McEwen Inc. (MUX) Earnings Call Transcript & Summary

March 17, 2020

New York Stock Exchange US Materials Metals and Mining earnings 72 min

Earnings Call Speaker Segments

Rob McEwen

executive
#1

Thanks, operator. Good afternoon, everyone. From the perspective of our investors—both those who've been with us and those who've since left—along with our leadership team and me personally, the past year was awful. It's common knowledge that our stock price plummeted, so I'd like to open this call by offering my heartfelt apologies to all of you. Throughout that year, we issued projections regarding how operations would perform, and we fell far short of those targets. We simply didn't come through. By year's end, trusting any operational estimate we put out had become impossible. That situation was truly regrettable, since we achieved a great deal of success with exploration at Black Fox; those gains were entirely buried beneath the negative developments on the operations side. I recognize that regaining your trust will require us to hit our targets consistently across numerous quarters. The past year, I can honestly say, ranks as the most difficult one of my entire career in business, and I'm certain it was deeply frustrating for all of you as well. Let me promise you that we are putting in serious effort to make sure it never happens again. Later today, we'll share our views regarding the operating, financial, and exploration outcomes from 2019, and discuss our outlook for 2020. At this point, I'll hand things over to Meri, who'll begin with a broad summary of where our finances stand.

Merushe Verli

executive
#2

Thanks, Rob. Good afternoon, everybody. In 2019, our consolidated production came to 174,400 gold equivalent ounces, which was roughly the same as what we produced the prior year, while total sales reached 175,500 ounces. Those total sales consisted of 85,100 gold equivalent ounces from the mines we own entirely — Black Fox, Gold Bar and El Gallo Gold — plus 90,300 ounces tied to our 49% stake in the San Jose mine. Revenue from the mines we fully own came to $170 million for 2019, down roughly 9% versus 2018. Had we counted the revenue linked to our 49% interest in San Jose, that figure would have added $129 million; however, San Jose's revenue doesn't appear in our income statement since we apply the equity method of accounting to that asset. We've introduced a new metric meant to assist you in assessing how well our operations generate cash flow; it's a non-GAAP measure we disclose in our Form 10-K, and it's called cash gross profit. You calculate cash gross profit by adding depletion and depreciation back to gross profit. For 2019, cash gross profit from the operation we fully own was $33.7 million, versus GAAP gross profit of $9 million. Cash gross profit tied to our 49% stake in San Jose was $51 million, versus GAAP gross profit of $16.6 million. That said, as I mentioned before, we don't consolidate San Jose. In 2019, dividends we received from our interest in San Jose amounted to $8.9 million. Now I'll walk through the key items that drove our net loss for 2019. Over the year, we put $37.7 million into exploration, with 90% of that spent at the Black Fox complex and the remainder at Gold Bar in Nevada. Depreciation and depletion expenses came to $24.8 million; we spent $9.5 million on growth projects, which covered spending to advance the Froome Project in Timmins, Ontario, the Fenix Project in Mexico, engineering and permit work at the Gold Bar South property in Nevada, and preproduction expenditures at the Gold Bar mine; we recorded a loss of $8.8 million on our 49% investment in the San Jose joint venture company, which brought the book value of our investment in that joint venture to $110 million. We incurred interest expense of $6.8 million, mainly tied to our debt, along with G&A expenses of $12.8 million. We also realized a gain of $5.3 million on the sale of marketable securities, a gain of $3.8 million on the recovery of taxes, and $2 million in other income. All told, our consolidated net loss for 2019 came to $59.7 million, or $0.17 per share. Financing activities in 2019 included issuing 54.9 million common shares and 29.8 million warrants for gross proceeds of $77 million, averaging $1.4 per share. Share issuances for cash during 2019 produced equity dilution of 16%, measured against shares outstanding at the close of 2018. As of December 31, 2019, liquid assets had risen to $49.7 million, up from $37.8 million at the close of 2018. Our working capital rose, reaching $43.2 million, compared with $23.4 million as '18 came to a close. The amount of debt still on the books stayed level at $50 million. As we look toward 2020, a meaningful drop in exploration costs is what we anticipate, bringing them below $10 million, while growth project spending should come in at roughly $14 million, mostly tied to the Black Fox Complex, and debt repayment plus interest expense is set to rise, hitting $14.7 million. Given that Gold Bar mine production in 2020 is expected to fall short of what we had planned, we are in the process of adjusting our budget right now, though specifics on those changes aren't available at this point. At this time, I'll hand the call to Chris Stewart so he can walk through mining operations.

