Operator
operatorGood afternoon, ladies and gentlemen, and welcome to the KEFI Gold and Copper Plc Investor Update. [Operator Instructions] Before we begin, I would like to submit the following poll. And if you could give that your kind attention, I'm sure the company would be most grateful. And I'd now like to hand over to Executive Chairman, Harry Anagnostaras-Adams. Good afternoon, sir.
Aristidis Anagnostaras-Adams
executiveGood afternoon, and thank you, everyone, for joining. The format today is that myself and my chief colleagues will make a brief update presentation, and then we'll open the floor to questions. There are quite a few that have come through already. And we'll answer those and any that come through subsequently, we'll try to get through as well. And as the introducer said, if we don't get through questions that we can answer during the webinar, we'll post answers subsequently on the website. Without any further due, the photo on the screen is that of the Tulu Kapi deposit, that's the hill the deposit is inside. Our exploration camp is on that hill. When we arrived in Tulu Kapi as a company 8 years ago, a very, very quiet serine district. It still is. It always has been. But the country itself has been through some turmoil that I'm sure you read the media reports about last year when it peaked. It went from in travel advisory or travel rating language. It went from an almost completely green country, if you like, low risk to red country last year when there was internal warfare in the north of the country, not actually in the country, but nevertheless, in the country. And now coincidentally with this webinar over the last few days, I gathered a lot of advisers and some important ones have turned much of the country back green again, including this area. So the country has settled down, which is why a couple of months ago, the financing syndicate for the Tulu Kapi project resolved to get the closing procedures back in motion again, having allowed the country to settle down before mobilizing hundreds of people and hundreds of millions of dollars. That's a conventional disclaimer about forward-looking statements. Now the reason I've put up this introductory -- introduction of the directors and then of the senior executives is because on this occasion, I'm introducing to the webinar a couple of senior executives that we've really formed the trio, if you like, on the front line, the 3 of us. And I apologize if you can't see us tonight, but we're all in different countries and in the culprit of being in a location in an add-back location where the uploading of internet signal is very poor. And that would -- it would destroy the effectiveness of this webinar if we were using video communication. So I had to dial in via my phone whilst the others are on the internet. So I hope it all works okay, and I apologize that the video is not working as we speak. And now going back to the Board of Directors, there's 2 executives and 2 nonexecutive directors, myself and the Finance Director and the executives. The 2 nonexecutives, one, Mark Tyler, former Head of Resource Lending and one of the larger African banks. So quite-- if you like, quite at the forefront of banking for this sector and project financing for mining specifically, and Rich Robinson, who ran large organizations of the gold space, including the Gold Field's gold group in South Africa. There are a couple of other nonexecutives retired or resigned over the last year, and that's created space for directors we expect to appoint as nonexecutives as some large institutional shareholders come onto the register. And we thought it was the right thing to leave those spaces vacant, if you like, to allow that as parties to have a say and who gets nominated and appointed so that everyone feels duly represented. The executives, the senior executives in the company are myself and the Finance Director, plus 3, Eddy, who will speak shortly about Ethiopia. I'll let him introduce himself, but for good order, we've presented in summary CV here. And Brian, who will speak about Saudi Arabia. It's sort of amazing to see those country activities from our side specifically. And have some wider roles in the company, but that's -- 95% time is over seeing those 2 country activities from our viewpoint. And Norman, who overseas and mentors the project development, project construction side. Norman's a world-renowned plants oversee are really construction oversee, particularly for the mining and heavy industry infrastructure sectors, and we're fortunate to have him to mentor and oversee that side of things for the company. We'll keep this moving. I'll hand to Eddy now. And if you don't mind, just introducing a little bit about who you are and your background, but then just giving a bit of a snapshot of how you see things in Ethiopia as summarized in the slide and anything you care to add and if then you would mind handing it to Brian to do likewise for Saudi Arabia. Thanks, Eddy.
