Kosmos Energy Ltd. (KOS) Earnings Call Transcript & Summary
May 6, 2025
Earnings Call Speaker Segments
Jamie Buckland
executiveThanks, operator, and I appreciate all of you being with us today. Earlier this morning, we put out the earnings release for the first quarter of 2025; that release, along with the slide deck for today's call, can be found on the investors page of our website. Here with me on the call to walk through the materials are Andy Inglis, our Chairman and CEO, and Neal Shah, our CFO. Throughout today's presentation, we'll be making forward looking statements that relate to our estimates, plans and expectations. Actual results and outcomes might differ materially because of factors we point out in this presentation and in our U.K; and SEC filings. For additional details, please see our annual report, stock exchange announcement and SEC filings. Those documents are available on our website. And with that, I'll hand the call over to Andy.
Andy Inglis
executiveAppreciate that, Jamie, and a good morning or afternoon to all of you. It's great to have you with us for this call covering our first quarter results. I want to begin by restating the points I made back in February alongside our full year results — points that hold even truer given how turbulent the market is right now. Kosmos stays committed to putting cash generation first, keeping a tight grip on costs, and strengthening the company's financial resilience. After that, I'll give you an update on how operations have progressed this year and what we expect for the rest of 2025. Neal will take you through the quarter's numbers and the balance sheet, and then I'll finish with some closing thoughts. Following that, we'll take your questions. Let's begin on Slide 3. Although volatility has picked up in our industry and in markets around the world generally, what we prioritize hasn't changed. Back in February, I went into detail about making cash generation the top priority, and that remains our number one focus. We achieve it by both raising production and bringing costs down. First, production. We were happy to report last month that the first cargo had been exported from the GTA project. Every one of the four trains aboard the FLNG vessel is now up and running, with daily output climbing toward the contractual sales volume equal to 2.45 million tonnes of LNG each year, and there's room to go beyond that. I'll cover more on this on the next slide; over in Ghana, the drilling rig should show up later this month, and we have 2 Jubilee wells planned for 2025, which ought to support production growth during the second half of the year. The partnership also intends to drill four more Jubilee wells during 2026, which should boost production further with low-cost, high-margin barrels, even if oil prices are lower. In the Gulf of America, we're drilling the fourth Winterfell well right now, and it should come online in the third quarter. Turning to costs — I mentioned in February a substantial reduction in costs spanning both capital expenditures and overhead, along with the ability to exercise greater control over our CapEx going forward; we expect CapEx to drop by more than 50% compared with last year, and 1Q shows evidence of this, with CapEx of $86 million, which is $200 million below the same quarter a year ago. We've also committed to cutting our annual overhead by $25 million by year-end, and through April we've already made meaningful progress toward that goal; and lastly, as we steer through a volatile market backdrop, the important steps taken last year to strengthen the company's financial resilience have positioned us well for the year ahead. During 2024, we brought in new capital, refinanced and expanded our reserve-based lending facility, which extended our average maturity length. We keep protecting our balance sheet through a rolling hedging program, and we have minimal near-term maturities along with ample liquidity. Our portfolio also consists of assets — especially on the oil side — with low operating costs and therefore low breakevens. Neal is going to walk through the specific steps we're taking in greater depth later on in this presentation. That said, the work we've already finished gives us room to maneuver, so we can keep our balance sheet resilient while riding out today's volatility. So to wrap up, our attention is on holding the business in solid condition as the market goes through an uncertain stretch, with output rising, material costs coming down, and an unchanged top priority on delivering cash to bring debt down. If you'll turn to Slide 4, we hit a number of important milestones across Mauritania and Senegal over the past few months, starting with first gas and LNG production at the GTA project, which was then followed by the first LNG cargo. Thanks to that initial shipment going out, Mauritania and Senegal are now the newest LNG exporting countries, and Kosmos takes pride in having become an LNG producer. Aboard the FLNG vessel, all four liquefaction trains are running today, with output climbing toward a contracted daily rate that works out to 2.45 million tonnes per annum. Lifting of the second cargo is currently in progress, and our guidance for the full year on gross cargoes, 20 to 25 cargoes, has not changed. We likewise anticipate that the first condensate cargo will be exported during the second half of the year. When it comes to costs, our aim is material reductions on two fronts: operating costs and our FPSO lease costs. We anticipate that routine operating costs will come down in the near term, since the commissioning work will naturally wind down; on top of that, we're collaborating with