operatorThank you for standing by, and welcome to Lundin Mining's Third Quarter 2026 Earnings Conference Call. [Operator Instructions] I would now like to hand the call over to Jack Lundin, President and CEO. Please go ahead.
Jack O. Lundin
executiveWelcome to Lundin Mining's Third Quarter 2026 Earnings Call. Our operating and financial results were released yesterday and the news release, presentation and webcast replay will be available on our website. All amounts are in U.S. dollars unless stated otherwise. After the prepared remarks and presentation, as always, we'll open up the floor for questions. Today's results will contain forward-looking statements that are subject to risks and uncertainties, and we encourage you to review the cautionary notes in our presentation and our filings on SEDAR+. Joining me today on the call is our Chief Operating Officer, Juan Andres Morel; and our CFO, Teitur Poulsen. Before turning to our results, I want to address the challenges at Caserones, which have impacted the company's performance this year. The Atacama region experienced an exceptionally severe winter, with 2 major storms in July and August, damaging transmission towers and leaving the operation without power for approximately 30 days. Throughout the events, the Caserones team maintained a strong focus on safety and worked diligently to restore operations in a controlled and responsible manner. The impact has extended into the fourth quarter with snow melt reducing haulage rates and limiting ore deliveries to the mill. As a result, full year copper production guidance at Caserones has been revised to 105,000 to 115,000 tonnes from the previous range of 120,000 to 130,000 tonnes. Juan Andres will provide further detail on these challenges in the operations section. Our revised full year consolidated copper production guidance is now 285,000 to 310,000 tonnes, while cash cost guidance remains unchanged at $1.95 to $2.15 per pound. Despite these challenges, strong commodity prices and disciplined operational performance supported another quarter of revenue exceeding $1 billion and strong cash flow. Importantly, we also continue to make meaningful progress on our growth strategy. At Chapada, we sanctioned construction of an additional ball mill as part of the Sauva growth project. earthworks and concrete placement are underway, ball mill fabrication had commenced and commissioning is targeted for late 2027. The finer grind will improve recoveries and allow us to capture greater value from the higher grade over deposit, adding approximately 15,000 tonnes of annual copper production and 45,000 ounces of gold. At Vicuna, we achieved 2 important milestones in this quarter. First, we secured a long-term provincial royalty agreement with the San Juan government consolidating our infrastructure obligations into a single royalty structure and providing a 5-year payment holiday on trust contributions. Second, we received regulatory approval from Argentina's electricity regulator, ENRGE, to construct the high-voltage power line connecting the project to the national grid. Together with the RIGI approval received earlier this year, these milestones represent important progress towards advancing Vicuna to a sanction as planned. While we continue to navigate the challenges at Caserones, our underlying business remains strong. We have a robust balance sheet, a compelling pipeline of organic growth opportunities and a clear path forward at Vicuna. Our priorities remain unchanged, operating safely, delivering consistent operational performance and advancing growth strategy as we work towards our ambition of becoming a top 10 global copper producer. Performance at Candelaria and Chapada led the way this quarter and delivered our highest gold production of the year at 37,000 ounces, which drove down consolidated C1 cash costs quarter-over-quarter to $2.01 per pound, excluding storm-related impacts at Caserones of $66 million. Despite the operational challenges encountered in the quarter, Q3 was one of the strongest financial quarters in the company's history. Record realized copper prices drove revenue above $1 billion for the fourth consecutive quarter while adjusted EBITDA reached $650 million, and free cash flow from operations was $418 million, putting us in a net cash position of $237 million at the end of the quarter. Year-to-date, our adjusted EBITDA and free cash flow from operations have both already surpassed full year 2025 totals, and we expect 2026 to be another record financial year for Lundin Mining. On capital returns, we repurchased approximately 2.4 million shares for an aggregate consideration of $62 million under our normal course issuer bid and declared our 39th consecutive quarterly dividend. In August, the Board approved an increase up to $100 million to share -- to our share repurchase program for the remainder of 2026. I will now hand it over to Juan Andres to walk through the operational results in more detail.
