Thanks, operator, and I appreciate all of you being with us today; we put out our second quarter earnings release this morning. You can find that release along with the slide presentation for today's call on the Investors page of our website. Here with me today to walk through the materials are Andy Inglis, our Chairman and CEO, and Neal Shah, our CFO. Over the course of today's presentation, we'll be making forward-looking statements relating to our estimates, plans, and expectations. A number of factors we point out in this presentation and in our UK and SEC filings could cause actual results and outcomes to differ materially. For additional detail, please see our Annual Report, stock exchange announcement, and SEC filings; all of those documents can be accessed on our website. With that, I'll hand the call over to Andy.

Andy Inglis

executive
#2

Appreciate that, Jamie, and a good morning or afternoon to each of you. We're glad you could be with us for this call covering our second-quarter results. I want to begin the presentation by reviewing how operations were delivered during the quarter, after which I'll pass things to Neal, who will walk through the financials, and then I'll close out the presentation. After that, we'll take your questions in the Q&A. If you'll move to slide three. For Kosmos, 2Q marked yet another period of solid execution, as the boxes on this slide illustrate. Our production assets are doing well, with output for the quarter landing at the upper-end of guidance. All three of our development projects — Tortue Phase 1, Jubilee Southeast and Winterfell — keep advancing nicely and should bring about production growth of roughly 50% by 2024; we remain focused on optimizing our world-class gas portfolio in Mauritania and Senegal, collaborating closely with partners and the governments to speed up and capture value from the considerable resource we've discovered. Kosmos today revealed its intention to exercise existing contractual rights under the sales agreement covering GTA Phase 1 volumes so that cargos can be redirected to prospective buyers, letting us take advantage of the current market conditions. I'll say more about that shortly; and lastly, the balance sheet keeps getting stronger as the portfolio produces cash and brings leverage down, all while backing our differentiated growth. Each of these topics will be explored in more depth as today's presentation continues. Now to slide four, which covers our producing assets, and these are performing well, with 2Q production arriving at the upper-end of guidance; over in Ghana, the Jubilee field keeps delivering. Gross production during the quarter, once you exclude the shutdown's impact, was approximately 92,000 barrels of oil per day. When that impact is included, gross production came to approximately 74,000 barrels of oil per day; during May, the partnership finished the scheduled two-week shutdown, hitting our key objectives, among them critical maintenance plus the riser tie-ins for the Jubilee Southeast development. Once the shutdown was over, gross production has averaged more than 90,000 barrels of oil per day, helped by the producer well and the injector well that were completed and tied in over the quarter. As communicated recently by the operator, drilling performance in Ghana has been outstanding, with wells delivered ahead of schedule and under budget. The partnership will now concentrate on handling the field's performance and reliability until the Jubilee Southeast wells come online, which is scheduled for mid-next year. Those wells ought to drive the following step-up in production toward the field target of 100,000 barrels a day. At TEN, gross production of approximately 24,000 barrels of oil per day matched expectations. A producer well is being drilled right now at Enyenra, with production from it anticipated during the fourth quarter. As the operator pointed out in its recent trading update, the partnership has been carrying out a review of the TEN resource development opportunity. We think there's still a substantial volume of oil and gas that hasn't been developed, and they're looking at the best way to get those resources producing in the years ahead. Within that optimization effort, we