Eddy Solbrandt
executiveYes. Thanks, Harry. Well, as you've heard, my name is Eddy Solbrandt. I started off in the mining industry in 1986 where I was engaged in optimizing drag lines on a coal mine in the Bowen Basin in Northern Queensland in Australia. Since then, I started a successful consultancy that was largely focused on mining and have worked for large and small mining companies all around the world. I've also been a company director in places like Australia, New Zealand, South Africa, U.K. and Thailand. And I joined KEFI as an adviser several years ago now, 2018 and have come on since the beginning of this year, full time to assist Harry to work with Brian on moving both projects forward. So perhaps if I start chronologically, the point in the middle of the PowerPoint in front of you, was the June meeting of the Tulu Kapi finance syndicate in Cape Town. This was a very, very important meeting because all financial stakeholders were present either in the room and there were about 25 or so of them in the room and another 8 or 12 people online. It was also significant and so far as State Minister for Mining [ Million ] was present with his policy adviser, Dr. Eyob. And it gave the minister an opportunity to meet and listen to the various syndicate members, listen to their concerns, but also to see how they were supporting the project. The minister also listened carefully, reaffirmed Ethiopia's commitment to the mining industry as one of their pillars of economic growth. It was one of those rare opportunities where you get ministers, contractors, financiers and other advisers to be in a room together and have wide range in conversations around the funding requirements of the project budgets, inflation condition -- and conditions precedent. And as a side of the commitment a few weeks later, most members of this group that were required to assign the Umbrella Agreement and some important conditions precedent came out of the meeting, none the least of which was the need for security, and I'll touch on that a little bit later. And that both lending banks have the same rights and protections within Ethiopia. Now this latter condition present it was quite an important one. And very quickly, the Prime Ministry itself got behind and supported this and has approved it. And the documentation for this is now in its final stages of completion, and that paves the way for project finance, a large hurdle that was cleared. The fact that it was completed so very quickly show support form the Ethiopian government for this project, and it certainly would not have been possible without support from the Prime Ministry, support from the National Bank of Ethiopia, support from Ministry of Finance and none the least the support from the Ministry of Mining, which leads me to talk about the cost endorsement and the Ministry of Mines. Now there's a process that we follow that was laid down by the National Bank of Ethiopia, whereby any costs incurred on behalf of Tulu Kapi needs to be ordered and endorsed by the Ministry of Mines. Now for various reasons, is this-- this first run has taken quite some time to complete, but the Ministry of Mines auditors have confirmed that the equivalent of USD 80 million has been spent on Tulu Kapi until the end of 2020. Now this forms part of our equity contribution, and this equity contribution has been endorsed by the Ministry of Mines and registered with the [ NBA ]. This is an ongoing process. We'll be going through this several times now. So we're going to get good at it mutually. But we're going through this audit endorsement process again for a further $5 million up until the end of 2021. Project launch. We've been working very closely with Constellis global security consultancy and another global consultant called SLR who specialized in ESG to ensure that our plans for proceeding in accordance with the project timetable is sound, robust and to make sure that we stay on the right track and give advice when we need it. Constellis in their capacity as security adviser, regularly review our security systems and processes and have made recommendations on how to derisk activities in and on the mine license area as well as in respect of logistics from the port to the mine license area. Now as everybody is aware, there have been quite some security challenges in Ethiopia in the last 12 months. And as Harry mentioned a little earlier on, the country is returning to normality. There are still some difficult pockets. And as far as we need to work in or travel through those areas, we've designed very robust fit for purpose policies, processes and procedures, which we've road tested in order to navigate our way through those areas safely. As a further commitment to our safety there, we've asked Constellis to constantly audit not only the systems, the processes and procedures we have in place, but also our compliance to them. And to also to ensure that these are live documents that they're constantly being improved and updated as we learn. As far as SLRs role in this project, it's the -- as I mentioned earlier, the ESG adviser but they'll be also leading the relocation and compensation part of -- a resettlement part of our work, which is not insubstantial. There -- one of their first steps other than looking through our plans and working with us on planning this has been to lead and conduct a series of relocation, resettlement, workshops in the middle of September with Tulu Kapi stuff. We've got various regional and local government representatives joining us in those and as well as other stakeholders such as the roads authority and the electricity company, EEP. As far as EEP goes, we're working very closely with EEP around this as well. They're supplying the electricity to the site from the town called Gimbi, and we're mutually resolving overlapping problems that we have, any potential obstacles and planning to get electricity up and running according to schedule. So that all of us made our respective milestones. In short, I'd say we've engaged very effectively with all of these stakeholders and are collaborating with them daily. We have our -- one of our key people, leading relationships up there at the moment from South Africa. He's up in Gimbi in our regional office working with the zone administrators on the very matter of relocation. And further on project, we've now received updated numbers from our 2 main contractors. And there are a significant portion of our costs going forward. We've started evaluating these documents in detail, and they are quite comprehensive. There's a lot of technical detail in them, which we're coming through, and we hope to have those reviews sort of finalized in the coming weeks. So in summary, I can say that the TKGM team in Ethiopia is moving ahead persistently, systematically, consistently with a safety-focused can-do attitude. So having said that, I'll pass over to Brian to talk about Saudi. Thank you very much.
