McEwen Inc. (MUX) Earnings Call Transcript & Summary
May 19, 2020
Earnings Call Speaker Segments
Rob McEwen
executiveThank you, operator. Good morning to all of you who hold shares in our company, ladies and gentlemen. More than 2 months have passed since the World Health Organization labeled the COVID-19 virus a global pandemic. Beginning in late March and continuing into early April, our operations were shut down on a temporary basis so that every one of our employees could be protected, in line with restrictions the government put in place. I am pleased to report that not a single one of our employees, nor any employees of our contractors, has caught the virus. Partly, we hope this outcome stems from how quickly we acted and the extensive measures we implemented. Starting today, Black Fox is back to regular operations, and Gold Bar is starting to increase its activities, focusing on preparing for production. Because of government restrictions, our San José mine is operating at half its capacity, and our El Gallo mine is limited to residual reach. We expect those government restrictions to be lifted in June. Now, let's discuss Gold Bar. Last year was a disaster. I know, and I'm sure you wish, that our problems would be well behind us, but this year we've taken a significant hit. In this quarter, we're reporting a very large noncash write-down of our Gold Bar Mine. The root cause here is an updated geological model. It reduced both the tonnage and the structural read of the orebody. We had counted on this mine being a flagship holding. Instead, up to now, it is plainly a massive blunder. A lot of skilled people are on our payroll, and outside technical advisers likewise weighed in, and the choices they made piled up and produced the situation we face now. Shutting the site and declaring it a terrible, value-destroying call is not something we are prepared to do, and there are multiple reasons why. In our view, there is room to make the operation better, bring expenses down, and also delineate further resources by exploring. Later in this presentation, Peter and Sylvain will each address those points. Now, let's go over how we did financially this quarter. To start, looking at where we stood on liquidity when Q1 wrapped up: liquid assets came in at $31 million, down from $46.5 million at year-end. Working capital stood at $25.3 million. That said, our projections show working capital dropping under the threshold our debt covenants demand. Because of that, we're looking at a number of options for refinancing so we can extend and amend the terms on our $50 million debt. Importantly, we already have an alternative financing arrangement lined up, and it tackles the exposure that a possible working capital shortfall would create. Our auditors have inserted going concern wording into our financial statements, and you'll see that reflected in our Q1 10-K report. If oil stays at today's price, and assuming we successfully completed the debt refinancing along with the amendment that pushed out the turn—meaning the extended churn—then in our view the cash on hand is enough to keep the company funded all the way through 2020. The single biggest factor hitting both our balance sheet and our income statement is the impairment taken on the Gold Bar Mine. As we noted previously, this impairment arose from changes made to that mine's resource estimate. The finance group, the auditors, and independent real estate valuers — all that information got pulled together, and a recoverability assessment was performed using discounted cash flow, with a 9% discount rate applied; it also depends on a long-term assumption for gold at $1,430 per ounce, which frankly is hard for me to swallow. What came out of it was that the carrying value needed to come down, so we're recording a noncash impairment, reducing plant and equipment as well as annual property interest by $83.8 million in Q1. When you factor in that impairment alongside $6.3 million spent on exploration, certain projects, and G&A, our consolidated net loss for Q1 totaled $89.2 million, which works out to $0.25 per share. If you take the impairment out of the picture, the net loss comes to $15.4 million, or $0.04 per share. At this point I want to welcome Peter Mah, our new Chief Operating Officer, who joined the company on April 2. Peter and I worked together in the past at Gold Corp. He brings a great deal of accomplishment as an engineering executive, he's an advocate for innovation, he likes to challenge the way things have always been done, and I have to say that over these last six weeks he has been pushing ahead at full speed, putting together strategies that we believe will turn McEwen Mining into a robust performer. I'll hand things over to Peter now to carry on with the presentations.
Peter Mah
executiveThanks, Rob. It’s great to be back working with you, and I’m thrilled about coming on board at McEwen Mining. There’s a lot of promise ahead for this company. Sure, we’ve got certain operational hurdles to clear in the short term, but we also have an outstanding set of resources and discoveries that give us room to expand. Before I get into the update on operations and projects, let me tell you a bit about my own history and how that background fits the difficulties and possibilities here at McEwen Mining. My training is as an engineer, focused on mining and mineral processing, and I hold a master’s degree in rock mechanics for both open pit and underground work. Across the last 30 years, I’ve served as an engineer, a supervisor, a manager, and an executive in open pit and underground operations. My career covers feasibilities, building new mines, expansions, and a turnaround. I also spent nine years at the Red Lake Mine in a range of roles. From my time as Mine General Manager at the Victor Diamond Mine, I learned how crucial it is to blend difficult clay rich ores and to have material handling systems built to maximize processing efficiencies and throughput. At the Musselwhite Mine, gains in transverse open stopeing and conveying will help us move toward production at our new Froome project. Froome made headway on ramp development during the first quarter of 2020, and the initial store is expected to arrive in the fourth quarter of 2021. At a resource grade of 5 grams per ton, the firm deposit ought to provide two to three years of mill feed through a productive, low cost transfer approach using open stope mining. Now looking at how things are advancing at the Black Fox complex: the high grade mineralization found at the Grey Fox project, Black Box Mine, and the Stock mine presents considerable room to grow by tapping spare capacity at the Stock mill. We are currently evaluating high grade open pits at the Grey Fox project. We expect to secure permits during the second quarter of 2020, and that process ought to run about 24 