Liontown Resources Limited (LTR) Earnings Call Transcript & Summary

July 29, 2025

Australian Securities Exchange AU Materials Metals and Mining earnings 60 min

Earnings Call Speaker Segments

Operator

operator
#1

Thanks for joining Liontown Resources' call on the June quarter results. Once the formal presentation wraps up, we'll open a Q&A session for investors, analysts, and media. During today's call, participants can submit questions in text form or ask them live by audio. <<operator_script>> Should you run into any trouble submitting a question through the web, there's a backup phone line you can use. You'll find the dial-in details on the request to speak page, or on the homepage under asking audio questions. To see documents relevant to today's meeting, including more detailed instructions on how to use the platform, click the document icon. A list of all available documents will then appear. Once you select one, the document will open within the Lumi platform. You'll still be able to listen to the meeting while viewing the documents. <<operator_script>> I'll now hand over to Mr. Tony Ottaviano, Managing Director and CEO of Liontown Resources.

Antonino Ottaviano

executive
#2

Morning, everyone, and thanks for being here for Liontown's quarterly and full year results presentation. With me are Graeme Pettit, our interim CFO; Adam Smits, our Chief Operating Officer; and Grant Donald, our Chief Commercial Officer. Please turn to the first slide. That's the standard disclaimer. Now I'd like to frame the context for today's presentation. But first, I think it's important that we reflect a bit on the year that has just passed. I mean, we began production in July. Yet if we look at the macro environment, the spodumene price has dropped 36%, and it has declined even more over the last quarter. Even so, we have seen some green shoots over the past couple of weeks. This is a very volatile environment, and that's best illustrated by the fact that on Friday the spodumene price rose $60 a tonne, and last night it fell $50 a tonne. That's the macro environment we've had to ramp into. What we can control is how we perform and our business, and we've got to execute and execute well. And we've demonstrated that through 2 operational levers that we've had to pull.

Antonino Ottaviano

executive
#3

First, business optimization—there's a slide on that today—and second, how the plant has performed. We essentially brought the plant up to full operation within 6 months, then had 5 months to fine-tune it so it can process the strategic stockpile we've discussed. Six months ago we valued that stockpile at $93 million, and it consists of material from our open pit, some underground ore, and our OSP material, which is essentially our low-grade, high-gabbro material. So we've had to tune the plant to determine the operating settings that will carry us into FY '26. Even so, looking at what we've demonstrated we can do, we've delivered 320,000 tonnes of concentrate in 11 months—an outstanding effort for a plant that's in ramp-up. That figure is 294 on a dry basis, since that's what we're paid on. In terms of physical production, though, we produced more than 320,000 tonnes. The underground operation started on schedule. We've achieved $125 million in cost savings and deferrals against a $100 million target, we have a robust cash balance of $156 million, and we've met our second half guidance for all-in sustaining costs.

Antonino Ottaviano

executive
#4

Yet what pleased us even more during the quarter just ended was a record $23 million in net cash flow from operating activities. In this presentation we've likewise included our outlook for FY '26, and we have stated for a while now that FY '26 will be a transition year, since we are closing the open pit and finishing up the underground. Market conditions and the way things stand have also required us to keep optimizing the business. And then, as a final point, we have to stay relentlessly focused on maximizing value and on cash, and we will keep doing so in FY '26. That said, we are also keeping one eye on what lies ahead. And every one of our expansion options remains intact should a market rebound occur. Next slide, please. Next one, please. Okay. What follows is a summary of FY '25. Our ESG credentials have been strengthened further. And we have a slide showing that today. As I noted, we've turned out more than 320,000 tonnes of concentrate, achieved across 11 months, and the plant has ramped up, run reliably, and provided us with flexible options, which we'll discuss later on in the presentation. Underground operations have begun, and there are no surprises there.

Antonino Ottaviano

executive
#5

We're making solid progress. For those joining the site visit on Thursday, you'll be able to see that for yourselves. We remain on schedule to wrap up underground operations at the end of this year, and we're reacting fast to a market that's volatile, which our cost savings so far show, along with how we've preserved cash. Next slide, please. Alright, ESG. At a headline level, we've hurt fewer people this year than last year. In fact, we've hurt fewer people this quarter than we did last year. But the results aren't where they need to be, and we'll keep our focus on this. It's an ongoing focus, actually. But the good thing is that not only are we focused on lag indicators such as TRIFR and lost time injury frequency rate, we're also getting our leadership to focus on the lead behaviors, the observations we need to make, the field leadership we need to carry out. On the ESG front, consistently, we're delivering between 79% and 82% renewable power into our operations. There are times when we run solely on renewable power for a day or so. And on diversity, we continue to maintain our focus on achieving gender equality in our workplace.

Antonino Ottaviano

executive
#6

Yet what matters even more is having varied perspectives. Let's move to the next slide, please. At this point I'll hand things over to Adam Smits, who is going to walk us through the physicals we achieved both for the quarter and across the year.

Adam Smits

executive
#7

Thanks, Tony. Good morning, everybody. The main thing I want to get across on this slide, as Tony already mentioned, is that we have been operating for just 11 months. I'm not saying that to defend anything — it's simply a fact. And these numbers, especially the annualized ones, really show how we've performed across those 11 months, starting from scratch with a new team, a new plant, and ramping everything up during that period. For the quarter just ended, we produced slightly more than 85,000 tonnes of concentrate and sold a bit under 100,000. Lithium recovery in this quarter came in somewhat lower than Q3. We had flagged that back in Q3, when we said we would intentionally reprocess our OSP, and I'll touch on that a little later in the deck. We put just over 600,000 tonnes of ore through the processing plant. Annualized, that works out to a run rate of roughly 2.5 million tonnes per annum. June on its own equates to an annualized run rate of around 2.7 million tonnes. So you can see this brand-new plant is already operating not far off nameplate.