Brian Hosking
executiveThanks, Eddy, and good afternoon, everybody. Thank you for taking the time out to attend and listen in to this webinar. I'm talking to you from our office in Taif, which is in the western part of Saudi Arabia. It's about to hour drive from Jeddah to get to Taif. The reason I like Taif is that it's about a mile above sea level. So while the temperature in Jeddah today is 40 degrees. It's a cool 30 degrees in Taif. Just in terms of by way of introduction, I joined with Eddy. I joined Harry in 2018, and I spent a year really helping to get things going in Ethiopia. And then at the end of 2018, Harry asked me if I would come across and take on the Saudi Arabian joint venture. And at that stage, I must be quite honest and say, I knew very little about the country. So it's been a real journey for me. We arrived here really in January 2018 and had a team of 5 people. And I think that within 3 months, I was beginning to bang on the KEFI management door and saying, this is where the future of KEFI Minerals is. This is a stunning country from a geological point of view, the resource in the western part of the country has really not been tapped, and we have a first foot advantage in this country, which is without peer. We now have the biggest exploration team in Saudi Arabia. And I can tell you that the last 3.5 years have been pretty well full on. So we started with 5 people. Today, we have 70 and projection is by the end of the year, we will probably exceed 100%. And by the latter part of next year, we will have 500 people in the organization. So you can imagine that my challenges are not only on the technical side, but also in really building and hardwiring an organization. Very briefly, what we have today is 2 gold projects and an extensive exploration portfolio. We talk very briefly about the Jibal Qutman project. Jibal Qutman was really first foot on the golden and minerals radar in 2012. We did 3 years of exploration drilling before they changed the Mining Act. And at that stage, from a strategic and tactical point of view, exploration was closed down, and our joint venture partner ARTAR submitted a mining license application. Unfortunately, the ground is held by the government department or 1 of the ministries and it's taken us 5 years of positive engagement between the Ministry of Industry and Mines and that particular ministry for us to be able to get access on to that property. That internal debate was really went right up to the Royal Court and the Royal Court has come down in favor of allowing us to reengage and restart the Jibal Qutman process. In the interim period, Jibal Qutman well, originally, when we did the original PFS, the gold price is hovering around about $1,300 or $1,200 an ounce. Today, at $1,700 an ounce. This project looks vastly different. And on that basis, we took the original PFS document and we commissioned back a podium to start the DFS, and I'm happy to say that, that remains on track, although we're still having some challenges regarding access on to site, but those are rapidly being cleared away. We then -- we'll work through that. And probably I need to take one step back in this one and say, as regards our licensing situation, because there was this long hiatus between the awarding by us submitting the mining license application. And this -- where we are today, what has happened is that they launched the new Mining Act and they also upgraded and changed the environmental regulations. So in discussion with the Ministry of Mineral Resources, it was agreed that we would -- we agreed that we would, first of all, acquire an exploration license, allowing us to get back into the area. And once the exploration license had been cleared, then we would then start with the mining license application. During the exploration license phase, we will restart our exploration programs and we will also then start our environmental and social assessment, which will then need to get cleared by the ministry. That has been fully supported by the Ministry of Mineral Resources and the Minister -- Vice Minister himself has as one of the high priority projects in Saudi Arabia. Just to give you a perspective, Jibal Qutman will be the third largest gold mine in Saudi Arabia and the first new gold mine in the next year. And what we talk about the future of Jibal Qutman is those exploration licenses, we will have 3 of them covering an area of 270 square kilometers. The original 0.5 million ounce reserve that we are hoping to define in our DFS stage will obviously -- was based on an area of 23 square kilometers. So I'll leave you to do your calculations of how much -- what the potential is of our 230 -- or 270 square kilometers of exploration. So that's the Jibal Qutman project. It's a simple project. It's pretty much a gold -- straight gold plant, like a podium build, on average, one of these a year, we -- there are obviously always challenges with these things, but they will go ahead. Hawiah is a much more complex beast, but it's a much bigger beast. And we discovered this in 2019 and in the end of 2019, we declared a resource of 19 million tonnes. A year later, we had expanded that to 25 million tonnes. And I can assure you that this year, we have continued in that trajectory, and we will be completing our new MRE in the latter part of 2022. And I can assure you, as of today, it won't be 25 million tonnes. What we've then done is really started the PEA in 2019. We did our further work in moving the resource from an inferred to indicated category in 2021. And we have now commissioned our PFS. The PFS is on track. It should be delivered in December this year, as they say, in Saudi Arabia, In sha'Allah. And at that stage, we will then start considering whether we move through to a mining license application, and we would then obviously hope to commission our definitive feasibility study in 2024. We're not in a terrible rush with Hawiah and for obvious reasons. First of all, we want to construct the Jibal Qutman project. We will then have a full project team on site, and that project team will then move across to commence construction on the Hawiah. So really, our timing is everything on this front. We will then hopefully within the next 2 or 3 years, have 2 major producing mines. The Hawiah projects will be probably second to the Jibal side, based metal mine, the second largest base metal operation in Saudi. So if you sum those 2 up, my kind of back of the cigarette packets estimation at the moment is that we will be producing in the region of 200,000 gold equivalent ounces. Obviously, that would comprise about 18,000 tonnes of copper, about 12,000 tonnes of zinc in concentrate a year, plus 50,000 to 70,000 ounces of gold from our 2 projects. That's not the end of the story. And I'm really blessed with an excellent exploration team. As I say, we've got 3 teams now working in the country. And our exploration manager has been given the task that he has to deliver me another 2 projects within the next 5 years. So we hope that by the time we finished with Hawiah that we will have our third project up and running. But that -- the endowment in this country is such that I have no doubt in my mind that there will be another mine in our doorstep. And closing off, I'll make one comment is that this is not -- our journey has not been made possible or has been made possible by the support of our Saudi partner, ARTAR. They are fully, fully committed. And if there's a message that I would offer to KEFI shareholders is that ARTAR have the intention to build a genuine mining company in Saudi Arabia and the challenge for KEFI shareholders is to be able to keep the stake that we have in this company as it grows into the future. I think I've said enough, Harry, so I'll leave the rest to you.
