McEwen Inc. (MUX) Earnings Call Transcript & Summary
August 5, 2021
Earnings Call Speaker Segments
Robert McEwen
executiveThanks, operator. Hello everyone, and good afternoon to our shareholders and those investors who are following us. It’s a real pleasure to have you join us for this Q2 2021 conference call. During the last 15 months, we’ve restructured the senior leadership group at head office as well as at our other mines. The credit for the turnaround we’re seeing right now belongs to these highly capable people. Today, Peter, Anna, Steve, and I will walk you through the major gains we’ve made in how our operations perform and in our financial position. We’ll also go over what stands out in our exploration program and how we intend to unlock value from our enormous copper project, Los Azules. Before anything else, though, I’m genuinely happy to report that our mines are running far more efficiently, which means we’re once again meeting our production guidance. Our treasuries are growing, and our share price is recovering some of the ground it gave up last year. These are strong signals that we’re getting back on track and that things are clearly moving in the right direction. That said, plenty of ground remains to be won back, and I want to assure you that we’re completely dedicated and pushing hard to recover it. At this point, I’ll turn things over to Anna, who will tell you about the encouraging change in our financial condition as reflected in our Q2 results for the first half of this year. Anna, over to you.
Anna Ladd-Kruger
executiveThanks, Rob, and hello everyone this afternoon. The second quarter was one that showed our turnaround plan making operational headway, with reduced expenses and a healthier treasury. The upshot of all that was better financials. Robust output at our sites led to dependable income from selling gold and silver during the period. Revenue from wholly owned operations came to 40.7 million in the quarter, up 123% versus the second quarter a year ago. Realized sales prices averaged 1,830 per gold equivalent ounce in the quarter, against 1,733 achieved during last year's Q2. Cash gross profit — a non-GAAP figure that leaves out depreciation — reached 9.6 million for the quarter, a swing of 13.6 million from the negative 4.9 million cash gross loss posted in Q2 a year earlier. What drove the second-quarter change was more production and sales, better average realizable gold prices, and lower cash costs per ounce at both the Gold Bar and Fox Complex operations, which Peter Mah will walk through in a bit more detail soon; we recorded a net loss of six million, or negative $0.01 per share, for Q2; that figure includes 7.7 million in total put toward our exports and advanced projects; the comparison is a net loss of 19.8 million, or negative $0.05 per share, in Q2 2020. Once more, the improvement came mainly from gains in operations. Our exploration work concluded in 2021. So far we've spent roughly 0.9 million on high-potential targets across both Ontario and Nevada. We're also racking up eligible Canadian exploration expenditures at the two Ontario locations. Steve McGibbon will provide more updates on our different exploration programs soon. We spent slightly less than $1 million on advanced projects in the quarter as well. That covers ongoing outlays on our Fox Complex PEA, or Preliminary Economic Assessment, plus the Phoenix project in Mexico. Total liquid assets stood at 48.9 million as of June 30th, versus 20.8 million at the same point a year prior. That mirrors greater cash and cash equivalents, restricted cash, investments, and our precious metals inventory. We also collected 2.6 million in dividends during Q2 from my stake in the San José mine, bringing the H1 total to 7.6 million. That's against 0.3 million in the first half of last year. Net cash used in investing activities of 12.3 million during this year's first half stems mostly from capital development costs at our Froome mine within the Fox Complex. We're still on track for commercial production in Q4; we closed Q2 with 74.9 million in current assets and working capital of positive 30 million. Thank you. I'll now hand the call over to Peter Mah, our Chief Operating Officer.
