KEI Industries Limited (517569) Earnings Call Transcript & Summary

January 22, 2026

BSE Limited IN Industrials Electrical Equipment earnings 65 min

Earnings Call Speaker Segments

Operator

operator
#1

Good afternoon, everyone, and welcome to the Q3FY26 earnings conference call for Kei Industries, hosted by Nuvawa Institutional Equities. Just a reminder that all participant lines are going to stay in listen-only mode, and once the presentation wraps up, you'll have a chance to ask questions. <<operator_script>> Kindly be aware that this conference is being recorded. At this point, I'll turn the conference over to Mr. Achal Lohade of Nuvama Institutional Equities for his opening remarks. Thank you, and the floor is yours.

Achalkumar Lohade

analyst
#2

Yes. Thanks, Ryan. Good afternoon, everyone. We at Nuvama Institutional Equities are pleased to have the senior management of KEI Industries Limited with us. Joining us to talk through the Q3 FY ’26 earnings are Mr. Anil Gupta, Chairman and Managing Director of the company, and Mr. Rajeev Gupta, Executive Director, Finance and CFO. The call will begin with opening remarks from the management, after which we will go to the Q&A session. Thank you, and over to you, sir.

Anil Gupta

executive
#3

Good morning, everyone. Good morning, and thanks for being on this conference call. This is Anil Gupta, CMD of KEI Industries Limited. The headline for this quarter is that Q3 is net sales. You've likely gone through the numbers, which we — but I'll give a quick brief. Net sales for Q3 came in at INR2,954 crores, with net sales growth of 19.51%. EBITDA this quarter stands at INR354 crores versus INR254 crores last year, a rise of 39%. The EBITDA-to-net-sales margin is roughly 12%, compared with 10.29% in the same period a year ago. Profit after tax is INR234.86 crores against INR164 crores last year. PAT growth is 42.5%. The profit-after-tax-to-net-sales margin is 7.95% versus 6.67%. On domestic institutional cable sales: Wires and Cable is INR592 crores, and domestic institutional cable sale EH extra high-voltage cable is INR127 crores. Export sales this quarter are INR544 crores, and the overall increase in Wire and Cable exports is 95% this quarter. Total institutional cable sale contribution is 41%, compared with 45% in the same period last year. Sales via the distribution network, that is B2C, were INR1,612 crores, up 29%. B2C sale contribution is 55% in the third quarter, versus 50% in the same period a year earlier.

Anil Gupta

executive
#4

EPC sales excluding cable came in at INR60 crores, matching last year's INR60 crores. Stainless steel wire was INR53 crores versus INR54 crores a year earlier. Over the nine-month period from April through December, net sales reached INR8,271 crores, a rise of 21.26%. EBITDA for those nine months was INR963 crores. That represents EBITDA growth of roughly 33% across the nine months. The EBITDA-to-sales margin stood at 11.64%. Profit after tax for the nine months came to INR634 crores. The profit after tax to net sales margin was 7.67%. Domestic institutional cable sales totaled INR1,884 crores, while extra high-voltage sales were INR371 crores. Export sales over the nine months amounted to INR1,390 crores. So growth — the overall export growth is 79%. Total cable institutional sales contribution for the nine months is 42% compared with 41% in the same period last year, and the B2C contribution is INR4,413 crores. That works out to 23% growth. As of 31st December, the company had 2,114 active working dealers. B2C sales contribution held steady at 53% for the nine-month period. EPC sales were INR188 crores, and stainless steel wire sales were INR157 crores against INR166 crores last year. The total order book as of 31st December ’25 stands at INR3,928 crores, of which EPC accounts for INR361 crores, extra high-voltage cables INR717 crores, cable domestic INR2,426 crores, export orders INR424 crores, and the total Wire and Cable segment INR3,567 crores.

Anil Gupta

executive
#5

Looking ahead, over the nine-month period the company incurred total capital expenditure of INR928 crores. Within that capex, Sanand accounts for INR769 crores, Salarpur land purchase came to INR72 crores, another piece of land at Sanand was bought for INR24 crores, and other locations — other plants and locations for plant and machinery — came to INR63 crores. Capex payments made for Sanand so far total INR1,353 crores. A further INR200 crores will be spent during this quarter, with the remainder going out in the next financial year. The company is hopeful of achieving 20% plus growth for the full year period and will also improve our operating margin in FY ’25-’26. That view takes into account Phase 1 commercial production at Sanand and the strong order book as of today from domestic institutions for cable sales, from export orders, and for extra high-voltage cable. Once the Sanand project is complete, and given strong demand in both domestic and overseas markets, we are hopeful of growing more than 20% in the next — CAGR over the next three to four years. I would like to highlight that at present we are very strong in the institutional cable market, whether domestic or export. KEI is the first Indian company to supply several projects of extra high-voltage cables, 330 kV cables to Australia, and it has also supplied 220 kV cables to UAE and Spain.

Anil Gupta

executive
#6

KEI stands out as the sole Indian firm qualifying under National Grid U.K.'s framework agreement covering maximum voltages of up to 400 kV. Our footprint has grown to the Caribbean islands, where we supply West Indies along with numerous neighboring nations. Within the domestic market, we serve the whole solar power chain, which includes Reliance's polysilicon factory at Jamnagar. Over in UAE, KEI has secured three contracts to supply 132 kV cables, and we are earning recognition there as an EHV, extra high-voltage cable manufacturer in the Middle East. That gives you a brief summary of the results from my side. I would now invite your questions, and I will be glad to answer them.

Operator

operator
#7

Thanks to everyone. We're ready to move into the Q&A portion now. <<operator_script>> Our first question comes from Rahul Agarwal at Ikigai Asset. Please go ahead.

