Kosmos Energy Ltd. (KOS) Earnings Call Transcript & Summary

February 26, 2024

New York Stock Exchange US Energy Oil, Gas and Consumable Fuels earnings 62 min

Earnings Call Speaker Segments

Jamie Buckland

executive
#1

Thanks, operator, and I appreciate all of you being with us today; earlier this morning, our earnings release for the fourth quarter and the full year 2023 went out. You can find that release along with the slide deck for today's call on the investors page of our website. Here with me to walk through the material are Andy Inglis, our Chairman and CEO, and Neal Shah, our CFO. Throughout today's presentation, we'll be making forward-looking statements regarding our estimates, plans and expectations. Actual results and outcomes might differ materially, because of factors we point out in this presentation and in our UK and SEC filings. For additional details, please see our annual report, stock exchange announcement and SEC filings. Those documents can be found on our website. With that, I'll hand the call over to Andy.

Andrew Inglis

executive
#2

Thank you, Jamie, and hello everyone, whether it's morning or afternoon where you are. We appreciate you being with us for this call covering our fourth quarter and full year results. I want to open today's discussion by talking about our company's purpose, since it shapes our strategy and the traits that set Kosmos apart. After that, we'll walk through how our operations and finances progressed in 2023, and then turn our attention to the coming year, which is full of catalysts. Let's start on Slide 3. Our purpose here at Kosmos is straightforward: we're a top deepwater independent E&P firm, dedicated to satisfying the world's rising need for cleaner energy. Through oil output from our low-cost, lower carbon oil properties in Ghana, the U.S. Gulf of Mexico and Equatorial Guinea, we supply the energy required around the globe right now. Simultaneously, we're building out cleaner energy sources for what lies ahead via world scale gas projects located offshore Mauritania and Senegal. And lastly, while delivering the energy the world requires, we aim to be a positive force in each country where we work, speeding up economic and social advancement throughout our host nations. This happens through expanding production, which generates greater revenues and royalties for those countries. We also supply natural gas for domestic power generation, improving access to electricity that is more affordable and more dependable, while making investments in significant social programs within the countries where we operate. Now to Slide 4. Kosmos offers a distinctive investment case, featuring a world-class portfolio, differentiated growth in the right assets and a strong free cash flow outlook. Let me address those three points one by one; first, our portfolio of world-class assets is diversified; it consists of advantaged oil assets today, marked by production that carries low costs and top-quartile carbon intensity. In addition to our oil assets, we're expanding our advantaged gas position, which will reduce the overall intensity of the products we sell. Crucially, this portfolio offers longevity, with a 2P reserves to production ratio exceeding 20 years and a deep hopper of discovered resource capable of extending the reserve line even further. Second, we possess meaningful growth. Our goal is for production to climb to roughly 90,000 barrels of oil equivalent per day by the end of the year, consistent with our 50% growth target from the second half of 2022. Within that targeted growth, gas is expected to rise from approximately 10% of our overall production to approximately 25% during that timeframe. Looking beyond, we hold a hopper of value-accretive growth opportunities, including Tiberius, Yakaar Teranga and Akeng Deep, to underpin future growth. Though at a more measured pace, as we aim to prioritize free cash flow and debt reduction. And last, we anticipate a meaningful boost in free cash flow as we exit the present development stage, with CapEx projected to decline once Winterfell and Tortue commence operations this year; with those two projects producing, we estimate quarterly free cash flow in the range of roughly $100 million to $115 million assuming mid cycle oil prices. Our intention is to direct future free cash flow first toward reducing debt, until our leverage target is reached, and after that we would evaluate returning capital to shareholders. Moving to Slide 5, which examines the initial one of three traits that set Kosmos apart, namely the caliber of our portfolio. Our portfolio spans exploration, development and production assets, diversified across five countries within the Atlantic Basin, and is balanced between short cycle oil and gas opportunities with longer dated horizons. The chart positioned at the upper right of this slide details our reserve base. Roughly 280 million barrels of oil equivalent in 1P reserves gives us a 1P reserves to production ratio of approximately 12 years, with a greater weighting toward oil. Portfolio quality stands out through the 1P reserve replacement ratio for 2023 exceeding 100%, mirroring robust reserve additions at Jubilee from bringing Jubilee Southeast on stream; measured on a 2P basis, our reserves to production ratio exceeds 20 years, weighted a bit more toward gas and oil, which illustrates the trajectory ahead in the years to come as gas takes on an expanding role in the company's outlook. The chart located at the lower right of the slide illustrates why diversity within the asset base matters, since every business unit contributes significantly to delivering the company's future. The 2C resource base, encompassing some contribution from Yakaar Teranga plus upside at Jubilee and Winterfell, delivers a 2C reserves to production ratio exceeding 30 years, with further discovered resource past that, including Tiberius, anticipated to lengthen the production life. Moving to Slide 6, which examines our growth for this year and afterward in greater depth. The chart at the top displays the headway we are making toward our target of 50% production growth. The Jubilee ramp up already delivers a substantial step-up after the Jubilee Southeast start-up last summer. That ramp up should carry on, with five more wells anticipated to come online at Jubilee during the first half of this year. First oil at Winterfell should arrive early next quarter, a key milestone for our Gulf of Mexico business. Following that, we anticipate the start-up of Tortue, which should lift the company's production past 90,000 barrels of oil equivalent per day; the lower portion of the slide covers our opportunity set past 2024. We hold a balance of top-quality short cycle oil opportunities, including Tiberius, alongside longer dated gas and LNG opportunities such as Yakaar Teranga and Tortue Phase 2. Moving to Slide 7. As we complete the development projects in our current phase and then go after chosen investment opportunities, we anticipate growth that is more moderate and a significant improvement in our free cash flow profile. With production targeted to rise 50% by the end of 2024, measured against the first half of 2022, we anticipate our free cash flow will increase materially at mid cycle oil prices. As these projects are delivered, CapEx should drop sharply. With Tortue and Winterfell online, we anticipate annual CapEx returning in 2025 and beyond to a steadier figure of roughly $550 million, encompassing maintenance plus some additional growth. With production rising and CapEx declining, we are arriving at a key inflection point, with quarterly free cash flow anticipated to land in the $100 million to $150 million range once the present phase of developments has been delivered. Moving to Slide 8. Backing our strategic and operational progress is an ongoing emphasis on our ESG activities. Providing the energy the world requires today and satisfying rising future demand has to be accomplished responsibly in a manner that delivers not only affordable and reliable energy, but also sustainable growth and advantages for our host countries. Our progress in 2023 makes me proud. Beginning with environment, we keep maintaining carbon neutrality for our operated Scope 1 and 2 emissions; during 2023, we announced a near-term goal of reducing our equity Scope 1 emissions by 25% in 2026 from a 2022 baseline, and we are progressing well toward that objective. Shifting our focus to social.

