Kosmos Energy Ltd. (KOS) Earnings Call Transcript & Summary

May 7, 2024

New York Stock Exchange US Energy Oil, Gas and Consumable Fuels earnings 51 min

Earnings Call Speaker Segments

Jamie Buckland

executive
#1

Thank you, operator, and I appreciate all of you being with us today. Earlier this morning we published our earnings release for the first quarter of 2024. That release, along with the slide deck that goes with today's call, can be found on the Investors page of our website. With me today to walk through the materials are Andy Inglis, our Chairman and CEO, and Neal Shah, our CFO. During this presentation we'll be making forward-looking statements relating to our estimates, plans and expectations. Actual results and outcomes may differ materially because of factors we describe in the presentation and in our U.K. and SEC filings. For more detail, please see our annual report, property exchange announcement and SEC filings. All of these documents are available on our website. With that, I'll hand the call over to Andy.

Andrew Inglis

executive
#2

Thanks, Jamie, and good morning or afternoon, everyone. We appreciate you being with us today for the call on our first quarter results. The year has gotten off to a busy start at Kosmos, and I'll begin today's presentation by reviewing the operational and financial momentum we established during the first few months of the year. Neal will then take you through the financial results for this quarter before I discuss what lies ahead in terms of catalysts for the rest of the year; after that, we'll open the line for Q&A. Beginning on Slide 3 with delivery of our major projects. Kosmos delivered a strong first quarter, making significant progress toward our objective of growing production by roughly 50% between the second half of 2022 and the end of 2024. In Ghana, every planned 2024 Jubilee production well is now online, with 1 water injection well anticipated to come online later in this quarter. Once this well is completed, the planned drilling campaign will wrap up approximately 6 months ahead of schedule, thanks to efficiencies achieved in the drilling operations. In the Gulf of Mexico, oil production at Winterfell is expected to start shortly from the initial 2 wells. The third well should come online later this year, raising expected gross production to approximately 20,000 barrels of oil per day. In Mauritania and Senegal, the Tortue project continues progressing toward first gas, with several key milestones already reached this year. I'll discuss our progress on these projects in greater detail later in the presentation. Looking further out, we continue advancing the next phase of our growth projects. Long lead items are being secured for Tiberius in order to optimize the development time line and project costs. We have also obtained a 2-year license extension for Yakaar Teranga. While continued growth remains an important part of the company's future, as I noted last quarter, it will be selective and more measured over the coming years, consistent with sustained annual CapEx of approximately $550 million per year targeted from 2025 onwards. On the financial side of the business, we strengthened the company's financial resilience through the convertible bond issuance and the RBL refinancing. Neal will cover these in more detail shortly. These transactions improved liquidity and extended our near-term maturities. The free cash flow inflection point we've been anticipating — roughly $100 million to $150 million per quarter once our development projects come online — is now just a few months away. I'll now walk through operational progress across our different business units, beginning in Ghana on Slide 4. Jubilee production during the first quarter averaged approximately 93,000 barrels of oil per day gross, nearly 30% above the first quarter of last year. That reflects the progress achieved from both the start-up of the Jubilee Southeast project and the ongoing infill drilling program. Jubilee FPSO reliability remains high, at approximately 99% uptime for the first quarter. Fortis replacement also performed well this quarter, coming in at roughly 110%, driven by elevated water and gas injection levels. Gross Jubilee gas sales during the quarter were approximately 16,500 barrels of oil equivalent per day. The partnership recently agreed to an 18-month extension of the Jubilee gas sales agreement at about $3 per MMBtu. Some planned maintenance at the onshore plant that receives Jubilee gas is scheduled for the second quarter, and that is captured in the 2Q guidance. At TEN, gross production came in at 18,600 barrels of oil per day, consistent with expectations, with high FPSO uptime of approximately 99%, comparable to Jubilee. Moving to Slide 5. Gulf of Mexico production for the quarter was about 14,500 barrels of oil equivalent per day net, in line with guidance. At Winter fall, where Kosmos holds a 25% working interest. First oil from the 2 initial wells is anticipated shortly, with another well expected to come online during the second half of the year. Once all 3 wells are online, gross production is anticipated to be approximately 20,000 barrels of oil equivalent per day. We estimate total gross resource across the greater interval of up to 200 million barrels of oil equivalent, which offers meaningful future follow-on potential. To boost existing production, we keep investing selectively in high-return projects such as the job subsea pump and Cody workover, both anticipated to wrap up around mid-year. Together, these projects are expected to add roughly 5,000 barrels of oil equivalent per day net to Kosmos's year-end exit rate. The tornado field is anticipated to be offline through most of the second quarter for scheduled routine maintenance on the HP1 floating production unit, which has been incorporated into our guidance for the quarter. On Tiberius, where Kosmos serves as operator, we picked up part of Equinor's interest during the first quarter to keep the partnership aligned. We now hold a 50% interest in the project, which is already reflected in our 2024 capital guidance. Development as a subsea tieback to Oxy's nearby Lucius platform is advancing despite this, with project sanction anticipated later in the year. Certain long lead items are being secured to optimize the development time line and project costs. Around the time of project sanction, Kosmos intends to farm down to optimize our working interest so it fits within our targeted capital program for 2025 and beyond. Please turn to Slide 6. Equatorial Guinea production averaged approximately 24,400 barrels of oil per day gross and 8,400 net in the first quarter. Kosmos lifted one cargo for actual Guinea during the quarter, in line with guidance. In early February, as previously communicated, the operator paused the Sabre and the cume drilling campaign because of safety issues with the previous rig. The partnership has now secured the Noble Venture to resume the drilling campaign, with a rig expected on location mid-year. The rig is set to drill and complete two infill wells over in Block G, and after that it will move on to the King Deep ILX prospect in Block Hess. Those new infill wells should contribute roughly 3,000 barrels of oil per day net to Kosmos's year-end exit rate. Results from the King Deep well — which is chasing gross resource of about 118 million barrels — are anticipated near the end of the year. Moving to Slide 7. Greater Tortue Acme keeps advancing toward first gas, with meaningful progress made across every work stream during this year, and first gas is expected in the third quarter while first LNG is expected in the fourth quarter. The floating LNG that showed up in the first quarter has been shifted to the hub terminal. The partnership is presently collaborating with the vessel's operator to speed up commissioning. Subsea activity is advancing as expected: flowline installation is finished and final connection work is continuing. Inspection and repair of the FPSO is now finished, and the vessel has departed tenereef under its own power for the project location, with mooring work to begin after that. Commissioning of the FPSO stays on the critical path toward first gas, which is anticipated in the first quarter. I'll hand things over now to Neal, who will walk you through the financials.

