McEwen Inc. (MUX) Earnings Call Transcript & Summary
May 10, 2021
Earnings Call Speaker Segments
Rob McEwen
executiveThanks, operator. Morning, everybody, and thanks for joining. I think we can all agree that 2020 proved to be an incredibly tough 12 months for this company. Yet 2021 has kicked off with a lot of positive momentum. First, our treasury is well funded. Second, the going concern qualification no longer appears in our financial statements. Third, our exploration efforts are delivering solid results, as you can see in today's press release. Fourth, mine lives and pinions in Nevada have been lengthened, and operations are now meeting our gold production targets, though plenty of work remains before we get our cost per ounce lower. Fifth, given how much better copper and silver prices have gotten over the past 12 months — more than doubling in each case — we have, within McEwen Mining, a silver company, QSource and Production, plus a very large copper deposit, Los Azules, and we're searching aggressively for the best ways to move that project forward. With that, I'd like to hand things over to Anna to discuss our financial operations, and after her comes Peter, and after him comes Steve. Anna, over to you.
Anna Ladd-Kruger
executiveThanks, Rob, and hello everyone. I'll quickly walk through our first-quarter results. Revenue for Q1 from gold and silver sales at properties we operate entirely came in at slightly less than $24 million. The average realized price was $17.63, versus Q1 2020, when we had $31 million in revenues at average realized prices of $15.91. We produced 30,600 gold equivalent ounces in Q1. The main drivers were lower output from the assets we wholly own, which Peter Mah, our COO, will go through in greater detail in a moment; we posted a net loss of $12.5 million, or $0.03 per share. That's against a net loss of $99.2 million, or $0.25 per share, in last year's Q1. The smaller net loss is tied to an $84 million impairment charge taken at Gold Bar during the comparable quarter a year ago; we also saw better results from our stake in the MSC San José mine during Q1 2021. As Rob mentioned, our treasury is full, and in the quarter we closed 2 equity financings. The first was a targeted raise of $12.7 million for Canadian development expenses. Those funds were raised specifically to develop our new Froome deposit, which forms part of the Fox Complex in Timmins, Ontario. The second was an equity financing with gross proceeds of $31.5 million. With both raises done, every one of our programs is now fully funded for 2021. On top of that, we collected $5 million in dividends during Q1 from our interest in the San José mine. We finished the quarter with $52.5 million in liquid assets, $81 million in current assets, and working capital that was positive at more than $35 million. Exploration has kept us very busy, with $5 million invested in Q1. The main emphasis was expanding the resource base at the Fox Complex; we also put $1.8 million into the Fox Complex expansion PEA and into our Fenix Project in Mexico. Steve McGibbon, our new Executive Vice President of Exploration, came aboard during Q1, and he'll share more specifics about our exploration program in a moment. We keep managing our operating margins by controlling capital expenditures and material contracts, while also aiming to bring down our G&A cost this year. We've also started putting management systems in place to streamline processes and capture additional efficiency. We anticipate that our financial performance, and particularly cost, will keep getting better through 2021 as we ramp up our free deposit toward commercial pricing in Q4. Because of that ramp-up and the ongoing PEA study, which will carry additional production and cost details, we still can't offer firm cost guidance. Beyond that, continuing variable restrictions responding to recent outbreaks of the new COVID-19 strains keep creating uncertainty for the mining industry. The company will update on costs as soon as it can, and in any case, not before our PEA study is released in late Q2. I'd like to hand things off at this point to our Chief Operating Officer, Peter Mah. Thanks.