Andrew Inglis

executive
#3

Our goal is to be a dependable partner and a responsible corporate citizen in the nations that host us, as well as right here in America. We keep putting money into our employees and the areas where we operate, backing an equitable energy transition that brings more people in Africa access to electricity; across every one of our international offices, our workforce remains 100% local hires, and once again we were recognized as the best place to work in Houston and in Dallas for 2023. The individuals who work for Kosmos and alongside us matter enormously to us, and that forms a vital piece of what makes our company successful. Finally, governance. Kosmos boasts a highly seasoned and varied Board whose members come from a broad array of backgrounds. That got even stronger during 2023 when three additional Board members joined, each contributing distinctive viewpoints and fresh thinking that assist in sustaining Kosmos' expansion. To sum up, ESG credentials sit at the heart of our strategy; this dedication was, one more time, acknowledged by MSCI, a top ESG ratings firm, which gave Kosmos a AAA grade, the maximum score available, placing us among the top 20% of businesses in our industry for a second straight year. In the same vein, Newsweek and Statista included Kosmos on their list of America's most responsible companies for a fourth year running. Executing our strategy effectively depends on how committed and focused we are when it comes to running things responsibly. That dedication begins at the top with our Board of Directors, extends through leadership, and reaches every one of our employees, and it underpins our capacity to generate long-term value for all of our stakeholders. Moving to Slide 10, which reviews what we accomplished during 2023. 2023 marked yet another year of steady delivery. We keep operating safely, with lost time injury rates and total recordable injury rates well under industry averages, a pattern we've sustained for multiple years. As covered earlier in the presentation, production keeps rising, with fourth quarter output reaching 66,000 barrels of oil equivalent per day, a 12% increase versus the prior year. Our development projects keep moving forward, with Jubilee Southeast now online and ramping up, Winterfell set to come online soon, and Tortue Phase 1 advancing well with start-up anticipated later this year; we keep expanding our pipeline of future growth opportunities through the discovery of the operated Tiberius ILX prospect and by raising our working interest in Yakaar Teranga while taking over as operator. As noted on the prior slide, our ongoing ESG emphasis earned recognition from MSCI, since we held onto our AAA rating. I'll hand things over to Neal now so he can walk through the quarter's and the year's financial results.

Neal Shah

executive
#4

Thanks, Andy. Moving on to Slide 11. Output across the year matched the revised guidance we gave during the previous quarter, with fourth-quarter production sitting at the bottom of that range because of the water injection problems Jubilee brought up before; those problems are now fixed, and Andy will soon provide an update on what's currently happening operationally in Ghana. OpEx during the quarter exceeded what we had expected, driven by greater workover expenses tied to the first rig operations in Equatorial Guinea prior to the operator ending the rig contract over safety concerns, something we'll also cover in more detail shortly. Other items — DD&A, G&A and tax — each landed under guidance, which helped produce today's EPS result above consensus. We booked an impairment on 10, bringing the carrying value all the way down to zero, which mirrors an anticipated smaller activity set along with well performance. Favorable 1P reserve additions at Jubilee outweighed the downward revision to 10's 1P reserves across the period. Although we continue to see potential future value at 10, in both oil and gas, capturing that value depends on getting the plan of development approved, and the activity set must compete for capital against other opportunities within the Kosmos portfolio. CapEx during the quarter came in above expectations, mostly because of inventory timing tied to the EG drilling program. Inventory showed up sooner than we thought and was therefore booked as CapEx in the fourth quarter. I'll now pass things back to Andy to walk through the outlook for the coming year.

