Loop Industries, Inc. (LOOP) Earnings Call Transcript & Summary

October 16, 2026

NASDAQ US Materials Chemicals earnings 24 min

Earnings Call Speaker Segments

Kevin O'Dowd

executive
#1

Thanks, operator. I want to mention before we get started that during today's call we'll be making forward-looking statements as defined under U.S. securities laws. Those statements have to do with our expectations, projections, beliefs, future plans and strategies, anticipated events, and other matters concerning performance. Known and unknown risks and uncertainties are part of forward-looking statements, and those risks and uncertainties could cause actual results to differ materially from what is expressed or implied. If you'd like a complete discussion of these risks and uncertainties, please look at the risk factors and forward-looking statement sections in our most recent Form 10-K and Form 10-Q, as well as other filings with the Securities and Exchange Commission. You can find those documents, plus yesterday's earnings release, on the SEC's website and in the investor relations section of the Loop Industries website. Unless the law requires it, the company assumes no obligation to update or revise any forward-looking statements. With that said, I'd like to hand the call over to Loop Industries Founder and Chief Executive Officer, Daniel Solomita. Daniel, please go ahead.

Daniel Solomita

executive
#2

I'm Daniel Solomita, the founder and CEO of Loop Industries. I'll go over how our big commercialization project in India keeps moving forward, and Spencer Hart, our CFO, will then give everyone an update on the company's liquidity, where things stand with financing, and what the special committee that was recently formed has been doing. At our Indian joint venture with Ester Industries, a decision has been made to cut the capacity of the first plant in India down from 70,000 kilotonnes per annum to 45,000 kilotonnes per annum; that adjustment is going to bring the facility's capital cost down substantially, along with the debt and equity financing requirements that come with it. Toyo Engineering is in the middle of finishing up its detailed work so the new cost estimate can be finalized. A quicker construction timeline is another thing this change makes possible. Should our capital raise succeed, our expectation would be to break ground in Q1 calendar of 2027 and wrap up construction before 2028 ends. Attractive economic returns are anticipated from the smaller facility, thanks to the benefits of Loop's technology, which operates at low temperature and with no pressure added, turning out virgin quality PET resin and polyester fiber while keeping operating costs very low, and also because it sits in a low-cost environment in India, where there is additionally access to abundant textile waste. On the same site, the Indian facility is still envisioned as the first of two. A second facility, planned to be much bigger than the first, would come once the first has started up successfully. With a major bank in India, which has a long-term relationship with our Indian joint venture partner, we are holding positive talks about the project debt facility, and those talks are going well. The technical due diligence portion, known as the TDD study, has been started by the team from the bank in India. A few weeks back, a team from India visited our Montreal facility; the technology assessment within the TDD study was completed successfully by us, and the debt lender will use that as documentation for its loan covering the debt piece in India. It's fortunate for us that our strategic partners in India and Europe remain committed both to their relationships with Loop and to the success of our commercialization projects in their respective geographical areas. Now I'll turn things over to Spencer, and after that I'll come back with a closing comment.

Spencer Hart

executive
#3

Thanks, Daniel. Keeping a tight rein on costs has remained a priority for us, which let us bring our overhead down. Cash operating expenses came in at $1.6 million for the quarter, which is $800,000 lower than the same period a year ago. Into the third quarter, our run rate kept falling. Those savings come from deliberate cuts to personnel, insurance, and other operating costs, plus our outside directors waiving their cash compensation. Total available liquidity stood at $1.9 million as of August 31st. In September of 2026, our board set up a special committee to tackle our capital needs and lock in funding for Loop's equity contribution to the India joint venture. That committee is working closely with advisors to weigh a full range of financing alternatives, spanning equity, debt, and non-dilutive options. Importantly, by rescaling our first commercial facility in India, the project's overall capital requirements will come down, which directly reduces the equity contribution we need to make. Every key element of the India project is now in place, among them an experienced joint venture partner, secured land, advanced engineering designs, reliable feedstock sourcing, and strong customer demand. Securing the financing is the last step before we reach the construction stage. Along with the equity contribution from Ester, our 50/50 joint venture partner, and the project debt currently being syndicated, we are actively working to fully fund the facility. With that, I'll hand the call back to Daniel for closing remarks.

