Good day, ladies and gentlemen, and welcome to the Kirloskar Brothers Limited Q2 FY 2026 earnings conference call. This call may include forward-looking statements regarding the company, and those are based on the company's beliefs, opinions, and expectations as of today's date. Such statements do not guarantee future performance and carry risks and uncertainties that are hard to predict. As a reminder to everyone participating, the line will be listen-only, and you will have a chance to ask questions once the presentation ends. If you require any assistance during the call, you can signal an operator by pressing * then 0 on your touch-tone phone. Kindly note that this conference is being recorded. I now hand the conference over to Mr. Sanjay Kirloskar, Chairman and Managing Director from Kirloskar Brothers Limited. Thank you, and over to you, sir.

Sanjay Kirloskar

executive
#2

Thank you. Good afternoon, everyone. I'd like to offer a very warm welcome, on behalf of Kirloskar Brothers Limited, to all of you for being with us on today's call. I trust everyone has had a chance to review the financial results and investor presentations, which have been posted on the stock exchanges as well as on the company's website. Joining me on this call are Alok Kirloskar, Managing Director of Kirloskar Brothers International B.V.; Ms. Rama Kirloskar, Joint Managing Director of KBL and Managing Director of Kirloskar Ebara Pumps Limited. Since Mr. Chheda is on leave, his deputy, Mr. Hemant Shaligram, AVP, is also present, along with Strategic Growth Advisors and Investor Relations Advisors. Turning to how we performed in Q2 of fiscal year 2026, I'll start my remarks with a few business highlights. Consolidated revenue for the quarter ended September 30, 2025 came in at INR 1,028 crore, which was broadly stable year-on-year. Revenue for the first half of fiscal year 2026 reached INR 2,007 crore, a modest decline of 3% versus the same period last year. Although the quarter carried certain seasonal and external challenges, our diversified business model and disciplined execution enabled us to stay stable and to position the company for stronger growth in the quarters ahead.

Sanjay Kirloskar

executive
#3

Seasonal headwinds, especially a longer-than-usual monsoon, put a temporary dent in our standalone performance. Even so, demand stayed robust in both the small pump and industrial segments, which shows the inherent strength and resilience of our diversified portfolio. As all of you know, our company keeps its strict commercial policies in place. We were quite hopeful when the center released funds for the Jal Jeevan Mission, but dispatches and further manufacturing have been held up because funding has not been released at the state level. Excluding the small pumps business, our standalone order book stands at INR 2,127 crore, a strong 13% growth over the previous year, underscoring a healthy pipeline and sustained customer confidence. Domestic subsidiaries have registered a revenue growth of 14% year-on-year, and PAT has improved by 26% year-on-year. On the international business performance, our operations in the U.S. and Thailand delivered strong year-on-year growth of 21% and 158%, respectively, in constant currency. This impressive performance was driven by the execution of orders that were deferred from earlier quarters due to election-related delays, along with an improvement in overall product demand. South Africa also continued to perform exceptionally well, registering a 27% growth in constant currency. While the U.K. operations faced temporary softness due to delay of certain orders to subsequent quarters, the overall international order book remained strong, expanding 25% year-on-year to INR 1,289 crore.

Sanjay Kirloskar

executive
#4

What these numbers show is that our worldwide footprint is strong and that we can seize growth opportunities in a range of different markets. Quarterly EBITDA came in at INR 124 crore, and margins were 12%. EBITDA for the first half of fiscal year 2026 reached INR 251 crore. The moderation compared with a year earlier stemmed mainly from shifts in product mix as well as the impact of forex revaluation. Crucially, the underlying business. Fundamentals stayed robust, backed by steady volumes, better efficiencies, and a solid order pipeline spanning segments. In the quarter, we also booked healthy order inflows in domestic and international markets alike, which speaks to ongoing customer trust and demand momentum. That strong inflow, together with our expanding order book and diversified portfolio, provides high visibility for sustained performance in the second half of the fiscal year. Going forward, we continue to feel optimistic about the growth trajectory of our business. With a healthy balance between domestic and international markets, a solid order pipeline, and ongoing focus on operational excellence and customer engagement, we are well positioned to deliver sustainable and profitable growth in the periods ahead. I will now open the floor for questions and answers.

Operator

operator
#5

Thanks so much. Ladies and gentlemen, we’re now starting the question-and-answer portion. If you’d like to ask something, you can press * and 1 on your touch-tone phone. Should you want to take yourself out of the question queue, press * and 2. We ask participants to use handsets when asking a question. We’ll pause for a moment while the queue is put together. Our first question comes from Balasubramanian at Arihant Capital. Please go ahead.

Balasubramanian A

analyst
#6

Good afternoon, sir, and thanks very much for the chance to speak. Sir, when it comes to the distribution network — particularly for Jal Jeevan Mission — the funds have been stuck. What concrete steps have we taken to de-risk that channel? How are government fund flows looking at this point in time? And what is the receivables exposure on the channel side?

