Thanks, operator. I appreciate all of you being here with us today. Earlier this morning, we put out the earnings release covering both our fourth quarter and the full year 2024. You can find that release, along with the slide deck for today's call, on the Investors section of our site. Here with me to walk through everything are Andy Inglis, our Chairman and CEO, and Neal Shah, our CFO. Over the course of this presentation, we'll be sharing forward-looking statements about our estimates, plans, and expectations. A number of factors could cause actual results and outcomes to differ materially, and we describe those in this presentation as well as in our UK and SEC filings. For additional detail, please see our annual report, stock exchange announcement, and SEC filings. All of those documents can be accessed on our website. With that, I'll hand things over to Andy.

Andy Inglis

executive
#2

Appreciate that, Jamie, and a warm welcome to everybody, whether it's morning or afternoon where you are. We're glad you could be with us for the call covering our fourth quarter and full year results. What I want to do first today is discuss what sets our cash generation apart. After that, we'll walk through how operations and finances progressed during 2024, and then we'll get into what 2025 looks like and how our focus will sit on generating cash by growing revenue and keeping a tight grip on costs. If you turn to slide three, you'll see that Kosmos Energy Ltd. holds a portfolio unlike most others for a company our size, spanning a varied collection of oil and gas assets on a world scale. You can gauge the portfolio's quality through how long the asset base lasts, with a 2P reserve life that keeps growing and now exceeds twenty years. Low operating costs and high cash margins define our oil assets, whereas our gas assets are set up to grow revenue with rising margins, aiming at sustainable cash flow over the long term, especially as gas and LNG keep expanding their share of the global energy mix. For Kosmos Energy Ltd, 2025 matters a great deal; higher production combined with lower capital should produce an appealing free cash flow yield, which is illustrated in the chart located on the right-hand side of this slide; with Kosmos Energy Ltd. shown alongside our peers in the U.S. and internationally, plus the majors. Since the ongoing ramp-up of GTA and scheduled maintenance at other fields during the first quarter of the year have to be taken into account, we've based this on an annual free cash flow from 2Q 2025 forward, which in our view is sustainable over the medium term. Beyond our strong potential to generate cash, the portfolio carries considerable future optionality; with substantial discovered oil and gas opportunities like Tiberias and Yakataranga, together with a quality hopper of infrastructure-led exploration prospects in the Gulf of America. Now to slide four: during the second half of 2022, we established a goal of expanding production capacity by roughly fifty percent via multiple projects spread across the portfolio. The chart here illustrates the foundation we've constructed to reach that goal, which is attainable through the ramp-up of GTA and Winterfell plus new wells in Ghana. Crucially, with these projects coming on stream, the CapEx tied to them is wrapping up; in 2025, total CapEx is expected to drop significantly from an average above $800 million across 2023 and 2024 down to $400 million this year. That's a cut of more than fifty percent. We'll be looking at ways it might be lowered even further wherever we can. It's not only the work scope we're refining—the costs tied to it are being tightly controlled as well. The resources required to build and grow the portfolio differ from those needed to sustain it. So we're aiming to cut annual overhead by about $25 million by the end of 2025, mostly through fewer contractors and external consultants. And by having the right workforce focused on the right things. This involves directing our exploration spending toward the Gulf of America, since we already have such a deep discovered resource base throughout the remainder of the portfolio; as output grows and costs come down, generating free cash flow becomes our priority; over the near term, we plan to direct cash toward paying down debt until leverage reaches our target of under 1.5 times at mid-cycle oil prices. Absa Rich will balance cash between additional debt reduction and returns to shareholders. Moving to Slide five now. What supports the company's potential to generate cash is a robust and varied reserve base. With variety spanning numerous geographies, split roughly fifty-fifty between oil and gas. At the close of 2024, our 2P reserve replacement ratio came in at 137%. We replaced what was produced last year while adding further reserves over the year. Upward revisions were mostly gas-driven as we keep advancing the GTA project. With that project set to ship its first cargo and additional drilling at Winterfell and Jubilee later in the year, there's room for more upward revisions during 2025. Year-end 2024 2P reserves totaling 513 million barrels of oil equivalent equate to a reserves to production ratio of twenty-two years, a significant differentiator for Kosmos Energy Ltd. relative to our U.S. and international peers, as the chart at the bottom of the slide shows. Add in the vast 2C resource base beyond that, and the figure approaches thirty years, underscoring the organic running room available to us for many years ahead. Over time, via enhanced seismic imaging, additional infill drilling and project sanctions, we anticipate migrating 2C resources into 2P reserves and 2P reserves into 1P reserves. The key point from this important slide is that although numerous companies throughout the sector confront shrinking inventory and reserve lives, we possess the reserves and resources needed to underpin sustainable cash generation. For many years ahead. Moving to slide six, where I want to briefly cover several highlights from 2024. We accomplished a great deal in 2024. Finishing the year as a better, more resilient company. Reviewing some of those achievements, safety is a central priority at Kosmos Energy Ltd., and we kept operating safely throughout the year with zero lost time injuries or total recordable injuries. Safety is a central priority at Kosmos Energy Ltd., and we kept operating safely throughout the year with zero last time injuries or total recordable injuries. Strong safety performance, with incident rates far under industry averages, is a pattern we've sustained for many years. As noted earlier, our two pre reserves increased year on year to 530 million barrels of oil equivalent, a reserve replacement ratio of 137%, underscoring the portfolio's longevity; we reached first oil at Wintervale during the summer of 2024 and anticipate production climbing later this quarter. As Winterfell three returns to service, with a fourth well anticipated online early in the second half of the year. Near the end of Q4, the partnership hit first gas production, the GTA project. Earlier this month, first LNG production was reached, and the first cargo lifting should happen soon. During the year, we brought in $900 million altogether through new bonds at attractive rates, and we refinanced our RBL facility while also boosting its capacity. These moves meaningfully strengthen our financial position and stretched out our weighted average maturities, leaving very little coming due within the next two years. Neil is going to give some detail on that last point now and walk you through the quarter's and the year's results.

