KSH International Limited (KSHINTL) Earnings Call Transcript & Summary
August 11, 2026
Earnings Call Speaker Segments
Bhavanishankar Kumawat
analystThank you, Ray. Good morning, everyone. On behalf of Axis Capital Limited, I welcome you all to KSH International Limited Q1 FY '27 Earnings Conference Call. Today on the call, we have with us management represented by Mr. Rajesh Hegde, Managing Director; Mr. Amod Joshi, Chief Financial Officer; Mr. Dhruv Chopra, Head of Investor Relations; and Mr. [ Nakul Pathy ], Company Secretary and Compliance Officer. We thank KSH International Limited for giving us the opportunity to host the call. And now I would like to hand over the floor to the management for their opening remarks, post which we will open the floor for Q&A. Thank you, and over to you, Rajesh.
Rajesh Hegde
executiveYes. Good morning, everyone. This is Rajesh Hegde. Welcome to our first quarter fiscal 2027 results call. Fiscal 2026 was a pivotal year in our 45-year history, marked by the completion of Phase 1 of our Supa expansion. In fiscal 2027, we are focused on utilizing the capacity while concurrently completing Phase 2 of our expansion, and I'm extremely pleased with the start we have made in the first quarter of 2027. Our first quarter financial results, along with supporting information have been submitted to the exchanges and have been uploaded to our website. On today's call, I will start with a quick summary of KSH and then focus on some of the strategic developments and trends we see as well as some of the key operating metrics of the company, including progress on Supa. Amod will then discuss the financial and operating metrics as well. For those new to KSH International, we are a 45-year-old manufacturer of magnet winding wires, which is the most critical component of coils used in electric machines from power transformers down to AC compressors and everything in between. We are the leading manufacturer of specialized winding wires in India and the largest exporter of winding wires from the country. Our installed capacity at June 30, 2026, was 43,445 metric tons. And once Phase 2 of our Supa expansion is complete by the end of this year, this financial year, we would have an installed capacity of roughly 59,000 metric tons, making us the second largest winding wire manufacturer in India. We are a B2B company servicing about -- servicing over 120 leading domestic and global OEM customers and maintain long-term relationships with these customers with repeat revenue in excess of 95%. Additionally, our business is make to order, which means we procure the copper and begin processing only after receiving a purchase order from the customer. Thus, LME copper price and exchange rate is a direct pass-through. Roughly 75% of our revenue comes from large power transformers used in T&D, renewables, railways and data centers, driven by our core continuously transposed conductors or CTC product in which we are the market leaders in India. CTC is a complex engineered wire product, and all of our exports are exclusively to T&D customers across 5 continents. The T&D sector, as you know it, is in a structural long-term cycle driven by renewable energy, grid modernization, urbanization and growing power demand for AI data centers in India as well as globally. To address this demand, almost every transformer OEM is meaningfully expanding their own capacity. So to put it simply, more transformers require more winding wires. On our last call, we mentioned that some large transformer clients were exploring long-term multiyear agreements to ensure predictability of their supply as they ramp up capacity. We are very pleased to announce that we have entered into a 5-year supply framework agreement with Hitachi Energy Global to supply winding wires to their Indian plants as well as some of their global plants. As yet, this framework agreement and the details are still being finalized, we will, of course, provide an update when we are in a position to do so. Long-term agreements such as this further improves visibility for us to ramp up utilization as we complete the Phase 2 expansion at Supa. Looking at our export performance in Q1 of FY '27, our export revenue increased 76% year-over-year and 12% higher than Q4 of FY '26. Export growth remained strong across all our key geographies and was driven by wallet share gains with existing customers as well as new OEM customers added over the last 2 quarters. Specialized wire revenue overall grew at record 113% year-over-year compared to 62% growth in FY '26. Growth was driven by higher CTC contribution and exports. In fact, in Q1, CTC's contribution to the total revenue reached record levels in the last several years. Apart from the end-user demand environment, this was also partially driven by the fact that we front-loaded some of our Phase 1 capacity addition towards specialized wires. Over the next 2 to 3 quarters, we expect this to normalize to previous levels as we complete Phase 2 of our expansion over the remainder of this year. Domestically as well, we have added a number of standard wire clients, particularly as capacity has ramped up in Supa. As we have stated, our focus for standard wires is predominantly in the select end-user industries such as EVs, AC compressors, motors, alternatives for DG sets, et cetera, where precision technology plays a critical role. Standard wire revenue grew at a robust 83% year-over-year rate during Q1, similar to the 80% growth in Q4. Overall, sales volume was a little under 8,000 metric tons in Q1, up from roughly 7,600 metric tons in Q4 and 6,100 metric tons a year ago. This represents 30% year-over-year volume growth while being 5% higher than Q4 of FY '26. Similar to revenue trends, specialized wire volumes significantly outpaced standard wire volumes growth. There is one short-term industry dynamic we have observed, and I feel it's worth calling out, which is that we have seen a few of the transformer OEM customers who are in active capacity expansion mode delay picking up their orders by a few weeks. We do, however, believe that this will normalize as soon as they are able to resolve the bottlenecks and make their new facilities operational. Our Supa expansion continues to remain on track for FY '27 completion with the next wave of capacity expected to be added in Q2 of FY '27. In Q1, annualized capacity was unchanged at 43,445 