Kosmos Energy Ltd. (KOS) Earnings Call Transcript & Summary

November 7, 2022

New York Stock Exchange US Energy Oil, Gas and Consumable Fuels earnings 58 min

Earnings Call Speaker Segments

Jamie Buckland

executive
#1

Thanks, operator, and I appreciate all of you being with us today. We put out our earnings release for the third quarter this morning. You can find that release, along with the slide deck for today's call, on the Investors page of our website. Here with me to walk through the materials are Andy Inglis, our Chairman and CEO, and Neal Shah, our CFO. As part of today's presentation, we'll be making forward-looking statements about our estimates, plans, and expectations. A number of factors we describe in this presentation and in our U.K. and SEC filings could cause actual results and outcomes to differ materially. For more details, please see our Annual Report, stock exchange announcement, and SEC filings. All of these documents are available on our website. With that, I'll hand the call over to Andy.

Andy Inglis

executive
#2

Appreciate it, Jamie, and greetings to all of you, whether it's morning or afternoon where you are. We're glad you could be on this call as we discuss what we delivered in the third quarter. To begin my remarks, I want to offer some thoughts about the broader macro picture and the part Kosmos plays in tackling the energy difficulties confronting the globe. After that, I'll walk through how the quarter went and share where things stand on the oil & gas development venture we're pursuing throughout our portfolio. Then I'll pass things to Neal, who will cover the financial details, after which I'll conclude the presentation and we'll take your questions. Turning to slide three: the planet is struggling with the need for energy that is affordable, secure and cleaner, and tackling all three of those dimensions calls for a balanced approach. Kosmos holds the right strategy and the right portfolio at the right moment to contribute to the answer; ours is a strongly oil weighted portfolio capable of delivering more of the energy the world requires now. Across each of our core production hubs, we are putting capital into expanding oil supply, focusing on upgraded projects that yield low cost, lower carbon barrels with strong cash generation. Simultaneously, together with our partners, we are bringing new sources of natural gas into production. By delivering additional gas to the global energy market and to domestic markets in Africa, these projects tackle affordability and strengthen energy security. That ought to help our host countries in two ways. First, money earned from exporting LNG may be put toward critical infrastructure that drives economic development. Second, supplying base load gas domestically will broaden access to electricity, which is a key objective in every African nation where we operate. Across the coming two years, we anticipate raising oil & gas production by roughly 50% as we optimize existing output and start up new projects. At Kosmos, the cash flow generated by what we do now and what we have planned lets us reinvest selectively in the most attractive opportunities within our deep natural gas portfolio, which is capable of satisfying demand and underpinning the energy transition for decades ahead. Over a longer horizon, we intend to keep tilting our portfolio's balance away from oil and toward natural gas and LNG, so as to satisfy the world's energy requirements as cleaner natural gas takes the place of coal, heavy fuel oil and biomass as a primary energy resource in developed as well as emerging economies. Global demand for energy keeps rising, especially in Africa, yet only a small number of E&P companies are putting money to work to satisfy it. Because of how good our asset base is and how many opportunities exist inside our differentiated portfolio, we think Kosmos has a significant part to play in meeting these worldwide energy challenges. The following slide points out the traits that set Kosmos apart. On the left-hand portion of the slide, we lay out what makes our portfolio distinctive. To start, we possess a top-quality, long dated asset base, with 2P reserves providing a production life extending beyond 20-years. Next, our assets that cost little and yield a lot throw off significant cash, especially given where commodity prices sit right now. Also, we're projecting roughly 50% production growth between now and 2024, coming from three development projects that are all moving along nicely. Tortue should account for the biggest share of that increase, boosting the gas portion of our portfolio substantially from Phase 1 alone, with an even bigger shift expected as we bring on later phases along with our other gas ventures in Mauritania & Senegal. Then there's what sits to the right — the embedded values and policies of the business that form the foundation of our strategy. Capital discipline is a major emphasis for us; we only chase the most attractive value-adding opportunities within the portfolio, all while keeping the balance sheet strong. We keep lowering absolute debt and bringing leverage down, and Neal will cover how far we've come this year. Our management team brings deep experience, we have the drive to execute our strategy and meet the challenges facing the industry right now; and lastly, we've built a solid record across the ESG spectrum, from our near-term emission reduction target, to contract transparency, to funding social programs in our host countries. MSCI, a leading ESG rating agency, acknowledges this commitment and the strides we're making, and recently lifted Kosmos to AAA, its top rating available. Together, these policies set Kosmos apart and bolster our capacity to generate meaningful shareholder value across the short, medium and long-term. So in summary, my belief is firm that Kosmos is positioned well for what lies ahead, armed with a clear and compelling strategy, and we keep delivering progress on our strategic priorities every quarter. Moving to slide five. Looking at 3Q, Kosmos delivered another quarter of solid execution, as the boxes on this slide show. Our production assets are performing as expected, with quarterly production matching guidance. We keep building the value of our oil portfolio through advances at the Jubilee Southeast and Winterfell development, and we have hydrated our ILX offer for next year's drilling activity. We're also increasing the value of our gas portfolio through continued execution of the Tortue project and at BirAllah, where we have signed a new PSC with the Government to Mauritania. And lastly, the balance sheet keeps getting better as the portfolio generates cash, which pushes leverage down, with our year-end target leverage of 1.5 times achieved and further progress anticipated. We'll explore each of these themes in today's presentation. Moving to slide six, which centers on how our production assets performed during the quarter. In Ghana, the Jubilee field keeps delivering, with gross production for the quarter around 69,000 barrels of oil per day. After a strong drilling campaign so far this year, with wells being spudded safely and faster than we had anticipated, we've now kicked off drilling at the first of the three Jubilee southeast wells, and that's ahead of plan. We finished transferring Jubilee FPSO operations and maintenance responsibilities away from MODEC as the third quarter got under way, and what we've seen to this point has been encouraging, with a number of opportunities flagged that will let us push efficiencies further and bring costs down. Since that transition, operating performance has been solid, with no safety incidents that require reporting and facility up time above 98%. Turning to costs, we've pinpointed possible savings through direct contracting, focused work stubs and competitive retendering. TEN gross production came in at roughly 22,000 barrels of oil per day for the quarter, which matched what we expected. The EN-21 well came online in late September, and it has since been shut in awaiting pressure support from the injector pair, which we anticipate seeing shortly. During the quarter, the partnership also drilled the second riser based well, and the only one of its kind, which hit about five meters of oil pay, though the reservoir quality was poorer than we had thought. Data gathered from both riser based wells is going to be fed into the expansion plans for TEN, which will now center on proved accumulation areas where we already have well control. In Equatorial Guinea, gross production has stayed consistent and stable, at roughly 30,000 barrels of oil per day for the quarter, once again matching our expectations.

