Jamie Buckland

executive
#1

Thanks, Daryl, and I appreciate all of you being with us today. Earlier this morning, we put out the earnings release for our first quarter. That release, along with the slide deck that goes with today's call, can be found on the investors page of our website. Here with me on the call to walk through the materials are Andy Inglis, our Chairman and CEO, and Neal Shah, our CFO. Over the course of today's presentation, we'll be making forward-looking statements that relate to our estimates, plans, and expectations. Because of factors we point out in this presentation and in our U.K. and SEC filings, actual results and outcomes might differ materially. For additional detail, please see our annual report, stock exchange announcement, and SEC filings. You can find these documents on our website. With that, I'll hand the call over to Andy.

Andy Inglis

executive
#2

Appreciate that, Jamie, and a good morning or afternoon to all of you. As of today, we're essentially at the 10-year mark since Kosmos listed on the New York Stock Exchange, with the actual anniversary falling tomorrow. I'd like to open this call by reflecting on the distance the company has traveled across those 10 years, then turn to where we anticipate the company going across the coming decade. I'll cover the operational highlights for the quarter, walk through our upcoming appraisal work and infrastructure-led exploration activity, and then pass things to Neal for the 1Q financials and the balance sheet. Beginning on Slide 2; back in 2011, when the NYSE listing happened, Kosmos was a successful frontier explorer. Operations were focused on Ghana, with production coming from one FPSO at Jubilee. That year, oil prices averaged $111 per bbl. The consensus view held that supply would fall short of rising future oil demand. In 2011, full-year production came to only 16,000 bbl of oil per day, and Kosmos held net 2P reserves of roughly 70 million bbl, nearly all of it oil. Over the last decade, Kosmos made the shift from an oil explorer focused on frontiers to a company operating across the full E&P cycle. In Ghana, we achieved first production from 10 fields. In Mauritania and Senegal, we found several enormous gas fields, and later reached FID on Tortue LNG's Phase 1. By completing acquisitions in Equatorial Guinea and the U.S. Gulf of Mexico that added value, we broadened our production base and picked up ILX opportunities. In the prior year, we cashed in on frontier exploration assets with longer-dated potential. Output during this span climbed to almost four times its earlier level, and our reserves expanded roughly sevenfold, reaching the size they are at present. While the company has expanded and our approach has shifted to keep pace with a fast-changing global landscape, one thing remains constant: our dedication to corporate responsibility and to fostering economic and social progress in the nations where we operate. When we went public, Kosmos began posting every one of its petroleum contracts on the internet as a way to bring greater transparency to the oil and gas sector. As far as we know, no other American oil and gas firm has done the same, even now. In order to strengthen the communities where we do business, we launched the Kosmos Innovation Center in Ghana — a program that has earned awards — and it subsequently grew to include a number of additional nations across West Africa. Through the Kosmos Innovation Center, we put money behind talented young business owners and smaller companies, which delivers durable gains to the nations where we operate and helps build economies that are stronger and more varied. Over the past several years, we've stepped up what we're doing for the planet—folding climate change consequences into the choices we make about our strategy, reshaping what we own so it stays competitive and suited to what lies ahead, and committing to reach net-zero carbon for Scope 1 and Scope 2 emissions no later than 2030, possibly earlier. As for where the company stands today, Kosmos functions as a full-cycle exploration and production business centered on oil, with production coming from three separate hubs, a major LNG project of global importance, and a substantial backlog of confirmed ILX opportunities. We have built a robust foundation that we think positions us to steer successfully through the coming decade, thanks to clearly identified, top-tier projects already in our portfolio that will let us expand and diversify output further. Looking ahead across the next few years, we see a clear route to organically raise production to roughly 100,000 barrels of oil equivalent, alongside possible ways to add even more through attractive, value-accretive inorganic chances. During 2023, we anticipate first gas at Tortue Phase 1, while Phase 2 is slated to begin during the middle portion of this decade. This substantial increase in the company's output should establish Mauritania and Senegal as a key production center for Kosmos, with gas making up a much larger share of what we produce. Every credible outlook from top analysts — spanning economists, financial advisors, and scientists — has charted a course to 2050 that includes a considerable share of natural gas within the energy supply blend. In our view, the planet is unable to meet the Paris targets and raise millions out of poverty across the developing world via a just transition unless natural gas serves a major function. Thanks to our expansion in natural gas and a solid dedication to cutting emissions, Kosmos is contributing its share toward the Paris targets; we are already achieving solid headway on those targets through our measure, reduce, mitigate strategy for emissions, plus our funding of top-tier, nature-based carbon capture efforts in Ghana and the U.S. This steady program for addressing climate as part of our wider pledge to further our ESG duties has formed a key element of Kosmos's operations throughout the past decade; possessing a portfolio of advantaged assets, we anticipate staying well-placed to keep advancing that program through the following decade. Moving to slide three. Back at our 4 Q results in February, I discussed the operational momentum we anticipated returning during 2021. We have gotten off to a robust beginning this year. This slide illustrates the headway achieved throughout the portfolio during the first quarter. Regarding production, we intend to drill nine infill wells during 2021, which is triple the number we drilled in 2020. That work kicked off consistent with our 2021 plan, with infill wells already drilled in Ghana and the Gulf of Mexico, while our second well in Ghana is presently being drilled. In Equatorial Guinea, this year's production enhancement work has begun effectively. We anticipate starting our first infill drilling campaign shortly at three development wells, with the rig due to show up by the close of this quarter. On the development side, Phase 1 of the Tortue LNG project keeps moving forward, standing at 58% complete as the first quarter ended. Regarding the FPSO sale and leaseback, the paperwork is nearly complete, and approvals from the government are progressing nicely, so we expect the deal to wrap up during this quarter, consistent with what we told you before. On the exploration side, things got off to a strong start this year when we hit success at Winterfell in the Gulf of Mexico. Our partners have sped up an appraisal program, and we expect a well to appraise it in Q3. We also plan to spud the Zora ILX well in Q3. I'll have more to say about that shortly. When it comes to financing, we completed a successful high-yield bond offering in late February, and earlier today we announced that our RBL extension had closed along with our spring redetermination. Taken together, these transactions have strengthened the balance sheet, increased liquidity, and pushed every near-term debt maturity further out. With a strong start to the year behind us, we're still positioned to generate $100 million to $200 million in free cash flow for the full year from the base business, assuming Brent at $55 per bbl. Slide four provides a closer look at how activity is ramping up across our three production hubs. In Ghana, we keep collaborating closely with the operator to improve facility performance and achieve greater reliability. Progress is going well. During 1Q, FPSO uptime reached 98% at Jubilee and 99% at TEN, sustaining the momentum built in the second half of 2020. Water injection at Jubilee, which aids in providing reservoir support, has now reached levels unseen since 2012.