BP on refinancing the FPSO, which ought to bring OpEx down even more, and we're targeting completion in the second half of the year. Looking at the medium to longer term, the operator is examining alternative operating models that might cut costs substantially and improve the project's overall returns. We're eager to work alongside them on this initiative. We see upside potential ahead at GTA, first from higher production using the facilities already in place, and after that a potentially material step-up in production via some low-cost modifications to those same facilities. The FOG vessel's nameplate capacity stands at 2.7 million tonnes per annum, and testing of the liquefaction trains is happening at roughly 10% above that equivalent nameplate capacity. Coming up next, we'll test the common systems at the maximum rate so we can get a clearer picture of where the facility can safely operate above the contracted sales volume; we're also working with the operator in GoA to look into possible upgrades to the FLNG vessel, which might help push LNG production capacity past 3 million tonnes per annum. Early work indicates this could be reached with upgrades that are relatively modest; in all likelihood this would be carried out as part of Phase 1 plus, where work with the project partners has already started to fully leverage the infrastructure that exists. Phase 1 plus is a low-cost brownfield expansion that could potentially double future gas sales, requiring minor modifications to the FPSO along with the upgrades to the FLNG vessel and the supply of additional domestic gas. Results from the first production data at the GTA reservoir have been encouraging, opening up the possibility of lowering the number of wells we'll need going forward as well as future CapEx. As more progress is achieved, we will keep the market informed. Moving on to Slide 5, where Ghana operations are covered; the year has gotten off to a hectic start there, with two significant pieces of work now finished. First, a new 4D seismic survey was shot by the partnership — the first one across the field in roughly 8 years — and processing of those data is underway with cutting-edge algorithms. Our expectation is that the improved 4D image will substantially sharpen our reservoir models, and that pairing it with AI-backed production optimization will let the partnership high-grade upcoming infill drilling campaigns and refine reservoir management strategies, ultimately driving greater field recovery across the asset's life. The scheduled Jubilee FPSO shutdown made up the second significant piece of work, and it wrapped up safely and within budget in early April. The scope of that work ought to support maintaining strong reliability and elevated production as new wells get drilled down the road. Throughout this year, the operator has been achieving solid facilities uptime and steady water injection into the fields, which is needed to counter the natural decline rate. On the drilling side, the rig should show up this month, with 2 Jubilee wells slated for 2025.
Andy Inglis
executiveThe partners are planning to spud four wells at Jubilee during 2026, plus they have the option to add more wells should outside conditions allow. Across our whole portfolio, Jubilee infill wells deliver the strongest returns, typically paying back completely within a matter of months thanks to low operating and development costs along with high cash margins on the barrels, even when oil prices are weaker. Then, last month in Accra, I held a very productive meeting with President Mahama, where we discussed his vision for the future of Ghana's energy sector. Our agendas are very closely aligned when it comes to how important investment in oil and gas is for supporting the country's long-term economic and social development; we're eager to keep working alongside the President and his government to invest in and move Ghana's energy sector forward under his leadership. Moving to Slide 6; in the Gulf of America, first quarter production came in as expected and included a planned 30-day shutdown of the facility that hosts the Kodiak field, which is now complete. Our Gulf of America production has climbed back up to roughly 20,000 barrels of oil equivalent a day net. At Winterfell, the workover on the number three well did not succeed, and we're presently working with partners to assess a future sidetrack that would access those reserves. The rig right now is drilling the Winterfell 4 well, and it should come online during the third quarter. At Tiberius, which Kosmos operates, we're making solid progress on a better, lower cost development plan, and that plan will get support from new ocean bottom node seismic, or OBN, being acquired this year. We're collaborating closely with Oxy, our 50 to 50 partners on the project, who also hold the nearby Lucious facility, which we anticipate would host production from the field. Once the OBN acquisition is done, the farm-out process will move ahead with the goal of bringing in a partner before project sanction; in Equatorial Guinea, quarterly production held steady at approximately 9,000 barrels of oil per day net. Following the recent infill drilling campaign, activity is fairly light this year while the partnership concentrates on well work to sustain current production levels. We're also working with the operator to reprocess our seismic using modern technology so we can high-grade future infill drilling potential. There's plenty of opportunity in EG. So what matters is ensuring we have the best possible understanding of the subsurface ahead of our next drilling program. Neal will now take you through the financials.