Adam Smits

executive
#8

Regarding the year, as Tony referenced or brought up, we produced 320,000 wet metric tonnes of concentrate across 11 months. We can't say, without being anecdotal, how many additional start-ups would be needed to generate that in the first year of operation. Concentrate sales came in at just under $300,000 annual recovery, at 58%. And that was a tale of two halves. So half one stood at 55%, half two at 60%. We processed slightly more than 2 million tonnes, again, a tale of two halves. Half one was roughly 0.8 million, half two was 1.2 million. So you can see the steady improvement and the continuous improvement in the plant across that period. Another thing that isn't on this slide, but it's really critical to mention, and I think it really reinforces the money and the time and the effort we spent in the early phase of the project, is that our availability for the plant for the second half of '25 was 93%. So just think about that for a second, brand-new processing plant, 93% availability, and very much the newness is worn off in half two. So not only was it built well, but it's being maintained and operated well.

Adam Smits

executive
#9

And I believe that's an important thing to highlight. Next slide, please. Regarding underground, this is very much a central priority for everyone, Tony down. And the main priority is getting that underground operation to ramp up, because, as Tony mentioned, the open pit wraps up in December of this year. Underground is really about being prepared. You can't simply flip an underground mine on and expect it to generate the tonnes. You need to plan, and we've spent years planning to reach where we are now, along with the infrastructure being installed. And the development underway was all scheduled well and truly ahead of time. What we're observing now that we're at underground, and we've completed substantial development, is that ground conditions are excellent. We believed they were excellent based on the geotech work. They're turning out to be excellent. Our mission bolting and the ground support we're installing is on budget. We've encountered no surprises. The first stopes that we've drilled and blasted and mined now are running somewhere between 4.5 and 8.5 tonnes per meter of drilling, which is what we planned. We're achieving excellent fragmentation. You can see that in the bottom left picture.

Adam Smits

executive
#10

The infrastructure that supports our operations is progressing as planned. Between the contract we spearheaded and the owner's expenses, $100 million is tied up in that paste plant. It ranks as Australia's largest such facility, and construction and commissioning have been happening ahead of what we actually require. Ventilation is close to finished now. In the top-left photo, you can see it. That represents a $15 million spend on ventilation alone — primary ventilation — plus roughly 18 months to 2 years of planning so it would be ready today, at the moment we need it. On underground productivity with the jumbos, we've talked about this for a while. It keeps advancing at a steady pace, even with us now stoping, paste filling, and carrying out plenty of other work underground. Our attention stays on the mine when it comes to running it efficiently. That's why we held firm on our dual declines. We're eager to see larger stopes arrive in the back half of '26 — up to roughly 40,000 tonne stopes, and 80,000 over the coming 2 years. And already we've lifted that underground operation to a run rate, as of around today, of approximately 0.6 million tonnes per annum within about 3.5 months. Over the next 2 to 3 months, it should approach 1; and in 3, it will sit at about 1.5.

Adam Smits

executive
#11

What this demonstrates is that the underground mine is genuinely advancing, and it must, since the open pit is winding down—that's where we're concentrating. Let's go to the next slide. Tony mentioned this back in November of last year: in that low-cost setting, we truly shifted our approach toward figuring out how to remove spending from what we'll be sending out the door going forward. Among the most significant levers we used was scaling back on development and reworking our mine plan, so we descended more quickly into the higher-grade, thicker sections of the ore body. The result was that we eliminated a great deal of development. We decelerated development overall, and that placed somewhat more strain—or rather, it pushed us to process our ROM and OSP stockpiles sooner. We lowered our target for the common rate we intended to produce from roughly 6% down to 5.2%; it generates more profit and definitely delivers more savings on development. And we began trialing how best to treat this OSP material. Now, this OSP material is basically clean ore blended with the gabbro—the host rock—at anywhere from 5% to more than 30%.

Adam Smits

executive
#12

For anyone who isn't familiar, gabbro is extremely — how should I put it — unfavorable when it comes to processing recovery; it consumes a lot of power and a lot of reagents. As for our peer companies operating DMS and DMS float circuits, they really can't handle much beyond 5%, since gabbro's actual SG sits very close to spodumene's SG. So you essentially get no selectivity at all. What we've shown during the past few months is that we can not only sort — something many others are doing, and ore sorting does bring some benefits — but we've also proven that the plant can accept direct OSP feed at levels above 20%. The graph on the right shows we're still producing salable grade concentrate with gabbro levels between 15% and 20%. That is genuinely, genuinely, genuinely impressive, and it reflects the enormous effort of the team on site as well as the flexibility of the plan to handle this kind of feed. It also hands us one more lever to pull regarding what we do with the OSP. The OSP is very much a finite issue. It's very much an open pit mining problem to have.

Adam Smits

executive
#13

And any of our competitors who operate open pit mines would confirm this. From underground operations, we are definitely not observing that share of OSP. Actually, it's the reverse. We're still collaborating with an OSP, and that will continue through the first half of 2016. But the message I want to convey to everyone listening is this: a plan exists, we have things under control, and we are making that plan succeed. Beyond simply making it succeed, we're making it succeed effectively. At this point, I think I'll pass things to Graeme. Please move to the next slide.

