I appreciate that, operator, and I want to thank all of you for being with us today. Earlier this morning, we put out our earnings release for the first quarter. You can find that release along with the slide deck for today's call on the Investors section of our website. Here with me today to walk through the materials are Andy Inglis, our Chairman and CEO, and Neal Shah, our CFO. As part of today's presentation, we'll be making forward-looking statements relating to our estimates, plans and expectations. A number of factors we describe in this presentation and in our UK and SEC filings could cause actual results and outcomes to differ materially. For additional detail, please see our annual report, stock exchange announcement and SEC filings. All of these documents can be found on our website; and with that, I'll hand things over to Andy.

Andy Inglis

executive
#2

Appreciate that, Jamie, and hello everyone, morning or afternoon depending on where you are. We're glad you could be with us for this call on our first quarter results. What I want to do first in today's presentation is walk through the company's portfolio, homing in on the main traits that set Kosmos apart in an oil and gas sector that's changing quickly; after that we'll go over the quarter, covering the operational and financial strides achieved so far this year, and then we'll take your questions. Let's begin on Slide 3. You saw this slide back in February alongside our full year results, and it now reflects the Tullow preemption in Ghana. The conflict in Ukraine has reshaped global oil and gas markets from the ground up, and in our view our portfolio is the right one at the right moment to meet the difficulties this permanent shift has brought about. Over the coming two years, our production should rise by roughly 50%, which helps supply the oil and gas the world requires now. We hold a strategic LNG resource that's needed to back a just transition in Africa and to strengthen energy security at the same time. These qualities, we believe, are what set Kosmos apart and give investors an attractive chance to own a company with a purpose and a portfolio suited to what lies ahead. First, over on the left, are our low-cost, high-quality assets. World-class fields form the foundation of the company, with a combined 2P reserve life exceeding 20 years and enough longevity to produce sustainable, high-margin cash flow. That lets us put money into our current assets to grow production and free cash flow substantially while paying down debt at the same time, and through the quarter we made great headway on exactly that. Second, as you can see in the chart on the right, our LNG exposure is growing right when gas is gaining both strategic and financial importance. Tortue Phase 1 should start up late next year, and we have additional world-class gas development opportunities in Mauritania and Senegal that ought to drive further growth past 2024. Third, our balance sheet is solid and keeps strengthening. Liquidity is on the rise and absolute debt is coming down, with leverage moving nicely toward our year-end goal of under one and a half times at current prices. Fourth, CapEx declines and free cash flow rises, just as we planned. Once we get leverage sustainably beneath our target, there's room for meaningful returns to shareholders. And last, we have strong ESG credentials, supported by our climate target commitments, our sustainability track record and sound governance. Our stakeholders want more from us than <<inaudible>> ESG, and our company carries a broader agenda. As our gas exposure grows, we back a just energy transition for the African countries where we operate and also deliver stronger energy security for parts of the world, Europe especially, that are seeking to diversify where they currently get their supply. Now to Slide 4. What's happened over the past two months has driven home how vital it is to have dependable access to energy, and to gas above all. At Kosmos, we hold a meaningful position in a sizable and strategic natural gas resource