Chris Stewart

executive
#3

Thanks, Meri. I'll begin with a look at how each operation performed, and San Jose comes first. In 2019, our joint venture mine there in Argentina enjoyed a solid 12 months and hit the targets we'd set for both gold and silver output. Looking to 2020, the portion of production attributable to us at San Jose should come to 45,700 ounces of gold along with 3.2 million ounces of silver — a combined 82,000 gold equivalent ounces, assuming an average gold:silver ratio of 88:1. For cash costs and all-in sustaining costs, the midpoints sit at $975 and $1,225 per gold equivalent ounce, respectively. Turning to Mexico, residual leaching continues at our El Gallo heap leach. We generated 16,333 gold equivalent ounces there across 2019, at a compelling residual leaching cost of $688 for every gold equivalent ounce sold. Our 2020 guidance for that operation is 12,000 gold equivalent ounces. Now to the Timmins area, where our Black Fox Mine ran into a number of one-off events early in 2019 — matters we've covered thoroughly in earlier quarters. Those difficulties pushed production back and limited our mining flexibility throughout 2019. Consequently, we trimmed — our production guidance was reduced over the course of the year. For 2019, total production came in at 35,700 gold equivalent ounces, versus 48,900 in 2018. Worth noting: even with fewer ounces, the team managed to bring cash costs down to $825 per GEO from $845 in 2018, while keeping the rise in all-in sustaining costs to $1,225 per gold equivalent ounce, up from $1,137 in 2018. For 2020 at Black Fox, we're guiding to between 35,000 and 40,000 gold ounces, with midpoint cash costs of $1,075 and all-in sustaining costs of $1,200 per gold equivalent ounce. We're able to give that guidance now thanks to more than 2 years of operating experience since the acquisition, plus a revised forecasting approach that assigns risk factors to every mining area planned for the year. On the capital side at Black Fox, we're busy building the access ramp that runs from the Black Fox open pit over to the adjacent Froome ore body. Froome should carry development expenses of $21 million spread across roughly the next 15 months, and it's expected to deliver ore production for about 2 years, starting in Q4 of 2020. Froome's mineralization differs from Black Fox in being considerably thicker and more homogeneous, which allows a more productive transverse mining method and ought to bring our costs down. The schematic on the slide shows how the longitudinal mining methods used at Black Fox compare with the transverse mining method we'll apply at Froome. Under that transverse mining method, our internal studies and schedules anticipate Froome yielding 65,000 gold equivalent ounces in 2022 and 45,000 gold ounces in 2023. Froome's cash costs are put at roughly $850, with all-in sustaining costs of $926 per ounce. Adding Froome extends the life of the Black Fox Complex through 2023. In addition, we aim to boost output by pulling ore from several locations to feed our mill and greatly prolong the mine's lifespan. Today, we plan to present a conceptual plan, and it sits at different stages of engineering. Central to this plan is the exploration success that Sylvain and the team have achieved during the past 2 years. I'll now hand things to Sylvain so he can talk about exploration and resource definition at the Black Fox, Grey Fox and Stock properties.

Sylvain Guérard

executive
#4

Thanks, Chris. Among the standout items from what we did in payments exploration during 2019: we found Stock West, a major new mineralized zone; we grew the indicated resource substantially at Grey Fox; we hit highly encouraging drill intervals at multiple targets across that area; and we got favorable drill assays close to currently active mining zones at Black Fox. Let me expand a little on Stock West. Drilling conducted last year resulted in the identification and preliminary delineation of a striking new mineralized zone. Altogether, 31 holes have been put into this zone. Mineralized intervals came in at roughly 5 grams of gold per tonne, across typical widths between 15 and 20 meters; these robust results are found within an area that spans 265 meters along strike and 200 meters vertically. This newly identified mineralized zone sits under 350 meters away from current underground development, and under one kilometer from our mill. Stock West stays open in every direction, and the 2020 exploration plan we've built is meant to yield a maiden mineral resource estimate and, in addition, to probe how far the mineralization extends so we can gauge just how large this discovery might be. Also, at Stock, the historic Stock mine gives us a chance to explore beneath the current workings. Right now we're reviewing and interpreting the historical data and putting together the drill program plan. Turning to Grey Fox, our drilling enjoyed a high success rate, which pushed the indicated resource estimate up by 33%, or 155,000 ounces, bringing the total to 620,000 ounces at an average grade of 7.2 grams of gold per tonne. What we did was concentrate on drilling mineralized cross structures that hadn't previously been well understood or adequately tested by drilling, and that produced numerous exciting intersections spread across a 1.5 square kilometer area. Beyond the resource zones, at the Whiskey Jack target, drill results — among them a recent intersection of 53 grams of gold per tonne across 6.7 meters — point to a strongly mineralized system with excellent potential for delineating a new mineralized zone. We <<inaudible>> resource at Grey Fox. Now at the Black Fox mine, we've got underground drill platforms in place to investigate the West extension and the depth extension of the mine. High-grade intervals were cut on the upper Western extension of the mine, for example 79 grams of gold per tonne across 2.6 meters, 41 grams of gold per tonne across 3.3 meters, and 78 grams of gold per tonne across 1.8 meters; these encouraging drill results point to the possibility of extending mining in that area. The mineralization includes high-grade drill intersections reaching as much as 120 meters West of the closest mining phase. A high-grade intersection of 105 grams of gold per tonne across 1.5 meters was also recently cut near mining development on the depth extension of the mine. That intersection lies halfway down, directed toward the deepest 55 gram per tonne exploration pit at the mine's 1,050 meter level, which suggests the high-grade mineralization continues along the depth extension of the mine. With that, I'll hand things back to Chris.