Graeme Pettit

executive
#14

Thanks, Adam, and good morning, everyone on the call. On this slide, we lay out a few of the main financial highlights, covering both the quarter just reported and the year-to-date period. Beginning with cash: during the quarter we produced positive cash flow from operating activities of $23 million, which felt especially good given how tough the pricing environment was. That marks the third quarter in a row of positive operating cash flow since we began operations a little less than a year ago. Our closing cash balance stayed solid at $156 million, and that figure does not include the $25 million returned to cash back the guarantee facility referenced in last quarter's presentation. Those funds should now come in over the following quarter. On a quarter-on-quarter basis, our closing cash balance fell by $17 million, roughly 10%. I'll go into the cash balance movement in somewhat more detail on the next slide. Moving through the quarterly financial stats: revenue came in at $96 million, an 8% (sic) 9% decline quarter-on-quarter, reflecting a lower average realized price that was partly offset by a modest rise in volume. The Q4 average realized price was USD 633 per dmt CIF, 75% below the prior quarter.

Graeme Pettit

executive
#15

Measured in dollars, the average realized price came in at $984 per dmt, reflecting an 11% decline quarter-on-quarter. The average concentrate grade shipped stayed consistent with the prior 2 quarters at 5.2%. Unit operating costs were $898 dmt sold FOB, and all-in sustaining costs were $1,227 dmt sold FOB; both were chiefly affected by an inventory charge that mirrors the reduction in stockpiles. As we laid out in the Q3 quarterly presentation, we had anticipated unit operating costs would rise in Q4 as we bring ore sorting back in and draw down on stockpiles. I won't take time on the year-to-date financial steps, but I do want to point you to the note in the quarterly report that discusses ROM ore stockpile valuation. While preparing our FY '25 full year fin stats, we found the need to reduce the carrying value of our oil inventories to their net realizable value. That adjustment, falling between $75 million and $85 million, follows our accounting policies and is chiefly tied to our OP inventories. Let me be clear that this is a noncash accounting adjustment, and it stems from the current low lithium price environment.

Graeme Pettit

executive
#16

That impairment charge has no effect on the unit operating costs or AISC we report, and as Adam noted, OSP output comes mostly from the open pit mine, which is set to wrap up in December 2025. Let's move to the next slide, please.

Antonino Ottaviano

executive
#17

Before we leave this slide, let me just underscore something Graeme said: that $23 million in net cash from operating activities is the largest amount we've received to date. Yet it comes against the backdrop of a realized price that has fallen by $75 a tonne. So for context, it's a stronger result achieved at a lower price, and that speaks to the business optimization work and our emphasis on cash.

Graeme Pettit

executive
#18

Thanks, Tony. Moving to the next slide, if you would. This slide contains a cash flow waterfall that, in chart form, largely presents the same data found in the 5B cash flow statement we issued today. We've added a further breakdown of investing activities so the working capital advantage from drawing down stockpiles is clearer. Beginning on the left side of the waterfall, cash flow from operating activities was positive at $23 million, as we've described. As Adam said earlier, the underground mine began production stoping in April. That makes this the first quarter in which we've started to see some underground mining costs appear in operating cash flows. Investing activities cash flows came to $49 million for the quarter, and we've supplied an indicative split reflecting cost weightings. Growth capital was estimated at $30 million, primarily covering the initial construction costs for the tailings storage facility plus underground infrastructure and development costs. As noted, underground operating costs are beginning to show up in operating activities. Still, given where the underground sits in its development and ramp-up, it has not reached commercial production for accounting purposes and isn't expected to until Q3 FY '26. Sustaining capital was mainly tied to open pit deferred waste and mining capital projects.

Graeme Pettit

executive
#19

During the upcoming quarter, the open pit is set to keep concentrating on waste stripping, and after that it will reach the final major ore zone in Q2 FY '26. Financing cash flows included $15 million in loan proceeds properly obtained from the WA state government through the Lithium Industry Support program. No interest applies to this loan, and repayment occurs across 2 years once the interest-free period ends. We have drawn attention to a cash AISC of $1,099 per dmt sold. The purpose was to make clear that the AISC we reported—$1,227 per dmt sold in this quarter—is being pushed higher by noncash inventory charges. Consequently, the real cash unit cost we achieved during the quarter came in lower. Lastly, we closed the quarter with a solid $156 million closing cash balance along with 11,000 tonnes of concentrate on hand. Let's move to the next slide, please. Our actual H2 FY '25 performance compared with the guided ranges is laid out on this slide. As context, we issued our H2 guidance 3 months after the processing plants were switched on, and very few producers give guidance while ramping up the way we have. Going through the cost metrics, concentrate sold on an SC6 basis came to 165,000 dmt, 3% under the bottom end of guidance, partly affected by lower concentrate production.

Graeme Pettit

executive
#20

SC6-basis concentrate output came in at 155,000 dmt, 9% under the low end of guidance. Lower OSP recoveries than what was initially envisioned at the time guidance was issued drove this, and Adam has gone over how we have been addressing that. Unit operating costs, on an SC6 basis, reached $931 dmt, 9% above the top end of guidance. That mainly stemmed from reduced production plus a higher inventory charge caused by a drawdown on inventories. Total capital expenditure amounted to $94 million, 3% beneath the bottom of guidance, and this partly mirrors capital reductions and deferrals stemming from the business optimization program. And finally, taken together, AISC on an SC6 basis came to $1,256 dmt, which fell inside the guidance range. Even though there were a few messages to guidance, the outcome should be viewed against the backdrop of a new facility being ramped up and a challenging pricing environment that requires operational adaptations. And to that end, we are pleased with what's been achieved. I'll now hand back over to Tony.

Antonino Ottaviano

executive
#21

Appreciate that, Graeme. To give a bit of context, we're shifting our focus now to FY '26 and what the picture looks like for that year. We've been saying for a while that this is a transition year, and we're building up the underground. So at this point I'll pass things to Adam, who can walk you through some of the detail on what we're seeing for FY '26.