Aristidis Anagnostaras-Adams
executiveThanks, Brian and Eddy. Okay. In the same sort of spirit of condense, a corporate update onto this one slide, and then I'll finish off with a couple of other summary slides. So today, we have 3 development projects at slightly different stages to the KEFI all those start already, Jibal Qutman perhaps start in the middle of next year and Hawiah a long behind that by a couple of years. Between the 3 of them in 2 countries, both of which have turned on for us, both of which were in a sense, retarding us adversely until last year. But now both of them have made large strides to either settle down their internal affairs as in Ethiopia or to overhaul their regulations as in Saudi Arabia. And those are pushing us very hard to get going. So whereas 18 months ago, we were in a sense of 1 project company in 1 country, which was in a bit of turmoil. We're now a 3-project company in 2 countries that have quite settled and very supportive. The risk profile of that is unparalleled within the history of this company. And obviously, there were times when in a fronting market when things happen outside our control that can very seriously impacted us to a good or the bad. And to be in 2 countries now is a level of diversity on the one hand, but there's also quite a lot of synergy on the other hand, between the fact that there's this natural pipeline now coming through, starting with one and growing to 3 projects, which between them will be the best part of 0.5 million ounces gold equivalent a year. So this company is going into a very challenging but very potentially rewarding transformation into a development and production house, although in the binoculars, if you like, of the global gold industry into a mid-cap producer. Now in preparation for what's about to happen in Ethiopia, we made a raising earlier in the year, derisked the balance sheet by repaying all our abilities and we sit with some cash in the bank and undrawn advanced facilities at our disposal. Our resource base has grown enormously. Over the last couple of years for reasons that Brian essentially referred to for Saudi Arabia. And our market cap is very low given the sort of ratings that companies that are on the go and development would normally retain in the stock market. So as I express it that as we derisk our development progress, and the stock market trader who sets the price at the margin can see that indeed 3 projects or at least the first one is starting to come on stream. What would normally happen is that the natural derisking that's taken place and is being observed, we see those numbers escalate as the market cap moves with it. Well, our development plan is -- was laid out in the annual report. There's no fundamental change since they report only a couple of months ago. I think one of the frustrations of the company, clearly, but it's also one of the strengths of the company, if I can explain what I mean by that is that if we want to run at our own pace, then we would raise all the money from our shareholders and spend all the money at our shareholders behest. But obviously, that's not what we're doing here. The vast majority of the capital that's going to be allocated to these projects for development is actually being project financed. And albeit that a lot of it is being project equity financed and equity financed up into the PLC. The fact is that KEFI shareholders today are putting up very negligible part of the total budget for development. And that -- what comes with that is the frustration and frankly, the responsibility and obligation to properly manage as a good fiduciary syndicate and have responsibility of all syndicate members and do it properly and carefully for everyone's protection. I'm not making excuses. I'm just stating the reality that KEFI is not just managing on behalf of KEFI shareholders. KEFI is managing syndicates on behalf of partners and contractors and some of those partners are amongst the most powerful richest families in the world or a government. So our duties are indeed very serious. Anyhow, the most important next step for us is the closing of the Tulu Kapi funding package, which I know is probably prominent to many shareholders' minds, and it's certainly the most important next priority for the company. And it's fair to say that Jibal Qutman and Hawiah would be financed in a similar way. But in a sense, it should be more straightforward because the majority owner is certainly not reliant on outsider or stock markets for capital, it's our only capital. But also the country doesn't rely on banks from outside the country to deliver a project finance because there's no shortage of capital inside Saudi Arabia. So all the capital for the Saudi projects will by and large be sourced from inside Saudi Arabia, whereas nearly all the capital for the Ethiopian project is being sourced from outside the Ethiopia. I'll keep moving. This is just a graphic illustration of the 3 projects in the sequence. And I won't dwell on the presentation, but it's just giving a schematic representation that there's the 3 of them move through their time lines. And you can already see that there's some synergies in the way we straddle other 2. And you've got expertise being shared within the company. What we're doing is building a -- based on today's resources -- this is based on -- today's resources has published in 2021, nearly 500,000 ounce producer of gold equivalents, mainly gold, but a bit of copper as well. Now I have no doubt that what Brian said has absolutely spot on. And there's no way that between 2022, '23, '24 or '25, we're not going to keep getting resources. So that just under 500,000 ounce production projection based on 2021 resources will obviously be a different number and we'll grow as we got our resources as we work through our agendas over the next few years. And replacing steps for the Tulu Kapi project, which is the nub of the short-term critical milestone for the company. First thing to say is that between February and July, the country settled down sufficiently for us to meet as a syndicate and make a decision to remobilize for closing. We were preparing for it previously and we suspended because of what happened last year in Ethiopia. And although it was very frustrating and I'm not making excuses, but I would have to say that it's a good thing. We