Neal Shah

executive
#3

Thanks, Andy. Moving on to slide seven now. Fourth-quarter output came in below what we had guided. That was partly because of weaker Jubilee volumes, which the operator flagged only last month. Steps have been taken to fix the water injection and reliability problems at Jubilee, and voyage replacement is above 100% so far this year; we also experienced a minor hold-up in the ramp-up of output from the EG infill wells, and Winterfell one and two sat idle for the bulk of the quarter before coming back onstream late in the year. The 4Q output problems are mostly resolved, though given a number of planned maintenance programs in the current quarter, output should be roughly level from one quarter to the next. You'll find detailed guidance in an appendix to the slides. The 1Q maintenance plan includes the shutdown of the Jubilee FPSO for a one-month turnaround of doubles tower, which hosts the Kodiak field, plus some other scheduled maintenance in Equatorial Guinea. We're also seeing GTA ramp up during 1Q and expect to finish the quarter close to full capacity. On the cost side, costs came in largely as budgeted, with CapEx a bit higher because of GTA startup cost. Now to slide eight. 2024 mattered a great deal for strengthening the company's financial resilience. As Andy said, we issued $900 million of new bonds refinance and expanded the capacity of our reserve-based lending facility, adding two new banks. Together, those deals pushed our average debt maturity out to roughly four years. The top right chart lays out our current maturity schedule. Near-term maturities are minimal — just $250 million due in 2026, which we expect to repay out of cash flow. It's also worth noting that we've managed our debt so that no single year carries a large maturity. That lets us pay down the debt from future cash flow. Further derisking the balance sheet. The bottom right chart shows how we keep actively managing future price volatility via our rolling hedging program; right now about 60% of our first half oil production is hedged, with downside protection of approximately $70 per barrel. That gives solid protection for our cash flow. We'll stay proactive in managing oil price volatility through 2025 and into 2026. On slide nine, our financial priorities for the year. Andy made it clear in his opening remarks that cash generation is our key financial priority in 2025 and beyond. So we intend to be very disciplined about cost management. Targeting meaningful reductions in both CapEx and overhead. As we reach the end of a capital-intensive stretch for the company, we expect capital spending to drop sharply, with a 2025 capital budget of $400 million or below — a reduction of more than 50% year on year. We're also working hard to bring overhead down, targeting a reduction of around $25 million by year-end 2025. Once the cash flow we anticipate starting in Q2 begins coming in, paying down debt will be our top priority. At first, we'll target the RBL, since it's the prepayable debt carrying our highest cost, along with the 2026 and 2027 notes that remain outstanding. Then, from a financial standpoint, the last item to deliver this year is refinancing the GTA FPSO. That financing was originally arranged with the operator back during COVID, and we're now collaborating with them to reduce the total expense. That ought to bring down our per-unit operating costs on the project. So to wrap up, our objectives for 2025 are well defined. We'll grow production and cut costs, with cash generation as the priority. With that, I'll turn things back to Andy, who will walk you through the assets and the outlook for the coming year.