Peter Mah
executiveThanks, Anna, and hello everyone. We're happy to share results from yet another solid quarter at McEwen Mining, with output rising and tracking in line with the 2021 guidance we provided. Expenses are coming down as our teams concentrate on ongoing enhancements, and the expansion effort at the Fox Complex is moving ahead nicely. For Q2 2021, consolidated gold production reached 40,700 gold equivalent ounces, which is more than double what we produced in the same quarter a year earlier. First-half 2021 output totaled 71,300 GEOs, matching the bottom end of our guidance range of 141,000 to 160,400 GEOs. Q2 production from our 100% owned lines came to 22,400 GEOs, an increase of 12,300 compared with Q2 of last year. For Q2, consolidated costs per GEO at our 100% owned lines and operations were 12.86 for cash costs, roughly 41% below last year, and 14.47 for all-in sustaining costs, which was 47% below last year. Now to each region. At the Gold Bar Mine in Nevada, Q2 output was 14,100 gold equivalent ounces, a 132% rise over last year. Production for the first half of 2021 grew to 21,500 gold equivalent ounces, up from 15,300 in the same period a year ago. Cash costs per GEO for the quarter fell 18% to 14.63, while all-in sustaining costs dropped 35% to 16.19, versus the same period last year. The better production and costs came from higher gold output, operational efficiency gains, and no COVID-related disruptions to production. Turning to Canada, Q2 production at the Fox Complex was 7,100 GEOs, more than triple the 2,200 GEOs produced in Q2 of last year. The increase matched our expectations under the mine plan as mining wound down at Black Fox and shifted to the ramp up at Fox Mine, coming in modestly better than expected. Cash costs per ounce in Q2 declined to $917, compared with 31.21 in 2020, while all-in sustaining costs per ounce in Q2 declined to 10.88 compared with 33.32 in 2020. The cost reduction reflects improved gold production, better mining efficiencies, more consistent throughput, and more reliable grade control programs. Additionally, Q2 2021 cost per ounce benefited from an optimized mine design that lowered underground development costs and schedule at the Froome deposit, plus no production interruptions from COVID. Froome stays on-track to achieve commercial production in Q4 of this year, grade reconciliation is on plan, metallurgical recovery has slightly beaten our expectations, and further optimization of recovery versus grind size was ongoing. Underground resource and reserve definition drilling is underway with the goal of extending the life of mine at Froome and helping bridge gold production, while the Grey Fox and Stock projects are advanced. Results from the Fox Complex expansion drilling and model updates are expected in Q3, and the preliminary economic assessment is expected subsequently in Q4 of this year. We're moving forward with plans to bring on a mining contractor so that dewatering of the Stock mineshaft can begin in Q4 of this year; once that's done, we'll have access to the existing underground developments, and from there the Company intends to carry out underground drilling at Stock. Over at El Gallo in Mexico, Q2 production came in at 1,300 gold equivalent ounces, generated from residual leaching on the existing heap leach pad. We expect residual leach activities to taper off around early 2022; right now we're looking at a number of strategic alternatives, among them a possible divestiture of our Mexican business units. Turning next to Argentina, at the San José Mine. Production attributable to our 49% interest during Q2 was 18,200 GEOs, which is almost double what we produced in the same period a year ago, driven by more ore tons processed and fewer COVID-related effects. Those gains were partly offset by reduced process grades stemming from delayed smelting timing and lower-grade mill feed replacing development material. Cash costs came to 1,105 per GEO, a bit below Q2 2020 for the reasons I just mentioned. On all-in sustaining, we're level with the same period last year at $1500 per gold equivalent ounces. Thank you, and I'll now hand the call over to Steve McGibbon, our Executive Vice President of Exploration.