months. In addition to the open pits, we're also evaluating underground alternatives. Grey Fox ought to become a long-life cornerstone asset for us. We've already obtained approval to dewater the stock shaft, and we're assessing the choices and expenses involved in getting back into the mine through that existing shaft. To advance this promising discovery, we need to carry out resource definition drilling. The high-grade intercepts at stock use are likewise heartening, and there's considerable upside for mining underground, open pit, or both. During the first quarter, we accelerated lateral development at Black Fox Mine, which expanded the number of working faces and opened access to additional stoping zones on the western portion of the site. Our other initiatives for lowering costs and lifting productivity encompass less stope dilution by way of better drill control and capable through trials, exploration and mining concentrated more heavily on the mine's upper section so that haulage expenses come down, optimized ground control, fewer rehabilitation requirements, and faster development rates. Turning to Nevada: the numbers from Gold Bar Mine fell short of what we hoped for. At the gold pick deposit, we expect contained ounces to drop by about 25% to 35%. Work is underway on updated drilling resource modeling and figuring out the strongest business case moving forward, with completion targeted for early Q3. We are looking into the main causes behind higher costs and weaker performance in 2019 so we can find better solutions. Among the areas under review for enhancement are definition drilling of our resource reserve to boost mine planning delivery, stronger stockpile management and blending, lower unit mining costs and higher productivities through a dispatch system, evaluation of run-a-mine heap leaching, and better practices for grade ore and blast control. During April, the mine began a return-to-operations phase that included maintenance work, cleaning up the site, and limited stripping to reach the next drill-ready ore at west pick, along with processing ore from stockpiles. Management is adjusting operational plans, so the remaining ore remains on hold. At Gold Bar South, we're currently in the permitting stage, and we expect production to begin in the second half of 2021; ongoing metallurgical work indicates favorable recoveries exceeding 70%, plus the possibility of run-of-mine heap leaching. The mineralization starts at surface, and we plan exploration to target the extensions; in Mexico, residual leaching continues to produce gold at our El Gallo mine. According to the Phoenix project study, the economics look robust, and our plan is to wrap up that study during the latter half of 2020. Over at the San José joint venture mine we operate in Argentina, output remains capped at half of normal levels owing to travel limits imposed by the government. At this point I'll pass things over to Sylvain, who will take you through the exploration update.
Sylvain Guerard
executiveThanks, Peter. Over the past couple of weeks, our exploration efforts have centered on three assets: Black Fox and Stock in Ontario, plus Gold Bar in Nevada. Throughout this period, thanks to how seriously we take exploration, the results we achieved clearly demonstrate the strong quality of these projects. Drilling has moved us quickly toward building a discovery process, which is helping grow our resources and shape an impressive pipeline for project development. Let me walk through some of the main highlights, beginning in Nevada. At the Gold Bar Mine, when mining kicked off at Gold Pick West, grades and tonnage came in below what we'd anticipated, so we've revised the resource model to place greater weight on the geological and structural controls of the mineralization, which the open pit now exposes more clearly. To support that model review and reduce near-term mining risk, we put together an in-pit drill program using both RC (reverse circulation) and core drilling. That program got underway in late March, and roughly 15,000 meters have been finished so far during Q2. The results, which you can see on the slide, are verifying meaningful gold mineralization across the area in question and will help us validate and strengthen the model. Notable drill results are defining, first, in-pit mineralization that lowers mining risk, with intercepts like 5 grams across 64 feet, including 11 grams per tonne across 70 feet and 3.4% across 90 feet. We also have strong intersections below the updated pits: 2.9 grams per tonne across 82 feet, 1.2 across 144 feet, and 1.7 grams per tonne gold across 225 feet, along with the potential to push mineralization further to the southwest of Gold Pick, where we have an intersection of 0.9 grams per tonne gold across 120 feet beyond the pit boundary. An updated resource estimate drawing on recent pit mapping and all the new drilling data, together with a revised mine plan, should be finished by Q2. During 2019, significant drilling at the Gold Bar South deposit strengthened our geological understanding and boosted confidence in the resource at this quality satellite deposit near the main Gold Bar operation. The potential to expand the Gold Bar South resource, which stands at 63,000 ounces measured and indicated, remains strong, and a drill program set to begin later in Q2 will target three main areas. First, the southern extension of the deposit, which is open to further drilling — that area has returned significant results, as this slide shows. Second, the northern part of the deposit, which has only been partially tested. And finally, the northeast-southwest structures that control the higher-grade mineralization. Turning to Timmins now, at Black Fox Mine, we're concentrating on resource and reserve growth on the western portion of the operation, targeting depths between 300 and roughly 700 meters. We've cut multiple encouraging intersections there, among them high-grade pits characteristic of Black Fox mineralization, which points to possible growth across those target zones. The standout recent hit, for example, 79 grams per tonne gold across 2.9 meters, along with other high-grade pits, appears in the figure, where yellow markings denote 2020 drilling results. Over at Grey Fox, we're happy to report that the mineral resource estimate for the Grey Fox deposit has been refreshed, incorporating exploration drilling finished in late 2019. That revised estimate held 888,000 gold ounces grading 7.1 grams per tonne gold in the Indicated category, plus 173,000 gold ounces at 6.6 grams per tonne in the Inferred category — gains of 43% and 30% respectively versus the earlier estimate. Grey Fox's gold mineralized system is extensive, spanning 1.5 kilometers by 1.5 kilometers, and consists of five separate deposits sitting on our Black Fox property, 2.25 kilometers southeast