executiveGood morning, everyone, and welcome to Magnora's presentation for the first quarter of 2022. The year has gotten off to an eventful start, and I'm proud to walk you through the highlights this morning. First, though, a brief introduction to our background. Many of you are aware that we were formerly an oil and gas technology company, and in 2018 we sold the technological assets to Sembcorp. Along the way, we combined 20 years of experience in project development and management within oil and gas with Torstein Sanness, our Executive Chairman, who founded the company that is Lundin Energy today, which has been sold to Aker BP. He remains a driving force in developing energy projects. We've succeeded in growing our team with highly capable people from the renewable industry, whom we had worked with previously, and we possess strong skills and the ability to get things done. Together, we've developed projects placing great emphasis on capital discipline so as to keep a low LCOE across all our projects — next slide, please. As we entered 2022, we have a handful of development companies along with a few early-stage collaborations that could quickly turn into companies. All of them sit under the umbrella and are backed by our balance sheet. Next slide, please.
Erik Sneve
executiveTo put it briefly, we are putting money into businesses and ventures so that we can play a role in building out the renewable energy answer that will bring clean power to industries and consumers across the EU, Norway, the U.K. and South Africa. Our goal is to be a global renewable energy developer with 5 gigawatt of capacity ahead of 2025. As of today, we have 2.7 gigawatt net in place. So we are making solid progress toward those targets. That said, we recognize a considerable amount of work still sits in front of us before those projects become reality. Next slide, please. We keep a constant watch on new projects, with the ambition to invest at an early stage, team up with strong partners, and take mature projects down the risk curve all the way through farm-down sales and phase. Once a project reaches the ready-to-build phase, we look to optimize ownership of the assets toward suitable owners for long-term ownership and operations. As one illustration, Helios last week divested 2 turnkey solar projects totaling 69 megawatt, at the ready-to-build phase or soon ready-to-build phase, to the German institutional investor Commerz Real, which is owned 100% by the Commerce Bank of Germany. Next slide, please. Helios is just one of the companies in our portfolio. Having succeeded in the Scotland licensing round, Magnora Offshore Wind is moving toward applications for areas in Norway and the U.K.
Erik Sneve
executiveOn the Kustvind development, we're now finalizing the impact assessments and the application. In Magnora South Africa, we've brought in the right people and competencies in that market, where there are big opportunities — roughly 20 to 30 gigawatts of renewable energy is expected to be built out over the coming decade. Following the African Green Ventures transactions earlier this year, our portfolio in South Africa now stands at 1.7 gigawatts. Helios has really demonstrated proof of concept: a 45-megawatt sale to OX2 in 2021 — a leading European independent developer — and, just recently, the deal with Commerz Real that I mentioned on the last slide. We expect more in 2022 and approximately 600 megawatts in 2023. Given how projects in the solar space are currently priced, that will mean significant profit for Helios and Magnora shareholders when it comes to dividend potential next year. There are other ways to realize that value as well. Evolar has matured its technology to the point where commercial testing and scale-up are now possible. The company has agreements with 3 companies, up from 2 last quarter. Evolar has matured its technology to the point — sorry, we have high hopes for Evolar in the year ahead.
Erik Sneve
executiveFor the solar sector, Perovskite stands out as the most disruptive technology to arrive in decades. Over the past 6 months, we've watched many major companies announce that they are conducting research and entering the perovskite space. On top of that, we are at an early stage in our cooperation with Troms Kraft and Prime Capital on developing a green maritime fuel hub in the Tromso area, green ammonia. And we keep searching for other attractive opportunities. Today, our focus will be on the selection of these companies and their recent developments. Next slide, please. Magnora Offshore Wind has matured as an offshore wind developer in record time. Roughly a year ago, the company was founded as a collaboration with TechnipFMC, and it now holds 80% of the shares in the company. The team has 3 things on the agenda: one, continuing the development of 500-megawatt offshore wind capacity in the N3 field in Scotland after a successful application in the ScotWind leasing round, which we won in January. Two, maturing the Celtic Sea opportunities with a local partner Hiraeth Energy after signing heads of terms. And three, preparing for the upcoming region licensing round, as well as other international rounds. The company has a global ambition and is preparing for industrial and financial cooperation in several geographic areas, and we're in discussion with several banks and investors around the world.