Steve McGibbon
executiveThanks, Peter. During the second quarter, we ramped up exploration activity significantly at all of our projects throughout Canada, the U.S., and Argentina, spending about $6.9 million in total. As you know, we've completed nearly 35,000 meters of core and are seed drilling, which comes to more than 114,000 feet. Our exploration priorities remained focused on cost-effective discoveries and on expanding deposits adjacent to our current operations, which helps sustain gold output in the near to medium term. First, let me update you on what's happening at San José, our 49%-owned property operated by our joint venture partner, Hochschild Mining. On a fully consolidated basis, the exploration budget at San José for 2021 totals $9.3 million, and during the second quarter of 2021, $2.9 million of that was spent. First-half lease and exploration spending came to $5.2 million. Resource drilling has now been completed in Escondido, which sits near the existing San José operations, and so has the timing of gains. From the 3410 meters drilled, we encountered a number of encouraging intercepts, each between 1.5 meters and 2.5 meters, with grades generally falling in the range of 2.5 to 3.5 grams per tonne gold and 200 to 300 grams per tonne silver. One more detail on these core monomers for SKD 2267: it returned 18.4 grams per tonne gold and 1879 grams per tonne silver over a core length of 1.4 meters. I want to point out to everyone listening that the gold and silver deposits located at San José are epithermal in nature, which means drill results will frequently vary a great deal over the typical course of a drill program. Over at Timmins, roughly 283 meters were finished, and those include an intercept of 3.1 meters that graded 5.5 grams per tonne gold along with six grams per tonne silver, tied to SKD 2328. Looking at the third quarter, 3000 meters of drilling are going to be done on the permanent structure, and on top of that, a geophysical target south of San José will be tested. During the second quarter, we spent $1.3 million on exploration at the Gold Bar Mine area. That work covered 4,700 meters, which equals 15,400 feet, of core. This forms a portion of the roughly $5 million exploration budget we had planned for 2021. Our drilling during that quarter mainly targeted the ridge deposits situated west of the operating pit, along with the nearby Atlas Mine, where we hold a 30% interest. The exploration program was designed to lower the risk surrounding known mineralization and to evaluate possible expansion of deposits in both locations. Core drilling at the Ridge area verified mineralization in certain spots and produced intercepts that we disclosed in our May 10th exploration and definition update. On the atmospheric side, our exploration work covered 1,500 meters across 10 RC holes, following mine mapping and modeling that flagged multiple drill targets to assess. A number of assays are still awaiting results, though the strongest outcome we've seen so far comes from a deeper intercept — it measures roughly 27 meters, or 90 feet, grading 3.10 grams per tonne gold in hole OGB 010; within that sits a richer zone of about 10.7 meters, or 35 feet, at 6.33 grams per tonne gold. Three additional directional core holes are on the schedule for Q3, and they'll wrap up stage one of our drilling program. At the Tonkin property, work is underway, such as launching a property-wide reassessment of the regional geology, controls on mineralization, and how those relate to other large carbon-type systems in the industry. The revenue derived from this effort often indicates stronger parallels to other properties that host large carbon-type systems to the north than we previously believed, including the geological setting for the lower-grade loss. A program of 19 RC holes plus 4 core holes, amounting to roughly 1,500 meters, has been running during Q3, mainly to test oxide mineralization at the one deposit; this work is being folded into an updated geologic model that will align with our better understanding of property rights. During the latter portion of 2021, we'll keep up exploration efforts at Tonkin, East Deck, Cabin, and Park Canyon. Over at Gold Bar South, our exploration efforts have successfully advanced that project, and it ought to contribute to what Gold Bar produces down the line. Turning to the Fox Complex up in Canada, exploration there will continue all year long in 2021. With the production zone shifting toward the frontline underground exploration area on both its East and West frame, we've been working toward the objective of extending the Froome deposit close by and supporting the structure. The Froome deposit additionally remains open at depth, and there's possible potential for sub-parallel mineralization nearby within the hanging wall and footwall, which we'll also test through drilling. Underground drilling at the Black Fox mine has continued to deliver encouraging hybrid results at the 160 West and 130 East targets, which approximately remain. Underground diamond drilling is being carried out to find additional mineralization next to the Black Fox ore body that could be incorporated into a future mining plan. During Q2, we put 3.5 million into exploration, including about 26,500 meters of core drilling centered on Stock West and Stock lien targets at the Stock property, plus the Whiskey Jack and Gibson targets at Grey Fox. The area we're exploring at Stock sits right beside our Stock home, and that home is where ore from the Black Fox and Froome mines gets processed today. The mill also handles ore from the historic underground Stock mine, which operated on and off between the 1980s and 2004 and yielded 137,000 ounces of gold over that time. Discovery at Stock came in mid-2019, and during 2020 our exploration efforts focused on follow-up drilling. What we saw early on suggested there could be a sizable mineralized zone roughly a half mile, or 800 meters, away from the Stock processing facility. Then, in Q2 2021, we brought in core drilling at Stock to infill and grow the main dimensions of the gold mineralization. During the quarter, surface exploration drilling wrapped up at Stock West and Stock Main, totaling 20,008 meters, and the bulk of that effort went toward developing Stock West. In addition, two drill rigs completed 1,861 meters aimed at checking how far the sheets extend beneath the Stock mine's underground workings. At the promising box project, work centers on drill targets, with emphasis placed on understanding localized heating patterns at Whiskey Jack and Gibson. We expect an updated resource model sometime in the second half of 2021. Back in Q2, we shared new stock less assay results as part of the <<inaudible>> update mentioned earlier. Considerable advancement has been achieved on shortening sample analysis turnaround at funded assay laboratories in Ontario as well as Nevada, plus on boosting drilling capacity through extra rims input jurisdictions. Consequently, we expect to refresh exploration and delineation results prior to Q3 ending. At this point I'll hand the phone back over to Rob.