Andrew Inglis

executive
#5

Appreciate that, Neil. Moving on to Slide 13. In Ghana, 2023 marked a major turning point, thanks to the launch of Jubilee Southeast, and there's additional activity coming during 2024. For Jubilee and TEN combined, the operator's guidance covering the entire year sits at roughly 116,500 barrels of oil per day on a gross basis, equivalent to approximately 40,000 barrels of oil per day net for Kosmos, plus another 6,000 barrels of oil equivalent per day net from gas. Regarding Jubilee specifically, the operator's full-year target is 100,000 barrels of oil per day gross, and output is anticipated to climb as the year progresses with additional wells being connected. To date in 2024, a single water injector alongside a single producer have been tied in. A second producing well should be hooked up very shortly, and that ought to push Jubilee output back past 100,000 barrels of oil per day gross, with a further pair of wells scheduled to be connected afterward. Beyond the infill drilling campaign, what we're concentrating on alongside the operator during this year is overseeing the existing production base, aiming for 100% voidage replacement; we've gotten off to a solid start this year by pumping record volumes of water into the field, and we intend to keep fine-tuning injection support throughout the year. As output increases, the drop in OpEx per barrel that we recorded during the prior year ought to hold, since the partnership keeps pushing through efficiencies while fixed costs get distributed across a greater number of barrels; regarding gas, the interim gas sales agreement covering Jubilee has been prolonged until the close of May at approximately $3 per MMBtu; when it comes to TEN, the operator's guidance is roughly 16,500 barrels of oil per day gross across 2024. As for the TEN plan of development, government approval is still pending, so we haven't scheduled any significant activity on that field during this year. Now on to Slide 14. Over in the Gulf of Mexico, 2024 looks set to be yet another active year. Guidance covering the full year stands at 15,500 to 17,000 barrels of oil equivalent per day net, and that figure incorporates our projected hurricane downtime during the latter half of this year. Beginning with our production optimization efforts, the Odd Job subsea pump project remains on schedule for start-up around the middle of the year, with the Kodiak workover slated for roughly the same period. Each of these represents a high return project, and both ought to speed up future output. On which both first oil from the initial development phase as I expected in early 2Q, with a pair of wells anticipated to be tied in during the second quarter and a third one expected at some point later in the year. Things have gone smoothly on the project so far, with the first two well tests matching what we anticipated. And we continue to feel enthusiastic about what the Greater Winterfell area might hold going forward; regarding the Tiberius discovery, where Kosmos serves as operator, we've obtained laboratory analysis of the rock and fluid samples, which backs up the production potential of the development wells and aligns with analogous wells in the Wilcox. We are now advancing a phased development approach involving a subsea tieback plan to the Lucius platform, located 6 miles away. Oxy runs Lucius, and Oxy is a partner in Tiberius. We expect FID for Tiberius later this year, and the development timeline runs 18 months to 24 months, comparable to Winterfell. Looking at the map at the bottom right of the slide, in lease sale 261 Kosmos and Oxy picked up the block west of Tiberius plus two blocks to the southeast, and those contain the Logan discovery. Those blocks, adjacent and nearby, give us extra near field upside past what Tiberius offers, and they can underpin a phased build-out of the Greater Tiberius area. This is an exciting period for our Gulf of Mexico business, since we anticipate near-term production gains from Winterfell and from our production optimization work, with an operated Tiberius development coming next as the following leg of growth. Kindly go to Slide 15. Guinea comes next. Base production remains stable, with full year guidance of roughly 8,000 barrels of oil per day net. That guidance includes nothing from the planned infill drilling campaign, which was deferred once the operator ended the rig contract over safety concerns. Kosmos stands fully behind that operational decision and won't compromise on the safety of operations. The partnership is now reviewing alternative rig options that would let the infill drilling campaign restart later in the year, with the Akeng Deep infrastructure exploration well to follow. We'll bring the market news about a replacement rig at the right moment, and we've built potential CapEx into the high end of our CapEx range on the assumption that the EG drilling program resumes. Moving to Slide 16. At Tortue Phase 1, the key work streams keep moving forward. The hub terminal is finished and has been handed over to operations. The floating LNG vessel is now on location. Mooring is finished, and connection work with the hub terminal is underway. Golar keeps working alongside the operator to push commissioning ahead. Subsea work scope is advancing as expected, with completion anticipated by the close of the second quarter. And last, the FPSO is in Tenerife right now for the scheduled inspection and repair of the fairies. Once that work wraps up, the vessel will head to its field location early in the second quarter and start final hookup and commissioning activities. The FPSO stays on the critical path for first gas, which we expect in the third quarter of 2024. On other Tortue matters, we anticipate a ruling around the middle of the year on the arbitration concerning future cargo optimization; separately, BP, acting for the partner group, has served the previous subsea contractor with a claim notice and started the process under its agreement to recover losses incurred. We estimate our net share of the potential recoverable damages at up to $160 million. With Tortue moving closer to its initial gas production, and while we're seeking to add a partner at Yakaar Teranga, there's been growing interest from the industry in these assets. Down the road, that could give us a chance to unlock some worth from our gas holdings and speed up our financial strength. On that note, I'll pass it back to Neal, who will walk you through the financial outlook.