Sanjay Kirloskar

executive
#7

There was an echo there. If you wouldn't mind speaking a bit more slowly. You mentioned something regarding the Jal Jeevan Mission, something to do with channel management. I didn't catch it.

Balasubramanian A

analyst
#8

Yes, sir. There are, in fact, a few liquidity issues.

Sanjay Kirloskar

executive
#9

Yeah?

Balasubramanian A

analyst
#10

On the Jal Jeevan Mission channel side, how are we handling things, and what's the receivables exposure?

Sanjay Kirloskar

executive
#11

Yes. Regarding exposure on receivables, it's zero. And as you know — I brought this up in my remarks too — the company keeps its commercial policies very strict. Nothing leaves the factory unless payment is assured. As I said, the center has released funds, but states have to chip in — in some cases 10% of the funds, and in other cases 50% of the funds. Unfortunately, the states haven't been able to come up with their share. So, as I said earlier, since we don't deal with the government directly and handle Jal Jeevan orders through our distribution channel, we've made sure our distribution channel stays healthy. That's why we've held back dispatches of a certain quantity of products, so that only once the money is certain to come will we ship those pumps. I'd also like to point out here that the pumps are generic. If the state government doesn't lift them for a certain period of time, they can be redirected to other customers. We're holding on to them, expecting this to be resolved in the near future.

Balasubramanian A

analyst
#12

All right, sir. Regarding pumps — retail petroleum pumps in particular — that's a strategic product line for us. How exactly do we plan to go to market and take on the international competitors? Could you shed some light on the price, service, or technology dimensions, and also tell us what market share we're targeting and what revenue we expect from this segment over the next two to three years?

Rama Kirloskar

executive
#13

Yes. Regarding these items, can you hear me?

Balasubramanian A

analyst
#14

Correct, ma'am.

Rama Kirloskar

executive
#15

Right. When it comes to these pumps, the market is dominated by two American players acting as monopolies. We managed to make a breakthrough in that market. We're going to be an indigenous participant in this space now. These are a kind of canned motor pump that we've manufactured. They're headed for a critical application. As you're aware, we always have to be L1 on these orders, correct, since it's tender-based. That's the reason we don't really want to state the value or the margin, because it will genuinely hinge on that tender. It's going to be highly tender-specific. We don't want to create needless confusion in the market by quoting a fixed price, since that isn't how this business operates. Even though this is a big area, and given that just two to three global players exist, we do view this as an area for future expansion. There's substantial potential for exporting these products. That said, since this is our first large order, we'd prefer to focus on executing this business domestically first. For me to offer a long-term outlook as of today would be very premature.

Balasubramanian A

analyst
#16

All right, ma’am. Regarding the data center side, ma’am, each site carries a value of roughly $5 million-$7 million. For cooling and firefighting packages specifically in the U.S. and Europe, what’s the estimated total addressable market? And in those areas, how are we contributing?

Alok Kirloskar

executive
#17

When it comes to data centers, the U.S. is where we're primarily focused. That's genuinely where our attention is, with the big players either building data centers or, naturally, with some of the others who end up occupying them. I'd call that our core market. The overwhelming majority of data centers are being built in the U.S., with the U.K. and Ireland coming next — oddly enough, since that's where the communications cables land from the U.S. I'd say that's our area of focus for data centers. On firefighting, our U.S. market share remains roughly 15%-20%. In India, naturally, our firefighting share is considerably higher — closer to 55%-60%. I believe those are the two answers. I think the final one is district cooling. For district cooling, our main focus is the Middle East. We're seeing plenty of district cooling projects emerging right now in the U.A.E. and in Saudi. Having said that, there's a bit of sluggishness in Saudi, particularly around the NEOM projects, where a couple of sizable district cooling projects were in the works. Spending on those projects has come down at the moment.

Alok Kirloskar

executive
#18

That said, I would say the Middle East is the region where we secure district cooling projects. Right now, we probably have a handful of them in progress with the main district cooling developers.

Balasubramanian A

analyst
#19

Alright, sir. For my final question, I want to touch on those U.K. structural headlines. I believe there were some high power cost problems, particularly affecting the industrial side. What share of U.K. service and project revenue carries exposure to this risk — the industrial customers? Second, I think such entities are on track with profitability at present. What sort of strategy do you have in place for launching new products, especially things like hydrogen pumps and so on? Do you have any plan to scale that profitability up over a three to five years' timeframe?