Chris Stewart

executive
#5

Thanks, Sylvain. As you've heard, the success rate we're seeing in exploration points to the Black Fox Mine possibly having the ability to keep producing for a number of additional years. What we're aiming for is to take the window available to us over the coming 12 to 24 months and start establishing the development required so that we can produce from 2 to 3 deposits at the same time. If we stack several production sources together, we could get to a production level of 100,000 to 125,000 ounces within 5 years. Since the acquisition, Grey Fox has expanded. We're starting a feasibility study on the project, initially examining an open pit mining approach that would later transition into an underground operation comparable to our present Black Fox Mine; this schematic illustrates potential open pits on the contact in 147 Zones, which represents the extent of what we've studied to date. The 147 Northeast Zone also reaches surface, and it could be part of the open pit plan. Preliminary analysis indicates that the 2 high-grade pits at around 3 grams per tonne would deliver substantial ore feed for our mill across a 5- to 7-year life. We expect to have the feasibility study finished in Q4 of this year. Right now, permitting work is happening at the same time as the feasibility study work. This schematic shows the development needed to gain access to the old Stock Mine plus additional development to reach the Stock West Zone. We picture a portal and a new ramp from surface to reach the old mine workings, since the existing shaft can no longer be used for personnel transport. Fuel drifts would be built to link the Stock West Zone to the existing mine. A major advantage we have at Stock is that this is a permitted site. So we can move quickly to develop an underground mining plan. At this point, it appears that this plan could be put in place fairly soon after access to Froome is established. The exploration program of 2019 defined the mineral inventory at Stock West, and we intend to keep exploring this zone and to finish a compliant resource estimates in 2020. Turning to Gold Bar, we produced 30,700 gold equivalent ounces in 2019 against our original guidance of 55,000 ounces. Cash costs and all-in sustaining costs came in at $1,101 and $1,282 per gold equivalent ounce, respectively. It matters to understand the different factors behind the shorter fall of 24,300 ounces relative to our original plan and the higher costs we took on. There were 5 principal reasons. First was the delay. Commercial production had been scheduled to start in March 2019, yet it wasn't achieved until May. That meant fewer ounces on the heap leach pad and less time available to recover them. Second was gold grade; we moved roughly the number of tonnes we had planned in 2019. But to do so, we had to mine some lower-grade stockpiles, and the pre-stripping in the Pick pit contained lower grading tons than our model had predicted. Third was the recovery. People who specialize in heap leaching think we're going to hit the ultimate recovery we've been expecting on material that's been crushed and agglomerated, though our expectation is that getting to that figure will require considerably more time. Another element was the choice we made to stack run-of-mine material on a selective basis, and by its very nature that won't recuperate as effectively as crushed material. The fourth thing was our choice to go after the Cabin Creek ore body sooner than we'd originally planned in order to boost cash flows; that choice brought about a number of difficulties for the ore handling system, on account of greater clay content along with wet conditions that winter. And fifth, there were shortcomings we had to resolve in how the mine infrastructure was engineered and built. To illustrate, a quantity of preg-robbing carbon that contained carbonaceous material ended up being used when the heap leach pad was constructed. Sorting mistakes in the process plant brought about carbon attrition and likewise led to preg-robbing on the heap leach pad. Lately, we've run into yet another major obstacle at Gold Bar. Our first experienced mining out of the 2 Cabin Creek pits was encouraging in the sense that they held roughly 8% more gold than our reserve model had forecast; that kind of thing isn't uncommon, and for us it was a nice outcome. Lately, we've shifted to mining from the Pick deposit almost entirely, and more specifically the Pick West pit. There's a substantial amount of waste stripping tied to Pick West, and we've been progressing nearer to the ore zones while moving forward roughly 120 feet of bench each month. What we've found from Pick West is that reconciliation against the reserve model has been quite poor, both for ore tons and for gold grade. The pit has by now moved along to where we're extracting some improved material. And what we're seeing is that our actual tonnes remain below the model while grade is higher, even though we lack sufficient data at this point to make a dependable prediction of those differences; this set off a fresh evaluation of the resource reserve modeling, which we've been pushing forward as quickly as we can; we now have an initial draft resource interpretation finished. And although our geological team wouldn't call it optimized, we know enough to grasp that the resource reserve estimates will probably go down and the mine plan is going to shift. There are a number of mitigating circumstances that could partly counterbalance the decrease in contained ounces, which I'll bring up, so that everyone's aware. To start, fewer ore tonnes to process together with higher gold grades potentially delivers a bigger margin on every tonne of ore we place on the heap leach. Better grades also have a tendency to recover more effectively; and second, some capital costs, like an expansion of the heap leach pad, might not be necessary. For those of you who follow this closely, there's a geological — a geology-based account of what's showing up in the pit, and that's what led us to tighten the modeling criteria we use for Gold Pick, so I'll pass things over to Sylvain, who will walk you through some specifics.

Sylvain Guérard

executive
#6

Thanks, Chris. We've taken fresh data from pit mapping and in-pit drilling to update and sharpen the resource model for Gold Bar. Under the old approach, modeling leaned heavily on bedding control — meaning gold mineralization was largely spread through and restricted to particular favorable beds within the Gold Bar deposit. More recently, we built a stronger grasp of structural controls for locating and thinking about the deposit, and that has become a key piece alongside bedding control, giving us what we consider a sturdier model. Thanks to the revised structural control on mineralization, we identified a number of near-mine targets that earlier and existing resource models left out because drill density was too low. The geological and resource teams at McEwen are collaborating with SRK Consulting to fold the updated structural and mineralization control, together with bedding control, into a refreshed mineral resource at the Gold Pick deposit. The preliminary model is finished, and McEwen and SRK keep working to fine-tune and optimize it. We expect the revised model to wrap up in Q2; we're also working to bring the Gold Bar South satellite deposit into the mine plan. Gold Bar South offers an appealing chance to introduce a new ore source at the Gold Bar Mine. It's a near-surface deposit sitting to the Southeast of the leach pad. In 2019, drilling took place at Gold Bar South, and the resource was upgraded to the measured and indicated category, now totaling 63,000 ounces of gold at an average grade of 1.1 gram per tonne. There's upside potential to expand the resource, and more drilling is planned across the Southeast — the South extension, which stays open, and across the North portion of the deposit, which recently became fully accessible for drilling. Over to Rob.

Rob McEwen

executive
#7

Thanks, Sylvain. I'll wrap up by sharing 4 points: first, Gold Bar continues to encounter difficulties; because of that, we're revising the gold reserves and resources, as well as the mine plan. Resolving this issue is going to require some time, and we're proceeding as fast as we can; second, San Jose should produce another strong year. That said, the quite recent significant shift in the silver:gold ratio, were it to continue, would mean the mine pays out fewer dividends; third, exploration at the Black Fox Complex has expanded our current resources and uncovered a new resource. Our exploration spending, we believe, has given us reason for optimism that we can boost production and lengthen the mine life at the Black Fox property; and four, the enormous capital infusion currently being put to work fighting the spread of, and addressing the economic harm inflicted by, the coronavirus will, over time, prove highly inflationary. My view is that with 0 interest rates, and this fresh global quantitative easing, the movement of investment dollars into gold will speed up over this year. At this point, I'd like to begin the Q&A.

Jacob Sekelsky

analyst
#8

I've got a handful of brief items on my side, and I'll begin with Gold Bar. I realize that specifics there remain a work in process. That said, I'd like to know whether guidance for 2020 ought to be anticipated at Gold Bar after the refreshed reserve and mine plan come out. I'm simply attempting to understand how matters could shape up ahead.

Rob McEwen

executive
#9

Without question. That being said, it won't happen for at least another month.

Jacob Sekelsky

analyst
#10

All right, that's useful. Turning to Gold Bar South, I understand you're discussing the possibility of adding it to the mine plan. If that choice gets made during the coming 2 quarters, how soon could it be up and running?