Rahul Agarwal

analyst
#8

Good afternoon, sir. Thank you for the chance to ask. Sir, I have three questions. First, I’d like to understand the Sanand ramp-up plan. Could you elaborate across the segments? From what I understand, LTHT will make up a bigger share of this plant, and EHV will contribute another INR1,200 crores in peak sales. So for ’27, ’28, and ’29 — over the next three years, how do you intend to ramp up Sanand sales? Which products come first, and which come later? If you could break it out by those three years, that would be helpful. That’s my first question.

Anil Gupta

executive
#9

All right, so at LTHT, trial production kicked off just in December. Then, through this quarter — January, February, and March — we've been ramping up gradually. Come April, we expect the electron beam equipment for making electron beam pure solar wires to be commissioned, which will give this plant another boost. As for extra high-voltage cable, we'll also be ramping up our medium voltage cable capacities further by July or August. However, the extra high-voltage cable facilities will come up by March ’27. So that's how the ramp-up will go. In the next financial year, then, this project will be complete in all respects.

Rahul Agarwal

analyst
#10

Understood, sir. So on the whole, for us to get there, should I take it that you've laid out — the intention is to put in INR2,000 crores. That ought to generate asset turns of at least three times, 3.5 times. We spoke of INR6,000 crores in top line, which should come about around March ’29. By FY ’29, that full INR6,000 crores of incremental top line ought to be reached. Is that a fair way to read it?

Anil Gupta

executive
#11

Yes. Yes, definitely.

Rahul Agarwal

analyst
#12

And then the second question had to do with how we're capitalizing capex. From what I understand — as you mentioned, LTHT pile production began in December — we've incurred roughly INR800 crores of capex on Sanand over nine months, correct?

Anil Gupta

executive
#13

Yes.

Rahul Agarwal

analyst
#14

The remaining INR500 crores came in last year. So roughly INR1,300 crores of capex has been completed as of today. By December of ’25, how much has been capitalized?

Rajeev Gupta

executive
#15

So essentially, we capitalized roughly INR550 crores, and the remainder will be capitalized once this machinery gets started — as Anilji mentioned regarding the electron beam control cable in April, and then additional machinery in medium voltage during July or August. So accordingly, it will be capitalized in the books of account. However, the entire plant will be capitalized by March 2027.

Rahul Agarwal

analyst
#16

All right, so of that full INR2,000 crores, what portion would be land cost, sir? I mean, we'd leave that out of capitalization, wouldn't we?

Rajeev Gupta

executive
#17

Originally, the land cost came to INR140 crore.

Rahul Agarwal

analyst
#18

Okay, so starting in fiscal ’28, that balance is going to be depreciated on a full capex basis — is that right?

Rajeev Gupta

executive
#19

’28. Yeah. Yep.

Rahul Agarwal

analyst
#20

Alright. That's great, thank you.

Rajeev Gupta

executive
#21

The depreciation burden actually won't land in 1 year — it arrives next financial year, since it's being phased in. So the full amount will only show up in ’28.

Rahul Agarwal

analyst
#22

So that comes to roughly 5% of INR2,000 crores, correct? That works out to around INR100 crores — is that about right?

Rajeev Gupta

executive
#23

However, in ’28, the top line will also come from that — by itself it will be close to INR5,000 crores.

Rahul Agarwal

analyst
#24

Yes, I get that. Yeah. Yeah.

Rajeev Gupta

executive
#25

Yes.

Rahul Agarwal

analyst
#26

Sir, my third question just returns to what Anilji said — we're anticipating 20% top-line growth for the full year. I believe we've posted something like 21% over nine months, and December brought a really sharp jump in copper. So I just want to understand why we're being conservative here?

Anil Gupta

executive
#27

No, I think growth for this quarter should land somewhere around 25% plus. So we're working on quantifying that more precisely. But certainly, given the rise in copper prices, it will be — more than 25% this quarter.

Rahul Agarwal

analyst
#28

Right? Right. Understood, sir. Understood. And on margins, you already brought up that in two years' time, roughly 100 bps should build up at the EBITDA level. Do you still stand by that guidance?

Anil Gupta

executive
#29

Yeah, and I think we've already provided guidance that for next year, we expect to hit EBITDA margins of roughly 11% overall across the full year.

Rahul Agarwal

analyst
#30

Understood, sir. Thanks very much, and best of luck for the years ahead. I’ll rejoin the queue.

Rajeev Gupta

executive
#31

Thanks, Rahul.

Operator

operator
#32

Thanks. Our next question comes from Natasha Jain with PhillipCapital. Go right ahead.

Natasha Jain

analyst
#33

Thanks for taking the question, sir. My first one concerns hedging. If we assume metal accounts for 50%—or rather 40%—of your total raw material cost, and you export roughly 20%, then that portion is naturally hedged. As for the other 20%, I'd like to understand whether we buy at spot or hedge the full exposure.

Rajeev Gupta

executive
#34

No, there's no hedging on our side. We operate with a natural hedge in place. Our inventory runs three to four months — that's three to four months of pending orders from the institution side. On top of that, we hold 2.5 months or more of inventory on our floor, plus one month's worth while goods are in transit, since we're importing.

Anil Gupta

executive
#35

Also, about 85% of the metals we purchase come from Hindalco and Vedanta here in the domestic market. So those purchases are made in rupees. That means foreign exchange exposure really isn't a factor for us here.

Rajeev Gupta

executive
#36

So we're operating with a natural hedge, just as we've been telling you previously as well.

Natasha Jain

analyst
#37

Understood. Sir, looking at your figures in sequence, growth has been moderate. I appreciate that volume has been constrained. Yet when I look at your EBIT margin on the same sequential basis, the rise is sharp. Historically, you've said your EBITDA margin typically falls within a range across your categories. So if I work out EBITDA purely on a sequential basis, growth still comes out very high. So is it possible that, since you just mentioned holding inventory for a longer period, we also benefited from low-cost inventory during this quarter?

Rajeev Gupta

executive
#38

Ma'am, typically when we discuss any given quarter from the past as well, whenever copper prices swing suddenly, whether upward or downward, there can be a rise or fall of 0.5% to 1%. On a full-year basis, though, as we guided earlier, we will enhance our operating margin, which you have been observing since last year. And year over year, we are going to keep improving, thanks to the capacity we are adding and the product mix such as extra high voltage, along with segments like export that are growing. So that is assisting us in improving our EBITDA margin.