had planned two riser base wells at TEN during this year to help delineate the Ntomme resource. The partnership drilled the first of those two riser base wells in July. The NT-10 well was drilled to test two distinct reservoir objectives, and reservoir quality and thickness came in above what we expected, yet the well hit water. That well was drilled in a structural low in order to test boundary conditions for the Ntomme resource modeling. NT-11, the second riser base well, is scheduled for late 2022 and will target a different fairway in a structurally higher setting. What we learn from these two wells ought to let us high grade and optimize future drilling plans for the TEN Enhancement Project. Gross production in Equatorial Guinea came in around 31,300 barrels of oil per day, in line with expectations, though it was lower quarter-on-quarter on a sequential basis because of greater facility downtime and a certain well being offline for work over activity. Two ESP installations are planned for this year, with the first finished during the quarter. As we flagged in May, the partnership extended the licenses for both Ceiba and Okume to 2040, which extends our 2P reserves base by around 6 million barrels and creates an incremental NPV10 of roughly $100 million at a $75 per barrel oil price. Along with the extension, the partnership has committed to drill a package of four infill and ILX wells. A rig has been selected, and we expect that work to begin in the second half of 2023. In the Gulf of Mexico, net production of 20,600 barrels of oil equivalent per day exceeded expectations and was roughly 10% higher than the prior quarter thanks to less downtime of third-party facilities in the second quarter. The HP-1 vessel, which processes production from the Tornado field, had been scheduled for routine drydock in late 2Q. That is now being deferred to the third quarter, so we expect around 45 days of downtime tied to Tornado in 3Q. Full year production guidance remains unchanged. The Kodiak sidetrack is now being drilled, with completion activities ongoing. Drilling results from the well are in line with our expectations, and initial production is expected later this quarter. Also on Kodiak, we completed the pre-emption transaction in June to acquire an additional 6% interest, bringing our total interest to around 35%. The new sidetrack well, combined with our larger working interest, should raise our net production in the Gulf of Mexico by approximately 3,000 barrels of oil equivalent per day once the Kodiak sidetrack comes online. Finally, at the end of the second quarter, we sanctioned the new subsea pump project at the Odd Job field, which should both accelerate production and increase recoverable reserves by extending the economic life of the field. This is a compelling investment, and we anticipate it will pay back quite quickly, especially when oil prices are higher. Now, if we move to slide five, in earlier presentations we discussed increasing output by roughly 50% by 2024. The slide you're looking at provides an update on where things stand with the three main developments we believe will fuel that expansion. The first is Tortue Phase 1, our LNG venture located in Mauritania and Senegal. Every work stream is still advancing well, and as of the close of the second quarter, the project has passed 80% completion. At the hub terminal, installation of all 21 concrete caissons is finished, marking a significant project milestone. Piling work remains on track and is almost done, while the living quarters platform has been fully built and is currently being transported to the location; regarding the floating LNG vessel that is under construction in Singapore, construction and mechanical completion tasks are ongoing, and commissioning has gotten underway. As for the FPSO being built at the COSCO yard in Qidong, China, mechanical completion loop checking work is continuing and stood at roughly 50% finished when the second quarter ended. BT is making strong efforts to lessen the effects of the April lockdown at the COSCO yard along with the persistent COVID-related disruptions in China, while also making sure the FPSO departs the yard having reached a targeted high level of completion.