capable of playing a key part in strengthening energy security. Across the past 18 months, and long before the conflict in Ukraine, we've observed what happens to gas markets when energy demand climbs during years when supply investment falls short. The chart in the upper right, drawing on Wood Mac data, illustrates that LNG demand is projected to rise steeply in the years ahead, nearly doubling by 2035, and that forecast is holding up. The chart in the lower left of the slide illustrates that the anticipated gap in new LNG required to meet that growing demand has expanded considerably over the past few months; that stems directly from European nations seeking to cut their reliance on pipeline gas and substitute it with LNG sourced from international markets following the war in Ukraine. Since demand is anticipated to keep strengthening across that span, prices have moved in response. The chart in the lower right displays today's TTF forward curve against November of last year, with forward prices roughly $13 and then MMBtu higher today on average across the coming three and a half years than they stood in late 2021. Although near-term prices have traded at record levels, it matters to examine how the present situation in Europe affects the medium to long term; we hold the view that the longer-term picture for LNG has shifted fundamentally, with elevated prices probably persisting because of the premium now attached to greater security and flexibility. Here at Kosmos, we hold roughly 27% of an estimated 100 Tcf of gas in place throughout Mauritania and Senegal. We anticipate that this gas will play a significant part in satisfying growing demand alongside improved energy security. Moving to Slide 5 now. Our gas in Mauritania and Senegal enjoys a cost advantage stemming from both its location and the quality of the resource; it sits geographically advantaged relative to Europe, delivering a substantial time and distance edge over U.S. supply, which translates into markedly lower transportation costs. For an LNG cargo making the trip from Tortue to one of the UK's existing terminals or to Williams Hub <<inaudible>> and the proposed site have secured the new German import terminals, the voyage covers roughly 2,000 nautical miles, or a sailing time of five days to six days. Departing from the US Gulf Coast, that distance comes closer to 6,000 nautical miles, or three times as long to deliver the identical cargo, producing shipping costs that might be almost $1 MMBtu higher at long-term charter rates. We think we're able to produce gas at an upstream cost of about $2 to $3 per MMBtu across the life of the field, which stacks up well against prevailing U.S. gas prices of roughly $8 per MMBtu. Whilst we believe the U.S. It's going to be a key supplier to Europe when it comes to future LNG, and what's on the slide makes clear that Tortue stacks up well against rivals on both the upstream side and transportation costs to Europe, so it ought to play a meaningful part in Europe's expanding LNG market. The gas we serve in Mauritania and Senegal also carries a carbon benefit, since there's virtually no CO2 in the feed gas produced from the field. Just to remind everyone, pricing for our gas in Phase 2 of the project hasn't been set yet, and that opens up a major opportunity for Kosmos once we take that gas to market. Let's move to Slide 6. We also presented this slide at year-end, and we've refreshed it to reflect the Tullow preemption in the first quarter of the year, which is now behind us; in 1Q, free cash flow from the business came to roughly $220 million, leaving out the Tullow preemption proceeds; because capital expenditure in Mauritania and Senegal was minimal during the quarter, that figure shows the steady state cash flow the business can potentially deliver once our growth CapEx is behind us. With oil at $75, we would anticipate the business generating more than $700 million of free cash flow in 2024 as production ramps up and CapEx declines. At today's prices, that figure is going to be considerably higher.