metric tons. With capacity unchanged, consolidated company utilization improved to about 73.5% in Q1, up from 70% in Q4 of FY '26. Last week, we completed yet another one of our IPO objectives on time by commissioning our Acast backward integration facility in Chakan. This facility will have a capacity of 5,000 metric tons and be used to recycle our own copper scrap, which in turn should provide some modest operating efficiencies and further strengthen our sustainability effort. I would now like to focus my remaining comments on 2 of the key metrics of our business, namely our capacity expansion through Supa and the EBITDA per tonne. First, on our capacity expansion in Supa, though Q1, we have completed 14,400 metric tons of the scheduled 30,000 metric tons expansion. Let me highlight 2 points. #1 being we are on track to complete the remaining Phase 2 capacity by March 2027, with the next wave of addition expected during Q2. To secure our long-term capacity -- and the second being to secure our long-term capacity expansion requirements, our Board last night authorized management to evaluate acquiring an additional 10 acres of land within Supa MIDC for its long-term expansion requirements. Purchasing land in Supa MIDC is the obvious choice for us given the established infrastructure we are currently building out. Moving now to our EBITDA per tonne performance. In Q1 of FY '27, we reported EBITDA per tonne of approximately INR 93,000 per metric ton, up from roughly INR 74,000 in Q4 and INR 66,000 a year ago. The key drivers for these improvements were: #1 being within specialized wires, we had a record contribution of CTC during Q1. While demand is undoubtedly strong, there is also a timing element of front-loading specialized winding wire capacity in Phase 1. And hence, we expect contributions from the standard wires to increase as we go into the second half of the year. #2, being higher export contribution and volumes during Q1, which are all for specialized wires. In addition, some of the new OEM customers have been more favorable and market-driven value addition rates compared to our established long-term customers on a like-for-like basis. #3, an increase in the consolidated utilization rates to 73.5% in Q1 of FY '27 versus 70% in Q4 of FY '26 on a larger installed base. And lastly, a persistent weaker rupee is also helping the EBITDA per tonne. Lastly, I want to touch upon our working capital management efforts given it is a key focus area of improvement for us and will take us closer to our goal of ultimately being cash flow positive despite the hypergrowth environment we face. After showing a 5-day average working capital day improvement in Q4, we were able to improve it by another 5 days in Q1 -- during Q1, resulting in an average working capital days of 60 days during the quarter compared to 71 days a year ago. There is more work to be done, and we are focused on doing just that. To conclude, I would like to highlight some of the financial trends we have observed over the trailing 12 months that we believe should be sustainable through FY '27. First, for the trailing 12 months, volume growth was 26%. The higher Phase 1 capacity will be available for the full year FY '27 as opposed to only for a part of FY '26. And therefore, we feel that we should be able to sustain this rate of volume growth for the full year. Second, we reported an EBITDA per tonne of approximately INR 74,000 for the trailing 12-month period. We, therefore, believe that we should be able to sustain approximately INR 75,000 per tonne for FY '27, though the actual performance will depend on the product mix, exports and currency. We also want to highlight that we expect some fixed costs to increase as we ramp up capacity utilization going forward in the Supa plant. In summary, our key strategies to drive sustained growth is, #1, being to grow volume in our ultra-precision higher value-added products in segments like T&D, EV motors and exports; #2, expand our international presence, including expansion with our global clients; #3, being increased wallet share with existing clients; #4, drive operating efficiencies through scale and backward integration; and lastly, to improve our sustainability efforts. I would now like to ask Amod, our CFO, to go over some of the financial and operational details. Over to you, Amod.
Amod Joshi
executiveYes. Thanks, Rajesh. I will discuss our first quarter FY '27 financial and operating performance. During Q1 FY '27, our revenue from operations were INR 1,164 crores, which is 108% higher compared to the same period last year. Specialized winding wires revenue in Q1 increased 113% versus a year ago, driven by ongoing demand from our T&D clients domestically as well as from the export market. Standard winding wires also grew 83% year-over-year in Q1. Revenue from exports grew 76% compared to Q1 of FY '26. Volume, mix and material prices were key drivers of top line performance. Q1 EBITDA of INR 74.4 crores improved from INR 40.3 crores last year and INR 56.3 crores last quarter. As we have stated, reported margins can fluctuate due to movement in copper prices given that copper is a pass-through. Therefore, to evaluate the underlying progress of the company's profitability, it is more important to look at the unit economics of the business. EBITDA per tonne for Q1 was approximately INR 93,000 per metric ton on a consolidated basis, up from approximately INR 66,000 in the last year and INR 74,000 in Q4. During Q1 of FY '27, we reported a quarterly record PAT of INR 42.2 crores, which increased 86% from Q1 of FY '26 and 22% higher than INR 34.5 crores reported in Q4 of FY '26. Lastly, turning to cash flows and the steps we are taking to improve cash flow generation in a high-growth environment. Working capital days calculated on an average balance basis improved to 60 days from 65 days in Q4 and 71 days in Q1 of FY '26. In Q1, we made further progress on both payable as well as receivables compared to Q4, payables showing a 5-day improvement and receivables a 2-day improvement. Inventory days remained flat given the nature of our business. We will, of course, keep looking for further efficiencies over the next several quarters with the goal of being operating cash flow positive even in the high-growth environment. With that, I'd like to hand the call back to the moderator to open up for questions, please.
