executiveThanks, operator. Good morning, everyone, and I appreciate you joining us today. During Q3, we addressed a number of the persistent problems that had been dragging on McEwen Mining. The first concerned how McEwen copper would be funded. Despite a very tough market, we completed an $82 million financing. And on top of simply closing it, the second largest mining company in the world now holds a stake through its subsidiaries. At Fox, our operations were costly; in the third quarter, we reported operating cost, cash cost per ounce below industry averages, at $774 per ounce. Meanwhile, at Gold Bar, output fell in the first half of the year owing to carbonaceous ore, which pushed cost unusually high — cost that cannot be accepted. We are currently opening the Gold Bar South deposit, which has no carbonaceous ore. The ore there carries a higher grade, and the strip is lower; because of that, we should expect production at reduced cost from that deposit. In Mexico, it looked as though we were approaching the end of the mine's life; we did finish a feasibility study for a project called Fenix, and we have improved its economics considerably — by roughly 10% — by acquiring a process plant on extremely favorable terms. As I see it, all of these matters had been concealing the value of McEwen Mining. Now that they are resolved and we are seeing steady improvement ahead, I believe the value of McEwen Mining will become more clearly visible. After my colleagues give their presentations, I will talk about the value I think lies behind McEwen Mining. At this point, I'd like to turn things over to Perry Ing.
Perry Ing
executiveAppreciate that, Rob. Let me give you a quick rundown of how the third quarter looked on the financial side. First off, our mines that we own entirely brought in cash gross profit of $5.8 million, along with gross profit of $1.5 million. Set that against the GAAP loss we reported of $10.5 million, or $0.21 per share, which mostly comes down to the $7.6 million put into Los Azules plus $5.1 million on acceleration and other projects being expensed instead of capitalized. As Rob noted, these figures factor in the 10-for-1 share consolidation that wrapped up in July, during the quarter. With that consolidation done, McEwen Mining is back in full compliance with the NYSE's share price listing requirements. Turning to gold equivalent output, on a consolidated basis alone, the third quarter came in at 35,700 gold equivalent ounces, about the same as what we produced in the second quarter, and roughly 16% lower than the approximately 43,000 gold equivalent ounces we produced in the third quarter of 2021. I'll let Bill Shaver walk through the production specifics. Broadly speaking, though, I'd describe the quarter as strong overall at Fox and San Jose, while Gold Bar kept facing difficulties, as Rob hinted at. On cash costs, like Rob said earlier, we posted $774 per ounce as cash cost and all-in sustaining costs of $13.08 per ounce, helped by solid results from our underground operations, which keep delivering ore well beyond what the current mill can process. A weaker Canadian dollar also gave us a hand — the U.S. Canadian dollar exchange rate came in around $131, roughly $0.05 softer than the same stretch in 2021. One detail on Fox production: if you check our inventory balances, there's roughly a $6 million increase in ore inventory stockpiles during the third quarter by itself. That ore is now sitting in surface stockpiles at our mills. So looking ahead, this ought to give us more flexibility in mine sequencing and open up some chances to save on costs. Out in Nevada, at Gold Bar, cash costs were $17.12 an ounce, with all-in sustaining at $20.49 an ounce. Those numbers are down a bit from the first half of the year, but they're still high versus the prior year because of low production tied to carbonaceous ore problems, and they sit well above spot gold prices. We noted our mining contractor demobilized at the end of the quarter; we think the effect on our cash flows will be limited, since we expect to keep covering <<inaudible>> from the leach pad, and we anticipate kicking off self-production within the next quarter. Wrapping up, if we turn to the San Jose mine in Argentina, where we hold a 49% stake, it was by and large a solid quarter, posting cash costs of $12.23 per ounce along with all-in sustaining costs of $15.62 an ounce. That marks a meaningful step up from the first half of the year, when they ran into silvit-related production problems, plus the fire <<inaudible>> the San Jose mine occurred during the quarter, yet our outlook going forward is positive, subject to silver and gold prices. Last, turning to our treasury, cash and equivalents came to $55 million when the quarter closed, essentially flat versus the $54 million we had at the start of the year. As Rob pointed out, that figure reflects the closing of $82 million in private placements, with roughly $42 million of that done across 2022 and $27 million in the quarter, mostly coming from a Rio Tinto subsidiary. After that private placement, McEwen Mining held approximately 68% of McEwen Copper; with that, I'll hand things over to Bill Shaver, our COO.