of the mine. We see excellent potential to expand the Grey Fox resource. Both open pit and underground mining scenarios are under evaluation for possibly developing the Grey Fox deposit. Further details on those evaluations will come later in 2020. At the Stock property, our exploration targets the 3-kilometer trend, which reflects a robust gold system encompassing the Stock mine and newly identified zones of mineralization. The key highlight from our 2019 program is the discovery of the significant use on the organization at Stock West; altogether 31 drill holes have been finished in that area. The gold mineralization ties to quartz veining and <<inaudible>> pyrrhotite hosted within coarse-grained clastic rock. Across those intersections, the average runs about 5 grams per tonne gold over widths between 15 and 20 meters, occurring in an area measuring 265 meters along strike and 200 meters vertically. This new mineralized zone sits under 350 meters from existing underground development at the mine and inside a kilometer west of our mill. Stock West remains open in every direction, and our exploration program is built to deliver an initial mineral resource estimate and also to test how far the mineralization extends, so we can gauge the discovery's potential size. Our exploration work at Stock has produced results fast, with the first infra resource at Stock East in late 2018, followed by an upgrade to the indicated resource category at the close of 2019. Stock East is a shallow mineralized zone of 121,000 gold ounces located within one kilometer east of our processing mill. During 2019, our exploration efforts produced a number of the strongest intercepts encountered to date in the East zone, among them 63.6 grams per tonne across 6.2 meters and 34.7 grams per tonne across 6.5 meters, which point toward possible shoots. At the historic Stock mine, we have shown the gold mineralizing system continues at depth below the old workings, with a deep intercept of 27 grams per tonne gold across 7 meters, including 0.8 meters running 300 grams per tonne gold. I prefer — that's roughly 900 meters down. In closing, I would say we sit in a good position to continue creating value ahead, building on the solid exploration base we have put in place in payments. Over just 2 years, we have built a robust exploration pipeline spanning target delineation and drill testing through to resource estimation. Our success rate on deals keeps climbing. Momentum is strongly positive, and we stay focused on a small number of high-quality targets, among them new discoveries displaying outstanding upside and development potential at Stock West and Grey Fox. In Nevada, at Gold Bar, mining at the Gold Pick deposit exposed a geological filling and control of the gold mineralization unlike what underpinned our feasibility study. Armed with this fresh grasp of the geological setting, our in-house technical group thinks additional gold remains to be discovered on and around our highly prospective, district-scale Gold Bar property; that brings our presentation to a close. We will now take questions. Thank you.
Rob McEwen
executiveThank you, Sylvain. Operators, please open the session for questions.
Jake Sekelsky
analystAppreciate you taking my questions, and I hope everyone is doing well. It appears that activity at Grey Fox is moving along quite nicely. I mean, it's encouraging to watch the resource grow there. Could you share any detail about the environmental studies and permitting efforts that may be required as you move toward adding it to the mine plan?
Rob McEwen
executiveCertainly. I'll simply have Peter step in for that one.
Peter Mah
executiveYes; so basically, every one of our AFEs is written up in draft and prepared for sign-off on a range of activities — baseline work, handling of water, water-related studies, and how the Creek shifts as our North pit and South pit, the ones we intend to mine through — so that's the kind of initial baseline data and the crafting of the project description.
Jake Sekelsky
analystAll right. And considering the operating environment we find ourselves in at the moment with the pandemic, have you noticed that process slowing down at all, or?
Peter Mah
executiveNo, in fact we haven't observed any effects on it. We've all been working virtually and interacting with our consultants via the RFP process and the different departments. So no real impact has shown up there.
Jake Sekelsky
analystAll right, that's useful. Then, over at Gold Bar, it seems like the work right now centers on input drilling at Gold Pick along with some stripping. I'm just attempting to understand what's budgeted for those things in Q2 and afterward. Can you share anything about that?
Peter Mah
executiveNo, not at this point. Like I said, we're assessing what lies ahead in terms of plans, and we'll present that. And that will be at the close of Q2, at the start of Q3, as I mentioned.
Jake Sekelsky
analystAlright, that's reasonable; nothing else from me. Appreciate it once more.
Bhakti Pavani
analystHello everyone. Thanks for giving me the chance to ask. I'd like to begin with Gold Bar — if I heard you correctly, roughly 15,000 meters of drilling had been finished at Golden Pick. I just wanted to clarify: in your view, is that amount of drilling adequate to release a revised resource, or are there plans to continue drilling and reduce risk on the deposit?
Rob McEwen
executiveSylvain, do you want to take those questions?
Sylvain Guerard
executiveAbsolutely, hi Bhakti, good morning. So up to this point, our drilling has been concentrated on the West Pick portion of the Gold Bar deposit, since that's where we're currently seeing near-term mining. Our aim is to reduce risk, and ideally we also want to recover those additional ounces that right now have been lost or are falling under the updated pit scenarios, plus we're simultaneously testing extensions surrounding the pit; for those reasons and other matters, this drilling is essential, and the plan is to move over to Gold Bar South, where we see solid upside for growing the resource there, and then return to Gold Bar for follow-up drilling, which includes the East side of the deposit. At the close of Q2, we'll have a resource update, and it will be based on the revised interpretation of the structural setting, drawing as well on all the historical and new drilling information available. So, answering your question, this is crucial information that will feed into a new resource, which would be finished by the end of Q2.
Bhakti Pavani
analystAlright, thanks. I have one additional item regarding Gold Bar. In your prepared comments, you noted that stripping has begun gradually and that stockpiles are being processed at present. At this point, how much material do you have in stockpiles at the site?
Rob McEwen
executivePeter, would you take that one?