Andy Inglis

executive
#3

We think this amount of cash generation can be maintained, and it's supported by our 2P reserve life of 20 years, which means we're positioned to provide steady, meaningful returns to shareholders when the timing is right. What sets our portfolio apart from others in our peer group is the mix of high-quality growth and cash flow generation, and that's the reason my team is enthusiastic about what lies ahead for our company. Now we'll examine the 1Q results more closely, beginning with Slide 8. This was yet another quarter of robust operational and financial performance. On the operational front, we did well, with production landing at the top end of our guidance range, aided by continued strong performance at Jubilee, which in particular keeps delivering solid results. Once you adjust for Tullow's preemption impact, we're at the top end of our original guidance; when it comes to our developments, Tortue Phase 1 and Jubilee Southeast are both still on track, and right now we're navigating the tougher operating conditions we're encountering related to supply chain problems and cost inflation. We anticipate FID on Winterfell around midyear, as we keep working to optimize the development in light of the current environment; on the financial side, as I noted, we enjoyed an outstanding quarter for cash generation, supported by robust production and favorable commodity prices. That robust cash generation, together with preemption proceeds from Tullow, enabled us to cut net debt by $330 million during the quarter, bringing leverage at the close of 1Q to 1.9 times. Regarding the balance sheet, we finished all our financing requirements successfully through the RBL redetermination RCF refinancing, and those were key steps toward locking in our solid liquidity position. Moving to Slide 9, which covers operational performance for the quarter. As I said on the earlier slide, Jubilee's performance was strong during the quarter, averaging slightly above 91,000 barrels of oil per day gross with 99% uptime. The field is shut in right now for the scheduled two-week shutdown and should come back online at the end of this week. Before the shutdown, Jubilee was producing at roughly 95,000 barrels of oil per day gross on a daily basis, showing what the field can do with better reliability and disciplined investment. We anticipate one more production well and water injection wells coming online later in this quarter, which ought to help sustain production levels through year-end. At TEN, gross production for the quarter came in at about 25,000 barrels of oil per day, once again with high uptime of 99%, matching expectations, with the next wells scheduled for the third quarter. At Jubilee Southeast, we're progressing nicely with ordering long lead items before drilling, which should begin around the end of the year. Production from the first well is targeted for mid-2023, and that ought to drive gross production at Jubilee past 100,000 barrels of oil per day. Regarding the Oxy deal, the Petro SA preemption hasn't closed just yet. We'll bring the market up to speed in due course after that happens, though the effect on what we produce and on guidance isn't material. Over in Equatorial Guinea, gross output for the quarter came in near 35,000 barrels of oil per day, helped along by strong uptime aboard the Sabre FPSO. The reliability work we've put money into across the last several years is now paying off, with 99% uptime at Sabre during the quarter. Add in the upside from the wells we drilled in the year's second half, and first quarter output landed 15% above 4Q 2021. During the quarter we also wrapped up the accume upgrade project without a hitch, which gives us more capacity to handle extra ESPs, and we began installing those in April to keep supporting production levels. Down in the Gulf of Mexico, average quarterly output was roughly 19,000 barrels of oil equivalent per day net, held back by facility downtime that wasn't planned. Everything is back up and running, and April output reached about 22,000 barrels of oil equivalent per day net; right now we're drilling the Kodiak side track, with production anticipated in the next quarter. Moving to Slide 10, which centers on three cheap resource additions across the Gulf of Mexico and Equatorial Guinea that deepen our current asset base. Together, these bring in roughly 12 million barrels of resource at an overall cost near $4 per barrel, with economics that look very appealing. First, at Winterfell, we lifted our stake in the central Winterfell blocks, home to the original discovery plus a successful appraisal well. We picked up another 5.5% from a partner for roughly $10 million, which brings our total interest in those four core blocks to about 22%, and to 36.5% in the derisk northern blocks. Capital reductions elsewhere in the Gulf of Mexico business unit will offset that consideration. Second, we exercised our preferential right to buy an extra 6% in Kodiak for a total of about $28 million, with the first installment landing in 2022 and another payment deferred afterward. Worth noting: the original deal was negotiated largely back in 2021, when oil prices were far lower, and that's what opened the door for Kosmos. On Kodiak, the transaction carries a forecast payback of about 13 months at $75 per barrel, with an IRR north of 95%. At the current oil price strip, payback ought to come in under a year, with an IRR exceeding 180%. To fund the Kodiak preemption, we signed over a small portion of the Ghana preemption proceeds toward this compelling opportunity. Third, working with our JV partners, we've reached agreement with the Ministry of Mines and Hydrocarbon in Equatorial Guinea to extend the Block G license through 2040, which adds 11 years to Sabre and six years to accume, backing the next round of investment in that country. Under this extension, we are making a signature bonus payment, and that amount is already baked into the CapEx guidance we gave for the full year. We've also committed to carrying out a work program that centers on the upcoming infill and exploration drilling campaign. Through this extension, roughly 6 million barrels of 2P reserves are being added, and at $75 Brent, that translates to approximately $100 million in NBV 10 net to Kosmos. Moving to Slide 11, let's look at our developments in Mauritania and Senegal. At Tortue Phase 1, things keep moving forward, with every major work stream showing progress during the quarter. Over at the hub terminal, building is proceeding on schedule, and the 21st caisson — the last one — was shipped offshore in early March 2022, leaving 3 caissons still to be installed. Regarding the subsea scope, we expect the offshore installation campaign to kick off this month. As for drilling, the 4 wells needed for first gas got underway last month, and 2 top holes have already been finished. On the FPSO side, mechanical completion is still ongoing. A two-week COVID-related lockdown affected the Costco yard in China in early April, though that restriction has now been lifted and the yard has resumed operations. When the operator held its first quarter results call last week, it noted that the FPSO sits on the critical path, and the team is putting in hard work to mitigate these disruptions while holding to the contractor sailaway schedule of end 3Q. Meanwhile, the FLNG vessel is progressing well at the Keppel yard in Singapore, where pipe rack installation has now been completed.