Neal Shah
executiveAppreciate it, Andy. Let's move to Slide 7, where we break down the quarter in detail. Several one-time items weighed on first quarter production. As we mentioned back in February, we had significant planned maintenance, mainly from the Jubilee and Kodiak shutdowns, and that resulted in a sizable underlift during 1Q. Entitlement production came in a bit below guidance, largely because of how the GTA ramp-up was timed. As Andy noted previously, the GTA ramp-up made progress during April, and we're keeping our full year GTA cargo guidance as is. Our 2Q production guidance accounts for that GTA ramp-up, with second quarter output projected to land roughly 15% above the first quarter at the midpoint of our guidance. OpEx per barrel of oil equivalent matched guidance but rose compared to a year ago, driven by reduced production and more maintenance in 1Q 2025, including a construction support vessel at Jubilee before and throughout the scheduled shutdown, plus the Winterfell-3 workover. CapEx represented the largest shift, coming in significantly below the prior year, consistent with our pledge to keep capital for the year at $400 million or less. G&A, exploration, and interest expense likewise all declined versus a year ago. Tax came in lower year-on-year, mostly because of weaker commodity prices. In the appendix, as you'll notice, we've included our revised guidance. Our full year guidance remains the same. That said, I'd like to highlight a few items tied to 2Q. The rise in 2Q OpEx stems from our 110 cargo being lifted during this quarter. The higher CapEx in 2Q comes from certain activity shifting into 2Q from 1Q, along with kicking off drilling activity in Ghana and the Gulf of America. Now on to Slide 8. As Andy mentioned before, 2024 was a key year for financing work that set us up well going forward. During the past year, we refinanced and increased the size of the reserve-based lending facility, and we recently wrapped up the spring redetermination alongside our banks. That process went smoothly, with the borrowing base coming in well above the current facility size, and the banks applied a long-term price deck that sits under the current strip. Importantly, no value for our GTA and Gulf of America assets is included in this borrowing base, and those could be used to secure financing down the road; we keep actively managing every lever available to us to maximize cash generation for debt repayment, including our 2026 maturity. As part of that push, after the quarter closed, we carried on with our rolling hedging program, adding another 2 million barrels. At this point, roughly 40% of our remaining 2025 oil production is hedged, with a floor near $65 per barrel and a ceiling near $80 per barrel. Also, as I noted on the prior slide, CapEx in this year's first quarter was materially below the prior year, as the chart in the bottom right shows, and we're working to bring full year CapEx down even further from the $400 million we shared at our full year results. As we look ahead to the coming year, our capital commitments are quite limited, and that gives us considerable room to maneuver as we adjust which activities we pursue. Even though conditions remain unpredictable, we stay proactive about evaluating our choices so that our financial strength holds up. With that said, I'll now return the call to Andy.