Adam Smits

executive
#22

Moving to the next slide, please. Appreciate it, Tony. As I mentioned a bit earlier, I think '26 is very much a transition year. The main focus is on enabling infrastructure. One thing I've learned as a non-mining engineer is just how much infrastructure and preplanning goes into one of these underground mines. And our team, many of whom have been onboard now nearly 3 years, has certainly done that work, which is why the infrastructure is coming on as planned in this quarter. That includes the ventilation, which should kick off in about a week's time. The first big vent fans will be brought online. Our bigger stopes will kick in, in the back half of 2026 where we're talking north of 40,000 tonnes per stope, and that will enable us to get that sort of ore delivery out of underground that we need to support the processing plant. We're looking at completing the open pit on schedule in December this year. The better ore from that pit now comes out in October and November and December. That's a project -- or that's a contract that was let nearly 3 years ago that basically has finished almost within a month of the date that we ordered it.

Adam Smits

executive
#23

That's really a standout accomplishment from Pete and the crew on the open pit. We're still aiming for recovery above 70% in Q3. Folks might wonder, since we're at 57% for the quarter, how we'll get there. It's largely tied to the ore, and I have a slide that addresses this. Clean ore means better recovery, and we showed that already in Q3 of '25. And by Q3 of '26, all of our ore will be coming from underground, and we're on track to make that happen. As for the processing plant, we believe our availability is best-in-class — 96% feed on, feed off availability is genuinely outstanding. We're restructuring the ROM pad right now. Originally the ROM pad was designed as an ore stockpile, because of how the ore came out of the open pit. Now it's being set up much more around feeding the crusher and cutting tramming distances. The processing plant had a lot of tech built in at startup, including an onstream analyzer from Metso. It took us a while to get that technology working, and now it is working. So we're now trending lithium online.

Adam Smits

executive
#24

Yet we didn't stop at that point. We've kept investing funds and allocating capital toward initiatives that are sensible. So we are now in the last phases of installing an advanced control system on the mill known as Manta. That lets us regulate grind much more effectively than the ordinary PLC alone. We have also just brought online what we believe is the first camera-based particle analyzer in Australasia, using cameras inside pipes to deliver a particle size distribution every 20 seconds. This technology is quite revolutionary. Still, we keep advancing these kinds of projects. And you might have caught a recent video in which we discuss a regrind mill, due to be commissioned in August, where the plan is to regrind a portion of our tailings, once more with a focus on recovery. And we keep honing the way we process that OSP. OSP is a very finite issue, as I said, yet our attention stays on what proportion we saw, what proportion we feed, and whether we blend or direct feed to the mill. Next slide, please. Earlier I referred to a tale of 2 halves; '26 is very much a tale of 2 halves. Half 1 is very much about processing those stockpiles, finishing the open pit and bidding in the underground.

Adam Smits

executive
#25

That covers the first half. The second half really centers on scaling things up underground and truly capitalizing on the advantages of that clean underground ore. That's exactly why we have such confidence we'll achieve roughly 70% recovery, given the work already completed, processing straight underground ore through the plant. So the first half of '26 is clearly about ramping down that open pit production. We wrapped up in December. We've still got roughly 400,000 tonnes of clean ore left to come out of the pit. Our focus stays on maintenance. We recently completed a large maintenance shutdown at the plant. It wasn't maintenance strictly speaking, but much of it involved actual improvements to the plant to make it even better, and we'll keep optimizing that OSP strategy across the next 2 quarters. When it comes to Q3 and Q4 of '26, everything is about scaling up that underground. The underground is really all about scalability. We've built that scalability in through the dual deep declines, the level development, and even the equipment mobilization and the contract we signed with Byrnecut over 2 years ago is very much built or structured around ramping up the underground.

Adam Smits

executive
#26

Availability remains a key area of attention for us. For context, the underground operation is currently generating somewhere in the range of 70,000 to 100,000 tonnes each month, along with 36 stopes during the first half. That will build toward 100,000 to 170,000 tonnes per month and roughly 48 stopes in the second half, before climbing to 230 tonnes a month across something like 80 to 90 stopes on an annual basis in '27. So the plan is clearly there. It's the very same plan we've been running with for some time now, and we keep executing against it. and we remain ahead of that plan. I'd say a key lesson, or a key driver, in how Liontown has always conducted business is staying ahead of the curve and ahead of where we need to be. That's precisely where we stand, or where we believe we stand, with the underground when it comes to infrastructure, people, systems, and simply the overall ramp-up we're driving forward.

Antonino Ottaviano

executive
#27

Thanks, Adam. Moving to the following slide — Adam has one more slide to present, but I do want to express my thanks to Adam. This marks his final quarterly call with us. I'm deeply grateful to Adam for his tireless dedication to the organization. As you can see, he loves the technical side of things. He's an engineer — and I can say that because I'm one myself. So thank you, Adam, for the work you've done and the way you've positioned us. Okay. So as we head into FY '26, there's a lot we've already uncovered, but there are 2 points I want to highlight here. First, the first half and the ongoing emphasis on the OSP and clearing those stockpiles out of the way, so we can position ourselves for the really prime, good quality underground materials and thereby maximize our recoveries. The second piece is the Q1 scheduled shutdowns for the mill and the dry plant — that's planned. We've now been running the mill for more than a year, and we needed to go in and carry out the scheduled maintenance.

Antonino Ottaviano

executive
#28

Yet when you examine the real parameters for FY '26 and the guidance — I mean, production, taking the midpoint, that works out to a 39% increase over this year. So that's a meaningful step up. And then many of those costs are tied to drawing down stockpiles, but again, the emphasis on maximizing cash. Okay. And nothing has changed regarding our recovery target or our planned underground production. So let's go to the next slide, please. And we'll have Adam wrap up on this one.