Andy Inglis

executive
#3

Even so, the operator hasn't managed to completely offset those effects, and our current expectation is that the FPSO sail-away will move from the end of September to sometime in Q4. Even with that later departure date, the partnership is trying to hold the broader project schedule for first gas by fine-tuning how the hook-up work is sequenced; over on the subsea side, subsea pipeline installation got underway in Q2, and a second pipe-lay vessel should show up before this year is out to start the deepwater section of that pipe-lay. Some subsea equipment came out of fabrication with quality problems and will need repairs, though at this point we don't expect any effect on the project's overall timeline. Then, turning to drilling, we've now finished two of the four wells needed for first gas, and well three is currently being drilled. So in spite of supply chain difficulties, quarterly progress remains solid, and we're still aiming at first gas during Q3 2023, with the initial LNG cargo slated for the close of 2023. Regarding Jubilee Southeast, that project sits at roughly 40% complete, long lead items have been ordered, and drilling should kick off in Q4 as planned. As I noted earlier in the presentation, work carried out while the Jubilee FPSO was shut down will enable these wells to be tied in. First production is being targeted for mid-2023, and the new wells should lift total Jubilee field output beyond 100,000 barrels per day. Over at Winterfell, the field development plan has gone to the partnership, and formal FID should come before Q3 ends. Thanks to extra technical work done on the initial wells, our view now is that total resource is much bigger than we'd previously estimated, with as much as 200 million barrels of gross recoverable resource. I'll cover the development plan in more detail on slide six. As we've said before, the plan is to develop Winterfell as a phased subsea tieback project. Looking at the right side of that slide, Phase 1 is expected to consist of five wells, with three of those drilled before first oil, and it would target approximately 100 million barrels of gross recoverable resource. Based on pressure analysis done on the discovery wells, our current belief is that the total resource could end up around double that initial 100 million barrel number, and we expect to have that confirmed once Phase 1 wells are drilled and brought into production. At Winterfell, things are already quite advanced — long lead items have been ordered and a rig has been selected for drilling and completing the first wells next year. The operator has handed the field development plan over to the partners, and we look for FID approval to come before the third quarter ends. This oil development has a low cost and lower carbon footprint, and we expect it to be quite profitable. We're looking at development costs of about $10 a barrel, operating costs around $12.50 a barrel, which puts our breakeven under $25 a barrel. First oil is expected approximately 18 months following FID approval. Let's turn to slide seven. Over the last two slides, I walked through the development projects and the portfolio that we think will drive roughly 50% production growth over the next two years. On this slide, we're looking at the extensive pipeline of opportunities in Mauritania and Senegal that we believe can add significant value and support an increasing gas weighting across the portfolio. Starting with Tortue Phase 1. Kosmos plans to leverage the contractual entitlements we already have through our Phase 1 LNG agreement, redirecting shipments toward potential purchasers, so that we can make the most of today's market conditions and maximize the commercial worth of gas production sales from Tortue. Under the Phase 1 gas sales agreement, we possess a deliver-or-pay right, which enables us to take advantage of higher worldwide LNG pricing for a share of our Phase 1 volumes. If Kosmos exercises that right and sends cargoes elsewhere, we might retain considerably greater exposure to global gas prices — especially given that gas prices right now have fallen far below oil prices. Next, Tortue Phase 2. During our previous quarterly update, we mentioned that shifts in the structure of worldwide gas markets over the past few months have led us to work alongside the operator and governments. Our goal is to make sure Phase 2 has the appropriate development concept when it comes to both scope and scale. So, together with our partners, we're striving to refine the development plan so that the infrastructure already in place from Phase 1 can be used as effectively as possible, which should boost cash flow and returns for the partnership. At the same time, we aim to keep cost exposure under control given the supply chain limitations and inflationary forces affecting the entire industry. These days, a final investment decision is expected by the close of Q3. Moving on to the third point, which concerns BirAllah. When our C8 license ran out during the second quarter, the partners reached agreement on the main terms and conditions for a fresh PSC, and that license is now going through the government approval process. Under the new PSC, the zones around the BirAllah and Orca finds, both of which came in successfully, would be kept, and the partnership would be given a two-year window to file a development plan. As we have noted before, this area holds the potential for future development of roughly 10 million tons of LNG each year, and we would also intend to bring these resources onstream in stages. Since a fresh PSC would be separated from the C8 license we already hold, accounting rules obligated us to record a write-off of our prior E&A expenditures, even though those amounts remain deductible for tax purposes and can still be recovered as costs under our Tortue development. Turning to Yakaar-Teranga, the partnership is continuing to move forward with the government on the gas development's first phase, which focuses on a domestic gas approach aimed at delivering inexpensive gas to meet the nation's energy requirements and fuel its fast-expanding economy. Not long ago, I traveled to Senegal and Mauritania, where I met with the energy ministers of both countries as well as President Sall of Senegal, to talk over upcoming gas prospects in the area. In the case of each nation, there's a shared perspective on what lies ahead for developing their gas resources. A substantial lower carbon advantage gas resource sits offshore, and it might deliver greater energy security globally, especially for Europe. Just as crucial, because of the gas's properties and its reduced carbon intensity, this resource might serve a major role in bridging the energy transition and afterward supplying the affordable energy that Mauritania and Senegal justifiably require for their own growth — the very essence of a just transition. The pandemic and the events in Ukraine have demonstrated that we inhabit a volatile world, and both governments acknowledge this, and I think both nations possess the foresight to look past such volatility and emerge as key participants on the global energy stage over the years ahead. As we fine-tune the upcoming stages of our LNG projects, I think Mauritania and Senegal's futures look bright; with that, I'll hand the call to Neal so he can walk you through the quarter's financials.