didn't start last year from the point of view of protecting people and property to be in construction in the middle of resettling families. Whilst the civil war break out, it will be hundreds of kilometers away, would not have been a very comfortable position to be in. And as it's come to pass, those episodes of Ethiopia have passed recently learned a lot from them, from things that happened to us as a company as well. We are a stronger company for it. I may say so and we're all better informed, prepared and ready for going forward now. So in August, what did we do, we circulated the penultimate structure and model. But if banks approved to proceed on essentially the same terms, as Eddy said, a bit of ironing out to go, but it seems to be happening. The Constellis security report essentially said that their plans and systems and policies and behaviors are fit for purpose. And we have to upgrade, obviously, as we proceed. We received our lead contract as final pricing and terms. Over the last 10 days, we've got the final one. And so we've rolled up our sleeves and the teams are crawling all over and deep diving into it with our contractors to unpick anything we're not comfortable with or needs explanation and then to make sure we assemble in the right format that we're comfortable with and our banks will be comfortable with, then we're going to seek board approvals. September will be the result of the final terms and pricing with these contractors agreed the final consequential structure with syndicates simply that's our lead financers between them putting up $200 million of the package in debt and sub debt and equity, approving the final structure for all the boards. And there are about a dozen entities involved in this. We'll sort of add up all the different components of the syndicates and finalize all the documentation for a financial close by the end of October. And following that would a stage disbursement schedule equity flows first. And then the sub debt and then the debt and the debt wouldn't be needed probably through the second half of 2023 just based on the disbursement schedule. Small consolation for not being able to see, so I apologize again, but that's the photo of the 3 people who have been talking to you tonight. And I thank you for your attention. Now we've taken 40 minutes for the introductions and the presentation. And what I'd like to do now is to move straight into the Q&A. And there are a whole list of questions that were submitted as of yesterday, which we've provided to us, which I can guide through and my colleague, John Leach to say some of them. And then if time permits, I'll gave the -- that just lodged during the talking. And I'll try to keep it to about an hour, not to overstay our welcome, but anything we don't answer we will go through and assemble for the Q&A on our website.
Aristidis Anagnostaras-Adams
executiveAll right, the first question, what's the planned date for signing definitive agreements and first draw down till the KEFI sign definitive agreements? The answer is to sign the definitive agreements at the end of October. You normally have some weeks or a month of executing all the various settlement documentations and registrations in various departments and so on, and that's going to be quite democratic in Ethiopia. Syndicate members will then provide funds into the equity funds into escrow accounts for their lawyers to check satisfaction of condition precedent. There's a large multinational with a local subsidiary that's subscribing convertible equity and ratable into KEFI and subscribing down in Ethiopia and have a special permission from the government to convert it to KEFI. It's a good deal for them because they get to repatriate some of their accumulated result -- returns by investing into KEFI and it's a good deal for us because they converted at the very well 3 years, hence, it's not dilutive at today's prices. So got sort of an unusual transaction, but all done with the blessing of the authorities because it suits both the country and the private parties involved. Institutional investors, we really do want the -- to give the market the opportunities as I just -- what we've done when we signed these agreements because there are large [indiscernible] borrowings outstanding and the share price in the market trades at 2.4p or more, they have -- those what else have to be exercised at 1.6p. And that brings a significant amount of last brick-and-mortar type of capital to the project. But obviously, we don't control the markets and the people I'm talking to on this call are into the controllable market that we are. And then, of course, sub debt and debt follows the equity fees. Given the fast tracking of Saudi Arabia, would it not be worth divesting a small part of Ethiopia and return some to shareholders by way of a special dividend? I mean we're happy to consider anything that's reasonable in due cost, but let's get it financed and build and worry about cutting up our supports and we've actually achieved something and get the show on the road. What steps need to be undertaken to receive the Ethiopian exploration license back in KEFI's hands? It's discernible for anyone in the public by going into the government website, and I know various shareholders have done this. I can see that licenses that we deployed for were granted to -- or were purportedly granted to a Hong Kong Shelf Company owned by British Virgin Island Shelf Company, which is a bit strange. But what I can say is that we have reserved our rights, we will act on it. I just speak publicly as the tactics and that sort of thing is not really appropriate. But let's -- first things first, let's get the mine in development and then sort out those issues later. But the other thing I would say is that without -- in any way just missing the relevance of retaining access to satellite prospects around to the KEFI. Clearly, by having been a bit stymied in Ethiopia, over the last few years, I think when I hear in Brian's voice, the reality that we certainly [ polished ] our time. We got on and achieve things in Saudi Arabia through Brian and his team there that we shall take note of. We certainly consider on twilling our funds and crying in our suit over Ethiopia. Whilst we were tenacious and we protected the people and the assets, we have put some serious exploration runs on the board