Robert McEwen
executiveThanks, Peter. I got it — I was muted, and the phone was on silent mode while the meeting was going on. My apologies. Now I'd like to discuss our plans for advancing one of our assets in a manner that, in my view, could generate substantial value for McEwen Mining. As you're aware, we hold a sizable copper project — Los Azules. Within our portfolio of properties it's a giant, and on a worldwide basis it's a giant too. In my view, the share price doesn't reflect what Los Azules could be worth, and we're committed to changing that. Beyond that, I think a few factors explain why it has stayed undervalued. To begin with, Los Azules carries quite a few risks. It sits in a remote location with limited access — the only way in is by road, and that's possible for 5 months each year. It has only reached the preliminary economic assessment phase. That means uncertainty persists regarding its resources, its economic projections, CapEx, and permitting. Bringing those risks down calls for major investment; and regrettably, the money needed is far beyond what McEwen Mining's treasury can handle. Unless we turn to financing, which would cause substantial dilution for shareholders. Next, the market doesn't see McEwen Mining — its management — as having the debt and copper expertise to develop it. We've taken considerable steps to fix that by assembling a big team of highly experienced copper people. Third, the market favors — or seems to favor — putting money into a pure copper play, a pure copper development company, rather than into small gold producers like us that hold a large copper development asset with cash flow potential; so to bring out the value of Los Azules, we looked at a number of alternatives. The first was funding it ourselves, but given the big potential dilution tied to funding it on our own, that option isn't appealing. The second was pursuing a joint venture or an outright sale. We held discussions with a number of major mining companies that have the treasury and the expertise to build it. But we wanted to keep a continuing interest, and of all the companies we talked to, none was interested in a joint venture — every one of them wanted to purchase 100%. That would leave us with no continuing interest in the property; we suggested to each of them that we'd like to keep a royalty, since at this point the property has a 36-year life with very robust economics. And it would be a shame to let it go at an early stage, when the copper price appears to be heading higher thanks to electrification of the world's transportation system, and renewable energies. All of those are big copper users, and a deficit is projected to arrive in the future when it comes to copper supply. Option three involved handing something back to the people who own stock in our company, a concept that has existed from the era of <<inaudible>>, which we built up over time through contributions, yet it never took off, for two reasons that still apply. There is an intricate tax framework that must be taken apart, and when we give this to our investors, taxation would hit them, affecting both McEwen Mining and those shareholders who receive the development or the distribution. On top of that, if we distributed it, the business would need to seek outside capital. And at present, that isn't feasible, given the problems I brought up before, in order to secure a substantial valuation for these assets. The fourth path we examined, and have concluded we wish to pursue, involves funding a subsidiary privately that carries the losses and pushes the project ahead, steering it toward a prefeasibility study, and afterward toward a feasibility stage. But first, reaching the prefeasibility point means building year-round access, which is happening as we speak. After that, in a span of 12-months to 14-months, we would take it public. If you examine — we think this represents a solid — the finest route for boosting shareholder value. If you examine copper projects, those sizable copper projects acquired from 2010 to 2018, it's evident that how far along a project is in development directly shows up in what was paid per pound. So at the initial phase, when you have a few drill results and establish a resource, that figure is at its minimum, and as you progress all the way from there to a preliminary economic assessment, then to a prefeasibility, and then to a feasibility study, the worth climbs step by step. That is the approach we've adopted, where we foresee a major rise in the property's worth by fixing the access challenges, by drilling more, and by finishing the environmental, metallurgical, and other studies needed to generate a prefeasibility study. And then proceed to a feasibility study. To get things moving, we lacked the funds, putting us at a drawback when it comes to going public. So I chose to kick this off personally by pledging $40 million out of the up to $80 million. We aim to raise, and that lets us push the project forward quite forcefully; as a matter of fact, the road leading to the property, the new path, is now on its 15th day of construction. Completing it will consume the greater portion of a year; however, it will make an enormous impact on this project. What it might accomplish in reinvestment constitutes a related party transaction. We went to the independent board members, and each one of them is committed to being involved and to independence when it comes to value. So consider the terms McEwen Mining was being offered compared with what the market shows. They were essentially looking at 175 million on the properties, along with a 1.25% royalty. In our view, the projects right now hold just under £29.5 billion of copper in the indicated and inferred category, and that is valued at roughly 0.6 of a cent. Once you advance to pre-feasibility and then feasibility, that figure can shift to £0.03 to £0.06, and it can go even beyond that in a robust market. If you run the numbers, it becomes clear why we believe this generates the greatest value within McEwen Mining, instead of handing the company over today, when we are at an early point in what looks like a powerful bull market for copper. With that, I want to thank you for joining us and invite you into our question-and-answer session. Operator, please open the lines for questions and answers.