Andy Inglis

executive
#4

Thanks for that, Neil. Let's turn to Slide 10. I want to start with GTA and take you through how we got here in creating an entirely new LNG hub in the Atlantic basin, and why our outlook for what comes next is positive. Starting at the top of the slide, the timeline begins in 2015, when Kosmos Energy Ltd., serving as operator, notched its first exploration win at Tortue, uncovering a field with approximately 25 TCF of gas in place. That stood as the world's second largest hydrocarbon find that year. A year later, we ran our farmout process, and BP came aboard as operator, with total consideration paid to Kosmos Energy Ltd. of about $950 million, which included covering the first $550 million of our development CapEx on the GTA project. Toward the end of 2018, the project hit final investment decision, and at the close of 2024, first gas production was announced. We certainly hit obstacles along the way, including COVID-related delays and a major typhoon in China that damaged the FPSO. Roughly five years have been needed to develop the project. Earlier this month, we announced the first of several major milestones related to delivering the project. Initial LNG production occurred in early February, and we're about to load the project's first cargo, with an LNG tanker already waiting at the hub terminal. This new Atlantic basin LNG hub occupies an ideal location for particular European markets, given short sailing distances and low transportation costs. GTA gas also contains minimal carbon dioxide or hydrogen sulfide, which benefits both the environment and proper infrastructure upkeep. Now on Slide 11, we look at what's ahead. Partners will start receiving revenue from the project soon, another important milestone. Once fully ramped up, anticipated in the second quarter, reducing LNG at the off-takers' contracted volume of 2.45 million tons per annum requires about 400 million standard cubic feet of gas per day. That equals roughly thirty gross cargoes each year. Project partners will co-lift the cargoes, which should provide a steady revenue stream, with minimal over-lift or under-lift impact between quarters. With GTA Phase one now starting up, the partnership has worked together on expanding into future phases. The operator, National Oil Companies and Kosmos Energy Ltd. share a vision of fully utilizing the existing infrastructure to drive a low-cost brownfield expansion. That raises future LNG output while ensuring local markets' gas needs are met. A chart at the bottom left shows there's ample recoverable gas in place to support multiple future phases, each capable of producing for over 20 years. Early data from the producing GTA wells has been encouraging, building confidence in a reserve base for upcoming expansion phases. For the full year, guidance is 17,000 to 20,000 barrels of oil equivalent per day net, an approximate 20% increase year-over-year. This partnership starts out concentrated on phase one plus, which is a brownfield expansion taking advantage of the infrastructure we put in place for phase one. On phase one expenses, the initial year truly represents a transition period, and we'll see higher operating costs while we wrap up commissioning and ramp volumes to full capacity. As time passes, unit costs should come down once the facility hits its peak and start-up costs stop being a factor. Even though we've moved 2.45 million tons per annum under the BP sales contract, the floating LNG vessel should be able to hit a nameplate capacity of about 2.7 million tons per annum or more, which is normal for LNG plants. Also, as Neil mentioned, we're working alongside our partners to refinance the FPSO lease, which ought to reduce operating costs even more. Over the medium term, growth from the phase one plus expansion, together with extra volumes that haven't been counted, should keep driving margins upward. In summary, getting to this point has been quite a ride. This project still has plenty of running room, and we're excited about what's coming. Turning to Slide twelve, which addresses operations in Ghana. Net production for 2024 was just over 41,000 barrels of oil equivalent, below what the operator had aimed for during the year. The main reasons were the J-sixty nine well and Jubilee, along with insufficient voidage replacement or water injection resulting from reliability issues mostly related to power generation. We've teamed up with the operator to tackle these field management problems. The slight decline ahead of the upcoming drilling campaign, combined with improved power reliability, is delivering voidage replacement above 100%, which is required. That aligns with what's been achieved in the first two months of 2025, as the chart on the slide indicates. Going forward, we have a busy year in Ghana, beginning with the four d seismic campaign, which is already in progress. This modern four d data will be processed with the latest technology, giving us a much clearer view of the subsurface, particularly when it comes to fluid migration, which allows the partnership to choose the best drilling locations down the road. We stay convinced that Jubilee has significant upside, so we're focused on securing the best technology to raise the recovery factor from over two billion barrels of oil in place. We plan to leverage our position in the Gulf of America to tap the most current seismic processing methods and reservoir management tools, AI included. We're also planning two new wells at Jubilee this year with a rig that's returning to Ghana, and we'll continue with a four well program through 2026. On this year's guidance, the operator provided no specific guidance for the fields in its most recent trading update. We expect gross Jubilee production of 70,000 to 76,000 barrels of oil per day and gross ten production of 15,000 to 16,000 barrels of oil per day. For the full year, guidance is 17,000 to 20,000 barrels of oil equivalent per day net, roughly a 20% increase year-over-year. Additionally, for Kosmos Energy Ltd., we anticipate net gas output of about 6,000 barrels of oil equivalent. Now, let's look at slide 13. In the Gulf of America, we saw output rise consistently quarter by quarter, beginning in the second quarter. As this chart illustrates, after the first Wintervale wells were brought online, the production optimization work at our job and Kodiak—both surpassing our expectations—became clear. The rate at which we closed out the year demonstrates what this business unit is capable of producing, before accounting for planned maintenance and hurricane-related downtime. Remediation work is happening at the Winterfell tree well right now, carried out by the project's operator, ahead of the rig moving to spud the Winterfell four well, which we expect to start producing early in the back half of the year. As for Tiberias, we're continuing to move its development forward with our partner, Oxy, but at a measured pace, because our focus is cash generation in 2025. Our aim is to complete the farm out close to the point of project sanction; past that, we have an attractive set of VIALX prospects. Under the new administration, the outlook for activity in the Gulf of America has improved, with the potential for additional lease sales creating more opportunities for us to keep enhancing the quality of our future activity set. Our full year guidance is 17,000 to 20,000 barrels of oil equivalent per day net, an approximate 20% increase year-over-year; we Now turning to Slide 14. In extra ordinary, we finished the infill drilling campaign late in 2024. With both wells now producing, they together deliver roughly 9,000 barrels of oil per day. Gross. In the fourth quarter, we drilled the King D Violex well, and it did encounter oil zones within the Upper Albion section, confirming parts of an active petroleum system. Still, it was determined to be sub-commercial, so the well was plugged and abandoned. Tippie is currently reviewing the results to get a clearer understanding of what the area might hold going forward. For 2025, we expect continued output from the two in full wells, and we'll reprocess the latest seismic data across the fields to help plan the next infill drilling campaign, which we anticipate running in 2027. Our full year guidance is 9,000 to 11,000 barrels of oil per day. Net, roughly a 15% increase compared to the prior year. Moving to Slide 15 to conclude today's presentation. As I've outlined in today's material, we achieved a great deal in 2024 to lay the foundation for delivering shareholder value in 2025. Production is rising as new projects come online and ramp up. As the previous slides showed, we have the reserves needed to keep producing at this level well into the future. We are keeping a tight rein on expenses so that free cash flow stays the priority, and we plan meaningful reductions in both capital expenditures and overhead. The cash we bring in is meant to go toward paying down our absolute debt and leverage, which makes the company's financial position more resilient. We've also retained our attractive set of growth opportunities, giving Kosmos Energy Ltd. differentiated optionality ahead. Thank you. At this point, I'd like to turn the call over to the operator so we can start the question session.