Peter Mah
executiveThanks, Anna, and good morning, everyone. Our operations' turnaround keeps demonstrating encouraging indicators when it comes to enhancing delivery, lowering costs, and expanding output from a robust pipeline of resources and discoveries that we source organically from assets positioned strategically. In Q1, we achieved key milestones including feasibility studies at the Fenix Project in Mexico along with the update at the Gold Bar Mine in Nevada. We also hit a significant milestone at the Froome deposit, where the first ore was extracted during Q1, and right now, mining is advancing according to plan. Every operation generated production consistent with the results and what we anticipated. Output should rise throughout 2021 and reach 20% to 40% above 2020 levels. At the San José mine in Argentina, our attributable production from that mine came to 9,500 gold ounces plus 492,300 silver ounces, totaling 16,700 gold equivalent ounces. Total cash costs and all-in sustaining costs stood at $10.88 and $13.28 per GEO, respectively, and all of these compared favorably against the same period a year ago. Turning to Gold Bar in the U.S. That mine generated 7,400 gold equivalent ounces in Q1 with a total cash cost and all-in sustaining cost of $18.65 and $19.34 per GEO, respectively. Output represents a 19% decline versus the 9,100 GEOs generated in Q1 2020. Production suffered because of reduced mining and pressure availability stemming from COVID quarantines, which limited operators who were available, and winter weather that hindered mining, all of which led to lower gold production. We keep carrying out improvement initiatives at the Gold Bar Mine, and these involve enhancing contractor mining efficiencies while bringing in additional equipment to speed up production, potentially stacking more raw material to cut costs and boost throughput; and lastly, adding ounces to plan through exploration drilling at Ridge, Pick and Old Gold Bar mine deposits. Production during Q2 should exceed Q1 and, correspondingly, cost per ounce should decline. At the Fox Complex in Canada, we generated 5,200 GEOs in Q1 with a total cash cost and all-in sustaining of $12.62 and $15.60 per GEO, respectively. Mining at Black Fox has started shifting toward the Froome deposit, where a progressive ramp-up is scheduled and commercial production should arrive in Q4. Cost per ounce should decline as we ramp up. There are an estimated 111,000 gold ounces in the life-of-mine plan at Froome, with additional underground exploration drilling planned that aims to extend the deposit near existing and plan mining. During Q1, work moved forward on the expansion PEA for the Fox Complex; we are aiming for better production and cost profiles, capitalizing on the potential for operational synergies via shared resources and infrastructure. Results from the PEA should be published near the end of Q2. At El Gallo in Mexico, we generated 1,300 gold equivalent ounces from residual leaching. Operations got disrupted in March by a demonstration at the mine entrance involving some local community members. The community as a whole demonstrated tremendous backing for the company, and that is what allowed us to get past the impasse, ultimately securing a fresh agreement with the communities that runs 10 years. Over at Los Azules, our copper project in Argentina, the first quarter saw us pushing ahead on preliminary engineering and putting together a cost estimate, all to move forward the proposed access road that sits at low altitude and can be used all year round. For the rest of this year, we'll keep going with baseline studies covering flora, fauna, surface water quality, and archeology, which the environmental and mining authorities require. A bankable feasibility study estimate is in the works and is right now being reviewed by the company; on top of that, we'll keep looking for ways to boost the economics at Los Azules through pulp or sorting technologies as well as other alternatives that add value. At this point, I'll hand things over to Steve McGibbon, our Executive Vice President of Exploration.
Steve McGibbon
executiveThanks, Peter. In Q1, we put $5 million toward exploration drilling, and we also invested $5 million in other exploration work, mainly aimed at expanding the Fox Complex and its resource base. Our main exploration objective stays the same: finding and extending gold deposits next to our current operations in a cost-effective way so they can feed into near-term gold production. Over at San José, the 2021 exploration budget comes to $10 million on a 100% basis, and $2.3 million of that was used during Q1. The latest exploration results from our partner and mine operator have been encouraging, and that includes a standout intercept from the Escondida vein — 62.5 grams per tonne gold and 5,571 grams per tonne silver across 2 meters. Roughly 1,400 meters of drilling were finished at the Escondida and Tonkin targets during Q1. Another 1,000 meters of drilling is planned at Escondida in Q2. At Gold Bar in the U.S.A., we completed an updated resource and reserve estimate. Of the $5 million exploration budget, $0.9 million was spent in the quarter, with the focus on testing near-mine targets and continuing to define oxide resources on the neighboring Tonkin property. Drilling work centered mainly on the Ridge deposit, partly to gain better density and metallurgical data. Near-mine exploration in Q1 produced encouraging results at the North Ridge target. The oriented drill core program at Ridge successfully confirmed mineralization, boosting the average grade of existing resource model blocks in certain places and