Andy Inglis

executive
#3

In late August, the partnership signed a rig contract for the drilling campaign planned for next year, with activity set to kick off during the second half of 2023, at which point the partnership anticipates drilling several infill wells in Block G, then an ILX well. Net production in the Gulf of Mexico came in at 40,700 barrels of oil equivalent per day, a touch under what we had expected, because of a longer Delta House turnaround and the effect of current lease issues on Tornado output once the scheduled drydock at the production vessel wrapped up. Over at Delta House, an unplanned shutdown lasted roughly two weeks last month, caused by an <<inaudible>> of the gas compressor. That problem is now fixed and has been baked into our 4Q guidance for the Gulf of Mexico, which you'll find on the appendix slide at the back of the material. On Kodiak, well number three started up in mid-September, and initial production results matched what we had anticipated. That said, as one of our partners pointed out in their results last week, well productivity is falling and workover plans are in development. So we've had some unplanned downtime issues across the past couple of months, but we are now back to roughly 18,000 barrels of oil equivalent per day net and are focused on growing our GoM production. Work also kicked off on the Odd Job subsea pump project during the quarter, after sanction in 2Q, marking an important step toward sustaining the field's long-term performance. Moving now to slide seven. As we advance our development projects, we keep growing the portfolio's value. This slide examines the recent progress we've made in growing the value of our oil portfolio. On Jubilee Southeast, the project has now passed 50% complete, with drilling of the first well now underway. Initial production should arrive in mid-2023, and the partnership is aiming to ramp gross Jubilee production up to roughly 100,000 barrels of oil per day. At Winterfell, every partner signed the build development plan in September, and the operator has signed a recommissioned lesson to drill and complete three wells beginning mid-‘23. The host facility production handling agreement and mid-stream export agreements should also be finalized over the next several months, backing our target of first oil at the end of first quarter in 2024. With the scale of the potential resource at approximately 200 million barrels of recoverable oil, we stay excited about this project. And during the quarter, we acquired an additional interest, bringing our overall interest in the project up to 25%. Beyond that, we are targeting further growth by drilling two high graded opportunities in our ILS offer. We expect to drill the <<inaudible>> well in the Gulf of Mexico mid-2023, and they are keeping deep well in extra G&A around a year later. Both projects target over 100 million barrels of oil gross and would be high return tieback project if successful. So, having covered what's happening in the near term — and that one isn't an oil asset — I want to pivot to slide eight, where we look at the ways we're building long-term value in our gas portfolio. Starting with Tortue Phase 1, the LNG development we have in Mauritania & Senegal: every work stream keeps moving along well, and at the close of the third quarter the project stood at roughly 85% complete. The hub terminal is essentially finished at this point, though the living quarters platform has been installed, and commissioning work has now gotten underway. Turning to drilling, 4 wells have been drilled, with total capacity of about 700 million standard cubic feet per day. We finished the first of those 4 wells not long ago, and the <<inaudible>> to the rig for a brief cleanup period. Taken together across all 4 wells, our capacity now sits well above the 400 million standard cubic feet per day needed to feed the liquefaction volumes for Phase 1; as for the floating LNG vessel, built in Singapore, we're still on schedule for sail away during the first half of 2023, consistent with what Ghana (ph) communicated in their latest results. On the subsea side, the shallow water gas export pipeline and the FPSO for the hub terminal have both been installed, and the deepwater pipeline vessel has reached the region. Final testing has been carried out by commercialization in the weeks ahead for the deep water pipeline and the infill flow line. Regarding the FPSO, the timing of the FEED trial relative to sail away was affected back on the Typhoon, which swept through the yard in mid-September and pushed the vessels away from the key side. Roughly 2 weeks afterward, the vessel came back to Kingstine, and based on the inspection done today, no material damage has been reported. With the necessary inspections and the extra work scope stemming from Typhoon, the FPSO schedule has slipped by about a month. Consequently, we anticipate sail away of the vessel near year-end. Zooming out to the projects as a whole, the operator is putting in hard work and making solid progress in overcoming challenges tied to COVID, supply chain constraints, and, more recently, Typhoon Muifa. We anticipate first gas roughly 9 months after FPSO sail away, and we continue to aim for first LNG near year-end 2023. As for the cargo sales opportunities we mentioned last quarter, an engagement process has begun, and we've received considerable interest so far, spanning majors, traders, and end users. We'll share more updates as the process moves along, and we stay focused on unlocking additional value for shareholders through this opportunity. In the rest of Mauritania & Senegal, we keep advancing the various projects. Regarding Tortue Phase 2, we find ourselves in sophisticated talks with our collaborators BP, Petrosen, and SMH, along with the two administrations, including their individual Presidents, about the appropriate approach to speed up the project's second stage; given the altered worldwide market circumstances after the invasion of Ukraine and the ongoing instability, our goal is to settle on the optimal approach in the next few months, which will let us move forward at the right speed with the proper growth. This is requiring more time than we first anticipated since we needed to secure complete consent from both governments, who are properly weighing the significance of their gas resources and the chance to establish fresh state-to-state alliances. On the whole, I am satisfied with how much agreement there is on the path ahead. There is a strong emphasis on creating the arise, low constellation, capitalizing on Phase 1 synergies and tapping into appealing pricing possibilities amid the strong demand climate. Concerning BirAllah, we have now executed the PSC with Mauritania's Government, which was noted in the previous quarter's results. We are collaborating with BP on upcoming development content, and the PSC grants us as much as 30 months to achieve FID. Thus, that has started the timeline for that project; we anticipate this project will follow a comparable staged method to Tortue in order to handle both expenses and timing. In Senegal, we keep advancing the domestic gas plan alongside the operator and the government. There is a substantial and expanding requirement for domestic gas in Senegal, and the government plans to push this ahead swiftly. With that, I will pass it to Neal to walk you through the financials.