Juan Morel
executiveThank you, Jack, and good morning, everyone. Consolidated copper production was 63,000 tonnes, Candelaria and Chapada had strong quarters, while Caserones was the only site meaningfully affected by the weather-related restructuring. Gold production was 37,000 ounces, the highest quarterly gold production we have seen this year, driven primarily by Candelaria and Chapada. Year-to-date, consolidated copper production stands at 219,000 tonnes across our 3 mines. And as mentioned, Candelaria is pack has of the year weighted, and we expect grades to increase to the fourth quarter to deliver a strong finish of the year. Now let's walk through each site, starting with Candelaria. The operation delivered an excellent third quarter, producing 35,000 tonnes of copper, up 13% from the second quarter. The increase was driven by a greater contribution of ore from Phase 12, which delivered higher average head grades in line with the planned grade profile for the back half of the year. Production remains on track with full year guidance of 135,000 to 145,000 tonnes. An important milestone at Candelaria this quarter was the substantial completion of our underground mining in-sourcing initiative. Mining rates and unit costs have been better than planned levels, and we expect underground mining rates to stabilize at approximately 14,000 tonnes per day by the end of 2027. This expansion represents a meaningful path to grow production at Candelaria. Turning now to Chapada. The operation produced 12,600 tonnes of copper in the quarter, up 5% from the second quarter, the highest quarterly output in the last 2 years, along with 16,900 ounces of gold. We expect to see similar levels in the fourth quarter as well. Throughput benefited from high planned availability and improved plus fragmentation. Chapada remains on track to meet its full year copper production guidance of 45,000 to 50,000 tonnes. As discussed, it was a difficult quarter for Caserones, a series of severe winter storms caused 2 extended production stoppages in July and August, totaling approximately 30 days of suspended operations when accounting for the time required to safely restart including following the flotation banks and turning over the mills. I want to recognize the Caserones team for their outstanding work navigating these conditions safely and efficiently. Production in the quarter was 15,000 tonnes of copper, reflecting the impact of the storm. As we move out of the winter in the Southern Hemisphere, operations continued to face weather events of lesser severity. In October, the site received 1.4 meters of snow. Snow melt has created extremely muddy conditions in the pit. This has reduced haulage rates and limited the volume of ore delivered to the mill. Haulage speeds have dropped by 20%, along with track availability. The last 2 months of difficult conditions have impacted maintenance schedules and reduced fleet availability. Given the mining rates we saw in September and October, we reforecasted production for the remainder of the year, factoring in the lower haulage speeds and maintenance time to improve the fleet availability. As a result, we have further revised Caserones full year copper production guidance from 120,000 to 130,000 tonnes to 105,000 to 115,000 tonnes. This is very disappointing but is not a reflection of the underlying asset or the team. It is a direct result of the strong events that have driven Chile's lowest copper production in 20 years. New full year consolidated guidance is now 285,000 to 310,000 tonnes with cash cost guidance unchanged at $1.95 to $2.15 per pound. I will now turn the call over to Teitur to walk through the financial results.