Neal Shah

executive
#4

Thanks, Andy. If you look at slide eight, we kept making headway during the second quarter, and our financial position got even better. Because oil prices are higher, we're moving quickly to shore up the balance sheet, and net debt is down by roughly $400 million across the first half of this year, landing at $2.1 billion. EBITDAX for 2Q came in at about $385 million, producing free cash flow of roughly $70 million for the quarter and about $290 million across the first half of the year. If you set aside capital expenditures in Mauritania and Senegal, base business free cash flow during the first half reached approximately $450 million, which shows how strongly our business throws off cash before any of our development projects start up. That solid cash performance, together with the ongoing reduction in net debt, pushed leverage down to 1.6 times. Liquidity has risen steadily over the last year and stood above $1 billion when the second quarter ended — the highest level since 2018. Looking ahead, since we expect the business to keep generating robust free cash, our plan is to keep prioritizing paying down debt, with the goal of moving past our leverage target of under 1.5 times by year-end and getting net debt under $2 billion. Now to slide 9. As Andy said, net production above 62,000 barrels of oil equivalent per day landed at the upper-end of guidance, aided especially by strong results at Jubilee and reduced downtime in the Gulf of Mexico. Our realized price was $86 per boe, hedging included. With hedging excluded, the realized price came to about $109 per boe. Operating costs for the quarter came in below guidance, which reflects production landing at the upper-end of guidance along with some deferred maintenance work in Equatorial Guinea. CapEx during the quarter ran a bit above forecast, mostly because of higher accrued capital tied to activity in Mauritania and Senegal. Like many companies across our industry have been reporting, we're feeling some inflationary pressure, especially at the Tortue project in Mauritania and Senegal now that we're nearing the finish line. Because of that, we're raising full year CapEx guidance by roughly 5%, to about $700 million. Even with these higher costs, we've kept our free cash flow guidance for 2022 at approximately $420 million, assuming current oil prices offset the inflationary cost impacts. So to wrap up the financial portion of today's presentation, it was another good quarter, with continued progress across every key area. We posted a strong cash flow performance alongside rising liquidity, substantial debt pay down, and a meaningful cut to leverage. I'll now hand back to Andy to close today's presentation.

Andy Inglis

executive
#5

Appreciate that, Neal. Let's go to slide 10 as we close out the presentation of today's results. Even though the macro backdrop remains choppy, Kosmos has delivered yet another strong quarter on both the operational and financial fronts. Output from our producing assets keeps performing nicely, landing at the top end of our guidance range. All 3 of our development projects keep advancing nicely toward the 50% production increase we anticipate over current levels by 2024; alongside our partners, we are working hard to maximize the worth of our gas portfolio, which we believe will bring growth past 2024. Our financial standing keeps getting stronger thanks to ongoing robust free cash flow generation. That has allowed liquidity to reach multi-year peaks while leverage has dropped significantly, and we remain firmly on course to beat our target for year-end. And last, we hold the right portfolio at the right moment, supplying the energy the world requires now and backing a just transition that tackles the trilemma of energy security, energy affordability, and climate change. Thanks very much. At this point I'd like to hand the call to the operator so we can begin the question session.

Austin Aucoin

executive
#6

Good morning, Andrew, Neal and Jamie. Thank you for taking the questions this morning.

Andy Inglis

executive
#7

Yeah. Hey, good morning, Austin.

Executive

executive
#8

Regarding Tortue Phase 1, I'd like some clarity on how the spot pricing opportunity actually works. And would that raise the possible worth to Kosmos across the initial 1 or 2 years of the contract?

Andy Inglis

executive
#9

Absolutely, Austin. So, our view is that Kosmos carries a different kind of value compared with our peers, and that comes from the meaningful and expanding exposure we have to international gas. The way the worldwide gas market has been restructured following the war in Ukraine suggests prices for gas will probably remain elevated for a longer stretch and stay out of sync with crude. As we've mentioned before, the volumes in our Phase 1 are priced off a Brent slope, meaning what we get paid is tied to crude prices. That said, there's a deliver-or-pay provision that lets us make use of and benefit from today's gas prices whenever the pricing works out such that paying an agreed non-delivery penalty to our existing buyer makes sense. You'd find this kind of clause normally in an LNG sales contract; we're not able to disclose the specific terms of the agreement. For contracts from this period, though, the penalties generally fall somewhere between 20% and 30% of the contractual price — that is, the price tied to the Brent slope. So, taking those inputs and assuming an average gas price, say, for '24 and '25 of roughly $20, along with an oil price of, say, $100 per barrel, the upside could come to about $200 million in extra revenue net to Kosmos altogether across those 2 years. Now, if you consider the forward strip and where it stands right now, TTF is nearer to an average for '25 — that '24, '25 window; under those assumptions, the aggregate revenue gain to Kosmos over the 2 years would be roughly $350 million. So this represents a sizable opportunity for us, and we feel it matters to begin talks with potential buyers at this point, since that opportunity is plainly present.

Executive

executive
#10

Thanks for that context. As a quick follow-up, you gave us encouraging news on Winterfell, where you anticipate FID sign-off before this quarter ends and now expect gross recoverable resources to be twice as large. Has the technical work done recently on those first two wells led to any changes in how you plan to develop this project or when it will happen?