Andy Inglis

executive
#4

All told, we'd finished roughly 75% of the project by the close of Q1, and we're aiming for first gas in Q3 of next year. As for Tortue Phase 2, we're still collaborating tightly with the operator, the governments, and the NOCs to fine-tune the development plan, looking at both its size and its schedule. That effort is moving ahead, and we anticipate a development decision near the midpoint of the year, with formal feed and FID coming afterward. Getting a handle on upcoming cost pressures the right way matters so the project keeps its appealing economics. When it comes to BirAllah and Yakaar-Teranga, we're continuing to engage both governments and our partners to move development concepts forward. Doing so will put those projects in the best spot to capitalize on today's market conditions. With that, I'll pass things to Neal, who will walk you through the quarter's financials.

Neal Shah

executive
#5

Thank you, Andy, and greetings to all of you this morning and afternoon. Building on the solid operational results Andy described for the quarter, we delivered robust financial outcomes, and the main points are laid out on this slide. EBITDAX came in at $430 million, which represents a rise of more than 25% compared with the fourth quarter, driven by the complete effect of the Oxy Ghana deal during the quarter along with strong realized prices. Net debt dropped by more than 10% relative to year-end, and combined with that solid EBITDAX result, this brought leverage down to 1.9x as of the close of 1Q, a meaningful decrease versus last quarter. Free cash flow for the quarter reached roughly $220 million, up more than 60% from the prior quarter, which showcases how our low-cost portfolio generates cash; with solid results throughout the portfolio, liquidity grew by approximately 20% during that same period. Moving to Slide 13; we wrapped up the RBL redetermination and RCF refinancing as the quarter ended, with liquidity climbing above $900 million, and we anticipate it will keep growing further by year end. The chart on the right illustrates that we face no material maturities before 2025, following repayment of about $100 million on the RBL during the first quarter. As cash is generated, we intend to reduce additional debt, extending debt maturities even further out. Now to Slide 14, which examines the quarter more closely. As Andy noted, net production reached 72,600 barrels of oil equivalent per day, landing at the top end of our guidance range and marking a rise of nearly 40% versus the same quarter a year ago. Realized price per barrel, after accounting for hedging impacts, was $88 per barrel, nearly twice what it was in the same period last year; regarding costs, we came in according to guidance, with OpEx per barrel higher this quarter than last year, mostly because of lifting at TEN <<inaudible>> cargo during this quarter. Total CapEx for the quarter slightly exceeded $100 million, not counting the effect from the Tullow preemption. CapEx for Mauritania and Senegal was minimal in 1Q, as anticipated — since we keep benefiting from last year's FPSO sale transaction, though we expect it to rise in the second quarter. The inflation we project for 2022 is modest. Because our contracts are longer-term in nature, we saw inflation emerge from variable components within those contracts, such as fuel. We have also offset inflation this year by using existing inventory for certain materials. On our biggest development projects, we have additionally secured large portions of our future capital spending, as shown by the progress at GTA, Phase 1, Jubilee Southeast and, to a lesser degree, Winterfell. Even for that project, though, we have committed to long leads, accounting for roughly 10% of the overall cost of Phase 1 of that development; that being said, we do anticipate higher costs to appear next year should we stay in an inflationary setting. Now to Slide 15. Like I said when going through the intro slide, during the quarter we achieved solid improvement on leverage, thanks to both higher EBITDAX and a sizable paydown of debt. Leverage at the close of the quarter came in at 1.9x, which is a considerable drop from roughly 2.5 times at the end of 2021. With prices where they are now, we're still firmly on course to reach our target for leverage by year-end, which sits under 1.5 times, and bringing debt down further in absolute terms remains a top priority. The bullets over on the left illustrate what we've accomplished during 2022 up to this point, and there's still more ahead of us in the remaining part of the year. Under the present — under the present strip, we would anticipate an additional $200 million or more in free cash flow, plus the payment we'll likely receive from Shell over the next few months following the exploration success they've achieved with their first two wells in Namibia, which would back a total reduction in debt of somewhere around $550 million to $600 million for this year. At this point I'll turn things back over to Andy so he can wrap up today's presentation.