Teitur Poulsen
executiveThank you, Andres, and good morning, everyone. Revenue for the quarter was $1.1 billion and marks the fourth consecutive quarter of revenue generation in excess of $1 billion, with continued strong metal prices enabling the company to sustain a very solid revenue profile. Year-to-date, revenue is close to $3.5 billion, up over 25% compared to the first 9 months of '25. During the third quarter, copper contributed 87% of revenue with gold at 11%. Candelaria was the largest contributor of 53% of quarterly revenue, followed by Chapada at 24% and Caserones 23%, with the Caserones revenue contribution negatively impacted by the severe meter storms previously discussed. For reference, Caserones was the biggest revenue contributor for the previous 3 quarters, typically representing over 40% of the quarterly revenue contribution for the company. While Caserones revenue of $255 million in the third quarter was below the prior year quarter due to the weather-related disruptions to production and sales volumes. Caserones year-to-date revenue of $1.3 billion compares favorably to the $1 billion generated in the first 9 months of 2025. Turning to sales volumes and pricing. Total payable copper sold in the quarter was 64,000 tonnes, slightly above production as we lowered inventory levels during the period. The realized copper price, including adjustments from prior period provisional pricing was $6.85 per pound and is the highest realized quarterly copper price recorded in the company's history. On gold, the realized price for the third quarter was $4,321 per ounce. Year-to-date, the realized copper price was $6.22 per pound, while the realized gold price was $4,590 per ounce. As of the end of September, approximately 69,000 tonnes of copper were provisionally priced at $6.55 per pound and remain open for final pricing adjustments with the majority of this volume being priced in the fourth quarter of this year. Production costs in the third quarter were $441 million compared to $530 million in the previous quarter. As mentioned earlier, Caserones incurred $66 million of mine standby costs in the quarter relating to the weather-related suspension of operations, of which $58 million relates to operating costs. These costs are reported separately in the income statement as mine standby costs and are therefore excluded from our adjusted EBITDA and adjusted earnings calculations. Without a reclassification of certain costs into standby costs, the consolidated production costs would have been more in line with previous quarters. Consolidated cash cost for the quarter was $2.01 per pound, which is around 5% lower than compared to the previous quarter. The cash costs do not include the standby costs incurred during the quarter. However, the cash cost metric was nevertheless negatively impacted by the lower sold volume, but this was more than offset by higher gold by-product credits when compared to the previous quarter. Year-to-date, consolidated cash cost was $1.92 per pound slightly below our revised guidance range of $1.95 to $2.15 per pound. Chapada's year-to-date cash cost of $0.57 per pound continues to significantly outperform driven by the elevated gold prices generating strong by-product credits. Candelaria's year-to-date cash cost of $2.27 per pound reflects the impact of planned lower grades in the first half of the year, which are improving as higher-grade Phase 12 or becomes more available in the second half, leading to a lower cash cost per pound. Candelaria is on track to meet cash cost guidance for the year of between $2.05 and $2.25 per pound copper. We continue to actively monitor the broader input cost environment, and this slide shows that among the biggest drivers for our input costs are diesel prices, cost of power and labor. Labor is the single biggest input cost factor with most of our labor costs in Chile and Brazil incurred in low currencies. Therefore, any movement in foreign exchange rates has a material impact on our U.S. dollar C1 cash costs. With our labor force in Chile being significantly larger than in Brazil, in addition to other normal running costs incurred in local currency, you can see that a 10% move in the Chilean pesos has an order of magnitude larger impact on our U.S. dollar C1 cash cost compared to any other input cost factor. This will also represents a material input cost for the company. Over the past year, we have seen diesel move from representing about 5% of the input cost structure to now representing between 7% to 8% of overall input costs relating to our operating activities. With annual consumption relating to operating activities of approximately 175 million liters of diesel, every $0.10 per liter increase in price translates to roughly $18 million in additional indirect cost, impacting cash costs by approximately $0.03 per pound. The cost of sulfuric acid has been very topical in the industry over recent months. But as you can see, this represents a very small portion of the company's input cost. We typically consume about 40,000 tonnes of sulfuric acid a year or roughly $10 million to $15 million annum at current prices, which represents less than 1% of the company's total production costs. When blending all these factors and looking at the realized costs year-to-date and our assumed foreign exchange and diesel costs for the remainder of the year, we retain our full year cost guidance of $1.95 to $2.15 per pound. Total capital expenditure in the quarter was $220 million on a cash basis, comprising of $123 million of sustaining capital and $97 million of expansionary capital. Sustaining capital of $123 million in the quarter was directed primarily towards open pit waste stripping and underground mine development at Candelaria as well as TSF construction at Caserones. Year-to-date, sustaining capital is $359 million and is tracking slightly behind plan. As a result, we have reduced sustaining