Alok Kirloskar

executive
#20

Yes. I believe across the recent few calls, I've brought up the point you're making—that the U.K. has seen serious deindustrialization since power prices sit near GBP 280 per megawatt hour. Compared with Germany, that figure is roughly GBP 120 per megawatt hour. And compared with Sweden, it's around GBP 52 a megawatt hour. The U.S. falls in that same range as Sweden. It's a fraction of what the U.K. pays. As a result, the U.K. has experienced heavy deindustrialization, particularly in the north, among the chemical plants. Really, any energy-intensive facilities—so chemicals, steel, all of these have seen their plants merely idling. Given the U.K. government's muddled strategy on oil and gas, no licenses have been granted in the North Sea. You might have seen in the news that Total recently decommissioned and exited the U.K. North Sea market by decommissioning their rigs. Now, what that means for us broadly is that, as you're aware, we hold service contracts with chemical companies, petrochemical companies, as well as steel companies and water companies. We do observe that although we have three-year or five-year contracts with them, activity on contracts in the petrochemical segment and even the steel segment has dropped significantly, because many of them are merely idling their plants.

Alok Kirloskar

executive
#21

We’ve been trying to counter that through fresh contracts won in the water and power plants segment. Although the overall contracts now available — the total executable service contracts — have recovered to prior levels, during the first few months of the year we did experience a period when a great deal of service work was not coming through. That impact shows up in the overall margin. In the U.K., in particular, we’ve identified two problems. First, there are certain supply chain difficulties that persist, and these affect the large project side. Second, we have problems regarding how many service contracts are available. We do have service contracts, but the available service contracts with ongoing work shrank. Those are the two areas we’ve been attempting to balance. We’ve lifted revenue by boosting sales in other segments within the U.K. As we’ve said, we’ll keep growing the service business in the U.K. and in Europe as well, and try to counter the softness in the U.K. service business. We continue to secure new service contracts in power plants and water in the U.K.

Alok Kirloskar

executive
#22

And in other segments outside the U.K., to be able to stabilize those service revenues and then slowly, after stabilizing, move into growth phase again. Does that answer all your questions?

Balasubramanian A

analyst
#23

Yes, sir. What kinds of opportunities exist for Total?

Alok Kirloskar

executive
#24

Yes. Well, as I said earlier, there are opportunities on the service side. We keep signing new major service agreements with water utilities and power plants. When you move into Europe, where power prices remain lower, there are chemical plants as well. We are building those up. We had several of them during the last quarter too. As you know, after you win them, it takes a minimum of two to three months of working alongside the operator to settle what the service plan will be for the coming three to five years — three or five, depending on the contract — and how much of the work gets done each year. Once we reach agreement and sign that off, the service contract then takes effect. That is really the reason we have not yet seen new business emerge from contracts signed recently. We do expect to see that soon, once we have agreed on what will happen in year one, year two, and year three under those contracts. Yes, we do have an upside. As you know, there is a further upside for us, namely fish-friendly pumps. The U.K., together with Europe, has now stated as a matter of policy that every canal and river requires fish-friendly pumps, and those pumps need to be retrofitted.

Alok Kirloskar

executive
#25

We can see they're putting money into that again, since we already have a product that's ready to sell in those markets. The other thing is that growth has occurred in the water segments, both in the Benelux region — that's Belgium, Luxembourg, and the Netherlands — and, as I've noted on earlier calls, AMP8 has now taken effect in the U.K. AMP8 is a GBP 88 billion program running over five years, and we're optimistic that this time there are more clear water pumps rather than sewage pumps. In a similar way, we're noticing an uptick in Benelux investments on the water side. I'd say there are still plenty of areas that look interesting within these segments.

Balasubramanian A

analyst
#26

Understood — thanks.

Operator

operator
#27

Thanks a lot. Our next question comes from Pratik Kothari, who is calling in from Unique PMS. The line is yours — go right ahead.

Pratik Kothari

analyst
#28

Yes, sir. Good afternoon, and thank you. First, on the standalone side — I mean, we've been gradually winning orders each quarter. Our order book has also been ramping up. Beyond this Jal Jeevan case, anything — if you could highlight the positives, the negatives, what's happening? For the last three odd quarters, we've either been stagnant or degrowing in that segment. Just some comments excluding Jal Jeevan — how are things turning out there?

Sanjay Kirloskar

executive
#29

I believe bookings have continued to rise steadily. What may not have met our expectations, though, is sales growth. On numerous occasions I've remarked that you shouldn't judge how we're doing on a quarter-by-quarter basis—not even across two or three quarters. Looking ahead to the close of the year: if you review this company's historical pattern, roughly 35%, 36%, 38% gets completed during the first half. The remainder—call it 60%-62%—gets completed during the second half. That stems from seasonality in our business. It also stems from the fact that the majority of industrial firms, particularly pump companies, perform very strongly as we approach the government year-end and our own year-end. That's simply how it works.

Pratik Kothari

analyst
#30

Sure, that's reasonable. Then, Alok, I believe you covered the U.K. difficulties quite thoroughly. Honestly, even the U.S. appears to be performing quite strongly. What I mean is, it has gotten quite near to the U.K.'s position. So is there any detail, any notable points, about what's working well in the U.S.?