Neil Mehta

analyst
#5

Thanks, Ian. Andy, Neil, and the rest of the team — this morning we've had a few questions come in about startup costs, the ones you called out in the deck. So that might be the right spot to begin, meaning just walking through the start-up and commissioning costs, and these look like they're one-time in nature, but how are you thinking about, you know, laying those out and getting through them?

Andy Inglis

executive
#6

Yeah. Hey. Appreciate it, Neil. Yeah. Good to hear. Question. On earlier calls we've discussed what makes up the main pieces of the operating costs, you know, specifically the F and FLNG toll, the upstream OpEx and the FPSO financing. In what we're sharing today, we've given you pretty thorough full-year guidance, and it reflects our best assessment of when cargo will ramp up in production along with the associated costs. As we mentioned in our prepared comments, this year will be a transitional one for us, you know, particularly regarding the expenses tied to finishing all the commissioning activities and seeing volumes climb. Given that, we expect costs to stay at this level throughout the year before declining gradually. So what's driving that? There shouldn't be any more of those one-time commissioning expenses. We'll be ramping production up to the contracted level, which is an ACQ of 2.45 million tons per annum. And then, as I said in my prepared remarks, we'll be testing the facility at its nameplate capacity of 2.7, and possibly beyond that. On top of that, there's some refinancing work to be done on the FPSO lease. So at this point, it would probably be good for Neil to walk you through those three items and give you a bit more detail on what we're aiming for as we strip out some of those one-time costs and reach a steady state.

