Kosmos Energy Ltd. (KOS) Earnings Call Transcript & Summary
August 3, 2020
Earnings Call Speaker Segments
Jamie Buckland
executiveThanks, operator, and I appreciate all of you being with us today. Earlier this morning, we put out our earnings release for the second quarter; you can find that release, along with the slide deck for today's call, on the investors page of our website. With me on this call to walk through that material are Andy Inglis, our Chairman and CEO, and Neal Shah, our CFO. Over the course of today's presentation, we'll be making forward-looking statements relating to our estimates, plans, and expectations. Actual results and outcomes may differ materially because of factors we identify in this presentation and in our U.K. and SEC filings. For additional detail, please see our annual report, stock exchange announcement, and SEC filings. Those documents can be found on our website. I'll now hand the call over to Andy.
Andy Inglis
executiveThanks, Jamie. Hello everyone, and welcome to this afternoon's call. To begin, I'll share what stood out during the quarter, and after that Neal will take you through our financial results along with the balance sheet. My closing remarks will focus on what we expect for the remaining months of the year as well as heading into 2021. Please go to slide two, where you'll find the quarter's key points. During a challenging period for our sector — one defined by historic lows in crude pricing and unprecedented market swings — Kosmos delivered solid results on the operations side. Our output came in at about 60,000 barrels of oil equivalent each day, which aligned with the forecast we gave during the first quarter. That number accounts for the Gulf of Mexico shut-ins in May, which reduced overall company production by approximately 6,000 barrels of oil equivalent per day across the quarter. We remain on schedule to realize the expense savings outlined at the start of the year, including reductions in OpEx per barrel and G&A in the range of about 5%-15% for Q1. We think the impact will be larger during Q3 and Q4, since additional reductions in OpEx and G&A will take effect and CapEx will decline in line with the smaller activity set. The key point is that we do not see these savings harming the portfolio or our operations over the long term, and they should help put Kosmos in a leaner position, able to perform well as the sector eventually recovers. On top of those sustainable savings, we acted to preserve a strong balance sheet. In the quarter, we increased liquidity through a prepayment arrangement with Trafigura, which Neal will cover in greater detail shortly. We ended June with liquidity of roughly $600 million. The key point here is that with oil priced where it is now, we've hit a turning point for cash flow. What that means is we anticipate generating free cash flow across the back half of this year and on into 2021, and our plan is to apply that toward lowering our net debt at year-end and strengthening liquidity. As we look forward, the Greater Tortue development keeps moving along well, even with the COVID-19 mitigation steps that have been put in place in Mauritania and Senegal. Phase 1 of that project has reached roughly 40% completion, which is a 7% gain during the quarter, and work is picking up pace in important areas. On the exploration side, we are upgrading the quality of our prospects for 2021 by pairing targets led by infrastructure in proven basins with basin-opening tests that we expect to fund ourselves in 2021. Let's move to slide three. Like I said on the slide before this one, Kosmos turned in solid operational results during Q2, with net production reaching 60,000 barrels of oil equivalent per day, which matched what we'd guided previously. Over in Ghana, net production came in at 29,000 barrels of oil per day, landing at the top end of the range we'd given. Jubilee keeps running reliably and performing strongly, turning out gross production of roughly 90,000 barrels of oil per day during that quarter, and we got there thanks to steady water injection along with gas offtake. More recently, we've kept pushing forward and set new records for water injection rates since this field first came onstream, and we've also seen higher gas offtake, which helps us pursue the goal of bringing down the gas oil ratio across the whole field. We're still encouraged by how much better we're collaborating with the operator, and by how the partnership has aligned around delivering consistently and boosting reliability. At TEN, gross output came in at approximately 50,000 barrels of oil per day, matching guidance. The NT-09 well, which should come onstream soon, is anticipated to boost TEN output during the second half of the year. Over in Ecuador, net output was 11,000 barrels of oil per day, which matched guidance. In the Gulf of Mexico, net output reached roughly 20,000 barrels of oil equivalent