Rob McEwen

executive
#11

Permitting is underway, and it should take roughly 12 months, perhaps slightly more. After the permit comes through, we would begin operations there. What's favorable regarding Gold Bar South is that it sits at a lower elevation, and snow and related conditions have caused us problems with ore processing in winter and with mining up on the hill. So the elevation is lower. Getting to the pad involves a mild incline, yet the distance is comparable, meaning weather won't affect things as heavily.

Jacob Sekelsky

analyst
#12

All right, that helps. Then, specifically at Black Fox, exploration still seems to be the main priority. And Froome is beginning to appear as the following stage of expansion. I'm simply asking whether any permits are still outstanding that you need there before you can proceed with that conceptual mine plan mentioned earlier.

Rob McEwen

executive
#13

At Stock, the mine already has its permits. Right now, operations are temporarily suspended. It's a shallow operation. It extends down roughly 330 meters. Dewatering was done there previously. We were told that when they last dewatered it, roughly 4 months were required; we don't know what condition the underground is in, which is why Chris mentioned driving a ramp over to it and then connecting with the underground system so ventilation and additional access would be provided. So as far as timing goes, we'd prefer to gain a clearer understanding of the Stock West Zone, add more drilling there, so a more complete plan could be presented. But what has been observed to this point is broad widths, steady grades, both quite near the old mine's existing workings. We're also finding values deeper than the old workings. In fact, there's a drill hole down there approximately 600 meters beneath the previous working, so the grade was quite appealing, which indicates the ore body extends farther down. We're also examining regions surrounding the existing workings where resources appear to exist that were never mined.

Jacob Sekelsky

analyst
#14

Jacob Sekelsky speaking here — from what I'm hearing, it seems like this could move forward pretty fast.

Rob McEwen

executive
#15

that's right.

Heiko Ihle

analyst
#16

I want to expand a bit on what Jake raised earlier. This morning I reviewed your MD&A filed on SEDAR, and on Page 44 you write — and I'm quoting here — "With respect to the Gold Bar mine, a significant reduction in cash flow results from changes to the reserve estimate at the mine plan." Then, as Page 45 explains, there could be a need to cut back, postpone, or halt operational spending, and/or bring in money via different financing avenues. My question, I suppose, is whether that represents the mitigation of risk, or whether you already have actual contingency plans under review? And should you be evaluating particular scenarios, could you at least share some sense of, say, a downside base case along with a more optimistic one? Also, which gold price assumptions go into those scenarios? Thanks.

Rob McEwen

executive
#17

Certainly. Thanks, Heiko. What you were quoting comes from the risk factors included in our 10-K.

Heiko Ihle

analyst
#18

Right. It was the MD&A filed on SEDAR.

Rob McEwen

executive
#19

Correct. You'll find the same thing again in the 10-K. However, within that document, worry exists that ounces and tonnage might be slipping away. At first glance, the tonnage appears — and this is quite preliminary — but our expectation is an announcement of reduced tonnage. How big that reduction will be, we can't say.

Heiko Ihle

analyst
#20

Alright, that's reasonable. And I'm guessing you still haven't given an answer on this one. You have no idea what was spent on exploration at Gold Bar during 2020, correct? In the release, you cited 2018 and 2019, but for 2020, I only noticed a work in progress, since there's no way anyone could know.

Rob McEwen

executive
#21

We did have certain figures, yet many things are up in the air right now. We're unsure what — my view is that the whole industry, and actually every industry, is getting disrupted by coronavirus. As a result, it's getting somewhat hard to forecast what the effect would be if the site were to become infected and be shut down for a period.

Heiko Ihle

analyst
#22

That's reasonable. Actually, since it flowed right into what I planned to ask next — my follow-up was going to be pretty much the same thing. So far, what precautions have been taken, or what adjustments has the company made? Is the entire staff at home? Is the office shutting down soon? I mean, travel — international travel in particular — is severely restricted. Honestly, it ought to be. What adjustments have been implemented? And in the coming 2 weeks or so, should we anticipate hearing something from you folks about this?

Rob McEwen

executive
#23

Within the company, no coronavirus cases have been reported to us. I figured I could have been exposed during the PDAC, yet 14 days have gone by and I have no symptoms. At present, our office runs with a skeleton staff. Over at our operations, Chris has plans ready to handle whatever might come up there. As you said, international travel has been halted. At the moment, most travel has been halted; and we are treating this very seriously. Chris, is there anything you'd like to add?

Chris Stewart

executive
#24

Right. No. Thank you, Rob. Echo, correct. We're pretty much doing what other mining firms are doing, making sure our mine sites and operations stay safeguarded. Temperatures are being taken for individuals arriving at the site. We've limited visitors. Nobody who isn't essential can come onto site. And yes, we've shared a great deal of information with our staff too, links to sort of help monitor this, and we're giving our people at the sites updates every day. We've also taught them how to self-monitor. Should they have traveled, we send them home for 14 days to self-quarantine and keep an eye on themselves. So we're taking every appropriate step to ensure we can hopefully prevent this from appearing at the level of our operations.

Adam Graf

analyst
#25

I have a brief follow-up regarding being ready for corona. In the event that supply chains are disrupted, have you fellas considered inventories of grinding media, cyanide, supplies, and other spare parts, so that you could keep operating without depleting any critical item?

Rob McEwen

executive
#26

Chris, your turn.

Chris Stewart

executive
#27

Yeah, thank you. We've stayed in touch, and we're still in touch on a regular basis with the folks who supply us. And right now, once again, they're taking steps much like ours, and they remain open for business. When it comes to building up reserves or — cyanide, we lack containment. We do have extra cyanide at the site. With many of these chemicals, you've got your containments, and that's all you have. And permits can't be obtained overnight just to store additional amounts. So we're depending on our supplier network to keep going. And as the virus continues to spread, it's pretty difficult to figure out what the total effect on our business will be, but we're definitely keeping in regular touch with our suppliers and making sure we're getting — stockpiling whatever we can at the site, within reason. And we'll just have to keep watching this and make changes as we go along here.