Alok Kirloskar

executive
#31

Well, I'd say that in the U.S., as you know, there are new industries that are returning to the country. We're getting inquiries from those, and at this point we also have orders from quite a few of them. That's likely a piece of Mr. Trump's broader program aimed at drawing industries back. We're seeing some fresh inquiries, and our attention is on those industries. Beyond that, I'd say the other major growth area is, as I believe was mentioned earlier, data centers. A large number of data centers are being built. For most of these data centers, as you know, we supply both fire and cooling systems. We've shifted from only providing pumps to providing container systems, since data centers have a fast lead time of 18 months-24 months. They're looking for modular concepts. I'd say that we are — as you know, SyncroFlo's specialty is modular systems. Building pump houses, containerized pump houses, is something they do. SyncroFlo does that not just for our pumps, but many of SyncroFlo's distributors also sell pumps from other manufacturers, other major U.S. manufacturers. Frequently, those distributors purchase the pumps from those major U.S.

Alok Kirloskar

executive
#32

So the manufacturers give those pumps to SyncroFlo at no charge. After that, SyncroFlo builds them into highly intricate houses — these contain the piping, the control systems, valves, pumps of course, all pre-supplied, plus everything else inside — and delivers the whole thing as one complete package, again for data centers and other process units. I'd say that really is the main area. You're probably aware that right now there are close to 2,000 data centers in the U.S. that have already been granted planning permission. That's a huge number of data centers. To give you some context, a hyperscale data center — which is what most data centers are these days — needs close to 2 million liters of water daily, known as top-up water, simply from evaporation within the data center. Top-up water alone comes to 2 million liters per day. These are pretty large systems going into those data centers. Does that answer your question?

Pratik Kothari

analyst
#33

Yeah, absolutely. Yeah. Regarding that number, we’re seeing an FX loss of roughly INR 30 crore in our cash flows. I mean, was that this quarter? And does it flow through our P&L?

Alok Kirloskar

executive
#34

Right, so as you're aware, we've shifted to mark-to-market. Sorry — we shifted to hedge accounting. Yet even under hedge accounting, we're carrying mark-to-market losses, and that's because the dollar has deteriorated or depreciated heavily against the pound, as you know. Despite having hedge accounting in place, those excess losses still surfaced. On top of that, there's a second situation: we hold deposits. As you know, we keep cash at KBIBV, and we keep sizable dollar deposits in the Netherlands. Those are denominated in dollars, but since KBIBV's accounts are prepared in euros, we're also reporting translation losses of $500,000 on that amount. Yes, the mark-to-market losses are notional, coming from the operating side of the business. Now, the translation loss stays notional so long as we don't use that money in any currency other than dollars. Should we spend that money from KBIBV in a currency other than dollars, then it turns into a real loss.

Pratik Kothari

analyst
#35

Right. And another factor behind the weaker margins in this quarter, or across the first half, is that FX loss we’re seeing.

Alok Kirloskar

executive
#36

Right, right. As you correctly pointed out, that FX loss comes to roughly GBP 1.8 million, which works out to around INR 20 crore.

Pratik Kothari

analyst
#37

That's reasonable. I appreciate it.

Alok Kirloskar

executive
#38

If you look at it from an operating standpoint, the operating profit at KBIBV is stronger than it was at this same point a year ago, and stronger than last quarter as well.

Pratik Kothari

analyst
#39

Right, that's fair enough. Thanks, and all the best.

Sanjay Kirloskar

executive
#40

Thanks.

Operator

operator
#41

Much appreciated. Our following question comes from Raj Shah at ENAM AMC. The floor is yours.

Raj Shah

analyst
#42

Hello, sir, and thanks for giving me the chance to ask. My first question relates to that Jal Jeevan Mission matter you brought up. During the last year — 2025, let's say — what sort of contribution would the Jal Jeevan Mission make to our standalone business?

Sanjay Kirloskar

executive
#43

For Jal Jeevan, that figure would come in at 2%, 3%. Roughly 5%. At most, perhaps around 5%.

Raj Shah

analyst
#44

Is that 5% of annual standalone revenues?

Sanjay Kirloskar

executive
#45

Regarding yearly revenue on a standalone basis.

Raj Shah

analyst
#46

So that's the effect for this year, is that right?

Sanjay Kirloskar

executive
#47

Yeah, sort of.

Raj Shah

analyst
#48

Alright, this is for Alok, sir. The Dutch business is smaller in terms of numbers, but what we've seen is that from INR 24 crore last year, same-quarter revenues have fallen to INR 8 crore. The six-month figures are lower too, and there's also some loss that's been reported. In the Dutch entity?