pushing mineralization into new areas. Exploration efforts continue at Ridge, where this stage of the 2021 program includes 20 reverse circulation holes and 7 oriented core holes. Early-stage geological evaluations at the Old Gold Bar mine are underway in Q2. At the Fox Complex in Canada, exploration picked up in Q1 after funding came in from our flow-through share programs, which are being used to grow high-potential target areas that qualify for Canadian exploration expenditures. Exploration work has been the main focus for expanding the Fox Complex resource base. In Q1, drilling at the Black Fox Mine kept delivering encouraging high-grade intercepts at depth. Underground drilling is being carried out to find additional mineralization near the Black Fox ore body, where mineralization is still unconstrained in several directions. The Stock West mineralized body was found in mid-2019. During 2020, exploration work centered on follow-up drilling. As our press release this morning noted, 57 holes have been finished since August 2020. Assays are still pending for part of those, including some with visible gold. Initial results point to the potential for defining a significant new mineralization zone 500 meters, or about 0.5 mile, from our Stock processing facility. In Q1, we used $3.4 million out of a total $9 million exploration budget for the Timmins area. At Stock, we brought in four drills to tighten up the spacing between our intercepts — that's what we need to build a 3D model, put together an initial resource estimate for Stock West, and verify the historical drilling results beneath 300 meters at Stock Main. All told, 58,000 feet, which works out to 17,700 meters, of surface exploration drilling got finished across Stock West and Stock Main, with most of the attention going to the Stock West mineralized zone. Alongside the PEA covering the Fox Complex expansion, due out in Q2, we're going to update the Stock East resource and deliver a maiden resource for Stock West. Exploration work at the Stock property keeps moving forward, with four drills on Stock West and one rig at the historic Stock Mine. That wraps up the exploration presentation, and at this point we'll open up the call for questions.
Rob McEwen
executiveBut prior to inviting your questions, I want to express my appreciation to Anna, Steve, and Peter for what they shared and their evaluation of our current position. As we move forward, you can anticipate additional exploration findings across the remainder of this year. We hold extensive land holdings situated in key gold regions — Timmins and Nevada — and we're also achieving success in a developing gold/silver district located in Southern Argentina at our San José mine. Regarding the growth initiatives at our Timmins properties, we have 3 million ounces classified as indicated, which should be reported at the conclusion of Q2. And given that silver and copper prices have doubled over the past 12 months, if you examine our silver operations, we effectively have a silver business within 2 operations producing silver: the San José mine and the Fenix Project in Mexico. As for our sizable Los Azules copper venture, we are currently advancing 2 options in parallel to move that project forward. It responds strongly to copper prices, and we intend to capture that value through every avenue available to us. So — I anticipate a determination on that within the coming few months; at this point I'd be glad to take your questions. Operator, kindly begin the Q&A.
Heiko Ihle
analystTwo quick questions from me. About those impressive drill results at Stock West today—it seems like you've got multiple asset results for holes, and to use your phrasing rather than mine, a few of them show visible gold and are still pending. Do you have any sense of how long those results will take? And even more importantly, has anything you've seen at Stock West, or anywhere else for that matter, caused you to shift your drilling focus for that particular site for the rest of the year? It also looks like additional assays at Gold Bar are pending.
Rob McEwen
executivePeter and Steve, would either of you like to take Heiko's question?
Steve McGibbon
executiveSure, I can jump in on that first. Regarding the drill results we're still waiting on, our expectation is that they'll come in as a consistent flow over time. What we're observing right now is that assay labs have limitations, which means that turnaround isn't as fast as we'd prefer, and we're looking at ways to try to reduce that a bit. That said, overall the results we've delivered haven't altered our focus or priorities, which in the end are being set by the plan and the results that the PEA will present. Peter, maybe you'd like to add something?
Peter Mah
executiveAbsolutely, and I'd agree with what Steve said, Heiko. That's the Fox Complex. Our drilling is happening at Stock West, Stock Main, Whiskey Jack, 147, Contact Zones, and Gibson. At Gibson there's already a decline that we'd likely rely on to reach Whiskey Jack along with the northern portion of Contact and 147. All of that was part of the plan. The results have been very promising and encouraging, validating both the geologic interpretations and the business cases behind our PEA. Turning to Gold Bar, Ridge ranked as our top target. We've gotten some excellent results there and are keeping up drilling at that site. After that, the next target we'll focus on is the Old Gold Bar mine; analysis for targeting is currently in progress there, and Tonkin will come afterward, and then we'll also conduct some follow-up drilling at Pick. So we're staying on plan, and the results really are encouraging.