capital at console by $20 million mainly due to the deferral of relating to a purchase of [indiscernible]. Expansionary capital of $97 million in the quarter was mostly related to Vicuna, accounted $41 million reflecting the significant step-up in project readiness activities, including detailed design and engineering, execution planning and site level early earthworks as the project allows us towards a sanctioning decision. The balance of expansionary capital includes early-stage construction activity at the Chapada ball mill as part of the Sauva project and other site-level initiatives. We have reduced the expansionary CapEx on the Chapada ball mill by $30 million due to the timing of payments for the fabrication of the mill falling into next year. Year-to-date, expansionary capital is $234 million. Our revised full year capital guidance is now $980 million, comprising $530 million of sustaining capital, $55 million of expansionary capital at operating mines and $395 million for the spend being 50% of our equity share. Moving to the key financial metrics for the quarter. Adjusted EBITDA was $648 million, representing an adjusted EBITDA margin of approximately 58% from revenue of $1.1 billion. Adjusted operating cash flow for the quarter was $430 million, which includes a release of working capital of $101 million. Turning to free cash flow and adjusted earnings. Free cash flow from operations was $418 million for the quarter, up 16% from $360 million into the second quarter despite the higher sustaining CapEx growth in the third quarter. Year-to-date, free cash flow from operation is close to $1.2 billion, 50% above the full year 2025 total of $774 million. Adjusted earnings attributable to shareholders were $277 million or $0.32 per share, up 8% from $257 million last quarter. As mentioned earlier, adjusted earnings exclude the $66 million of mine standby costs at Caserones. Now turning to the balance sheet. Our financial position continues to strengthen throughout the quarter. Net cash improved to $237 million compared to $79 million at the end of the previous quarter, an increase of approximately $160 million year-to-date. As of yesterday, net cash was approximately $200 million reflecting capital investment at Lacuna and other normal cash outflows in October -- in the month of October. During the quarter, we received $23 million in contingent payments relating to the Neves-Corvo and Zinkgruvan transaction that was completed last year. As part of the transaction, a contingent consideration of up to $150 million was agreed based on copper and zinc prices. To date, we have received approximately $28 million in cash consideration relating to this contingent element. Overall, the company's balance sheet remains extremely robust, and we are in a good position to follow to the Vicuna project on a session decision is made. Our revolving credit facility was undrawn at current compared to $60 million drawn at the end of last year. As a reminder, we upsized the revolving credit facility in February this year to a total commitment of $4.5 billion leaving the company fully funded for the very siting Vicuna project. So in summary, yet another very strong quarter in terms of financial performance despite the headwinds that Caserones faced from the 2 severe winter storms during the quarter. I will now turn the call back to Jack for final remarks.
Jack O. Lundin
executiveThank you, Teitur. Turning to Vicuna. We achieved 2 pivotal milestones this quarter. First, we secured a long-term provincial royalty agreement with the government of San Juan. This consolidates our infrastructure obligations into a single royalty structure and provides the project with a 5-year payment holiday on infrastructure trust contributions, in exchange for an upfront commitment of $250 million on a 100% basis or $125 million for Lundin Mining's 50% share. Second, we received regulatory approval from Argentina's electricity regulator ENRGE to construct the high-voltage power line connecting the project to the national grid. Together with the RIGI approval received earlier this year, these milestones represent significant progress in establishing the conditions required to advance Vicuna towards sanction. In the background of this slide, you can see an image of 150-tonne haul trucks being transported to site. They will form part of the civil construction and earthwork fleet. Year-to-date, 12 have been purchased and delivered to site. Excitingly, we are also making strong progress on the technical and commercial definition of Stage 1 Engineering is advancing, and the Vicuna team is finalizing the bottom-up Stage 1 capital estimate alongside further refining the execution strategy and integrated project schedule. This work is currently undergoing extensive independent peer reviews, which will ultimately support a robust and executable capital cost and delivery plan. Our focus is on completing this work, ensuring the project is sufficiently mature and well defined and positioning ourselves to make a Stage 1 sanction decision before year-end. While we have faced significant operational challenges due to the super El Nino winter at Caserones, our business has demonstrated resilience delivering strong financial results, generating solid cash flow and maintaining a robust balance sheet. At the same time, we continue to advance our organic growth opportunities at Chapada and are making important progress at Vicuna. We are exceptionally well positioned to capitalize on the long-term strength of the copper market. With accelerating demand, increasingly constrained supply and a strong operating foundation at Lundin Mining, we have an exceptional pipeline of growth opportunities to pursue. Our focus remains on delivering sustainable value to our shareholders and progressing towards our ambition of becoming a top 10 global copper producer. And with that, I'll now open the floor for questions.