Adam Smits

executive
#29

Right, so I suppose one of the main takeaways for us on the mine side for '26 is that it's genuinely a year of transition, and the goal is to be low cost and scalable by '27. The plant, or the underground, is built for scale. We have been progressively derisking the underground — and we've done that from day 1. And the objective underground is always a lower cost per tonne. What do I mean by designing for scale? From day 1 we put in dual declines. We know we have big stopes, and they are coming. They arrive in half 2 '26, when we break the 40,000 mark and go up to 80,000 over the following 2 years. So that's 80,000 tonnes out of a single stope, compared with the smaller stopes we're mining now, which sit around the 10,000 tonne mark. We also reach the bulk levels, where we have more than 125,000 kilotons of material per vertical meter. And you can see the annualized production run rate. So we're already at roughly 0.5 today — 0.6 actually — by the end of this month. We will break 1 million tonnes within the next couple of months, and then at the end of March, around 1.5 million tonnes.

Adam Smits

executive
#30

And that involves pulling together equipment mobilization, systems, and really a great deal of advance planning and development work we've been carrying out over the past several years to support that kind of ramp. It doesn't happen simply by sending a few extra pieces of equipment underground. It happens because you've genuinely got a plan behind it. You can't — and you can observe this in other companies' results across roughly the last 12 months. Without the levels available, without that space available on the ground, there's no way to physically ramp that underground operation up. And we've planned for that from day 1. On derisking, I'd say much of the derisking has concentrated heavily on infrastructure. It has concentrated heavily on people. And wherever we've identified gaps, we've strengthened the team, and that took place in the last quarter as well. So we're driving very hard, not just on the physicals, but also on the people and systems. And what does all of that deliver? It delivers that lower cost per tonne. So '26 is very much a year of development. There's considerably more development happening underground.

Adam Smits

executive
#31

We have roughly 12,000 meters being drilled in -- 8.5, pardon me, being drilled in '26 compared with sort of 7 over the last 12 months. And that really is aimed at remaining ahead of the curve. And then of course we are prepared for that expansion, 2.8 to 4. That has not slipped from our view. It is very much dependent on price. And look, wherever the price goes, that is where it goes. But certainly, the mine was always built with expansion in mind, and we simply have the capacity to switch that on and off. I do not believe there is much else to add on that.

Antonino Ottaviano

executive
#32

Thanks, Adam. Now let's advance to the following slide, please. This is essentially where we bring things to a close — the ongoing, unrelenting emphasis on creating as much value as possible. Let's go to the next slide, please. So we made a commitment to the market that we'd hit our cost-reduction goals, and we achieved $112 million against a target of $100 million. The breakdown is $71 million, which is recurring, plus $41 million stemming from deferrals. A significant portion of that deferral came from North-West Flats being pushed out, along with all the development costs tied to North-West Flats. But in '26 the emphasis carries on. We've got our — the market is what it is. And when we consider where we'll address this next horizon of cost optimization and business optimization, it will center on sourcing our product and our consumables better, buying better, improving the outcomes of our top 10 contracts — many of them signed during the peak market — and eliminating waste and duplication across our processes and activities, okay? So we currently have our program underway, and it will run through '26 and produce results. Let's go to the next one, please.

Antonino Ottaviano

executive
#33

Alright, I’ll now hand things over to Grant Donald, and he’ll walk everyone through the following 2 slides. Thanks, Grant.

Grant Donald

executive
#34

Thanks, Tony. So, we felt it was important to highlight the highly attractive debt package we obtained from customers. It's covenant light, and that really sets us apart compared with bank debt or project finance debt. To begin with the forward facility: this AUD 300 million debt facility carried no interest payments until the offtake, which means the accumulated unaudited balance stood at AUD 336 million as of the end of June 2025. The term runs 5 years from the start of the offtake, which was agreed at Ford's request to be 1 July 2025, so the debt matures in June 2030. 60% of the principal amortizes across that 5-year term, with a 40% balloon repayment at maturity. The interest rate sits at 1.5% above BBSW, equivalent to over 5.6% today. And the first interest and principal repayment falls due at the end of September 2025, now that the offtake has commenced. Turning to the LG Energy Solution convertible note: it is denominated in U.S. dollars to align with our revenue line. Again, a 5-year term, it's $250 million, equivalent to around AUD 370 million at the time of conversion. The share price conversion is AUD 1.80, and the interest rate on this is SOFR flat, which currently is around 4.3%.

Grant Donald

executive
#35

There's also biannual interest on this, and it gets capitalized during the first 2 years; after that, Liontown has the option to pay in cash or equity until the facility matures in July 2029. Choosing customer-backed financing for building Kathleen Valley has created genuinely strong alignment for us with customers who likewise want to lock in the product for the long-term supply chains they are constructing. We see this as a competitive advantage compared with where we'd have stood had we gone with traditional debt finance from project financiers. Next slide, please. We'll wrap up with the market. Over the short term, we're starting to notice indications of a policy shift aimed at stopping the rational competition, or involution as it's called. Premier League Chang signaled this shift at a state council meeting in mid-July. And this year, it's specifically referenced as it relates to the EV sector, emphasizing a shift towards quality and innovation as opposed to price cutting. Local authorities have also been directed to discourage overinvestment in redundant projects, and this is built through to a number of audits or restrictions placed on lithium producers in China, which is impacting the supply side. You can see the very tangible impact of these stories on futures exchange in China on the lifetime chart.