Neal Shah

executive
#4

Appreciate that, Andy. If you look at Slide 9, the third quarter brought further advancement as we kept bolstering our financial standing; with oil prices elevated, we're capitalizing on that to keep reinforcing our balance sheet, and net debt is down roughly $500 million since the start of the year. EBITDAX for 3Q came in at about $301 million, nearly 4 times higher than the third quarter of 2021, driven by greater production and stronger realized prices. That happened even with a sizable under lift during the quarter, something we anticipate reversing in this year's fourth quarter. Free cash flow generated in the quarter was roughly $30 million, bringing us to approximately $320 million for the year-to-date. This robust EBITDAX result pushed leverage to the 1.5 times target we had aimed to hit by year-end, and we expect additional headway on that front. The chart on the right illustrates the quarterly strides we're making on both EBITDAX and leverage. Since our production has increased year-on-year, we now anticipate roughly $1.5 billion of EBITDAX for 2022, assuming an average oil price near $100 per barrel. Liquidity has risen steadily across the past year and stays above $1 billion. Going forward, assuming the business keeps producing robust free cash at present commodity prices, our plan is to keep prioritizing debt paydown in the near-term. Moving to slide 10, I covered the financial highlights on the prior slide; on this one we intend to just address the key items. As Andy noted, net production of approximately 61,000 barrels of oil equivalent per day matched guidance, aided especially by robust performance at Jubilee and partly offset by certain weakness in the Gulf of Mexico. Given the ongoing elevated unplanned downtime in the Gulf of Mexico during September and October, full-year production guidance has been narrowed to 63,000 to 65,000 barrels of oil equivalent per day; we realized a price of about $81 per barrel of oil equivalent, hedging impact included. Without hedging, realized price stood at roughly $97 per barrel of oil equivalent. Costs largely aligned with guidance, and our OpEx came in below forecast thanks to reduced Ghana operating expenses plus some delayed projects in Equatorial Guinea. Looking ahead, we anticipate some rise in our floating debt costs as interest rates climb. Even so, that should be offset by shrinking the amount of our floating rate debt. Consequently, overall interest costs ought to stay mostly flat into next year. On capital, we expect 4Q to be broadly consistent with the third quarter, which includes somewhat higher CapEx on Winterfell, reflecting costs tied to acquiring our additional working interest. Regarding the Greater Tortue project, there's also some uncertainty around the timing of accruals through the end of the year, which might either accelerate or defer capital between 2022 and 2023. To wrap up the financial portion of today's presentation, it was yet another solid quarter of progress. Our support for distinctive expansion keeps going, and we're still generating cash beyond what we need, which assists us in cutting debt further and strengthening the balance sheet. During Q4, we anticipate the same pattern continuing. At this point I'll turn things over to Andy so he can wrap up today's presentation.