Neal Shah

executive
#6

Thanks, Andy. Now let's look at Slide 17. Like Andy said, our focus stays on strengthening the company's financial resilience as output increases in the months ahead and CapEx declines. During 2023, we paid off the Gulf of Mexico term loan, so no debt maturities fall due this year. Regarding the RBL, shown by the dark blue blocks on the chart, the refinancing with our bank group is progressing well, and we expect it to be completed in the first half of the year. The goal is to extend maturities by roughly three years, which would move the final maturity to nearly 2030. On leverage, we ended 2023 at 1.9x, and our long-term target is 1.5x or below at mid cycle for oil prices; since CapEx is expected to be higher in the first half of this year, the cash generation we anticipate once production is ramped up should arrive in the second half of 2024 and would go toward debt pay down. Leverage should then begin dropping quickly toward our target. Now on Slide 18, our capital allocation priorities for the year. CapEx for full year 2024 is projected at $700 million to $750 million, with just over a third of that being maintenance CapEx. Growth CapEx is expected to be about 60% to 65% of 2024 total, mainly tied to completing Winterfell in Phase 1 of GTA, which does include some duplicative subsea costs incurred because of the switch in subsea contractors made last year. We hope to recoup this through the recovery of damages from the process mentioned earlier. Looking past 2024, we expect normalized annual CapEx to be about $550 million, with around $300 million to $350 million in maintenance CapEx and $200 million to $250 million of growth CapEx. As CapEx declines and free cash flow rises, we have three clear priorities; first, enhance our financial resilience. As noted on the previous slide, we want to get absolute debt and leverage down sharply, and this will be the first call on free cash flow generation. Second, we want to invest selectively in compelling opportunities; we support the continuing growth of the company, albeit at a lower rate than what we expect in 2023 and 2024. And third, when leverage is in the right place, we will look at shareholder returns. I'll now hand back to Andy to conclude today's presentation.

Andrew Inglis

executive
#7

Appreciate that, Neal. Moving on to Slide 19 now. For Kosmos, 2023 brought steady execution. We accomplished quite a bit, with output climbing during the back half of the year once Jubilee Southeast, the first of our big development projects, began producing, and we're still poised to hit our goal for production growth before this year wraps up; we also made the Tiberius find and assumed the operator role at Yakaar Teranga. The coming year, 2024, is packed with catalysts, as Jubilee ramps up and Winterfell's first oil are both anticipated within the next few months. Further along in the year, initial gas flowing from Tortue will mark a significant achievement for the company as well as for Mauritania and Senegal. Growing output alongside declining CapEx fuels robust cash flow from now through the end of the year and on into 2025, alongside swift deleveraging toward the debt levels we're targeting. Everyone at Kosmos is eager about what lies ahead and motivated to hit our strategic goals. That's all from me. At this point I'll hand things back to the operator so we can begin the Q&A portion. Operator?

David Round

analyst
#8

I have a few, if that's alright. First off, Andy, you brought up something — you made a remark regarding possibly unlocking value from the gas portfolio. Could you say more about what you were getting at there? Is this something you're actively pursuing, or does it only tie to possible income at Yakaar? Second, we've clearly witnessed the recent halt in U.S. LNG export approvals. Has that altered any discussions you're having, or at least affected any of your forward assumptions, or is it still too soon to tell?

Andrew Inglis

executive
#9

Well, it appears the moment has arrived for Kosmos in Mauritania and Senegal as we move our wider agenda forward. Like I said during my remarks, Tortue first gas is now within reach. We're achieving genuine headway with PETROSEN regarding the concept for Yakaar Teranga. I'm also glad that we're advancing with the NOCs and BP on a concept to speed up Phase 2 ahead of BP's earlier schedule. When you combine all of that, we're constructing a substantial LNG business that is arriving at the right moment; it's arriving when gas's long-term worth is gaining recognition along with its part in the energy transition. As you noted, the outside environment is shifting. There's a halt in U.S. LNG and I believe that's among the reasons why fresh gas sources are being held in higher regard. Today, you've witnessed we've come forward with our own announcement regarding constructing a bigger business. There are likely advantages and drawbacks on the supply side. But I believe one point is evident: future supply is becoming heavily concentrated. Consequently, new supply sources that bring diversification to customers will be valued. So when you combine all of that, we've received interest in Yakaar Teranga, as you pointed out. As we said in our third quarter results, we aim to bring in a partner possessing the right skills and balance sheet to assist us in moving forward, and that is our priority. But while it's clear from the discussions on Yakaar Teranga that there are parties interested in potentially a bigger stake than just YT in our other assets in Mauritania and Senegal. That's something we will take into account as part of the sell down process in Yakaar Teranga; and why would we do that? In the end, it lets us speed up our strategic agenda; we can anticipate growth and we possess a very rich hopper, but what's the appropriate working interest for that? And can we discover alternative means to speed up delivery of a more resilient balance sheet that permits shareholder returns. So, we view it as being yet another point — another route to access and accelerate that outcome; so it's sort of early days. The discussion is mainly about Yakaar Teranga, where we're going to complete the pre-FEED and then begin that process. However, should a bigger transaction that includes Tortue become available, we would certainly weigh that possibility, given the rationale I already explained.