Heiko Ihle
analystJust to clarify something quickly regarding El Gallo. You're clearly stating that cash costs and all-in sustaining costs aren't key metrics you rely on anymore, and that's understandable; therefore you're not disclosing cash costs, all-in sustaining costs, or anything of that nature. Would you be open to sharing a different metric? Or perhaps offer additional guidance that could help us model the cash flow generated by this site through the remainder of the year? Also, do you have any sense of the timeline for this becoming a disclosable asset? Or rather, how long this disposable asset's phase might last?
Anna Ladd-Kruger
executiveHeiko, it's Anna here. I appreciate the question. Regarding El Gallo and <<inaudible>>, we do disclose certain costs, and I'd be glad to discuss this with you offline too. Keeping El Gallo carries a cost that matters as we work toward strategically determining what to do with that asset; a decision will likely arrive within the next 2 months. A workforce remains on site that we're retaining. Operations are permitted to begin there. As for cash flow, I'd describe us as essentially at breakeven when it comes to care and maintenance. That said, we keep putting money into maintaining El Gallo until the company formally decides on a strategic path for the asset.
Jacob Sekelsky
analystRemaining on Mexico, I have a brief question regarding Fenix. I'm simply wondering about its position from the perspective of allocating capital. Also, do you folks intend to proceed toward a development decision for it? Or perhaps just share your thinking on that.
Anna Ladd-Kruger
executiveJake, this is Anna.
Rob McEwen
executiveJake...
Anna Ladd-Kruger
executiveGo ahead, Rob.
Rob McEwen
executivePlease proceed.
Anna Ladd-Kruger
executiveAll right. So right now, once again, we're simply assessing strategic alternatives. In all likelihood, within the next 2 months — possibly sooner — we'll reach a determination regarding that asset, covering how we intend to finance it and what the following steps will be. Rob, I wasn't sure whether you wanted to say anything more about that?
Rob McEwen
executiveNo, that's covered, Anna. You covered it well.
Jacob Sekelsky
analystSo that's likely something along the lines of a midyear event, and we'll get something out of it on that front.
Anna Ladd-Kruger
executiveJake, you've got that right.
Jacob Sekelsky
analystThen, moving on to Black Fox and Timmins overall — that hub-and-spoke approach looks like it's taking shape now that Froome is up and running. Still, do you see more M&A chances in that area? Or do you feel you're basically set with the properties and ground you already hold there?
Rob McEwen
executiveJake, as long as our currency stays weak, our plan is to strengthen what we've got — get it solid — before we consider reaching further out.
Joseph Reagor
analystAlright, let's start with the first item — the dividend we got from MSC this quarter was quite large. Did all of it come from just this quarter? Or did some additional cash get included that had built up from earlier quarters during the pandemic, back when the team at Harsha might have been leaning a bit more cautious and keeping that money aside?
Anna Ladd-Kruger
executiveI can take that one. Appreciate the question. Regarding the cash we received, you're correct that it's partly one and partly the other; they kept that money on hand through the majority of 2020 because of COVID. There's an excess amount sitting there, so — it's really a combination of the two. We're definitely glad that the $5 million dividend came in. And there's an indication that additional dividends could possibly arrive in the year ahead, though that truly hinges on how things stand in Argentina regarding COVID. At the moment, some aspects of their operations appear to be fully running smoothly again. However, we're essentially staying paused on that front when it comes to any further dividends through the remainder of 2021.
Joseph Reagor
analystAlright, that's reasonable. Moving on to Gold Bar now. Clearly, cash costs came in pretty high this quarter. My understanding is that the expectation is for those costs to decrease as grades improve and stacking rates rise through the rest of the year. I realize you aren't providing formal guidance, but from a modeling perspective, would it be best for us to assume a steady reduction?
Peter Mah
executiveYes Joe, Peter here. Yes, that's precisely correct. Hello? Yes. That's precisely correct; we're working to get through that strip we discussed last year. We're making our way through it, releasing ore and evaluating opportunity ore, and factoring in the exploration items you heard about earlier; so we're progressing toward the feasibility and exceeding the feasibility.