Natasha Jain

analyst
#39

Got it. And sir, just one final question from me. When it comes to wires, how are you viewing the channel at present? Is it overstocked beyond what's needed? Or do you expect that the fourth quarter will still deliver margin in growth for wires?

Rajeev Gupta

executive
#40

In the wiring segment as well, we're seeing growth of over 22%, 23% year after year. So that's going to keep going on a full-year basis.

Natasha Jain

analyst
#41

Got it. Thanks a lot, sir. Best of luck.

Operator

operator
#42

Thanks. We’ll take the next question from Saumil Mehta at Kotak Mutual Fund. Please go ahead.

Saumil Mehta

analyst
#43

Okay, thanks for giving me the chance to speak. So, to start with, what was the overall inflation we observed in raw materials during the last quarter? And how much of that has already been passed along to the cables and wires customers? If you could give us a rough quantification?

Rajeev Gupta

executive
#44

As we've mentioned, we consistently hold 2.5 months of inventory on the floor and one month in transit, compared with that three-to-four-month pending order position from the institutional side, whether domestic or export. So in practice, older orders get fulfilled using the older inventory. With the retail market, though, every 15 days the retail price moves up or down based on how prices are trending. So in practice, all of it gets passed through.

Saumil Mehta

analyst
#45

Okay. And if you could just say, for the quarter that's happening right now — Jan, Feb, March — what sort of price increases have you implemented in the retail markets, given that copper is trending upward?

Anil Gupta

executive
#46

We've already implemented the necessary hike in cable and wire list prices. So at this point, in effect, sales are taking place at the average copper and aluminum prices that were in effect in January.

Rajeev Gupta

executive
#47

This is just standard practice, really. Anytime copper rises, the price rises too; when copper falls, the price falls as well. That's a typical approach used by every player in the industry.

Saumil Mehta

analyst
#48

Rajeev ji, I get that. I just want to get a handle on Foreign Speech. Passing on the price hike isn't something I'm concerned about with Foreign Speech. What I'm really trying to do is get a clear picture of the Foreign Speech retail markets.

Anil Gupta

executive
#49

For house wire, we're seeing foreign speech in selling prices. And in Cable, starting effectively in December — actually, the major price increases began in December. So whether it's December or January, on the whole, I can see that 10% rise in foreign speech prices.

Saumil Mehta

analyst
#50

Cable price Foreign Speech. And sir, my final question is this: regarding the guidance you're providing of 20% plus for next year and 25% plus for Q4, is that mainly a volume guidance or a value one? And more broadly, what copper price increase are we building in?

Anil Gupta

executive
#51

Look, I can tell you that volume guidance is going to land somewhere in the 16% to 18% range. And on top of that, you'll have input price inflation added in. So the real growth ought to come in higher than that.

Saumil Mehta

analyst
#52

Great, great. Thank you, sir, and I wish you the very best in the quarters ahead.

Operator

operator
#53

Thanks. Our following question comes from Anupam Goswami at SUD Life Insurance, who is on the line. Go right ahead.

Rahul Agarwal

analyst
#54

Thank you. Sir, good morning. Sir, just one broader question: across the industry we’ve observed expansion of over 20%, 30%, whereas our own growth came in at 20%. How should we view that relative to inventory — how does industry and volume growth plus the value split look, sir, during this quarter?

Anil Gupta

executive
#55

On the Cables side, our capacities were pretty much maxed out. So, well, there wasn't much room for us to expand in that segment. We only — our volumes went up roughly 10% in Cables, and in Wires it was more than that. Perhaps in the other piece, like Havells, they brought their new Tumkur cable factory online about nine months or a year ago. So they were able to boost their volumes from that point. We've managed to get our Sanand facility commissioned, and the contribution from it will show up this quarter, in our Q4.

Rahul Agarwal

analyst
#56

Sir, could you put a number on the capacity that Sanand has brought in?

Anil Gupta

executive
#57

Right now, what we've got commissioned in Sanand is roughly INR250 crores a month, and that represents half of the capacity being commissioned. This capacity will gradually come into production as we ramp up with the induction of manpower across all the departments, and machines are also being commissioned and put into production one by one. Second, in any cable factory, the initial one or two months go into obtaining a lot of type tests conducted on cables by different agencies, visits by the customers, and also obtaining the BIS license.

Operator

operator
#58

Ladies and gentlemen, the management line has dropped. Please remain on the call while I get management reconnected. Thank you. Ladies and gentlemen, management is back on the line. Sir, go ahead.

Anil Gupta

executive
#59

Yeah, sorry — there was a question in there.

Operator

operator
#60

Anupam, would you mind asking that question again?

Rahul Agarwal

analyst
#61

Hello sir, regarding capacity, you mentioned something like INR250 crores per month, and also the BIS certification that's needed — you said that would be scaled up gradually, is that right?

Anil Gupta

executive
#62

Right, right. So the BIS license for low tension cables has already been secured — those have come through. As for HT cable, we expect to get it by the end of January. So we're doing everything we can to bring in contribution from the new facility. And I can assure you that given our experience running a cable industry for roughly 50 years, it will ramp up very shortly. It's just that we need some basic approvals, which are absolutely essential for selling.

Rahul Agarwal

analyst
#63

Understood, sir. Thanks.

Anil Gupta

executive
#64

Yeah.

Operator

operator
#65

Thanks. Our next question comes from Keyur Pandya at ICICI Prudential Life Insurance Company Limited. The line is yours — go ahead.