Operator
operatorWe take the first question from the line of [ Diksha Jain ] from InCred Research.
Unknown Analyst
analystCongratulations on some very good numbers. My first question was regarding the EBITDA per tonne. As you discussed that the EBITDA per ton number has been very high this quarter. How do we see this moving for the rest of the year? Also, has the EBIT margins improved for standard wires as well? How sustainable is this?
Dhruv Chopra
executive[ Diksha ], I think Rajesh just addressed this particular point in his prepared remarks. But essentially, what we feel is that there are some obviously strong structural trends supporting the EBITDA per ton -- but there are also various factors in there. First of all, as our Supa Phase 2 capacity comes in over the next 3 quarters, there will be additional higher costs, which is a counter as well as ultimately, what is the mix between the product CTC versus others as well as standard and special broadly. So from our perspective, where we feel comfortable is INR 75,000 a tonne for the remainder of FY '27 for the full...
Unknown Analyst
analystHas the EBITDA per tonne improved for standard wires as well? I'm not asking for a specific number, but I just want an idea regarding that. And how has the share of higher kV classes CTC moved in the specialized wire segment?
Amod Joshi
executiveYes. So as the round wire or the standard winding wire capacity utilization has gone up, the EBITDA per metric ton of standard also has improved marginally from earlier quarters. And your second question is in terms of higher value-added products for 765 kV, yes, the quantity has been higher as compared to both the earlier quarters.
Rajesh Hegde
executiveSimilar. I think it's around...
Dhruv Chopra
executive25% of the higher kV classes within specialized...
Operator
operatorWe take the next question from the line of [ Gaurav Bhatia ] from Goldman Sachs.
Unknown Analyst
analystCongratulations on great set of numbers. Again, asking this question again on EBITDA per tonne. Is there any lumpiness in the CTC orders that we've executed in the current quarter?
Rajesh Hegde
executiveSo as we mentioned in the call, Yes, go ahead.
Unknown Analyst
analystLet me explain the question. So the question is when you're talking about specialized -- nonspecialized wire capacity also coming up and that growth going forward being higher than, let's say, CTC growth, will absolute revenue that you've generated from CTC business, will that fall? Or will that also grow, but it will grow slower than the nonspecialized wire? That's my question. That's my first question.
Dhruv Chopra
executive[ Gaurav ], so to simply answer your question, no, there's no lumpiness. I think it's a question of proportion. So as capacity on standard wires and others come in, those volumes will pick up. So if CTC, as an example, was at an extremely high mix percentage of the total, that mix percentage will revert closer to normal. It doesn't mean that it would necessarily go down on an absolute...
Unknown Analyst
analystSo if I were to just look at EBITDA per tonne or EBITDA separately for CTC business versus, let's say, non-specialized business, both will grow, but the mix could change, and therefore, we could see a lower EBITDA per tonne on an average for the company. Is that what you're trying to imply?
Dhruv Chopra
executiveYes. I mean I wouldn't say explicitly that EBITDA per tonne for both will grow, but EBITDA will grow on an absolute basis for both, yes.
Unknown Analyst
analystFair. Because the number that you just mentioned, INR 74,000 for the full year, and if you've done INR 93,000 in the first quarter, it essentially implies lower than 74,000 for the rest of the 9 months, which is a bit surprising why it would be below last year Q4?
Dhruv Chopra
executiveSo [ Gaurav ], again, we have mentioned that this is not a guidance in that this is a number we are going to deliver. We have said that 75,000 is a level we are comfortable delivering.
Unknown Analyst
analystUnderstood. That makes more sense. Second question on this 10-acre land and the capacity. Now at the Supa facility, I remember you had mentioned that there's another 12,000 tonne expansion that is possible without any need for extra land. Then this 10-acre land is on top of that. So 2 parts to the question. One, if I were to use this 10-acre land, how much incremental capacity is possible on a 10-acre land?
Dhruv Chopra
executiveRight now, we don't have an answer to that question because the focus is on identifying the land. And ultimately, the tonnage that comes out of any plot of land will depend on the mix of the machines and products that you're putting in, and we are a long way off from determining that. This is more to ensure that longer term, we have the ability to add more capacity as we need it.
Unknown Analyst
analystOkay. Okay. Okay. And just the last bit on working capital. Now we've seen a steady improvement in this -- in the working capital number of days. Where do you think is the sweet spot? I mean, where do you want to head to ultimately in whatever time frame, but what is that number?
Amod Joshi
executiveSo if you look at the industry standard overall, see 30, 35 net working capital days is what the industry is operating at some of our -- including some of our peers are even lower than that. But we feel that 30, 35 days is something that is fairly achievable. And that is what our aim going forward will be to do better than that also, if possible.
Unknown Analyst
analystAnd any time frame you think is reasonable...
Dhruv Chopra
executiveSorry. So yes, on the time frame, it's a multi-quarter process, not multiyears.
Amod Joshi
executiveBut...
Dhruv Chopra
executive[ Gaurav ], can I ask you to jump back in queue so we can give some...
Operator
operatorWe take the next question from the line of [ Viyank Subramaniam ] from a Capital.
Unknown Analyst
analystJust one on the long-term contract, which you've signed with Hitachi. Could you talk a bit more about that? And what kind of product does it cover? And what is the EBITDA per tonne potential from it? That's one. And number two, related to that, you mentioned last quarter that a lot of OEMs were looking to sign similar such contracts. So do you think that over the next few quarters, you could see more OEMs locking in supply primarily because of the scarcity in supply today?