Bhakti Pavani

analyst
#28

Just one quick thing. At Black Fox Mine last year, you guys hit some drill intercepts of very high grade. So I'm wondering, does the company intend to return and do additional exploration during 2020 within the exploration budget?

Sylvain Guérard

executive
#29

Bhakti, yes, and that is a good question. We've had nice results lately at Black Fox Mine on the West Flank. As you're aware, underground development has been underway so that we can get better access for drilling the West extension as well as the deeper part of the mine. Drilling has therefore been going on there, and at the 1,050 level we obtained a positive intersection <<inaudible>>, plus there's a fresh high-grade hit of 105 grams per tonne in the middle, at the deepest intersection where mining is taking place at present. Once again, this is typical Black Fox high-grade mineralization, strongly showing that the system stays open and that mining can be extended on the West — possibly on the West Flank — and also at the mine's depth extension. And drilling continues underground, with 4 rigs active underground.

Bhakti Pavani

analyst
#30

Understood. Previously, you mentioned Froome as a supplementary deposit, with output coming from there alongside the Black Fox Mine. Do the exploration findings you currently have still support that view? Or do you expect that by 2022, mining would come solely from the Froome deposit?

Sylvain Guérard

executive
#31

Bhakti, if I have your question right, is it regarding extraction at Froome, or exploration in the area around Froome?

Bhakti Pavani

analyst
#32

It's a mix of the two. With Black Fox, the reserve report you put out yesterday gives it a bit under two years of remaining mine life; and Froome should start production in Q4 of 2020; so considering what exploration has turned up at the Black Fox Mine itself, do you expect that operation to keep going past the close of next year? Or would you say that by 2022, Froome will be the only source of ore?

Rob McEwen

executive
#33

Chris, would you mind — that piece of our conceptual plans, could you walk us through it once more?

Chris Stewart

executive
#34

Yes, absolutely. So, yes, I'd say we've enjoyed quite a bit of exploration success on the Western Flank. There are many excellent holes situated 150 meters from where we're currently developing. So what we're seeing at the Western Flank has us quite enthusiastic, though we still need to keep drilling there and turn that into a new resource, and after that a reserve. And how we see it with Stock, we believe we can more or less keep Black Fox going until Froome enters the picture, and after that Froome provides us with a couple of years of production. And then at that moment, as things stand, our present plan, unless there's any — unless there's a whole lot more success and the resource grows substantially. What we intend is basically to scale back or halt at Black Fox and let the drills have a chance to truly drill and grow that resource; we feel — we're fairly bullish about Black Fox and think there's considerably more gold in the ground there, but we require the time for the drills to reach it rather than drilling above development above mining, which isn't efficient, as everybody knows when you're operating a mine. So Froome is designed to produce 1,500 tonnes per day. It has a somewhat harder work index compared with Black Fox, and the capacity of our mill is roughly 2,400 tonnes per day. So we do have a degree of flexibility while we're at Froome. If we're able to capture some extra ore at Black Fox, we would certainly have aimed to run that through the mill; however our primary emphasis at Black Fox, once Froome is up and running, would be to grow our resource into what we think it can genuinely become.

Bhakti Pavani

analyst
#35

Got it. That's really useful. Now regarding how Froome gets developed, could you take us through the timeline for finishing that development? And what other work remains before Froome can enter production in the fourth quarter of 2020 to 2021, sorry?

Chris Stewart

executive
#36

Sure, yes. So at Froome, essentially what we're doing is driving twin drifts. In the fall we refer to them as the portals, and we only began driving those drifts in March; we've — we have held the contractor back a little bit right at the beginning, since we have roughly 5,000 ounces along the Western edge of the Black Box pit, which sits in our 2020 mine plan for the underground. So we've actually had them power the drifts, and the ramps will be driven there to reach those ounces, because the existing underground workings can't get us there. So that's finished, and now they'll be moving down the hill toward Froome. And we expect that to take until the end of — we ought to be down there in late Q1 of 2021. And then, naturally, the mine has to be developed and the stoping has to be set up. And we'd be looking at entering production in Q4 2021; as for — no permits are needed. All permitting is in place; we're ready to go. Essentially it's just a matter of getting down there and getting ourselves set up, and then mining can begin; our ventilation circuit is already set up. That's the reason we're driving twin ramps, so we'll have fresh air and return air and escape ways and everything; we'll be all set, and we're driving — we've positioned the ramp so it comes right in to sort of the bottom third of the mine, so that we can basically hit the high-grade zone and the thicker zones right off the bat to ramp up our production quickly.

Bhakti Pavani

analyst
#37

Alright, just one additional question from me. From what I gather, you said earlier that Froome's output would come in at 65,000 ounces during year one, then 45,000 ounces in year two — is that right?

Chris Stewart

executive
#38

That's right.

Bhakti Pavani

analyst
#39

All right. Switching over to Gold Bar. You mentioned, I believe, that a reevaluation and remodeling effort is underway for the reserve at the Gold Pick deposit. Gold Ridge, meanwhile, is on the smaller side. How do you view the possibility of reassessing or redefining the resource at that location?

Sylvain Guérard

executive
#40

Correct. At this moment, Bhakti, our top priority is the Pick model. Immediately afterward, though, we continue carrying out that same kind of work using whatever data exists at Gold Ridge. One major plus we currently enjoy at Gold Pick, if you will, is that fresh exposure within the pit is available to us; naturally, we also benefit from active mining plus grade control data. That gives us far greater detail than anything available previously. We're feeding such data into the model so it can genuinely refresh and sharpen our comprehension of what lies there in terms of mineralization style and the controls on it.

Bhakti Pavani

analyst
#41

Understood, and I have just 1 more question. Did any mining take place at Gold Pick East over that period?

Sylvain Guérard

executive
#42

No, none so far. Right now, operations are taking place at Gold Pick West.

John Tumazos

analyst
#43

For the indicated resource of 121,000 ounces on the stock, is the advantage from the strong drill results over the last year baked into that figure? Or what portion of it leaves those out?