Keyur Pandya

analyst
#66

Thanks for taking the question. Sir, I have two questions. The first concerns this capacity of INR250 crores a month, which would be added gradually. In other words, some addition will happen during FY ’27. So, purely on the basis of this INR250 crore capacity, by when do you believe you would be in a position to utilize a significant proportion of it? That is my first question. And the second one: since the plant has come up, or the opex may be upfront and the ramp-up may be gradual, do you believe that at the segment EBIT level — that is, at the Cable and Wire segment level — our EBIT margin could decline on account of depreciation and some opex during FY ’27?

Rajeev Gupta

executive
#67

Then for the following year, again out of Sanand specifically, we expect turnover of roughly INR2,700 crores from Sanand on its own. And any shortfall that arises will be absorbed. So we aren’t guiding toward a decline, nor do we expect our EBIT margin to fall.

Keyur Pandya

analyst
#68

Got it. One final question about demand: are you noticing any slowdown in T&D or in capex from other big consuming industries? I don't mean degrowth — rather a deceleration stemming either from the elevated base of the last few years or from steep commodity prices, and not just for cables but for all the other raw materials as well. Thank you.

Anil Gupta

executive
#69

Right now, we aren't seeing any slowdown in cable demand. You see, pricing doesn't truly influence the project. If a project is underway, it's moving forward — I mean, perhaps decision-making might pause for a month or so. But in the end, that product must be bought so the project can be finished. And I don't believe the energy sector will experience a downturn due to the extraordinary energy demand needed by industries, households, and data centers along with other consumers. So, I mean, we don't anticipate any drop-off in demand.

Keyur Pandya

analyst
#70

Got it. Best of luck. Thanks.

Operator

operator
#71

Thanks. Our following question comes from Achal Lohade at Nuvama Institutional Equities. The line is yours — please proceed.

Achalkumar Lohade

analyst
#72

Yes sir, just a quick clarification. Could you speak a bit about the competitive landscape, since we've noticed some new entrants in Wires? You also brought up competition in your media interview this morning. So could you give us a little more sense of what competition looks like for both Cables and Wires from these new players?

Anil Gupta

executive
#73

Alright, let me give you a quick briefing on that. Over the past 12 months, we've seen some new pan-India entrants such as Torrent, Surya, Roshni, Luker, and so on, plus a handful of other smaller players coming into the Wire segment. Even with all that competition, our growth continues. Product performance and brand image are our biggest strengths. For any newcomer, building that brand image and product performance takes roughly five to seven years. We're price competitive as well. So we're already competing in a market that's very, very competitive. We already have substantial capacities and solid — as a result, we enjoy good purchasing power, and our fixed overheads are very, very low thanks to the large volumes, compared with the new players. Demand on its own is expanding at roughly 13% to 14%. So over the next few years, the new players will get absorbed too, while also giving the existing players growth. Second, on this — we offer a complete basket of products, including cables, flexible wires, telephone cables for residential buildings, land cables, and solar wires, and we're approved with leading consultants and architects. So with a complete basket like this, whoever the new entrant may be, conceptualizing all of it will take them a long time.

Anil Gupta

executive
#74

We’re always going to hold an advantage over them, and we’ll be in a position to handle this competitive pressure. Building the network you need in order to get to a sensible scale takes a minimum of 4 to 5 years. Even the distribution network — what’s required, along with the manpower needed to put that network together — likewise takes a fair amount of time. On top of that, the market itself keeps expanding. As for whatever lies ahead down the road, no one is able to see it.

Rajeev Gupta

executive
#75

Over the past 13, 14 years, even at that point KEI has gotten only to roughly INR3,500 crores to INR4,000 crores in Wire sales. So reaching this level has taken us almost more than a decade.

Achalkumar Lohade

analyst
#76

That's a fair point. Do you have anything to add about Cable as well, sir, aside from Wires?

Anil Gupta

executive
#77

On the cables side, I mean, I don’t see any new entrant entering that Cable segment. And given our strong position with the projects and exports, I don’t see any deceleration there.

Rajeev Gupta

executive
#78

And is pre-qualification something that anyone has to have before they come for that Cable?

Achalkumar Lohade

analyst
#79

Apologies — let me jump in quickly on this Wire topic. Bajaj has also fairly recently announced that it's entering wires, so there's presumably speculation that Crompton might do the same. Given that these are electrical companies and appliance companies, they already have some distribution in place. So how would you defend against that, or how do you expect it to play out when it comes to volume or pricing — both for the industry and for us?

Anil Gupta

executive
#80

From what I can see, sir, they’re proposing what I’d call an outsourcing model. And based on what I’ve experienced, an outsourcing model won’t work in Wires and Cables.

Rajeev Gupta

executive
#81

And at this point, we already have three, four companies that have entered, even though every one of the incumbent players has performed quite strongly despite that competition.

Achalkumar Lohade

analyst
#82

Got it. All right, I’ll move to the back of the line, sir. Thanks very much.

Operator

operator
#83

Thanks. Our following question comes from Pulkit Patni at Goldman Sachs. The line is yours — please proceed.

Pulkit Patni

analyst
#84

Thank you, sir, for taking my questions. There are two of them, sir. The first one follows on from Achal’s question, and you did touch on it — why do you believe the outsourcing model in wires won’t work? That would be my first question, sir.

Anil Gupta

executive
#85

This is just my personal view. Nobody has put it to the test so far. So whether it will work or not, we’ll find out. What I mean is, in my opinion — and given how competitive this market is, and once you’ve covered manufacturing cost, etc., plus the other call profits that go to a contract manufacturer — I don’t believe you can make too much on margin through brand alone. And even a newcomer will need to build up the brand in the wire segment, which in a good case scenario takes at least five to seven years. You can’t build a brand overnight.

Pulkit Patni

analyst
#86

Yes, sir. Sir, regarding your margin guidance for my second question, let me break that down a bit. A substantial amount of capacity is arriving online. My guess is that this will create some negative operating leverage, and on top of that, you have a strong emphasis on export, which carries a higher margin. Given all of those combined, are you guiding for margins to improve? Would that be a fair assessment? Or is there something incorrect in that underlying assumption?