Andy Inglis

executive
#3

Roughly 110 million standard cubic feet per day of gas is being taken off from Jubilee and TEN, which is about twice what it was in 2019. There's room for that figure to rise even more. When more gas is taken off, less of it gets injected back into the reservoir. Along with better water injection, that should help the GOR at Jubilee, and it ought to soften the decline from wells that already exist. During the first quarter, the CALM buoy at Jubilee was brought into service, so shuttle tankers are no longer needed, which lowers OpEx and makes our operation more efficient. As I said in my opening remarks, drilling has resumed in Ghana, and we have just completed a producer well at Jubilee. No well had been drilled on Jubilee since 2019; this one performed as planned and is the initial one of four wells scheduled in Ghana during this year. The rig has since relocated to drill a water injection well at Jubilee, and after that it should finish both wells, lifting Jubilee output by an estimated 15,000 to 20,000 barrels of oil per day gross, which ought to keep pushing our production upward. In 3Q, following those first two wells, the partnership intended to drill and complete a TEN gas injector well, then drill and complete a third Jubilee well in 4Q, which is expected to come onstream near year-end. In Equatorial Guinea, we were busy in 1Q, with the Okume Upgrade Project close to finishing, adding more power, water injection, and gas lift capacity needed for additional facility debottlenecking and more ESPs; in April, we finished the first of three ESPs for 2021, an upgrade to the G-19 flow line, which has notably boosted output from that well. We have secured a rig for our next drilling campaign, and it should reach the country later in this quarter. The three wells planned for this year will be the first infill wells drilled in Equatorial Guinea since 2015; in the U.S. Gulf of Mexico, Kodiak-2 was restored to service late in 1Q following successful remediation of the sub-sea infrastructure problem found in the fourth quarter of 2020. The Kodiak-3 well began producing last month, and we intend to drill the Tornado-5 infill well during this quarter, with output anticipated in 3Q. Kosmos produced about 53,000 barrels of oil equivalent per day in the first quarter, matching guidance, and our production activities stay on course to reach a year-end exit rate of 60,000 barrels of oil equivalent per day. Moving to Slide five. The momentum seen in 1Q across our production activities is equaled in our development project. Tortue Phase 1 finished the first quarter roughly 58% complete, with solid progress on every major work stream, as the images on the slide show. The upper image is the FPSO, whose hull was launched last month. The lower image shows how the breakwater is advancing. Five caissons are done, with work continuing on the next two; in April, the first caisson offloading occurred. Everything from the start of building the caisson all the way through offloading has proceeded as planned, and now that caisson sits in wet storage, waiting to be moved to its final breakwater position sometime later this year. It's a thrilling moment for this project, since the infrastructure is beginning to head offshore. On the whole, our progress looks solid. We expect Phase 1 to reach roughly 80% completion by the time the year ends. Regarding the FPSO sale and leaseback, the paperwork is in its final stages and the government's approval review is moving along nicely. Near the end of last month, energy ministers representing both nations convened jointly about this project, and there they gave their backing to the FPSO financing—an extension of the steady, robust support both nations have shown for this effort. Because of that, our confidence in where things stand is high, and, as we've said before, we're still set to wrap up in 2Q. Moving to Slide 6; back in February we discussed the ILX win we achieved with Winterfell in the Gulf of Mexico early in the year. Winterfell is a Miocene subsalt find located in a trap style frequently seen in the Gulf of Mexico. The exploration well evaluated two reservoir sections within one fault block, and we're now calibrating the seismic response against the well data. The Winterfell find reduces risk on over 100 million bbl of gross resource potential throughout Kosmos' acreage position spanning numerous fault blocks and reservoir sections. During the most recent quarter, the partnership has been advancing a fast-tracked appraisal plan, which should kick off in 3Q via an appraisal well. That well is built to evaluate the fault block northwest of the discovery, which shares the same seismic signature as Winterfell. The well should additionally evaluate a deeper horizon with an exploration tail, visible on the seismic cross-section in the bottom image of this slide; we think that if the appraisal well succeeds, the resource potential we've found in the core development area will be more than enough to support a development decision. We expect development will probably move forward in phases, with as many as three potential drill centers; this discovery, sitting in an infrastructure-rich portion of the Gulf of Mexico, offers the chance to build a highly economic, low-carbon project. Now to Slide 7, covering Zora, our next possible ILX hub. Zora is set to be the first exploration well in yet another mini basin. The initial prospect, Zora, is a supra-salt Miocene target within the same play as neighboring analogous producing fields including Odd Job, Horn Mountain, and Marmalard. Kosmos will serve as operator of the well with a planned working interest of 37.5%; every permit we need has come through, and the rig is under contract with drilling scheduled for 3Q. As the map on the slide shows, the Zora prospect sits close to host facilities, which could enable a low cost, lower carbon development should it succeed. This picture also makes clear that Zora is located close to a number of other prospects in which Kosmos has established a significant position. Our view is that if the Zora well succeeds, it will de-risk those neighboring opportunities, which could allow us to establish a new production hub with total gross resource potential of approximately 200 million bbl. I'll now turn things over to Neal, who will walk you through the financials starting on Slide eight.