Jake Sekelsky
analystI appreciate you taking my question. It's encouraging to see those gold bar costs moving lower. I'm wondering whether we ought to anticipate additional gains in that area across the coming few quarters. And if that's the case, could you speak to a few of the operational enhancements that are pushing this?
Robert McEwen
executiveOf course. I'll hand that question over to Peter.
Peter Mah
executiveJake, thanks for asking. As you know, we put out the feasibility study, and we're pushing toward that guidance; right now we aren't giving any revised trough guidance. Still, based on what our production profile shows, and with costs moving along pretty favorably compared with the feasibility, that's really the most we can offer at this point. On the question of where to make gains at this machine, we discussed during last quarter's call the mine, the process plant, and simply overall administration as our priority areas. With our mining contractors, we keep searching for ways to enhance our mining. On the processing side, we've been finishing up that program that I believe we mentioned on the prior call. It was aimed at run of mine leaching; the tests are only now arriving; results have been reasonably encouraging, though we're still analyzing what that implies for the split between how much we might put on the pad as ROM versus crushing. And there are plenty of business improvements via amendments and teams pursuing synergy. Among our synergies involving the Mexican operation, we've had some of the crew down there helping the Nevada team. Things are going pretty well.
Jake Sekelsky
analystAlright, that's useful. Now, when it comes to Mexico, residual leaching at El Gallo seems set to wrap up during the opening six months of next year. I believe you addressed this somewhat already, but could you share additional detail regarding what Kynapse (Ph) intends for its mix moving ahead — whether that involves M&A activity or pursuing development of both Phoenix? Any insight at all on Mexico would be appreciated.
Peter Mah
executivePhoenix is something we're currently examining. We've got a couple of leaders there being pushed to enhance the project's economics, and we're also exploring initial funding.
Jake Sekelsky
analystWhether it's M&A in that case or building it out yourself, we started to lean one way or the other.
Peter Mah
executiveThat's correct.
Jake Sekelsky
analystUnderstood. All right, I have that noted. Thanks once more, Rob, and congratulations on a solid quarter.
Robert McEwen
executiveAll right. Appreciate it.
Heiko Ihle
analystRegarding the Fox Complex, could you provide a bit more detail on when you anticipate seeing it? And even more significantly, what do you think a good-to-amazing, all-time-best scenario for that side would resemble?
Robert McEwen
executivePeter, would you like to take Heiko's question?
Peter Mah
executiveApologies — my clumsy fingers pressed the incorrect key; I had just returned and missed that question, Heiko.
Heiko Ihle
analystLet me ask that again. Regarding the PA at the Fox Complex, could you share a bit more detail on the AUM figure that you expect will be made public? And even more significantly, it would help to know what an amazing outcome scenario for the site might look like — what should we anticipate?
