Jamie Buckland

executive
#1

Thanks, operator, and I appreciate all of you being with us today. Earlier this morning, our first quarter earnings release went out. You can find that release, along with the slide presentation for today's call, on the Investors page of our website. Here with me to walk through the material are Andy Inglis, our Chairman and CEO, and Neal Shah, our CFO. During today's presentation, we'll be making forward-looking statements relating to our estimates, plans, and expectations. Actual results and outcomes may differ materially because of factors we point out in this presentation and in our UK and SEC filings. For more details, please see our annual report, stock exchange announcement, and SEC filings. Those documents can be found on our website. With that, I'll hand the call over to Andy.

Andrew Inglis

executive
#2

Appreciate it, Jamie, and greetings to everybody, morning or afternoon depending on where you are. We're glad you could be with us for the call covering our second quarter results. Before I pass things to Neil, who will walk you through the financials, I'll review the progress achieved over the quarter; after that we'll take questions. Let's begin on Slide three. A year ago, we laid out our approach for building out a world-class asset base, targeting production growth of roughly 50% against a 2022 baseline. I'm happy to report that within recent weeks, we've achieved the initial milestone toward that growth objective, bringing the Jubilee South East project in Ghana onstream. This significant increase in Ghana output accounts for approximately half of the growth target we've stated. Further growth should arrive from the Tortue LNG project spanning Mauritania and Senegal, along with the Winterfell project located in the Gulf of Mexico. I'll cover each of these developments in greater depth in a moment. As these growth projects keep moving forward, development CapEx ought to decline, producing a smaller capital program across the next year. With output climbing toward our growth target while CapEx is anticipated to decrease, we're approaching the free cash flow inflection point, where we anticipate generating substantial free cash flow, especially given present commodity prices. As cash flow expands, we'll stay disciplined in directing capital toward three priority areas. Strengthening financial resilience by paying down debt, financing attractive growth opportunities, and possible shareholder returns. To wrap up, we're delivering solid progress against our strategy, with considerably more to come over the next six to nine months. Now to Slide four, covering operations throughout our three production hubs in the quarter, along with the activities coming up at each. Net production came in at approximately 58,000 barrels of oil equivalent per day, matching the guidance we gave for the quarter. Our producing assets company-wide delivered strong performance. That said, the quarter felt the effect of a brief postponement in Jubilee South East's startup; in Ghana, Jubilee's gross oil production came in at roughly 73,000 barrels per day on average, unchanged from the first quarter; during May, the first Jubilee well of the year was finished, marking the beginning of production growth. The initial two Jubilee South East producer wells went live in mid-July, raising Jubilee's gross output to approximately 100,000 barrels of oil per day. I'll say more about that on the next slide. At TEN, gross oil production averaged roughly 20,000 barrels per day, matching the first quarter. In the second quarter, the operators delivered to the Ministry of Energy the revised draft plan of development for a high-grade set of additional wells at TEN; that activity set should keep TEN oil production near present levels while boosting gas supplied to the domestic market via a combined gas sales agreement, or GSA. The GSA encompasses all future gas sales from the Jubilee and TEN fields. Conversations regarding the GSA and the revised TEN plan of development with the Ministry are still moving along well. During the previous month, we executed a temporary arrangement covering Jubilee gas deliveries through September 2023 priced at $2.90 per MMBtu, pending finalization of the definitive agreement. Shifting to Equatorial Guinea, gross oil output came in at an average of slightly more than 24,000 barrels per day for the quarter. In the middle of July, the 500th cargo lifted from the field to base — a significant accomplishment for the partnership and the government of Equatorial Guinea. A three-well infill drilling campaign should kick off in the fourth quarter, and the first of those is slated for right around the close of the first quarter of next year. Before that, two workovers are planned, which ought to help sustain production levels through year-end and on into 2024. The Akeng deep infrastructure exploration well is set to spud once the infill drilling campaign wraps up. Finally, in the Gulf of Mexico, net production reached roughly 16,000 barrels of oil equivalent per day, consistent with guidance; at Kodiak, performance has exceeded expectations this year. As we've progressively raised drawdown, output from the ST-3 well has grown, enabling us to capture a solid share of what we anticipated from the planned workover. Consequently, we've adjusted the workover timing to mid-2024 so we can bring on a third producing zone and secure additional upside from the planned well intervention. The Odd job subsea pump project is still advancing well and should come online in mid-2024, on schedule. I'll cover more on Winterfell and Tiberius on the next slide, with activity picking up in the Gulf of Mexico as we head into the back half of this year. Now to Slide five. As I noted earlier last month, we reported the successful startup of the Jubilee South East project in Ghana. That represents a key milestone for the partners, the government and the people of Ghana, and opens the next chapter for the prolific Jubilee field. Soon after the initial announcement, a second JSC well came online, lifting gross Jubilee production to approximately 100,000 barrels of oil per day. Beginning later this quarter, three additional wells — one producer and two water injectors — should come online at Jubilee, which would boost production further in the fourth quarter. The second water injector is a well that was accelerated from 2024 to late 2023, reflecting the efficiency of this year's drilling program in Ghana. This injector will provide pressure support to Jubilee South East as we enter 2024. The chart on the right displays our updated guidance for the Jubilee ramp-up this year. As I mentioned, Jubilee South East actually started up roughly a month behind schedule; that has slightly affected 2Q and 3Q production, leading to a cargo deferral from 3Q to 4Q and from 4Q to early 2024. We still expect fourth-quarter production to be roughly 50% greater than what we saw in the first half, as new wells come online. With output at Jubilee currently at levels we haven't seen in several years, this is an exciting period for the partnership. Moving to Slide six, which covers our Gulf of Mexico activity set, that activity rises considerably this quarter. Last month, drilling began on the Tiberius infrastructure lead exploration well, operated by Kosmos, which holds a 33% interest. Tiberius is a four-way structural trap located in the outboard Wilcox Trend, and it targets an estimated gross resource of approximately 135 million barrels of oil equivalent. Spudding of the well occurred in early July, and it should take about two months to reach target, with results anticipated in September. Later this month, we anticipate starting to drill development wells at Winterfell. That's the second among our three key growth projects. The initial drilling campaign consists of three of the five wells planned in the first phase, targeting a gross resource of roughly 100 million barrels of oil equivalent. An upside case exists of about 200 million barrels of oil equivalent throughout the greater Winterfell area. The project is still on track to begin production at the close of the first quarter of 2024. Moving to Slide seven, the views on this slide from the past couple of quarters give a status update on the key workstreams for the Tortue LNG project. As we planned last quarter, the critical path to first gas on Phase I runs through completing the subsea works go. Because of a delay in the subsea workstream, first gas is now targeted for the first quarter of 2024. The operator communicated this last week in their 2Q results, and it is the primary reason for our lower CapEx in the second quarter; we are collaborating closely with the operator to resolve the subsea delay and optimize the remaining work streams so they align with this one 1Q first gas timetable. Regarding the FPSO, arrival of the vessel is now slated for the fourth quarter as we keep up pre-commissioning work and improve resource shipyards and line delivery under a revised timeline for the subsea work scope. On the Hub Terminal, construction is finished now, with handover to operations currently in progress. And lastly on the FLNG, construction plus mechanical completion of finishing and pre-commissioning work is ongoing. Sailaway of the vessel should happen around the close of the third quarter, with arrival in hookup planned around year end. I'll now hand over to Neal to take you through the financial.