Neal Shah

executive
#4

Appreciate that, Andy. Morning to you all, and good afternoon as well. On slide 8, you'll find our financial results for the quarter, and those came in right where we had told you they would. Just as we'd signaled beforehand, production declined versus a year ago, mostly because drilling had dropped off in reaction to the pandemic. Drilling is picking back up fast here in 2021, and once new wells start producing in Ghana, Equatorial Guinea, and the Gulf of Mexico, we anticipate those declines will flip. The realized price for 1Q, after adjustments for derivatives and cash settlements, came in a bit below where it stood a year ago, which mirrors the hedges we've got in place that limited some of the upside on oil prices during the quarter. Just as important, that weaker per-barrel realization also mirrors reduced sales volumes in 1Q, driven by how our lifting schedule fell in Ghana and Equatorial Guinea. Of the 12.5 cargoes we anticipate for 2021, only 1.5 were lifted during the first quarter; that fact, together with what we spent in Mauritania-Senegal and shifts in working capital, left us with negative free cash flow for the quarter. Once cargo timing smooths out through the remainder of the year and we lift a greater volume than we're entitled to, we'd anticipate the reverse happening, which lifts both realizations and free cash flow. On top of that, once we wrap up the FPSO and NOC financing for Mauritania and Senegal, we anticipate a net cash inflow from Mauritania and Senegal across the rest of the year. During 2020 we put in serious effort to bring costs down and make Kosmos a leaner organization, and you can see evidence of that throughout the OpEx, exploration expense, interest, and CapEx lines on this slide. Guidance for the second quarter is included in the appendix of the slide pack. Our guidance for the full year hasn't changed. Now let's look at slide 9. We've made major progress this year toward further bolstering the balance sheet and our liquidity position. Late in February, we closed a $450 million senior notes offering successfully, aimed at lowering outstanding balances on the credit facilities and funding working capital; this morning, we announced that our RBL facility has been extended, together with the spring redetermination. Maturity on the facility got pushed out two years, so final maturity now lands in 2027, and with the banks we settled on a borrowing base of $1.24 billion, with $1 billion drawn on the facility at present; we've brought the facility size down to $1.25 billion from $1.5 billion so that, as planned, we lean less on the RBL facility for liquidity. The two charts on this slide compare the debt maturity profile at year-end against the close of the first quarter, adjusted for the RBL extension and the second quarter RCF repayment. As you can see, we've moved early with important steps on the maturity schedule and cleared out all material near-term debt maturity. When the first quarter ended, the company held roughly $0.8 billion in liquidity. Since we've mostly taken care of the maturity schedule, our attention stays on bringing down the total debt and leverage by paying down borrowings using free cash flow. As cargo timing returns to normal and hedges roll off, we anticipate leverage dropping quickly starting in 2Q and continuing through the rest of the year. For the second quarter, our projection is 4.5 cargoes out of Ghana and Equatorial Guinea — triple the 1.5 cargoes that came from the two production hubs during the first quarter. Having said that, I'll turn it back to Andy so he can close things out on slide 10.