Peter Mah
executiveAbsolutely. Fine, amazing. I'll address the second part first. We're reviewing it, and clearly there's some additional work in the grilling that Steve told you about. Our aim is Q4 for putting out the PA, probably on the sooner end based on what our present schedule indicates. So my expectation is that it arrives prior to the end of the year. Fine to amazing — well, how large do we dare to dream here? Within the PA, as the initial phase of our expansion, we're aiming at a 10 year mine life of somewhat beyond 100,000 ounces per year under this project charter, and we're still analyzing resources and awaiting certain results while optimizing our mine plan layers, so it is trending well. We haven't yet consolidated everything to provide a view on that, and it will be released before this year ends.
Heiko Ihle
analystShifting to the copper venture and the interest in those losses. Tomorrow it will have been one month since the first announcement. What's the status of the deal? Are there any other future timelines you might share? I know you set 12 months in the original press release, that was in July. But are there any other hard or soft timelines you're willing to discuss, or what do you think we should expect, maybe quarter by quarter?
Robert McEwen
executiveWe'll likely close it in two stages. First, around the middle of this month. I mean, it's a legacy of many subsidiaries; they came as losses in the previous owners' list, and Andy described a labyrinth of subsidiaries, in Canada and Argentina. All of those needed to be cleaned up, and that took a bit longer than we expected. So we're aiming to close and simplify that structure by mid-August. Then again by the end of September. As for going public, we'd be looking at up to 12 months following September.
Heiko Ihle
analystUnderstood. That's really useful. Thanks a lot.
Robert McEwen
executiveYou're welcome.
John Tumazos
analystThanks a lot, and congratulations on the fresh advancements as well as the vitality shown by every person on the McEwen crew. I have in mind the announcement from February 1, or a different firm, that is, gold, saying a brand-new management group was being formed, or a management group that had been made stronger, and they brought aboard a onetime CEO of Nevada Copper, for that specific jurisdiction, a Nevada enterprise. And I am simply considering how the Fox Complex contains no fewer than three deposits and the Stock Complex contains no fewer than three deposits, and the Timmins downtown Lexam VG projects, or no fewer than three projects. Gold Bar has more than three deposits and then El Gallo exists along with an $80 million program up in the <<inaudible>> in Argentina. Will an entirely new management framework be introduced for Argentina, or are Peter and Steve and Stephen and the team putting in 72-hours a day, or ought we simply presume that El Gallo and what I refer to as the downtown Timmons, such as the Lexam VG properties, sit on a back burner, since there is a limit to what you can accomplish at Fox and Stock and Gold Bar and it is simply an extraordinary treasure of opportunities.
Robert McEwen
executiveYes, they are putting in 76-hours a day. Pete, would you like to discuss the team that has been put together for loss of service. It is fairly extensive, extremely deep in copper experience?
Peter Mah
executiveCertainly. And thank you, John. There are lots of in-depth questions and gathering, since a day contains more than 76 hours; we've put together a fairly substantial support crew for this project, including certain in-house types of advisors, extra personnel on the ground in San José — or pardon me, in the Miss Adlon — plus outside consultants. So on the internal side, we've strengthened things with a construction manager, Gary Cochran, a former Anglo staff member with a highly decorated career of mine in building; we added Bill Thomas, and one of his latest efforts was Constancio. Dave Tyler, who's been handling work for us across all our technical projects, was beginning to get more involved. And then Jim Sorenson, from Samuel, which you might have heard of, has a rather extensive project history; alongside Samuel on the external front and their team that we brought aboard, we brought on — and their copper excellence group, Dave meadows, and Howe, who served as study manager for the Elton project. They've come into the fold recently. And then with our case put together, a very formidable team, Dr. Sullivan, and Sylvia for the resource development. So they're actively working with our team on crafting growth plans. On the mind engineering front, we've brought in the Gerald Whittle and his group, plus the enterprise optimizer, and in fact that got started today; we're examining types of optimizations regarding phasing and everything like that. So we have a pretty broad group infrastructure, I suppose, going on and on and on; but it isn't in our final stretch. It's across a few years of experience in big corporate projects, successful ones, with a team pushing forward.
John Tumazos
analystSo you, along with Steve and Stephen, aren't actually running the Argentina operations, where Nevada and Ontario come across as odd, with a bit of a twist?
Peter Mah
executiveRegarding our management group — that's me, Steve, and Reuben Wallin handling permitting, environmental matters, health and safety — or handing over the most established site to that group — they deal with things like governance and controls; through that group, we keep an eye on things and push for the right course of action. Beneath each of those areas sits a sizable team that's the one really doing the work.