Operator
operator[Operator Instructions] Our first question comes from the line of Alain Gabriel of Morgan Stanley.
Alain Gabriel
analystJack, one question from my side. First, to start with is on the Vicuna spending. You've maintained your full year CapEx $395 million, which implies a very substantial step-up in Q4. How realistic do you see the chances that the step-up will be spilling into 2027? That's my first question. I have a second follow-up. I'll stop you now.
Jack O. Lundin
executiveThanks for your question. Yes, we maintained our forecasted expenditure guidance on Vicuna. I mean we believe that at Vicuna, with the weather that we've encountered and the work that's ongoing towards the end of this year. We're going to be continuing to ramp up expenditures as we get into what will hopefully be a 2027 year where we would be formally kicking off with construction. So overall, I think expenditures are continuing to trend up month-over-month. And so that's why we maintained our projections on the Vicuna expenditures.
Alain Gabriel
analystThat's very clear. And the second question is on Caserones. You've got the CapEx there. I presume mostly related to some stripping activity because of the weather conditions. And yet you have maintained your volume guidance for 2027. How much or how much risk do you see to that guidance range now that some activities some maintenance activity has been delayed or postponed into 2027?
Teitur Poulsen
executiveAlan, it's Teitur. We have taken guidance down by $20 million for sustaining CapEx at [indiscernible] it's relating to some equipment purchases being pushed out into 2027. .
Alain Gabriel
analystYour guidance range.
Teitur Poulsen
executiveWell, we have to see how the weather pans out over the last few months here in the year. I mean, historically, Caserones has not quite kept up with the budgeted projects as gone through the last 2 or 3 years. And of course, this year on top of that, we've had the severe weather impacts. So let's see where we end up, but we have decided to reduce guidance by $20 million so far for the full year sustaining CapEx number.
Operator
operatorOur next question comes from the line of Orest Wowkodaw of Scotiabank.
Orest Wowkodaw
analystMy question is also about Vicuna. Curious, what's left in terms of remaining steps before an FID decision just given the expected timing before year-end?
Jack O. Lundin
executiveOrest, thanks for the question. So we're getting close to the end of this year. And as you've seen and as we've been updating the market, we've been very disciplined and able to hit all of our key milestones, whether it be various permits, various fiscal stability agreements, both at the federal level and at the Prudential level. And so we continue to make progress towards that sanction decision before the end of this year. And really, the last remaining step is the bottom-up capital estimate, the execution plan, the schedule and just getting all of the details that will support Stage 1 for the execution of Stage 1. And then once we complete that, once the Vicuna team completes that, then it will come to the shareholders for approval. So it's really just internal work that's being done now that will support the favorable sanction decision before the end of this year.
Orest Wowkodaw
analystOkay. Appreciate that. And with respect to the CapEx for Phase 1, I realize it's not quite complete, but you must be in the later stages here. Is it fair to say that your -- the CapEx is likely experiencing some inflationary pressures just given the environment we're in, over and above the previous $7.2 billion estimate?
Jack O. Lundin
executiveYes, that's fair to say, Orest. I think we're working through these independent peer reviews and stress testing all the areas of project from a CapEx standpoint, execution and schedule. And so we're going to be implementing all recent input pricing assumptions. And therefore, we're also bringing the CapEx forward by over a year. We came out with the PEA in Q1, but those were really kind of prices that were back from end of 2025. So now we're bringing this forward to a January 1, 2027 estimate. So we'll take into consideration inflation and escalation in Argentina. And so it will be all updated prices that went that go into this bottom-up estimate.
Orest Wowkodaw
analystWell, even including like current diesel pricing in terms of impact for, let's say, stripping and everything, it's going to be completely costed as of the current environment.