Neil Mehta

analyst
#10

First off, I want to ask about that shift in free cash flow. You mentioned $100 million to $150 million each quarter once we reach run rate. Could you explain which pricing scenario that assumes? And when you look ahead to 2025, as this big free cash flow inflection arrives, what are the priorities for cash regarding where we head next?

Andrew Inglis

executive
#11

Yeah, Neal will handle the question regarding the metrics that drive it; but I believe it matters, 2024 matters because we're finishing the two big projects Winterfell and Tortue, and that lets us reach that free cash flow inflection point. Delivering those projects is a key moment in the company's journey. It lets us strengthen the balance sheet, pay down the debt, and at that stage then move forward to shareholder returns. But it also lets us continue growth. But it matters — it's at a far more measured pace than what we've clearly delivered over the past two years. So I think as we move through 2024, 2025 is about that dual agenda, prioritizing free cash flow to enable the debt pay down, but actually, there will be growth, but it's to be at a much slower pace; but Neal, the fundamental metrics behind the free cash flow?

Neal Shah

executive
#12

Yeah, I mean, that comes from what we're estimating right now — roughly 70 for TI and around 75 for Brent.

Neil Mehta

analyst
#13

Moving on to 2025, I have a few questions about the cost structure. First, is it reasonable to use roughly 550 as a placeholder for CapEx, knowing that you'll provide more detail in the coming months? Also, I noticed a footnote mentioning operating costs of $115 million to $130 million for Greater Tortue. Once the project is up and running, is that the correct CapEx run rate?

Neal Shah

executive
#14

Neil, I'll address your second question first, sorry. Regarding operating costs, yes, I believe it will be somewhat higher, since that amount is phased as the development ramps up, and this year there are several moving parts such as commissioning costs and the ramp up. So on a regular basis it will be a bit above that figure, but the per metric, barrel metrics, per BCF metrics will look more attractive on that basis, on a 25 in regular run rate going forward; and then apologies, Neil, what was your first question again?

Neil Mehta

analyst
#15

It's just Neal. What's your take on CapEx for '25, roughly, given that you're going to have—?

Neal Shah

executive
#16

Yeah. And once more, I believe, as we mentioned during the call, that 20, the $550 million, is our target across the coming several years, '25 and afterward included. So I'd say that's a solid figure to keep written into your models.

Andrew Inglis

executive
#17

That figure essentially serves as the foundation for maintenance CapEx in the range of roughly $300 million to $350 million over the long term, plus growth spending of around $200 million to $250 million. So it's a far more disciplined pace of expansion, and in the end, with long-term CapEx at $550 million, you're able to support free cash flow of $100 to $150 each quarter.

Matt Smith

analyst
#18

Let's start with the question about how you're deploying capital. I appreciate the specifics you provided in the presentation. For Kosmos, that inflection point is obviously significant. I suppose I wanted to revisit it. Does that $550 million in CapEx represent a kind of steady state, or is it a firm commitment from Kosmos? Because it seems obvious that you have a great many opportunities. I mean, it's encouraging to see that Phase 2 of Tortue might be returning to consideration earlier than we had expected. And you mentioned Yakar Taranga too. I suppose I'm just trying to figure out whether that $550 million is a signal or actually a pledge to shareholders that regardless of the plan, regardless of the working interest, that's roughly the level of CapEx you'll be at ease spending across the coming years? I just want to get a sense of what — where the real priority sits on that, if that's alright? And then my second question concerns the FPSO with respect to Tortue. I think it's really just confirming what we've picked up elsewhere regarding first gas now slipping to the third quarter? I was wondering if you could discuss the confidence intervals you have about hitting that milestone this time, please.