Bill Shaver
executiveThanks so much, Perry. Morning, everybody. The third quarter came in at a reasonable level, even if it fell short of our expectations. Even so, across every operation we're moving forward to build a better future. Where safety is concerned, we had a solid quarter. There was 1 minor medical aid, a worker who experienced neck pain while lifting an oxygen cylinder. On the environmental side, nothing needed reporting during the third quarter. Additionally, at the Fox Complex, construction of the tailing management facility, which lifts every dam by roughly 2 meters, wrapped up on schedule and within budget. At the Fox Complex as well, the mine enjoyed an excellent month, turning out ore holding 13,146 ounces against a budget of 12,441 ounces; that lifted the stockpiled ore both at the mine and in the milling process to 112,000 tons; once milling cost and applied recoveries from the mill are factored in, that equals a value of roughly $10 million. Sadly, mechanical problems have persisted in the Fox processing plant, which squeezed plant availability down to about 77% for the quarter; as a result, this stockpiled ore grew considerably during the quarter. During October, plant availability improved markedly, reaching 90% against the nominal rate of 50 tonnes per hour, or 1,200 tonnes a day. So the plant ran at roughly 1,100 tonnes a day. We turned out 9,000 gold equivalent ounces during the quarter. What we must accomplish, though, is raise the processing plant's rate so the stockpiled ore can be drawn down. The mine is currently sitting in a very sweet spot of its mining life, one that many mines encounter from time to time, where we're able to produce more ore than we can actually process right now; to tackle this, we're debottlenecking the process plant methodically, and at the same time cutting costs at the mine so we remain inside our cost per tonne budget. And we're succeeding at both the mine and the plant in holding costs to our budgets. We'll also put a crushing plant in at the mine to ease the strain on the plant's front end; our hope is that this lets the ore move fairly quickly through the front end of the mill straight into the grinding and leaching circuits. Our hope is that this eases the strain on overall plant availability and lifts throughput. Over at the Gold Bar mine in Nevada, we've reached a point where we better understand the carbonaceous minerals present in the ore and their ability to rob ore from the pregnant solution. This has made the mining process of separating ore from waste in the pit more complicated. Still, we're bringing this under control too. Gold Bar turned out 7,200 ounces for the quarter. Regarding Gold Bar South, the initiative we're currently launching, it faced roughly a 2-month hold-up because of permitting issues. Production out of Gold Bar South is now expected in December. On a brighter side, we've brought on a reliable contractor, and over the past 6 weeks that contractor finished building the road into Gold Bar South, meaning we won't experience any schedule slippage there; additionally, a different contractor has been hired to run the mine. That contractor is moving its equipment to the site during this month so it can assume operations. Preliminary mining has begun at Gold Bar South under this contractor, and the initial roll showed up on site last week. Meanwhile, ore totaling about 100,000 tonnes that had been sitting beside our crushing plant has been run through the plant and placed onto the leach pad. That work wrapped up in October, and the material is now being leached. We're reporting 2,500 ounces of gold for October, and we expect 4,500 ounces total across November and December. As a result, we should generate positive cash flow of roughly $4.5 million during the fourth quarter. Turning to Mexico, we've figured out a way to bring the El Gallo project back into production. The heap leach pad, which grades 0.6 grams per tonne, will be reprocessed. To make that happen, as Rob noted, we purchased a coal processing plant with a capacity of 7,000 tonnes per day that was running until recently at a different mining operation in Mexico; that plant sits about 150 kilometers from our site and was bought recently on very attractive terms. At El Gallo, we'll put together just the grinding, cyclones, and leaching sections of that plant, then rely on the existing El Gallo gold recovery circuit to process the leach pad. A few small permit amendments are needed, and we're finishing up some last revisions to the project evaluation and analysis while engineering and scheduling studies are also underway. Everything coming out of that work should produce an attractive project return along with a fairly modest capital cost ranging from $12 million to $15 million. Our target is to have this plant operational late next year or in early 2024. Thanks so much. I'll hand things over to Steve now for an update on our most recent exploration results.