Andy Inglis

executive
#5

Thanks, Neal. In short, we're off to a solid start this year, carrying out the quarter's planned work right on schedule while momentum gathers throughout the portfolio. Output should climb as the year goes on, helped by nine infill wells spread over our three production hubs. Tortue Phase 1 is still set to reach roughly 80% completion by the end of the year, and the FPSO sale and leaseback should close during this quarter; in quarter three we intend to spud the first Winterfell appraisal well along with the Zora ILX well, bringing near-term production growth that comes cheap and with lower carbon. Last, on the financial side, now that the bond and the RBL financing are done, we'll begin the work stream aimed at refinancing the Mauritania and Senegal NOC loans, which we expect to wrap up in the year's second half; taken together, we're solidly on course to reach our target exit production rate of 60,000 bbl of oil equivalent per day by year-end, and still on course to produce $100 to $200 million in free cash flow from the base business at $55 per bbl Brent. Thank you. At this point I'd like to pass the call to the operator so the question session can begin.

James Hosie

analyst
#6

Hi there, and thank you, Andy and Neal. I have a few things to ask. To begin with, you've kept your 2021 guidance for base business free cash flow at $100 million-$200 million with Brent at $55. Could you give us a sense of how sensitive that is given prices right now are roughly $10 higher, maybe even more? Also, this quarter saw a $95 million working capital outflow. For the rest of the year, should we anticipate that turning around? And then regarding Ghana, with drilling restarted on Jubilee and output rising later in the year, at what point do you think the Ghana partnership will decide on a contract and a second drilling rig?

Andy Inglis

executive
#7

Okay, yes. Hey, James, thanks. We'll handle those starting from the last one. I'll address Ghana, then hand it to Neal for the price sensitivity and the working capital movement. Yes, I'd say in Ghana, we're really in the middle of our planning process alongside partners right now. It fits within our usual mid-year review, which then leads into approving the work programs and budgets for 2022. My sense is that will actually be a 3 Q decision. What I'd offer as context, though, is that we obviously see a substantial set of opportunities in both Jubilee and TEN. I think it's positive that we've begun well, in fact, on this year's drilling program. We kicked off on schedule, and we've in fact drilled the first well completely on time. That strong beginning, I think, then really creates momentum and backs the discussion about extra drilling capacity next year. I'd say two points for the debate with partners will concern the depth of the portfolio, which is strong, and how well we're performing, and we've begun well. Neal?

Neal Shah

executive
#8

Alright James, regarding your first couple of questions, when it comes to free cash flow, the way I'd frame it is that for 2021, each $5 move in the oil price translates to roughly $30 or $35 million of sensitivity in free cash flow, and that does factor in where the hedges sit right now. Ordinarily you'd think that number would be bigger, but we've limited part of the upside on oil prices by way of the hedges we already have in place; then on your second question, when it comes to working capital, a few main items are behind the movement there. One of them, obviously, is the underlift during the quarter. We keep paying JIBs month by month, but you only book it once the oil volume has been sold. Like I said, as the timing of oil cargoes smooths out across the remaining part of the year, we'll book that, and the working capital tied to that item will turn around. You also get some normal 1Q outflows that even out as the year progresses, and beyond that there's a component tied to Mauritania and Senegal. My expectation is that the bulk of it will reverse as the year goes on.

James Hosie

analyst
#9

All right, thank you very much. I just want to build on what Andy said, regarding that second drilling rig — should we view it as another rig committed to TEN, while the remaining one operates at Jubilee, or does it involve greater adaptability than that?

Andy Inglis

executive
#10

James, there's a lot more adaptability involved than that. Naturally, we need to be certain we're operating efficiently when it comes to how our assets get deployed. That's still something the partnership continues to discuss. What we clearly must accomplish is making certain we prioritize the drilling prospects so the finest wells get drilled first. I believe you'll observe a broader set of activity at TEN. The way we fine-tune that rig scheduling, and afterward the deployment of rigs, is merely one element of that effort — taking the extensive inventory of prospects and ensuring the top wells are drilled first.

James Hosie

analyst
#11

Very good. Thank you.

Andy Inglis

executive
#12

Great. Thanks, James.

Charles Meade

analyst
#13

Good morning, Andy and Neal.

Andy Inglis

executive
#14

Morning.

Charles Meade

analyst
#15

First off, I'd like to inquire about Tim Nicholson and John Shinol being elevated to head up your exploration program. Could you tell us what, if anything, will look different at Kosmos, either in the types of things you go after or in how you go after them? And can you tell us how much those two gentlemen have been involved with the EG assets recently?