per day for the quarter, matching our guidance and reflecting the May shut-ins we highlighted in our first quarter results. Also, drilling at the Tornado-4 well is finished. Completion work on that well is underway right now; we anticipate it coming onstream near the start of the fourth quarter. In late July, a hydrate formed in the gas export line at the Delta House platform, which caused the facility to be shut in temporarily. At this moment, efforts are underway by the operator to remove that hydrate obstruction, and we expect it to be resolved before this month ends. For the Gulf of Mexico, our guidance covering the entire year remains at the lower end of the range we provided. Turning to slide four, I want to take a moment to talk about our actions in response to COVID-19. Our commitment to the nations and nearby communities where we do business has not been set aside. A few illustrations of the role we are fulfilling appear on this slide. Working alongside governments and local communities, we have obtained and provided medical supplies along with other critical equipment to support COVID-19 relief efforts. While four countries in West Africa are featured on the slide, we have engaged in similar initiatives across our whole portfolio. This vital work demonstrates our dedication to being a force for good; it fits with how we've backed communities before, especially during the 2014 Ebola outbreak; with that, I'll pass things to Neal, who will walk you through the quarter's financials in greater detail.
Neal Shah
executiveThanks, Andy. Now let's look at slide five, which covers the main financial items for the quarter. Production came in at 60,000 barrels of oil equivalent per day, which matched our earlier guidance and reflected the effect of the May shut-ins in the Gulf of Mexico. One thing I'd like to highlight is the price realization we saw during the quarter. As Andy mentioned in May when we reported Q1 results, there was a big gap between quoted oil prices and what we actually realized. That gap was mostly driven by weaker demand and buyers pushing significantly higher shipping costs onto producers. On top of that, the timing of our sold volumes had a major impact on our realized pricing. Because of lifting timing, we sold roughly 60% of our volume in the second quarter during April, when benchmark prices hit their lowest point. Realizations have since come back to normal, with GOM production and international cargoes selling at benchmark prices or a bit above. I won't go through every line item on this slide, but as you can see, we're in line with guidance in most cases. On CapEx, we're still on track for full year guidance, since the second half should be materially lower than the first half because of how expenditures are phased. Likewise, on OpEx, we expect costs to come down in the second half, and we're not changing our full year 2020 guidance. Moving to slide six, the balance sheet: we closed Q2 with more than $600 million of liquidity, which includes $160 million of cash. The prepayment agreement with Trafigura that we announced in June strengthened our liquidity position and gives Kosmos a new source of liquidity secured against our future Gulf of Mexico production, mainly in 2022 and 2023. It gives Kosmos low-cost capital and the flexibility to potentially seize opportunities that could come up in a dislocated market. Also, if oil prices go up, we can pay back the prepayment sooner and benefit from higher oil prices. Net debt rose by roughly $65 million in 2Q, mostly because of a build in working capital. Net debt should begin to reverse in the second half of the year, since the business is expected to generate free cash flow in the current environment. Because of the lower realized prices we discussed earlier, EBITDAX in the second quarter came in below forecast and will affect our net debt to EBITDAX covenant as the year goes on. At the full year, we expect leverage could exceed our original 3.5x net debt covenant. So we've proactively requested a waiver from our banks, which gives us additional temporary headroom through the end of 2021. Even with that waiver in place, we're working to keep future leverage as low as possible. Our conversations with the banks remain highly productive, and we're grateful for the backing they've shown in keeping Kosmos in a strong position to capitalize on today's market. Steps we took early on to cut costs brought our cash flow break-even down to roughly $35 per barrel across the 2Q to 4Q window, which leaves the company well set up to produce free cash flow during the year's second half. Given where prices stand now, we anticipate generating substantial free cash flow moving forward, which will let us reduce debt over the back half of the year and on into 2021, all while still funding chosen growth opportunities. On that note, I'll turn things over to Andy for the rest of the presentation.