Joseph Reagor
analystAll right, and one last item, if I may, regarding Gold Bar. Based on what's been reaching us, plenty of parties are interested in acquiring operating properties in Nevada. Would you entertain selling it? Or is it viewed by you folks as something akin to the company's flagship?
Rob McEwen
executiveAny asset carries a price. So, as — we remain receptive to proposals at all times, though we believe our Nevada property is sizable. It sits along a trend where several major mines are located directly above us. And we don't see any loss of exploration upside there; we believe there's potential to expand those deposits along with our Tonkin project considerably. Therefore, they'd need to present a sleek figure for it.
John Tumazos
analystRob, nice work on the longer life at Gold Bar. Now, regarding the Black Fox PEA, I want to direct this to Peter and Steve. It puzzles me that this is classified as a PEA given how well established the mill, the tails, and the processing already are. To move it to a feasibility study, what level of spending would be required to upgrade the gold resources, determine the precise size and shape of the stopes, figure out the mine development layout, and resolve any questions about top cuts or drill density? Specifically, how many holes and how many dollars would it take to arrive at a more certain mine plan?
Peter Mah
executiveSteve, I'll start. John, it feels like you're practically on the payroll already, chiming in from inside the room. Yeah, those are certainly substantial questions. I'd say the reason we've reached a PEA and are assembling the three strong project areas across the district is that balancing the trade-offs was genuinely difficult — figuring out the sequence for bringing things forward and what permitting would involve. We ran a comprehensive gap analysis to pin all of that down, so at this moment we're working through the cash flows and getting those questions answered. Regarding the PEA, I can't really predict what the outcome will be. However, our intention is to move quickly into an FS, and in certain situations—if we have sufficient visibility toward advancing the project into development and starting production early—we'll pursue that. As you may remember from earlier calls, determining whether such a route existed was our goal. We're also favorable on the Stock West deposit and on reaching the Grey Fox area via the Gibson decline, and addressing that is what we're aiming to do. At Grey box, plenty of drilling has occurred, though once again it's been above the 400, 500-meter level. There's still plenty of work ahead of us, and the PEA is going to deliver that as one of its results.
John Tumazos
analystPeter, allow me to attempt a different approach, given that I serve as an honorary team member. Black Fox's reserve at year-end stood at 14,000 ounces. Everyone realizes additional gold exists at that site. Ever since McEwen acquired this project, countless assays exceeding 1 ounce have appeared, frequently within narrow intervals of 0.5 meter or a meter. What amount of funding do you believe this property deserves for tight drilling, such that a QP would classify it as reserves?
Peter Mah
executiveSure, I'll hand that over to Steve, though I can also chime in afterward.
Steve McGibbon
executiveYeah. I suppose when it comes to Black Fox specifically, what I'd tell you is that, as you probably know, we do receive a number of extremely high-grade results from drilling. However, the ore itself is quite nuggety — extremely so. To truly pin down and capture that upside, our expectation is that we'll need to carry out a substantial program, one that likely brings our drilling centers down to somewhere in the range of 5 to 8 meters, aiming to get past that nuggety characteristic of the ore. And we can sort of verify what that drilling shows from closer, more readily available access points, though the property's longer-term upside is going to demand a considerable amount of drilling — and we haven't settled on a final figure for that as of yet. At this stage, we're really just first attempting to focus on reachable zones and drill them at a density that we find satisfactory, while also reliably turning those into reserves.
John Tumazos
analystHitting 5 to 8 meters would be quite a target to reach. It would really establish how big those stopes are and what form they take.
Rob McEwen
executiveThat's right. Steve has my agreement, and we have shifted — right now we are shifting our production crew over to Froome, so exploration can get on with the drilling and the work that's required without production weighing on them. And the west flank appeals to us, the deeps appeal to us, and we wonder whether there could be some link to Froome. So the Stock project is still something we'll keep pushing forward, and with luck, we'll come out with a clearer picture of which shapes can be mined and what better grades we can reach.
Rob McEwen
executiveAppreciate it, operator. Thanks to all of you for being on this call, and for carrying things forward toward additional exploration updates along with our PEA from Timmins, plus how we're progressing on the loss of business front. Wishing you the very best. May your day be highly successful. Thanks so much.
Operator
operatorThis concludes today's conference call. Thank you for participating. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete McEwen Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to McEwen Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in McEwen Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.