Andy Inglis

executive
#16

Yes, Charles, look, I believe both Tim and John possess an exceptionally strong record in exploration and proven basins, with a sort of Cobalt heritage, and clearly, Deepwater, Gulf of Mexico, a tremendous record in that area. I think we've got the right capabilities for the strategy. Our attention is clearly fixed on the areas where we've already had success: Equatorial Guinea, the Gulf of Mexico, and Ghana as well. What we're doing is bringing those capabilities to bear there. We're being selective, prioritizing the better prospects—ones that bring quick repayment and strong returns by making the most of existing infrastructure. Having the two of them here at the company makes me extremely happy, and I'm equally glad that they're now stepping into leadership roles tied to that strategy of focusing on proven basins. That's right—across a span of more than two years, in fact, each of them has been engaged with Equatorial Guinea. They've put in work on the Gulf of Mexico, and Ghana has been part of their efforts too. So the deliverables coming out of Equatorial Guinea have played a central role throughout. Looking back, the assets came into our hands in 2017, then we ran seismic acquisition during 2018, with processing wrapped up in 2019. The following year, 2020, centered entirely on interpreting that data and ranking the best prospects within the opportunity set. Their team has been deeply engaged at every one of those stages.

Charles Meade

analyst
#17

Andy, thanks for providing all those extra specifics. Regarding Tortue — if we look forward to the close of the year, that puts it at 80% done. So what comprises the remaining 20%, or what do you expect will still be outstanding by the time we reach the end of 2021?

Andy Inglis

executive
#18

Right. Once you arrive at year-end 2021, the drilling campaign is what you have ahead of you. As for the subsea infrastructure, the goal is to have it installed so that you're able to commence drilling the wells needed for the initial startup. The aim by the close of the year is for the caissons to be completely deployed; that in turn lets you, during 2021, construct the jetty structure situated behind those caissons, which then makes it possible to bring the FLNG vessel in at year-end. Once the wells have been drilled, you're then able to place the FPSO at its location, and that's an activity of a year-end 2021 nature. Naturally, there's the project's integration along with pre-commissioning work that runs through commissioning on every individual component, followed by integrating all of that, which brings about first gas. Those constitute the major items left to execute during 2022.

Charles Meade

analyst
#19

Thank you, Andy.

Andy Inglis

executive
#20

Great. Thanks. Charles?

Neil Mehta

analyst
#21

Morning, everyone, and thanks for fielding this. I'd like to expand a bit on what was said regarding Tortue. At present, your company is producing 60,000 bbl per day. You mentioned, if I recall, a goal of reaching 100,000 bbl per day by 2026. We've discussed Phase 1, but Phase 2 matters greatly as well. What stands in the way of reaching FID on Phase 2, and what's your view on Phase 2's incremental economics compared with Phase 1?

Andy Inglis

executive
#22

Yes, thanks, Neil. That's a good question. In part, this concerns making certain Phase 2 has been optimized as thoroughly as possible, and as I've mentioned during earlier quarters, through our efforts alongside BP, who serves as operator, we've set aside time on this project to pause and ask ourselves, "What's the smartest way forward?" The smartest way forward involves making complete use of every piece of infrastructure being installed for Phase 1. I've noted this previously, meaning we'd be making complete use of the gas processing facility aboard the FPSO. Pipeline capacity would also be fully used, and since the breakwater is obviously already constructed, the question becomes how to grow FLNG capacity situated behind it. Those are the central items we've been addressing, and I'd say that alongside BP we now share a common view on this approach, under which the following move toward a facility of essentially 5 million tons per annum draws on all of it completely. It represents the most economical move available to us. It caps how much capital must go in to produce that outcome, and in fact renders it much easier to finance from Kosmos's standpoint. Honestly, I'm genuinely — we're enthusiastic about, I'd say, the structure we've settled on for Phase 2, and therefore the incremental economics come out considerably better. Our belief is that when you examine brownfield expansions globally, and this qualifies as one — an expansion stemming from Phase 1 — it ranks as one of the most economic projects, if not the single most economic. Its economics are quite robust thanks to that leverage. After that, it comes down to making sure the engineering effort proceeds at an appropriate speed. We are, plainly, intensely focused on bringing Phase 1 to the proper stage of completion. Following concept optimization, which happens this year, FEED arrives in 2022. A target of FID near the close of 2022 would then, in effect, bring first gas roughly three and a bit years afterward.

Neil Mehta

analyst
#23

Thank you, Andy. To build on that, you mentioned achieving carbon neutrality for Scope 1 and Scope 2 emissions on the project by 2030. Could you walk us through how you plan to reach that, and offer a bit more detail on what it takes to hit that target?

Andy Inglis

executive
#24

Sure. Neil, we're focused on two main areas. The first involves measuring and cutting the carbon generated by our own operations, and that's something we're actively pursuing. We're fortunate to begin from a solid foundation in the Gulf of Mexico, thanks to the naturally lower carbon intensity of those assets. Since you're relying on infrastructure that already exists, there's no flaring involved. You're connected to the gas networks. Your carbon intensity comes in at roughly just under 10 kg/bbl produced. So you're beginning with a robust asset base, yet there are still chances to further mitigate and cut; for those emissions we can't tackle that way, we're handling them with nature-based offsets. We're examining a reforestation initiative in Ghana, plus a wetlands reforestation effort in the U.S., and additionally a possible wetlands project in the Gulf of Mexico. Again, with all of these, the goal is to find a nature-based solution that's high quality, both regarding the carbon offset and in how it generates jobs, remains sustainable, and delivers a broader economic benefit. The wetlands projects bring an extra advantage, given coastal erosion, in how we can advance projects that assist in mitigating that. It'll come down to a mix of those two approaches.