Neal Shah

executive
#3

Thanks, Andy. Moving to Slide 8, where we look at Q1. Net production for the quarter came in at roughly 66,700 barrels of oil equivalent per day, up about 13% versus the same quarter a year ago. Quarterly costs landed within guidance or a touch better, and that's what drove the earnings beat versus consensus. First-quarter CapEx totaled $286 million, in line with guidance, and it's mostly the Ghana drilling program plus the progress we've made at both Winterfell and Tortue. As we said before, we expect the bulk of this year's CapEx to fall in the first half, and the free cash flow inflection Andy mentioned on his opening slide should arrive as the development projects wrap up and production builds through the end of the year. Now to Slide 9, our debt maturities. We took 2 significant steps this year to strengthen the company's financial resilience. The first was the March convertible bond issuance, which proactively replaces the liquidity from the $250 million undrawn RCF that expires at the end of this year. The convertible also brought down our overall interest expense, since we used the proceeds to pay down part of our RBL, our highest-cost debt. We've also watched yields on our high-yield bonds tighten, which should help with pricing when we consider potentially refinancing them down the road. To limit future equity dilution, we bought a capped call, so there's no dilution until the shares reach almost $11 per share. We also elected to cash settle the principal amount raised, which further reduces any future dilution. The second key step was refinancing our reserve-based lending facility, with terms broadly consistent with the prior facility. Total facility size rose to $1.35 billion from $1.25 billion, with commitments currently around $1.2 billion. Through this refinancing, we've pushed out the final maturity by roughly 3 years. At the same time, some of our banks have moved their commitment to the RBL from the RCF, which, as I noted, expires at the end of this year. I want to thank our banks for their ongoing support as we keep growing the company. The chart on the right illustrates how both the convertible bond issuance and the RBL refinancing affect the maturity schedule. We now carry no near-term debt, with a staggered maturity schedule from 2026 onwards. As we hit the expected free cash flow inflection point, we intend to keep prioritizing RBL paydown, shrinking the amounts shown in dark blue on the chart at right; we still target leverage below 1.5x at mid-cycle oil prices, with deleveraging expected to begin once revenues from Tortue start up later this year. So with that, I’ll turn things back over to Andy to wrap up today’s presentation.