Andy Inglis

executive
#6

Appreciate that, Neal. If we move to Slide 16, we'll close out what we've presented today. To sum it up, we're keeping the commitments we've made in the present while also constructing an enterprise aimed at what lies ahead. The assets we have in production are delivering results and throwing off substantial free cash flow. The development projects we've clearly identified are moving forward nicely in spite of a tough backdrop. We are expanding our footprint in international LNG right as demand for gas and LNG climbs steeply; supported by solid cash, leverage on an EBITDAX performance basis is coming down while liquidity goes up. And last, we remain dedicated to the energy transition and are able to serve a meaningful function in strengthening energy security for those countries seeking to broaden where their future energy supply comes from. That's all from me. At this point I'd like to hand things to the operator so the question-and-answer portion can begin. Operator?

Neil Mehta

analyst
#7

Team, I really appreciate you making room for us this morning. My first question concerns Tortue Phase 2, and I'd value hearing how you see things. The operator gave us some detail a few days back. But what's your read on whether we're on course for a new FID? And then, as far as you're able to discuss it, how do you figure the economics of that additional growth project have shifted, given that its capital intensity is far lower?

Andy Inglis

executive
#8

Yes. Thanks, Neil. Yes, we are deliberately spending the time needed to confirm we have the correct scale and underlying concept, covering both how big the project is and when it happens, so that the resource gets fully optimized. A great deal has shifted in the market, I'd say, and we must be certain we're advancing the appropriate project at the appropriate moment. We are plainly in an inflationary stretch. And something that I believe both BP and Kosmos recognize is that full optimization is essential, and that we're committing the appropriate capital for a long-term project during an inflationary stretch; this gives us room to grow the project and add to the existing infrastructure we've established, and that is plainly where our attention sits. And as we've previously stated, the hub terminal is going to act as an offloading point for later expansion of the project; we can grow the offshore portion at a fairly low cost. So we think this project is cost competitive. Given the tougher supply chain and the inflation we're witnessing, we have to stay very disciplined regarding the capital we commit to it.

Neil Mehta

analyst
#9

I'd like to stay on Tortue Phase 2, and my second question is this: with construction on the project now at 75%, what represents the greatest execution risk? Is that COVID, or is it something different? And in what ways are you — what actions is the operator taking in order to reduce that risk?

Andy Inglis

executive
#10

Yeah. Well, like I mentioned during my remarks, when you move through the different work streams, the FPSO sits on the critical path. That hasn't shifted. The crucial upcoming milestone is obviously the sail away from the yard in Costco, which is near Shanghai in China. We experienced a brief disruption when the yard was locked down for 2 weeks. And once more, as the operator stated on their call, I believe the team has accomplished an incredible job keeping the project advancing under those conditions. So the item we're truly concentrated on at this point is the release of the FPSO so it can then sail to Mauritania and Senegal; and after that we can begin, so to speak, all of the hookup activities, which would get underway at the start of next year. So that's the critical matter we're focused on. Like I said, we've started the drilling. That's progressing well. Regarding the hub terminal, we had concerns previously about COVID-related issues there; but clearly, we're making solid progress on it. Subsea installation is set to begin this month; and the FLNG vessel is under construction in Singapore, where I believe the COVID risk is lower. So I think the FPSO continues to be the item we're focused on.

Neil Mehta

analyst
#11

Thanks a lot, everyone.

Charles Meade

analyst
#12

Morning, Andy and Neal, plus the remaining cosmos team out there.

Andy Inglis

executive
#13

Morning.

Charles Meade

analyst
#14

Andy, I was hoping you might go into a bit more detail regarding the inflation you're observing. I believe you've brought it up a few times during your prepared comments, but should — are the issues you're facing purely about cost? Or do they extend to availability as well? And is it — I think you've already addressed the sum with the FPSO, but is it more about — just give us a sense, is it more about drilling your facilities or something different?