Neal Shah

executive
#7

Right. So beyond that, when you consider things moving ahead on a normalized-day basis, we mentioned the two pieces involved — the SLNG vessel, which falls under normal OpEx, plus the operating expense. We'd anticipate that settling into a range of $4 to $5 per m type. Then there's that question about FPSO financing and how far we can push that down as well. But yeah. I'd say, roughly speaking, if you treat that as a bit over an additional dollar per MCS when it comes to a long-term FPSO cost — though once more, a substantial decrease comes about through lowering the cost and, in fact, raising the volume, as Andy noted. And then, yes, then, as I mentioned, at that stage you're set up to produce LNG that's very cost-competitive.

Neil Mehta

analyst
#8

Alright, thank you. Appreciate it, Andy. Thanks, Neil. So my follow-up is really about CapEx. Your guidance points to a maximum of $400 million. Could it actually land below that figure? What options do you have available to get the most out of capital efficiency? That question is a twenty-five. Obviously, it's too soon to be discussing twenty-six, but for those investors concerned about whether that capital efficiency can last, are we moving into a harvest mode that might stretch across multiple years?

Andy Inglis

executive
#9

That's a fair question. Yeah. I believe, as I tried to stress during the prepared remarks, free cash flow sits at the top of our priorities. That is what our shareholders want to see. And we've been explicit that we'll deliver a sustainable pre-tax flow yield against today's equity price. In the neighborhood of twenty-five percent. That's exactly what we presented on that opening slide. What does that tell you? We've completed a growth phase. What matters now is strict cost control and, you know, strict discipline in how we allocate capital. We're addressing overhead through a substantial cut that will be delivered by the year-end, and that clearly carries forward on a sustainable basis. Then when it comes to capital, as you mentioned, we're aiming for $400 million or less; and mostly in twenty-five, that money goes toward sustaining the base. The Julie; the wells over in Winstead; and after that, you know, it comes down to striking the correct balance between growth and cash flow returns. And we're confident we hold a portfolio where that's achievable and where we can strike the correct balance. Operated projects moving ahead, you know, a number of those are operated. Those growth projects are operated. That gives us more control. You know, on earlier calls, we've described a capital profile. You know, of roughly $500 million. So we said $300 million to $350 million on the base. $150 million to $200 million for growth. In twenty-five, we sit at the low end of that guidance, because we have, you know, limited spend on growth. And we intend to stay disciplined about how we allocate growth capital. So this isn't about decline. This isn't about harvesting. We can absolutely grow the business. $300 million to $350 million. And after that, it's about bringing in those quality growth options at the correct pace to sustain the company; and you know, one thing that sets Kosmos Energy Ltd. apart is the quality of its portfolio. We currently have an RFP on a 2P basis extending beyond twenty years. We have no shortage of organic material to work on. What matters at this point is the discipline of pushing the free cash flow yield to where it belongs — by actually delivering the cash and steering that growth portfolio, so the free cash flow yield holds up over time; that is exactly the work we are doing right now. And I would hope that, through some of the points we laid out in the prepared remarks regarding cost discipline, you can feel confident we will carry that forward. Along with, of course, the proper pacing of the growth target. So to be clear, this is not a harvest story. It is not a story of decline; it is a story of a free cash flow yield that can be sustained going forward.

Neil Mehta

analyst
#10

Thank you, Andy.

Andy Inglis

executive
#11

Great. Thanks, Neil.

Charles Meade

analyst
#12

Yes. Good morning, Andy, Neil, and all the other participants on this Kosmos Energy Ltd. call. Andy, I want to go back to something you mentioned during your prepared remarks about GTA. Not the short-term part, but instead what you discussed concerning phase one plus, which I think is the term you're using. What does that actually entail, and at what point would it take place? When you say one plus, does that refer to the extra volume going from the 2.45 contract up to the 2.7 nameplate, or does gas going to domestic markets also fall under that? Or, if you wouldn't mind, could you explain what composes it and how the timeline appears?