Andy Inglis
executiveAppreciate that, Neal. Now moving to Slide 9 as we wrap up what we've covered today. Staying focused on generating cash and keeping costs in check hasn't changed for us — it matters even more with the market as volatile as it is right now. Output is climbing as GTA comes up to speed, and the drilling we're doing soon in Ghana and the Gulf of America should drive additional gains in production during this year's second half. Our priority is cash generation, achieved through the strict cost and capital discipline laid out in the materials we've shared today. The assets we hold have low breakevens, which lets us produce cash even when commodity prices are weak. And underpinning the company's long-term value story is a 2P reserves to production life of more than 20 years. That's all from me. At this point I'd like to hand things to the operator so we can begin taking questions.
David Round
analystGreat, thank you. Thanks, everyone. I have a couple of questions, please. First, regarding the nameplate capacity test at GTA, could you discuss the timeline for actually determining the potential rates? And what specifically do you need to observe to feel confident that those higher rates can be maintained? Secondly, during your presentation, you mentioned breakevens several times. I'm curious if you could share where you see your breakevens currently, and how they might change in the coming years?
Andy Inglis
executiveYes. David, yes, thank you for those two questions. Regarding nameplate capacity, as I mentioned in my remarks, the FLNG vessel's nameplate capacity stands at 2.7 million tonnes per annum. The process for reaching that level and surpassing it involves testing each train separately, and we are currently working through that. We've tested several, and they are coming in roughly 10% higher, which is normal. Work is then continuing to test the entire system, and that will establish the rate we can deliver reliably and safely beyond that 2.7; so that's the initial step. I believe that work will continue through the second quarter, yes; and after that, once we confirm we're at that level, their goal will be to deliver reliably at that rate. Consequently, you have the possibility of additional volumes beyond the ACQ of 2.45; so that's how it goes. There's nothing out of the ordinary here. I think if you examine LNG facilities globally, they generally operate above — roughly 10% higher than nameplate. And that's what we're observing on the FLNG vessel at GTA. Turning to your second question about breakevens. I think, look, with oil prices near current levels for the rest of the year overall; we anticipate being free cash flow positive, and we would clearly use that free cash flow to reduce debt. Then looking ahead beyond today, we have a volume ramp-up in the latter half of the year and into 2026, as we expect production to increase, obviously, with the GTA ramp-up I just mentioned, and then with Jubilee drilling, which should begin soon. And again, as we've discussed today, we've been quite clear about our emphasis on cost control, which is lowering CapEx and cutting overhead. I think as we demonstrated with the first quarter CapEx, we're making solid progress on that; so we haven't provided CapEx guidance for '26, but in a low price setting, Neil discussed the minimal committed CapEx we have for '26, which is essentially just the four-well Jubilee program. So if you combine that with maintenance CapEx across the remaining portfolio, we reach a target breakeven of approximately $50 per barrel Brent. So under that set of conditions, you'd still be looking at output increasing from one year to the next, '25 into '26, though we would be pushing back later expansion projects given that softer pricing backdrop. And one more point I'd make: in that case, roughly 85% — the vast majority — of our spending is directed toward the Jubilee infill wells. Those, as we mentioned earlier in our prepared comments, represent our best-returning opportunities, and their breakeven is quite low, on a per-project basis somewhere near $30 per barrel. That means even when prices are weak, these are projects that will continue creating value for the business. So I guess I simply want to be sure I've laid out a couple of items: how you should think about that breakeven level moving forward, where the money would go, and our capacity to operate in that cheaper price setting.
David Round
analystThat's very clear, thanks Andy.
Andy Inglis
executiveGreat. Thanks, David.
Lydia Gould
analystMorning, and thanks for letting me ask. I'd like to focus on credit and the balance sheet. When commodity prices are lower, how do you view financial leverage, and what about liquidity under those conditions? I'd also really appreciate your thoughts on the 1.5 times leverage target.
Andy Inglis
executiveSure, thank you, Lydia. I'll hand that over to Neal.