Andy Inglis
executiveThanks, Neal. Moving on to slide seven. In Mauritania and Senegal, even with COVID-19 mitigation efforts in place, the Greater Tortue project keeps moving forward. All four of the key work streams laid out on this slide have shown substantial progress since our last update in May. The FPSO being built in China is now roughly 40% complete, while the floating LNG vessel under construction in Singapore has passed the 50% mark; over in Senegal, the caisson construction yard in Dakar has been shut down because of COVID-19 mitigation measures. Work on the breakwater stream is still advancing, with rock being delivered from the quarry in Mauritania. The headway made throughout the pandemic keeps de-risking the project's overall schedule, which now stands at 40% complete. This solid progress has generated additional momentum in the sell-down process, which is still underway. Now to slide eight. As we begin producing free cash flow during the second half of the year and on into 2021, our plan is to make paying down debt the near-term priority. That said, we still anticipate staying active with a high-quality exploration portfolio, covering both proven basin ILX and frontier opportunities. We expect our first discretionary cash use to go toward short cycle, high return, lower risk ILX opportunities in the Gulf of Mexico and Equatorial Guinea, where our high-graded opportunity set has us excited. We're also still focused on cutting our interest in Suriname, Namibia, São Tomé and Príncipe, which would let us keep upside to future drilling activity at very little to no cost to Kosmos. Good progress continues to be made on these processes. We expect to give a full update on our 2021 exploration plans when we report our 3Q numbers in November. Moving to slide nine, and to wrap up today's presentation, I'd like to recap the key points we've covered today before we open things up for Q&A. Kosmos turned in good underlying performance while steering through a challenging second quarter. On operations, we delivered in line with prior guidance, and we've kept company guidance for the full year. Our balance sheet sits in a solid position, and at current strip prices, we've hit a free cash flow inflection point. Last, we're getting ready for the future with growth through LNG and high return, fast payback exploration in 2021 and beyond. Thank you. I'd now like to hand the call over to the operator to open the session for questions.
Charles Meade
analystHello to you and the rest of your group there — or good afternoon, depending on where you are. There's something I'd like to ask about. You said the efforts to sell down Tortue are still underway. Can you share anything further on that? Should we be keeping any particular timeframe in mind, or is there a point when news becomes more likely or perhaps less likely?
Andy Inglis
executiveYes. Hey, Charles. Yeah, if you take a broader view of how the sell-down has been running, I'd say that during 2020, the initial stage of work involved getting the data room ready, using all the material that came out of the exploration success we enjoyed late last year, and sorting the buyers into those interested in the wider resource play versus those who wanted a stake in the Tortue project itself. Obviously, given the steps taken to mitigate COVID-19, we had a Tortue project that had essentially come to a halt as that quarter got going. What I believe we've shown is that we kept driving really solid progress on this project through 2Q, and that mattered to the buyers focused on Tortue; together with BP we've reset the schedules and, I'd say, established greater confidence in them. At this point, I'd characterize the process as one of talking with those buyers, especially on Tortue, building on what we've achieved on a project that in the end will deliver first gas at a moment when we perceive opportunity in the LNG market. It's probably worth recalling that this stems from the innovative development concept — a design sitting in the top quartile on cost and holding an enormous resource base, with room to keep expanding the project toward a scheme of 10 million tons per annum. That's the stage we've reached, Charles. I'd rather not be constrained by timelines. All I can tell you is that discussions with the pool of buyers continue. As far as we're concerned, the end goal is plainly to reach the right deal — one that lets us move a project forward that finances itself while still delivering a significant contribution to Kosmos.
Charles Meade
analystUnderstood. Andy, that commentary has been quite useful. Could I pose something regarding Suriname? As I recall, since our previous conversation, Apache has made a pair of finds on the block situated inboard of your acreage.