Peter Mah
executiveRight, so right before the COVID shutdown, we still had a bit of stockpiled material sitting at under 60,000 tonnes, and that's going to be consumed over the coming 4 or 5 days. On top of that, there's a separate pile of broken ore at West Pick, roughly 60,000 tonnes, which we're thinking about putting through the mill. That said, no decision has been made on it as of yet.
Bhakti Pavani
analystIs there any chance you could give us a bit of detail regarding that grade?
Peter Mah
executiveMy apologies — I wasn't able to catch what you asked.
Bhakti Pavani
analystI asked whether you might be able to give a bit more detail about the grade present in the broken ore stockpile.
Peter Mah
executiveThat's not something I can recall right now. But yeah, unfortunately, I don't have that information to give you.
Bhakti Pavani
analystThat's fine. Turning to Black Fox, your results at Grey Fox are quite strong, and the drilling results displayed on the slides look quite strong too. So right now you're still working out the access plan for Froome — is that still on schedule, and given the drill results you have so far, what does that mean for Black Fox? I mean, do you expect the mine life at Black Fox to grow, or do you think Froome is going to take the place of the Black Fox mine during the next two years?
Peter Mah
executiveYes. So the decline is roughly — in a straight line, approximately 160 meters in, and we still have about 800 meters before reaching the ore. The timeline I mentioned before factors in where the decline stands right now and aims for first production in Q4 2021. The plan is that we will hopefully extend, on this West Flank, the new discoveries that Sylvain's team and exploration have identified in the Western area of Black Fox, which would in fact also extend Black Fox mining itself; but at the outset that was the plan. Black Fox would stop mining and Froome would begin the extra development I referred to before, targeting part of that West Flank area where we're drilling now and getting good success on hits. So, what I expect is that we'll also see some improvement on the Black Fox mine side.
Bhakti Pavani
analystThat sounds excellent. Thanks. Turning to the advanced projects: roughly a $1 million charge showed up in Q2 tied to Canada, and my guess is that it concerns the actual development work for Froome. My question is, what amount of development cost is still left for Froome at this stage? Then my second question concerns the $1 million cost in Mexico, which relates to Project Phoenix. So how much of that expense has yet to be incurred in Mexico at this point?
Rob McEwen
executiveMeri, could I ask you to give us those figures, please.
Meri Verli
executiveAlright, regarding Froome, we've projected roughly another $10 million to $10.5 million across the remainder of the year; and then for Phoenix, just so you're aware, that figure also accounts for property holding costs. So, a comparable amount could show up over the rest of the year.
Bhakti Pavani
analystso will that run about $1 million each quarter?
Meri Verli
executiveno, it isn't per quarter. It isn't per quarter. It's, like, something along those lines, I believe it lands in the year's second half; so roughly $1 million more, and there could be a few genuinely minor amounts.
Bhakti Pavani
analystUnderstood, that's great. Thanks a lot. That's all I had, everyone.
Rob McEwen
executiveThanks, Bhakti. Let's take the next question.
Rob McEwen
executiveHey, Adam.
Adam Graf
analystHi everyone. I appreciate you letting me join. Rob, I just have one question about the broad graphical development plan you all walked us through previously. Is there anything new on that front regarding timing? I believe you all said something about the possibility of developing Western Black Fox. Any news on that whole coordinated plan?
Rob McEwen
executiveNothing new on timing. No, it remains a couple of years away, with production being possible.
Adam Graf
analystThen, regarding how things are progressing at Stock West, are you waiting until you've broken through at Froome, or what does the plan look like there — just moving gradually toward Stock West?
Rob McEwen
executivePeter, would you like to speak to that?
Peter Mah
executiveAffirmative. At that location, we've got roughly 250,000 ounces in mineral inventory that we're aiming for, and that's sufficient for us to move ahead with development, though we'd prefer to complete better resource definition drilling beforehand. Also, that permit I brought up — the one we got to dewater the shaft, the main shaft at Stock — represents another possibility we're reviewing, one that might link up with that decline as well as any potential remnant mining at Stock mine. So while more drilling is needed, we're weighing the expenses and the trade-offs involved in determining the optimal approach for that.
Adam Graf
analystIs it possible for you to access the Stock mine and carry out remnant mining there before permits for Grey Fox are secured?
Peter Mah
executiveIndeed. The Stock mine has its permits in place, and like I said, we currently hold authorization to dewater. That is precisely the chance we are looking into at this early point. We're obtaining some quotes regarding what dewatering the shaft would involve and bringing it back as either a production shaft or an exploration shaft; so over the coming quarter I'll be working through some of those assessments.
Adam Graf
analystAnd would you be considering that before you start building things out — or at minimum before you move across to Stock West for the underground test mining, the structural confirmation, and everything else?
Peter Mah
executiveThat could happen, and as you're likely aware from what we've shared previously, the development program for Stock West runs roughly 2.5 kilometers, which is fairly lengthy. So we're examining what options exist. If there were a way to get more material to the mill faster and open up access for drilling — particularly those deeper targets Sylvain brought up — it would help us to get onto some of the lower levels of the mine that already exists and set up drill platforms in those spots. So those are a few of the things we're reviewing, and ideally you can put forward some compelling possibilities for how that mine might be developed.
Adam Graf
analystIf you decided to develop an open pit at Stock East, would that require extra permits? And if it wouldn't, at roughly what — I realize the grade is lower, but at roughly what gold price would that ore suddenly start to look appealing, given how much spare capacity you have at the mill?