Rajesh Hegde
executiveSo with Hitachi, as we mentioned, this is a framework agreement where the broad construct is decided upon. But still, there is no quantity or price defined as of right now. It's more of a framework that we agree on. But it's in due process. We will also frame the quantity as well, which we will, of course, communicate as we go along. Now the trend in the industry, what we had mentioned before also is since most of the transformer manufacturers globally are sitting on an order book of, say, about, say, 3 to 4 years. So the general tendency is to at least lock in some amount of the capacity that would be required. And that's where we come in because we have already been servicing most of these customers. And this discussion is ongoing. And we will report back whenever we are in a position to finalize any more agreements. That time, we will probably come back to all of you and mention it in the call.
Unknown Analyst
analystUnderstood. And just if you could throw some color on the EBITDA per tonne, would you be able to say like whether this is higher, like a customer like Hitachi, given that they are very prevalent in high voltage, is there -- is the EBITDA per tonne higher than the company average when you supply to them?
Rajesh Hegde
executiveNo, it will be similar. And except like, I mean, when you look at it from a 5-year agreement, then there would be obviously some clauses, which going forward might move the EBITDA per tonne. But this is still work in progress. So I don't want to give any real guidance as such on the EBITDA per tonne going forward. But definitely, we'll be able to maintain it.
Unknown Analyst
analystUnderstood.
Rajesh Hegde
executiveAnd the products you mentioned, I think one of your other questions was what products. So Hitachi transformer companies use special winding wires. -- which is your CTC, your paper insulated or your enamel insulated rectangular conductors.
Unknown Analyst
analystUnderstood. And I think just on the EBITDA per tonne, I think previously, your guidance was INR 65,000 to INR 75,000, but I think now you're confident of sustaining INR 75,000 at the very least. Is that the right way to look at it?
Rajesh Hegde
executiveYes. That's what we are saying.
Operator
operatorWe take the next question from the line of [ Shubham Bor ] from ICICI Securities.
Unknown Analyst
analystCongratulations on excellent set of numbers. So my first question is, in this quarter, exports contributed 24% to the revenue, which was 29% in last Q1 FY '26. So what is management's outlook on this? And what number can we expect for the full year FY '27? And second would be in this quarter of total exports, how much were to U.S. and Middle East? That was my question.
Dhruv Chopra
executiveI'm sorry, can you repeat the second question?
Unknown Analyst
analystOut of total exports in this quarter, how much was U.S. and Middle East...
Dhruv Chopra
executiveOkay. So on the first question around export percentage, I think you are calculating -- I mean, the way we typically calculate it is on operating revenue.
Amod Joshi
executiveExcluding the other operating revenue.
Dhruv Chopra
executiveIncluding other operating revenue. So on that basis, I think it was 27-ish.
Amod Joshi
executiveAround 27%...
Dhruv Chopra
executiveYes, this quarter. And what we have said is over time, so not specifically in this period of this year, the target is to increase it back to its historical peak of around 40% of total revenue. And on the second question was the mix...
Amod Joshi
executiveMiddle East and...
Dhruv Chopra
executiveSo quarterly, we don't provide that information. But annually, Middle East, Europe and U.S. are our key 3 export geographies. and each of them represented between 8% to 11% of total revenue.
Operator
operatorWe take the next question from the line of [ Jinesh Karia ] from Union AMC.
Unknown Analyst
analystI hope I...
Rajesh Hegde
executiveYes...
Unknown Analyst
analystCongratulations on a very strong set of numbers on the operating front as well as on the balance sheet side. The question is more from an industry demand outlook. How do you see the cycle panning out? Do you expect the cycle to remain strong over the next 3 to 5 years, growing incrementally each year? Or you expect the growth rates to slightly moderate in the next couple of years? What is your view on the cycle?
Rajesh Hegde
executiveSo if you -- let me just break it up into some parts. I mean if you look at the T&D side of it, like we mentioned, a lot of the customers locally and globally, we find them they are sitting on an order book of anything that could be from, say, 3 to 5 years and depending on which customer you talk to. Most of these customers are also in expansion mode. But some of them have expanded. Some of the capacities are going to come in this financial year. Some of it is going to come by around 2029. And every year, you're going to have some capacity that comes into the market. So what we expect going forward on the T&D side, definitely, the volumes are there as we go forward. And that's the reason why we decided to add capacity for the T&D segment. Then the other drivers, if you really see are the EV or the AC compressors or even the alternators, which are used in DG sets. Finally, these alternators are being used for the data centers as well. So there also, we are finding like if you see alternators for DG sets or some of the motor segments and AC compressors, there is a strong demand pipeline that's coming up because of the sectors that they are going to be used in. And there are some other factors also like BIS, which is being implemented. So there's a lot of localization of the winding wire that's happening, which was earlier being imported from -- imported into the country. But now because of BIS, the standard wires are necessarily being -- the supply base is shifting to Indian companies. And then lastly, the EV motor side, this is a more long drawn-out process because the EV -- the winding wires, which are going to be required for EV, the 2-wheeler side is very, very strong. 3-wheeler side is also very strong. Passenger car and bus in terms of volumes, I feel that still, we would say around '28 -- FY '28, FY '29 is where the incremental meaningful volumes would really play. But then you have to be a part of those programs right now, so that whenever those programs mature that time you are in a position to supply to these companies. Have I answered your question?