Andy Inglis

executive
#5

Appreciate that, Neal. Now moving to Slide 11 as we close out the presentation for today. Kosmos has delivered yet another strong quarter on both the strategic and operational fronts. Our production assets keep performing at a good level. We're increasing the worth of our oil business as developments in Ghana and the Gulf of Mexico move forward, with extra upside from high graded ILX opportunities that we intend to kick off really in the next year. We're also building value throughout our gas portfolio, with more headway at Tortue and the signing of the BirAllah PSC in Mauritania. Our financial standing keeps getting better, thanks to another quarter of free cash generation; that has brought leverage down to multiyear lows, and more improvement is planned. And lastly, we hold the right low cost, lower carbon portfolio at the right moment, delivering the energy the world requires today and backing a just transition that tackles the trilemma of energy security, energy affordability and climate change. Thank you. At this point I'd like to hand the call to the operator so we can open the session for questions. Operator?

Neil Mehta

analyst
#6

Good morning, Andy, and thanks to the team for making time. My first question is about when the FPSO sale will actually happen. Weather clearly played a role there. From what you're saying, it sounds like you handled it pretty well. Can you share anything further? And after the testing you ran on the asset, did you find any structural harm, or was there basically no real effect? Thank you.

Andy Inglis

executive
#7

Hi, Neil. Thanks for asking. Obviously, the Typhoon that came through the yard hit us. The mooring lines were compromised, the vessel shifted 200 meters away. It's now been back at Keysight now. Like I mentioned earlier, every inspection performed so far hasn't turned up any meaningful harm, nothing wrong with the structure. That effort set us back roughly four weeks, between the extra checks that had to be done and the repairs needed for the small amount of damage that showed up. As a result, the operators are aiming to have sail away happen near the close of the year. Taking that into account — and we can go deeper on the full timeline if you'd like — we're still positioned so that by the end of 2023 we can produce our first LNG. So it's the same story as any major project: you have to work through the obstacles that come at you from time to time. BP has obviously faced difficulties from both the COVID shutdowns and the Typhoon, yet they've managed those obstacles quite well and kept moving forward. During the quarter, the projects advanced considerably; we've reached 85% completion, with gains seen in every dimension, and getting past the recent FPSO problems was clearly a key part of what we delivered this quarter.

Neil Mehta

analyst
#8

Yeah, I believe that will serve as a key catalyst for the narrative. And here's my follow-up: as those of us in the investment community monitor your progress from where things stand today all the way to final completion, which milestones ought we to keep an eye on from this point through the close of ’23 to judge whether everything remains on schedule?

Andy Inglis

executive
#9

Yeah, right. Appreciate it, Neil. Yeah, once more, it's nice to have the chance to discuss this. If you walk through the project's five work streams — and clearly bringing those five work streams together matters a great deal — you begin with the wells. Four wells have been drilled by us, and we've just finished the initial completion, flowing that well back with a solid, clean result. So that's 1 completion behind us, with 3 remaining. Once those are done, the wells are wrapped up, and we anticipate finishing all of it before the first quarter ends. Then you shift to the hub terminal, which is essentially finished — an extremely high degree of completion, in fact. The pack we sent out this morning contains a photo showing the hub terminal's present condition, and from that image you can gauge the completion level achieved. We anticipate it being fully commissioned and ready to receive the FLNG vessel before the first quarter of next year wraps up. As for the FLNG vessel, the objective — stated in their own disclosures — is that it ought to leave Singapore during the first half, with a transit taking 60 days to 90 days. That means it should be on schedule to reach the location and hook up during the third quarter. And last, there's the subsea portion. As I mentioned during my remarks, the shallow water line is finished, the deepwater pipeline vessel is nearby, and work is expected to begin later in this quarter, with all deepwater pipeline and flow lines wrapped up before the second quarter concludes. After that comes the crucial handover of the FPSO, with sales toward the close of the year, anticipated to show up 90 days afterward. We handle the FPSO hookup and the subsea connection once all equipment has been laid, which lands around the end of the third quarter — roughly the third quarter. Consequently, gas introduction begins around that point on the timeline, which brings you to first LNG before the year is out. So those are all the component pieces, and as we keep hitting those milestones on our large projects, there will be difficulties with integrating everything, though a clear path forward exists and considerable energy is now focused on delivering that timeline.

