible>> is going to be lower. So all of this will help bring down our specific power consumption, first, absolute power cost second, third is an improvement in the renewable proportion, and fourth, operating leverage.
Arun Shukla
executiveSo that's what I view as the positive aspect of it <<inaudible>>.
Shravan Shah
analystRegarding that green segment at 48% in the second quarter, how much will it grow with the solar we're adding in the fourth quarter, or perhaps in 1Q '28 — what's the capacity?
Arun Shukla
executive<<inaudible>> But that depends. It will arrive, in part, perhaps in quarter 4. Not fully — the advantage we're going to let you see.
Shravan Shah
analystSo once that's in place — where does that 48% green side reach?
Arun Shukla
executive<<inaudible>>.
Shravan Shah
analystAnd finally, regarding that clinker sale in Q2, what size should we expect it to be?
Arun Shukla
executiveOn the clinker sale, I’ll cover that in just a second. It’s roughly 150,000 tonnes.
Operator
operator<<operator_script>> Our following question comes from Sharkat Sitar of DSP Asset Managers. You may proceed.
Unknown Analyst 2
analystI've just got a single question, sir. So I was actually looking at the balance sheet, and I noticed that the INR 130 crores receivable — I'm assuming that's from the...
Arun Shukla
executiveCould you raise your volume a little? I can’t hear you.
Unknown Analyst 2
analystCan everyone hear me at this point?
Arun Shukla
executiveYeah, that’s an improvement.
Unknown Analyst 2
analystI noticed that on the balance sheet, INR 130 crores of refund receivable has been reclassified from current to noncurrent. So that has worsened somewhat. I just wanted some clarity on whether we are making any provision for that at all? And what is it…
Arun Shukla
executiveI'm not sure where that INR 130 crores moving came from. It has stayed right where it was before.
Unknown Analyst 2
analystMy sense is that it's shifted out of current financial assets and into the noncurrent category. That said, I'd say that…
Arun Shukla
executiveThe rise in noncurrent assets comes from fixed deposits held with banks — it has nothing to do with that INR 130 crores. If you mean the jump from INR 57 crores to INR 187 crores, that INR 130 crores increase isn't due to the INR 130 crores receivable moving from current to noncurrent. It comes from more fixed deposits with banks having maturities beyond 12 months. That's where the increase is, right? It has no connection to the shifting. That's the reason you assume it's sitting there. That has not…
Unknown Analyst 2
analystThat's quite useful, sir. And have you set aside anything to cover that receivable, given that it has gone into arbitration, or…
Arun Shukla
executiveNope, there isn’t any genuine management <<inaudible>>
Operator
operatorThe following question comes from Amit Murarka with Axis Capital. You have the floor.
Amit Murarka
analystTo start with, on those expansions — you gave some updates during the presentation regarding the preheater installation and where that stands. I just wanted to ask about the status of the split grinding units you're planning alongside this clinker expansion.
Arun Shukla
executiveYes. We've also provided an update in our presentation, but I'll give you a quick summary. At Durg, where we're building 2.3 clinker and 1.6 cement, over 50% of the civil work is finished. The clinker silo, cement silo, pre-heater, WHRS — I believe all of that civil work is above ground now, and 50% of the civil job is done. On fabrication, we've already completed roughly 20%, 25%-type progress, right? At this point, all civil and mechanical contractors have been mobilized. And the approach we took this time was to finish all the below-ground work before the monsoon arrived. That has helped us move somewhat faster. So that's where things stand. And we remain right on track to achieve this by March 2028. That covers the Durg clinker unit of 2.3 and cement of 1.6 million tonnes <<inaudible>>. We've also — clearances are in place <<inaudible>> we've already done quite a bit of work on the multiple compartment silo. <<inaudible>> All clearances are in place, including environment clearance <<inaudible>>. Now we've mobilized our civil and mechanical contractor. A temporary power connection is also in place.
Arun Shukla
executiveI'd say all 3 of those things are moving forward at the same time and staying on schedule. As a result, we'll have every one of these projects finished by March 2028.
Amit Murarka
analystWasn't there also a plan in place for Patratu? So has anything changed regarding that?
Arun Shukla
executiveThe reason we made a change is that we ran into a problem in Jharkhand — the Chota Nagpur Tenancy Act, which perhaps all of you are familiar with. So things were being delayed, and on the cost side as well, land acquisition was, you know — so we faced some challenges. As a result, we chose to reconfigure the capacity across all 3 of those locations in order to reach 4.6 million tonnes, and to shift Patratu into Midnapore, which I mentioned on my call. In Midnapore, land is already available to us. Clearances are already in place there. That means Midnapore will be much faster than Patratu. The decision we took was to go to West Bengal together with <<inaudible>>. As I said when answering one of the questions from one of you, we'll have a chance to take clinker from the Northeast as well going forward in West Bengal. So that was also a bit of — we see some synergy there, right? So we moved Patratu to Midnapore, together with this 4.6 million tonnes at those 3 places.