Neal Shah

executive
#3

Appreciate that, Andy. Moving on to Slide eight. Our second-quarter financial results matched the guidance we'd given previously. As we anticipated, during the quarter we were substantially under-lifted by roughly 1 million barrels of oil, and we expect that situation to return to normal in the back half of this year. The single significant anomaly for the quarter involved CapEx, which totaled $170 million, coming in under the 200 million to 225 million guidance range, mostly because of reduced accruals tied to the subsea work scope at the Tortue project. Now, as I look ahead to our 3Q guidance, which you'll find in an appendix to this presentation, I want to highlight a few things. To begin with, we anticipate that 3Q production will come in roughly 20% above the second quarter, driven by the step change in production that we've observed in Ghana over recent weeks. Next, the quarter-over-quarter rise in OpEx per barrel stems from the scheduled TEN cargo in 3Q, which is what we expected. Then in the fourth quarter, OpEx per barrel ought to decline once more, given that no TEN cargo is scheduled and production levels from Jubilee will be higher. Third, 3Q CapEx should be comparable to the second quarter, since ramp-up of activity in the GoM offsets the completion of Jubilee South East. We further anticipate that the lower Tortue Subsea CapEx from 2Q will be pushed into the fourth quarter and early 2024. As Andy noted during his opening remarks, with production growing and CapEx set to drop as the growth projects wrap up, we are approaching that crucial free cash flow inflection point for the business. So with that, I'll turn things back over to Andy to wrap up today's presentation.