Andrew Inglis

executive
#4

Moving on to Slide 10 — like I mentioned at the start, the first quarter was a busy one, and in only 3 months we've accomplished quite a bit. The operational and financial momentum we built carried through that same quarter, with several milestones already under our belt and additional ones on the horizon. As the graphic on this slide illustrates, we have a substantial lineup of catalysts spread across the year in every one of our business units. All of these feed into our target of a year-end exit rate of 90,000 barrels of oil equivalent per day, along with a free cash flow inflection point. Together, we believe these will deliver meaningful value to our shareholders. Thank you; at this point I'll hand the call to the operator so we can begin the question session.

David Round

analyst
#5

If I could, I'd like to ask a couple of things. First off, regarding Senegal — since the elections that just took place, has anything at all changed in the way business runs there? The press has covered it quite a bit, so I'd welcome whatever you can share. Then, on Equatorial Guinea, it's clearly encouraging to see things moving again. That's obviously been a real strength. From what I remember, the in-place figure there was fairly substantial, with a rather limited recovery factor so far. I'm just curious whether, once CapEx drops elsewhere, that might expand into a bigger area of activity down the road?

Andrew Inglis

executive
#6

Sure, David. Appreciate you raising both. I'll handle those. Let me begin with Senegal. The key point, I think, is that none of what we do in the countries where we operate is new for Kosmos, and our guiding philosophy is to work in step with those nations and their requirements, no matter how their governments change. Our method in Senegal follows the same pattern, where we are helping bring about the development of low-cost gas to grow the Senegalese economy in a sustainable way and to drive social progress for the country. So there is a strong degree of alignment between our activities and the objectives of the new government, which are clear: they want to bring down the cost of living for this population and to improve the economic environment. I think it is early days for the new administration. Many officials have yet to be appointed. My team and Senegal have met with the new Energy and Mining Minister, and I'm pleased to say it was a very constructive dialogue. The discussion focuses on how we can actually speed up development of the gas resources so the country sees the benefits sooner. So as far as day-to-day operations go, our business in Senegal remains the same. We're working to bring Phase 1 online later this year, to advance a capital-efficient Phase II — the expansion of Phase 1 that will boost revenues to the states and the partners — and then to move forward with a domestic gas LNG export scheme at YT, all of which will deliver economic and social benefits for the country. I believe there's a genuine foundation for a win-win here. And I'm glad to report that we're currently engaged in a constructive dialogue about how we shape that agenda. Regarding Equatorial Guinea, I think you're right that there's actually a great deal of undeveloped resource. And — when we first took over the asset, it was about boosting production from essentially workover activities. If you recall, I think it was — we described it as being gas lift constrained; so we actually switched to ESPs, and we've seen the benefit of that work. I think we're now entering a different stage, which concerns infill drilling — that's the present campaign. As you correctly point out, we're aiming at one infill well in Sabre and another in a cume. And then, in fact, we're following that up with King Deep, which gives us a deeper test of the Albian. And obviously, if that works out, we have a considerable amount of knowledge in the facilities to bring it on, plus the very short tieback distances. So I believe we have, sort of, 2 avenues. For SEBRA and cume, what we're envisioning is an intermittent infill drilling program — around two or three wells every 18 months or so — and with that, I think you can certainly keep the production profile sustained. That CapEx is all included in the forward forecast for base maintenance. Then, with King Deep, I believe you have the ability to actually grow the profile. So I think we have a clear plan for sustaining the profile in Equitorial Guinea through that infill drilling, along with, I think, still some workover-type activities, and growth coming if you have success at King Deep; so I think it's been a really good acquisition. In my view, our team has done a solid job executing a highly structured initiative aimed at easy early gains, largely involving workover operations. We're now moving toward a staged infill strategy. Even so, substantial opportunity remains, and the fact that our facilities have available capacity clearly enables us to advance this swiftly.