Peter Mah
executiveCorrect. Extra permits would be required. We haven't moved that forward so far, even though a fairly attractive resource sits there. It's close to some water and a river in certain low lying spots, and it also stays open further toward the east and at depth. So we don't yet know how big it is, which we'd need before pursuing a permit, and on top of that we've encountered some very high-grade intersections and sheets; so there's a choice to weigh between going underground and going with a pit, plus more drilling before making that call.
Adam Graf
analystOkay, that's excellent. I really appreciate it.
Rob McEwen
executiveThanks, Adam.
Mike Kozak
analystHey everyone. Thanks for having me — hello there. So, when I look at the balance sheet right now, the Gold Bar challenge is going to have an effect on the company's cash flows in the near term. I mean, how much room do you have to trim some discretionary spending? And also, are you actually considering reducing things such as exploration G&A and sustaining CapEx? And if that's the case, what sort of amount are we talking about?
Rob McEwen
executiveMy assumption is that the gold price we see today holds steady or moves up, and that we're able to refinance the terms on our debt; under those conditions, we ought to have enough capital to make it through the year. We had been contemplating roughly $5 million of exploration at Black Fox as well as Gold Bar, plus around $1 million in Mexico, and once pricing shifts, that's when we adjust our plans with them.
Mike Kozak
analystUnderstood. And I believe the initial principal repayments on that debt kicked off, I think, in Q3. So, presumably, you're looking to refinance that debt, I guess over the next few months?
Rob McEwen
executiveYes. That's right.
Mike Kozak
analystAlright, understood, I appreciate it. That's all I had.
Rob McEwen
executiveFine, sounds good. Let's take the following question.
Rob McEwen
executiveHi, Heiko.
Heiko Ihle
analystHi — my name was about to be called, then it got passed over. I appreciate you all fielding my questions. I hope that each person on this call, along with their families, remains safe, and I'm somewhat thankful that you're still putting more than $6 million toward exploration, considering what these assets could deliver over a longer horizon. This is partly a follow-up to something Jake asked before. Regarding what Sylvain said, you directed a fair amount of spending toward pre-stripping at the Gold Pick West pit. Should we anticipate that kind of outlay during Q2 and Q3? And on top of that, what's the overall extent of the opportunity for mining in that region and basically relocating operations somewhere else?
Rob McEwen
executivePeter, would you like to address that?
Peter Mah
executiveOkay, we recognize that West pit is a profitable operation. So we're simply trying to determine the optimal approach to move ahead with the mine and then implement enhancements to overall costs and productivities prior to restarting. After we receive the updated resource model that Sylvain referred to, we will redo our pit optimization for an improved perspective on strip. But right now, there isn't anything significant regarding stripping that differs from before, and what was the second portion of your question?
Heiko Ihle
analystHow much — I believe you have a solid handle on this. What I mean is, it was — how much do you appear to be spending, and how much is available so that you might potentially postpone getting to mining at that location?
Peter Mah
executivePostpone the mining?
Heiko Ihle
analystJust shift it to a different location, then.
Peter Mah
executiveAh, and then target, say, Pick East or a similar option.
Heiko Ihle
analystRight.
Peter Mah
executiveYeah. What I mean is, we're directly above the Pick West ore body, and as we see it now, the plan is to extract Pick West first, then transition over to Pick East; however, there could be a chance to descend the mountain at that location and approach things in a way that differs from what was done before. So, as soon as the resource update comes out, we'll be evaluating those scenarios.
Heiko Ihle
analystUnderstood. Now, about that listing — I mean, nearly 90% of the volume you're doing sits on the NYSE. When I checked this morning, it was 4.2 million shares against a Toronto daily average of 480,000. Still, there's no question the listing matters a great deal. Could you talk us through any timelines you're able to share — at what point would you need to weigh something like a reverse split, or other alternatives, to keep the listing, given that a range of pool processes would come into play if you went with some of the harder options?
Rob McEwen
executiveCertainly. First off, a reverse split isn't something we intend to do. And the requirement to stay above $1 — the deadline for compliance hasn't been pushed out yet by the New York Stock Exchange, nor by those COVID virus issues; it now sits at early December. That gives us a decent runway on timing. You'd need to notify shareholders, so you'd likely have to start looking two months ahead of that — which puts you into early October.
Heiko Ihle
analystAlright, that's honestly a lot tighter than my expectation had been. I say that since, well, right now we're at 6.5 months, yet from what you're describing, 4 months remain for you to return, and presumably that really will take place.
Rob McEwen
executiveCorrect.
Heiko Ihle
analystSpeaking of that, could you take a stab at estimating what you'll save on G&A in Q2 and afterward, since travel and conferences have basically stopped? Might you consider shrinking your office space somewhat? How big a figure do you figure you can achieve with everyone telecommuting, and how long-lasting do you believe that is, please?
Rob McEwen
executiveWell, a lease was in place. When the lease on our office — the lease for our head office — runs out, I'm not certain. Based on what I've been able to learn, I mean, working from home part of the time is fine with people, but doing so constantly is not something they want. So an office presence remains necessary for us; we haven't looked into reducing our office footprint, even though that idea has been floated, given how comfortable people are becoming with remote work technology. We haven't — right now, I'm unable to provide a figure for Q2 or Q3 regarding what we could — the savings we may realize.
Heiko Ihle
analystThat's reasonable. Great. There's another person who grabbed a spot at the house — hopefully at some point we can all return to an office. Take care, everyone. Thanks.
Rob McEwen
executiveThanks, Heiko. Goodbye. On to the next question.
Rob McEwen
executiveHi there, John.