Andy Inglis

executive
#11

Not at this point, Austin. What I'd say is that our aim is to reach FID by the close of this quarter, and first oil would come 18 months after that. Obviously, the technical work done on those first two wells, in our view, points to a resource that's considerably bigger. As I mentioned in my remarks, Phase 1 involves drilling five wells, going after that initial 100 million barrel opportunity, though we believe production data from those first wells would show us this is a sign of something larger, and of course the infrastructure being installed would let us then build out and grow so we can fully access it. So the effort over this quarter aimed at getting to FID centers on that Phase 1 — three initial wells before first oil, then two follow-up wells — but we're expecting a bigger resource, and so the capability to expand beyond that.

Austin Aucoin

executive
#12

I appreciate the color. That's all from me.

Andy Inglis

executive
#13

Great. Thanks, Austin.

Carly Davenport

analyst
#14

Morning, everyone. Carly here, filling in for Neil. Appreciate you making the time. I'd like to begin with Tortue, thinking ahead to a possible Phase 2. Could you walk us through the key gating items still outstanding that we ought to keep in mind before that project reaches FID? And beyond that, has anything shifted regarding when first gas is now expected?

Andy Inglis

executive
#15

Hello, Carly. Sure. We've deliberately spent the time to ensure Phase 2 is the right project, covering both its scale and its scope. The LNG market saw a great deal of movement over the past half year, especially in Europe, and having the right project matters so we can capture that opportunity completely. On top of that, with genuine inflationary pressure around, we must be sure our contracting strategy toward the market is the correct one, and the development concept we choose plays a clear and significant role in that. That's the effort underway right now. Our aim is to settle on that concept before the third quarter ends, which then lets us carry out the detailed engineering, the FEED work, to establish costs in Mauritania and Senegal and secure formal approval — that is, FID. We need to present the governments with the complete contractual picture, the forecast, and so forth. What we expect is to complete that during 2023, which points to a first gas date somewhere in the end '26, '27 window. So there's no real change there, though ultimately it comes down to whether we have a concept that lets us make the most of today's market conditions and guarantees the best possible scope for handling the inflationary pressures obviously present in the market right now.

Carly Davenport

analyst
#16

Understood, that's useful. Then my next question relates to what you just mentioned regarding inflation. While you're working on these various development projects throughout the portfolio, could you elaborate a bit on what you're observing when it comes to inflationary trends and the measures being taken to reduce those pressures?

Andy Inglis

executive
#17

Yes, it's evident that in deepwater we're facing supply chain difficulties in every area, such as drilling rigs operating at very high utilization levels, subsea equipment, installation vessels, and so on. So I believe the ways we address this involve doing the upfront work to make sure you have a concept and a contracting strategy approach that lets us achieve the most cost-efficient path, and I think that's part of what we've been doing at Winterfell. To give another example, at Winterfell, without getting ahead of ourselves, we've been placing orders for the long lead items and have proceeded to choose a rig. We've done the same for the program in Equatorial Guinea. Having access to the proper equipment is obviously crucial. So I think these are long-established, proven methods that the industry has employed. For us, I think it comes down to being strict now about managing this on a literally daily basis. No scope growth, don't let the projects include any unnecessary extras, and then it's about the strictness of execution, the right ways to approach the market, access to the finest equipment, and so on; and I think that's the other difficulty the industry faces today, it's not just about equipment, but also a people matter, securing access to the top teams; so I think those are the areas we're concentrating on. But from Kosmos's viewpoint, we have three projects, we're certain about our position on each one, and now it's the strictness and discipline of steering them through to first production.

Carly Davenport

analyst
#18

Great. Thanks for that color.

Matt Smith

analyst
#19

Hey, thanks, guys. To start, I have a few questions about LNG pricing, if that's alright. First, on Phase 1 volumes, I want to verify: does that contractual right cover all of your <<inaudible>> Phase 1 volumes? Then my second question, staying on the same subject, concerns Phase 2 and what contracting opportunities exist there. It seems like whenever we discuss this, the gas curve moves up even more. Would it be accurate to say you're more inclined to pursue gas exposure for Phase 2 volumes? And if that's the case, would it probably come through pure spot pricing?