Neil Mehta

analyst
#10

Understood.

Andy Inglis

executive
#11

Thanks, Neil. Yes. All right, thanks. Let’s move on to the following question, then.

Bob Brackett

analyst
#12

Yes, hello. I'd like to know about ’23 CapEx, though I'll let someone else ask that one, and turn instead to GTA Phase 2. I hear how you're talking about government to government, and I remember the high level visits involving the President of Germany and Senegal. Could you give us some detail on that? When governments become involved, does the project's scope shift, or the timing, or maybe how much we can count on the counterparties — how should I think about it?

Andy Inglis

executive
#13

Hey, that's a good question, Bob, and the answer is kind of all of the above. We went back and took another look at what the best approach should be for Phase 2. We did this with every partner participating fully, and clearly BP was in charge of that effort. The Ministry has a role in it too, and in fact both Presidents have a hand in it. From their standpoint, the key is having the <<inaudible>> project in place, since it allows them to frame their gas as a meaningful commercial tie with Europe; and you mentioned the shop visits to Senegal; and all of that connects to the broader question of energy security, with Africa emerging as a major new supplier of LNG. So getting the project right, at the right size, at the right moment, as governments consider those relationships between one government and another, is part of this effort — it goes beyond the engineering alone. It's really about them needing to reconsider how they operate, given everything that has taken place over roughly the past half year. Still, I believe it made sense for them to do so; and naturally, things get somewhat more complex, Bob, because two governments are parties to it, which has consistently been the difficulty with GTA. Even so, there's a significant delivery item here for us. There's a venture we're involved in that genuinely comes in at a low price point, and it produces gas with a smaller low-carbon footprint — zero CO2 emissions — which makes it a valuable addition of new supply for Europe. Given those discussions, my sense is we've achieved meaningful movement. I'd say I feel hopeful that the operator is going to bring forward a proposal within this month that folds in everything that came out of that input, and that would allow us to lock in the concept, which then enables us to carry out the effort needed to refine that concept and afterward push this venture ahead into — around that point — taking the concept into FEED and in the end into construction. So my take is that we're seeing genuine momentum. The difficulty, as I see it, stems from a world in flux and the need to get both government positions pulling in the same direction.

Bob Brackett

analyst
#14

Understood completely. If the decision were yours, if you were the one steering things, would you lean toward a Phase 2 that's smaller in size yet faster, like what was proposed not long ago, as opposed to something that might end up bigger and perhaps no more delayed in terms of scale?

Andy Inglis

executive
#15

Right, Bob. And keep in mind I'm just one perspective here; so I should tread carefully regarding my own individual viewpoint; this isn't about my personal preference. Nor is it about whatever the customers wish to pursue, or what serves the partnership best. I believe the partnership genuinely recognizes that there's a chance for us to bring about a genuinely low cost project by making full use of the infrastructure we put money into during Phase 1, and I think there's clear agreement on that point. So really, the discussion has centered on which liquefaction approach works best to make complete use of the infrastructure we've established, and consequently, in what manner do you develop that liquefaction so it yields the strongest possibilities—you consider doing so at a bigger scale, yet with optimal timing, correct? And that's essentially where the boundary lies, that's what's been debated. But I believe there's quite solid consensus on the reality that we now effectively have a brownfield expansion and on how we can best maximize all the investments made during Phase 1.

Bob Brackett

analyst
#16

Very clear. Thanks for that.

Andy Inglis

executive
#17

Thanks, Bob.

Charles Meade

analyst
#18

Morning, Andy, to both you and the folks working with you. I just wanted to pose a follow-up on Phase 2, though maybe looking at it through a money lens. In the past, when you've discussed Phase 2, the thinking seemed to be that the cash coming in from Phase 1 would basically turn your route toward — or through — getting Phase 2 built into something cash neutral. I'd have to figure that while you all have revisited and looked again at your approach to contracting for Phase 1, you're moving more toward a position where free cash flow is positive in Mauritania & Senegal — even after Phase 1 gets underway, is that the correct read? Or perhaps any additional specifics you could give on that?

Andy Inglis

executive
#19

Yes, no, no, I'll give the response together with Neal. Yes, on the whole Charles, your take sounds accurate. So back when we discussed it, and regarding how the projects are phased, the aim was always to guarantee a Phase 2 that used capital very efficiently by drawing fully on Phase 1. And we mentioned a fairly modest upstream spend, something under $1 billion. And I believe that still definitely remains the case. And I believe there's a chance for us to do even better than that; then in the end, the real issue is how you handle the CapEx on the midstream side. And inside that, we'll have financing or leasing choices of one kind or another. So nothing, in a sense, has shifted on that front, as I see it. And your point seems right to me — I think likely, when you look at it from a cash flow angle, there may be a chance to be a bit more positive because of that.