Unknown Analyst
analystYes, sir. That was really very helpful. Next is on the margin front. While you already guided that you will be able to maintain at least margin of INR 75,000 per ton -- is it possible for you -- so I'll break my question in 2 parts. Is it possible for you to break down the 93,000 tonnes margin as to qualitatively or quantitatively, however you would like to answer between inventory gains, value mix improvement from specialized wires and standard wires and operating leverage. That is the first part of the question. And second part of the margin question is with the HVDC and other higher value items increasing going forward, maybe not immediately, but 2, 3 years down the line, can we see an upward trend in the margin from the 75,000 guidance?
Rajesh Hegde
executiveI think you have answered that first one. I mean from the operating leverage, Yes.
Amod Joshi
executiveYes. So see, the breakup of the EBITDA that you asked in terms of the improvement, what you mentioned, all 3 factors have contributed to the increase in EBITDA. However, we do not give a full breakup of the 3 on the call over here. Second question is on your higher specialized value-added products. Yes, there is -- expectation is that the quantities will go up, and it will help to sustain or improve the EBITDA going forward. But like it was mentioned on the call earlier, we are comfortable to say that 75,000 is a long-term sustainable EBITDA.
Rajesh Hegde
executiveINR 75,000...
Amod Joshi
executiveINR 75,000.
Dhruv Chopra
executiveSo [ Jinesh ], if I can just add, this is Dhruv. One quick thing on that EBITDA question. Look, I think the key driver, which is what we called out on the call rather than the individual components is the mix. And we have always mentioned that specialized wires are more profitable than standard wires. And even within specialized wires, CTC being even more so. And so in this particular quarter, the contribution from CTC reached historically record levels. And that was a much bigger driver of the higher EBITDA per tonne than any of the individual components.
Operator
operatorWe take the next question from the line of [ Mayank Chaturvedi ] from HSBC.
Unknown Analyst
analystSir, just to one of the earlier participants, you were mentioning some percentage of revenues that has come in within the specialized wires from higher-rated transformers. Can you just repeat that percentage for me, please?
Dhruv Chopra
executiveYou're talking about the 765 kV in HVDC?
Unknown Analyst
analystYes. Yes.
Dhruv Chopra
executiveYes. So for the last 2, 3 quarters or so, that has trended above 75% -- 25% of overall CTC volume is coming from the large power transformers, and that continues to hold.
Unknown Analyst
analystOkay. So within specialized, you have historic high CTC levels and within CTC, you have 25% above coming in from 765 kV and HVDC?
Dhruv Chopra
executiveYes correct.
Unknown Analyst
analystOkay. And that historical high level of CTC mix within specialized, would that be -- would it be fair to assume it would be more than 50%?
Dhruv Chopra
executiveSo again, we are conscious about what specific metrics are disclosed. But I think if you look at our overall specialized wires, CTC will represent anywhere between 50% to 75% of that segment.
Unknown Analyst
analystAll right. All right. Got it. And just sir, on this new land parcel that you're trying to identify in Supa, I'm assuming would it be a mix of specialized and standard wires? Or would it be for one of those capacities? If you can just give me some color on it?
Amod Joshi
executiveSo the land we are identifying, it was mentioned earlier, is for future expansion, and it will be in our existing products. But currently, that is under discussion within the company, and we'll give you more details as and when we finalize it.
Operator
operatorWe take the next question from the line of [ Priyanshu Jain ] from Growth Infinity.
Unknown Analyst
analystCongratulations on great set of results. The execution has been really phenomenal. I have a few questions. First will be on the CapEx side. So like by the year-end, we will be somewhere close to 59,000, 60,000 MT ton. After that, like as you mentioned that we are acquiring land as well. So can you share some -- and like the earlier, we can have around 12,000 additional capacity. So for that, can you tell me what is the CapEx required for the additional 12,000? And any future plans, if you can share right now?
Dhruv Chopra
executive[ Priyanshu ], it's, again, difficult to answer those questions that far in advance. we have said our focus right now is the Phase 2 of the capacity expansion, which takes us to 59,000 tonnes. We have space available on the existing Supa plant where we have said we can add potentially another 10,000 to 12,000. And this new plot would then be over and above that for future expansion requirements. So I think you have to look at it sequentially for now for FY '27, the focus is exclusively on the -- getting the Phase 2 completed. The challenge and the objective along with that is, of course, to utilize that capacity. So that is going to be a key focus area for us. As we are -- as utilization is building in the overall 59,000 tonne capacity, we will accordingly start working on additional capacity expansion. So at that point in time, we will be in a clearer position to let you know how many tonnes would come in, what would be the mix? Would it be only special, standard special, only T&D or T&D and EV. All of those are still to be determined. For us, right now, the focus is get the 59,000 in place and then make sure we utilize that effectively.
Unknown Analyst
analystGot it, sir. And sir, second question will be on the clientele addition side. So as we are -- like the data center boom is there and like transformer and distribution is also there. So can you throw some light on it? Like are we in current talks with any future potential clients or the existing clients as well? And like what kind of a specific product like...
Dhruv Chopra
executiveData centers?
Rajesh Hegde
executiveFor data centers, you mean? No, we lost you there, but you're saying any specific products for data centers you're saying? And clients?