Andy Inglis

executive
#15

Yes. As I noted in my prepared remarks, deepwater operates somewhat differently than onshore, largely due to the presence of longer-term contracts. I believe our team has performed very well in reducing the effects felt during 2022. We are likely encountering some pressure in certain commodities, including fuel costs, to be honest, but beyond that, there is nothing of significant magnitude. In fact, we have offset those pressures, and as previously stated, we have added a few new opportunities in the Gulf of Mexico along with Equatorial Guinea, while keeping our CapEx guidance unchanged. Charles, the initial point I'd make is that this is a time when we have to be extremely disciplined about how we deploy capital, and because of that, make sure we stay completely focused on execution and carry out every task to the highest standard we can. That covers 2022. Now, looking ahead to 2023, I think what you're witnessing is inflation pretty much everywhere, whether that's the deepwater rig market or whether it ties back to the underlying commodity prices. Over the past couple of years, deepwater rigs have likely gone from roughly $200,000 per day up into the low to mid-300s, yes; so that's perhaps around 75%, and you could see casing and other supply vessels moving in a comparable way. From my perspective, supply in the market looks sufficient right now, though it is clearly getting tighter. Rig availability is one sign of that, and that's exactly why we're moving early on the longer-lead items, especially for Jubilee Southeast and Winterfell. So this strikes me as a moment that calls for genuine discipline — seeing the squeeze coming and positioning ourselves ahead of it. As for the COVID disruptions in China, I'd treat those as their own distinct category, since they're quite particular in nature. I hope that adds a bit more clarity on how we're thinking about this. For me, this comes down to discipline. When prices are elevated, you still need to deliver at a very high level, and that is exactly what we are doing.

Charles Meade

analyst
#16

Understood, that's useful. Andy, my follow-up is really regarding whether share repurchases might be possible. I realize this could come across as peering too far ahead, but the reality is you are either 18 or 19 months out from that figure of more than $700 million. I recognize your attention is on initiatives within that window, and you likely have tasks to address regarding the debt portion of the balance sheet, yet could you offer some perspective on whether you and the Board have discussed this, or would consider it — either taking advantage of an opportunity on a day such as this one, or perhaps doing it systematically if your stock price remains roughly where it is now?

Andy Inglis

executive
#17

Well, look, I believe we have been straightforward, Charles, that tackling debt comes first, and we must bring the balance sheet down to a leverage ratio that can be maintained at approximately 1.5. And obviously, achieving that depends on a price setting that is sustainable; so that is the initial priority; and throughout 2022, that is definitely our plan; assuming oil prices stay where they are, we can reach under 1.5 by the close of the year. And after that, I believe you begin a somewhat different discussion regarding our assessment of where we stand on lowering debt for the sake of lowering debt, our position concerning a leverage level that can be sustained, and what possibilities that might open up for us. So in terms of the message, nothing has shifted. What I think you are highlighting is that the future might be arriving faster than expected and how we should factor that in. But we simply aim to remain very disciplined in our approach. We are disciplined with capital regarding our growth choices. We are disciplined with cash flow and its deployment. And once we reach a point where we believe the balance sheet is properly positioned, then I think repurchasing shares would be among the options we would consider.

Charles Meade

analyst
#18

Got it. That’s helpful. Thanks Andy.

Andy Inglis

executive
#19

Thanks.

Bob Brackett

analyst
#20

Morning. You pointed to a pair of deals whose purchase prices came in at roughly $4 per barrel of oil equivalent. Could you explain how you pulled those off, how much appetite exists for doing additional ones like them, and what that might say about your strategy?