Andy Inglis

executive
#13

Yeah. No. That's a great question, Charles. In my opinion, the best way to describe one plus is as fully utilized — getting complete use out of all the infrastructure that already stands for phase one. Right. The FPSO actually has debottleneck capacity of around eight hundred millimeter cube. That's double what it currently produces. And that debottlenecking is available at a relatively low cost — genuinely low cost, in fact. Beyond that, the job is to leverage the rest of the infrastructure already in place so that, you know, that gas is best transported through the existing plan and and and beyond it. What you'll probably see is one component involving an increase to the current vessel's capacity. The gimme that's there, and you'll very likely also see a boost in the domestic gas take; but at the same time, those projects are incredibly economic. The reason being that the capital cost is literally very low. And you have the opportunity to to double the throughput; so that's the route we're taking. And, you know, regarding timing, we now have strong alignment among, you know, the NSCs, ourselves, and VP, you know, in advancing the technical studies required to bring it about. And, I believe, as minister Khaled from Mauritania said, our objective is to accelerate production in the upcoming phase with a target for 2030, while ensuring the local gas market's needs are met. So that's the aim, Charles. Yeah. It's it's an expansion of a brand field. It's getting the most out of what's there today. And doing so in a genuinely capital efficient way.

Charles Meade

analyst
#14

No, that all tracks, Andy. Appreciate it. Now, going back to—I think it's slide twelve, the one on Jubilee—could you walk us through the assumptions? The question is this: you've gotten it to seventy to seventy-six thousand barrels of oil per day gross. What assumptions sit behind that, particularly regarding the FPSO—its generation and water injection? What's baked into that seventy to seventy-six when it comes to how the FPSO performs?

Andy Inglis

executive
#15

Yeah. Well, Charles, once again this really circles back to the fundamentals of Jubilee, right? What I want to do is re-enter a class oilfield. It holds two point four billion barrels of oil in place. Our reserves currently carry recovery factors of roughly thirty-three percent. Do the math. We've produced only about fifty-five percent of the reserve base so far. My view is the recovery factor ends up in the high thirties when all is said and done, so we're likely around the halfway mark. Yeah. Under halfway. So reaching those remaining reserves means you need solid reservoir management, which—you know, at its core—comes down to placing water in the correct spots underground; we struggled, the operator struggled in twenty-four, as slide twelve shows, with voltage replacement under a hundred percent; that hurt the entry rate going into twenty-five; and that's basically why guidance sits where it does. Our aim is to hit a hundred percent voyage replace across the year. That's a key assumption, and we've begun the year strongly on it. It largely hinges on our generation reliability, and we're working alongside the operator to fix that. Obviously, there's a component tied to facilities uptime. Facilities uptime has held up well. That's ninety-eight, ninety-nine percent. So that's not a concern. We do have a planned shutdown baked in. It happens at the end of the first quarter. It's affecting, you know, 1Q volumes; so those are the key assumptions; and the last one is delivery of two additional wells—one producer and one injector. The target is starting two q with those wells delivering, you know, toward the back end of three q. So I'd say we have a solid, credible set of assumptions. And the goal, clearly, is then to make use of four d, which we're shooting this year—we've already begun. Then, of course, there's the goal of taking what that 4D gives us and applying it to influence which wells we choose for twenty-six. Once we've got a complete development plan in place — so the combined effect of moving ahead with a higher exit rate in twenty-five, plus the extra drilling in twenty-six, plus better-quality information coming from the 4D — that's what lets you keep the profile going afterward. So, you know, reserves aren't our constraint here. What matters is ensuring we manage the field properly, which really comes down to putting good replacement water in the right location; and then, you know, picking top-tier wells and getting them delivered.

Charles Meade

analyst
#16

That’s excellent — really helpful detail. I’ll get back in line.

Andy Inglis

executive
#17

Sounds good. Thanks.

Matt Smith

analyst
#18

Hello. Morning, Andy. Morning, Neil. I have a few questions. Let me begin with one about Tortue, if that's alright. First, I suppose it's noteworthy that you're once again discussing three phases or additional phases at Tortue. That includes phase one plus. So my initial question is really whether you've noticed a distinct shift in the operator's focus, or at least perhaps more momentum, regarding those possible development plans. And then, in the same vein, could I connect that to the fact that phase one a seems like it may be moving forward? Should we continue to view your forward CapEx run rate the same way, and should we still keep that $400 million in mind? As the ceiling for upcoming years past 2025? Or might the Tortue CapEx come on top of that?