Andy Inglis
executiveYes
Charles Meade
analystRegarding the Campanian and Santonian. What I want to know is whether their discoveries would boost your Suriname prospects for 2021, or on the other hand perhaps lead you to reconsider your objectives in that area?
Andy Inglis
executiveWell, I believe the key takeaway from Apache's well results, especially that most recent well, is the Santonian. It has obviously delivered. In my view, more work remains regarding the characterization of the hydrocarbon in that zone. It seems to me that Apache has shown the presence of hydrocarbon-bearing intervals in both the Campanian and the Santonian. When you examine the block, the play we're evaluating is one where we're confident about the presence of good reservoir, and we're confident it's present down dip, and those down dip locations we're pursuing contain the very same reservoir intervals Apache has penetrated in the Campanian and Santonian. Looking at it from the reservoir angle, that's encouraging. This is a supercharged basin, as we know, and Apache's achievement in essentially reproducing the Liza-style structure on the shelf has proven that. Obviously, the play type we're chasing is a different one. Ours is a play type located down dip and outboard. The Santonian success, along with the reservoir quality, is plainly a key element of grasping the overall prospectivity within the basin, and especially within Block 42.
Charles Meade
analystThanks for those thoughts, Andy.
Andy Inglis
executiveGreat. Thanks.
David Round
analystHello, Andy. I appreciate you walking us through that. Let me begin with Jubilee, if I may. At 90,000 barrels per day, that looks like quite a solid result so far. I'm mainly hoping to get a sense of how you're viewing the back half. Looking at your guidance, it does appear to suggest that holding output at these levels is achievable, though I'm curious how confident you are that you can keep production at or near 90,000. Perhaps I could also touch on the Gulf of Mexico, since you brought up some high-return projects there. With the ILX assets, there's still some exploration risk in play. Do those high-return projects you mentioned also carry a very strong likelihood of success? I'm simply trying to get a feel for where risk appetite stands right now, whether it has shifted, and how soon we might see activity pick up there.
Andy Inglis
executiveAlright. Thank you, David. On Jubilee, I believe it helps to take a step back while you're examining those figures. From the start of the year through the close of July, output has been roughly 85,000 barrels per day, and that figure absorbed the first-quarter shutdowns. As you noted, the second quarter was robust at 89,000 barrels per day, and right now the field is producing approximately 90. The key factor when it comes to maintaining that level is controlling the GOR. As I mentioned, we're injecting unprecedented volumes of water — in fact, the highest since the initial year of commissioning. That's paired with steady gas offtake. All of this, in my view, supports the confidence we hold in our forward projections. What we're delivering today is fully indicative of what we believe can be achieved moving ahead. Now, the Gulf of Mexico. It's an interesting situation. Treating this interregnum as a pause lets us revisit the portfolio and really upgrade the quality of the hopper. Since you aren't rig constrained, you have the chance to thoroughly sort through everything and guarantee you drill the very best prospects first. The opportunities we've pinpointed in the Mississippi Canyon area, I'd say, are high quality. We're truly excited that we've had the opportunity to rework the seismic data. So I'd argue exploration success stems from quality through choice — concentrating on the best prospects and making sure you pursue the lowest-risk opportunities initially. As a reminder, within that Mississippi Canyon area, the former DGE achieved success rates of roughly 60%, and that's precisely the caliber of opportunity we're aiming for. I don't see this as altering our risk appetite at all. In terms of the types of prospects we'd be drilling, it's more a case of back to the future. In fact, taking a time-out gives you the certainty that you're executing that strategy, that the data backs it up, and that you have the time to do it properly. I'm genuinely eager to move forward with that ILX program now, because I believe we hold a truly high-quality set of opportunities.
David Round
analystOkay. Thanks, Andy. Makes sense.
Andy Inglis
executiveGreat. Thanks, David.
Richard Tullis
analystHey, appreciate it. Morning, everybody. Andy, you mentioned in the release something about the potential for free cash flow as we head into 2021. Under today's assumptions — say $40 WTI and roughly $45 Brent — what range of free cash flow could you potentially deliver next year?