Jack O. Lundin
executiveCorrect.
Operator
operatorOur next question comes from the line of Richard Garchitorena of Barclays.
Richard Garchitorena
analystCongrats on the results. My first question on Caserones. It looks like the copper grades declined in the third quarter. Maybe if you could just talk about how the issues around hauling sort of impacted that? And then how should we think about that going into 2027?
Juan Morel
executiveYes. Richard, this is Juan Andres. Thanks for the question. Yes, of course, since we experienced these muddy conditions at the end of the third quarter, we had to turn to stockpile. So that has an impact on the grades. And of course, the delay on the pit development also did not allow us to reach some high grades that were at the bottom of the Phase 6 and 6B. But those high grades are going to be pushed into 2027. So we should expect better grades in the first half of next year.
Orest Wowkodaw
analystOkay. Great. And then maybe if I could just follow up on Candelaria better than expected, I guess, better than second quarter grades there. Maybe if you could just talk through how -- what impacted that? And then maybe just overall, any early reasons that the 2027 sort of impacts of those going into the mine plans for that?
Jack O. Lundin
executiveYes. And in the case of Candelaria, as I mentioned before, we have known since the beginning of the year that it was second half weighted. We tried to move some of the high grade from Q4 into Q3. So that, in part, explains the better results in Q3, but we're confident that Q4 will deliver the high grade that is coming from the Phase 12. That high grade comes from the vicinity of some old stopes. So we're very confident that, that high grade is there. So we'll have a strong 2026 in Candelaria, and we're looking also having a very strong 2027.
Operator
operatorOur next question comes from the line of Daniel Major of UBS.
Daniel Major
analystI got 2 questions. Firstly, on CapEx, looking into next year, I appreciate obviously, we'll get the Vicuna numbers when you get the FID. But if we think about kind of baseline CapEx, $530 million sustaining diesel pricing, I guess, higher going into next year stripping. Can you just give us a directional steer on CapEx ex Vicuna across the rest of the portfolio, if there's any offsetting factors that would see it not be driven up by sort of inflation in some of the input costs we're seeing.
Teitur Poulsen
executiveYes. I mean we're working through the budget as we speak, and Board approval in December. And following that, we will come out with guidance, whether it's later in December or early January, yet to be decided. But I think generally speaking, there shouldn't be any significant movements on sustaining CapEx as such. Obviously, diesel prices are higher now. So you'll see how that pans out and then we've seen a slightly weaker Chilean pesos over recent weeks and months. So that might also have some sort of impact on margins, but I wouldn't expect any step changes in sustaining CapEx as such.
Daniel Major
analystOkay. Then a couple of questions on Vicuna. The first one, just on the royalties, you mentioned signing the provincial royalty agreement, 5-year holiday and capped at 3%. Can you remind us what the total revenue-based royalty would be including any other kind of associated royalties normalized basis in first 5 years when you're getting the holiday on the provincial royalties.
Teitur Poulsen
executiveYes, we will have 1.5% on the provincial and then there's a 3% provincial royalty in addition to that. So those are the royalties we have on Vicuna.
Daniel Major
analystOkay. So 4.5% is the total life over the course of the operation normalized?
Teitur Poulsen
executiveYes. .
Daniel Major
analystOkay. And then the final one, just thinking about the -- what information we're going to get with the FID of Vicuna, obviously, we'll get a CapEx number. Will you be providing updated kind of medium-term production profile? Or is it just the Jose Maria sort of development? And then the second one, you previously discussed the desire to accelerate Phases 2 and 3 in order to bring forward the high grades, maximize NPV. Will there be any additional capital sort of sanction beyond Phase 1 at the stage?