Neil Mehta

analyst
#25

Thanks, Andy.

Bob Brackett

analyst
#26

Andy, thanks for taking my call. I may be overanalyzing slide two, where you talk about the next decade. That long-range number of about 100,000 BOE per day roughly matches keeping production flat from the oil assets you have now, while getting to Phase 1 and Phase 2 of Tortue. So does that plan decide what you do with cash or barrels if you end up above or below that level? Is it basically a conservative baseline for what you'll achieve, with upside potential? Or am I overthinking it?

Andy Inglis

executive
#27

No, good question, Bob. You've really nailed the key idea here. What it comes down to is that our resource base is robust right now, and that gives us the ability on the oil side to keep upgrading the quality of what we hold, put money into the strongest projects — the ones matching the traits we want — and produce free cash flow. Right. Our oil operation is solid, and we're confident it can be maintained indefinitely. In the end, how much we invest will hinge on making sure, above all, that this business throws off free cash flow. Right. Being short on resources isn't our problem, and neither is lacking opportunities. What we're ultimately aiming for is getting the company's leverage down and delivering that free cash flow. Right. To me, Tortue represents a meaningful growth driver for the business. What sets it apart as a growth driver is that it provides a dependable cash flow stream lasting many years. Correct. With LNG developments, the difficulty, as you're aware, lies in the capital required upfront. On Phase 1, we've mostly gotten past that point. As we talked about in response to Neil's question, Phase 2 offers a first gas path with very little CapEx. You end up with a steady, consistent block of cash flow generated by the business. That, I believe, is the fundamental approach that produces that outcome and, in a sense, brings the resources together with the project and the cash flow.

Bob Brackett

analyst
#28

All right, that strategy does get us to a higher gas percentage, yet oil would remain your dominant piece. So could we consider deliberately divesting some oil properties in order to shift capital toward gas properties? Or is that simply too distant a prospect to even consider right now?

Andy Inglis

executive
#29

Yes, Bob, and once more, that's a terrific question. Very well. In my view, the gas portion of the portfolio ultimately matters a great deal, since the way the world will evaluate upstream businesses is by what they offer for sale and by the carbon intensity of what they offer for sale—not merely on the production side, but with regard to how it gets used. A portfolio whose gas element keeps expanding is something we need. Yes. At the same time, we must ensure those count as high-quality projects and can win capital on merit. In my view, we hold a powerful internal growth wedge. As you're aware, at Tortue growth is available past 5 million tons per annum. How quickly that keeps expanding. What I like is the optionality before us. What I like is the balance before us. My sense is that we can turn the dial upward or turn it downward as the world keeps changing around us. The built-in strength of the portfolio across both dimensions—gas and oil—is something I consider important.

Bob Brackett

analyst
#30

Okay, great. Thanks for that.

Andy Inglis

executive
#31

Great. Thanks.

Mark Wilson

analyst
#32

Hi, and thanks. To start off, I want to ask about the upcoming ILX program. Andy, regarding Winterfell, I believe you mentioned that a successful appraisal of the North Fault Block would remove the risk from a commercial tieback development. There are a fair number of prospects displayed, which to my understanding account for the 100 million BOE. What 2C threshold would you aim to establish through the discovery and appraisal? I assume the same applies to Zora. The 200 million bbl gross resource potential, I'd guess, spans all the prospects shown on that slide. How much of that 200 million bbl does Zora represent? Am I correct that, and you may have mentioned this, you intend to farm down a bit prior to drilling at Zora? Thanks.

Andy Inglis

executive
#33

Yes. Taking Winterfell first, I believe it's crucial, in a sense, not to run before we can walk. We believe there's considerable extra potential at Winterfell; our first well on the fault block that we drilled was a success. Another well is planned. It sits on the fault block to the northwest. The result from that first well lowered the risk for it, so it shares the same size signature. My sense is we'll have reached a commercial threshold there. A meaningful share of that 100-million-bbl-plus potential in the middle sector will have been demonstrated, which brings you to that commercial threshold. Yes. There's a considerable amount of reserve intensity within that central portion of the opportunity set. I believe extra upside remains from drilling both to the south and to the north. I won't provide a precise figure, but from that central portion — the two initial fault blocks we've circled on the view graph — I think we'll reach a number near that 100 million bbl plus. It will hinge on the appraisal outcome and the exploration tail, yet that's the opportunity set before us; on its own, it's material. On Zora, once more, we see Zora. It's a prospect of roughly 30 million bbl to 40 million bbl. There are four or five prospects in total; that's what constructs the opportunity set you see there, the 200 million bbl potential. Once again, to underpin an initial development, you'd likely need about two of those to come in successfully, which would support the initial development. Again, I think you'd likely see a phased sort of approach in which you drill, bring the initial prospects online, leverage the nearby infrastructure, and then expand from there. Right? A comparable approach for both.