Andy Inglis
executiveAll right. Thank you, Richard. I'd prefer to stay a bit careful about committing to specific figures for next year, since we're still fine-tuning the activity set at this stage. What I can tell you is that during the back half of the year, we expect to cross into positive free cash flow territory. The reason? Prices clearly are stronger; also, a greater share of our output falls in the latter six months versus the first six months — 60% comes in the second half. Cost measures will start showing up in the numbers, and we view those as lasting, plus the working capital buildup will reverse. I'd say we've clearly reached that inflection point where our confidence in the magnitude and the direction of free cash flow generation is solid. As for the exact amounts, it mostly hinges on how quickly certain working capital items unwind, which in turn depends on the pace of the forward activity sets. What I can tell you right now is that at present prices, we're confident it's material, and by 3Q we should be able to offer a far more precise outlook on what those figures will look like. It's material, and we're now at a stage where that trajectory is actually visible to us.
Richard Tullis
analystAll right, that's useful. Thanks. And then, to follow up on that, right now, how would you gauge or project the amount of capital spending needed to keep output level in the coming year — for instance, relative to what you anticipate for the fourth quarter of 2020 on average?
Andy Inglis
executiveWell, here's how I'd put it: it should be fairly similar to what we saw this year, correct; we landed somewhere between $200 and $225. My view is it definitely falls inside those bounds. Perhaps somewhat improved, truthfully, as you mentioned, since you're essentially settling toward a more typical level. As for the capital expenditure necessary to maintain the business moving ahead, we are certainly right there in that band.
Richard Tullis
analystAll right, many thanks. That's much appreciated.
Andy Inglis
executiveWonderful. Thank you, Richard.
Nick Stefanou
analystHello everyone, good afternoon, and thanks for letting me ask. There are two things I'd like to raise. First, I want to revisit what David brought up regarding Ghana production. The guidance you gave the operator there early on seems to differ pretty significantly. Could you spell out the key gaps between your assumptions and what Tullow assumes for output at Jubilee and TEN during this year's second half? Second, on liquidity and planning, what about total CapEx for next year if you aren't able to farm it down? Could the RBL be refinanced with Gulf of Mexico total reserves folded in, lifting the borrowing base so the cost there gets funded — or would that not be something you'd consider pursuing? Thanks.
Andy Inglis
executiveFine, thank you, Nick. I'll handle the Jubilee piece, and after that hand things to Neal so he can walk through our liquidity position, then the RBL, and finally the reserve base at Tortue. On Jubilee, what I'd simply say again is that at bottom, our projection rests on how the asset is performing right now. And how is it performing? So far this year, it has averaged 85,000 barrels per day, and that figure covers a major shutdown during the first quarter. During 2Q it was 89. At present we're sitting at roughly 90,000 barrels per day; we're injecting greater volumes of water into the reservoir while continuously removing gas, which in fact controls the GOR. I'd say our projection has genuinely stayed steady. Since the year began, right through to today, we have not altered our Jubilee guidance; seven months in, the field is delivering precisely what we predicted from the outset. That, I believe, is the core message I want to convey: our method here has been highly consistent. Actual results have matched it, and we keep achieving solid headway on the crucial performance measure — making sure water goes into the ground and gas comes out of the reservoir. Neal, would you address the liquidity question and the RBL borrowing base for Tortue?