in Saudi Arabia, where we could run. And we will do it in Ethiopia, but first things first. How will KEFI be reimbursed for financing 2 TKGM alone? In inceptions, cash flow reduction of liability, how much is currently outstanding? I think the -- there's a misunderstanding there. We haven't been financing TKGM to get money back from the project finance syndicates. We've been financing Tulu Kapi to develop to the Tulu Kapi. And that's why we're getting 70% ownership to Tulu Kapi there because we finance this and because of the mix of shareholdings going in now. So I'm sorry, if anything we've said is learn to [ new ] body, but we're certainly not -- we're not asking for the syndicate to pay us back our $80 million or anything. Other than small intercompany accounts, there's no sort of passage and money back from the subsidiaries at this stage. Why did an Umbrella Agreement suddenly become required? It had never been mentioned in previous dispatches. Is it legally binding? Are there penalties for anyone wishing to pull out? Basically, the Umbrella Agreement was offered up by this syndicate to demonstrate to the Ministry of Mines, they're all very serious and actually in good faith. Clearly, the ministry is under a lot of pressure and is applying a lot of pressure to us. And we thought that it was the right thing to do for everyone to demonstrate a test to and sign what the plan is and that they're likely in good faith and what the conditions are and they're all very clearly spelled out. And I must add some of the conditions are there to be fulfilled by the government, not just by the private sector. This is the first mine to be developed for decades in the country. And many rules and policies have been overhauled to allow this to happen. And there's still some consents and some approvals and signatures to go, and they all need to be in place for the investment to flow. There is no penalty for people to pull out only that they've wasted their time and money. I have yet to find a bank who will be penalized for not proceeding with alone, but happy to try it on [indiscernible]. Next, question is, in the annual results, it said that the [ EDF ] Ministry has allowed until eighth of August, previously stated eighth of July, previously stated previous dates, for project financing and launch commitments to be achieved. How could you have misread the situation so badly? The one thing I would say is the license is in good standing until 2035 and it's renewable for another 20 years. And I perfectly understand, the company perfectly respects pressure being applied on it, but it will only go so fast as it is safe. And so fast, it's conditions that are normal and satisfied, and that's all we can physically do and the company has demonstrated its resilience, and it has a good license and it will defend its good license. And I think the ministry has demonstrated its support of what we're doing. Next question is, when do you think TKGM will receive first money from an entity other than KEFI and who will be depositing it? The government spent about half of that $20 million commitment already. I'm not sure exactly how much, but I know the -- most of the electrical equipment for the power connection is in country now, haven't been fabricated elsewhere. The next big funds to flow are those that I mentioned earlier, the equity funds, which will flow after definitive agreements are signed. And I've answer it a bit earlier, but the equity first and the debt would come last next year. Next one, are you planning another placing before October? There are no planning to do that. I think I said earlier -- I mentioned earlier that we raised capital early in the year. We derisked the balance sheet, put cash in the bank, some of which is still there, and we've not drawn down any advances like we've done over some years now from very supportive shareholders who were there to provide working capital advances if we need them to reach a milestone like this closing that's coming up. Do we have -- do we still have the license for sort KEFI? I think we've answered that. If the mining license for Jibal Qutman received today, how soon would KEFI's share of the financing being required? Brian, if you're still online, do you want to answer that? How soon would we need to put the development funds in for Jibal Qutman if we got the mining license today?
Brian Hosking
executiveThanks, Harry. Just -- it's not a simple question because really, we're in a process now with the Ministry of Mines here. So as I said earlier, we're going to be issued with the exploration licenses, and there are just 1 or 2 administrative steps that we are still needing to care on that. And then we will start really mobilizing. And that really begins this process of us starting the construction at Jibal Qutman because one of the first things we're going to do is actually established a permanent camp on site. So those things will have to be funded by the shareholders in the early stage and things that we put up by the early infrastructure, bear in mind that this site is 40 kilometers from the main road. And so we will actually need to put in road links. We need to put in communication towers. We will need to put an account for people. And those are all part of the project, which the shareholders will be funding. During that process, we have been assured that -- by the ministry, that we will have the full support and we're move into the mining license application. And really, the only thing that's outstanding on the mining license application, quite frankly, is the environmental permitting, which has changed. So they're not there to judge whether this is a good project or not. It's just they're there to judge whether we've thought through all of the sites. And for them, the most important thing are the social and environmental considerations. We know how do we support the community, what's their value in the community, bearing in mind that we will be creating around about 400 jobs at that mine alone. So those are the issues. And it's not that simple for us to say we will get a mining license then we'll start funding. The shareholders will really be starting to fund the moment our exploration license is given. So I know that's not an easy answer to give, but that's the reality of it. This is work in progress rather than something about discrete steps.