Anil Gupta

executive
#87

No, no, that's a fair assessment. And the margin guidance we're providing reflects both the domestic market and the export market combined.

Pulkit Patni

analyst
#88

Got it, sir — that's very clear. Thanks.

Operator

operator
#89

Thanks. We’ll take the next question from Puneet Gulati at HSBC. Go ahead, please.

Puneet Gulati

analyst
#90

Thanks a lot for the chance to ask. First off, when it comes to the total volume growth you saw this quarter, do you think any portion of that reflects inventory stocking? Or would you say it's entirely organic growth?

Rajeev Gupta

executive
#91

Usually this is purely growth, since we provide the figures quarter over quarter and our guidance is also on a quarter-over-quarter basis. However, as you know, inventory held in the channel by a dealer or distributor does not exceed 15 to 20 days. So for them as well, this is just the routine nature of the work.

Puneet Gulati

analyst
#92

However, given that raw material prices rose so dramatically, do you believe any inventory restocking has taken place?

Rajeev Gupta

executive
#93

Apologies. This applies across every quarter, since it went up in Q2 as well. It rose in Q1 too. Q3 also saw an increase. Pricing keeps climbing continuously, which means the system configures it automatically.

Puneet Gulati

analyst
#94

Alright, my second question concerns exports. At this point you've posted 4 quarters of extremely robust expansion. Could there still be scope for comparably very high growth across the coming few quarters? Do you figure you've now hit a base and have largely exhausted the chances for the more like 20% growth you're guiding for across the whole business? Or ought we still to anticipate expansion being very rapid, matching what you've turned in during the last 4 quarters.

Anil Gupta

executive
#95

Sir, global markets are really, really strong. I mean, from India, what we export amounts to just a peanut. It all hinges on how much we can explore and push ourselves into large economies.

Puneet Gulati

analyst
#96

Yes. So as far as your own trend goes — keep in mind, that figure could carry on through the next few.

Anil Gupta

executive
#97

Right, right, right. I’m not saying we can double annually, but we still expect robust growth over the next few years until we get to a sensible market level.

Puneet Gulati

analyst
#98

Got it — that helps a lot. Last thing, could you give us a sense of where capacity utilization currently stands across your different units?

Rajeev Gupta

executive
#99

So, in the Cables division, capacity utilization stands at just about 76%.

Puneet Gulati

analyst
#100

All right, that covers what I had. Thanks very much.

Operator

operator
#101

Thanks. Our next question comes from Praveen Sahay at Prabhudas Liladar Capital. Go ahead, please.

Praveen Sahay

analyst
#102

Yes, hello. Hello. Sir. Thanks for the chance. Sir, regarding the volume growth you mentioned—16% to 18% going forward, that's what you're looking at in terms of volume growth. And how did it go in the third quarter?

Rajeev Gupta

executive
#103

Regarding the third quarter, Anil-ji mentioned growth of roughly 10% to 11%, because, as you can see, volume sometimes shifts between copper and aluminum. Copper cable costs 3x as much as aluminum cable. So it isn't an exact mirror image that can be measured quarter to quarter, since aluminum cable orders are higher in certain quarters, which can make volume appear larger. Yet on a value basis, it's 1/3. With copper, when we get more of it — as in some export markets, where copper accounts for a bigger share — the value will be higher, but the volume won't look like aluminum.

Praveen Sahay

analyst
#104

Okay, okay. Understood. Understood, sir. Second, regarding the HT cable, since for a number of quarters now the ST cable has shown a decline in revenue — so if that — I get that there’s fungibility between the capacities, but is this a demand effect? Or is it a capacity effect on the HT cable?

Rajeev Gupta

executive
#105

During the previous year, capacity meant for extra-high voltage power cable was used to produce HT power cable. That explains why the comparison looks the way it does. As things stand today, extra-high voltage orders are extremely strong. Extra-high voltage power cable is therefore being made on extra-high voltage lines, and no high voltage product is currently produced on extra-high voltage. That is the reason for what you see there.

Praveen Sahay

analyst
#106

Right, yes. But now that Sanand capacity is operational — the first phase — could HT cable improve from this point?

Anil Gupta

executive
#107

Yeah, yeah. For sure. For sure. It’s going to get a lot better.

Rajeev Gupta

executive
#108

Look, we keep discussing growth at a 20% CAGR — not just for a single quarter or a single year. Even during ’21-’22 and ’22-’23, when copper prices weren’t rising but instead falling, or when aluminum prices were declining, we still grew by 19% in that period. So price increases or decreases aren’t what drives us; our greater focus is on value growth, and that’s the disciplined growth we’re able to maintain, really.

Praveen Sahay

analyst
#109

Yes sir. And finally, regarding how the order book breaks down, if you could provide it — such as EPC, extra high-voltage, and domestic cable — how has that been?

Rajeev Gupta

executive
#110

To reiterate what Anilji just mentioned about the order book: the total stands at INR3,928 crores. Within that, EPC accounts for INR361 crores, and extra high-voltage power cable makes up INR717 crores. Domestic cable orders come to 2,426 crores, while export cable orders are INR424 crores. So the overall order book totals INR3,928 crore.

Praveen Sahay

analyst
#111

Thanks very much, sir — and best wishes to you.

Operator

operator
#112

Thanks. Our next question comes from Kunal Sheth at B&K 360 ONE Wealth Asset Management. Please go ahead.

Kunal Sheth

analyst
#113

Yeah, hi — thanks for the chance to ask. Most of what I had has already been covered. I just need one thing clarified. On the export side, is there a specific benchmark you're working toward — like, if we aim to keep it at, say, 15% to 18% of sales, or is it more of an opportunity? Do you have a number like that in mind?

Rajeev Gupta

executive
#114

Sir, our growth depends on capacity. As capacity rises, we grow. That is the basis on which we originally provided guidance of 20% CAGR. However, should certain prices go up, that effect will certainly show up in the future.