Mark Wilson

analyst
#34

Got it, that's clear. Thanks a lot. One thing, I think, for Neal. OpEx during Q1 actually came in under what you'd guided to, at 13.9 BOEs. Guidance covering the remaining part of the year is unchanged. I wanted to know whether some infill drilling expenses in other regions do flow into that OpEx figure, keeping it elevated relative to Q1 across the rest of the year. That's my first item. If I could, I'd also like to inquire about Ghana production, and the 15,000 to 20,000 bbl of oil per day potentially added from that initial producer injector pair. When you mention an exit rate of 60,000 BOE, are you likewise factoring in a Ghana exit rate that's 15,000 BOE above what those 2 fields currently produce on a gross basis? Thanks.

Neal Shah

executive
#35

Certainly. I'll address the ILX piece, then Andy can cover the production forecast. OpEx in 1Q came in mostly under guidance because of the production mix. A bigger share of relative production came our way, owing to the under lift out of the Gulf of Mexico, which carries a somewhat lower OpEx per barrel. When you consider quarter-over-quarter guidance as lifting occurs, cargoes lifted from different places carry differing OpEx levels, so the total figure isn't significantly changed; it's encouraging to observe certain cost reductions flowing through. Within the broader picture of our OpEx guidance, that hasn't really been a meaningful swing either direction. As for ILX, to answer that, it has no effect on the overall OpEx impact.

Andy Inglis

executive
#36

Mark, regarding the Ghana projections specifically — the first quarter came in robust, correct? At Jubilee we hit 70,000 barrels per day, and TEN gave us 39,000 barrels per day. Fairly solid results. Looking ahead across the year from the wells we already have, reliability has been good. Should that hold up, it definitely reinforces the baseline from those existing wells. Water has been going into the reservoir while gas comes out, and that, as I mentioned during my remarks, assists in reducing how quickly output falls off. When you project forward, I believe two conditions must be met. Right? We have to keep operational reliability at that standard and sustain base management along with the water and gas; provided that continues, it will clearly bolster the year-end exit rate from the existing wells. Naturally, drilling got off to a robust start. We must drill the second producer, or the second injector, at Jubilee, finish off both wells, quote, bring them online; they could potentially contribute 15,000 to 20,000 barrels per day gross. Once more, that ought to support what we hope becomes a solid base production level. In my view it's somewhat premature to offer fresh guidance for Jubilee's exit rate. What I can say is that the patterns we observe, provided they persist, are encouraging.

Mark Wilson

analyst
#37

All right, that works. Appreciate it. I'll hand things over now.

Andy Inglis

executive
#38

Sounds good. Appreciate it, Mark.

Nick Stefanou

analyst
#39

Hello, everyone. Nick here, calling from RenCap. I appreciate your time in addressing my questions, and congratulations on reaching 10 years since the listing.

Andy Inglis

executive
#40

Thanks.

Nick Stefanou

analyst
#41

If I could, I have a few things I'd like to ask. The opening one is directed at Neal. Neal, it really caught my attention that the RBL banks had ESG KPIs tied to the margin. Essentially, what I'm getting at here — let's call it two parts. First, how did this situation arise? Did Kosmos bring it forward? Are those banks genuinely shifting what they prioritize when lending to oil companies and attempting to adopt an ESG perspective? A bit of explanation on that would be great, please. My second thing is meant for Winterfell. I'd like to revisit what Mark raised. As I read this slide, my takeaway was that for every appraisal or exploration well, you'd drill in each of the fault blocks. Should it turn out to be a discovery, you could essentially finish it off, connect a flow line, and turn it into a producer. If that holds true, then you'd simply be tallying up well locations. You're attempting to prove this out in order to construct something larger. It doesn't truly seem like ILX as such if you do have to put in some extra infrastructure. Could you say a bit about what additional infrastructure might be required compared with merely adding a flow line and then completing the well? Thanks.

Neal Shah

executive
#42

Yes. Appreciate that, Nick. I'll handle the first one, and then Andy will take the second. On that initial point, once more, I believe we enjoyed solid backing in our talks with the banks across the past several months regarding the extension of the facility; we've been able to reach the banking market as a whole at appealing levels due to, I'd say, really two factors — first, the robust cash generation capacity of our current assets and the clear growth within the portfolio via Tortue. The second factor is a compelling ESG narrative concerning the direction the company is taking. We've remained quite transparent and outspoken about our agenda, and about reaching where we must get to across the coming several years. Regarding embedding it in the facility, we've observed it appear in certain other facilities, though not in our region. We felt it mattered for us as a company, and so our bank ought to be in step with that agenda. During the conversation, we put forward including it with the banks, and I think many of them viewed it as a significant positive; it wasn't something forced upon us so much as something we urged the banks toward, to ensure our vision regarding where we're steering this matches where they wish to head. When it comes to ESG broadly, I'd say that as investors have zeroed in on the topic, banks are paying more attention to it too. Standards are unmistakably rising, and lenders will get behind businesses that in the end hold solid assets generating cash along with the appropriate asset quality, yet likewise the businesses backing the correct ESG agenda, since the banks are concentrating on directing their capital toward such businesses. I believe we arrived at a really strong position, and on the whole this serves as something of a distinguishing factor when it comes to Kosmos offering or generating extra justification for standing behind the company.