Erik Sneve
executiveMoving to the next slide, please. Kustvind is our bottom-fixed wind project in shallow water, with 500 megawatts of total capacity — the same size as the capacity Magnora Offshore Wind was awarded in the Scotland leasing rounds. Production potential for the project is 2 terawatt hours. Within that area, that equates to powering 100,000 homes or 720,000 electrical cars. It sits in the strong pricing area SC3, which is part of NordPool. Interest in hydrogen development in the area has been growing positively as of late, which makes the project even more relevant. And recent environmental impact assessment studies found no red flags for the project from an environmental standpoint. That's quite important. It's no secret that projects of this kind take time, but we see great prospects for Kustvind and expect our final application to be submitted by year-end. Next slide, please. A lot has happened in South Africa this year, and we're happy to have brought in a team of 6 local renewable specialists by acquiring 92% of African Green Ventures into Magnora. Peter Nygren works closely with the African Green Ventures team, and he was there for a couple of weeks last quarter.
Erik Sneve
executiveIn the near term, our existing development portfolio in South Africa is something we take real pride in, and over the longer term we see a substantial and expanding renewable opportunity across the region, backed strongly by the local government. Within our 1.7 gigawatt portfolio, we expect somewhere between 50 and 250 megawatts to reach ready-to-build status or enter the sales phase as early as this year. Wind measurement work got underway last year, and we have filed an application with Eskom for grid connection on a number of projects. We are actively looking at further projects, and thanks to our dedicated team on the ground, we think we hold an edge when pursuing appealing opportunities. Let's move to the next slide, please. Helios keeps growing its project portfolio and has now signed landowner agreements in Lithuania and Latvia, allowing feasibility studies to begin for developing large-scale solar PV plants. We have seen considerable interest in the projects Helios develops. And last week, they sold 69 megawatts to Commerz Real, which I touched on earlier. These projects are the biggest utility-scale parks in Sweden to date and build on the successful sale of 45 megawatts last year. Helios now has a further 200 megawatts in an ongoing sales process. More than 30 companies requested information about the projects we sold to Commerz. And that process was shortlisted in December last year.
Erik Sneve
executiveFor those projects, we received nonbinding bids from 11 companies. Given the situation in Ukraine and Europe’s focus on energy security, we think interest will be stronger now. At present, solar PV is the renewable segment expanding most quickly worldwide. And in the near term, it is the only genuine answer for boosting supply in the EU, because onshore wind keeps running into more opposition—not just in Norway, but in several European countries. As you already know, offshore wind requires a long time. Next slide, please. A few highlights from Commerz Real. As I said, it is owned by Commerzbank. They have EUR 36 billion under management. In operation, they have 50 solar parks and more than 30 onshore and offshore wind farms across Europe and elsewhere in the world. We are very proud that they picked the Helios projects merchant risk in the Nordic area. From Helios going forward, we expect only great things, and we are proud to hold 40% of the company. Next slide, please. Today, solar power is the renewable energy source growing fastest and costing least worldwide. Imagine boosting the efficiency of conventional technology by 25% while lowering cost. That is precisely what Evolar’s perovskite technology does.