John Tumazos
analystMorning, Rob. I appreciate you taking my question. When it comes to that Gold Bar charge, did it eliminate the entire PP&E while leaving working capital untouched?
Rob McEwen
executiveMeri? Anything you'd like to add?
Meri Verli
executiveSure, absolutely. We still haven’t completed the final allocation of that charge between PP&E and mineral interest, to put it plainly. That said, we have established that the fair value of mineral corporate, or net assets if you prefer, comes to $47 million. At some point during Q2, we will divide it up and assign it.
John Tumazos
analystThanks. Rob, that matter concerning the bank covenants brings back memories of a training class I attended while I was a graduate student preparing commercial bank lending officers at Morgan Guaranty Trust Company.
Rob McEwen
executiveRight.
John Tumazos
analystAlso, someone by the name of Charleston Chatfield III is going to speak to us about relationship banking and about regaining the firestone account. I find myself somewhat puzzled that the lenders are fond enough of your business to extend credit, yet now, at what feels like a rather inconvenient moment, they are enforcing the covenants and have set off a going concern. Wouldn't it be far easier for them to simply charge a fee for waiving the covenant — banks do enjoy collecting fees — or to sit down with you in private and work out a remedy before this whole chain of events got triggered? Is it that the lenders are basically uneasy about your approach of putting together assets and drilling exploration? Or do they prefer the managers who left over the ones currently in place? Or are they merely attempting to get you to write a personal check for $50 million in order to settle the loan? It's just that the whole thing is a strange situation. And whatever comments you're able to offer, if you yourself grasp what's going on, I would value your perspective.
Rob McEwen
executiveSure. We're not — we have not breached the covenants on the loan for the first quarter. It's the second quarter that worries us, along with what comes after. The gap was set up with a three-year term, but with partial principal repayment beginning on the second anniversary. So that's the point where working capital problems begin for us. That — and it would come to roughly $2 million per month, or approximately $10 million across the year, mostly in impairment. They haven't — the lenders are worried, and they simply had this covenant requiring you to keep a minimum of $10 million in working capital at the close of each quarter. But we're only looking forward; and that's where the partial payment and the working capital clause led the auditors to state that there's a growing concern over the next 12 months. And we haven't reached the point of saying I should write a check; we have spoken with another party or two; and their creditors, I have half of that yet. Creditors put up 25 and I was another creditor for 25. So and I looked at it and said, "Well, I think we're looking to refinance; and if we can refinance, we seem to have some agreement at the moment that we could extend the term and lighten or light and extend the partial repayments. That's where we got. And as for that creditor in the half of the debt there just they like it, but they didn't expect nor did we the problems that we'd encountered with Gold Bar.
John Tumazos
analystI appreciate you clarifying that. That seven-gram-per-ton material at Grey Fox looks quite strong. But you'd have to do some development work to ramp into it, plus other logistics — dewatering, ventilation, the whole infrastructure needed to reach it. So how many quarters or years away is that seven-gram material from being processed through the mill?
Rob McEwen
executivePeter, do you want to take John's question?
Peter Mah
executiveRight, the resource only became available seven days ago, so for the news Sylvain just delivered, we haven’t yet refreshed either the open pit or the underground scenarios. That means I’m not in a position to comment on it at this point. What I can tell you, I believe, is that Gibson represents a promising new find — possibly one more open pit, or even a third, since we already have 147, the contact, and Gibson — and then we’ll examine how underground operations could be arranged around them, how the transition would work, and run those trade-offs to determine which option delivers the strongest margin and returns, and which mixtures of open pit and underground mining perform best. So there’s a fair amount of work still in front of us on that front.
John Tumazos
analystWould you say one year is needed to sort this out, followed by another 2 years before it's underway, or does it stretch beyond that?
Peter Mah
executiveNot at all — my guess is roughly half a year of effort, and the mine planning portion shouldn't require nearly as much time, though we're moving ahead with the remaining technical assessments, including the Grey Fox pit permits tied to the 147 and the contact, and we'll likely bring in, at the outset, an acceleration of the Gibson pit work and fold that into the project description. So the open pit comes first on our priority list; after that, we need to confirm how our footprint comes together and how the underground comes together alongside those pits, so that we aren't sterilizing good ore — there are still several trade-offs that have to occur — but the permitting for the open pits is something we're continuing to pursue.
John Tumazos
analystThis situation resembles a basketball matchup in which your best three-point shooter sits on the bench, given the NYSE listing rules inside the bank loan plus every one of those various strains on the business, that seven-gram material running through the mills, your three-pointer being whether you require that same basket?
Rob McEwen
executiveCorrect; that has us quite thrilled; the ore is tougher, yet we must stay somewhat disciplined regarding how we introduce it, in which amounts versus the mill's capacity. So those are additional elements of the trade-off and how everything combines. Alongside the remaining feed; but indeed, we are quite thrilled by it. I mean, extremely high-grade pits and highly appealing underground ore, and we will definitely be pursuing it as aggressively as possible.
John Tumazos
analystThank you.
Rob McEwen
executiveThanks, John. Next question?
Will Power
analystYes. Thanks for taking my call.
Rob McEwen
executiveHi, Bill.
Will Power
analystHello, Rob; I appreciate you taking my call today. There were a few things I wanted to ask about, though I suppose the initial one is this: you mentioned that at Gold Bar, the auditors applied a figure of 14, 30, or somewhere around there? My assumption is it doesn't sound as though they were applying future strip pricing down the road, or anything like that. So, have you calculated on your end, if the forward strip is considerably greater — I'm certain you know this — what the write-down would have come to, by any — or does it differ materially?