Andrew Inglis

executive
#4

Appreciate it, Neal. Moving to Slide 9 now, and that brings today's presentation to a close. When the year got underway, we laid out a portfolio featuring several significant catalysts spread across our 4 business units. The first of 3 major development projects to come onstream with a substantial boost to output was the recent start-up of Jubilee South East, which accounts for roughly half of the 50% growth target we set for 2024 production. More wells at Jubilee in the latter part of the year ought to underpin an additional rise in output. Over in Equatorial Guinea, the infill drilling campaign remains on schedule to kick off near year-end, and the initial well is anticipated to come online near the close of Q1 next year. As for the Gulf of Mexico, drilling has gotten underway at the Tiberius ILX prospect, while the first development well at Winterfell is likewise slated to begin drilling later in this quarter. Then, finally, at Tortue, we're looking at a highly active 6 to 9 months as subsea installation work moves ahead while we optimize the work scopes that remain. Successfully delivering the various catalysts laid out on the slide ought to push production higher, together with wrapping up a multiyear development spend, which underpins our substantial free cash flow generation ahead. With cash flow on the rise, we'll stay disciplined when allocating capital across 3 priority areas; added financial resilience via debt paydown, financing attractive growth opportunities and possible shareholder returns. Thanks very much, and at this point I'd like to hand the call to the operator so the question session can begin.

Charles Meade

analyst
#5

Morning, Andy and Neal, plus everyone else on the Kosmos crew. Andy, to kick things off, I want to ask about Winterfell — can you help frame what we should expect in terms of production rate there? I get that every reservoir and every development is different, but there's a subsea tieback in the Gulf of Mexico that recently came on, and I believe it's producing roughly 80,000 barrels of oil per day out of seven wells. How would you use that figure as a reference point, or what direction would you point us in?

Andrew Inglis

executive
#6

Yeah. Charles, I think if you consider it — actually, let me put it the most straightforward way possible. From the initial three wells, the net amount to us would be 5,000 barrels. Our share is 25%, which works out to a gross figure of about 20,000 barrels per day.

Neal Shah

executive
#7

It's ultimately pipeline installing; it's flowline constrained.

Andrew Inglis

executive
#8

There's a limit from the flowline side, yes. And because of that, we see additional chances past what we've got now. What you'd call the second stage would involve two more wells. And assuming things go well, we'd be considering putting in one more flowline. So there's ongoing potential at Winterfell, I'd say. Like we mentioned in our comments, it comes to a gross resource of 200 million barrels in the end. So the initial three wells, per Neal, are capped by the flowline at 20,000 barrels per day, with the chance afterward to keep removing bottlenecks from the project.

Charles Meade

analyst
#9

Okay. Understood. That's clear. Now for my second question, regarding Tortue. And I'm glad you finished on Slide 9. That one's among my favorites. But let me ask — maybe I'm reading too much into this — yet there's the item at the lower right, the initial cash, and it sort of appears as though it will land at the close of 1Q '24. Do I have that correct?

Andrew Inglis

executive
#10

Correct. Well, I'm grateful for that question, Chuck. There is room to read too much into things. As VP mentioned during that 2Q results call last week, first gas is now anticipated in 1Q '24, and that's the placement we gave it on the chart, Charles. So that is what you ought to go by.

James Hosie

analyst
#11

I suppose, to start with, regarding Tortue and that Phase I being pushed back — could you tell us whether you anticipate any extra CapEx because of those delays, and also from the shift in the subsea inflation timetable? Then, just turning to Jubilee, I mean, are you in fact aiming for oil production facility capacity, which we believe reaches 120,000 barrels a day by year-end? And then, about the gas price hike you have in Ghana, ought we to think about a lower price than what you expect to get under the longer-term sales agreement you're in the process of finalizing?