Steve McGibbon
executiveThank you, Bill, and good morning to all of you. Rather than citing grades and intercepts at this time, I'd prefer to focus on the plans and opportunities ahead in 2023, which stem from work finished during Q3 and Q4. I'm pleased to share that an exploration press release regarding the Fox Complex will be issued soon. Key results will be updated in that release, among them a near surface discovery located East of the mill at stock, plus strong infill results demonstrating the quality of our Stock West deposit; we also have encouraging early results at Grey Fox, which build on the successes from 2021. Service exploration work in Nevada is almost wrapped up for the season and is picking back up at San Jose, as spring has arrived in the southern hemisphere. Over at the Fox Complex, drilling is underway at both stock and Gray Fox through Q4. For us, Q1 2023 will be pivotal for exploring along the Nighthawk Fault as part of our winter program. When it comes to all prior discoveries at stock, Nighthawk serves as the controlling structure. Each discovery has a near surface expression that responds favorably to fire assay and other analytical methods; in fact, you might find it surprising that historically, roughly 5% of past production comes from the prolific Destor-Porcupine Fault Zone. The other 95% largely occurs along secondary fault displays, including Nighthawk. For decades, no exploration has taken place along the 3 kilometers west of Stock West on Nighthawk, even though there are exciting yet limited near surface exploration results there. Our winter program, much like a string of pearls, will be built to indicate the probable additional discoveries along Nighthawk west of past discoveries. The optimal approach for identifying where later, more focused drilling phases should go is systematic near surface drilling that passes through the Nighthawk and into the Destor-Porcupine Fault Zone. When it comes to Gold Bar in Nevada, 'boots on the ground' is the phrase that captures our Q3 work best. This summer, we drew on portions of our geological teams from Argentina and Mexico to speed up surface mapping across areas of the Gold Bar property where nobody has set foot in decades. Completion of that effort is expected in 2023, together with what we anticipate being a very robust overall exploration program. April is when drilling gets started. Mapping may lack the sex appeal that drill results have, but this effort is prioritizing targets with near-term oxide potential to support mining a stones drill from the leach pad south of current mining operations. Over the longer term, similar host rocks and the key contact of the Gold Bar South deposit have been mapped and sampled in other parts of the property, showing strong alteration and rock chip sample grades. At Gold Bar, we observe the geologic framework that hosts world-class gold deposits at Cortez. Our Bartin host rock, which is the analog to Cortez's Windband 5, remains virtually untested away from the Gold Bar mine as a deeper refractory target, especially along the Wall Fault Corridor. The Wall Fault is a significant feature tied to widespread alteration, and our current interpretation is that it represents the southern continuation of the Cortez Fault. Whether 2023 proves to be a breakthrough year for discovery through exploration across Nevada and Ontario is something only time will tell. Still, we have key programs on the table and feel a great deal of enthusiasm about what could happen both near term and over the medium term. Thank you. Our McEwen Copper update will now be given by Michael Meding.