Neal Shah
executiveAbsolutely, Lydia. Once again, what I'd emphasize is that our commitment to bringing down financial leverage and keeping enough liquidity on hand for the company remains intact. So, to repeat, the path we're on involves continuing to produce free cash — and like Andy mentioned a moment ago, we're able to do that when crude is priced near where it is right now — and then applying that cash toward debt reduction. Over time, as a consequence, leverage is going to decline. The speed at which that happens really depends on what happens with oil prices. That said, that's not something we can control. Even so, we've already put measures in place — we're putting measures in place — to simultaneously boost output while bringing down both capex and opex, which supports and fits well with that kind of market condition. On top of all that, we spent some time discussing hedging during this call. That represents one more instrument we're putting to work right now to safeguard and shield the company's cash flow. Now, regarding the latter portion of your question about liquidity — yes, once more, I'd say there remain open questions about the debt maturities coming due in '26 and '27. Last year we did substantial work aimed at bringing those maturities down. Our expectation is still that we'll retire most of the remaining '26 notes using cash flow the business produces. Beyond that, should crude prices decline further, or remain depressed across a prolonged stretch, we obviously have additional avenues available — drawing on the liquidity we already hold, plus securing financing against certain assets that aren't encumbered. Specifically, the Gulf of America properties along with our holdings in Mauritania and Senegal carry no debt at all, and that gives us room to maneuver if we choose to pursue cost-effective secured financing backed by those assets. So there are numerous levers at our disposal to handle things should conditions deteriorate.
Lydia Gould
analystThanks, team.
Andy Inglis
executiveGreat. Thanks, Lydia.
Bob Brackett
analystBob, good morning. This may be a bit of a reach, but let me ask about Tiberius. I notice you're pursuing a development plan at a reduced cost, supported by fresh OBN seismic information. And suppose I set that beside certain Department of Interior studies dealing with commingled output, or production under higher drawdown — how are you viewing the shifting policy landscape in the Gulf of Mexico, and is any of that shaping what you're doing in that area?
Andy Inglis
executiveYes. No. That's an interesting one, Bob. Yes — I'd say as of today, nothing particular is altering our plans. In my view it stays a basin where we find the capacity to operate. It's a basin in which technology can be harnessed. Currently, I believe more than half the seismic in the Gulf of Mexico is OBN, and in our view that gives us a substantially improved image, and thus the capacity to reduce risk and fine-tune the development. So one element of the fine-tuning involves harnessing that OBN, while another element is in fact the effort we're carrying out alongside Oxy, our partner in that venture, on a 50 to 50 basis. Yet it's tied back to Lucius. That is our aim, together with the capacity to determine how to completely fine-tune the infrastructure already in place at Lucius. So regarding Tiberius in the Pacific, I don't believe anything the Interior — Department of Interior — has undertaken is producing a major shift for us; this is effort we've had underway for quite a while now, and to me it's chiefly about the capacity to harness the technology and how quickly it keeps evolving. And beyond that, I'd mention simply solid, straightforward engineering aimed at removing costs. Those, I think, are the relevant points.
Bob Brackett
analystVery clear. Thanks.
Andy Inglis
executiveThanks, Bob.
Matt Smith
analystHello Andy, hello Neal. My questions basically centered on this. Given where prices stand right now, with oil trading at current levels, would you feel at ease putting that growth CapEx toward the Tortue expansions you mentioned a moment ago? To be specific, I believe that's Phase 1+; so the first thing I wanted to ask was whether you'd be prepared to commit that growth CapEx at today's oil price. Tied to that, the second thing was whether you're now looking more seriously at cashing in on some portion of your interests in Senegal and Mauritania? Does that have to be Tortue alone, or could it include the surrounding discoveries too?