Grant Donald

executive
#36

When it comes to demand, the company still sees a strong outlook for lithium, supported by solid demand for high-quality spodumene concentrate. During the first 6 months of 2025, lithium demand kept up its double-digit growth rates, fueled by strong electric vehicle sales and battery energy storage systems. Global EV sales rose by 28%. To give that some context, that equals 2 million additional EVs sold, bringing the total to $9 million in sales in the first half. And the silent sleeper here really is battery energy storage systems, where installations are up 54% year-on-year. BESS is going to be a very material demand driver going forward. And we tried to illustrate this in the chart on the right-hand side to show you that 1 out of every 4 incremental units of lithium demand over the next 5 years will go to battery energy storage. So in summary, our view is that the current fuel price environment really reflects an evolving supply-demand dynamic. And we expect a return to more normalized conditions as demand continues its robust long-term growth trajectory. Thanks, Tony.

Antonino Ottaviano

executive
#37

Thanks, Grant. Before we move into Q&A, let me turn to the final slide. As CEO, I want to give a quick summary of where we stand: I feel a great deal of pride in what we've accomplished since production began in July of last year. We had to fight through that ramp-up amid an extremely challenging low-price environment, and in my view the team has done a remarkable job of getting us to this point. Our attention has stayed where it belongs — on performing well and running the business as effectively as we can while safeguarding cash — and we achieved that, finishing June with a cash balance of $156 million. We understand what lies ahead in FY '26. Adam has already laid out how we've planned for it, and we're well positioned to deliver those outcomes. And finally, a relentless focus on maximizing value ought to be a theme no matter what the market is doing, but it stands out even more sharply as we head into this period of uncertainty. With that, I'll open the line for Q&A. Thank you.

Operator

operator
#38

<<operator_script>> Adam Baker of Macquarie has our initial question.

Adam Baker

analyst
#39

I'm quite curious about that slide on Page 14 covering the underground ramp-up. As your run rates reach 375 kt by 3Q FY '26, and then you have that progressive ramp-up to 2.8 million tonnes by 4Q FY '27, I'm just wondering what kind of drop-off we'd see in milling rates during that first half of FY '27, as you sort of dovetail that underground ramp-up and it gets offset, obviously, by the reduction in stockpiles and the remaining open pit material — what kind of percentage of the reduction in throughput plant capacity would that be?

Antonino Ottaviano

executive
#40

My view is that we aren't seeing any drop-off or ramp — what we're aiming for is a steady state, and that's the approach we're taking to managing both the stockpiles and the transition.

Grant Donald

executive
#41

The mill rate is going to take underground production into account.

Antonino Ottaviano

executive
#42

That's right.

Adam Baker

analyst
#43

All right. It looks like it's just falling away slightly on the Y axis, though that might simply be my...

Adam Smits

executive
#44

Absolutely — that answer is a definite yes.

Antonino Ottaviano

executive
#45

That annualized figure is fairly stylized, though for '27 the annualized rate comes to 2.8.

Adam Baker

analyst
#46

Thanks. And then second, regarding the Ford offtake, I just noticed there was a deal to resell 150 kt of spodumene. Do you expect any future arrangement to resell additional spodumene offtake? And second, if that happens, would the timing of the P&L repayments change?

Antonino Ottaviano

executive
#47

Over to you, Adam.

Adam Smits

executive
#48

Yes, thanks, Adam. I suppose the reality is that the EV landscape has shifted significantly over the past few years. And we identified a chance to allocate those tonnes on behalf of forward with a different customer who was seeking the product. At the end of the day, that's just ongoing business as usual from our perspective. If a chance arises to place product with another customer for greater value, and it works for everyone involved, then those are opportunities we would chase. I don't believe that's necessarily any sign of what's to come. I think it's simply what we've done in the short term given the current demand position Ford has for its own internal consumption.

Operator

operator
#49

Our next question comes from Hugo Nicolaci at Goldman Sachs.

Hugo Nicolaci

analyst
#50

Congratulations on hitting your first year of production. This is my first one as well, Tony, and you have consistently concentrated on volume and cost measured on an SC6 basis, while your FY '26 guidance issued today uses a 5.2% basis for both production and costs. What accounts for that shift?

Antonino Ottaviano

executive
#51

Well, we’ve stayed in step with the other players in our space. We’ve seen that going back to SC6 again and again has been difficult. And honestly, if what we make comes in at 5.2%, that is the cost structure underpinning it. So really, we’re just aligning ourselves with how the rest of the market is operating.

Hugo Nicolaci

analyst
#52

Right, understood. So we've essentially shifted to what everybody else is doing. That's logical. Regarding the cost savings item, you've already mentioned part of it. Could you just verify whether rosters and reagents have actually been changed at this point, and whether that sits within the $71 million of recurring savings? Then perhaps expand a little on how large the cost savings from better buying and sourcing plus eliminating duplication should be through FY '26.

Antonino Ottaviano

executive
#53

Yes. So the rosters are still the same. That figure doesn't include it. As for the reagents, we're still using the reagent we've had. We've been experimenting with consumption rates. So an opportunity still exists to consider a different reagent, but a bit more test work is needed, and that's planned for FY '26. Regarding a target for FY '26, we haven't released one because we're still working through it to establish how big the prize is. So until that work is finished, Hugo, I'm not willing to put a target out.

Operator

operator
#54

Lyndon Fagan from JPMorgan has the next question.

Lyndon Fagan

analyst
#55

Turning to your cost guidance, if I multiply the midpoint of that by the midpoint of production, site costs come out at slightly below $400 million. What I'd like to know is whether that essentially establishes the benchmark for running the site from here on. Clearly, underground is ramping up while open pit is ramping down. So perhaps you could give us a clearer picture of what that dollar figure in the millions looks like as a pure underground operation. I'm just attempting to get a handle on this number so I can forecast forward.