Andrew Inglis

executive
#19

If I take the first one, on capital allocation for '24, a significant year, we're achieving growth by bringing Jubilee Southeast on stream for continued growth, along with Winterfell and Tortue. And when you look past that, you're correct, we do have a deep inventory. And what matters, I think, for shareholders is that we are extremely disciplined regarding which projects we pursue. And we can choose the timing and the phasing, and as I said in response to David's question, we can also choose our level of participation in those projects. So, having that inventory is a good thing. Gaining greater control by serving as operator is beneficial, and our goal is to work inside a structure that enables us to reach that growth over the long term. During my remarks, I noted that the speed will be much more deliberate compared with the past 2 years. Even so, the Kosmos portfolio offers longevity, which means it carries a terminal value, though we have to deliver that while also producing the free cash flow shareholders look for. Ultimately, reducing debt comes first; once leverage targets are reached, the focus will move to returns for shareholders. Looking ahead, that $550 million figure is the basis of how we're structuring things. We believe we can keep base production — which is a mix of assets and a key piece in Ghana, the Gulf of Mexico, and Guinea as well — running within the $300 million to $350 million range. That leaves $200 million to $250 million available for chosen growth projects. That's the structure we'll be using from here on out, and it's what underpins the free cash flow goals we've talked about. On Tortue, since you raised a particular point regarding the FPSO, maybe I should give some broader context, because this subject is bound to come up — what's the current status of the project? We've gotten a tremendous amount done over the quarter. Ahead of this quarter, drilling had already been completed and the hub terminal was finished. However, while the quarter was underway, the Guinea vessel reached the hub terminal, where it is now secured and undergoing hookup—both the gas intake link and the offloading connection—so that effort is moving along nicely. Regarding subsea work, there has been substantial advancement. All Seas, as I understand it, put out a market notice confirming that the deepwater pipelines—the 10-inch and the 16-inch—have been fully installed. In fact, that entire scope of work is now complete, marking a major milestone. At this point, the remaining subsea activities involve getting the jumpers installed — that falls under the Saipan scope — and we're aiming to wrap that up before the second quarter ends. As for the FPSO, there's ongoing activity in Tenaris at one of their shipyards, where the fair leads are being readied, examined, and fixed up. Basically, those serve as the mooring mechanism for the vessel once it's positioned. About four weeks back, I went to the hub in person, and things are progressing nicely there. The fair leads have been examined at this stage, so we have a clear picture of what repairs are needed — they're fairly minor. So the FPSO should depart early in the coming quarter, arrive at the site, and then we'll kick off mooring and hook-up work there. That whole sequence gets us to first gas during Q3, and from there LNG comes in Q4. Matt, with all the subsea progress already achieved, the FPSO is still what sits on the critical path as you work through this. The operator is clearly putting a lot of emphasis on it, but I'd say at this point — when you're bringing a big project like this across the finish line, every milestone that gets hit matters, since it takes risk out of what lies ahead. Looking back at the past quarter, I'd say we got a great deal done, and I'm eager for those milestones ahead — they won't be easy — as we move through the rest of the year.

Charles Meade

analyst
#20

Andy, I'd like to ask something about EG. From what I understood in your prepared remarks, the top end of your guidance presumes you do bring a rig back in there and complete some work during '24. Could you talk about how likely that is? And maybe, if there is some — do you need any particular rig capability to carry out that work, or is it more of a standard thing, which would make it more probable?

Andrew Inglis

executive
#21

Yes. I'd say it's a bit early to offer you much detail on that. We're obviously just heading to the market right now, as we speak, to check out rigs that are available. Regarding what the rig needs to be, it isn't anything beyond what a fixed gen can — 6 Gen can handle at present. So the sole problem is that it must be, in a sense, completion ready, since clearly on the infill wells we are drilling and completing. You can deepwell it, it's purely an exploration well; so I think it's a little early, Charles, to say precisely how that process will play out. But I think we simply wanted to be sure that in our guidance, we were, in a sense, clear and had covered the spectrum. So we have not put any contribution from the infill program into our production guidance, but we have put in a possible outcome of the rig being part of our activity set in 2024. So I think that's a suitable way to view the situation today; and clearly, we'll give you an update as we make progress in the investigations with the market regarding rigs that are available.

Charles Meade

analyst
#22

Then my second question, which is related, but concerning TEN in Ghana — could you help us understand something? You've handed the government a fresh suggested scope of work. Could you tell us roughly when approval might come through and when it would then be carried out? And at a high level, what effect might it have on output at that field, or those fields?

Andrew Inglis

executive
#23

My sense is that the impairment at TEN really came down to a handful of matters. The first one concerned how the wells drilled lately have performed. They didn't produce quite the results we had wanted. Then there's the question of confidence in the upcoming work program, which would need the government's sign-off in the form of the plan of development. So at present, we have not factored in any meaningful future scope of work at TEN. And by the same token, should there be a breakthrough on the PoD, that capex would need to vie for capital under the framework we described in our prepared remarks. So I feel good about where things stand right now. It's hard to say when the PoD might get the green light. Obviously, Ghana has an election year coming up. In my view, that makes it somewhat harder to feel certain about the timing and likelihood of anything happening. Yet the key point, from Kosmos's standpoint, is really what we mentioned before: an extremely abundant hopper set; we truly have a very rich collection of opportunities in the base spanning Equatorial Guinea, the Gulf of Mexico, and Ghana at Jubilee; in fact, our reserve replacement ratio of 104% this year came about because Jubilee's performance more than made up for the shortfall at TEN. So a robust opportunity set exists at Jubilee. Jubilee is a field — a large field that will grow larger. As a result, I could see us directing capital there first. So TEN is essentially on hold, and I'm okay with that. For us, I believe it comes down to making sure our base capital goes toward our strongest opportunities. And Jubilee would certainly rank extremely high.

Bob Brackett

analyst
#24

Coming back to the GTA FPSO and that matter with the fair leads needing repair. Has the operator taken delivery of that vessel from the contractor yet? Do we have some kind of recourse here, similar to what happened with Tortue, with Jubilee, or with the pipeline vessel problems as well? Are you going to return to that contractor and tell them the FPSO wasn't delivered within the timeline or according to scope?