Kunal Sheth

analyst
#115

Sir, my point was more about exports serving as a fallback. Is there a figure we have in mind—do we want to cap exports at some specific percentage, or...

Rajeev Gupta

executive
#116

Anil-ji had mentioned that earlier regarding export.

Anil Gupta

executive
#117

No, no — nothing says we have to halt there. We'll find out just how far we can go; the sky is the limit.

Kunal Sheth

analyst
#118

But at the end of the day, it comes down to the capacity we have to use. Whatever capacity exists, we can deploy it either in export, in retail, or in domestic. It isn't possible for exports to rise, our domestic to rise, and retail to rise all at once, because ultimately we have to grow in line with that capacity. Right, sir. But sir, realistically speaking, what might the export share be, say, in two years?

Rajeev Gupta

executive
#119

Anil-ji has already visualized close to more than 20%.

Anil Gupta

executive
#120

Yet we're certainly going to target a higher figure. Still, the moment we gain clearer visibility, we'll be able to offer improved guidance. During this year, exports to the U.S. have affected us, and those began last year. So in the end, given these uncertain geopolitical times, it's extremely hard to say what a leader in another country is thinking.

Kunal Sheth

analyst
#121

And sir, during this quarter, which country stood out as the main destination for our exports?

Anil Gupta

executive
#122

Our exports now reach Europe. Australia is another destination we ship to. We also export to the Middle East and Africa. As for the U.S., right now things are on hold there owing to that tariff.

Operator

operator
#123

Thanks. Our following question comes from Rahul Agarwal at Ikigai Asset. The line is yours — please proceed.

Rahul Agarwal

analyst
#124

Thanks for the follow-up. Just one question. If Sanand is left out, could you help me get a sense of the current capacity in terms of sales value for LT, HT, EHV and housing wire? What peak sales are achievable from that existing capacity?

Anil Gupta

executive
#125

No, no — that's already done. We've hit the peak already, so nothing further is coming.

Rajeev Gupta

executive
#126

Capacity excluding Sanand would be somewhere between INR10,000 crores and INR12,500 crores.

Rahul Agarwal

analyst
#127

My apologies, sir, I didn't catch that figure. INR12,500 crores?

Rajeev Gupta

executive
#128

Right, so that figure represents the total capacity, excluding Sanand.

Rahul Agarwal

analyst
#129

Right. And apart from Sanand, are we planning any expansion brownfields over the next two to three years?

Rajeev Gupta

executive
#130

Yes, sir, that’s already been planned. And once Sanand is done, even in the next financial year, we’ll be starting at our Bhiwadi, but as of now that will be at the planning stage.

Anil Gupta

executive
#131

We’re starting a fresh initiative on undeveloped property.

Rajeev Gupta

executive
#132

We acquired new land during this financial year, putting in INR92 crores. Following that, we're already in the process of acquiring land in Baroda of roughly 70 acres. We're building up our holdings there. So over the coming three to four years, we plan to invest a further INR2,000 crores, separate from Sanand.

Rahul Agarwal

analyst
#133

All right, yes. So as far as this goes.

Rajeev Gupta

executive
#134

Over the coming 4 to 5 years, our goal is growth at a compound annual rate of nearly 20%.

Rahul Agarwal

analyst
#135

Got it. So that INR12,500 crores covers the capacity we already have, plus the brownfield once it gets going, and Sanand as well — is that right?

Rajeev Gupta

executive
#136

Yes.

Rahul Agarwal

analyst
#137

I really appreciate it.

Operator

operator
#138

Thanks. Our following question comes from Vidit Trivedi at Asian Market Securities. Go right ahead.

Vidit Trivedi

analyst
#139

Yes. Sir, I appreciate the chance to ask. Most of what I had has already been covered. I just wanted to find out: what is the asset turn for Wires, and what is the asset turn for Cables?

Rajeev Gupta

executive
#140

In Cable, the asset turn is roughly 1:4. And for Wires, the asset turn might come in around 1:5 or 1:6.

Anil Gupta

executive
#141

That figure is going to be higher than that. It's going to come in at 1:6.

Vidit Trivedi

analyst
#142

The ratio stands at 1:7.

Rajeev Gupta

executive
#143

It’s 1:6, or perhaps 1:7, during the period when the brownfield capex is underway there.

Vidit Trivedi

analyst
#144

Understood, sir. Thank you very much.

Operator

operator
#145

Thanks. Our next question comes from Saket Kapoor <<inaudible>> of Kapoor & Co. <<inaudible>> You have the floor.

Analyst

analyst
#146

Yeah. Namaskar sir, is my voice coming through?

Anil Gupta

executive
#147

Yeah. Yes. Yes.

Rajeev Gupta

executive
#148

Yeah. Yes.

Saket Kapoor

analyst
#149

To sum up, sir, could you give us a bit more color on the overall landscape, particularly for the EHV cable segment — specifically what current demand looks like given how renewable growth is driving that segment, plus the country's capacity and the main players taking part in this journey, KEI included? Could you share some additional color there? And then there had been some talk about the Government of India easing things to let Chinese players take part in government projects and in power utilities as well, on account of certain shortages in the Power segment, especially when it comes to building out this reverse infrastructure. So where do we stand on that? And is there any update you'd like to share on these two aspects?

Anil Gupta

executive
#150

The government has discussed permitting Chinese suppliers in certain areas—for instance, transformers for some high-voltage equipment where a genuine shortage exists and lead times from current makers stretch out very far, perhaps 2 or 3 years. When it comes to the cable segment, that problem doesn't arise. Also, in the EHV segment there are now 4 or 5 major companies, such as KIE, Universal Cables, Sterlite, and LS Cable. And given the volume involved with this product, my view is that cable manufacturers from China cannot match us within the Indian market, owing to the drawbacks on their side.

Analyst

analyst
#151

On the foreign speech side — right now, if we look at it — you brought up four player names. In terms of capacity, sir, how would we rank them, and then <<inaudible>>

Anil Gupta

executive
#152

Look, roughly 25% of overall capacity is what we have, matching the other four. As for the new capacity being added, I doubt anyone is building an EHV plant that serves EHV alone. There could be a dual purpose behind making both EHV and HT cable. So we'll work out the quantification and get back to you.