Graeme Pettit

executive
#56

That $400 million figure gives a fair picture of what gross costs will look like going forward. For FY '26, underground mining essentially takes the place of that open pit, and we remain broadly inside that $400 million range.

Lyndon Fagan

analyst
#57

So the volume is increasing?

Graeme Pettit

executive
#58

Correct — volume does increase, so it rises somewhat.

Operator

operator
#59

Our next question comes from Kate McCutcheon at Citi.

Kate McCutcheon

analyst
#60

For the coming two quarters, that OSP material will be moving through. Regarding your all-in sustaining cost, could you tell me what the stockpile adjustment piece of that is?

Antonino Ottaviano

executive
#61

Just to make sure I understand, Kate — is this about the adjustment made to the carrying value of the stockpile, or is it about what portion of the unit cost comes from the inventory piece?

Kate McCutcheon

analyst
#62

The second one. So does that per-tonne AISC figure include the stockpile adjustment? Yes.

Graeme Pettit

executive
#63

Understood. So, Kate, on an all-in sustaining cost basis, our estimate came in at $40 to $50 per tonne.

Kate McCutcheon

analyst
#64

Now, turning to Slide 16, you mentioned an expectation for FOB costs to decrease by 20% to 25% in '27. That suggests slightly above AUD 800 per tonne, which is somewhat like what Lyndon asked about — is that cost level out? Also, how should we consider all-in sustaining costs? And would it be unfair to assume that this is a level going forward?

Graeme Pettit

executive
#65

A significant portion of that FY '27 decline comes from efficiencies beginning to kick in. Underground mining expenses are largely fixed in nature. As volumes increase, those fixed costs get spread more evenly across a greater number of tonnes. Looking ahead, I'd note — as the middle chart shows — capital development costs are elevated right now, and we anticipate them easing as time goes on.

Antonino Ottaviano

executive
#66

To add to what Graeme mentioned, Kate, as we’ve said before: when we get into the thicker bulk zones of the ore body — something we expect to do in the latter part of FY ’26 and on into ’27 — we will certainly achieve economies of scale. Once we’re in those bigger stopes, we’ll be able to spread the fixed cost of the contract mining across more tonnes.

Graeme Pettit

executive
#67

Correct, gross sustaining will decline as time goes on, that's right.

Operator

operator
#68

Our next question comes from Glyn Lawcock at Barrenjoey.

Antonino Ottaviano

executive
#69

That part isn't clear on the recording for you.

Glyn Lawcock

analyst
#70

My apologies, Tony — I didn’t catch that; your audio cut out.

Antonino Ottaviano

executive
#71

As I mentioned, you saw that we performed that cash flow — that cash computation for you as part of our cash flow guidance.

Glyn Lawcock

analyst
#72

Thanks so much. Tony, it's great that you recognize my skid math?

Antonino Ottaviano

executive
#73

That's correct — we did.

Glyn Lawcock

analyst
#74

That's the thing everybody's discussing right now, though nobody's using the term skid maths. But going back to what Lyndon and Kate asked, the spend is $400 million. As per your earlier guidance, I assume your inventory movement actually shows up within your cost of production. So with the $400 million — or you had $100 million of inventory — and your $40 to $50 a tonne inventory movement, to Kate's question, that only implies $20 million. Is that correct? I'd have expected that with the $400 million, you'd be out of quite a bit of inventory, wouldn't you, over $26. So what's the figure in dollar millions that you anticipate will be inventory movement?

Graeme Pettit

executive
#75

I don’t have that figure on hand, Glyn, though the $40 to $50 estimate is calculated against a somewhat higher sales base. Also, it’s—we’ve only been get—we use up the majority of those inventory units during the first half, yes, sorry, I don’t have the gross number.

Antonino Ottaviano

executive
#76

Glyn, the way I'd frame it is that the inventory drawdown is going to play out in 2 halves. A significant portion of it will land in the first half of FY '26. And as our FY '25 results show, we carried out a drawdown during FY '25. So as we ramp up the underground, we'll be pulling considerably more out of that inventory. Then, in the back half of FY '26, the feed will come predominantly from the underground.

Graeme Pettit

executive
#77

Also worth pointing out: our inventory does grow gradually. That $40 million is therefore a net inventory charge that flows through, which means the full WACC of the drawdown isn't visible.

Glyn Lawcock

analyst
#78

I suppose what I'm getting at is — if I put together a really basic model using the midpoints of everything you've guided to, CapEx included, along with all the interest and principal payments, then this year you'd be spending more than AUD 660 million ahead of any inventory adjustment. On that basis, your breakeven comes out at roughly USD 1,050 per tonne on an SC6 equivalent basis, purely from your guidance, just running the rough math. So you haven't had a chance to do that yet.

Grant Donald

executive
#79

So I take it you're correct there — but what exactly is it you're asking?

Glyn Lawcock

analyst
#80

So at today's $800 per tonne, I suppose that means a $100 million cash burn, and with $156 million on hand, that's fine. I guess the question is just: what are you doing? You have that extra $100 million of debt available to you — you're permitted to draw it, and maybe you can get forward to defer. I'm just curious what steps you're taking to make sure your additional liquidity?

Grant Donald

executive
#81

All right, so that’s the question. OK. Well, look, there are a few areas we’ll be concentrating on. Obviously, we’ll place greater emphasis on optimizing costs, and we’ll make that a lever. Second, we begin with a solid balance of $156 million. Third, we have a track record — well, there’s some price improvement, but we also have a track record of securing funding solutions together with our customers and other parties, right? So as we move forward, we’ll keep examining those funding options — it’s as simple as that. But really, it hinges on where the market goes.