Andy Inglis

executive
#19

Alright. Yeah. Let's unpack those questions a bit. The first one is essentially whether there's alignment, so to speak, among the operator, ourselves, and the NSCs regarding the way forward. I believe there is. BP has consistently spoken about bringing the first phase online and obtaining well results. That then allows them to begin considering the subsequent phases with fresh data. What I'd add is that the early data from actually flowing the wells since the start of the year is genuinely positive. That reinforces the resource base; it gives you confidence in the later phases. I think that's a significant piece of data, so to speak, six weeks into the flowback, or seven weeks into the flowback. I think we're also clear on being very careful and efficient regarding the next phases. So, as I mentioned to Neil and Charles. What we're trying to do is expand phase one plus in a highly capital efficient manner. It requires very little extra CapEx. And so we're obtaining an incremental value add from that. Brownfield development. So if you move on to your follow-up question. Which is, fine; we'll see how that fits within the capital allocation. I'll essentially do a repeat of the earlier response, which is that we've consistently mentioned three hundred to three fifty in the base. One hundred and fifty to two hundred in growth. The three hundred to three fifty in the base sustains the base. Today, that's what the capital expenditure is aimed at, so we aren't in harvest mode, and it isn't falling. After that, it comes down to how we stage those expansion projects. So, in the free cash flow yield we projected—based on our present share price—we've allowed for, you know, somewhat higher growth CapEx, though definitely inside that Great range we've discussed before. So the real question underneath is something like: are you racing ahead once more with an enormous capital outlay? The response is a flat no. Yeah. Free cash flow will be the priority. And through the close of this decade, the capital outlay on Torture, you know, is going to be small; it will involve maintaining the existing well count and doing a modest amount of brownfield work, which lets us obtain additional volume and and get the most out of revenue.

Matt Smith

analyst
#20

Thanks a lot for that, Andy. Now, may we squeeze in a follow-up, a brief one? Sorry in case I overlooked this before, but on Ghana and Jubilee in particular, if I may; it looks like a nice result when it comes to the voided replacement on the water side early in 2025. I was just hoping you might shed some light, and as I said, sorry if I overlooked it, on where the product has gone so far across January, February — has the reduction run rate come in similar to the voyage? Replacement.

Andy Inglis

executive
#21

Yeah. So we are entirely inside the range we projected. And, naturally, The one caveat is that, you know, when you consider the quarter, you must keep in mind that we have downtime. From the maintenance; so, you know, we are definitely producing inside the range we are forecasting. Right now, though we'll see a small impact in one q as a result of the unplanned maintenance. And after that we receive the upside from the extra wells coming online in, you know, three q. So everything is proceeding as planned regarding the forecast arrangement we have in place.

Matt Smith

analyst
#22

Alright, I really appreciate it. Glad to pass it along.

Andy Inglis

executive
#23

OK. Appreciate it, dude.

David Round

analyst
#24

David, thanks — one more thing on Jubilee, if I may. Honestly, I felt that outlook was fairly encouraging compared with what some others have been saying. So how much of that outlook — and, say, this somewhat brighter take on Jubilee — comes from what you've already observed with voyage replacement? And when will we be able to say with confidence that those problems are behind us? Or is it too soon to get ahead of ourselves?

Andy Inglis

executive
#25

Yeah, David, that's a fair question. I don't want to make it sound too simple, but doing the right things the right way produces the right outcome, so we understand exactly where our attention has to go. For the operator, I'd say the emphasis — and as things have gone so far, we've begun on a positive note. The core problem, I believe, really comes down to how reliably we generate power. Considerable effort has gone into pinpointing the weak points and fixing them. In fact, one generator was shut down earlier in the year, and that will actually work in our favor going forward. So I'm at ease that we understand what has to be done and how to get it done, and because of that, our attention is on hitting the forecast we've set out. As for the variables — the extra one will be bringing on 2 wells, though I believe we've shown before that we deliver those wells well. The rig returning to drill is the very same one used in the earlier campaign, which takes some of the risk out of it. We have, I think, a very clear set of goals for the field. We know what we're managing, and so what you ought to do is hold us accountable for delivering what we promised — order displacement, when the wells come in, when the shutdown happens, and so on.

David Round

analyst
#26

Alright, thanks, Andy. Moving on to the second point. I believe this is the first occasion we've gotten your perspective since those talks with Tullow were called off. Could I just hear what you're thinking on that? And is that completely ruled out going forward?

Andy Inglis

executive
#27

Well, let me perhaps pull back slightly from that specific situation and speak about m and a more broadly. The company has gone through a stretch of expansion and a stretch of putting capital to work. That's now, yeah, wrapping up. In my view, we've assembled a really robust portfolio, with a solid and lengthy RFP and a slowing down of growth projects. And, in fact, as we've talked about during this call, yeah, what's genuinely difficult is striking the proper balance between delivering free cash flow and growth. And as twenty-five shows, our complete attention is on generating that free cash flow. If I then shift to M and A, we've always examined possibilities through two filters, and to be clear, these need to be value additive for us; yet, and above all, free cash flow additive, which, you know, because of our emphasis on bringing leverage down, simply must be a component of any deal. So that's what we pursued with the Oxy deal, for example. So returning to Tello, the brief response for you is, do we intend to revisit it? And the response is no. You're familiar with the background, David; we were at an extremely preliminary stage. Before we had to issue a press release simply to bring the talks to a close. Clearly we have no plan to use Kosmos Energy Ltd.'s accuracy at the currently depressed levels, which was a position our shareholders also held.