Aristidis Anagnostaras-Adams
executiveThanks, Brian. And just to add to that, if you -- if the question is to do with when do you start funding the building, the construction, it would be, if the mining license were granted in Q2 next year, a few months later, that sort of time in middle of next year or something like that. Next question. After the recent closing, Harry stated that one institution to take mistake of 3% or over 3%, why has been no [TL1s ]? What have they done with their shares? I understand that the shares were split between 2 independent institutions. I just know that would be done. Can we tell you what are your thoughts and how they gonna split between 2 independent institutions, and they must be under 3% or they would have lost [ TL1s ]. What they do with their shares? I'm sure -- I know their shareholders, but that's only because I stay close to shareholders. It's actually in business to be honest, but I know the shareholders. The auditor's reports that the company needed further funds. The current quarter survivors are going concern. We -- I think I've already said that we've already -- we have cash and we're not drawing any facilities that we've drawn many times in past years with [indiscernible]. Next one is I really fear for the share price, and it was quite a long -- it's quite a long paragraph of explanation why the shareholders care about the share price? I mean I openly say it's a very challenging task. We've taken on a small -- a small junior explorer is transforming itself into the developer and I'm not pretending it's low risk, it's high risk. I believe it has hiked our returns to go with it and the valuations from any number of experts that have been published shows that. But it's only people who really have a tolerance for risk that can't sleep at night on these exercises because they are high risk. And when they work, they can be extremely lucrative. And we've taken on startup risk, exploration risk, development risk to be followed by start-up production risk in countries that are front-end markets for mining. The quick [indiscernible] is that we're first movers or early movers and it's situations like this that can provide terrific returns if you get a momentum going and flow with our successes. So hopefully, we get the successes in the not-too-distant future, but I sympathize with the shareholder that I openly admit that it's risky and one should only go where one feels comfortable, to be honest. What do you say to long-term shareholders have seen their shares decimated over recent years? Well, I say, yes, sorry, but we've done our best. KEFI has raised and spent over about $100 million in 16 years since its inception. It's intrinsic value as many times that and it will grow and can see that quite easily in the projects we've got now. And the share price is about a fraction of all that. And obviously, management has little influence on the share price but we just keep our eyes squarely focused on what we have to do to run with these businesses now that we can run with them in these 2 countries. And the market has to be left to correct itself as it deems appropriate. It has been a tough journey, and we hope that the milestones we put on the table over the next months and years will justify the effort and patience. Next question. I was surprised by the potential [indiscernible] of cash bonuses last year were deferred to next year. And whilst some long-term shareholder delighted if the share price change to 3p more of our cash and where is the money for the bonus coming from? I mean we -- this company will spend over -- this company will control the spending, I won't spend it itself, but there's over $500 million being spent in the first 2 projects and salaries and bonuses to senior executives a very small fraction of the money that's being spent. And I hasten to add without making anything of it, it's just a fact is that I don't know of any other company that's paid so much of its senior executive salaries and remuneration in shares rather than cash. And I think the management could ever be accused of leading this company quite the opposite given how we've accepted shares as to the cash. So it's very difficult, I suppose, as a shareholder realize how much money is looming to be spent because the company itself is not putting up the $500 million. But that's the money that's being spent on this project managed by this team. Could you please share how Constellis has helped KEFI check all the security and safety and... Actually, Constellis is a global firm and their report is a comfort not necessarily to management or it is to management but principally to the finances to give third-party verification that policies, procedures and so on are in the right shape, it's as simple as that. But their reports are very detailed, very lengthy, come from in-depth research in the country and on the company and the country and the district and the size and the routes and it allows the banks and others to do their homework. Next question. Is the rebel group presence and activity an issue in the transport routes from Djibouti? Eddy, do you want to pick up on the security side? Or I should have added to you just get rolling, but any comments on the security you'd like to pick up on that one, the transport routes.
Eddy Solbrandt
executiveLook, if you look at the FCDO website, Djibouti right through to a [ cent ] county is very clear. So we don't anticipate anything there. These things are quite changeable. But we have a system of, let me call it, informants along the way that give us day-to-day access -- information of access to road and routes. Detailed planning happens sort of post the cent and going to site is really subject to day-to-day monitoring, we move when it safe. If it's not safe or we don't perceive it to be safe to go forward, we sort of wait until it is so. And if you would ask me, is it a day or 2, that's completely variable. Ultimately, what I can say is that the site to the Tulu Kapi camp there has been safe during all the events you would have read about in the papers and seen in the news. It's been safe. It's been quiet. We've had about 30 local people working up there, and we've now got one of our expat employees up there working as well. So to sort of talk about security, you really have to look at the micro environment that we're operating in, and we plan those as best we can. But largely from Djibouti to fairly close to site is going to be reasonably straightforward. In that context, we're also talking to some major freight forwarding companies who have security procedures and systems of their own. We're collaborating with those, we share information with those. We share information with the Australian Embassy. We share the information with the British Embassy on security. So whereas informed as we possibly can be and quite comprehensively on a day-to-day basis.
Aristidis Anagnostaras-Adams
executiveThanks, Eddy. In August 22, Jadib Al Qahtanah, was awarded as a license. Any further -- can you provide a map of our interests? Let me just say that there's -- I'll ask Brian to comment on that particular license. But there is in our annual reports and PowerPoints usually recent ones would have the map showing where our areas of interest are so you can look them up quite easily. Brian, any quick comment on Jadib Al Qahtanah, what are we going after there?