Neal Shah
executiveRight, of course. Hello there, Nick. When it comes to liquidity, like you said, we've got approximately $600 million sitting on the books right now. We anticipate producing free cash during the back half of this year as well as going into 2021. From that angle, we're in good shape. One possibility we've examined as a kind of fallback or backup choice relative to the financing or the sales process in Tortue is whether you can secure financing against it. You're correct that we possess flexibility in the RBL to include it there. That's actually something we secured from the banks back in 2018, at the time we refinanced that facility. Putting it inside the RBL is an available option. There are project financing alternatives out there that we've reviewed in order to create some competitive tension throughout the overall sales process. We're aware those alternatives are available, and we'll keep pursuing them. It's a legitimate option that we're capable of moving forward with. All right. Understood. Just one brief follow-up. That prepayment advance — do the banks or the credit rating agencies treat it as debt? Yes; from an accounting standpoint it isn't debt, but as part of the waiver process we discussed on the call, what we settled with the banks is that in the end we would count whatever was accelerated or advanced from the prepayment when calculating leverage. Despite the fact that it isn't debt, we'll incorporate it into that calculation in return for obtaining the waiver on the absolute leverage limits.
Nick Stefanou
analystUnderstood. That's very clear. Thanks.
James Carmichael
analystHello. Good afternoon, everyone. First, regarding the covenant waiver, I believe you mentioned it remains in effect through the end of 2021. I'd like to know, with oil prices where they are now, how much longer do you anticipate actually requiring that waiver? Is it simply there to provide a little breathing room? Turning to Tortue, considering the postponement of that project — has this allowed the JV an opportunity to pause and potentially re-evaluate the cost structure for Phase 1, or is everything now fixed? Thank you.
Andy Inglis
executiveThank you, James. I'll address the Tortue question, then hand it to Neal regarding the covenants. Regarding Tortue, this has genuinely been a productive quarter. The operator has been able to take a step back and examine every individual work stream, make sure the work streams capable of advancing have advanced at the proper speed, and reschedule the critical area — the caisson placement — which was the gap that triggered the change. What emerges from all of this is two things: by maintaining a sharp emphasis on cash flows, we've worked diligently to safeguard the project's economics. The second aspect is that you're effectively reducing delivery risk, which has been a significant discussion with buyers, since we displayed a small photograph on the slide showing that quarrying activity in Mauritania has in fact carried on. We're accumulating a rock stockpile, so once we begin constructing the caissons, that specific critical path won't be a concern. From the offshore facility perspective, the FPSO was consistently the most constrained element of the critical path. We've now had the chance to re-phase it and make certain it is, as stated, "No longer on the critical path." Looking at the project today, I genuinely feel we have a highly credible timeline. Yes, we do. Does it include suitable contingency? Yes, it does. Have we successfully re-phased the contracts to protect the economics? Yes, we have. In certain ways, it is actually, as stated, "A better project." With that, I'll hand over to Neal to discuss the covenants and the waiver.
Neal Shah
executiveRight. Hey, James. Regarding that waiver, the main issue we were addressing was how 2Q got hit. There's no question 2Q took a hit from the cargo timing differentials. The real source of the short-term covenant strain is including that Q2 figure in the LTM EBITDA calculation. Since it's short-term and stems from the oil price collapse we saw last quarter, the banks were glad to back us on it; we advocated for pushing that ratio out into the second half of 2021, past that point, purely to give ourselves more breathing room, considering how volatile oil prices are, and in the end to keep reducing the risk in the story. Q2's impact is genuine. After you move past it, it just settles down on its own.
James Carmichael
analystOkay. Thanks very much.
Andy Inglis
executiveRight. Thanks.
James Hosie
analystHi there. Good morning, or good afternoon, depending on where you are. Yeah, I just wanted to ask about that $56 million in debt you've got classified as current. Is that simply a sign of how you think availability under your RBL will shift over the next 12 months? And are you assuming any portion of it will have to be repaid at the next redetermination in September?
Andy Inglis
executiveAll right. I'll hand things over to Neal.
Neal Shah
executiveYeah. That $56 really comes down to a projection quirk tied to the borrowing base model that got approved back in March. Around September, we'll run through another exercise of that kind to re-forecast it, using where prices sit right now and where the production profile ultimately lands. Given that prices have generally gotten better since the last redetermination happened, what we'll ultimately run into is a loan life problem. Our approach for handling that is that in the ordinary course of business, every few years or so, we extend the RBL's time period. My expectation is that we'll aim to do so at some point, likely next year.