Amit Murarka
analystGot it. Just so we get the figures correct, could you break down the 4.6 across those <<inaudible>>?
Arun Shukla
executiveYeah. So 4.6 <<inaudible>>. That's 1.6 plus 1.5.
Amit Murarka
analystUnderstood. <<inaudible>>
Arun Shukla
executiveThe speaker’s words were not discernible.
Amit Murarka
analystNortheast, what's your expected timing for finalizing those equipment orders?
Arun Shukla
executiveWhat's that equipment order for?
Amit Murarka
analystThe facility located in the Northeast.
Arun Shukla
executiveTo start with, I believe we're right now in the middle of placing orders for equipment.
Operator
operatorOur following question comes from Rajesh Ravi at HDFC Securities. Kindly proceed.
Rajesh Ravi
analystWhat level does the blended power cost per unit come in at?
Arun Shukla
executive6.22
Rajesh Ravi
analystHow did that figure look on a quarter-over-quarter basis and compared with the same period a year earlier?
Arun Shukla
executiveLast quarter came in at 5.52. For quarter 1 this time around, we hit 6.24.
Operator
operatorShravan Shah from Dolat Capital has the next question. The line is yours, please proceed.
Shravan Shah
analystI just have a question about the trade segment. For roughly the past 3 quarters, we've been at 58%, 59%. So even in this quarter and across the entire year, if you look at how the trade business has grown, is it that kind of 14%, 15% growth compared with the overall growth? So the second point is that, given non-trade, the price increase is on the higher side. So again, will we be focusing on nontrade once more? Or how should one think about that?
Arun Shukla
executiveOur strategy isn’t something we alter very often, since the trade we’re seeing is consistent over the long term. It depends on the long term — different customers, different demand cycles. I think we can still have <<inaudible>>.
Shravan Shah
analystAlright. Now about the premium — obviously it's going up 27%. So how should one think about where we want to get to with this 27% premium by March, or perhaps over the next 1 year?
Arun Shukla
executiveMy guess is it'll land near 27%, 28%. That's the level I believe we'll be at. Our goal is 30%, but 27% to 28%, roughly that figure is what we gave out.
Shravan Shah
analystAll right. And finally, since CapEx is going to be higher in the second half, and clearly we need those working capital requirements freed up — because in 1H as well, we've noticed that roughly INR 460 crore or so is tied up, or additional, in working capital — so how should one view this working capital and, net-net, the debt level by the end of this year, March?
Arun Shukla
executiveExactly, that's correct. During the latter six months, we will definitely see that working capital freed up — the portion that got tied up in the first half. After that, depending on the CapEx and the loans, we would reach a peak of roughly 2.5 this year, by the time this year comes to a close.
Operator
operatorThat wraps up the final question we had lined up. At this point, I'd like to pass the conference to Mr. Vaibhav Agarwal, who will offer some closing remarks.
Executive
executiveSir, just one question from me. Sir, we've changed our goal from 30 to 25 by FY '30. So previously it was 30 by FY '30, and at present it's 25% by FY '30. Could you give some detail on the new -- so when we aim for 30 million tonnes and the reasoning behind that.
Arun Shukla
executiveWe were concerned about keeping our balance sheet from getting out of control. So in order to stay within that prudential norm of net debt to EBITDA not exceeding 3.5, we have slowed the pace of expansion, which we have consistently told investors in our discussions — that we will not pursue expansion at the expense of overleveraging the company. Discipline is about more than just hitting a figure of 30.
Executive
executiveArun, I just have a single question for you. You mentioned mounted profitability. What would that scenario be?
Arun Shukla
executiveA portion of the market, certainly, requires—in some parts of the market where trading happens, prices haven't risen to that degree, correct? So you really need to examine what the foundation is for separating trade from non-trade. Margin was one of the criteria or classifications used. And in the past, non-trade volume sat below trade. That's the reason people began focusing somewhat on trade versus non-trade. But my view is that trade is long term, consistent, and carries a certain stability. Yet yes, if you look at most of the market today, non-trade is just as good as trade, and perhaps in certain parts of the market even better.
Executive
executiveGot it. Speaking for PhillipCapital India Pvt. Ltd., <<inaudible>>. That brings us to the end of today's call. Thanks to everyone for joining.
Arun Shukla
executiveThanks. Thanks, everybody. Thank you. Appreciate you being here.
Operator
operatorMuch appreciated. That brings us to the end of today's conference. We're grateful you could be with us. You can go ahead and disconnect your lines now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete JK Lakshmi Cement Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to JK Lakshmi Cement Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in JK Lakshmi Cement Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.