Erik Sneve
executiveWith a thin-film perovskite layer added on top of standard solar PV panels, the unit is able to capture a broader portion of the solar spectrum and needs less land area to produce the same amount of power. It isn't just Magnora that feels considerable confidence that perovskite technology will have a major part to play in the renewable transition — a number of big industry participants are now backing that view as well. Evolar's business model centers on commercializing its distinctive turnkey solutions, designed for integration into solar panel production lines that already exist or into new power production lines. Our belief in the technology team and the commercial projects has prompted us to raise our ownership further, to 63.5% of the company, by exercising the last 3 options after the quarter ended. We keep exploring ways to take the company public, and we are likewise holding discussions about Evolar with leading investors in Sweden and internationally. Next slide, please. Alongside its ongoing technology development, it's reasonable to say the business is progressing as planned. In fact, slightly ahead of plan. Evolar's obvious near-term edge is that it stands years ahead of the competition, given that it has the technological process platform in Uppsala — a 2,500 square meters prototype plant. The majority of competitors lack access to anything like that and take more of a chemical approach to the perovskite industry.
Erik Sneve
executiveDuring 2022, the business has hit every one of its commercial and technology targets. It is in advanced talks with a number of additional Tier 1 participants, and not long ago it filed an application with the EU for EUR 15 million in funding toward a pilot production line located in Uppsala. A ruling from the EU is going to come later in the year. A month back, the EU came out and stated it would do whatever is needed to restore solar manufacturing within the EU once more. We believe this aligns very well with Evolar's plans. The company keeps expanding, and with its present 27 full-time equivalents it possesses the technical and commercial strength to lift the business to the next level and to serve as a solid speaking partner for Tier 1 players in the solar sector. Next slide, please. To summarise, Magnora offshore Wind is pursuing fresh opportunities together with TechnipFMC and local partners as it develops the ScotWind area. Kustvind is moving forward, and we anticipate filing the final application before the year is out. In South Africa, we hope to see a number of projects move from the ready-to-build stage into the ready-to-sale stage during 2022. Helios is advancing quickly and has a further 200-plus megawatts under sales discussion. We will carry out a strategic review of the company later this month, in early June, since opportunities exist for Helios and we have also been approached by companies keen to invest directly into Helios as well as Evolar.
Erik Sneve
executiveEvolar's commercial rollout is now in progress, and there's potential for paying customers and orders both this year and next year. We believe those prospects look very strong. Beyond that, we're seeing greater interest in making direct investments in the majority of our portfolio companies, and at this moment we're also looking into solar for PV and energy storage opportunities across a number of European countries, with the chance to establish the new Helios and other areas. Next slide, please. One more, please. During the first quarter, revenues came to NOK 3.4 million, largely from royalty income from Dana. We've learned that Dana began its drilling campaign in late April. And we're hopeful that production at the Dana field will rise over the course of the year. The quarter's revenue increase stemmed from somewhat higher offloading volumes at the field. We also deliver certain professional services to our portfolio companies, a gain of 400,000 under IFRS rules. Adjusted EBITDA landed at negative NOK 3.2 million, improved from negative NOK 6.3 million in Q4. The gap versus our reported EBITDA of NOK 14 million consisted of development and M&A expense of NOK 9.8 million plus a noncash option expense of NOK 1 million.
Erik Sneve
executiveOperating costs are trending down 2.3% versus the prior quarter, and our emphasis stays on keeping capital and operational discipline at a high level. Let's move to the next slide. Our cash flow gets support from the agreement tied to our legacy FPSO assets from design operations during 2013 to 2018. That covers USD 0.50 per barrel produced and offloaded from the Western Isles FPSO, also referred to as the Dana contract. It also includes license income from Shell's Penguins FPSO. The initial installment under the Penguins contract comes with a sail-away from the yard. Media reports indicate this has slipped and should now occur in the next quarter, Q3. Once sail-away happens, we anticipate waiting no fewer than another 90 days until first production, and roughly 100 days until output of 4 million barrels at the current production rates on the Penguins field today. Let's go to the next slide. Given that cash flow backs our development work and the balance sheet carries low leverage, we can invest and reinvest in fresh opportunities within our ongoing projects. Our track record is that of a shareholder-friendly company, putting priority on distributions and distribution capacity. At present, though, our resources are directed toward developing our portfolio companies and the electric future.