Alok Kirloskar

executive
#49

Yeah. I mean, the order book position for the Dutch entity is stronger than it was a year ago. Since it's so lumpy, that business, there's a massive amount of executable order book in this quarter, which happens to be their last quarter. We're working to make sure we can push that out so that they end up with better numbers than last year.

Sanjay Kirloskar

executive
#50

I think that to a large extent, in both America and Western Europe, lots of elections have been happening, and there's been considerable uncertainty. We know that this will carry over into business. As was said earlier, whatever uncertainty existed in the previous — I think, on the previous call, we noted there was uncertainty in the U.S. before Trump got elected. Once Trump was elected, the order flow began. In a similar way, the Netherlands held elections recently. I believe they just finished them last week. Thailand has been dealing with its own particular issues. This is going to happen. What gives us a lot of confidence is the fact that, step by step, we are building our businesses in these countries, and they will only grow.

Raj Shah

analyst
#51

Alright. Sir, regarding the U.K. business, as you said, margins have come down because of a number of issues. From that 6% margin, do you see us getting back up to, say, double-digit — close to double-digit — margins, the kind we used to report previously?

Alok Kirloskar

executive
#52

The answer really hinges on which horizon you mean. Your question, though, is framed over the near term rather than the long run. From a medium-term perspective, I'd say yes, without question, since the margin you observed ultimately stems from a blend of products and services. And with service revenue climbing, hitting those margins becomes simpler for us. Naturally, as I told you, the arrival of the Labor government and the very muddled situation around it have hurt industries hard — specifically those that are energy-intensive. In time, as you're aware, everybody makes adjustments, and things return to normal business. Over the medium term, I'd say it's achievable. Over the very near term, we're looking at ways to achieve it through the order book position we currently hold. That order book position is pretty robust. As I've noted, the more we deliver on the product side, the lower the margins are compared with services, obviously. We always require that amount of service business we can execute. Meanwhile, as I mentioned, we carry 120 service contracts. Quite a few of them in the north of England are sitting idle at present — not 50 or 60 of them, but many of them are large ones.

Alok Kirloskar

executive
#53

Our focus is on figuring out how to make sure we can work through the order book in a manner that gets us close to what you're expecting.

Raj Shah

analyst
#54

Understood. Understood. One final thing, sir. As you mentioned earlier as well, our aspiration has been to report revenue growth of at least double digits. Do you see?

Sanjay Kirloskar

executive
#55

Yes.

Raj Shah

analyst
#56

Alright. Alright. Since H1 is showing 3% growth, do you think H2 can improve enough to make up for that?

Sanjay Kirloskar

executive
#57

Yes. As I've mentioned before, our historical performance has followed a particular pattern. We're confident that, provided everything proceeds as it should, we'll be in a position to reach our goals by H2.

Raj Shah

analyst
#58

Understood. Understood. Thanks so much, sir. Best wishes.

Operator

operator
#59

Thanks. Our next question comes from Manish Goyal at Thinqwise Wealth Advisors. Go ahead, please.

Manish Goyal

analyst
#60

Thanks a lot. I have two questions. First, regarding the petrol turbo pump set — you just said it wouldn’t be fair to disclose the order value. I just want to clarify: on 1st October, the press release said we had been declared L1, while the presentation says we have received the orders. I just want to confirm formally whether the orders have actually been received, and how execution will happen and over what time frame?

Rama Kirloskar

executive
#61

Could you repeat the final portion of your question? Yes, that order has come in, though there was something else you asked.

Manish Goyal

analyst
#62

No, that's actually what I was asking about. How long will it take to execute this order? That's what I wanted to know.

Rama Kirloskar

executive
#63

Roughly nine months is what we're looking at.

Manish Goyal

analyst
#64

All right. If you’re not able to provide an exact figure for the order, could you at least give a range for the price—ideally?

Rama Kirloskar

executive
#65

No, that isn't something we're able to do. The reason is that this business runs on tenders. There's no set price. To win, we must be L1, and our offer has to be competitive. The features and the kind of pump needed vary enormously. Given all that variability, we'd rather not quote a fixed price, since it wouldn't be accurate.

Sanjay Kirloskar

executive
#66

When the mix of products shifts, you could see lower volumes carrying greater value, or higher volumes carrying less value. We don't want to create confusion for anyone.

Manish Goyal

analyst
#67

All right. And as you said, we want to concentrate on the domestic market at first. So how large is that opportunity? We got the order from IOC. There are other OMCs as well — BPCL, SPCL, and plenty of others. What kind of opportunity is this? How should we think about it on a recurring basis, in the sense that this opportunity could play out across the next 2 to 3 years?

Rama Kirloskar

executive
#68

The yearly need for pumps.

Manish Goyal

analyst
#69

Could you perhaps specify how much would be needed across a span of, let's say, one, two, or three years — does that make any sense?

Sanjay Kirloskar

executive
#70

I believe on the previous call as well, Rama noted that the figure comes to roughly 25,000 to 30,000 pumps annually.