Unknown Analyst
analystYes.
Rajesh Hegde
executiveSo when we say data centers, it's basically any transformer that goes into a data center or maybe a UPS that goes into some data center. I mean these are our potential markets where we can supply either special winding wires or standard winding wires. So that's the way to look at it. I mean every data center requires x amount of transformers and some of them could be the higher kV transformers and they will also require some distribution transformers as well as the UPS that goes into the data center. So these are some of the markets that we -- when we look at the data center market, this is what we really look at. And the second one -- second question? Can you repeat the second question?
Unknown Analyst
analystLike on the clientele part only, like...
Rajesh Hegde
executiveAnd then -- sorry, one more thing. Also the DG sets, the diesel generating sets that go into these data centers, there is -- there are alternators that go into these DG sets. That's the other market that's going to -- we feel that is going to really grow as well because DG sets is a critical component within the data center as a backup power requirement. So if you were to really break up the data center market, I mean, this is how we look at it.
Unknown Analyst
analystAnd sir, just last question is on the product mix side. Sir, like the capacity which we are adding by the year-end, can we use the same facility for the -- I know it's a kind of a question, but like I still have to ask that can we use the same capacity for both like standard and the specialized one or they are separate -- different in terms of.
Rajesh Hegde
executiveNo. So like for CTC, I mean, if your answer -- I mean, if your question is, are they fungible, they are not. I mean for standard wires, some of the processes are fungible. But otherwise, the insulation lines that are there are very specific to CTC would have some specific lines. The EV products would have specific lines which cater to the EV products. And the PEEK products would have, again, SPMs that would be there. So they're not fungible in terms of capacities can't be used for each other.
Unknown Analyst
analystSo going forward, we can expect the standard wire like going to increase the share of standard wire products?
Rajesh Hegde
executiveNo. So we mentioned in the call, see, we -- when we did the 43,000 approximately capacity, we had front-loaded the CTC capacity. But now going forward, we would be having more of the standard wire and some of the special wire, which goes into the EV, some of those capacities will come in. But the CTC capacity is available with us for the rest of the year already, and that's the focus for utilization and with the customers.
Operator
operatorWe take the next question from the line of [ Surya Nayak ] from Sunidhi Securities.
Unknown Analyst
analystCongrats for the great set of numbers. So one question is that when we take the orders from the different clients during Q3 and Q4 of the year, so the specialized -- special and standard wires component is nearly fixed. So just to understand why the fluctuations in the EBITDA per tonne because of the product mix during the year? And secondly, to give -- to add to the previous participant's question is that up to the wire drying space, it is nearly same -- and up to -- and after the insulation, the operations are different. So just to understand that because it is -- I mean, semi fungible, we can say. So just to understand whether for -- in case of hyper demand situation from the specialized session, will you be more committed to your clients who are into the high heavy class customers or, let's say, maybe EV, those are the customers rather, let's say, taking less of the undercommitting to the general industry segment and other segments.
Rajesh Hegde
executiveYes. So I'll answer the second question first. I mean when we look at -- like you mentioned, I mean, the drawing capacities are fungible, but otherwise, the insulation capacities are not. Now we would really look at, let's say, if there is more -- we are open to if we have more orders on the T&D side, which is -- like, let's say, if we pick up more HVDC orders, say, 765 kV orders, then we would obviously pivot to adding capacity more on the specialty winding wire. Similarly, for the EV products, if we get some qualifications, which are where we see a visibility in the next few years where a program is going to be certain, then we would look at adding capacities in those areas. So that's how we decide about future capacity additions. And the first question was?
Unknown Analyst
analystQuestion the intake of orders and the change in the product mix afterwards.
Rajesh Hegde
executiveYes. So I mean, I think we mentioned it in the previous calls also, but let me just repeat it for the benefit of everyone. I mean how this works is that we get into a year-long contract for the value addition with at least about, say, 80% to 85% of the customers. Now this determines the overall -- but then the mix that we will get during the year, let's say, if I have specialty, let's say, CTC, we decide on the basic construct where the value addition is fixed. But then if we receive more orders during the year, say, in a particular month for, say, 765 kV or, say, more of exports of CTC, this would obviously -- that mix is what we are talking about drives margins up or down. And in this case, as we mentioned, 93,000, there were several driving factors One of them was obviously the CTC mix was higher. The export percentage was higher also. And there was -- again, within the CTC, you have your CTC as well as -- for the 765 kV and the HVDC also, there was some execution of that going on. But one thing that we pointed out also is that some of the new customers we had and which we were executing orders in the Q1, where we have onboarded, they are obviously at a higher value addition than the existing customers because we had an opportunity to link it to the market price as well. And so that's also pushed up the EBITDA per tonne for this quarter.
Unknown Analyst
analystSo sir, in that... Yes, in that case, when you sign the multiyear contract with Hitachi and likewise, maybe you will be getting more orders from similar kind of people like GE Vernova and others. So then your installation capacity will be falling short and we would be requiring quicker addition of capacities in that? Is my understanding right?
Rajesh Hegde
executiveNo, no. We have like 43,000 tonnes of capacity available right now. And we have another 16,000 tonnes of capacity that is going to come on stream by the end of this financial year, which will be available. So next year, we'll really start with an installed capacity base of around 59,000 metric tons. So that would take -- that would be the starting point for next year is what we are saying.