Mike Meding
executiveThank you, Steve. I won't be discussing material purpose programs. McEwen Copper operates as a subsidiary of McEwen Mining, set up in August 2021 to hold the <<inaudible>> copper assets. Nevada's Elder Creek property is made up of 577 <<inaudible>> mines plans with the better amount of copper rates. It shows perspective for gold and copper mineralization, and it sits well within a district that hosts several large copper and gold mines, among them Nevada Gold Mine, Cortez and Fenix. On September 6, 2022, McEwen Copper put its name to an option sheet. The plan is for a subsidiary—chemical acceleration—to gain a 60% stake in the remaining three properties located in Nevada, USA. That would involve putting in $18 million across the coming 7 years. Mining intelligence places the Louis project inside the top 10 of the globe's biggest copper deficits when ranked by resource. Perry mentioned earlier that McEwen Copper wrapped up its first financing round with more demand than available, and Newton contributed $25 million as part of that. The essential mantra centers on creative, readily attainable solutions for copper projects. The funds raised through private placements are being directed toward the Azules project, where we're updating our earlier PEA, tackling risks and opportunities, and advancing the project toward a feasibility study — our way of showing confidence in speeding up its development. That includes applying new techniques, exploration drilling, the resource model, environmental permitting, community engagement, other technical work, and general corporate purposes. During Q3 to date, we've invested $7.6 million in growth-related activities, drilling program work, technical services, and community engagement. Our goal is to get onto the site for a large portion of the year so we can conduct the exploration studies; and in Q3, we made additional progress on our exploration road as we prepared to move equipment and personnel to the sites earlier than planned. The <<inaudible>> to the site are intended to give us new access throughout the year that will properly support the core phase of the project. As for the drilling program, we reached operation on September 26. We locked in multiple drilling contractors for the drilling campaign that lies ahead and started mobilization. We have covered roughly 3.1 kilometers to date, finished 4 holes already, and have 6 holes currently turning. Our resource drilling initiative is designed to deepen our knowledge of the shortfalls and to move the payback pit up into the measured category. Alongside that, we're putting down a number of deeper exploration holes, hoping to extend a resource that's already sizable. On the technical side, the team is making solid headway against the PEA timeline, pulling in every hole drilled plus the meteorological testing from the 2017 and '18 season, along with results from the season before. Throughout the quarter, efforts carry on around the trade-off study for power supply and bringing renewables into the mix, and also around adding more processing alternatives and designing the future heap leach, selling, and waste storage facilities. We've begun deeper environmental reviews of past data and have restarted water monitoring stations that already existed. The first round of company-wide optimization, which finished in Q1 and drew on information we already had, was further refined during Q2 and Q3. This optimization effort pursued two goals: increasing worth by adjusting size and capital requirements together with usage and complexity, and reducing waste to the greatest extent feasible. What the analysis continues to show is that several changes to previously set limits could be achievable, potentially producing a meaningful gain in project value and becoming an objective folded into the upcoming PEA updates. Weather-related testing is still underway, and initial meteorological results arrived in Q3, spanning both flotation and heapage scenarios. More fields were slated for this drilling season, among them environmental baseline work, a program built to grasp the meteorology around the project, and a sizable geotechnical program to help with pitstop design. We intend to release the updated PEA in Q1 of next year, delivering a scalable mine project that presents an appealing investment case for our shareholders. Work on the exploitation environmental impact report — the filing needed for the environmental permit covering future operations — has been <<inaudible>>, and the draft is progressing well toward submission to authorities here in Argentina during the first half of 2023. Our view is that mining can and ought to back socioeconomic development. So with that in mind, on the Los Azules project in Argentina, we've got a dedicated community engagement team. They keep an approachable presence in both the city of San Juan and the municipality of Calingasta, which is where the projects sit. Sustainability work is led by that community engagement team, and their focus areas include local procurement and employment as well as violence, health, education and security. In addition to the facilities already up and running in the town of Calingasta, a new community development office is set to open in November. At this time, our team consists of 120 employees. Within that group, 98% are from Argentina, 17% are women, and over 75% of those women hold professional roles. This demonstrates how we prioritize diversity in our workforce as well as creating strong employment opportunities in San Juan. We appreciate your time. I'll turn things over to Rob now.
Rob McEwen
executiveThanks, Michael. To me, McEwen Mining is worth far more than what our stock currently trades at. Honestly, my estimate puts it somewhere in the range of $8 to $30 per share. That figure comes from summing up what each piece of the business is worth. This valuation is exactly why I've put more than $220 million of my own money into McEwen Mining and McEwen Copper. As I mentioned, I got to that $8 to $30 per-share range by totaling the projected worth of our holdings. McEwen Copper, which includes the Los Azules and Elder Creek property, plus our gold and silver assets and our royalties portfolio. You can find the calculations at the close of today's press release. In my view, the greatest upside will stem from people recognizing just how big and how substantial Los Azules is, and that will show up in our updated PEA, which we will then drive hard to turn into a feasibility study over the next 1.5 years, along with the turnaround happening in our gold and silver assets. Right now, buying shares of McEwen Mining basically means you're paying for the low-end value of Los Azules, and everything else comes to you at no cost. At this point, I'd like to open things up for questions.