Andy Inglis

executive
#20

Thanks, Matt. Sure — that LNG agreement is actually available publicly. So, Matt, if you go through it, you'll see that our obligation is to keep up half of the ACQ on a biennial basis. So in the first year, you're able to redirect half of it; in year two, all of it; year three, half again; and year four, the full amount — all while still fulfilling everything the contract requires, with a penalty applied to whatever cargo gets redirected. To break down the numbers: you incur that penalty on the redirected shipment, and on average you're permitted to redirect as much as 75% of the cargoes, modeled roughly as 50%, 100%, 50%, 100%. Regarding that penalty figure, I'm not able to disclose the specific amount, though agreements from that period typically included a charge falling somewhere in the range of 20% to 30% of what the buyer pays. Yeah, sorry about that. Moving to Phase 2, my view is that what we're doing on Phase 1 signals our intended direction for Phase 2. Our goal would be to establish relationships with customers capable of absorbing those volumes across the '24, '25, '26, and '27 timeframe. The volumes for Phase 2 would come strictly afterward—within that same window—and we'd aim to layer in contracts providing genuine exposure to gas, just as you mentioned. Honestly, what we'll end up with is probably some combination of the two. What really set Phase 2 apart from Phase 1 is that we're not expecting to need any outside funding this time around. Since the infrastructure was already built during Phase 1, expanding further doesn't call for much extra money. In the past we've mentioned a figure below $1 billion, so when you consider how much room that leaves us, it's a big deal. That's what's got us so enthusiastic right now about being tied to international gas prices. Like I mentioned when responding to Austin, I'd say we stand out pretty distinctly from others in our sector, given that we have this exposure not just to oil that's high-margin and low carbon, but really to gas that's high-margin and low carbon too. And when you consider where the forward curve for gas is heading right now, because of that regrettable prolonging of the conflict in Ukraine, we see a basic opening that we can tap into. So once more, when it comes to accelerating that, Phase 1 volumes let us do it, just as we outlined with the diversions, and then obviously we reinforce that afterward using Phase 2 volumes, turning us into a truly credible seller in that market.

Matt Smith

analyst
#21

Great, thank you. Andy, I really appreciate the specifics there. And maybe, if I could just slip in one final question, it concerned the NOC cost carry you have over at Tortue. From what I can tell, it sounds like you're not putting that refinancing at the top of the list anymore, since you no longer really face those balance sheet limitations. So I'd just like to ask whether you could walk us through, again, the standard mechanism by which that expense gets recovered, and maybe, if possible, share some sense of how soon that recovery might happen — that would be greatly appreciated. That's everything from me.

Andy Inglis

executive
#22

Sure, Matt — I'll have Neal take that one.

Neal Shah

executive
#23

Right, Matt. The way this works is that the money coming in from Phase 1 is intended to go toward paying back the NOC loan, and there's a certain amount of leeway when it comes to how long that payback period runs. So — but obviously, the more those Phase 1 volumes bring in, the quicker we might be able to recover what we're owed on that loan. On the other hand, the — as you pointed out, the — although the immediate strain of having the NOC loan sitting on our books is no longer there, it remains something we still intend to address. From a timing standpoint, I'd say it would naturally line up around the Phase 2 project sanction to fold that back in. So it's still on the agenda.

Matt Smith

analyst
#24

Alright, that's fine, thank you to the two of you. I'll hand things over now. Cheers.

Andy Inglis

executive
#25

Excellent. Thank you, Matt.

Alex Smith

analyst
#26

Hi, everyone. Thanks for hosting this call. I've got just a couple of quick questions for you. The first: you're getting close to your gearing target at a fast pace, and you're generating solid cash flows. So when might we possibly hear something regarding a decision on dividends or buybacks? And would Eva (ph) be the preferred option? Then, regarding Ghana, could you share your thoughts on what the wells you've been drilling have cost? You noted they came in a bit below what was expected. Also, what are the plans for deciding on the second rig, given where oil prices are right now — since the drilling program is going so well so far, is there a chance to speed up that decision? Thank you.