Sylvain Guérard

executive
#44

John, it's Sylvain here. Yes, that covers Stock East alone, and it represents an upgrade to the resource in that area. We'll still be examining an open pit and underground scenario; drilling density is much better across this East deposit or targets, so to speak. As you're aware, our attention at Stock has centered on a 3-kilometer strike land that takes in the old Stock Mine; we see solid potential directly beneath the old mining operation as we compile the data, the historical records. It may have been closed during a period of low gold prices, and a number of strong intersections sit just below the mine. So that's likely the initial spot we'll examine near term as we move Stock forward. Then turning to the West, as you're aware, Stock West is a major new discovery. The true size or potential of this zone remains unknown to us. We intend to return to it with 2 main objectives: first, infill Stock West to bring it to a resource estimate; and second, drill the extension of this new discovery to evaluate the site's potential. So there's a 3-kilometer strike land with the mine in the center and solid potential directly beneath the mines. And moving to the West side, we think we have — this is the big prize with Stock West. And we still have Stock East, this newly upgraded resource, which takes in some high-grade mineralization within a larger, lower-grade envelope of mineralization.

John Tumazos

analyst
#45

I'd like to aim this at Rob, if that's alright. Since right now you lack any production forecast from Gold Bar, plus the Black Fox Complex will be shifting from the old mine over to Froome, and there's the Grey Fox evaluation on top of that — do you figure exploration spending ought to be trimmed substantially? And should a project be shelved, just in case what comes out of Nevada or Ontario falls short of your hopes? Fewer balls in the air, with all this uncertainty.

Rob McEwen

executive
#46

Without a doubt, John. Our aim has been to streamline the property portfolio and sharpen our focus. Black Fox, which a lot of people figured had little future, has actually delivered solid exploration results for us — enough that we could ramp up output. Meanwhile Gold Bar, expected to be a standout, is currently somewhat hampered and limping along. So our plan is simply to tighten up certain exploration outlays elsewhere and concentrate them, so that we've got the money to bring these other production sources along.

John Tumazos

analyst
#47

So should the dewatering work at Stock, plus any additional assessment there, keep going — or should it pause until we see how Nevada and Black Fox perform later on?

Rob McEwen

executive
#48

Those are things we're giving thought to; once the Gold Bar figures are available, we'll have a clearer method for judging that.

John Tumazos

analyst
#49

Of course. I'm sorry for asking this while you're still evaluating.

Rob McEwen

executive
#50

No, no, no — that's a completely sensible thing to ask. It's exactly where attention should go. So, Sylvain, was there anything you wanted to add on that?

Sylvain Guérard

executive
#51

Sure, John — perhaps I could tack on a few thoughts here. I’d say the money we put into exploration across those 2 years has genuinely mattered quite a bit. Still, to put it briefly, what that does is let us concentrate our work on just a handful of zones where results have come our way. As you’re aware, one is the Black Fox Mine itself, where drilling underground continues, and we can see room to push the mineralization further and, with luck, the mining too. Then there’s the Grey Fox area, where things have gone well for us, lifting a resource of meaningful grade, with mineralization reaching surface on ground we own. That handed us a rather appealing chance to begin with open pit mining at Grey Fox. And Stock has been advancing, so to speak, as a project more quickly than we’d anticipated, particularly after the Stock West discovery. So at present, we’re focused solely on the Black Fox Mine and Stock West as a discovery. At Grey Fox, we honestly don’t see any need right now for extra major exploration, since we already have a critical mass that lets us continue moving studies toward development. With Stock West, our aim is to reach a resource stage; from there, we can genuinely back further studies and possibly dewatering or development of the Stock project. As for Gold Bar, every bit of exploration we intend to do there this year will be mine ex or near-mine work — continuing to drill within the pits or surrounding them so we can return ounces to them or grow them — plus Gold Bar South, since Gold Bar South is a solid satellite deposit: silica-rich, with very limited alteration, sub-cropping and reasonable grade, situated not far from our operation at a lower elevation; so we find that pretty attractive. Also, Gold Bar South remains open to the South. The final section toward the South contains mineralization, while the Northern part has only been partially drilled. So we see potential for growth there.

Adam Graf

analyst
#52

I have a brief additional question about slide #7, which shows your conceptual plans for Timmins. You discussed this somewhat earlier. You explained that Froome has its permits. And Stock, since it was never formally shut down, also has permits. Does that cover the entirety of Stock — the possibility of the open pit, Stock West, and so on? And then, clearly, in this conceptual plan, Grey Fox sits between Stock and Froome; what permitting, if any, is required there?

Rob McEwen

executive
#53

Froome has its permits. At Stock, the mine has its permits. If we decided to go underground at Stock West, that would be — going underground there is permitted. As for Stock East, we don't know whether that would be open pit or underground. If it were underground, you'd be linking up with the mine that already exists, so that permit would not be a problem. But if you wanted an open pit, it would be a problem. The only reason is that it would require time. And Grey Fox is located on our property, and no permit is needed.

Adam Graf

analyst
#54

So no permit, then. All right. All right, so from what I'm hearing, it's basically a matter of planning and engineering and how tightly you space the drilling, rather than any kind of regulatory obstacles as such?

Rob McEwen

executive
#55

Well, with Grey Fox, you'd need to handle containing water — and runoff too, in that location. You'd need to get the regulators comfortable on that point.

Adam Graf

analyst
#56

So how does that process work, Rob? Might it push back Grey Fox or change the order of some of your conceptual plan?

Rob McEwen

executive
#57

That could need — I'm not sure, some studies have to be completed, and that could consume most of 3 quarters of the year. Those are simply water and archeological matters that need to be satisfied.

Adam Graf

analyst
#58

Would you all be providing updates from time to time on that conceptual plan as your understanding and intentions develop?

Rob McEwen

executive
#59

Without a doubt. No. To us, this looks somewhat like a glimmer of light at the tunnel's end. And...