Andy Inglis

executive
#21

Yes. Thanks, Bob. Yes. Look, I'd describe both as falling into the opportunistic category. They're fairly small, yet they matter. What pleases me about them is that they sit in fields we already know well. We're building depth within our current asset base, and I believe that's genuinely a highly efficient route, so to speak, for keeping the company growing. So with Winterfell, one of the partners held a bigger stake than such a partner would normally keep through the development phase, and we managed to negotiate that, I think, during a period when conditions were favorable. The Kodiak preemption, that actually goes back to 2021, I believe; closing the whole deal took a while before the preemption could move ahead. Still, once again, it was priced under very favorable conditions and so we could capitalize on it. Looking further out, I'd say we've stayed truly disciplined regarding our M&A. We're explicit about chasing transactions we believe fit the company's strategy — near-term, high-margin oil growth now, backed by longer-dated quality gas — and we aim to build depth in areas we understand, meaning places where genuine economic value can be added by us. And at the core, they must be cash accretive while also continuing to strengthen the balance sheet. I think our history on deals has in fact matched those criteria; and should opportunities arise that let us keep that going, we'll pursue them. Obviously, given today's price environment, it's a bit harder, I think, but that's the course we're on.

Bob Brackett

analyst
#22

Thanks for that. My next question concerns how long it takes to travel between Shanghai and Greater Tortue — possibly around 60 days. Should hookup occur in 1Q, that would suggest even a sale early in 4Q would still work fine along that critical path. Is that how we should view it? Or is the situation more complicated than that?

Andy Inglis

executive
#23

Bob, you have the figures right, as you always do. My take is that it hinges on sailing duration and what the transit speed ends up being — likely somewhere between 60 and 90 days, so put it in a 60-to-90 bracket. Correct. The 90 figure represents the farthest edge, while 60 is the nearer edge. Right. So, yes, you're correct that some flexibility exists. Still, this is plainly the thing we are watching most closely, since hooking up the FPSO naturally opens the door to beginning subsea completion work, the tiebacks, the FPSO, and so on. Correct. So it is unquestionably on the critical path; and as you're well aware, on projects of this size, there are always chances to offset an overrun in one area through other work, yes, but the time line you have is essentially right.

Bob Brackett

analyst
#24

Understood. One last tiny item — Winterfell operates as a tieback, so has the host facility it connects to been settled on?

Andy Inglis

executive
#25

Not yet. Right now we are holding talks regarding a number of possibilities.

Bob Brackett

analyst
#26

Very good. Thank you.

Andy Inglis

executive
#27

Thanks.

James Hosie

analyst
#28

Hello there. I have a few questions regarding the Tortue projects. I suppose, to start with, about when the FPSO is scheduled to sail away. Is the intention to meet that end-of-Q3 goal by moving some of the work over to when the vessel gets to the location? Then regarding Stage two, how ought we to consider the inflationary pressures and the earlier cost estimate of under $1 billion gross? I suppose, does that number still hold?

Andy Inglis

executive
#29

Yes. Thank you, James. Well, yes, clearly you have — the key thing with a project like this is making sure you reduce that carryover as much as possible, since there is a cost multiple attached to moving jobs out of the yard to offshore. So that is plainly where optimization is focused right now. How do you make certain you are not moving a substantial amount offshore? Yes; so I believe our aim is for the FPSO to serve with minimal carryover. That has historically been how successful offshore projects get delivered, and that is plainly BP's focus at present; so I think your question is the correct one. And obviously, from where we sit, it is a key criterion to make sure we now deliver both on schedule and within budget. Yes; and as for Phase 2, yes, it truly matters that we deploy capital during a somewhat inflationary stretch in a genuinely efficient way and, once more, as you move through cycles, to make sure we are not investing at a moment, committing large amounts of capital, while inflationary pressures exist; so that is why we are going back and ensuring we have a properly optimized concept, both regarding scale and timing and those inflationary pressures. And it is not just the inflationary side, but in fact the execution issues along the supply chain have been properly assessed. So that is the work currently underway with the partners and with the government.

James Hosie

analyst
#30

All right, thank you. And building on what was just said, could we possibly wind up with something along the lines of a Tortue Phase 1.5 — where the project gets scaled up, though not to the magnitude you mentioned earlier for Tortue Phase 2?

Andy Inglis

executive
#31

Well, once more, our aim is to confirm we have the appropriate concept for the setting, correct. So in a sense, we are revisiting things to guarantee that our efforts fully account for both the schedule and the size needed to carry out the project in the best way possible. Yes, this is an excellent resource. It is a resource that the world requires. We must ensure we have optimized it properly.