Jack O. Lundin
executiveYes. Thanks for the question. So when we look to sanction Stage 1, we'll be coming out with an update on the CapEx and schedule for the execution of Stage 1. But all of that will be supporting a eventual update of the district. So recall in Q1, we came out with a district PEA. So we're now moving towards district PFS, which we're aiming to have completed in the second half of 2027. So this interim step of getting Stage 1 sanctioned. We'll come out with information specifically on Stage 1. And any relevant information that we feel we can update on Stages 2 and 3, but all of that supports a district PFS study. And the second question that you asked, I mean, of course, everything that we're doing is looking at finding areas where we can maximize the value of the project. bringing in higher-grade material and bringing in production at the later stages as as soon as reasonably possible. But all that's being worked through right now with the Vicuna team. So overall, I think we're doing a very good job on continuing to derisk Vicuna. But what you can expect to see is really just an interim update on Stage 1 as we look to sanction that followed by a district level study towards the back half of next year.
Daniel Major
analystOkay. Just CapEx, Phase 1 number and some scheduling of the CapEx really is what we should be expecting at this stage. .
Jack O. Lundin
executiveYes. And if there were to be expenditures that were put towards stages 2 and 3, like we would, of course, highlight what those costs are associated too. So we'll provide as much clarity as possible. But really, the update, the fulsome update will be through a district study that comes later.
Operator
operatorOur next question comes from the line of Matthew Murphy of BMO Capital Markets.
Matthew Murphy
analystCan you elaborate a bit more on vicuna preparation? Kind of interested given the winter, what state the site is in now? Is it still snow covered. And did the winter teach you anything or challenge any assumptions you had about what it's going to be like to build or operate there? And then I'm just wondering what the hiring environment is like, how is the sort of workforce preparation coming?
Jack O. Lundin
executiveMatt, thanks for the question. So obviously, we're still in this El Nino season, the winter has been extended in the Southern Hemisphere. And so the challenges that we're encountering at Caserones and the weather that we're seeing at Caserones, it's very similar over a the Vicuna a project, given that they're only 40 kilometers away from each other. However, the conditions are a bit more favorable on the Argentinian side of of the district. And we do still have a lot of snow covering some of the assets. But we have been able to move personnel and equipment. As I mentioned in the presentation, we've got 12 of our haul trucks now being assembled at site, and we are working on earthwork activities. And so progress is continuing to be made, but as it pertains to kind of the lessons learned from the experience that we're having at Caserones, I'll hand it over to Juan Andres because there are a number that we're experiencing that we're looking to apply to the execution plan for for Vicuna, Stage 1.
Juan Morel
executiveThanks, Jack. Matt, as Jack said, as you know, we experienced a very, very severe weather -- winter in Caserones, the one with the highest snow precipitation on record in Caserones. So we took the advantage to do an independent review. So we brought some specialists to help us collect all the lessons learned, and those are being captured in a report that we will hand it over to Vicuna to share the lessons learnt, so they can be incorporated either during the construction period and then, of course, during the operation.
Matthew Murphy
analystGreat. And then just on the hiring.
Jack O. Lundin
executiveYes. So we've been -- I think, as I mentioned in an earlier question, kind of ramping up our expenditures month-over-month, and the same goes for hiring. I mean we've been able to develop a pretty strong capacity building program, getting ready for construction and ready net activities. And so I think given that the Vicuna project will be kind of the first major one out of the gates, we are not experiencing significant challenges in terms of attracting talent. But I think more broadly, in this industry, we are, of course, seeing pressures and it comes to getting the right experts in the field, but we're addressing that. We've got a good team. We've already been able to ramp up with a significant amount of staff. And so we'll continue to work through that into the new year.
Matthew Murphy
analystGreat. Can I ask one more, a different topic on this corporate tax reduction in Chile. I guess that's most likely to affect Candelaria then? Like the Caserones taxability agreement ends, I think, 2028, and maybe you have some tax loss pools there. Any thoughts you can share about how we'll see that come into the financials?