David Round

analyst
#28

Alright. Thanks, Andy.

Andy Inglis

executive
#29

Great. Thanks, David.

Mark Wilson

analyst
#30

Thanks, and good morning, everyone. I simply wanted to inquire about the schedule you anticipate for reaching that 1.5 times leverage level, and then, yes, please remind all of us what your priorities will be once you move past that point — perhaps regarding shareholder returns compared with additional debt, as well as paying down leverage.

Andy Inglis

executive
#31

Yes. Thank you. Well, how about I have Neil address that?

Neal Shah

executive
#32

Hi, Mark. As I've said before, our top focus is producing free cash flow, and the cash we bring in goes toward reducing debt. On a steady schedule, roughly two quarters out, we expect to reach approximately 1.5 times, and I'd say that likely lands somewhere in the latter portion of 2026. That's where things stand right now. This comes from both paying down debt and an increase in EBITDAX as output keeps climbing. All of this presumes a typical oil price. Once we arrive at that stage, the discussion opens up again regarding what the proper priority should be between additional debt reduction and returns to shareholders. That's how I see it — we'll take up that topic once more and keep talking it through with our investors as we get closer to the second half of 2026.

Mark Wilson

analyst
#33

Understood. All right, that's great. Thanks. Next, switching to Tortue — this relates to your total twenty-two year, two p reserve life. You made it clear that only a small amount of extra CapEx is needed to debottleneck and handle the vessel's capacity. Could you also address whether, assuming we ran this facility at two point four five or even two point seven million tons per annum, how much time would pass before any wells at all would need to be drilled into the Tortue reservoir to sustain that level? Thank you.

Andy Inglis

executive
#34

Yeah. Thanks, Mark. Always good questions. I'll return to my earlier point: the initial, whatever it is, roughly seven or eight weeks of production data coming back from the reservoir looks positive. Naturally, we have to simulate all of it and incorporate that into the timing for the next well. So right now, well capacity far exceeds the four hundred million standard cubic feet we'd require to deliver the current ACQ of approximately two point four five. Yeah. As a result, when the next set of wells happens depends on the connected volume per well, and consequently the decline rate we observe. But we're several years away from requiring that well capacity. And if you did drill, you'd likely add enough wells to raise overall capacity beyond the eight hundred million standard cubic feet that drives the profile around that twenty thirty time frame. Yeah. So I won't provide exact guidance on how many wells in each year. I think it's a bit early for that. What you can take from it, though, is that it isn't a major capital draw. The infrastructure exists via tiebacks to the existing manifold. So it's essentially just the cost of those individual wells.

Mark Wilson

analyst
#35

Alright, thanks. I’ll pass things along, and best of luck with it, Ram.

Andy Inglis

executive
#36

Understood. Appreciate it, Mark.

Charles Meade

analyst
#37

Andy, I appreciate you letting me rejoin the queue here. You’ve brought this up twice, possibly three times — how the wells have performed over the first 7 weeks. Could you discuss that? Is it simply that you’re observing reduced drawdown along with improved flowing pressures, or is there additional information you’ve gathered during this initial period? What you’re actually doing in these early days, Charles, is essentially figuring out what you believe the tank size tied to each well to be. Right; regarding real productivity, we ran fairly successful DSTs with the initial DST, and afterward we achieved fairly solid flow through extended flowbacks of the wells as we commissioned each one; so we had a fairly clear picture of each well’s rate. So, if you will, the following data point we required was really what we think the tank size to be. Yes. And I’d say we’re observing more favorable signs regarding the tank size, since obviously we now have something like weeks of output from one well rather than merely a handful of days. Understood. That’s excellent detail. Thank you, Andy.

Andy Inglis

executive
#38

Great. Thanks.

Operator

operator
#39

As we don't have any more questions coming in right now, I'd like to wrap up this call. I appreciate all of you for being with us today. At this point you're free to hang up, and thank you for taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kosmos Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Kosmos Energy Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kosmos Energy Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.