Erik Sneve
executiveWe're really looking forward to what lies ahead, and we see mounting interest from bigger energy players in a platform company like Magnora. With that, let's open it up for questions.
Erik Sneve
executiveLet's see how many questions came in. First, is there any expectation for commercial sales from Evolar in 2022? That's question one. Question two concerns the OX2 sale: can you share anything about the number of milestone payments, and whether there's a timeline for those payments? Three, I didn't see Scotland clearly mentioned in the report presentation. If I'm not mistaken, the application headline is today. Will Magnora Offshore Wind take part in these rounds? So, on the first one, about the timing of Evolar sales, we will see revenues from paying customers this year. Whether it's for a full production line, a pilot line, or commercial activity testing is hard to say. But they're having very good discussions with several clients at the moment. Regarding the OX2 sale, can you say anything about milestone payments there, and if there's a timeline for these payments? So with the OX2 sale, and also the Commerzbank sale, we began both of those processes before all permits were in place. So the final payments will be contingent on, for instance, all permits being in place, and then we retain 25% until commercial operation date, for instance. So that's the typical scheme. But the various customer contracts differ somewhat.
Erik Sneve
executiveBut for the most part, 10 — if it's a straight auction, perhaps, at the beginning. Then you've got — with Commerz, 75% comes at signing once every permit is in place, and after that, 25% remains for a commercial operation date. The Scotland clearing round: only registered applicants who lost are able to apply, though they must request a permit together with the existing license taker in that particular field. Not all the documentation is available, but no wind park can sit next to ours without approval or a commercial process involving Magnora. So that's the answer for Synovia. How is progress at Evolar looking going forward? That's a question from Harry. And at Evolar, the key development progress is cell efficiency — which they can demonstrate in an industrial process — plus their capacity to make samples for customers. I believe we're at all of those aspects, and in Q1 they're now seeing clients who had approached competitors for offerings return to Evolar, since those clients aren't getting the right results from what's on offer. And I think that stems from the fact that Evolar genuinely has a production plant running today. It's a pilot line, yet it proves you can do this with full-size samples, and for the customer that matters a great deal.
Erik Sneve
executiveOver the past few quarters, we've observed a number of major companies showing interest in -- turning toward perovskite. To start with, solar for Tesco in Australia. Jinko, GCL, Oxford PV, and a few others, plus Equinor, all of whom had interest in this space. So it's evident that this represents the sole path -- the sole path the industry currently believes in for raising efficiency while keeping cost low. We have a question from Clarksons. About the divestment of the 2 solar PV projects within Helios, which together total 69 megawatts. Could you shed some light on the economics behind those project sales? I believe I've shared some guidance on this previously. Broadly speaking, we viewed these 2 opportunities as, on average, essentially, a multiple of 20x the development cost. For Helios, development cost is essentially their manpower -- 15 people -- divided by what they generate. The grid connection fees and environmental work, apart from their operational expenses, are fairly low in Sweden relative to certain other markets, so we achieve pretty decent multiples. Those multiples rest on the -- being how close they are to the grid connection fee. In addition, the land lease agreement and, as well, CapEx per client. After that, we assist them in sourcing an EPC contract, and following that we handle construction management on their behalf.
Erik Sneve
executiveSo overall, they receive a yield they find acceptable. Roughly 100 infrastructure funds across Europe are pursuing opportunities of this type, and it amounts to an industry-level price. We can't reveal the price, since we've signed an agreement covering it, but these are quite consistent with what the industry shows us. And we believe our PV multiples will be nearer to onshore wind's over the coming year. And they've been fairly healthy, ranging from 1 up to a couple of million in the region of NOK per megawatt. The next question comes from Turner at Clarkson. As I said, we're currently in talks with Helios about selling a further more than 200 megawatts during 2022 by itself. And after that, we aim to sell 600 megawatts in 2023. That cash won't be kept inside Helios, but I believe every shareholder there wants a dividend. And we've had certain discussions about larger Funds inquiring whether it might be appealing to sell out in order to create an IPP and similar things. But I believe there are multiple growth opportunities, though they don't consume much cash. So any extra cash can certainly be returned.