Daniel Solomita

executive
#4

Thanks, Spencer. Before we finish, I want to say that even with the stock trading at a low level right now and the work we're doing to bring in the capital this facility needs, our management team, our board of directors, and our partners all remain firm in their conviction about Loop's ability to create substantial long-term value. That belief rests on our technology, on the commercialization projects we have underway in India and Europe, and on what consumers of apparel and global consumer packaging goods brands are looking for: high-quality recycled product at a price that competes. With that, let's take questions from the call.

Jon Hickman

analyst
#5

Hello, and thanks for taking the time to answer my questions. Would you be able to provide an estimate for what the project's total cost will now be at the revised level, and also tell us what the new equity contribution comes to? My recollection is that previously the figure being discussed was roughly $20 million in equity. Can you bring us up to date on that?

Daniel Solomita

executive
#6

The Toyo Engineering group, which was brought on board to put together the final cost estimate, is going to finish that work over the next few weeks; the final number isn't available to us at this point, though the moment we have it, we will be in a position to share it. That said, it is going to come in substantially below the 70,000 metric ton plant we originally had-

Jon Hickman

analyst
#7

Okay

Daniel Solomita

executive
#8

designed.

Jon Hickman

analyst
#9

Alright. So your belief is that the money can be arranged, building can begin, and everything can be finished building before 2029 wraps up. Is that what I just heard?

Daniel Solomita

executive
#10

Building, starting up, and commissioning together take 20 months. So assuming the funding comes through and we kick off the project at the start of the 2027 calendar year, the plant would be commercially up and producing material before 2028 comes to a close.

Jon Hickman

analyst
#11

Of 2028. Yeah. Okay.

Daniel Solomita

executive
#12

Calendar years.

Jon Hickman

analyst
#13

Alright. Right, years by the calendar. Fine. Could you share some sense of how confident you are that you'll be able to develop a fresh type of reduced equity piece, so that this can get underway?

Daniel Solomita

executive
#14

Do you mean confidence that the figure will come in lower? That the expense will be smaller?

Jon Hickman

analyst
#15

Nope. Only your capacity to arrive at that smaller figure.

Daniel Solomita

executive
#16

The capacity to secure the funding?

Jon Hickman

analyst
#17

So, have you already spoken with parties that might be interested? Can you share any indication of where things stand in that process?

Daniel Solomita

executive
#18

Spencer, are you sort of—

Jon Hickman

analyst
#19

I realize you've just gone through the special committee matter, but might you share a bit more detail on it?

Spencer Hart

executive
#20

Absolutely. This is Spencer speaking. I'll take a shot at that. Let me make one point clear: our estimate is that roughly $20 million represents the overall sum needed for the equity contribution our side would make into the JV, which is what you basically referenced. What I can say is that this special committee is highly concentrated on the matter; advisors are involved, and we are actively pursuing conversations. As you might expect, nothing can be guaranteed before completion. Until it's finished, you simply don't know. That remains a top priority. The project is quite compelling. Unit economics look compelling, the returns are solid, and putting money into Loop to finance this holds the prospect of really compelling returns for investors. A great deal of interest has come our way from investors with whom we've been in talks.

Jon Hickman

analyst
#21

Alright. Thanks. I value what you've said.

Gerry Sweeney

analyst
#22

Hello, everyone. My apologies. I couldn't get connected earlier because of some technical problems. The call dropped me, so I missed quite a bit of what was said. I simply wanted to probe a bit deeper into all the developments. Clearly, there's been a bit of tension, I think, in obtaining financing for the facility. When you scale down this first facility, does that have any effect on the debt financing you're pursuing in India? Is there any knock-on effect? Should we be watching anything on that side?

Daniel Solomita

executive
#23

In response to that, Gerry, I'd say the debt lenders see it purely as a favorable development. Naturally, the sum of debt the project requires is smaller. We have strong confidence, given the LOIs and the contracts in hand from Nike and Taro Plast — those are signed contracts — plus the LOIs we hold, that we'll satisfy what the debt lenders need in terms of our commitments. On the whole, when we talked with the debt lenders, it was a highly constructive conversation. The facility's resizing went over very well indeed.