James Hosie
analystOkay. Thank you.
Andy Inglis
executiveJames on Barclays?
James Hosie
analystYes. Thank you.
Andy Inglis
executiveRight. Thanks.
Emily Chieng
analystEmily Chieng here, filling in for Neil. First off, I'd like to ask about next year's capital spend. You said it would likely stay pretty much in line with this year, I believe—but if we don't get a sell-down in Tortue by the time the year ends, could you give us some sense of how the capital layout might need to look? Put another way, what does the work program for that project look like over the coming couple of years?
Andy Inglis
executiveEmily, if you take a step back, we've discussed having a low level of maintenance CapEx in the business. Our estimate is roughly the $200 million mark, close to what we've mentioned before, and that supports cash flow breakeven at $35. On top of that, we generate free cash flow. The aim there is making sure we can pay down debt, as Neal has discussed, and go after what we see as a very promising set of opportunities with high returns and fast payback, especially in the Gulf of Mexico. As we've also said on this call, our goal is a self-funded gas business. We'll achieve that either via the sell-down process or via financing. We've already covered that we have the potential to do so from an RBL or project finance standpoint; when it comes to the frontier wells, our aim is making sure that program is self-funded going forward. I think we're clear on what the CapEx level must be to sustain the business. We're clear on what we'll do with the extra cash flow. Our aim is to use it to kick off the ILX program in the Gulf of Mexico, where we see a really strong set of opportunities.
Emily Chieng
analystAll right, that's helpful. For my next question, I wanted to touch on the hedging program set for 2021. What's your approach when it comes to shielding the business against macro volatility?
Andy Inglis
executiveSure, that's a good one — I'll let Neal take it.
Neal Shah
executiveEmily, as far as our 2021 plans go for the hedging program, they'll be largely in line with our historical approach. We'll keep adding hedges each quarter on a regular schedule. The floors are going to shift somewhat depending on what we're able to get done. Our aim is to offer protection on the downside, recognizing that volatility is going to be there. We'll stay in that program while preserving as much upside exposure as we can; right now, roughly 35% of production is hedged. Over the back half of the year, the objective is to bring that up to about 2/3. We're putting on approximately 1 million barrels per month, mostly through collars, though we might consider adding certain swaps down the road.
Emily Chieng
analystAppreciate that.
Pavel Molchanov
analystSo in principle, I'd like to hear what measures you're putting in place on your offshore facilities to prevent a COVID-19 flare-up. Give us a mental image of how things look now versus 100 or 120 days back.
Andy Inglis
executiveAbsolutely, Pavel. Once more, looking at what we do offshore, drilling isn't underway at the moment, so we're talking about the non-operated side. What is the operator up to in Ghana as well as Equatorial Guinea? They've put in place an extremely strict quarantine regimen. Basically, here's how that quarantine works: individuals are tested before they come, spend fourteen days in quarantine, undergo testing again when they leave, and afterward go offshore. An incredibly careful approach. Has it worked flawlessly? Not quite. There was a failure to follow the protocol in Ghana, and that led to a number of cases aboard the construction support vessel. The situation stayed contained and was dealt with quickly. We've identified the source, we understand how the breakdown happened, and in my view the process has actually come out stronger because of it. Over in Equatorial Guinea, a case showed up offshore, and the reason was that a government inspector went out there without adhering to the same procedure. The government has since fixed that. My take is that this is an interesting question. It's a bit like being 100 days in — we've picked up a great deal about how to carry this out and how to keep it going. Does that bode well going forward? Without a doubt. My view is that applying strict process and structure lets you keep the situation under control, so output never gets disrupted, and each step teaches you something new. At this point I'm genuinely optimistic about how well we can keep running the business while these practices remain in effect.