Manish Goyal

analyst
#71

Oh, okay, that's fine. And also, when you're supplying to IOC, does that mean you likely have to secure qualification with the other OMCs too? Or, since you've already made those supplies, do you figure that the supply benchmark is already in place, so you can probably go ahead and supply?

Rama Kirloskar

executive
#72

Yes. Once we provide that, then we’re set.

Sanjay Kirloskar

executive
#73

Yeah, with IOC, that’s right.

Manish Goyal

analyst
#74

But what about with other OMCs, sir — ones like BPCL?

Sanjay Kirloskar

executive
#75

That really hinges on whatever their specific needs happen to be, since those could vary.

Manish Goyal

analyst
#76

Sure. All right. Regarding the standalone business, you've certainly brought up the impact from JJM. I'd like to get a view on the demand side—both for industry pumps and for the pumps we likely supply into infrastructure across various accounts—because power was recovering fairly well and the irrigation order book was improving. If you could just share your perspective, since over the last three quarters some of the standalone sales have been rather muted, how should we think about it going forward, more toward the near to medium term?

Sanjay Kirloskar

executive
#77

Yes. I've noted that we see urbanization and the power sector as the two growth drivers. In the power sector, orders have kept coming in, and we expect more, since a large number of new power stations are being built—not just in thermal, but we anticipate the nuclear side will also begin picking up soon. As you know, these orders get executed over a period of time because, first, the power station has to be set up before it can receive the pumps. That generally covers the manufacturing period. What we've done here is that with the kind of orders we received from one of our customers, we set a new benchmark by delivering some very large pumps within a year, which earlier would have taken 18 months, because that customer is truly a demanding one and wants these power stations established very quickly. On the other side is urbanization. Our building and construction sector keeps growing very smartly. I think a few quarters ago, Alok had also mentioned that thanks to our strong presence on the firefighting side, we've been able to bundle HVAC and utility pumps.

Sanjay Kirloskar

executive
#78

That also keeps growing our market share in that sector, and it continues to do so.

Manish Goyal

analyst
#79

Right. We should probably be able to see growth in the double digits. A year ago, we were aiming for double-digit growth. Hopefully.

Sanjay Kirloskar

executive
#80

It seems my response to the earlier question wasn’t heard by you.

Manish Goyal

analyst
#81

No, I was just hoping to hear some reassurance from your side.

Sanjay Kirloskar

executive
#82

Right. I've been saying this for a number of quarters now. The past 2 quarters, I think, are when everybody has questions. When I look at the order board, when I look at how things stand with customers, and also at some of the changes we're making in the plant, I have a lot of confidence that we'll hit these targets.

Manish Goyal

analyst
#83

Sure. Thanks. This is for Alok. Alok mentioned that the AMP8 program in the U.K. has begun. I'd like to know whether we've started receiving orders, or whether it will likely take another 1 or 2 quarters before we begin to see meaningful orders coming through.

Alok Kirloskar

executive
#84

Yeah, orders are coming in. I'd put it this way: given that AMP8 ought to mean 1% of spending goes toward pumps, I wouldn't call it meaningful just yet. Sure, they're beginning to release orders that get classified as AMP8 orders.

Manish Goyal

analyst
#85

Okay, sure. One last question about services, Alok. How long do you figure it will take — with the new contracts we've signed — before we can offset the business we're losing and get back to a normal growth run rate?

Alok Kirloskar

executive
#86

To be clear, that figure is my own estimate. As I mentioned, it hinges on us—as I noted in my earlier response, it depends on both our company and the customer reaching agreement on what will take place in year one, year two, and year three, with our sign-off on that plan, after which we begin the process. Typically, I'd say three months. That's roughly how long it takes on our end. There's back-and-forth between the parties, and only then does it actually turn into products arriving, since those products are subsequently taken apart at the site and brought into our facility. We disassemble the products at the plant. We run through a process. As part of that process, we must submit a price. They accept that price as part of the overall agreement. We still have to follow that process. We begin the repairs, and then we dispatch the items. It isn't merely reaching agreement—there's also this process, after which you see the invoicing and therefore the margin. I'd say it takes no less than three months to accomplish all of this.

Manish Goyal

analyst
#87

Alright. Alright. One final question about the development order for the nuclear primary coolant pump. Could you share, sir, how progress is going on that?

Sanjay Kirloskar

executive
#88

Things keep moving forward. For the primary pump, there are several elements involved. From our standpoint, as I mentioned before, the hydraulic performance has been demonstrated. Casting of the main component is underway. Since hydraulic performance has been demonstrated, I don't anticipate many issues when we build the first pump.

Manish Goyal

analyst
#89

That's great. Thanks, sir.