Charles Meade

analyst
#7

Morning, Andy and Neal, and to everyone else on the Kosmos side. Andy, I'd guess you're even happier than we are to see that FPSO getting underway, so congratulations on that. But could you walk us through simply the highlights, or what the next pieces of the puzzle are, or the milestones, on the road to first gas? My guess is some of those pieces would be giving the FPSO additional hookup work with the risers, bringing gas into FLNG, and then running through the full FLNG cool down — but perhaps you can expand on that or add pieces we ought to be watching for?

Andrew Inglis

executive
#8

I love questions where you've already given the answer yourself.

Charles Meade

analyst
#9

My apologies for that.

Andrew Inglis

executive
#10

It's — no, I think you've got it, I believe. Clearly, a lot of progress has been made in — in these first 4 months of the — the FLNG vessel is now at the hub terminal, it's beyond the — and connection work is continuing. The final piece of equipment, or it with FPSO, as you said, will be on location in just a few days. The next step after that is the — is mooring. And while some morning is done, we begin work on the top signs in terms of the commissioning work. Connecting the risers is obviously the step that makes it possible to bring gas in. After that, as you mentioned, it becomes a matter of the gas reaching the FLNG vessel, kicking off the Kogan process, and then beginning to produce FLNG, with the first cargo and so on. So I think — if you walk through that sequence, you laid it out very clearly. Where do we stand? On the subsea equipment, every major component is in place; the final tie-ins are underway and that effort is moving forward just as we expected. So we're happy with how things are going there. As for the FPSO work, hooking up and commissioning the FPSO is still on the critical path. Of course, having the vessel positioned on site has allowed us to begin monetizing that operation. I'd say we're on schedule to deliver what we committed to, and the milestones set for this year have all been met thus far. Placing the FPSO on location is obviously a significant milestone, and we'll bring you up to date next quarter once that work is finished. And hopefully, with the riser hookup completed, that — which would then let us begin flowing gas.

Charles Meade

analyst
#11

Understood. Now for my second question, I was hoping you might give us more specifics on the BirAllah exploration. I'm also curious whether this resembles what happened with Yakaar Teranga, where BP perhaps chose not to stay involved, yet you still — you still have plans in place. Basically, just walk us through where things stand...

Andrew Inglis

executive
#12

No, that's a fair question, Charles. And once more, I'd say if you take a step back, it bears restating that YT and BirAllah are both going to scale discovered gas resources — in-place figures, as I see them, of 25 Tcf, with BirAllah at roughly 30 Tcf; and in our view this is advantaged gas. CO2 is negligible, and it sits close to Europe. So now that BP is no longer on either license, we're able to work independently alongside the NOCs of both nations on innovative, cost-efficient schemes that BP never proposed, but which we think will deliver attractive returns for the project partners as well as the governments. We've secured the license on Y2. We've secured the extension letting us proceed with that work; and we're holding discussions with the Mauritanian government about how we can help them advance BirAllah's development. They're eager to push it forward. And we think we hold both the subsurface knowledge and the concepts that will make it an attractive project. So that's essentially where we stand, and there's also been considerable third-party interest in the assets. So we believe that by working with PETROSEN and YT, SMH and BirAllah, we're trying to build an equal partnership in which they're properly represented, which we see as genuinely positive for both governments — and we're collaborating with them to identify ways of bringing in a partner that will let the development move ahead. So I think you've described it accurately, and we're energized about pursuing that agenda.