Nick Stefanou

analyst
#43

That's a really intriguing remark. Thanks.

Andy Inglis

executive
#44

Yes, Nick, regarding Winterfell. I believe the goal of appraisal well number two is really to establish a core area for that first development phase. Our aim is to make sure we get the flow lines sized correctly going back to possible hubs. We could tie back to a number of them, and we want to be sure the design of that first infrastructure element is optimal. Right? The thing is, you'll definitely have a drill manifold in place. The wells have been drilled. You're able to return and complete those wells. It really comes down to the ideal flow line size. Once that infrastructure exists, the next step is building some flexibility around what's been installed, so we can then consider the second and third drill centers that would be tied back. There's a chance to tie back a particular volume if things go well, and then upon reaching a tipping point, you might add another flowline; all of this is about making sure the capital deployed is correctly sized at the first well. You avoid overinvesting. Don't underinvest, yet don't overinvest either. Build the flexibility for what comes later. We perceive considerable upside past that initial core development. We must install the proper flowline size and then build the flexibility so tiebacks from a possible second and third hub can happen. What amount of extra flowline capacity would you add at that stage?

Nick Stefanou

analyst
#45

Okay, understood. Thank you.

Andy Inglis

executive
#46

Okay, thanks.

Richard Tullis

analyst
#47

Thank you. Morning, everybody. Andy, I've got a single question. A partner involved in Jubilee within TEN has been seeking to cash in on its stake. In those properties, does Kosmos hold preferential rights, and might Kosmos pursue its pref rights in Ghana based on what the pricing looks like?

Andy Inglis

executive
#48

That's a fair question, Richard. Like every agreement, I'd say pref rights really sit in the eye of the beholder. I'd rather not turn this into a back-and-forth, so to speak, regarding the manner and possibility of exercising them. Clearly it hinges on the structures, and a whole range of factors, right? What I'd say in response is that within one of the licensed blocks, an opening for pref rights does exist, I believe, though it hinges on whatever structures ultimately emerge. What matters more, I'd argue, comes back to our priorities—namely, generating free cash flow from the assets we already hold. We're focused on making sure the company de-levers. Were we to examine a chance like that, it would need to align with that framework. Right? Ultimately, what I'd say is that we keep screening possibilities that generate cash flow and would de-lever the company. Should opportunities resembling that arise, we'd definitely take a look at them.

Richard Tullis

analyst
#49

That answers my questions, Andy. I'm finished. Thanks very much.

Andy Inglis

executive
#50

Wonderful. Appreciate it.

Charles Meade

analyst
#51

Andy, I appreciate you allowing me to jump in again here. This won't take long. Looking at slide six, the Winterfell slide, in the bottom right corner. Something here catches my attention, and I'm not sure whether it means anything, but I wanted to tug on this thread and find out what the story might be. From what I can see, you have the Pliocene sitting beneath those Miocene targets. I was curious about what's happening there. Is this a large, inverted section, or am I getting something wrong? Is there some kind of larger narrative at play?

Andy Inglis

executive
#52

No, I don't believe there is, Charles. When we look at Winterfell, my thinking is that we see a chance with meaningful upside to it. That's what we need to chase through a proper appraisal program. My sense is that we're pleased with the first well. It has proven up the seismic. We've calibrated it against the wells, and we're underway with the second appraisal well, which has a deeper tail on it. I wouldn't read too much into any of that. My view is that this is a solid beginning for a sub-salt prospect, where the harder piece is always getting the seismic calibration right. We've made a strong start on that with the initial discovery well.

Charles Meade

analyst
#53

Right. Thanks, Andy.

Andy Inglis

executive
#54

Great. Thanks, Charles. Appreciate it.

Mark Wilson

analyst
#55

Yes, excellent. I figured I'd return to this since it appears everyone is now inquiring about Winterfell. Andy, from my reading of that slide, there's $100 million in the central area that appraisal can prove up, plus the additional prospects represent another $100 million across the other fault blocks.

Andy Inglis

executive
#56

Mark, what we're indicating is that we possess more than 100 million bbl of potential, all right? Let's not run before we can walk, yeah? That, I believe, is the key point. With the initial discovery well plus drilling of the second fault block, we feel we have sufficient resource to reach an initial development phase. Yeah? A significant proportion of the 100 million bbl. Yeah? Whatever sits to the north, whatever sits to the south is going to hinge on drilling results. Obviously, should the appraisal well succeed and we keep calibrating the seismic, then clearly confidence will build.

Mark Wilson

analyst
#57

Understood. All right, that's clear, Andy. Thanks.

Andy Inglis

executive
#58

Excellent. Thanks.

Mark Wilson

analyst
#59

Good luck with drilling.

Operator

operator
#60

Appreciate it. With no more questions coming in right now, I'd like to wrap up the call. Thank you all for being with us today. At this point you're free to hang up, and we appreciate you taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kosmos Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Kosmos Energy Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kosmos Energy Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.