Operator

operator
#90

Thank you very much. Before we move on to the next question, I want to remind everyone that you can press star and one to ask a question. The next question comes from Jayenam Doshi at KRIIS PMS. Please go ahead. Thank you for the report. In the presentation, regarding the strategy going forward, we mentioned that steps are being taken for de-bottlenecking and cost optimization at our key domestic subsidiaries. If you could shed some light on what steps are being taken and how much that would contribute to our margins on a per-person level over the years, that would be helpful.

Rama Kirloskar

executive
#91

Okay, so I actually have a question here. Did you mention subsidiaries, or was it factories? Subsidiaries comes next. That's slide number 41.

Sanjay Kirloskar

executive
#92

Yes. Regarding KPML, we’ve taken several steps so that output can keep pace with the small pump business. As you know, that small pump business relies heavily on KPML for motors and motor components. We’ve managed to add facilities and upgrade the machining lines and the other processing lines so output can be quicker and costs can come down. Likewise, you may have noticed that at TKSL sales have risen, which has reduced the losses versus the prior period. We’re very pleased that the power sector is actually getting attention, in the sense of placing orders with us. We expect that our original rationale for acquiring TKSL — having a steel foundry capable of producing the large steel castings needed in power plants — will pay off. Digitization efforts are ongoing. What has been done so far has helped us understand things better. The ERP packages have also been rolled out at the subsidiaries. Another step we’ve taken is group captive solar, so that costs — particularly the energy costs at our TKSL foundry — can be brought down.

Sanjay Kirloskar

executive
#93

Understood. Understood. That helped. In the JJM you referenced, you said we aren't — some states can't release funds to a certain extent. Could you help us by naming which states those are that aren't able to release? I believe this news is out there. I won't name and shame anyone here. Sure. Understood. Another thing: as we said, we supply systems into the data centers. What addressable market size would our systems have there? How many projects have been executed so far? What trajectory is it on?

Alok Kirloskar

executive
#94

In the data center space, the systems we can address and are supplying right now include the fire package — which, as I mentioned before, is effectively a fire system here, given the modular pump house. Then there's the primary cooling package, which will be tied into the chiller. Next is the secondary cooling package, which transfers from the chiller over to the on-chip cooling system. And naturally, the intake water systems. Those are the main areas we concentrate on for data centers. Naturally, it varies from one data center to another, since certain ones are co-location and certain ones are hyperscale. Those are primarily the ones our focus is on. What we do at each data center also varies, because at times the customer wants a single system for fire, another system for cooling, and possibly a third system for secondary cooling. Naturally, we aim to provide the entire thing as a single large package. In many of these situations, it truly comes down to what the customer prefers. I believe your last question was about the projects we've executed — how many projects have we executed so far? Yes. So far, we've likely completed around 25 to 30 projects. Right now, at any given time in our plant, we have roughly four to five projects' worth of data centers in the U.S.

Alok Kirloskar

executive
#95

since that's primarily where a lot of the data center work is taking place. Those might not be every system I listed, but it could be any one of the systems I've named at some point. Even right now, there are probably around five or six data center projects active on the shop floor. When I refer to a project, it's either the fire system, the secondary booster system, the primary system, or the intake system. Yes, that means we have quite a few different things underway in data centers. Okay. Thank you. Finally, I just wanted to get a view on the current bid pipeline for the projects we have, both domestically and in international markets. If you could highlight that, it would be of great help.

Sanjay Kirloskar

executive
#96

I didn't catch the question—could you say that again? You're asking about the total bid pipeline for the project business, both domestic and international. We don't disclose that figure. All right. All right. Understood. Understood. That's all from my side. Thanks very much. Thank you.

Operator

operator
#97

Thanks a lot. If any participants would like to pose a question, you can hit star and one. Our next question comes from Ishita Lodha at SVAN Investment. Go right ahead.

Ishita Lodha

analyst
#98

Hello, sir, and thanks for giving me the chance to ask. How are commodity price increases affecting our margins? Also, what portion of the order book is locked in at fixed prices?

Sanjay Kirloskar

executive
#99

At this point, I'd say the financials really haven't seen any impact.

Ishita Lodha

analyst
#100

All right. Is there any slowdown showing up in projects or tendering because of inflation in commodity prices?

Sanjay Kirloskar

executive
#101

But we’re not seeing that.

Ishita Lodha

analyst
#102

Alright. Can we put a number on how many of those pumps are being held back from dispatch? What’s the inventory value?

Alok Kirloskar

executive
#103

Hello?

Ishita Lodha

analyst
#104

Yeah. What's the value of the inventory on our books that we've been holding back from dispatch for Jal Jeevan Mission?

Sanjay Kirloskar

executive
#105

Numbers. The fact that these pumps can go out to other people when they aren't picked up within a set window, I think, ought to give you confidence that we'll hold on for a certain period and then it will come out.

Ishita Lodha

analyst
#106

All right. What's your view of the pipeline here at home, and how are pricing trends shaping up? Is it holding steady? Is it moving higher?