Erik Sneve
executiveRegarding FPSO payments we anticipate later in 2022 and 2023, how do you plan to deploy the cash you receive? Will you keep investing in new platforms, or focus on building out the current ones? I think that depends somewhat on when a dividend might come from Helios and South Africa. We're also talking about other portfolio companies. So we've stated that any excess cash would be repaid. We haven't laid out a clear cash and operational strategy, but I think we'll try to chase a few more smaller opportunities, such as some Helios replicas in other markets. And then I think we're ready to begin harvesting across all the companies. So we can return to that in Q3, I think, Turner. Next question comes from Jorgen Lomberg. You previously had a goal to divest 300-megawatt projects from Helios in 2022, which leaves roughly 86 megawatts remaining. So I think I've addressed that question. We're seeing strong interest, as I said. We sent the teaser to more than 70 companies for the 69-megawatt project. 35 -- over 30 companies came back on those teasers and said they would sign an NDA to get the information about them.
Erik Sneve
executiveSo 35 companies examined the project, and more than 10 put in nonbinding bids. So I'd say interest is very strong. And we also saw that <<inaudible>> along with all those other price makers, they're forecasting — they're getting more comfortable about the midterm gas price, and that's kind of their benchmark price for renewables, I believe, just in Europe right now. And with 1,700 terawatt hours of Russian gas that has to be replaced, we see that potential margins on both sides can rise. Some upsets with the potential for CapEx on the modules. But we see that selling above the guidance indicated earlier this year is possible. So the Helios team, together with Peter, is working very closely on all of these opportunities. And naturally they're having a good discussion with Commerz and other companies that they've been in dialogue with over the last year. Next question. Reveal earnings from the sale in Helios, so that has to be seen in Magnora revenues. As we reported today, it might -- it will be funneled down at the 40% level when it's recognized in the books of Helios. So we -- as I mentioned last quarter, we'll most likely change reporting from Q2 this year; we're in the process with PWC regarding the valuation of the portfolio.
Erik Sneve
executiveAnd after that, we’ll be reporting uplifts and downlifts in the valuation of the entire portfolio, rather than having the P&L from the portfolio companies funding in—but we haven’t concluded yet. But Stefan, to answer your questions, you’re right. Could you be more specific about sail-away from the Penguins project? We don’t know the exact reason. We—it’s very few people who know the exact timing in that line for any activities, which show even in some <<inaudible>>. So what we read is the same as what you read. We know that the work that surrounded was finished years back. I think it’s logistical issues and some planning, and maybe some optimizing from Shell; I think they’ve been accurate before upstream and sail-aways in Q3. On Evolar, could you provide more color on discussions with the Tier 1 players for commercial deployment of the company’s tandems to ourselves? Well, I can’t say too much, Turner, but what I can say is that some of these companies have been around in the industry and had the initiatives with what some people might perceive as Evolar’s competitors. And they have not been satisfied with the results from ups, I’ve learned. I think Evolar’s strength is that they actually have the platform in place, and you’ve seen it yourself, Turner.
Erik Sneve
executiveIn-house humidity testing is something they can handle, along with solar light testing, sampling, and experimenting with various perovskite solution combinations. Their whole approach to the perovskite opportunity is quite industrial. And my view is that any bigger company looking to put money into the platform has to witness it functioning in a larger-scale prototype environment, rather than merely a spin-coating setup in a tiny lab with a glove box—the kind of thing you'd see in X Files. Frankly, they lack what's needed to sell a technology process to a Tier 1 player. So Evolar will certainly face serious competitors, though I'd say the lead times on their equipment run probably 2 to 3 years. And we take real pride in the fact that a full prototyped line is now in place at ups today. I believe one more question came in by e-mail. Yes. That one I think I've answered—it was from Jorgen—and it's correct. We likely booked them net 40% at recognition. So 75% of the first sale lands in Q2, and then 25% at commercial operation date, basically. So I think all the questions are covered. What we started in 2020, with the focus on asset-light projects within the renewable segment, is by now widely known to be working.