Neal Shah

executive
#20

Yeah. I mean, I believe conditions for both gas and oil prices are obviously going to be favorable compared with the long-term scenario we laid out, in terms of generating that wedge, Charles. So there is a bit of upside in that, and obviously when it comes to the chance on cargo sales, there's extra upside that would provide us with additional cash during that near-term stretch. So, yeah, I'd say it's certainly trending favorably rather than simply sitting at neutral.

Charles Meade

analyst
#21

That's useful information. Thank you, Neal. Now, may I ask about the tiberious prospect located in the Gulf of Mexico? My understanding has been that not many untested four-way structures remain in that area, though maybe I'm mistaken. Could you share some background on where this prospect came from and when you plan to test it?

Andy Inglis

executive
#22

Yes, you're correct, Charles. Few four-way opportunities are left in the Outer World Cup — one never claims it's the final one, but I believe this ranks among the handful that remain. We're quite enthusiastic about this prospect since, as you're aware, that category of four-way prospects in the out of Wilcox has enjoyed strong success rates. We're aiming to drill it near midyear, and we're currently in the process of locking in a rig. From a geological standpoint, it's a top-tier prospect with scale exceeding 100 million barrels of resource, and it's a tieback. That makes it a perfect match for our strategy. As you correctly implied in your question, it comes down to quality — how do you identify the absolute best? Looking at what's left in this play, this stands out as one of the finest.

Charles Meade

analyst
#23

That's useful information. Thanks, Andy.

Andy Inglis

executive
#24

Excellent. Thank you, Charles.

Alex Smith

analyst
#25

Hey, everyone. I appreciate you holding this call. I have one brief question regarding what came out of those two TEN strategic wells. From an expectations standpoint, both were rather underwhelming, so could you share your thoughts on how this affects TEN over the near to medium term? What does the next course of action look like? Do we need to go back through the data and rethink the interim plans? Or since you brought up targeting proven accumulation, might you give us a bit of detail on which areas you'll pursue instead of that interim prospect?

Andy Inglis

executive
#26

Yeah. Well, thank you, Alex. The reason we drilled those two wells is that they were appraisal wells, designed to test the greater area and let us calibrate the seismic so we can be confident we have a robust development plan moving forward. And keep in mind, this is new resource that we are adding to TEN, so it's essentially new resource that once developed will turn into new reserves. So the point is about adding more beyond what exists today. I believe the appraisal wells have given us a chance to gain a clearer picture of the greater area's quality; and as we examine it, we can identify the possibility of adding new resource throughout that area, though our targets will be accumulations with well control, which means lower risk. That's the process the operator and we are engaged in right now. So we're working to put together a plan with those characteristics; it will involve a combination of oil and gas, associated gas and non-associated gas; but there is new resource to add, and I think the appraisal has fulfilled its role by properly defining the opportunities, so that we can advance something with the appropriate risk profile that can compete for capital within our overall allocation. So it accomplished what we set out to do, and at this point we are fully incorporating the results from those wells into the plan, and this is something we'll be discussing with the operator as the year turns.

Alex Smith

analyst
#27

Excellent, that's quite straightforward. Possibly one more brief item. You reached the leverage goal you'd somewhat intended for the close of the year. Therefore the matter arises of possible dividends or share repurchases now being in play, and perhaps when ought we to receive news regarding that?

Andy Inglis

executive
#28

Right. Wonderful, let me hand this to Neal, who will share our perspective on it.

Neal Shah

executive
#29

Yeah. Hi, Alex. So we've done well when it comes to lowering debt, and we've said all along that this is our main priority. Net debt has gone from $2.5 billion at the start of this year down to 2.1, and leverage has dropped from 2.5 times to 1.5 times. We've said consistently that our near-term goal is to bring leverage to 1.5 times at a kind of sustainable oil price, and reaching that means we'll need to keep driving debt lower than it stands today. So the positive thing is we keep getting nearer to that target, and so it comes down to timing, and oil price plays a big role in how that turns out. And so if oil prices kind of remain at current levels, I believe we can reach the right spot in the back half of next year to begin that conversation about shareholder returns. And given the conversations we've had with our shareholders previously, I think we're still leaning toward buybacks rather than dividends. But — so we're well positioned to keep — keep moving along the path of further debt reduction, and then once the right moment arrives, focus on shareholder returns.

Alex Smith

analyst
#30

Great. Thank you.

James Hosie

analyst
#31

Hi there. I have one question regarding Ghana. You mentioned some discussion around commercializing gas resources. Could you update us on the status of the Ghana partnership as far as locking in your uptick agreement for the associated gas? Also, does gas from Guinea factor at all into that 50% production growth target by 2024?