John Tumazos
analystWould it be asking too much — let's suppose briefly that Argentina is being handled through delegation and oversight by the management team — yet you still have Froome, the stock restart, plus all those various promising zones and Gold Bar? Do you folks run the North American operations?
Peter Mah
executiveWithout a doubt. I'd say the numbers we've posted for this year make the case on their own. Over at Froome, we're where we should be, and it's possible we exceed targets on commercial production. Our team is really strong. We strengthened the operations group too, adding managers under the Canada director of operations; since we do have a Director of Operations, those org charts have grown considerably in advance of all this; naturally, right now El Gallo isn't consuming much of our time and we're reviewing strategic options. My sense is we're a pretty good fit for this year. We aren't seeing any urgent gaps in positions. Recruiting is an ongoing effort at all times. And our aim is bringing aboard the right individuals to move every one of our regions forward. After the TA wraps up, we'll have a clearer picture of what comes next regarding the Fox expansion. Also, as I said before, provided they receive approval to choose the contractor, proceed with the soft trap for dewatering, and begin underground drilling, the project will keep moving ahead. But once we gain greater clarity around the strategic options and push onward, we'll be in a position to define what's left of McEwen Mining as far as our organizational structure goes. Anna is definitely the one to address the financial side, along with all the remaining areas where recruitment has been substantial, successful, and our team has been doubled up.
Anna Ladd-Kruger
executiveJohn, that's a really solid question. You need people in place to operate things. And regarding the administrative side of things, we're making a serious effort to implement systems that will genuinely assist with a great deal of the streamlining and automation, so we actually have an ERP system, a budgeting and forecasting system, and a number of other operational systems underway this year, with one completed by the end of the year, which will certainly be of help; as Peter mentioned, we're bringing on additional people at director level and VP levels, and we're giving thought to succession planning. I'd also mention that with your McEwen conference in particular, one path involves taking it public within a year or less. And obviously, the plan at that point is going to be supporting the public company. As an example, it will require a more dedicated management team handling compliance and reporting for public companies. So at present, we keep watch and we collaborate quite closely with some of the results we've seen. We observe some of that energy that's present here today at the company.
John Tumazos
analystMaybe I can pose a separate follow-up question. Thanks so much, Anna. With all that activity and fresh hiring taking place, your results got better and the loss came to just one cent. Could you discuss what capital expenditures amounted to during the June quarter? Also, among these additional staff members, what portion gets capitalized as opposed to expensed?
Anna Ladd-Kruger
executiveFor that quarter, the capital was mostly tied to the free mine project we recently attempted, I believe 12 million tonnes. Regarding the personnel, none of the people we are capitalizing could be described as additional—it's more like continuing management. Many of them were roles already established and in place. A number of them serve as replacements. Some involve merging roles and identifying the right individuals to advance and assume responsibility. Even at your executive tier, as far as I recall, we haven't created any fresh roles at that level—those were substitutions.
John Tumazos
analystAnd the Argentine consultants plus team members — was that capitalized for this, to show that cost?
Anna Ladd-Kruger
executiveRight now, under U.S. capital expense rules, as we move ahead into McEwen Copper, and right now our thinking is that a Canadian listing would be able to follow IFRS and those expenditures will get capitalized.
John Tumazos
analystIt's honestly pretty remarkable that, with everything that's been happening, you came out just a penny down. Nice work.
Robert McEwen
executiveI appreciate that.
Analyst
analystGood afternoon, Rob and the team. This is David Dennison, an individual investor and the author of his company since 2004, I believe; so just a few questions once more, speaking purely as an individual investor. The first one is: as someone who currently holds McEwen Mining shares, what should I anticipate over the coming 12, 18, 20 months while McEwen copper advances, and matters unfold differently than what you're hoping or expecting? Then my second question concerns the 100% owned — maybe I heard this incorrectly, so correct me if that's the case — but that 100% owned property or assets located beside the San José Mine that you're drilling. What does that imply if you discover something? Does it get absorbed into the existing structure, where your stake is 49%, or is that still undetermined, or what?