Andrew Inglis

executive
#25

To give you the full answer: no handover has taken place. That, I'd say, ends up answering everything else you asked.

Bob Brackett

analyst
#26

And a simple one to build on that — how do the difficulties with GTA compare with what it took to bring Winterfell up and running in the Gulf of Mexico, and where does your confidence stand on that?

Andrew Inglis

executive
#27

You've laid out plainly how the scales differ, and with GTA you're essentially putting in place the first stage of something bigger. That one is a greenfield development. It has wells. It has an upturn, or rather it has an LNG facility, plus an FPSO. So yes, several pieces, so to speak, make up that project. Winterfell is a far simpler kind of tieback. The basin it sits in already has the supply base, so equipment is more readily accessible, and its well subsidy ties back into an existing facility. So really, a completely different order of magnitude. I think that's an excellent question, because it takes you back to what this company is fundamentally about. On the oil side, we put money into short cycle, fast payback ILX style opportunities, and those produce a very different economic result — and in fact a different risk profile too. But you build longevity for the business by growing out a gas business. Now, with Tortue Phase 1 already established, Phase 2 is a brownfield, and it carries a very different execution risk. So it's tough to get going, and I think we plainly had our struggles getting Tortue to that point. But with the finish line visible, the next phase — Tortue — has a risk profile that's very different. So on relative competence, which we'll study up on: yes, it will come at the start of the quarter, flow back both of the wells, and alongside that, the third well will follow. And actually, what's interesting about Winterfell isn't only that first phase of development, but the phases after it. I think in the end it will be a considerably larger resource pool. So it doesn't just have a short cycle front end — it also holds that development opportunity to pursue afterward.

Subash Chandra

analyst
#28

Could you go over that again — I may have missed it — the Tortue volumes, are any of them in the '24 guide?

Andrew Inglis

executive
#29

Neal, would you like to take that one?

Neal Shah

executive
#30

Right. So we're basically taking it as consistent with the detailed guidance included in the presentation — meaning there are certain entitlement volumes during 3Q, followed by nearly the full rate in 4Q. That comes out to roughly 2,000 to 3,000 barrels per day of BOEs net under the forecast. So it isn't reflected in the full-year average. Still, it approaches full rate by the time we're in the fourth quarter.

Subash Chandra

analyst
#31

I was just wondering — so should we — does that OpEx figure sit inside the guidance? I got a bit mixed up regarding the footnote as opposed to the guide for the year?

Neal Shah

executive
#32

Correct. Regarding that OpEx, it isn't part of the per barrel metric. What the per barrel figure reflects, essentially, is the base business, with the OpEx applying only to the MS portion.

Andrew Inglis

executive
#33

The rationale behind our approach is that moving from a project phase into an operational phase involves a pretty significant commissioning component. So the total figure captures that shift — a portion of those commissioning expenses, plus the operating costs tied to the field once it starts up.

Subash Chandra

analyst
#34

And last of all, I suppose, on a like-for-like basis when comparing the prior year's CapEx with what's guided for '24, what amount of capitalized interest sits in there?

Neal Shah

executive
#35

Roughly $25 million each quarter, Subash. So we would kind of — looking at that guidance, we're basically just taking it as occurring during the first six months of this year and then disappearing across the back half of the year. That gives us interest, which is why you see the $25 million against, well, the $150 million figure for the entire year.

Subash Chandra

analyst
#36

So that $100 million in cap interest — was that from last year?

Neal Shah

executive
#37

That's right. Roughly the same figure, yes, on an annualized basis.

Matt Cooper

analyst
#38

First off, could you share your thoughts on the present output level at Jubilee, plus whether the other two wells that came online during 1Q are doing what was expected?

Andrew Inglis

executive
#39

Sure, Matt. If we take a broader view of Jubilee, the main thing to understand is that how this year goes comes down to a couple of factors. Number one is keeping the base up, which really means voidage replacement. Back in the third quarter of last year, that was a real challenge for us, but starting around November, we've been putting water in at record rates, and voidage replacement has hit 100%. In the three months before that, it had dropped to as little as 40% while water injection was offline. So I'm encouraged by how the base has held up going into this year, and in fact through the opening two months. Then you layer on more wells. One water injector and one producer have come on. In fact, I'd say today is likely when the second producer kicks off. Once that well is flowing, we'll be back to roughly 100,000 barrels per day — above 100,000 — right now we're sitting near 100,000. That marks a significant milestone. After that, two additional wells are still coming: another producer and another injector. So looking ahead at how the year plays out, I'd say the wells have come through. In fact, looking at the whole program, the operators would likely finish the wells six months early, which is the reason we're taking the break a bit sooner than planned, so we can rebuild that well still. But the core thing we're watching is water injection, and with it the voidage replacement that keeps the pace going.

Matt Cooper

analyst
#40

Just want to verify — regarding those initial two wells, I believe you mentioned they were drilled at the beginning of the first quarter. At this point, does the injection and output you're observing match what you'd anticipated?