Rob McEwen
executiveIt likely would differ. To respond to what you asked, I don't think I examined any prices above 14, 30. They used long-range forecasts, and evidently, there's a — well, you've got Bank of America, $3 million, yet they peer past that and noted that analysts remained down near $1,400 moving forward.
Will Power
analystAll right. All right. So in terms of, they didn't — put simply, they were relying on analysts; what they weren't relying on was actual pricing in the futures market. That didn't appear to have any impact whatsoever.
Rob McEwen
executiveNo, no.
Will Power
analystIs this the standard method for taking write-downs? Or do they instead — the thing is, the reason I ask is that within 12 months, this marks the second instance where they sought to alter the accounting tied to the end of mine life in Mexico, plus they wanted to — as we discussed, they created a brand-new category to slot that into. And it looks like, through the use of analysts, it comes across as somewhat arbitrary rather than reflecting what the market's future outlook is signaling you to price it at?
Rob McEwen
executiveYeah. Personally, I likely would have chosen a higher price — that's my take on this different market, though.
Will Power
analystThat's okay. I — it just appears like it's somewhat when you — I suppose, for the — with other sectors, pricing is quite transparent and firmly set, be it Comex or something else. Anyway, to change the subject, regarding the Black Fox mine, during the previous quarter, your average grade came in at 4.58 while the process rate was 3.53, which represents a significant drop versus Q1 of the prior year, and yet you still managed to perform very strongly on cash costs. The all-in sustaining figure was in fact reduced. What was the reason it seemed to — how did you arrive at those figures? Please explain that if you can.
Rob McEwen
executiveWell, their operations are getting somewhat better. A number of issues arose during the first half of 2019 that are no longer happening. A crusher buyer came up. A flood happened after that, and neither of those things happened again. That's the reason costs are declining.
Will Power
analystAll right. And later in this year, do you anticipate getting back to a better grade? And I suppose, are there additional gains you can identify on the cost side, or at least further reductions in the cash costs?
Rob McEwen
executiveWell, we're expecting improved recoveries. At the mine, solution has been an issue, or else dilution stemming from mining along with ground control, and we're hoping we've got some ways in on that. Peter, would you like to chime in here?
Peter Mah
executiveYeah. Regarding the dilution <> that we're dealing with, it's tied to the falls and the hanging walls here. So I've had many discussions with the team about running capable thing trials and various methods to try reducing this start and onset, at least once it begins traveling up to that point, since that sort of thing has been a historical challenge, particularly in the mine's lower areas, the upper areas of the marketing in the West Flank, 300. These are new parts of the mine, which aren't near old remnant mining. And so that's another reason we're aiming in our development to gain access to new areas, which should help with the overall solution; but I'm not expecting yet.
Will Power
analystAlright, so from what you're describing, it seems like this is being managed and you anticipate better results on the — at minimum where grade is concerned moving ahead. Would that be a reasonable way to put it?
Rob McEwen
executiveThat's right, that's what we're aiming for, though in my view proving it out and refining it will require time. We see a solid chance to make improvements there.
Will Power
analystAll right, and that's my final question for today. Thanks for bearing with me, everyone. So as I go through what was put out at Grey Fox, regarding the Whiskey Jack discovery — or maybe I'm not sure if that fell under the discovery itself, but it seems like there's some — it didn't — there was no specific mention that it had been factored into the updated resource. So was the drilling at Whiskey Jack part of that, or is it something that will go in later?
Sylvain Guerard
executiveSure, I can take that one. Yes, Sylvain here, and those are good questions; and yes, Whiskey Jack does form part of this revised updated resource. For the first time, we've brought in Gibson, and Gibson sits within Grey Fox. It's located to the West, sitting in a different host rock. It's within a syenite. But what we now understand is that the structure lies in the vein that controls mineralization, cutting through all units from mafic volcanic to sediment to syenite, every rock type that could serve as a potential host. And in this updated resource, we've merged in the contact zone and we've added Whiskey Jack into it, so it now forms part of what appears as the contact zone in this revised resource. And as you're aware, we have spectacular results there — 53 grams over 7.4 meters at Whiskey Jack. It's a new discovery that's only just a starting point, but it will have to be incorporated into this resource.
Will Power
analystAll right, I really appreciate everything you've shared in response to our questions today.
Rob McEwen
executiveThanks, Bill.
Analyst
analystHello everyone. I appreciate you letting me ask a question. I have a handful of things I'd like to ask regarding Gold Bar. Since you mentioned that the mineralization at Gold Pick is subject to greater structural control, could you give us some broad guidance on how you anticipate this will affect mine grade, dilution, and strip ratio, at minimum for this year? I believe something was said about stripping being comparable, but any input on that would be useful.
Rob McEwen
executivePeter, would you like to address that?
Peter Mah
executiveRight, like I said, we need the resort update before we can give you those figures, and they'll be released near the close of the following quarter.
Analyst
analystAll right. Even if it's only in a general sense, could you say something about how the geometry looks — it's controlled more by structure than by bedding. Does that imply the zones are thinner and would need to be mined in a tighter way, or do you have any thoughts on that?
Rob McEwen
executiveYeah, the slide Sylvain presented with all the drill intercepts should give you a decent sense of it. The amount of waste development actually needed to reach West pit hasn't moved much; so we have — we'll have complete access to the — or a portion of the drilling results Sylvain brought up sit beyond the optimized pit shells we're working with now, so using the old intermodel. So we expect a number of those waste blocks to become part of West pit, or honestly I'm unable to say anything further until we look at that resource model in both the cones and then go through all of that.