Andy Inglis
executiveYeah, those are fair questions, Matt. Honestly, this one is hard to answer, since it hinges on the level of the price as well, doesn't it. I'd say we've made it quite plain during today's call that we can handle a weaker pricing backdrop. What matters is the committed CapEx, and that's the scenario I described when David raised his question earlier. Looking ahead, our position would be that the growth CapEx for Phase 1+ isn't committed at this point; so we retain the choice over timing, and I'd argue that's the key point regarding the resource — we aren't going to forfeit that option. What it comes down to is how quickly we develop, and so it comes down to making certain we proceed in a manner that won't undermine the company's overall financial resilience; so I take comfort in the fact that we now see that option with more clarity. I'd also say we're better aligned among ourselves, with BP, and with the national oil companies. The alignment is genuinely strong at present, and the effort under way sits at the front end. That means very little CapEx, which lets us spend the coming 12 to 18 months getting a handle on the engineering and confirming we have the proper foundation to move ahead. So the initial outlay is really cheap. And obviously, you'll keep watching how that goes and then determine the moment to shift into spending more CapEx. Now, on the monetization side — value is being created at GTA right now as we ramp up, we're proving the field performs, and we have optionality, in my view, to go past the ACQ. I think there's still work ahead, Matt, to properly lay out the complete potential of GTA, prior to contemplating any dilution. So nothing is off limits, and in the end everything in the portfolio carries value. What we have to do is ensure we're at that stage of the cycle where we can properly lay out the value. The subsurface gives me confidence. We covered that in the remarks. The early production data coming in now looks quite encouraging. So that's a positive signal. My view is that we have to show this plant can deliver more than what the offtake currently spells out, and so factor that into models going forward. So my sense is that we're still some distance from that point, though it's something we're pushing toward — getting to where we've laid out in full what GTA is capable of.
Matt Smith
analystAll right, that's great. Thanks, Andy. I'm glad to hand things over.
Andy Inglis
executiveThanks.
Stella Cridge
analystHi there. Good afternoon, everybody. I appreciate all the details you've shared. A few points came to mind that I'd like to explore. To start, you brought up that gathering in Ghana recently and how constructive the conversations were. On a call not long ago, I believe somebody raised the idea that Ghana could see multiple investment rounds going forward. I'm curious what you took away from those talks. Do you see any key near-term steps tied to that partnership over the longer horizon? That's my first question. Then, for my second one, I noticed Q1 included a cash outflow related to notes receivable. I'd like to know whether more outflows from receivables are expected. Could there be some money coming in eventually from Senegal and Mauritania? That would be excellent.
Andy Inglis
executiveYeah, indeed — thanks, Stella. Neal will handle the part about cash going out. As for Ghana, our presence there stretches back a long way. We've witnessed a number of administrations come and go. Personally, it was a pleasure to see President Mahama again. He was unmistakably leading the country 8 years ago, so it was an opportunity to reconnect, and to get a sense of how he views and envisions the industry in Ghana. What stood out most to me is that he holds, in my view, a very clear mandate to bring new energy to the sector. I believe there's still a lot of upside left in the basin. That upside, though, really centers on near-term work — essentially squeezing the most value out of the fields you already have producing. The main thing to remember here is something I've brought up before on these calls: what we think Jubilee can deliver. The reserves that are still left to produce. A big part of making that happen is keeping our priorities lined up with the government and, of course, with the national oil company. That's my takeaway — our agendas match. It's somewhere Kosmos is welcomed. So now we're kicking off a plan—clearly two wells during 2025, followed by four in 2026—in order to boost output at Jubilee, with the possibility of further efforts on improved recovery at that field as well. The key takeaway, I'd say, centers on the reality that this is a nation that welcomes us. Our track record there stretches back a long way, and our priorities line up closely as we aim to get the most out of both how efficiently and how effectively that recovery happens, which pays off for the country as well as for Kosmos's shareholders. That, I think, is the major point to draw from all this. As I mentioned, that process is getting underway at this point through the infill initiative, and the drilling rig should show up during this quarter. Perhaps I should hand things over to Neal so he can address what you asked regarding cash flow.