Andrew Inglis

executive
#41

That's correct, it aligns with our expectations. And yes — they are performing as expected. The baseline is perhaps slightly stronger than what we observed, but essentially it matches our projections. So now, with the second well, the second producer coming online at this time. Our aim was to exceed 100,000 barrels per day, and that is exactly what we expect to achieve. So yes — it's been a strong beginning to the year. The main point — and I realize I sound like a broken record here — is that making sure the base gets the right level of support has to be our top priority.

Matt Cooper

analyst
#42

And then just lastly, I wanted to ask about EG. I was curious how much output in 2024 was cut because of the strip in the infill drilling? Just sort of considering what kind of upside might exist if a rig is secured during this year? Then on the other hand, what amount of risk is there that the new rig ends up costing more?

Andrew Inglis

executive
#43

Yeah. So essentially, Neal will address the production figures. Yeah, that other contract was likely signed when the market was more favorable; so yeah, I believe we'll likely end up with a somewhat higher rig rate. But once more, with everything — I realize it's typically a headline figure you focus on, yet you have to keep in mind that it's a relative, likely 1/3 of the cost of the total spread rate. So even a small, an increase there gets diluted on that basis. And after that, you have to determine how you achieve low NPT. So in the end, the well costs — the absolute well costs then rise. So yeah, we will see a somewhat higher rig cost, but it's not something that ultimately is going to interfere with the capital guidance or with the economics of the wells.

Neal Shah

executive
#44

Now regarding production — sure, for EG our full-year net guidance sits at roughly 8,000 barrels per day, assuming we drill according to plan; previously we were nearer 11,000. So that works out to an effect of about 3 million barrels per day that we're able to capture. Once more, I'd say part of that — there's potential upside should we actually wind up drilling within this year, though the base guidance doesn't factor that in.

Mark Wilson

analyst
#45

Regarding what will drive things this year and the CapEx once Tortue is finished — just to get a sense of the actual physical activity inside that $550 million annually and how maintenance breaks down: should we expect, say, one ILX well in the Gulf of Mexico every year starting in 2025, based on how well Winterfell and Tiberius have done, as part of that CapEx? And on top of that, are you factoring in a rig coming back to Jubilee in 2025 and beyond? That's my first question.

Andrew Inglis

executive
#46

If you think about it that way, then yes — when you consider the base and keeping the base maintained, we're talking about three quarters of a rig year at Jubilee. Obviously that's essentially a rollover, so yes, the rig comes back in '25, might be drilling in '26, then takes a break, and so on, yes. If you work it through, roughly three quarters of a rig year is about right, while this year we'll actually have around half a rig year in Ghana. So yes, that's part of it; it also covers a comparable drilling program in Equatorial Guinea moving forward, yes.

Neal Shah

executive
#47

Right, though it happens every 18 months.

Andrew Inglis

executive
#48

Roughly every 18 months, and perhaps a set of around 3 wells. Those make up the main foundational elements. After that, in the Gulf of Mexico, yes, likely at roughly a 30% working interest, around 1 ILX well annually. We typically spend $20 million to $30 million. That falls under growth before the sale.

Neal Shah

executive
#49

That falls within the $200 million to $250 million growth portion, as opposed to the $300 million to $350 million allocated for maintenance, which mainly handles Jubilee EG and, from time to time, certain GoM maintenance drilling.

Mark Wilson

analyst
#50

Moving on to Tortue, I'd like verification that every physical item tied to the startup has already been covered. Is there anything on the commercial side still needing to be settled ahead of that initial LNG? And perhaps you could connect that to what results, or what sort of effect, might come from it? You mentioned the contract talks — or the dispute, rather — ought to be wrapped up around the middle of the year? What does that mean — what should we be watching there?

Andrew Inglis

executive
#51

Right. So regarding cargo splits, arbitration is scheduled for roughly mid-year, with a decision coming around midyear as well. The hearing itself takes place during the second quarter. Usually a ruling arrives about a couple of months later, which puts it near mid-year. As for the rest — in the end, the contractual side won't hold back the project's completion; carrying out the physical work is what actually sets the pace.

Mark Wilson

analyst
#52

There was also an inquiry during this call, with someone bringing up the possibility of Phase 2 returning to consideration. Regarding Tortue Phase 2 in comparison to the remaining Senegal developments, or a timeline extending further out, is there anything new you can share?

Andrew Inglis

executive
#53

Phase 1, as we've previously stated, centers on constructing the infrastructure. What I'd note is that a genuine drive exists among the NOCs to identify the appropriate subsequent concept for Phase 2 that makes full use of the infrastructure already put in place, and that represents a fresh discussion now taking place with the NOCs; so in part, following the efforts we're undertaking on Yakaar Teranga, both SMH and PETROSEN have an interest in exploring how the timeline for Phase 2 might be sped up, which is plainly in the nation's interest and is in fact the partnership's interest prior to the date BP had earlier indicated. So that's the discussion happening on that front, Mark.

Operator

operator
#54

Appreciate it. With no more questions coming in right now, I'd like to wrap things up. Thank you to all of you for being on today's call. At this point you're welcome to hang up, and we appreciate your taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kosmos Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Kosmos Energy Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kosmos Energy Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.