Gerry Sweeney

analyst
#24

Understood. While you work your way through this, equity clearly plays a part, but could there be other avenues you're also exploring that might let you steer some of the financing toward backing the project?

Spencer Hart

executive
#25

Happy to address that. Hi there, Gerry. I'd say we have a great deal of flexibility when it comes to what shape the capital we're raising takes. My sense is that an equity piece is quite probable, be it plain equity or a convertible-type instrument. We're adaptable and willing to collaborate with investors to land on something that suits both parties. What we're after is securing the capital and getting that initial facility funded. As I'm sure you can picture, this stands to be the toughest financing we'll ever undertake, and with later financings, I believe people will be quite eager to supply capital to whatever degree we require it.

Gerry Sweeney

analyst
#26

Yes. No, I completely concur. Look, you're aware of where I stand, I believe. In my view, the tech is functional. What remains is simply to push the financing over the finish line, get some shovels into the earth, and get this underway. Okay. Is there any schedule you have for when you figure. Clearly, it seems this is top of mind, and I realize providing certain firm answers on this matter is tough, yet my expectation would be, might this arrive shortly, inside the coming 2 weeks? What ought we to have in mind regarding that, assuming you're able to talk about it given these circumstances?

Spencer Hart

executive
#27

When it comes to the financing, those timelines — is that your question?

Gerry Sweeney

analyst
#28

Yes. My apologies. Right.

Spencer Hart

executive
#29

Yeah, see, there's one thing we simply won't do, and that's forecast the precise amount, the timing, or the shape it takes, since you can't know any of that until it's finished.

Gerry Sweeney

analyst
#30

Fair enough.

Spencer Hart

executive
#31

We're putting a lot of effort into this. As Daniel mentioned, the aim is that to start construction during Q1 of the coming year, the financing would need to be secured beforehand. That's likely the clearest way to frame our target timeline. Naturally, earlier would be preferable, we definitely won't put anything off, and we intend to close it and get it locked in as fast as possible.

Gerry Sweeney

analyst
#32

All right, that's reasonable, and I get it. Very well. Spencer, Daniel, I appreciate you both answering my questions.

Daniel Solomita

executive
#33

Thanks.

Spencer Hart

executive
#34

Thanks.

Marvin Wolff

analyst
#35

Morning, everyone. Am I coming through clearly?

Spencer Hart

executive
#36

Yes, you are.

Daniel Solomita

executive
#37

Yes, that's right.

Marvin Wolff

analyst
#38

All right, sounds good. Regarding that reduced or optimized 45,000 metric ton capacity for the output, how much of it have you locked in under contract?

Daniel Solomita

executive
#39

We haven't provided specific volumes across every one of our agreements, but counting the LOIs we've executed, the contracts we've executed, and the commitments we currently hold, we've crossed the mark of 50% of the facility being sold.

Marvin Wolff

analyst
#40

60% of the 45?

Daniel Solomita

executive
#41

Over 50%, I said.

Marvin Wolff

analyst
#42

Oh, 50%.

Daniel Solomita

executive
#43

Committed in LOIs or contracts.

Marvin Wolff

analyst
#44

Correct. Out of the 45 size.

Daniel Solomita

executive
#45

Indeed. Out of the 45,000 size. Indeed.

Marvin Wolff

analyst
#46

Okay.

Daniel Solomita

executive
#47

Yes.

Marvin Wolff

analyst
#48

So if the first plant ends up smaller, does that mean the second one gets bigger? Weren't we discussing that the second plant might be around 100,000 tons?

Daniel Solomita

executive
#49

Right. That means we can also scale up the second plant, since what really limits how big the facilities can be is more a question of feedstock supply. We're quite confident there's sufficient feedstock in the area for at least 170,000 tons altogether, so scaling the second facility up to 125,000 tons would be possible.

Marvin Wolff

analyst
#50

Correct.

Daniel Solomita

executive
#51

The combined production from both of those sites would stay unchanged.

Marvin Wolff

analyst
#52

All right. Okay. Well, that's nice. Yeah. It's often fascinating when a project gets smaller, since folks figure perhaps it isn't as lucrative, yet I believe using your technology, a reduced size can be equally profitable. Is that right?