Adam Graf

analyst
#60

Yeah, I believe staying current on the ways this potential year could be unlocked would be quite useful for analysts and the market.

Rob McEwen

executive
#61

Right. This shifts the narrative considerably. So that's something we'll do; we'll do it with enthusiasm, Adam.

Analyst

analyst
#62

Thanks for being upfront right from the start of this call — I really mean that. That said, I've got a handful of things I'd like to ask, and I suppose I'll kick off with something fairly simple. Regarding Grey Fox, back on the December call, I think it was Ken who said he'd identified as many as 12 significant or potentially significant strikes along Grey Fox — or right in the vicinity of Whiskey Jack, I guess. He also noted that — and from what I can gather in the latest press releases — the widths appear to be broader than what had been encountered before. So on that point, first, is this a trend you've continued to see? And second, did it get factored into the latest resource update?

Sylvain Guérard

executive
#63

Yes, to answer that, Bill — thank you. And you're correct regarding Grey Fox; we've had success intersecting mineralization. Our geological understanding and model for that area are very solid. Our efforts have concentrated on testing a Northeast-Southwest trending structure that carries quite high grade. We've also added a new zone, 147 Northeast. You can see it on the slide — it's a discovery we made in 2018 and have been pushing forward, and roughly 100,000 ounces of new ounces have been found right in the middle of this Grey Fox area. Beyond that, we've also been making progress on many trends or structures, and the main ones, again, appear on the slide. Our drill success rate is high. So we're confident that additional drilling will bring additional success, and we'll keep growing the resource, provided there's further investment. Right now, we sit at 620,000 ounces of gold, and that's an indicated category only. No inferred material is included there, and the grade is 7.2 grams per tonne, which is quite good. As I said, a portion of the mineralization reaches surface. So we've reached a point where we could potentially drive and go both simple, or possibly in time pursue open pit mining there. So we regard Grey Fox as quite a key asset, on top of what we hold across the rest of the property at Black Fox and Froome. But at present, this is highly exciting, yet there's already a significant resource defined there; and as I noted, probably good enough to move ahead with permitting and studies to determine the best way forward. And alongside that, we're quite excited about Stock, using the old mine to quickly fast track and reactivate, and really trying to define what we're dealing with at the Stock West discovery. This is a zone that was never ever touched or drilled in the past. It was first drilled in the middle of this summer. The grade is good, thickness is good. This style of mineralization is quite favorable, since it contains high-grade material within those broad 5-gram average intercepts, so at present we regard it as likely the most thrilling new find within our Timmins complex.

Analyst

analyst
#64

Right. And when it comes to costs, would that be roughly comparable to Froome, I suppose, for getting that done? Or do you figure it would come in at a much cheaper price than, say, Grey Fox, when it comes to remediating the Stock property? Is that the early ballpark, the way you'd look at it?

Sylvain Guérard

executive
#65

I might hand that one over to Chris or Rob.

Rob McEwen

executive
#66

Bill, it's still early. We don't have a good fix on the numbers yet.

Analyst

analyst
#67

Okay. My other question concerned Black Fox. Based on the press release you put out yesterday or this morning, it seems some areas were dropped from the resource or reserve estimate since they couldn't be accessed. And could you — it looks like — I was somewhat surprised, considering the drill intercepts you had along the West, that you didn't see a bit larger growth; but could you shed some light on how much was removed and how much was added? My guess is it's probably in your reserve report, but I couldn't find it quickly.

Sylvain Guérard

executive
#68

Yes, we'll check that number. Chris, perhaps you'd like to discuss those ounces that can't be mined.

Chris Stewart

executive
#69

Yeah.

Sylvain Guérard

executive
#70

As for the resource growth picking up, the problem we ran into was being able to drill further on the mine's west side. Proper drilling platforms weren't available to us. Today they are, and we're putting additional holes into the west as well as the depth extension. Hopefully that helps us keep adding to and growing the resource.

Chris Stewart

executive
#71

Yeah. So regarding...

Analyst

analyst
#72

My apologies, please continue.

Chris Stewart

executive
#73

No, you go ahead.

Analyst

analyst
#74

No. So, what you're asking — you mentioned I'd think — so my guess is you want to know — how many — roughly what number of ounces turned out to be unminable, that's really what the question was about — at Black Fox, I assume, heading into that latest reserve update?

Chris Stewart

executive
#75

Yes. No; what happened was we carried out an evaluation during 2019 of Black Fox's reserves, and roughly 16,000 ounces got pulled from the reserve since they were no longer minable; so we had zones — basically, once you went back and redid the calculations and examined what rehabilitation would cost. Today, at Black Fox, we've reached the point of mining, for want of a better way to put it, what I'd call odds and ends, scattered around the mine. There are a few primary zones that have reasonable strike length plus some fresh stopes, yet much of it involves us going around grabbing small stopes in various spots to collect the leftover ounces we'd essentially abandoned. Because the gold price has climbed, we can now make certain stopes economic; however, there are also quite a few stopes within the mine's old workings, whether from cave-ins, ground failures and such, that basically aren't worth pursuing — going after a stope holding 500 ounces doesn't pay off once you factor in all that labor; so we reassessed the whole thing and took those ounces out; and then — so the growth — so what you're really seeing is likely somewhat more growth than what you'd — it appears at first glance when you simply examine the figures, since we removed ounces, we put them back in. And if you think about it — we mined 35,000 ounces when all was said and done, our reserve has fallen to, I believe, 66 — roughly 65. So we did lose some, but we're adding it back; so the Western Flank, where we've enjoyed plenty of drilling success, as Sylvain noted, but we still need to boost the density, secure the right drill platforms to drill it correctly, which are now in place; we put in hard work on that during the latter half of 2019. So the exploration team now actually has proper drill stations to be drilling out — to drill roughly perpendicular to the ore body, letting us obtain solid results. But that's what we're focused on right now, essentially attempting to expand that, and an update will come out of 2020. And with the success achieved so far, we're hopeful we can put additional ounces back in even as we mine 35,000, 40,000 ounces this year.