Erik Sneve
executiveOX2 follows the same playbook. They purchase a project from us or from Helios, then resell it. They assume the construction risk, and by providing the EPC contract they can pull an additional 25%, 30%, 40% margin on top. We're seeing other Nordic competitors do this as well. We're seeing firms such as Falck and Siemens <<inaudible>> get acquired by bigger industrial players. Developing these projects requires a great deal of groundwork in local communities, in municipal communities in South Africa, in Scotland, in the U.K. and in Sweden. And I believe we've now demonstrated that Helios, under a year after our investment in the company, could sell one project to OX2. 14 months later, they managed to sell a project to Commerz Real. This market is real. It's being driven by the downsizing of coal and nuclear, and also by making Europe carbon neutral. And I think the situation with Russia is simply crazy. It's going to require far more new supply, and the only supply we see in the short term is really LNG and solar. And many LNG terminals are running at full capacity. So in the short term, over the next 12 to 24 months, solar is in pole position, and onshore wind is frowned upon in most countries in the Nordpool area, apart from Finland, because they have those large forests, and Norway and Sweden.
Erik Sneve
executiveHowever, the market lacks a grid for delivering that power, and prices vary enormously between the northernmost regions and those in the south. The situation is even more severe in Europe, and in my view the 90% decline in CapEx between 2010 and 2020, combined with falling battery costs, has turned solar into something of a black swan — and we hold a leading position through Helios along with the other opportunities currently under review. Revenue is already coming in from Shell and Dana, and our banking relationships are strong; for instance, we raised the credit facility to NOK 100 million, which is unusual for a development company, yet banks are keen to pursue this market, many infrastructure funds are chasing projects, and bigger energy firms must demonstrate reduced fossil investment and greater renewable spending. It comes down to the EU taxonomy. I believe we have the right portfolio of companies, products and technologies. The green ammonia project in Tromso also makes us very happy, and we have submitted applications for investment grants on it. So hydrogen and green ammonia are part of our focus. Then there's battery. We have solar, and project development works much the same way. Typically you spend NOK 3 million to NOK 20 million, NOK 30 million on such projects — offshore wind aside — and then you can sell the project rights once they reach ready-to-build stage.
Erik Sneve
executiveBut a strong team is required for that. So the fact that we have this team makes me very happy. As of today, we have Espen, <<inaudible>>, Torstein, Bard, and Gisle with us, plus all of our advisers, and these are people who truly understand how to bring such projects to maturity and get an institutional investor keen on purchasing them. And then there's Evolar — a company we collaborated with for several years, from 2003 until we sold it in 2007 and launched a factory in Germany in 2008. Globally, they lead in thin film. Naturally, First Solar is out there, though their technology differs. Still, what I mean is that the Evolar team has spent 20 years in thin film, and this kind of cross-path opportunity is something that arrives once in a decade or a generation — essentially, it's the discovery of a new material capable of doing things nobody imagined 10 or 20 years back. So they've been — they've been working in this industry for quite a while now. They understand what's needed to produce a product at industrial scale. They're talking with clients, they enjoy solid EU backing with funding potential, and their business model aligns well with Magnora's capital strategy of being asset-light, and we believe good things lie ahead for Evolar during the next 12 months.
Erik Sneve
executiveWell, I want to express my appreciation to all of you for your attention, and you're always welcome to drop an e-mail if you happen to be around the <<inaudible>> area. Should that be of interest, we might find time for coffee, and we're very happy for the support. From me, I wish everyone a good day and warmer weather. And thank you for this session.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Magnora ASA transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Magnora ASA earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Magnora ASA or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.