Daniel Solomita

executive
#53

Yes; when it comes to a chemical facility, the scale cost factor. It's essentially one-to-one regarding the chemistry. The chemistry expenses stay the same since the quantity of catalyst consumed or the energy required is roughly directly proportional to how much feedstock gets processed and how much comes out. Those items remain unchanged. What would rise is mostly your fixed cost. Fortunately, within India, the inexpensive setting and the cheap labor there mean the economics remain quite appealing, since typically it's labor expense that hurts you, as you'll require the same number of staff operating the plant; however for us, given India's inexpensive character, it doesn't hit our financials hugely; it remains very profitable.

Marvin Wolff

analyst
#54

Alright, just one more thing I want to ask. When do you think the detailed engineering folks will wrap everything up and come to you with a figure you're able to share?

Daniel Solomita

executive
#55

My expectation is that happens over the next few weeks.

Marvin Wolff

analyst
#56

So definitely before year-end. Calendar year-end.

Daniel Solomita

executive
#57

Yeah. Yes.

Marvin Wolff

analyst
#58

All right. That's great. I appreciate it a lot.

Daniel Solomita

executive
#59

Thanks.

Varyk Kutnick

analyst
#60

Hey, guys. Good morning.

Daniel Solomita

executive
#61

Good morning.

Spencer Hart

executive
#62

Morning.

Varyk Kutnick

analyst
#63

< >. Let me just confirm I've got this right. Suppose the equity portion you originally had to provide for the factory came to 70,000 metric tons, or however much it was — your equity put-in was $20 million. Since that's now been cut by 42%, shouldn't the amount you're putting in be around $12 million at this point? Or doesn't it work that way, scaling proportionally?

Spencer Hart

executive
#64

Daniel, do you want me to handle that?

Daniel Solomita

executive
#65

Of course.

Spencer Hart

executive
#66

This is the way to consider the equity portion. The banks we have been dealing with — and once more, nothing has been finalized — but it appears reasonable to expect they will provide financing for 70% of the project. The other 30% will come as equity, and that will be divided equally between Loop and Ester, our joint venture partner.

Varyk Kutnick

analyst
#67

Okay.

Spencer Hart

executive
#68

If you look at it that way, we're talking roughly 15% of what the whole project costs, correct? Back when it stood at 70,000 and we were discussing $165 million — $170 million for the facility, 15% of that figure would come closer to $25 million, or somewhere between $25 million and $30 million. I realize your recollection is that the earlier figure was $20 million, though in reality it was likely somewhat higher; at this point

Varyk Kutnick

analyst
#69

So then, if we take $30 million and reduce that figure by 42%, the portion coming from equity would come to roughly $15 million to $16 million that you fellas would require at that point, is that right?

Spencer Hart

executive
#70

Yes. That's essentially the way the calculation goes. Correct.

Varyk Kutnick

analyst
#71

Understood.

Spencer Hart

executive
#72

The expense might not decrease by 40% merely due to the presence of some—that's simply not how it functions. Still, it will go down, and the portion paid in equity will go down too. I believe the approach we've just gone over is the correct lens through which to view what our equity contribution amount will total. Remember that a share of that contribution has already been provided by us. As time goes on—

Varyk Kutnick

analyst
#73

What's the amount you've earned so far?

Spencer Hart

executive
#74

We have put in toward the joint venture. That figure sits somewhere around $3 million to $5 million.

Varyk Kutnick

analyst
#75

Understood. So the figure you all have to put in comes to 20 in total

Spencer Hart

executive
#76

Most likely toward the bottom of that range. Right.

Varyk Kutnick

analyst
#77

Understood. If we assume you've already put in $2 million or $3 million, then you folks would really just need another $18 million or $17 million to get this across the finish line, right?

Spencer Hart

executive
#78

Yeah, that's exactly how to look at it.

Varyk Kutnick

analyst
#79

All right, that clears things up. Thanks for the detail, everyone. Best of luck.

Spencer Hart

executive
#80

You got it.

Daniel Solomita

executive
#81

We appreciate all of you joining this call and submitting your questions, and we'll make sure to update you on how things are progressing at the company.

Operator

operator
#82

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Loop Industries, Inc. transcript — plus 131,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Loop Industries, Inc. earnings transcripts and 131,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Loop Industries, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.