Teitur Poulsen
executiveYes, that's correct. It was enacted in October so after third quarter end. And you're right in that it will impact -- at the asset level, it will obviously impact Candelaria, where we do pay corporation tax quarter-on-quarter, whereas at Caserones, as you mentioned, we still have significant tax losses, so we're not projecting to pay any cash taxes there for the foreseeable future. So ultimately, this will obviously be cash flow accretive at asset level. But withholding tax on dividends when you take the money out of the country, it still remains at 35%. Our structure at the moment is we have intercompany loans going into Chile, so we are still repaying those loans, which obviously in the near term, will then -- we will avoid those dividend withholding taxes. But ultimately, when those loans have been repaid, we will move into a 35% withholding tax on dividends. So as such, the lower corporation tax rate at asset level will -- when that phase kicks in will not benefit the company as such. .
Operator
operatorOur next question comes from the line of Matt Greene of Goldman Sachs.
Matthew Greene
analystJust one question from me, it perhaps this one for you, Teitur. The standby charges you incurred in the quarter, could you just walk us through how you get to that number? Is this downtime or costs incurred or lost revenue? Just kind of keen to I guess that number. And has that been contained in Q3? Or should we expect some sort of charge in Q4 as well?
Teitur Poulsen
executiveYes. I mean the way we derive that is we look at all the normal direct costs and then we prorated on what uptime did we achieve in the third quarter. I mean, you can't charge that to inventory because you didn't have any production to carry the inventory against. So you have to expense it immediately. And so we were looking at mill of time in some cases and just normal production efficiency on some other cost items. And so it was a little bit of a blend of factors going into that. And out of the $58 million directly relating to OpEx, around about $21 million were actually costs incurred because of recovery exercises as a snow hit. So it was over and above normal production costs, if you like. So we had $21 million of the direct sort of slow recovery costs, and then the delta around about $37 million was reclassified from normal production costs into standby costs. And the other number that makes up to $66 million has tended to pleasing charge of $8 million, which we also rated according to uptime performance during the quarter. And in terms of impact on Q4, I would say it's early days, but I don't believe we will have any further charges into Q4.
Matthew Greene
analystGot it. That's clear. And obviously you can't control the weather. So is something -- would insurance cover this? Is this something you're looking to explore?
Teitur Poulsen
executiveYes. No. We will -- the stoppages haven't been long enough for business interruptions to kick in on this. So there will be no insurance. .
Operator
operatorOur next question comes from the line of Chris LaFemina of Jefferies.
Christopher LaFemina
analystMy questions have been answered. Just one remaining question. Have you guys considered potentially hedging some of your copper sales to lock in cash flows? I know your policy historically, your policy is historically has been to that hedge? Or would you consider hedging to lock in cash flows ahead of kind of large CapEx pipeline.
Jack O. Lundin
executiveChris, thanks for the question. I think we're always looking at those different opportunities. And so we haven't done that historically. I mean we've got some gold hedges that exist now that are coming -- rolling off at the end of this year. But for copper, given that's our main commodity, Historically, we haven't done that. And so -- we always look if there's opportunities in the market. But right now, we've avoided it. I mean, we see a strong copper price environment fundamentally. We do believe that the prices are going to remain strong. There's some near-term volatility, and we've also seen some of our peers and some other Lundin group companies looking at hedging their main commodity when they're going into heavy CapEx periods. So it's something that we look at, but we haven't locked in anything yet.
Operator
operator[Operator Instructions] Our next question comes from the line of Anita Soni of CIBC World Markets.
Anita Soni
analystMost of them have been asked and answered, but I just wanted to follow up on Caserones. Are there any knock-on effects going into 2027 that we should consider in terms of sort of the ore haulage delays? Like will that change where you would have originally thought you would have been in grade sequencing?
Juan Morel
executiveAnita, this is Juan Andres. Thanks for the question. As I mentioned before, we were considering some high grades to be mined in the fourth quarter. But given this delay of approximately 1 month those high grades are going to be pushed into 2027. So we will see an improved grade profile in the first quarter of next year. But in general, we're still keeping the same mine sequencing as our long-term mine plan. So no big changes there.
Operator
operatorThank you. As there appear to be no further questions in queue, that does conclude today's conference call. Thank you for participating. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Lundin Mining Corporation transcript — plus 260,000+ transcripts from 13,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Lundin Mining Corporation earnings transcripts and 260,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Lundin Mining Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.