Bob Brackett

analyst
#13

Charles took the wind out of my sails for the most part. So allow me to pick up from there. Regarding the Tortue FPSO, that vessel has been anticipated by the operator, by all of you, to pass muster. And so it's ready to go.

Andrew Inglis

executive
#14

Yeah. Like everything else, Bob, I think we're cursed with having to perform the work on the fair leads, and that's a blessing because it does give us the ability to — we had roughly an extra 3 months in 10, nearly 3 months in January, to make further progress on the top size work. So I think we grasp the scope quite well. And I think you're right to press the question about FPSOs sold previously with a great deal of work to carry out. So I think we have a solid grasp of precisely what the work scope is, and therefore, clear plans for how to carry out that work scope; so I feel good about that. Nothing's finished until it's finished. But clearly, we do have, I believe, the benefit of additional time to work on the top side thanks to the time on the fair leads.

Bob Brackett

analyst
#15

This follow-up takes us back to BirAllah. The PSC extension had been granted for 2 years. You, along with the government and BP, have all been cooperating in good faith to help move that project forward. Then time expired. How should we think about whether you're the obvious party to own a partnership that takes that asset to market? Or does it become a competitive tender where you sit alongside a number of other bidders? And I'd be curious to hear what concept you envision for a fast-track development at that location.

Andrew Inglis

executive
#16

Yes. No. Yes. That's an interesting question, Bob. My sense is the government is genuinely attempting to identify a constructive route for advancing this project. And what does that mean? Sure, they could obviously take it to the open market with bids and so forth. Sure, the downside of doing that is it produces a partnership with uncertainty. You could be introducing someone new who lacks the subsurface understanding that we possess. We believe there's a real wish to try to collaborate with the incumbent partners who hold that understanding. We probably — we hold the knowledge from 2 wells at BirAllah. — one of Mastodon on Orca. We hold the knowledge from every appraisal well on GCA and the development wells on GTA, plus the calibration of the seismic against that data set. So significant knowledge, I believe, is what we contribute; regarding the development concept, it really comes down to how you achieve cost efficiency in the subsea layout; and in the end, that's where the industry has seen the large cost increases — in the subsea. So by minimizing that architecture — you minimize it by placing the FLNG vessel right over the field. That also delivers the added advantage of reducing pressure drops, which yields enhanced recovery. So those — without delving too deeply into the engineering, Bob, those are the means by which you can alter the cost basis of the development; and those are the concepts being worked on in YT, and those are the concepts we're bringing to BirAllah.

Matt Smith

analyst
#17

Just a couple, please. The first one is — and I apologize if I missed part of the commentary on this earlier in the call — but could you give us any extra color on how Ghana performed, specifically at Jubilee, during the quarter? How did that compare with your own expectations, and what confidence does it give you in the full-year outlook? I believe you had another oil producer come online in April, so if you could speak to that at all, and also the exit rates you've seen after the quarter? Just to frame how Ghana started the year and the confidence that gives you for the remainder of the year, that would be interesting to hear. Yes, maybe I'll stop there and come back to the second one.

Andrew Inglis

executive
#18

I think just to update you. If you look across March and April, we averaged roughly 95,000 barrels of oil per day. So as you said, we brought on the — we recently brought on the final producer, and we're optimizing its subsea setup to get the most benefit from it. And then finally, we have the final water injection, which is being drilled right now; and then we'll actually begin the completion of that shortly. So I think it's early days. As you look ahead to how the field performs over the rest of the year, I think there were about 3 fundamental things we're focused on. The first is what the recently added wells contribute to the ramp-up in rate. The second is that we had really good reliability in the first quarter, I think close to 99% on the Jubilee FPS. So clearly, we need to keep that high level of reliability going forward. And then I think the third one is really the most important point, which is around sustaining high levels of voidage replacement; that was a challenge last year when we had downtime and didn't get to 100%; now we've done pretty well in the first quarter. We need to keep that up going forward; we've had a GTG down, I think, for a couple of weeks; so we've probably been a bit under the 110% in the last month. But that's a critical factor; so I think it's — those are the things we're focused on. And so, those are the things that will influence the outcome across the rest of the year. That said, the drilling has actually gone well. We've really drilled — the operator has done a great job on drilling performance, and the wells and their timing have absolutely met our expectations. And when the final water injection is done, I think, over this program, we've probably created close to 6 months of reduction in the overall program, which is pretty impressive. That's basically the position we're in right now, Matt.