Saket Kapoor

analyst
#153

Right. So the reason I posed that question was that there's information out there publicly about products customers favor — you brought up Universal Cables, which is likewise undertaking capex and building fresh capacity for EHV. Next, sir, on the compounding side: the sioplas compound, or the PVC compounds that are needed, are we getting those from domestic sources, or do they come in as imports, sir? Particularly when it comes to the higher kV?

Anil Gupta

executive
#154

There are certain special high-voltage compounds that we bring in from abroad, since no one produces them here in India. However, when it comes to medium-voltage and low-voltage XLPE and PVC compound, we make those in-house. Our company has already achieved substantial backward integration. Each month we turn out roughly 3,000 tonnes of PVC, along with close to 1,000 tonnes of XLPE compound, and that material goes into LT cables, solar wires, and low-tension control cables right within our own plant.

Saket Kapoor

analyst
#155

Right. Since major players such as DDev Plastiks are also looking for impediments from various participants in the higher kV segment, does that mean we are a customer of theirs, and as we ramp up to higher kV in the EHV segment, could they become a prominent or trusted supplier?

Anil Gupta

executive
#156

Right, right. From DDev Plastiks we purchase what we need for medium voltage cables ranging from 11 kV up to 66 kV. Anything above those voltage levels, though, every compound comes in from Borealis or Dow Chemicals.

Saket Kapoor

analyst
#157

Okay, and finally, sir, regarding the additional capex you just described — the INR2,000 crores — could you give us some detail on which segments you're directing that expansion toward? And sir, if you could also address one outstanding item: how do demand and supply stand right now for EHV capacity, both the capacity you're ramping up and that of other players — what's the demand/supply gap at present, and also two years out?

Anil Gupta

executive
#158

Sir, demand for EHV Cable keeps climbing, driven by the need to evacuate power from renewable sources and by new projects that are emerging on the power generation side and enhancing the transmission infrastructure. Right now we really don’t have that, nor a quantification of it, but we’ll try to compile the data and get back to you.

Analyst

analyst
#159

On the foreign exchange side, we posted a gain of $136 million. That figure includes about $102 million stemming from the balance sheet hedging program, and roughly $34 million tied to the revaluation of intercompany loans.

Anil Gupta

executive
#160

It's still on the drawing board. It will be cleared in the next — it will be finalized within the next six months.

Analyst

analyst
#161

And my best wishes go out to the team. Thank you, sir.

Anil Gupta

executive
#162

Thanks.

Operator

operator
#163

Thanks. <<operator_script>> Our next question comes from Amit Agicha at HG Hawa & Company. Your line is open.

Amit Agicha

analyst
#164

Right, good afternoon sir, and congratulations on the strong set of numbers, plus thanks for the chance to speak. Sir, given that you have more than 2,100 dealers, what would the optimal dealer count be? And how do you make sure leader productivity is what you're getting, rather than simply expanding?

Anil Gupta

executive
#165

We're certainly not growing the dealer network excessively. Of these 2,500 dealers — 2,100 dealers, roughly 100 of them are quite large. The remaining dealers, though, work in smaller towns and smaller markets — B2C — B and C category cities. In those places, dealer size ranges from INR1 crore to INR3 crore, INR5 crores. That's the reason the dealer count appears as it does. Yet the significant dealers, the ones contributing 80% — 70% or 80% of sales, fall within that 100. And we're working to ramp those dealers up so that our distribution chain gets improved.

Amit Agicha

analyst
#166

And sir, what amount of extra branding or advertising spending do you have planned in order to reinforce the retail footprint?

Anil Gupta

executive
#167

My estimate is that our advertising expenditure for this financial year falls somewhere in the INR75 crores to INR80 crores range.

Amit Agicha

analyst
#168

And sir, this is my final question. I believe you mentioned the order book stands at INR3,928 crores. What would the execution timeline be, and how much of that would be converted into FY ’27 revenues?

Rajeev Gupta

executive
#169

The timeline for executing these orders is three to four months.

Anil Gupta

executive
#170

These orders can be replaced fast. What I mean is, we simply carry them out, and the majority take three to four months. Just a handful stretch to five months. Yet for most of them, they're finished within four months at the latest. And new orders come in each month to take their place.

Amit Agicha

analyst
#171

Thanks for taking my question, sir. I appreciate it. And I wish you all the best going forward.

Anil Gupta

executive
#172

Much appreciated.

Operator

operator
#173

Thanks. Our following question comes from Nirransh Jain at BNP Paribas. The line is yours — please proceed.

Nirransh Jain

analyst
#174

Hello, sir, and thanks for the chance to speak. Sir, my first question concerns domestic institutional sales for the nine months, which includes. I do apologize.

Operator

operator
#175

Nirransh, I'm sorry to cut in, but we can't hear you clearly — the audio isn't coming through well.

Nirransh Jain

analyst
#176

Hi there. Apologies — is everything coming through clearly at this point?

Operator

operator
#177

Yes, go right ahead.

Nirransh Jain

analyst
#178

Yes, sir. So when I look at the domestic institutional sales figures — that's INR1,880 crores from cable and wires plus INR370 crores from EHV across nine months — I see growth of 3% year on year. So I just wanted to get a sense of why this figure looks so low for domestic institutional sales, particularly given that our utilizations sit at roughly 75% for cables. So how would you explain that 3% growth on the institutional side?

Rajeev Gupta

executive
#179

Look, once exports go up, capacity ends up being constrained. So in reality, that capacity has been directed toward the export market.

Nirransh Jain

analyst
#180

However, sir, the utilization rate is lower.

Rajeev Gupta

executive
#181

Utilization is driven by volume. As I mentioned, when we place the order for copper—copper carries a price three times that of aluminum—that is why it doesn't actually reflect the true picture.