Andrew Inglis

executive
#12

All right. Right; that came at us like a machine gun. Thanks, James. Regarding Tortue Phase I, if we simply take a look at the CapEx effect, the bulk of the CapEx still left on the project concerns the subsea work — just to remind everyone, the FPSO and the FLNG are lease vessels. The hub terminal is finished, the wells are already drilled. So in the end, it comes down to the CapEx remaining to finish the subsea work. 2Q CapEx, as Neal mentioned in his remarks, came in lower because of the accruals on the subsea stemming from the delay in this activity. But across 3Q, we're roughly aligned with guidance. So you ought to see some CapEx rephased from 2Q into 4Q to reflect the subsea delay, and that's the reason our full year '23 guidance is, in effect, unchanged. And then, really, depending on when the process of finishing the subsea work occurs — going back to Charles' question — I believe there will be some leftover CapEx for the subsea that will carry into 1Q '24, James, and we'll give you an update on that when we provide the '24 guidance. On Jubilee, if I just take a step back and try to offer a bigger picture, I think we're quite pleased with how Jubilee has performed. We've risen from 70,000 barrels gross. We came into the year, we're now up at 100,000 barrels per day, and that comes from three wells. We had one in the main field that started up, and then in July we had two more wells in Jubilee South East. The next wells to come on will be another well in the main field. And with that, we expect another bump in production, and then two water injectors will follow, one in the main fields, one in Jubilee South East, as a way of providing support to those higher levels of production. So we're getting close to the facility limit, which is really your question; and I think the other message to deliver is that as we look ahead to the Jubilee profile for the rest of the decade, we've got a very strong set of drilling opportunities. We're in our third cycle of the 4D <<inaudible>>, every time it is bringing forward more opportunities. We're obviously quite happy with how the Jubilee South East wells have done, so in the end it's going to come down to that drilling campaign on Jubilee to push us up against the facility limit while keeping reliability at a very high level. That's the aim, that's the chance we have, and honestly I'd say we've gotten off to a solid beginning. Then last, on the gas price question, you've got it right. The 290 is there to carry us through until the end of September; it exists so we can wrap up all the discussions with the government of Ghana regarding the 10 POD, which includes as a core element a gas sales agreement and covers Jubilee and TEN Gas going forward at the same price. So I'd say the base price of 290 lets us get underway. And after that, we expect there will be an increment on top of that tied to the continued investment in TEN. Good. Did I get to everything, James?

James Hosie

analyst
#13

Indeed it did. I appreciate that.

Neil Mehta

analyst
#14

Right. Andy, thank you very much — that was a really useful update. So my first question concerns the under-lift. It appeared as though, if there was any weakness in cash flow, a great deal of it came down to the timing of cargoes. Could you remind us how those trajectories are going to recover across 3Q and 4Q? Is it reasonable to expect that you will recover that cargo you lost?

Andrew Inglis

executive
#15

Sure, I'll have Neal address that.

Neal Shah

executive
#16

Indeed, Neil, your observation is accurate. During the opening six months, a significant portion of which fell within Q2, this was essentially tied to when our progress occurred, since we had only two Jubilee Cargos on the list, and that figure is set to rise to 3 and eventually reach 5 across Q3 and Q4 as we move ahead. Additionally, no TEN cargo was anticipated by us during Q2, and that will be picked up in Q3. We have not lifted a half cargo in EG, and that will be picked up as roughly one net cargo during Q3 and Q4 going forward. So indeed, an overlift element is very much present, which is preferable given that pricing is better, or greater, in the latter portion of the year compared with what prevailed during the first six months. Thus, yes, that will be resolved, at minimum according to our projection, partly in Q3 and in Q4.

Neil Mehta

analyst
#17

All right, that's quite useful. So now, speaking as the person who isn't an engineer, perhaps I can pose this one, and it concerns the subsea side of things; and without a doubt, that's somewhere productivity problems have shown up. Andy, could you put it in plain terms for us, what exactly is happening there, and how should those of us in the investment community gain confidence that a clear remedy is identified and that it can be handled without much difficulty?

Andrew Inglis

executive
#18

Yeah. Appreciate that, Neil. From the 1Q results, we see the subsea scope of work got pushed back because the deepwater pipeline vessel showed up late; that's really the initial, fairly simple problem. Consequently, that work stream shifted onto the critical path, and so it's now what's setting the pace for the whole project schedule. I'll return to the work streams shortly. As VP mentioned during the 2Q results last week, first gas is now anticipated during 1Q. That comes purely from additional slippage on the deepwater pipeline; and the operator is quite focused on this matter and is seeking both to handle that slippage through contingencies and to fine-tune the remaining work streams so they align with the overall 1Q first gas schedule. So that's essentially the core problem before us right now, Neil, and it centers on one very specific item. It's clearly receiving the attention it requires from the operator, and I believe they've assembled a solid plan, one that tackles the problem through a base plan plus contingencies so that first gas can happen in 1Q '24. And like any big project, we're now pulling together multiple work streams; and I think we shouldn't — obviously, there's heavy emphasis on the pipeline portion; but on the other work streams, plenty of progress has occurred and several significant items have had risk removed. The FPSOs departed the yard, and clearly, with subsea installation running behind, that opens the chance for us to finish work in places where we enjoy stronger support for imports at shipyards, instead of doing that work offshore Mauritania and Senegal, which plainly lets us reach an even greater degree of completion. Drilling and flowback on the wells are done, construction at the hub terminal has wrapped up and has now been transferred to operations, and the FLNG is nearly ready for sailaway. So although the subsea holdup is disappointing, it's receiving the attention it requires, and the remaining work streams are moving forward as they should.