Jake Sekelsky
analystCould you give us a bit more detail on that processing facility you bought in Mexico? Maybe what the price was, and how much CapEx savings you think you'll be able to achieve <<inaudible>>.
Rob McEwen
executiveAbsolutely. I'll have Bill speak to that.
Bill Shaver
executiveYeah, so as I mentioned before, this processing facility is a 7,000 tonne per day plant, and it had been operating at a Gold car led <<inaudible>>. That mine was in operation for roughly 7 years, and the plant was relocated from the Gold car site down in Mexico about 5 or 6 years ago. We paid $2.8 million to acquire it. My sense is that if you were building a 7,000 tonne per day plant somewhere, this one would likely save you somewhere in the neighborhood of $40 million, given that the mine only ran for 6 or 7 years. So the plant is essentially brand new.
Jake Sekelsky
analystOkay, that's useful. Turning to Fox now — you said output was somewhat reduced because of some mill bottlenecking, and you described a few of the measures you plan to take to address it. So should we be looking for that to get sorted out during Q4? Or would getting the mill caught up with mining rates perhaps require more time?
Bill Shaver
executiveNo. What I'd say is we're engaged in, and have been engaged in, quite a few initiatives aimed at boosting output and boosting the mine's availability. A new screening process has been put in; we're currently repairing certain conveyor components; yet the thing people need to grasp, I suppose, is that this plant has stood there since sometime in the mid-80s and originally it was put together using secondhand equipment. Consequently a portion of that equipment — particularly at the front end of the plant, the cone crushers and such — is quite old, has performed plenty of demanding work across the years, and therefore simply has poor availability; so we're attempting every measure we can to assist with that problem. And in the end, the finest remedy we're considering right now is to keep running that plant as well as we're able and get it as productive as we can; however, the long-term answer is to enhance the front end of that plant by, in fact, employing some of this equipment we acquired in Mexico to attempt to lift output from 1,100 or 1,200 tonnes a day to a level that's meaningfully greater. We haven't settled on what that figure is, though it's likely somewhere between 1,600 to 2,000 tonnes a day. And then we'd possess the ability to operate near the same rate the mine runs at, which right now is roughly 2,000 tonnes a day that we're able to generate from the mine as things stand. So what we've done to sort of assist with that problem is cut back the development crews. And since the mine is sort of in that sweet spot with plenty of headings and so forth — even though we've cut crew size by 50%, we've only succeeded in lowering output by roughly 25%, because with more headings, you simply create more footage and it's cheaper in effect. So in any case, having a large stockpile is good, but having a large stockpile isn't so good when you'd prefer to have the cash. So we're going through the process of attempting to turn it into a better situation.
Heiko Ihle
analystThis feels like a topic that keeps coming up in today's Q&A. Regarding the processing facility at Fox, the release says that 'we plan to start crushing at the Froome mine prior to transportation to the mill'. Would it be accurate to describe the crushing circuit as the sole bottleneck? Or does the problem extend to the broader plan? Could you perhaps give us some detail on which parts are creating delays beyond what was mentioned in the answer to the previous question?
Bill Shaver
executiveRight; so the tail end of the facility — the leaching and gold recovery side — is in good shape. The grinding circuit in the middle is likely fine, though it relies on 3 mills to handle the grinding work. As a result, over the years, as capacity at that facility grew — and from what I gather it began at around 500 tonnes per day — the initial ball mill was already there, then a second ball mill was installed, followed by a third ball mill. What that leaves you with is a facility containing numerous operating entities. Naturally, whenever you consider availability at a facility, as I'm sure you're aware, it comes down to the availability of every individual component within a sequence of components. Thus, if each item performs at the level one would expect — roughly 95% to 97% availability for a mill — multiplying them all together lands you in the 80% range. Still, the ball mills remain fine since they do function. Duplication is limited there. The front end of the facility, however, is where the bulk of the difficulty lies, since the cone pressure is extremely old. When the facility was, I believe, modified or when equipment was introduced, hardly any consideration was given to how maintenance would be carried out or how access would be provided, whether through cranes, overhead cranes, or otherwise, to reach those pieces of equipment. Consequently, whenever something needs repair, it turns into a fairly major undertaking. And with certain portions of the facility over recent years — I believe plant maintenance has been an area they've grappled with for quite a while. So we're methodically working through every section of the facility. A screen has been replaced, and we've modified part of the feeding arrangement. As I'm sure you know, one of the primary crushers is tied to the old hoisting plant; none of that makes maintenance any easier, given how many components exist and what their individual availability looks like; so it will take time, yet everything we've completed thus far appears to be delivering results. The next phase, then, is to get material crushed to a much smaller size, making it simpler to feed through the front end of the facility.