Matt Smith

analyst
#19

And maybe a second one, which could be for Neal. I suppose I'll just return to that free cash flow guidance you gave us — $100 million to $150 million each quarter once the growth projects come online. If my memory serves, you said that was broadly supported by $70 WTI and 75 Brent — please tell me if I've got that wrong. But I was just wondering whether you could address the sensitivities and the upside to those free cash flow figures in an 80 or 85 Brent world.

Neal Shah

executive
#20

Yes, sure, Matt. And yes, that's roughly correct. Regarding the $100 million to $150 million of cash flow — free cash per quarter after Winterfell and Tortue come online on a quarterly basis — in that kind of $75 Brent, $70 TI range. And yes, on price sensitivity, generally it stays about the same; it's roughly $100 million of free cash flow for the year for each $5 move in the oil price; and so $25 million plus or minus a quarter, if you go to $80 Brent, and the $200 million for the year, $50-$50 million a quarter, $85 million rent. So it is — yes, and right now we have sort of full access to the upside. So we can fully participate in that. Well, that's very clear.

Mark Wilson

analyst
#21

My question concerns the primary factors behind the production rise in the second half, alongside your reaffirmed group guidance of $71.72 — we understand Tortue delivers first LNG during Q4. May I just verify whether that is when you begin reporting the gas from Tortue? Or does it happen in Q3, as it moves through the FPSO? That would be my first question.

Neal Shah

executive
#22

Yes; so Mark, we quote on an entitlement basis, much like what we report for quarterly production alone. As for sales, though, it will be handled along the lines of our approach in Ghana and EG, where cargoes drive it; thus total entitlement production will be shaped essentially by the LNG entering the FLNG vessel and the condensate entering the FPSO as a kind of entitlement volume; however, sales volumes will in the end be linked to cargoes exactly as we are — do use cargoes in Ghana in EG.

Mark Wilson

analyst
#23

Got it. Okay. That makes sense to me. Alright, so FPSO comes in 3Q and entitlement follows in 4Q; and for my second question, I suppose another major production driver would be Jubilee, and Andy, you touched on that a bit already; so factoring in all of those different points, do you still believe that field can average 100 for the remainder of the year, or perhaps even more?

Andrew Inglis

executive
#24

Yes, like I mentioned, Mark, we're carrying out exactly what we committed to, namely delivering that result; we still need to realize the added gain from the infill wells. We have the last 2 left to complete, and after that we'll tune the system for the new well setup, and that work is underway; so that's the first variable, so to speak, that has to be handled properly. The second one is obviously sustaining reliability and building on a solid start to the year, and we must keep that going. And then the essential piece, I'd say, really concerns voidage replacement and how that water gets distributed. Again, since the offtake patterns are shifting as a result of the new wells arriving, getting that new reservoir offtake pattern optimized matters greatly. So there's plenty to do, Mark, in order to achieve that result. The initial step in all of this is to get those wells drilled and brought online, and we've got about one remaining. So it's — clearly there is work ahead, and we'll update you on how things progress as we move through the quarter.

Mark Wilson

analyst
#25

And that's my final question. From what I understand about Yakaar Teranga, you're working to get pre-FEED completed, and at that point you'll be looking at where the market stands for farm-outs. Would that be a fair way to put it?