Analyst

analyst
#76

All right. And considering how crucial Black Fox has become for the operations right now, would you think about putting out something like a reserve update partway through the year?

Chris Stewart

executive
#77

I'd tell you there are many things that play into that. Once again, with coronavirus and the fact that at some point we're going to have to halt our operations, it's quite difficult to provide much detail there. Certainly, as matters move forward, should we achieve the drill results from the bit, obtain the footage, and have all the pieces fall into place, we will definitely do our best to keep everyone informed about where we stand with Black Fox, no question, since indeed it currently serves as our sole source of production from the Timmins camp, so...

Analyst

analyst
#78

Yes. And just one more brief thing before we wrap up. I'm aware that with the Fenix Project, there has been — getting that study released. I'm aware there's been a bit of trouble with it. On that front, is it still expected for, I suppose, Q1 or the first half of this year?

Chris Stewart

executive
#79

Yes. The feasibility study has been finished, and its results don't differ meaningfully from those of the PDAC; so at present, if building isn't going to happen, then publishing it at this point doesn't offer much advantage, so...

Analyst

analyst
#80

Alright, that works. I simply wanted to express my appreciation once more for arranging this call. As a brief additional point, I'd also suggest that — considering you won't be attending any conferences, and there likely aren't any happening — I believe everyone gained considerable insight from the December drilling update. I'm not sure if you're planning something similar, but having one each quarter would be very much appreciated, until — since my assumption is that public communication will be diminished due to the availability; still, I'd definitely prefer to receive more updates rather than fewer, if that's something you could possibly arrange, it would be very much appreciated. But many thanks.

Rob McEwen

executive
#81

Thank you for that suggestion, Bill. Thank you for your questions.

Shareholder

analyst
#82

I've been following this for a long time, ever since I made my first purchase when you assumed control of the company, Mr. McEwen, and I'm grateful for what you've done. So my questions aren't about any of the mining details, since my grasp of that subject isn't as strong as it ought to be. What I mainly want to ask about is where the share price stands at this moment. The New York Stock Exchange enforces a $1 threshold for remaining listed, right?

Rob McEwen

executive
#83

Yes, that's right.

Shareholder

analyst
#84

What kind of duration are we talking about there?

Rob McEwen

executive
#85

Recent events could alter that, though typically a notification arrives once your shares have stayed beneath a given threshold for some set stretch. Should your stock...

Shareholder

analyst
#86

All right. So here's what I'm asking: assuming we get to that stage, do you have any sense of whether a reverse split of the stock would be something you'd pursue? I'm asking because I've seen how reverse split stocks have played out historically and what some companies have chosen to do. Does that appear anywhere among your plans? Is it something under consideration? Or can you not disclose what you intend regarding that, since...

Rob McEwen

executive
#87

We've been under $1 lately. My hope is that we don't remain at that level. That said, should there be 30 days in a row under $1, the New York Stock Exchange would let you know they'd prefer you off the exchange. And — even so, you get 6 months to fix that.

Shareholder

analyst
#88

All right, that's clear to me now. There are 6 months available for us to fix this. What I want to know is how you intend to fix it, since the way things look with the economy and this virus situation and all that's happening, frankly, I don't see McEwen stock getting above $1 anytime soon. It's likely sitting near the $0.75 level, and that's roughly where it has been stuck for some time. Nobody is putting money in, and that's not a knock against you or the business, it's simply how things are. Folks are just pulling their money out or fleeing; that's the reason my guess is the share price likely won't hit that dollar mark short term, although ideally it will down the road. So my question, once more, is whether you've factored that in regarding what you might have in mind to either remain on the New York Stock Exchange or whatever other choice exists at that moment?

Rob McEwen

executive
#89

Well, staying on the New York Stock Exchange is always what we aim for. Only lately did we fall under $1 during this year. The New York Stock Exchange hasn't sent us any notice. So — and doing a share consolidation is something we'd only turn to as a final option. And we — just to give a little background, since you're a shareholder who's been with us a long time, you may recall we got — back in 2015, when the gold share market completely collapsed and reached its lowest point, we dropped under $1 and didn't remain there, and we met the New York requirements needed to keep our listing on the exchange. So — and right now I don't hold your view that we'll remain under $1.

Shareholder

analyst
#90

I certainly hope your prediction pans out. Still, at this moment I can't see anyone making purchases, and for the short term ahead, I can't see them making purchases either.

Rob McEwen

executive
#91

On your point about the immediate future, I'd share that view — everyone's attention is fixed on coronavirus, on staying clear of it, and on the financial fallout from it. Yet authorities across the globe are committing enormous sums to inject big amounts of money into the system and to lower interest rates. They're striving to make sure the harm being endured at present gets softened; and from where I sit, that's causing their balance sheets to appear more and more troubled. So...

Shareholder

analyst
#92

Yeah, I get how injecting capital into the system functions. I'm not really interested in grasping every detail from all those gold reports I keep seeing in here whenever I tune into this call, but I do know quite well how money entering the system operates. I've just got one more thing to ask, since I didn't catch any mention at all today regarding Los Azules, which, in my view, is — based on everything I've reviewed, is — I still consider it a highly important asset, yet not a single word about it came up today. Is there any update on that?

Rob McEwen

executive
#93

No. Copper's price has fallen to $2.40. We're aiming to build a road to the site, a different route that would provide us access for 12 months instead of the 4 months — 4 to 5 months — we have now. Or — some work will get done on that road this year to provide the access. To me, that's a key piece of pushing this forward. Argentina is still working out what direction it wants to take; it's dealing with high inflation; a new government was recently installed there. They'd like to encourage mining. It's just too bad at the moment that base metals face a great deal of pressure, and the steps they've taken have driven away a lot of capital investment — foreign capital investment in their nation.

Rob McEwen

executive
#94

Thanks, operator. I simply want to pass along a note — my hope is that all of you remain in good health at this moment. I appreciate it a lot.

Operator

operator
#95

Everyone, that wraps up the call for today. We appreciate your joining us, and you're free to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete McEwen Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to McEwen Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in McEwen Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.