Andy Inglis

executive
#27

Yeah. Hey, Alex; so let me just — I'll start with Ghana, and then Neal can address the financial framework. Regarding the choice about the second rig, as I said in my remarks, we're currently drilling successfully in Ghana. The wells are coming in ahead of schedule and below cost. And so the real opportunity is to achieve the volume increase we planned across the assets, yet accomplish it with a high graded one-rig program, and that's what we're focused on today; so at present we don't expect to add a second rig. We'll keep assessing that opportunity, but I think it all comes down to this principle of capital discipline today. As you begin to face inflationary pressures, the chance in the end lies in operating more efficiently. That's the way you offset the rise in the unit cost; so that's where our attention is today, and I'm confident we can truly pull that off; so we don't — we're not deciding today to add a second rig. We have a clear program that lets us begin drilling the Jubilee Southeast wells this year, which lets us deliver on that project where we expect start-up once the subsea equipment is in place in the middle of the year. And that — when it comes to driving '23 volumes, that's the major factor. And then we have the TEN Enhancement Project as a follow-up, which would come in '24, '25. So I think we're in a good position today, and we don't have to — there's no economic gain from adding a second rig today. And then Neal, on the gearing targets?

Neal Shah

executive
#28

Okay, so when it comes to gearing and how we allocate capital, those things really haven't shifted all that much, Alex. What we're aiming for, I'd say, is to finance the capital program — that includes maintenance plus the growth projects we've got going — and alongside that, as far as leverage goes, we keep prioritizing paying down debt until it drops below roughly 1.5 times. We've said we're kind of on pace to reach that point before this year wraps up, though we'd like it to hold steady before we start thinking about returns to shareholders; still, it's plainly the next item on the list that we'd turn to. On the question of buybacks against dividends, once again, I think there'll be more detail coming on that — as for the exact route, it'll mostly hinge on how the share price happens to look during that window, but I'd say right now we're leaning somewhat more toward buybacks. That said, we'll revisit it once our debt goals are met.

Alex Smith

analyst
#29

Thanks a lot.

Bob Brackett

analyst
#30

Yes, if you don't mind. I noticed that at Tortue Phase 1, you drilled 2 of the 4 producers. Could you say whether, at minimum according to the log analysis, they matched what was predicted before drilling?

Andy Inglis

executive
#31

Yes, on the whole, Bob, our aim is to establish well capacity where we achieve the coverage, and essentially from about 2 or 3 wells that will produce the needed plateau rather than 4. So those initial 2 wells have kept us on schedule to accomplish that. Right now we're drilling well number 3, and the 4th is in fact a twin of one of the original exploration wells. So regarding achieving the necessary well productivity with a suitable degree of insurance at first gas, we're feeling positive about what we've observed up to now.

Bob Brackett

analyst
#32

Thanks for that. Regarding EG, you brought up those 4 wells forming a drilling program divided between infills and ILX. What's the strategic reasoning behind choosing a safer infill versus an ILX with bigger upside — how do you make that call?

Andy Inglis

executive
#33

Yeah, that's actually a great question, since we see 2 really solid opportunity sets there. If you look at why we originally entered EG, we believed from 2 angles that it hadn't been fully developed on the infill side, plus there was some remaining exploration potential in the Rio Muni. By now we've assembled a fairly strong hopper of infill candidates, and Bob, we're going to high grade the first 3 of those within the drilling program. The 4th well then becomes the ILX well, which targets a deeper, untested Albian opportunity beneath the Ceiba and Okume infrastructure that looks quite compelling; so that's how the balance works. And obviously, that ILX opportunity is meaningful and would represent a major game changer for our position at Ceiba and Okume, whereas infill wells offer really high quality, strong rates of return, quick payback, and tie back into existing infrastructure. So both types of opportunities sit on our roster. And obviously, securing the license extension through 2040 has improved both of those opportunities further, because with that extension, if the Albian works out, we'd have a substantial amount of time to drill out a fairly large associated inventory. So the drilling program kicks off at the back end of next year, and I think it'll be an interesting phase for the development of Ceiba and Okume.

Bob Brackett

analyst
#34

Great, thank you. One very quick thing, if I could, just to follow up regarding the enforcement of contractual rights on Tortue Phase 1 — my understanding is that BP serves as both the counterparty to those and the operating partner, correct? And are things friendly among everyone involved?

Andy Inglis

executive
#35

No, I think it's important to recognize — BP is the upstream operator, right? The purchaser is BP Gas Marketing; so in reality there's a Chinese Wall separating BP as upstream operator from BP Gas Marketing, which buys the gas. And in fact, everything is amicable.

Bob Brackett

analyst
#36

Perfect. Thank you.

Andy Inglis

executive
#37

Thanks

James Hosie

analyst
#38

Yes, hello there. I have a few questions for you. I suppose returning to your ability to redirect certain Tortue Phase 1 shipments. What amount of advance warning must you provide for this? I'm just curious about how early you're able to make a decision based on LNG spot pricing?