Andrew Inglis

executive
#26

That's exactly right, Mark. So if we look ahead — which is really what you were asking about — I think we now have a piece of work where we're completing the pre-FEED, with pre-FEED finished by the middle of the year; through the pre-FEED, we have the technical validation of the concept. And then we have a cost base that we can discuss with the new administration. Clearly, this is about building a new partnership for Yakaar Teranga. Our aim is for Petrosen to be a line partner at around 1/3, ourselves a third, and a new partner a third; so we have to work with the new government to bring that partner in. They're clearly going to have to stay in there. And we need a fiscal arrangement that lets us create the economics supporting a low-cost gas and an LNG export scheme. Now, with those 2 pieces in place, you can then move on to the financing, and the intent is to have the FLNG vessel financed. So there's a series of steps here. There's technical work to be done, which is, in a sense, a milestone within pre-FEED. There's work to be done on alignment with the new administration around fiscals and a new partner, and then there's work to be done on financing. You bring all those 4 together, and then you can start on the real work, which is on feed — but we won't be starting feed until we've got those things done. So again, I think we've made a lot of progress so far on the pre-FEED — and after the election, we can now start working on those next items.

Mark Wilson

analyst
#27

Much appreciated. It did cross my mind while you were answering that perhaps it would be worth hearing a comment on how the governments involved differ between Yakaar Teranga and BirAllah. When you last extended the PSC, BirAllah did appear to be advancing more quickly toward a development concept, arguably. And now Yakaar Teranga has shifted to this — the set you have at present. So I would be interested to hear a remark on the differences between the two.

Andrew Inglis

executive
#28

Yes. Look, honestly I don't see a difference. Both governments are eager to allow their gas resources to be developed for the country's benefit. And I believe the Mauritanian government has been just as explicit regarding its aim of taking BirAllah forward following BP's exit. So I don't believe there are any fundamental differences there, Mark; and so it comes down to how we can take part in helping them with those agendas and put forward compelling investment opportunities.

Neil Mehta

analyst
#29

I have a couple of questions here. First, I'd just like your view on deleveraging. Once you reach that free cash flow inflection that Neal mentioned — and those are really large numbers — how do you think about paying down the debt on the balance sheet? What are the priorities? And what's the target level? And how fast can you get there?

Andrew Inglis

executive
#30

I'll let the other Neal answer that.

Neal Shah

executive
#31

Yes, I believe our stance on leverage is unchanged. Our goal is to reach a sustainable level below 1.5x across the cycle. Once the products are online, the free cash flow we generate will go toward that, and probably at first it will preferentially go to the RBL, given that it's floating rate and is our highest-cost interest piece right now. So we have some work to do on reducing debt, and that has been a clear priority for the free cash flow. And again, from our perspective, I think you'd see the front end of that free cash flow clearly pointed at the RBL. Then once we're below 1.5x in a normalized oil price environment, it comes around to the competing priorities in terms of some allocation toward debt repayment versus capital returns. So that's a discussion for the future. But as of today, we'll keep focusing on just getting to that below 1.5x at the normalized price first.

Neil Mehta

analyst
#32

Got it, Neal. I'd also like to give you a chance to discuss the convertible bond issuance, since it caused quite a bit of volatility in the stock — though I believe much of that was simply about managing near-term interest expenses tied to floating rate debt. So I'd just like your view on why you felt that was the most cost-effective way to finance this? And how should we think about it over the long term?

Neal Shah

executive
#33

Sure. So once more, we've had quite a few conversations regarding the convertible with both debt and equity holders in the last couple of months since we completed it back in March; and for us, again, I think it comes down to where our existing bonds trade and how we maximize access to the debt capital markets at, in a sense, the lowest cost we can get. And the problem we've faced over the past 18 months, looking back at '22 and '23, is really where Ghana has traded and, as a result, the effect on our secondary bond levels — so a new issuance through the regular bond market would have come at a pretty high price just from a standard new issue market, and so, in trying to get ahead of the liquidity and the maturity wall, which is something we've always aimed to be proactive about; and so I felt that was the best option at the time for managing the maturity schedule, and as you can see in the presentation, with that in the RBL, we've truly cleared the runway for the coming couple of years so we can execute and keep paying down debt. And so it's really about getting the balance sheet off the agenda, concentrating on organic delivery of the business plan, and using, in a sense, the most efficient tool available at the time to try to get that done; so that's really the background behind it.