Robert McEwen
executiveOkay. San José first. Regarding the properties that Minera Andy's house — there were two groups of properties surrounding the mine, Minera Andy one off field had another; and several years back, we combined those two interests into one. So they're all held inside the San José mine property; and through Minera Santa Cruz, which is the entity that controls the mine. We hold 49% of that company, which encompasses the mine and the properties. And we opted to cost shield ourselves, retaining the 2% NSR on the properties we've ended in. So we no longer have anything at 100% on the properties near San José.
Analyst
analystOkay, I suppose I missed that — it was going out of here as 100% owned or something along those lines. Alright, thanks for clearing that up.
Robert McEwen
executiveNow, regarding the copper project, since it's in Argentina and access is somewhat restricted, we'll get onto the property in November. Our plan involves 53,000 meters of drilling. Studies are underway for environmental permitting, metallurgical work, economics, and community relations. Next year we're hoping to move the project forward substantially through that drilling, which should boost confidence in the resources as they come together. The first step will be an update to the preliminary economic assessment from 2017, and we're examining what the costs look like now or how they've shifted. We're reviewing how we proposed to mine and ways to bring costs down and reduce capital there, then progressing to a pre-feasibility study; that would likely wrap up no sooner than the end of next year; however, we truly want to go public ahead of that. But at present you've got a drill season that essentially spans November through the end of March, maybe early April, and we're installing camps so we can keep operating during that stretch. Work on the road has begun on what we refer to as the Northern route, which we think will provide 12-months access to the property by way of lower altitude winds and fewer issues with snow, whereas currently we have to cross two passes — one at 4,000 meters, and the other at 4,200 meters. And again, we're talking about snowing that even at 20 feet of snow up there. So <<inaudible>> went all the way up and down those passes; so for a long time we've really struggled to make the project economic, since we have only this tiny little window where you can get in, set up the drills, start drilling, and then have to take them out each year. So to my mind this could be a huge boost to the profit; so I'd like to take it public within 12-months plus 14-months. Hope that answers your question.
Analyst
analystSo mainly, I suppose, if you gaze into your crystal ball, Rob — 12, 18, maybe 25 months down the road. Everything goes the way you're hoping, with no major roadblocks. And McEwen Copper has listed publicly. The markets are showing interest. As somebody who holds McEwen Mining shares right now, do I receive anything out of that, or do I just need to purchase into it as it grows over time?
Robert McEwen
executiveAccording to the present plan, we examined giving shareholders a distribution of an interest; that brings tax implications both for McEwen Mining and for the shareholders who'd receive such a distribution. They'd face a taxable event, and many people would likely choose to sell in order to cover those taxes. So we've examined that, and I'd say the finest route to capture value is to push the project forward. When you examine the financing, we aim to bring in $40 million to $80 million. At the price this issue currently carries. Were we to raise just 40, McEwen Mining would keep an 82% stake in the company before it goes public, plus a 1.25% interest on that property. If you examine the last 12 big copper deals spanning 2010 through 2018, a pattern in value becomes clear as you go from the resource to the PEA, then a pre-feasibility study, then a feasibility study — value keeps climbing; so if we said our drilling verifies and upgrades, so these orders can we reach 29 — keep reaching 29.5 billion pounds of copper grade. If you received $0.03 per pound for them, you'd be looking at a value of $885 million. If you received $0.05 per pound, you'd be looking at 1.475 billion. And we hold a big stake in that company. So I believe there are, I think, loss reserves in this new vehicle that would make it a highly appealing asset; and pretty comparable to quite a few of the large, single-asset developed software developers, I'd say, that today carry considerably larger market share. But the work has to come first before we can justify the market cap.
Analyst
analystThanks, Robin. I apologize if those questions came across as pretty basic — I'm really not any kind of mining specialist, I'm just someone who invests as an individual. So, I appreciate it.
Robert McEwen
executiveNo need to apologize at all. You're always welcome here.
Robert McEwen
executiveThanks, operator. I want to express my appreciation to all of you for being here today. Keep watching, because the finest moments are still ahead. Thank you.
Operator
operatorThank you. This does conclude today’s conference call. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete McEwen Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to McEwen Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in McEwen Inc. or any ticker on your watchlist.