Adam Smits

executive
#82

Yes. And Glyn, to build on that point — what I'd say is we haven't gone the prepayment route the way many of our competitors have. As we've just shown for '27 and beyond, we've got a substantial amount of additional volumes to place. That might be spot, or it might be long-term offtake. So quite a lot of options remain open to us.

Operator

operator
#83

Stuart Howe from Bell Potter Securities has the next question.

Stuart Howe

analyst
#84

One quick question — sorry if someone already raised this — but for the guidance balance between the first half and the second half, do you have an approximate percentage split across those two, obviously factoring in the Q1 shutdown? And I'd assume costs would be correspondingly matched to that in reverse.

Antonino Ottaviano

executive
#85

Stuart, apologies — you're coming through a little muffled. Were you asking us to break down how costs are divided between the first half and the second half of FY '26?

Stuart Howe

analyst
#86

My apologies—regarding how output is split between the first and second halves of '26.

Antonino Ottaviano

executive
#87

Right. Well, it's going to be weighted more toward the back half. So I don't have that number on hand, Nick.

Graeme Pettit

executive
#88

In the first half we saw roughly 170,000, and then in the back half, around 250,000.

Stuart Howe

analyst
#89

Now, regarding flexibility at the plant—you clearly highlighted the capability to sort, to use the ore-sorting material and handle it effectively. That's obviously excellent for the upcoming fiscal year. But once you move to underground ore exclusively, do those flexibility advantages largely disappear? Or are there alternative ways to consider how you might leverage that moving forward from an underground-only standpoint?

Antonino Ottaviano

executive
#90

So Stu, what we were really trying to get across there is that the ore sorting product material is basically an open pit thing — in an open pit, roughly 30% of what you mine will usually end up in this OSP category. Once we move underground, by definition we'll be much more surgical about how we extract product, and we won't be dealing with anywhere close to that much OSP. So whatever OSP material comes from underground, we'll just blend it, and it will simply be part of the blend going forward.

Operator

operator
#91

We'll take our next question from Reg Spencer at Canaccord.

Reg Spencer

analyst
#92

Tony and Grant, apologies if this has already come up, but I wanted to dig into recoveries and the OSP from here through Q3 FY '26. When do you anticipate recoveries beginning to improve? And should what you posted in the June quarter serve as a fair indication of what to expect on recoveries, in terms of that OSP mix?

Adam Smits

executive
#93

Yes. Thanks for that, Reg. Our aim is roughly 60% to 65% across the first half as we gradually feed more clean ore at the back end of the half. But for Q1 specifically, 55% to 60% is a realistic figure to work with. Then Q2 of '26 should be a touch better. Same goes for Q3 and Q4. So really, the goal is to get a large share of that OSP finished off during this calendar year. Yes. And that's <<inaudible>> ore sorting. So it isn't simply straight feed, which is why we're...

Operator

operator
#94

Our following question is from Andrew Harrington of Petra Capital.

Andrew Harrington

analyst
#95

Nice work, Tony and the team. What I'm really asking about is the logistics side of things. As you scale up, what obstacles are you running into, and how well—or not so well—is everything moving along when it comes to ground transportation, port shipping, and where those costs stand? Any detail you can share on that would be helpful.

Adam Smits

executive
#96

Yeah, absolutely. On the logistics front, we took a really considered approach in choosing Qube. They’re highly experienced operators and extremely professional. We’re running quad road trains — that means four trailers, carrying 146 tonnes per road truck — and we’re rotating those through. They follow a figure-8 loop linking Mount Magnet with <<inaudible>>, and then Mount Magnet with Geraldton. That way, everyone gets to sleep in their own bed. Logistics have been very smooth and efficient up to now. Naturally, Geraldton is known for swells and weather at times. But that’s simply part of shipping out of Geraldton. So occasionally there’s a bit of a scramble toward year-end, though no issues so far.

Graeme Pettit

executive
#97

And to build on that, something important about the Qube contract is that it wasn't just about logistics strength, I suppose — the deal also brought in an established shared facility at the port, which is fairly unusual, a facility that had been built by others previously. But that makes a massive difference compared with simply arriving as a new customer at the port. So you already had an outload facility in place and 40,000 to 50,000 tonnes of storage capacity inside the port itself.

Andrew Harrington

analyst
#98

Okay, that makes sense. And if I could, let me ask a follow-up. Could you give us some insight into how sentiment is shifting in China and what your read on the market is? Right now, even fairly minor policy adjustments appear to be moving sentiment by a surprisingly large degree. Any thoughts you could share on that would be helpful too.

Adam Smits

executive
#99

Yes. Look, to me, what that essentially tells us is that the market is heavily tilted toward the short end. So there are fairly sizable short positions that have accumulated on GFX. I think a few of those narratives are only now beginning to emerge concerning supply curtailment, and that drove some of those shorts to unwind. But that unwinding was in fact already underway somewhat ahead of some of these news flows, presumably because people sensed the market had hit bottom. But look, it's always hard to judge supply and demand on fundamentals. We came into the year with 100,000 tonnes of oversupply growing, according to the numbers we get. Views always differ on projects coming in, but the reality is that with the 28% growth we just discussed, the BESS growth, we've seen over 100,000 tonnes of new demand in just the 6 months. So we're probably reaching that point now where some of these challenges of getting new products ramped up, new products ramped up, are beginning to show up as physical tightness. And certainly, what I hear from customers in terms of inbound inquiries, and a lot of people seeking a physical product, since you can't paper a battery.

Operator

operator
#100

That brings us to the end of the time we have for questions today. If anything else comes up, please get in touch with the Liontown team. Thanks to everyone for joining us, and enjoy the rest of your day. You're welcome to log out now.

Graeme Pettit

executive
#101

I appreciate that.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Liontown Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Liontown Resources Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Liontown Resources Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.