Unknown Analyst
analystOkay. So we don't have -- I mean, let's say, if you keep on onboarding more of the higher kV class or, let's say, HVDC segment customers, we don't have any issue so far as insulation capacity is concerned. Those are taken care of.
Rajesh Hegde
executiveYes. Right now, we don't. But once it reaches the 85% utilization rate, then that's when we would really start thinking about future capacity expansion.
Unknown Analyst
analystBecause in the Q2, Q3 '28, I see your utilization level reaching to 75 -- close to 75%. So is it fair to understand that you will be planning maybe in the Q2, Q3 time, Q3 '28?
Dhruv Chopra
executive[ Surya ], this is getting very focused in terms of timing. I think when we see utilization rates on the fully installed base trending up, we will start looking at which machines we need under which products. And at that point in time, we will be able to give you. It's -- Q2, Q3 '28 is 4, 6 quarters away. So I don't think on a quarterly basis, we'll be able to provide you any specific time lines. But like I said to an earlier question also, get the 59,000 installed and then start pushing that utilization up. And you will see once that on the larger base, the utilization is going, I think then this is a very direct and relevant question that you can ask us, which we will be in a position to answer.
Unknown Analyst
analystOkay. And regarding, sir, Acast capacity, any kind of benefit that may accrue if you can quantify because that will flow obviously in the next year perhaps. So if you want to quantify and whether this kind of scale will be also raised because this is a smaller investment of around INR 6 crores, INR 7 crores.
Amod Joshi
executiveYes. Regarding current year, considering that Acast has just come up in the last month and the remaining period that is remaining in this year, we see maybe it can just add maybe close to a few rupees to the bottom line to the gross profit, but not more than that because it is a capacity as compared to the total capacity for the year, it's right now not that high. But -- having said that, going forward, obviously, if we see that the benefit is accruing, there's nothing that stops us from planning more capacity in that. But currently, that is not on the cards immediately.
Dhruv Chopra
executiveSo [ Surya ], strategically, the way we have thought about this is essentially to be able to recycle the own scrap that we are generating from our production. We have -- so for captive purposes, we have not thought about expanding it into a much broader effect. So as a result of that, your overall recycling capacity is less than 10% of your overall capacity. So while it will provide a benefit, there's only a limited amount of benefit that will come because of the that it would -- relative to the overall...
Unknown Analyst
analystSo Dhruv, this 5,000 capacity is in sync with the overall 60,000 capacity scrap that we can get. I mean, is the understanding right?
Rajesh Hegde
executiveYes. Yes, I think that's correct. Slightly lower, but I think more or less, you're right.
Operator
operatorWe take the next question from the line of [ Abhi Jain ] from AJ Capital.
Unknown Analyst
analystI'm -- congratulations on a good set of numbers. I'm new to the company. So I have some basic hyping questions that I wanted to get clarity on. I hope that's okay. So the first question is, I think I missed that quantification of the inventory gain number inside this INR 93,000 crores EBITDA per ton that we have achieved in Q1. So can you help us quantify what part of it was inventory gain?
Amod Joshi
executiveNo. So you're asking on -- sorry, I didn't...
Dhruv Chopra
executiveHave you quantified the inventory gain, yes. There is no. No. No, I think, [ Abhi ], we had mentioned that everything played a role, nothing played an outsized role. The main impact on the EBITDA per tonne came from the mix and the contribution -- the higher contribution this quarter from CTC specifically than it has in previous quarters.
Unknown Analyst
analystRight. That's more reassuring. So this INR 93,000 -- okay. So then the INR 75,000 seems conservative, which is -- my second question is I just wanted to understand basically what is on a steady-state basis, the lag between copper pricing to the customer and the copper prices on actual entering your cost. So what would be that lag? Are you able to pass it on in quarter? Or does it lag by 2 quarters? Can you help us understand it better?
Rajesh Hegde
executiveYes. So [ Abhi ], let me answer the question. This is Rajesh. See, how this business works, I mean, we are in a make-to-order environment. We are not in a make to stock because we are basically supplying to OEMs. And typically, what we do is we get into a value addition contract with every customer -- every OEM. And then, let's say, for example, I get into a value addition contract for, say, 2,000 tonnes with customer X, then customer X will -- or 2,400 and customer X will release purchase orders for 200 tonnes a month, but not necessarily 200 tonnes on 1 day, but it will be staggered. Every purchase order is a unique purchase order. And on that -- and that's on an unknown LME basis. And we will book the copper once we receive the order, we will book the copper with our supplier. And whatever is the known copper price, that becomes the invoice price for the copper portion for that particular order. So that's the pass-through mechanism. And then we focus on the value addition. So that's how this whole business is run on -- and this is not just us. I mean, this is generally run by everybody. And we do this because we want to insulate ourselves from the copper price as well as the exchange rate as well. So there is no time -- I mean, when you look at the time lag part of it, we -- like when I receive an order, then I'll take about 15 to 20 days to manufacture the copper, the finished goods. But the copper price has already been finalized at the beginning of the order. So there is no real fluctuation as such for that order.
Unknown Analyst
analystAll right. Okay. Just last question coming to the borrowing cost. So in FY '26, I think your total interest was about INR 44-odd crores. And in this quarter, we have seen it ramp up a bit to about INR 17 crores this quarter. Can you help me understand for the company, your stature and your credit rating? It seems to be that your borrowing cost is in double digits. Is that a fair understanding? Or am I missing something?