Neal Shah
executiveYeah, I believe what you're asking about relates to the NOC financing from 1Q. That falls under the development loan we arranged with GTA, which wraps up essentially this quarter. So when it comes to our obligation to fund their development spending, and then, as you pointed out, a repayment schedule follows, meaning we begin getting that cash flow back. So again, during the second half of the year, it would cease being an outflow. And then, as we bring about higher production and lower operating expenses, there's room for that cash flow to begin flowing back to us and to BP as part of repaying the NOC loans. So in terms of capital spent, we're kind of close to the top of that.
Stella Cridge
analystThat covers everything I had. I appreciate the responses.
Andy Inglis
executiveWonderful, thank you, Stella.
Nikhil Bhat
analystMorning. Just one quick thing from me — I wanted to clarify something about that LNG offtake deal you have with BP. Can you remind me whether there's a set yearly amount of cargo volumes that you've agreed to sell to BP? And could you also go over the agreed price once more? Thanks.
Andy Inglis
executiveSure. Under the contract, the yearly quantity comes to 2.45 million tonnes per annum. As for pricing, it's 0.95, which works out to a 9.5% slope against Brent FOB.
Nikhil Bhat
analystThanks.
Andy Inglis
executiveIs that clear, Nikhil? I realize it's kind of rapid-fire, but that's exactly the response.
Nikhil Bhat
analystThanks.
Mark Wilson
analystThanks, and good afternoon, everyone. So first, regarding Tortue, if you could provide a little more detail about what you've observed in terms of subsurface performance that you said is exceeding expectations, which sounds encouraging. And then for my second point, I'm curious about the steps for the domestic obligation offtake physically via pipeline. And on the financial side, does that tie into what Neal was just discussing about NOC payback? Is having that domestic obligation in place a requirement? Thanks. Those are my two questions?
Andy Inglis
executiveYes, Mark, yes. So regarding the subsurface, you still have to go back in time. Obviously, you know this, but seismic, and then — we had 3 exploration wells, 1 appraisal well, and then we've got 4 development wells. On the 4 development wells, we did flow back for a brief period; with those shorter flowbacks, it's difficult to sort of determine whether you are getting any connected volumes, yes; and I believe the major new piece of data we have comes from the flowback of the first 2 wells — actually, we're observing a greater connection in volume than what we had initially mapped; so I think that's very positive, obviously, because as you begin to consider the future, therefore, there, you have the chance to lower the number of wells required for a given amount of recovered volume. That once more would improve the returns from the project. As for — on the second question, Mark, just remind me. Domestic gas and the build-out of the infrastructure, yes. Okay. Yes; so we don't — essentially — yes, the obligation, just so we're clear about the obligation. The obligation sits with the offtaker, which is the national oil company to build any infrastructure. So they are responsible for constructing the pipeline from the hub terminal to — which is the offtake point to their — whatever landing point they have chosen. So we have no capital liability for that. I think that was really the crux of your question, wasn't it?
Mark Wilson
analystYeah, that's right; and clearly, before they take that step, you — I suppose you could sell up to the nameplate capacity…?
Andy Inglis
executiveThere's additional gas you can sell. Right, precisely. You can sell additional gas, indeed. So — and I don't believe there is — when you consider what caps the system, the FPSO, okay, plus the infrastructure tied to it, you're able to handle considerably more than 3 million tonnes per annum, correct; so it comes down to — when it comes to producing LNG, what limits you is how much the facility itself can handle. And after that, when it's operating at maximum, and that figure exceeds 2.7 million tonnes per annum, gas is still there for domestic use; so we aren't — this isn't a situation where one thing has to be traded off against the other. The system has ample capacity.
Mark Wilson
analystSure, that's clear. Thanks. I'll pass it along.
Andy Inglis
executiveOkay, sounds good. Appreciate it, Mark.
Operator
operatorAppreciate it. With no more questions coming in right now, I'd like to wrap up this call. Thank you all for being with us today. At this point you're welcome to hang up, and we appreciate your taking part.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Kosmos Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Kosmos Energy Ltd. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kosmos Energy Ltd. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.