Subash Chandra

analyst
#19

I just want a bit of clarity regarding the CapEx matter. Is it right to view that spillover into the first quarter of next year as roughly the $30 million you fell short by in the second quarter? And then I believe you said there is likely some extra CapEx that also appears regardless of 2Q July.

Neal Shah

executive
#20

Right, Subash, I would say it's likely that the roughly $40 million we didn't spend in 2Q gets partly pushed into 4Q, plus some further CapEx that will turn up in the first quarter too. So again, we'll provide 24 guidance once we reach that point; but I think, once more, I think during the year or 2Q and 3Q are going to come in below the first quarter and fourth quarter, and then a leftover stretch in the first quarter will give us some clarity as we move through the budget cycle.

Neil Mehta

analyst
#21

All right, great. The second thing is about Phase 2 — is there any update on every element that feeds into it? And then, on Senegal's political situation, right, just keep producing the paper here over the last week, and any color on that?

Andrew Inglis

executive
#22

Yes. Yes, Subash, on Phase 2 I'd say it's again, sort of returning to the fundamentals. Phase 2 represents a brownfield build-out from Phase 1. We're installing the infrastructure for the extra gas processing capacity on the FPSO, pipeline capacity to send out more gas, and the hub terminal able to handle additional gas processing. So the key item right now is that we properly optimize the concept to factor in all of the brownfield capital we've put in. So that's the effort underway at present. And nothing has changed versus the lines we provided before, which is that once the concept is fully optimized, the aim would be to <<inaudible>> next year, which we and VP would treat as a formal project sanction because of the character of the spend rising at that point. So once more, I feel good about Phase 2 since it's fundamentally among the lowest cost, lower carbon gas expansion projects globally. Regarding the politics in Senegal, obviously, we're heading toward an election next year. the history as the country has a long history of a democratic process, changes of government and stability aligned around that. So I view this as simply being part of the normal ebb and flow of politics in the country. And the key point is that it has a very stable democracy and it's shown that through several election cycles, and this one will be no different.

Mark Wilson

analyst
#23

For Neal, here's my first question. Considering every factor you mentioned, would it be reasonable to conclude that Kosmos's net debt in Q2 represents the peak, and that from this point we'll observe it deleveraging each quarter?

Neal Shah

executive
#24

Correct. I'd say we're quite near that level. We're basically at that turning point, with production climbing and, obviously, as oil prices go, plus we're beginning to see part of that CapEx decline. So once more, I believe that will keep widening as output keeps increasing or going up while capital keeps decreasing. Yeah, I'd say we're just about at that elevated point.

Mark Wilson

analyst
#25

All right. Great. Thank you. So people have been asking about what the schedule looks like over at Tortue. When it comes to getting gas flowing into this health system now that the facilities are ready, it sounds like that will occur somewhere in the middle of 1Q, or during 1Q. What was the timeline you had for commissioning each of these different FLNG vessels, and do you figure it has gotten shorter because of how long things took, the extra time spent at shipyards? Or does it stay the same as the initial plan once gas is in the pipeline?

Andrew Inglis

executive
#26

Yeah. Mark, I'll handle that one. No, it is shorter, Mark, since we're performing work as the FPSO while traveling from China to Senegal, we were able to save some time. So in fact, it lands somewhat ahead of the first gas day, and the hookup itself will therefore be shorter. And then clearly, like you mentioned, you'd bring gas into the FPSO at that point. After that comes the cooldown phase for the FLNG vessel, and there too, we're hoping to trim that duration. But I'd say roughly, give or take, it's probably about three months starting from first gas into the FPSO. You still have roughly a 3-month cooldown window that would take you to the first cargo. So yes, I'd say it has gotten shorter. For me, the key thing is that risk has come down, because much of the work involved in inspecting, walking down and preparing has taken risk out of startup; and I believe that's really one of the biggest takeaways, in my view.

Operator

operator
#27

Appreciate it. We don't have any more questions coming in right now, so I'd like to wrap up the call here. Thank you all for being with us today. At this point you're welcome to leave the lines, and we appreciate your taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kosmos Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Kosmos Energy Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kosmos Energy Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.