Nirransh Jain

analyst
#182

Right, right, got it, sir. And then sir, second thing, I just wanted to verify: when we refer to INR12,500 crores as the peak revenue potential from our current capacity, is that figured using spot prices for copper and aluminum?

Rajeev Gupta

executive
#183

Copper is trading near $9,000 — the LME-based price sat in that $9,000 to $10,000 zone. But honestly, the copper price doesn't remain fixed at a single level. It moves higher at times, and it moves lower as well.

Anil Gupta

executive
#184

We get where you're coming from, and we're doing the same — pushing volume as hard as we possibly can. As for how turnover ends up being affected through pricing, that will show through in our results as well over the quarters ahead.

Nirransh Jain

analyst
#185

No sir, that makes sense. I just wanted to verify what the exposure is to that INR12,500 crores in either direction, since as you said, this is based on $10,000 LME-based prices.

Rajeev Gupta

executive
#186

To begin, I’d point out that for the past five years, on every quarterly or yearly earnings call, we have consistently provided guidance of a 20% CAGR tied to capacity. Whether prices rise or even fall — as I noted in ’21 and ’23, when prices were declining — we still grew by 19%, 18%. So going forward as well, it makes no difference to KEI; over the last 15 years, our growth has been close to 17% CAGR. During those 15 years, prices fell many times and rose many times, yet we have not had a single year without growth except the COVID year of 2021. That said, we are maintaining a disciplined approach. Even with prices down, we were growing in the past as well. So in the future, whenever we speak of CAGR growth, we mean 20% CAGR growth, regardless of copper declining, regardless of anything, because whatever capacity we are building, whatever new market we are creating — as Anil-ji visualized at the start of the year — we should reach 20% exports within one to two years’ time.

Rajeev Gupta

executive
#187

We’ve already gotten to nearly 17% during this nine-month stretch. So we’re pursuing our own plan, not somebody else’s. Look, you can’t keep expanding each quarter in a row. If someone posted 50% growth this quarter, could that person do 50% again in the third quarter of next year, or even hold a 20% pace? That won’t be feasible, sir, since we’ve been in this industry for 50 years. So we are growing while copper moves up and down. We keep working steadily toward the company’s growth, and we’re taking part in the industry. We are the leading company from the country. Those who export more across so many countries. So we’ll stay focused, we’ll stay focused on a growth rate of 20% CAGR, not for one year but across five years. That’s what we have on our side. Demand isn’t a problem in the country, and demand isn’t a problem in the overseas market either.

Nirransh Jain

analyst
#188

That’s helpful, sure. Thanks very much — and to everyone else as well.

Rajeev Gupta

executive
#189

Thanks very much, sir.

Operator

operator
#190

Thanks. Our next question comes from Rohit Balakrishnan at ithoughtpms. Please go ahead.

Rohit Balakrishnan

analyst
#191

Thanks for giving me the chance to ask. Hello, sir. My question concerns the EHV segment. After the VCV tower is commissioned in FY ’27, the precalibration period will still apply, correct?

Anil Gupta

executive
#192

It's actually much, much lower, since we already have 15 years of experience in extra high-voltage cable. So the only thing needed is a type test to be carried out at the new plant — the new facility.

Rohit Balakrishnan

analyst
#193

Just a quick follow-up. I'm noticing a move toward the more complex urban underground projects, the kind Universal Cables is doing. And at present, is KEI concentrating on that segment, or is it only in high-volume exports?

Anil Gupta

executive
#194

Could you say that question again, please?

Rohit Balakrishnan

analyst
#195

For instance, Universal Cables is right now going head-to-head on projects in urban areas that involve underground work.

Anil Gupta

executive
#196

Yeah. Yeah.

Rohit Balakrishnan

analyst
#197

High-voltage cables, 400 kilowatt cables — right now, is KEI concentrating on those, or just...

Anil Gupta

executive
#198

Yeah, yeah. Over the past 10 years, we've already completed over—I mean, 30 to 40 large projects of this kind throughout India. And we're still carrying out work in Mumbai, in Karnataka, in various states. So we're in very good shape there, and we're already giving this our attention. And it isn't as though we've stopped focusing on the domestic market or on urban underground work. We're handling plenty of projects like that.

Rohit Balakrishnan

analyst
#199

Alright. Thanks.

Anil Gupta

executive
#200

Yes, yes. We've already completed over — I mean, across India during the past 10 years, we have carried out 30 to 40 large projects of this kind, and we're still working on them in Mumbai, in Karnataka, in various states. We're in a very strong position there, and this is already a focus for us. And it isn't the case that we've stopped concentrating on the domestic market or on urban underground work. We're handling plenty of projects of that type.

Operator

operator
#201

Thank you. Ladies and gentlemen, we’ll treat that as the final question and bring the question-and-answer session to a close. I’ll now turn the conference over to Mr. Anil Gupta for his closing remarks.

Anil Gupta

executive
#202

Yes. So, a big thank-you to all our investors for joining this conference call. I want to assure everyone that given the sort of business KEI has established — in terms of product approvals, the capabilities of our products, and the strength of our management across production, quality control, marketing, and our worldwide network — we are going to grow considerably. It was only the capacity constraint that held back our growth for the last two years, perhaps, when compared with our peers. But now that the Sanand facility is getting commissioned and ramped up, we will see substantially good results in the fourth quarter and in the next financial year, as each machine is commissioned one by one in the cable factory. So it may take another one to two months to really ramp up the capacities, but we are on track. And we will be delivering very strong growth in this business over the coming next three to four years with these new capacities coming up. Thank you very much for your participation.

Operator

operator
#203

Thanks. That brings this conference call to a close, on behalf of Nuvama Institutional Equities. <<operator_signoff>>

Read the full transcript via the API

You're viewing the first half of this call. Get the complete KEI Industries Limited transcript — plus 133,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to KEI Industries Limited earnings transcripts and 133,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in KEI Industries Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.