Andy Inglis

executive
#32

Yes. Thanks, James. No, that's a great question. And obviously right now, we're producing roughly 100 million scuffs of gas out of Jubilee; we're nearing the end of the foundation volumes. And so because of that, we're beginning a discussion with the government regarding a gas sales contract for that gas. Woven into that is the development of TEN, which I discussed in an earlier question, which is going to be an integrated gas and oil development involving gas, though it's both associated gas from the oil and non-associated accumulations and putting in the infrastructure that allows us to optimize that; so I think the way you ought to think about it really is that gas is going to be a component of that growth in TEN. The government's approval of that plan will then provide the government an important source of domestic gas at a price, which is competitive with our current cost of gas; so as you begin to think about the growth target, I think the big chunks of it are obviously Tortue, which is the biggest chunk. You then have the growth in Jubilee, Jubilee Southeast, then Winterfell; and then there is some growth. There's some growth in TEN and it's going to be a mix of oil and gas. So a piece of it, it's going to be TEN gas. But overall, it's a minor part of the contribution to the 50% percent growth.

James Hosie

analyst
#33

All right, that's excellent. Many thanks.

Andy Inglis

executive
#34

Sure. Appreciate it, James.

James Carmichael

analyst
#35

Hey, everyone. A fast one regarding Jubilee — you brought up at least a few possibilities for bringing costs down there. Could you give us a little more detail on that? And also, I don't think anyone has followed up on Bob's 2023 CapEx question. It's likely early, but is there anything you can share?

Andy Inglis

executive
#36

Great. Thanks, James. Yes, what clearly created this chance, I believe, is that responsibility for operations and maintenance moved over from MODEC. That has actually given us a direct line of sight into it. I believe opportunities are opening up for us by truly fine-tuning what work falls within scope, and because you come at it with a fresh perspective — moving from being a kind of outside operator to somebody who is now entirely dedicated to that job — so that gives us a chance through scope optimization. On top of that, I'd say contracting approaches deserve some attention, specifically around how we can pull more value out of them. Bringing those two elements together, plus additional factors that are enabling us — that will enable us to — we'll be able to bring down our cost base. Obviously, the environment we're in today carries more inflation, but my sense is we have a genuine opportunity to offset that. That was partly visible in the third quarter. Our 3Q production costs, as I recall, came in under guidance, mainly due to operational activity in Equatorial Guinea moving from the third quarter into the fourth quarter, though there was also an underlying self-help element, especially from Ghana, at Jubilee, and we anticipate more of that ahead. It all comes down to reaching top quartile performance, in terms of both facility reliability, which has been excellent, and the operating costs, where I think we have greater access to those opportunities; and once more, I do want to mention how strong the drilling performance has been. Because of all that, we've been able to move faster on the Jubilee Southeast wells. So Jubilee has done well so far. And when it comes to costs, I'd say there's likely still some room for improvement.

Neal Shah

executive
#37

Yes, and James, regarding the second part of what you asked about 2023, I'll address that now. I believe your point is valid — it remains somewhat early to say, since we are still wrapping up the determination of activity across the different partnerships we hold. That said, on the whole, our expectation is to remain roughly level as we move into ’23, which is more or less the final significant year of capital investment for us while we complete the development projects. We are also capable of handling the inflationary pressure throughout. As Andy noted, this applies even on the work scope side — ensuring we are efficient with each dollar we deploy, both on the capital side and the operating side of the business. That is what allows us to keep things in a broadly flat range.

James Carmichael

analyst
#38

All right, and if I may, a brief additional question about where the greatest easing of cost pressures is showing up?

Andy Inglis

executive
#39

Sure. What's notable is that deepwater differs from the last 48 when it comes to contract scheduling. As a result, we hold some strong agreements, I believe, in Ghana, and those have worked in our favor. When you consider where the capital expenditure is concentrated, we're noticing it in our deepwater rig agreements. The operator, in my view, did an excellent job on winterfell, positioning itself ahead of the market and securing that rig at a highly favorable rate. We're pursuing the same with the rig on Tiberias, and I believe we're achieving rather strong utilization levels for premium equipment, yet cost escalation is appearing in those rig rates. For us, that's likely the largest variable. On other fronts, we're firmly committed. There's obviously remaining work on Tortue and the contract fringes, which must be settled regarding access to certain workflows once we begin the installation campaign — that will pose a challenge for us. We've discussed Jubilee Southeast: the rig is under contract, the equipment too, along with our long-term orders. We aren't detecting much cost escalation there. Lastly, on winterfell, I mentioned what the operator has truly been doing to stay ahead. So for us, within those significant reassurance areas, and in fact what we're concentrating on, is locking down the rig for Tiberias.

James Carmichael

analyst
#40

Great. Thank you.

Andy Inglis

executive
#41

Great. Thanks, James.

Mark Wilson

analyst
#42

Hello, and good morning to everybody. You folks have fielded quite a few questions already. I'll zero in on gas, and you're providing nice clarity regarding Tortue. But perhaps looking past that toward BirAllah and Yakaar-Teranga — there's that 30-month extension on BirAllah. So my question for you, Andy: should we view Kosmos as remaining involved in both of those projects all the way through development? Or are they better characterized as monetization opportunities, and would those two need additional drilling before a development decision gets made? Thanks.