Pavel Molchanov
analystAnother point regarding the sell-down. Clearly, no timetables are being provided, which is appropriate. Would it be accurate to state that in today's environment, the priority is completing it at the proper multiple, not completing it rapidly merely for the sake of speed? The result matters more than the schedule.
Andy Inglis
executiveYes. Well, excellent question, Pavel. Once more, it comes down to a balance, alright? We aren't being unrealistic regarding what we expect on price. In my view, things are shifting right now. Transactions are closing, and they're closing at believable valuations. Clearly, we also have alternatives, I believe. Should you take the financing path that Neal mentioned? Between that and the sell-down effort, there's competitive tension. Getting it finished is necessary. In my view, it's about balancing those two things. What I simply want to emphasize is this: our price expectations aren't unreasonable; we're pragmatic, yet at the same time, we need to reach a stage where we can keep running the business, since we've brought it to a place where it funds itself. I think it all comes down to bringing those elements together and ensuring we select the correct path while keeping options available. That, in my view, is the essential balance we're striving to achieve.
Pavel Molchanov
analystI appreciate it.
Andy Inglis
executiveGreat. Thanks, Pavel.
Bob Brackett
analystThanks. We noticed not long ago a big integrated player teaming up with an LNG explorer that's done well. How interested would you be in doing something comparable — a merger or an agreement along those lines?
Andy Inglis
executiveThat's a good question, Bob. What I'd say is that things keep evolving globally, right? More deals involving assets are showing up, and corporate transactions are showing up more too. Does that catch me off guard? Not particularly. It's exactly what you'd anticipate. My view is that this reshaping across the industry is underway and, as they say, is going to keep going pretty much no matter what happens with price, honestly. When assets are strong, they'll basically be sought after. At the end of the day, the point is delivering value to those who hold our shares. I'd say we certainly have what it takes to carry out the business plans we have right now; our organic portfolio is excellent, and we're capable of expanding the cash flow coming from the business. Above all else, that sits at the top of our list: ensuring we've got a business that, as we look ahead to 2021, generates cash flow and can keep reaching and delivering on a really robust organic portfolio. That's the thing we're concentrated on. Obviously, opportunities are emerging all around us in this industry, and we want to be sure we're able to take part in them.
Bob Brackett
analystGreat. Appreciate that.
Andy Inglis
executiveGreat. Thanks, Bob.
Al Stanton
analystYes. Good morning, everyone. Neal has already fielded the majority of what I had intended to ask. So, if I may, just a couple of miscellaneous items. There's still discussion about a sell-down in Senegal and Mauritania, but I take your point, Andy, regarding transactions happening based on pricing. At what stage will we begin referring to it as a disposal instead of a sell-down?
Andy Inglis
executiveWell, I suppose any terminology you prefer, Al, works for me. The key issue here, I believe, is how we generate value for our shareholders, correct? Our Mauritania Senegal process has gone well up to now. We held 100%, we brought BP in, we got a project underway. From discovery to first production, it will be the quickest project, even with the years in dragnet that we've endured. There's an excellent resource base in that location, and I believe we've succeeded in monetizing it in a highly credible manner. That, I think, is the term I'd like to employ: we are monetizing it and making sure we create value because of that. That is what we have accomplished thus far, and that is what we will keep doing.
Al Stanton
analystAlright, shifting gears a bit, though still on the topic of consolidation. I may have missed this, so apologies, but did anything get decided regarding the share consolidation?
Andy Inglis
executiveNo, that remains open. Right now we're obviously moving along in the right territory. The AGM gave us approval to proceed, and going forward the board will weigh it.
Al Stanton
analystOkay, got it. That's reasonable. I see. Great, thanks.
Andy Inglis
executiveOkay, thank you, Al.
Operator
operatorAppreciate it. With no more questions coming in right now, I'd like to wrap up the call here. Thank you all for being with us today. At this point you're welcome to hang up your lines, and we appreciate you taking part.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Kosmos Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Kosmos Energy Ltd. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kosmos Energy Ltd. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.