Sanjay Kirloskar

executive
#107

It's holding steady.

Ishita Lodha

analyst
#108

All right, I’m finished on my end. Thanks.

Operator

operator
#109

Thank you very much. Our following question comes from Manish Goyal with Thinqwise Wealth Advisors. Go right ahead.

Manish Goyal

analyst
#110

Yes, sir. I have a couple of questions, and I just want to clarify what Pratik was asking about earlier regarding the Forex unrealized losses. The cash flow statement shows — the consolidated cash flow statement shows INR 32 crore as the exchange loss for the first half of the current year. Alok, when you said GBP 1.8 million, which is roughly INR 20 crore, were you talking about the quarter two figure? And has that definitely been passed through the P&L?

Alok Kirloskar

executive
#111

Yes, that figure has already run through the P&L.

Manish Goyal

analyst
#112

Alright. Alright.

Alok Kirloskar

executive
#113

I should also point out the translation loss.

Manish Goyal

analyst
#114

Yes, absolutely. Well then, let me just.

Alok Kirloskar

executive
#115

That's coming out of the fixed deposit.

Manish Goyal

analyst
#116

Alright. Alright. So that's likely going to stay in place as long as you're using it — that figure won't go back the other way, or if some shift in exchanges occurs, it'll behave the same way again. Because what I'm noticing is that your.

Alok Kirloskar

executive
#117

I mean, if we're able to get a lot of those jobs done in the last quarter, that mark-to-market loss is going to come down, right? Because the U.K. has this problem since, as you know, 70% of the production is exported. The sole reason it's gotten a bit bigger this time around is that there's been additional depreciation in the dollar. Even so, it's only, I believe, the mark-to-market portion of the GBP 1.8 million, if I'm not wrong, is GBP 700,000 and change. What's left is translation losses, since the dollar deposits are held in KBIBV.

Manish Goyal

analyst
#118

Alright, so, okay, okay. Another question—again, regarding standalone cash flow, what we'd likely keep observing is that provisions for doubtful debts and advances, even during the first half of this year, come to about INR 15 crore. In contrast, for the entire prior year, that figure stood at INR 41 crore. So again, is that amount flowing through the P&L, and does it relate to the older contracts? If you could shed some light on that too.

Sanjay Kirloskar

executive
#119

Looking at the figures, I believe it's coming down quarter by quarter. As I see it, in line with our policy, we have to recognize it through the P&L.

Manish Goyal

analyst
#120

Alright.

Sanjay Kirloskar

executive
#121

That’s the policy we follow. We have to reflect that in our books.

Manish Goyal

analyst
#122

Alright. Alright. No. I agree that figure looks like it's going down, but you'd probably want to know this. How much longer do we expect that figure to keep going?

Sanjay Kirloskar

executive
#123

No, no. I think if you look at the trend — the most recent trend — since our recovery is really strong, we aren't seeing any bad debts per se. Even when payment receipt is delayed, we make a provision in the books.

Manish Goyal

analyst
#124

Alright, the final question concerns what appears in the presentation — in the updates, which we probably call the sector updates for our standalone business. There's something I believe I noticed for the first time: the engineering service division, where sales went up 27%. What exactly is this business? Is it aftermarket, or could you clarify that? How large is this business? Since growth was just 27%, we aren't able to get a sense of how relevant it is.

Rama Kirloskar

executive
#125

It's the same segment that's usually referred to as customer support and ESD. This time, I believe they simply spelled out ESD in full as engineering service division. It isn't a new segment. We typically don't provide the breakdown by segment.

Sanjay Kirloskar

executive
#126

Yes, precisely.

Manish Goyal

analyst
#127

All right. Good. All right. That makes it clear. Yes. Many thanks. Thanks very much.

Operator

operator
#128

Much appreciated. Our next question comes from Mr. Vishal of Bandhan AMC. Mr. Vishal, please go ahead. Mr. Vishal, you may proceed with your question, please. Mr. Vishal, your line has been unmuted. You may proceed with your question. Since Mr. Vishal has not replied, we will conclude this call. I would now like to hand the conference over to Mr. Hemant Shaligram. I'm so sorry. I would now like to hand the conference over to Mr. Hemant Shaligram for closing comments.

Hemant Shaligram

executive
#129

All right, thank you, ma'am. Thanks to each of you for being on today's call. We hope this session gave you a thorough picture of our business and answered your questions well. If anything further comes up or you need any clarification, don't hesitate to contact SGA, our investor relation advisor. We genuinely value your ongoing trust and support. Have a pleasant evening, everyone. Thank you.

Operator

operator
#130

That brings us to the end of this conference on behalf of Kirloskar Brothers Limited. We appreciate your participation, and at this point you're free to drop off the lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kirloskar Brothers Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Kirloskar Brothers Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kirloskar Brothers Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.