Subhasish Chandra

analyst
#34

Yes, to follow up on what Neal was saying, I have a couple more questions about free cash flow. Is the organising principle, beyond next year, basically to stay in that $500 to $600 million maintenance CapEx range? And then everything past that, obviously, pay off the RBL and then move to payouts, et cetera? Or is there some appetite you might have deferred until you get GTA going, whether organically or through acquisitions, that could take us to a different spending level down the road?

Andrew Inglis

executive
#35

Let me take that one. No, I think when we discussed the $550 million, we framed it along 2 dimensions; we described a base maintenance capital figure of $300 million to $350 million, which roughly covers the infill drilling programme in Ghana, the ongoing development of Jubilee; it covers the infill programme in Equatorial Guinea that I mentioned earlier; and then, looking longer term, what comes after the start-up of Winterfell and then Tiberius, the additional wells there. So I think we're allocating capital properly to that. And obviously, those projects carry very high returns; and then on top of that we discussed roughly $200 million to $250 million of spend that would fall under growth. Clearly, the 2 projects we're focused on today are Tiberius and the Yakaar Teranga with an expansion project at Tortue. And that capital, that $200 million to $250 million, includes the spend on those projects, net of financing of the FPSO on, say, Yakaar Teranga. So I think we're clear on the company's forward projection, where we believe we can not only grow, but grow at a more modest rate than we obviously achieved over the last 2 years, yet there is growth in high-quality projects, and it will be a mix of low-cost, low-carbon oil, EG Tiberius, and low-cost, low-carbon gas, EG and the expansion of Phase 1 or Yakaar Teranga; so it's single digits, middle single digits growth rates. But at the same time, with a capital level of $550, we believe we can — we have significant free cash flow, which, as Neal says, we can direct toward paying down debt and then, once we reach the right leverage level, we can look at shareholder distributions. And I think that's ultimately what sets Kosmos apart as a company. It has an organic activity set that it could sustain really through a decade and beyond, we have an RTP of over 20% on a 2P basis. So the ability to create something now that can not only keep growing but can actually return cash and with — we think a really competitive free cash flow yield is something that's quite unique. So that's our objective now. So — but we're clear about the frame. And that's something I really want to make clear on this call: the $550 in that cents is unambiguous, and we're unambiguous about the capital frame and, as a result, how it will be allocated.

Subhasish Chandra

analyst
#36

Understood. Alright, so your message comes through loud and clear — there's no genuine appetite for external opportunities. Given what looks like more churn in the assets, whether stranded gas or in the Gulf of Mexico, and so on, you'll stay with the footprint you already have?

Andrew Inglis

executive
#37

That's right; and what I believe we've made plain, Subhasish, is that anything inorganic must be accretive on a cash flow basis that in fact, as a result, speeds up that journey, yes. And I think that, that's — having laid that out as the organic path for the company to improve on, you need to speed it up through organic and inorganic that truly is significantly cash flow accretive, which has been true of the 3 acquisitions we've in fact completed as we've grown the company. In the same way, there could be opportunity, especially on the gas side, to lighten the portfolio, which once more speeds up that objective. So I think we're completely clear on the company we're building. And so, in a sense, on how an inorganic opportunity would fit. What we clearly don't need to do is buy things to offset decline. We have no declines. And I think that, once again, is what sets us apart from others. So if something is accretive from a cash flow standpoint, it organically speeds up those quality assets then obviously, those are the things we seek in the same way, the opposite if we can speed up delivery of free cash flow for our shareholders by lightening let's on the gas assets, then we would do so.

Operator

operator
#38

Alright, everyone, we’ve reached the point where there are no more questions. So I’d like to wrap up the call now. Thank you all for being with us today. At this stage, please go ahead and disconnect your lines, and we appreciate your taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kosmos Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Kosmos Energy Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kosmos Energy Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.