James Hosie

analyst
#32

Okay, thanks.

Mark Wilson

analyst
#33

Hi there, good afternoon, good morning. My question concerns the greater Tortue area instead of the volumes located outside Tortue in BirAllah and Yakaar-Teranga. There's a really obvious route to monetization with Tortue Phase 1 followed by Phase 2. You have a reserve life exceeding 20 years. So those extra volumes — extremely large quantities of gas in place. For Kosmos right now, what strategy would apply to monetizing them? Has the way the market regards them shifted? During the past few years — a few years back — you had a sales process underway. And also, do you believe any further appraisal drilling would be needed in order to maximize valuation there? Thanks.

Andy Inglis

executive
#34

Yes, Mark. Good questions. That substantial resource, yes. The core strategy remains the same. I think if you consider Yakaar-Teranga Angus next to the Dakar Peninsular, the initial phase of Yakaar-Teranga centers on a gas power scheme — meaning fairly low cost, practically an early production scheme. It lets you in fact appraise as you develop. So no extra appraisal would be done; and for that country, what it accomplishes is replacing diesel-burning power with gas combustion, both cheaper and with lower carbon; so I believe you can picture Yakaar-Teranga advancing along those lines, and that's the discussion with the government regarding how we proceed with that scheme while rightsizing the initial development so it delivers the kind of baseload power — gas power — that enables them to engage more credibly with a highly volatile external world; so I don't believe anything has really shifted on that front, and arguably the external volatility has actually strengthened that agenda. Turning to BirAllah, it's a different case. I think BirAllah is shaped by resources in a nation whose population is fairly small — roughly four million people. Power consumed domestically likely isn't the long-term plan. There is a near-term need for gas resource, and other fields exist that could be developed for that purpose; so BirAllah is essentially about how you achieve a low cost modular development letting you reach the market at the right timing and effectively construct another export scheme. That's the concept work we're carrying out at present. So I think clear plans exist, and as we see it today, we hold a resource where considerable value can be unlocked through progressing those development plans and turning them into reality. And I think the external environment has rendered that simpler rather than more difficult, and that's the effort we'll continue with both BP and the government.

Mark Wilson

analyst
#35

All right, that makes sense. I guess the concept down the line — the plans that have been worked through — would involve a choice about whether Kosmos gets involved in developments like that. But I get it. Then my second question is about Winterfell. I'd just like you to discuss that $100 million of resources in the area. What percentage of it do you figure gets developed in the first phase as a tieback?

Andy Inglis

executive
#36

You'd probably — in my view, the first plan with 2 wells could expand to as many as about 6 wells, likely, to handle the whole development. So think of it conceptually. My guess is we could end up with 3 phases of as many as 6 wells. That means the first phase is likely about a third of the resource, roughly that. Possibly a first half if things go better, Mark.

Mark Wilson

analyst
#37

Understood. All right. No, I appreciate it. I'll pass it along.

Matt Smith

analyst
#38

Thank you, and thanks for everything you've shared up to now. I've just got one small thing I'd like clarified, if you don't mind. I wanted to verify how you see things regarding the Shell exploration campaign to date — do you think that, first, you've set off one of those contingent consideration payments worth $50 million, or alternatively, second, that you're consequently already sitting at the $100 million cap that you expect to get?

Andy Inglis

executive
#39

Yes. Thanks, Matt. Let me make sure we're aligned on what was stated. That payment is made after an exploration well gets included in an appraisal plan. So I mentioned that they plan to drill more at the end of this year, and doing so would call for an appraisal plan. Whether it's 50 or 100 would hinge on if they put in both discovery wells or just one of them.

Matt Smith

analyst
#40

Got it. All right. That makes sense. Crystal clear. Thanks, Andy.

Andy Inglis

executive
#41

Good. Thank you.

Jamie Buckland

executive
#42

Absolutely. I appreciate all of you being here today, and please feel free to reach out whenever you have additional questions. Many thanks.

Operator

operator
#43

Today's call is now finished. At this point, you're welcome to hang up. Thanks for joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kosmos Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Kosmos Energy Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kosmos Energy Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.