Andy Inglis

executive
#39

Yes. I'd prefer not to go into excessive specifics, James, since it is — but regarding the capability, we can redirect each shipment individually, which means we can put together a schedule, allowing us to determine how long and how large those diversions will be.

James Hosie

analyst
#40

All right, all right. Moving to a different subject, then. Could you provide some insight into how the 2022 capsule budget is coming together? I'm wondering whether you mean Winterfell. From what I gather, that's a project with a $1 billion gross figure, plus there's inflation pressure to account for. Should we expect capital expenditure to come in higher than the $700 million budgeted for 2022?

Andy Inglis

executive
#41

Right, so as you know, we typically don't provide CapEx guidance for the next year, since we align it with our final results for the year. Conceptually, though, here's how to approach it: the base business, as we've discussed, involves steady production. On that, we're allocating roughly $350 million during '22. With the rigs secured going forward and so on, we're fairly comfortable with that figure. After that comes the capital directed toward growth projects, and there are a few factors at play. You likely have spending at a comparable level for Jubilee Southeast, spending in Mauritania is coming down, dropping considerably, and then Winterfell is rising, as you mentioned. That's how I'd frame it. Then within the margin, there's discretionary capital related to the ILX programs. So that's the right way to look at it. And obviously, the timing of when those projects ramp up versus ramp down matters — so spending in Mauritania and Senegal is clearly falling a lot, but as you noted, Winterfell spending will be going up.

James Hosie

analyst
#42

All right, that's great. Thanks very much.

Mark Wilson

analyst
#43

Hello, and thank you for fielding my questions. There are a few things I'd like to cover; first, it appears you aren't adding a second rig or intending to carry out development drilling at Jubilee Southeast — that's my initial point of clarification. Could you also help us see where things stand regarding those Shell exploration payments now that Namibia has come through successfully? And finally, with the BirAllah PSC extension, there have been some alterations to the terms. Should we anticipate anything comparable for Yakaar-Teranga? Many thanks.

Andy Inglis

executive
#44

Yes, as I mentioned when addressing an earlier question about the second rig, I actually view this as positive news. During a period of significant inflation, the focus is on generating efficiency within the business; and at Jubilee, I believe we've shown that through how the drilling has performed; so for us, it's a matter of staying on that course, selecting wells of higher quality, and being capable of achieving the volume growth we've laid out at Jubilee while capturing the advantages of that project; therefore we don't — at present we aren't expecting to make any call on a second rig, and obviously we'll keep assessing that, Mark. But to put it plainly, no, there's no second rig right now. Regarding Shell, they've had success with two wells in Namibia, Lebanon and Graff. From what we understand, their plan is to file an appraisal plan when the fourth quarter begins, and once that appraisal plan is submitted, they'd be required to make the bonus payment under the contract we currently have with them; that's our expectation; as for BirAllah, yes, BirAllah has — it's made a significant move forward with a new PSC. Obviously, from a development standpoint, we need to split apart the discoveries at Orca and the acreage around it. It's preferable to handle that now, before any sort of development proposal, than to leave it until afterward. So we're taking the time at present to accomplish that. From an accounting perspective, there's been an effect, yet in economic terms, the costs tied to the — basically, that was the Orca exploration well; we receive the upside from it both through cost recovery and tax at Tortue. So there's no economic consequence from this; however what we do have is a new PSC on largely identical terms. There are a few minor adjustments concerning local content, and so on. But in the end, we now possess the foundation to proceed with BirAllah from a very clean, forward-looking standpoint. And as I noted, I believe it mattered to us to get this done now instead of reaching the development decision and then having to negotiate the new PSC as part of that decision. So I think we're now on track to move ahead and complete the concept work needed to bring that forward, which is a genuine opportunity. Also, a substantial resource base exists in that location. Once more, what defines it is inexpensive, low-carbon gas situated near the European market, and as I mentioned in my remarks, our aim will be to address that through a phased approach, much like what we've carried out at Tortue.

Mark Wilson

analyst
#45

Understood. Right, no, thanks. I'll hand it over now.

Andy Inglis

executive
#46

Wonderful. Thank you, Mark. I appreciate that.

Operator

operator
#47

Thank you. With no more questions coming in right now, I'd like to wrap up this call. I appreciate all of you for being with us today. At this point, feel free to drop off the lines. Thanks for taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kosmos Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Kosmos Energy Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kosmos Energy Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.