Andy Inglis

executive
#43

Yes. No, good. Yes, those are great questions. I think if you begin at the largest, sort of strategic level — and these are distinct projects. When we consider BirAllah and Yakaar-Teranga, and look at BirAllah, I think what's involved is another — it's a fresh supply of gas, particularly for Europe. It carries the characteristics of being lower carbon; BirAllah matches GGA gas, with essentially no CO2 present. And what's needed is bringing forward a development plan that keeps costs low. My sense is it will be phased. And then, can we deliver cost competitive gas into Europe, where we observe a lasting market need? So work continues right now, as you mentioned — there's a 30-day clock, a 30-month clock, to reach FID; in fact, Kosmos is handling the concept work on that. And it will center on a low cost phase development aimed at a European market where our geographic position gives us an advantage. And I'm optimistic we can bring forward something genuinely credible. And I think the project's inherent value then gets developed. And I think decisions after that would follow. But for me, our first objective is producing something that is truly value-added, and when you consider the company's strategy, I believe gas, as I noted in my opening remarks, is something central to our future — it generates longevity and quality for the company. Building out GTA is one piece of that; following it with a project such as BirAllah is fully part of that. So I don't think we're questioning BirAllah's relevance within the portfolio. But clearly, we have work ahead to arrive at something where we truly have a compelling cost competitive project; and regarding further appraisal, the answer is basically no. How can you bring forward the scheme now without getting trapped in the timeline of spending a lot of money on appraisal, which generally only serves to destroy returns and stretch out timelines. On Equatorial Guinea, it's a different starting point. I think the country is very clear about its needs; it has a significantly larger population than Mauritania, a growing population, they have — today they're burning heavy fuel oil, and for power generation, displacing that with gas not only brings economic benefit, it brings climate benefits. So what are the ways we can speed up Yakaar-Teranga's progress? It's going to be a fairly small gas venture serving the domestic market while those power stations get converted. That one addresses a genuine requirement for the nation, and it gives us a strong investment opening. Then there's what comes after — the next stage that emerges from it, moving from what you might call an initial gas plan into one where, in my view, an export element also exists. That's why our attention is split between these two efforts. How do we build an LNG export chance in Mauritania that is truly cost competitive? And at the same time, press ahead with a domestic gas undertaking the country genuinely requires, then figure out how to capture the optionality arising from it. Naturally, a great deal of our effort goes toward Phase 1 and toward getting Phase 2 underway. Still, I think you're right to highlight the worth sitting in our portfolio thanks to these two ventures, since I sincerely think they rank among competitive gas sources worldwide — both when it comes to exporting and when it comes to serving domestic needs.

Mark Wilson

analyst
#44

Mark, thanks for that.

Andy Inglis

executive
#45

Glad you liked the remarks. Anything further? All set? Okay, then I'll turn to —

Bob Brackett

analyst
#46

Thanks. I'm just circling back with a question that's pretty small. I was attempting to grasp what the strategic or financial rationale was for the Panoro farm-in over in Equatorial Guinea. What kind of consideration came your way? And what was behind that call?

Andy Inglis

executive
#47

Yes. No, it's an interesting one, Bob. Yes, I'm not going to — we can handle that offline when it comes to the precise figures, but it isn't large, truthfully, relative to everything overall. But I'd say the key thing is getting everyone in the partnership on the same page. Panoro clearly stepped in, took over the entire stake, so they will <<inaudible>>, we haven't discussed this, but the significant upside in Equatorial Guinea that we tend to — the asset is doing nicely. We're observing production profile extensions thanks to solid production engineering, especially with the ESP program, yet the genuine upside will emerge from the chance in the Albian, an untested play, though with some excellent, extremely, extremely robust four ways; and Panoro was keen to obtain exposure to that chance, which is excellent, since it sort of — the decimals aren't exactly correct, but then we get alignment between the exploration potential and the ownership in the infrastructure. So it's truly about achieving alignment on that instead of it being a matter of disliking, so to speak, the opportunity in Akeng Deep. I believe Charles raised the question regarding Tiberius, if you like, about that, and it's a compelling four way. The Albian play in actual Guinea is just as interesting, since it has really strong geology; these are solid four ways. There's obvious source, and we have essentially a very good initial prospect and then genuine play extension now with the acreage surrounding it.

Bob Brackett

analyst
#48

Great. Thanks for that.

Andy Inglis

executive
#49

Great. Thanks, Bob.

Neal Shah

executive
#50

Alright, I appreciate all of you being with us here today, and that wraps up the call for today. Should you have any additional questions, feel free to get in touch with Jamie. Thanks.

Operator

operator
#51

Thanks. That brings an end to today's teleconference. We're grateful that you joined us. You can hang up your lines now. Have a good rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kosmos Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Kosmos Energy Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kosmos Energy Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.