Amod Joshi
executiveThe borrowing cost as far as the working capital is required, look, this is a working capital we require when the turnover goes up significantly. And the increase is because the turnover has gone up over the last quarter as compared to Q1, the turnover is significantly higher. Now for working capital, the borrowing cost is always is going to be there. So as the turnover goes up, borrowing cost on working capital is expected to go up.
Dhruv Chopra
executiveNo, but I think -- just to clarify your point, the cost of the capital has not gone up. The overall interest expense is higher because the working capital finance is higher.
Amod Joshi
executiveYes. If you look at the effective -- the borrowing cost, it has not really gone up significantly as compared to earlier.
Unknown Analyst
analystSo what would be that on a steady-state basis, high single digit?
Amod Joshi
executiveLook, I mean, we use a lot of borrowing -- we use a lot of working capital products and the interest cost ranges between as low as 6% to as low as 9.5%. And it depends on what mix we use when the borrowing cost gets determined on that basis.
Unknown Analyst
analystNo, yes. That helps answer the question because I was looking at because it seems like a double-digit figure, but clearly, that is not the case and that's assuring. Congratulations on great set of numbers and hope you keep delivering what you promised. And I'm sure you will overshoot your promises congratulations.
Operator
operatorLadies and gentlemen, we'll take the final question from the line of [ Rahul ] from Ambit Investment Advisors Private Limited.
Unknown Analyst
analystExcellent set of execution from the entire team. Hope I'm audible.
Rajesh Hegde
executiveYes, you are.
Unknown Analyst
analystA couple of questions. First, on the PEEK insulated wires, which we have planned for the EV traction motors, what is the status currently on that part?
Rajesh Hegde
executiveYes, it's still under installation. That whole -- I mean, we've still not installed the capacity, and we'll report it when we've installed that capacity and made it -- operationalized that capacity.
Dhruv Chopra
executiveBut it is part of our Phase 2.
Rajesh Hegde
executiveYes.
Unknown Analyst
analystOkay. Okay. And how much CapEx is being incurred for this Phase 2 going for the entire year for FY '27?
Amod Joshi
executiveSee, the overall project cost for Phase 2, like we had mentioned, was partly funded through the IPO funds was around INR 150 crores to INR 160 crores -- and we have incurred till now a large part of that has been incurred, but some of that is sitting in advances and so on and so forth. So by the year-end, we are hoping that the entire Phase 2 will get implemented.
Rajesh Hegde
executiveOperationalized though.
Unknown Analyst
analystSo for this year, we can expect another INR 50 crores CapEx, which was sitting in CWIP?
Amod Joshi
executiveYes, I think it will be more than that. If you see for this full year, if you look at it, it will be higher than INR 50 crores.
Dhruv Chopra
executiveYes. [ Rahul ], it was all -- a lot of it is basically financed from the primary issue of the IPO. And so I think that the whole breakup between Phase 1, Phase 2 was covered in the RHP...
Unknown Analyst
analystSure. And just a last question from my end. We have seen your value addition EBITDA per tonne has grown at a 23% CAGR from '23 to '26. Can we expect the same run rate if we exclude the copper and whatever the value addition which you do, how much growth run rate we can expect on that aspect? That will be very helpful.
Dhruv Chopra
executiveSo the value addition, [ Rahul ], just like the EBITDA per tonne is dependent on the mix between standard and special and then within that, each of the products. So the same trends we've talked about in the EBITDA per tonne would also apply on the value addition side.
Unknown Analyst
analystAnd the realization is coming to INR 14 lakh per tonne. So this also would be maintained on a steady-state basis or because the non-specialty is growing...
Dhruv Chopra
executiveNo, that is copper...
Rajesh Hegde
executiveThe metal is included in the...
Dhruv Chopra
executiveBut INR 14 lakhs is...
Amod Joshi
executiveYes, yes. The realization is -- I mean, if I understand correctly, you're dividing the revenue per metric ton. revenue per metric ton, large part of the revenue is the copper part, which fluctuates based on the LME and the exchange rate.
Unknown Analyst
analystIt would be -- can you give how much can be the rough range of the copper?
Amod Joshi
executiveNo, because the LME and exchange rate fluctuates, it's very difficult to put a number to like -- I mean, right now, it's been fluctuating between $10,000 to $14,000 per metric ton. LME has been fluctuating. And -- but what we are saying is that, that's always a pass-through for us.
Dhruv Chopra
executiveSo I think if you want to look at it, you look at it at the gross profit level.
Operator
operatorLadies and gentlemen, with that, we conclude the question-and-answer session. I now hand the conference over to the management for their closing comments.
Rajesh Hegde
executiveYes. So thank you for having us on the call. And now our focus is, of course, to -- going forward is to -- #1 is to utilize the capacity that we have in place and install the additional capacity that we are really looking at. And I'm quite hopeful that we will meet most of our objectives as we have said in the call as well.
Operator
operatorThank you. On behalf of Axis Capital Limited, that concludes this conference call. Thank you for joining us, and you may now disconnect your lines.
Rajesh Hegde
executiveThank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete KSH International Limited transcript — plus 256,000+ transcripts from 12,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to KSH International Limited earnings transcripts and 256,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in KSH International Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.