Brian Hosking
executiveJadib Al Qahtanah is a gold project, and that work is followed up, reconnaissance work in the early -- our late 2016 where there were old ancient workings and surface grab samples of up to 50 grams a tonne. So it's a gold project and of interest to us is that it -- the working seem to kind of peter out at the edge of a [ Hillit ], which is a [indiscernible]. The speculation from our point of view is that those structures may disappear under the [ Hillit ]. And [ Hillits ] in that area is not particularly thick, on average, about 5 meters. So the possibility of -- and this is a kind of groundbreaking area. If we can actually start discovering new deposits under the [ Hillits ], this will be a game changer in this country because at the moment, there's no exploration license discovering them. The question is we have -- we've been in the country since 2019. There are over 5,000 known mineral deposits or know mineral occurrences listed in the western part of Saudi Arabia. We have an intellectual property within the group, which is second to none. And we are constantly scanning the area for new opportunities. And if anybody here is listening who has been in the exploration game, they'll know that the way that you do it is that you look quite aggressively at these things, you take out licenses. But within a 12- to 24-month period, you should know whether it's going to work or not going to work. So the broad answer to the question is this is going to be an ongoing process. We have a team of 5 people entirely dedicated to regional exploration. That's 5 geologists not counting the field stuff. I see the next question on that Harry was about the [indiscernible] license. And let me comment on that. [indiscernible] license was -- we originally applied for in 2020. It was rejected, and it was now put up by the [ DMMR ] for auction. Technically, it was agreed between ARTAR and ourselves that ARTAR would use its balance sheet to make sure that we became a qualified bidder. But let me assure all our shareholders the ARTAR and KEFI joint venture agreement is quite firm that any license mining or exploration license can be at KEFI or G&Ms request transferred across to G&M. So it's not ARTAR going at the same way. It really is an indication of the close nature of our working relationship with ARTAR.
Aristidis Anagnostaras-Adams
executiveThanks, Brian. We've gone over the hour, but there's only a handful of questions to go. So I'll try to is through them. And anything we haven't answered that came in during the webinar, we'll have a look at in the next couple of days and post answers on the website. Next question. Are you thinking about share consolidation? I haven't thought about it. I don't think it's an issue. The share price rise that one would wish for as we derisk should put the share price in a good position. The Umbrella Agreement was an important step. Please share a road map and time scales? I think we've done that already. Could you explain financial close, normal stage schedule and procedures, explain what that means? There's a closing checklist that -- I don't remember the number of items on it, but there's scores of tasks for execution by 12 parties. And there's a myriad of lawyers for all these parties and advisers. So there's a long list of issues, but that's not abnormal for a complex transaction of this nature. The thing that really we do highlight is anything material or any high-level commercial precondition or material stumbling block like safety. We've always highlighted things that are material of that nature. And how would I put it, for people to spend so much time and money working on closing a transaction. They all understand that there are opening of bank account procedures and registration procedures and all those things that have to be done. Those things don't kill a project, what kills the project are the material conditions that we do spell out in our releases. What is the price institution, will you be able to sell the warrants out into the market? They're not -- you're referring to the warrants issued to institutions to subscribe to our placing. They're designed to bring in capital at an exercise price of 1.6p, and they're being approximately GBP 14 million of capital at 1.6p, designed around planning the last brick in the world type role of the financing, and they must be exercised within 30 days if the share price is 2.4p or better. And if they're not exercised within 30 days, they lacks. They're not listed warrants. So they're not designed to be traded, but design to be exercised and they are lost if they're not exercised if that sort of drag forward price is a [attributed ] . Now design really as part of the whole finance planning around Tulu Kapi. Thank you very much for your forbearance. And so I've covered the questions that were submitted until yesterday, and it's now around 10 after the hour, and I'd rather stick to the discipline of keeping it to an hour or so. And we do undertake to look at the questions submitted during the webinar and to get back to you through the website into question-and-answer section. Thank you very much, and thanks, Brian and Eddy for joining me. Sorry, you had to sit there during my questions and answers and only have a few that were really specifically about those areas. And I hope that worked for also shareholders, and thank you for your attention. I'll hand it back to the platform manager.
Operator
operatorHarry, Eddy, Brian, thank you very much indeed for taking the time to address all of those questions that came in from investors. And of course, Harry, as you kindly just mentioned, the company will have the opportunity to review all of the questions that were submitted today and we'll publish those responses where it's appropriate to do so on the investor and company platform. Harry, you did just briefly do so, so I won't ask you for those closing comments. What I'll do now is I will redirect those on the call to provide you their feedback, which I know is particularly important to yourself and the company. So can I please ask investors not to close this session as you'll now be automatically redirected for the opportunity to provide your feedback in order that the management team can better understand your views and expectations. It's going to take a few moments to complete, but I'm sure we'll be greatly valued by the company. On behalf of the management team of KEFI Gold and copper Plc, we would like to thank you for attending today's presentation. That now concludes today's session. So good afternoon to you all.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete KEFI Gold and Copper Plc transcript — plus 257,000+ transcripts from 12,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to KEFI Gold and Copper Plc earnings transcripts and 257,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in KEFI Gold and Copper Plc or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.