Analyst
analystAll right. And perhaps as a quick follow-up on that point. Based on the decrease — or rather, I suppose, the expected drop in ounces, plus the remarks about it being structurally constrained, one gets the sense that the zones will have a different geometry than you originally expected, and in my mind that means narrower. Yet the drilling you presented includes some fairly wide intercepts. So I'm just curious whether you could assist me in squaring what you believe is happening in that situation?
Rob McEwen
executiveCorrect. Yes, indeed the actual, those three zones — the West, the Central, and the East — have not shifted very much. The drilling Sylvain brought up is verifying the mineralization in the West pit, and that area has been the main emphasis for near-term mining. Most of the ounces were shed in the write down within the — the area we refer to as the hump, and it concerns the stripping program that we relocated from the West pit in the direction of the East pit. I believe, so that might provide a bit more clarity on that. Sylvain, might you address that matter?
Sylvain Guerard
executiveRight, yeah — apologies, my line was muted. So, yeah, the way the mineralization is governed throughout has both a sweat-related graphic aspect and a structural aspect. It's controlled structurally along the correct stratigraphical bedding horizon, with the rock mineralized at that location. What differs greatly is how much weight gets assigned to bedding, or stratigraphic, control as opposed to structural control. That, naturally, has had an effect on how the model — the resource model — was put together previously. As we gain improved exposure to the bits, plus a great deal of detail arriving from the most recent hole and from mining, we develop a clearer definition of what's taking place. We began with Cabin; on the whole, reconciliation came out okay, but once we shifted to the West pit upper bench, fewer and fewer answers appeared, so we chose to return with drilling — not only drilling, but oriented core as well — to examine the rock more closely and gain a better grasp of how the immunization is controlled. The drilling conducted so far, taken together, indicates that gold exists there and grade exists there; naturally, as Peter mentioned, we must hold off for our revised resource update, along with whatever the revised mine plan turns out to be, founded on this global revision currently underway. And depending on those fresh submissions, or we'll find out what business, where things land regarding that Gold Bar.
Analyst
analystAll right. Could you also give us your thoughts on, say, the characteristics of those structures that appear to be carrying grade, compared with what you observed in the mineralization controlled by bedding?
Rob McEwen
executiveYeah, in fact there are far more structures than had been interpreted or understood before. The more we advance that formation, the more we come to see that the structural setting is complicated, which isn't automatically a negative, but it differs from how it was understood and interpreted, so we still have considerable width tied to structures, to multiple structures, with the intersection of structure producing a broader mineralized zone. The greatest effect we're observing is that the model itself would be extending less away from the structure than it previously did in portions of the most recent estimation.
Analyst
analystAll right, understood.
Rob McEwen
executiveIndeed, Mike; that caught us completely off guard. What I'm saying is the way they read the structure served as the basis for the feasibility study within the mine plan, and everything got constructed along those lines, and then that very same group showed up and, using the mining data, did this and says, Oh, well, it isn't spread out sideways. It's controlled more in a vertical direction. Much appreciated.
Analyst
analystYes. All right. Perhaps only one additional inquiry regarding Gold Bar. When I consider the total ounces that were put onto the pad and the — has it actually been generated, I arrive at an aggregate recovery rate of roughly 52% following slightly more than 12 months of leaching. Is that right? Also, could you speak to how that stacks up against the feasibility, and what your thinking is about recoveries moving forward for the project?
Rob McEwen
executivePeter, do you want to take that one? Peter has only been here since April?
Peter Mah
executiveSure, I'll give that a shot. From what I remember, we calculated this back in April, and it came out to roughly 55% recovered. So you're in the right ballpark there. Recovery has been happening more slowly than the FS had projected. What that means is you get a bigger delay, and reaching FS levels takes more time. Still, for the most part, the goal is to reach the FS level on a cumulative basis by the time the mine life ends. A shorter mine life does bring some effects, and clearly those effects are smaller each time; so once we revise this resource model along with the life of mine, we'll have a clearer picture; we've completed certain leaching tests together with Forte and are currently in the process of revising the recovery model so it captures the combined run-of-mine placement on the — and agglomerated, and up to now, our production has tracked those curves quite closely. So Forte's work is going to wrap up and finish in August, and by way of that study we're also going to take the newly updated model, which is going to incorporate a clay model along with a preg-robbing component for the carbonaceous material. All of that is going to be put into an economic assessment so we can determine the best net present value approach for agglomerated versus <<inaudible>> a hybrid of agglomerated and <<inaudible>>.
Analyst
analystAll right. At this point, do you have a sense of what is behind the gap between recovery and the original test work? Is the cause clay that has been put down on the pad, or carbonaceous material going in? Or could it be something different?
Rob McEwen
executiveIt was more than one factor. That is why, I believe, we have brought the model in-house and intend to develop those models and improve them using our in-pit mapping, so that we can — that is what I was drawing from blending. And regarding the segregation to address preg-robbing, correct, we do separate out all of the carbonaceous material. But during the early part of the build, some tonnes did get placed there. The exact amount I cannot remember, though it was a minor share of the area, and that has been factored into the model.
Analyst
analystAll right. Excellent. Yeah, I have nothing further. Thanks a lot, everyone.
Rob McEwen
executiveThanks, Mike. Let's take the next question.
Rob McEwen
executiveAppreciate it, operator. Thanks to all of you for being here with us. Keep well and take care. Thanks. Goodbye.
Operator
operatorAnd this concludes today’s conference call. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete McEwen Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to McEwen Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in McEwen Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.