Heiko Ihle
analystThat's completely clear, and thanks for such a thorough response. Just to clarify, on a totally separate note, regarding those surface stockpiles, do you have any sense of what their average grade is? Is it simply run-of-mill material, or...?
Bill Shaver
executiveThe average grade comes to 2.44.
Heiko Ihle
analystThat's another really precise response. And at this point, what volume of material are you putting in there each week, day, month, or whatever period?
Bill Shaver
executiveWell, I'd say we're putting in somewhere in the range of 7,000 to 12,000 tonnes each month, depending on circumstances. And maybe I should return to what I said earlier. That stockpile has 2 parts. One runs roughly 1.5 grams per tonne, while the other sits just a tiny bit above 3 grams per tonne, and right now it's divided more or less 50 to 50, with ore we're introducing going forward being somewhat higher grade; and what we're doing, I suppose, is that since this grade coming out of the mine presently is just a tiny bit higher, we're sending it straight from the mine to the process plant rather than having it pause in the stockpile.
Heiko Ihle
analystUnderstood. Asking three questions is a bit impolite, I realize. Therefore, I will keep this extremely short. During this call earlier, you said that stock expiration in Q1 '23 is — and here I'm borrowing your term — critical. What amount do you anticipate allocating to exploration during 2023, and potentially in the first quarter as well? You were, after all, at $2.7 million per stock in Black Box in Q3. Is it possible to simply extend that trend line?
Perry Ing
executiveCertainly, Heiko. For the coming year, we have what I'd describe as a worldwide exploration budget of roughly $20 million. Thus, close to 80% of that, I'd say, will be aimed at the Fox Complex; and Steve, as I mentioned, discussed the winter drilling and the work he intends to carry out during the winter. So generally speaking, I'd say it will be distributed fairly evenly across the year, though Steve can likely provide an answer with more nuance.
Steve McGibbon
executiveAbsolutely. Perhaps I could build on what Perry said. We've made a commitment to complete flow-through during 2023. That means the first quarter coming up represents the sole winter campaign in which we're able to go after targets needing winter conditions. So on the whole, I'd expect our spending in Q1 to probably run above the typical quarterly level for the remaining portion of the year. Those figures aren't locked in yet, but that's roughly the direction I see taking shape.
Joseph Reagor
analystJust a couple more things, sort of fine-tuning questions similar to what the previous 2 callers brought up — I mean the detailed stuff that was good. But regarding your guidance for next year, what gold to silver ratio was assumed for that?
Executive
executive85 to 1.
Joseph Reagor
analystAll right. Then, regarding the carbonaceous material issue that's still ongoing, do you expect that you'll be giving us an update on the current resource at Gold Bar? And with the emphasis shifting to Gold Bar South in the coming year, I believe an earlier mine plan envisioned roughly 2.5 million to 2.9 million tonnes annually. Should we be anticipating a lower figure each year moving forward?
Bill Shaver
executiveWell, yes, I don't believe we intend to go below what we previously stated. From Gold Bar sales, we ought to generate ore at the pace we've had in mind. There's also a portion of ore that we'll still be extracting from the pick pit as well as from cabin. But certainly, in the next year, our focus will be on Gold Bar sales.
Joseph Reagor
analystAll right. Then regarding MSC — and I believe this one is also directed at Rob — net income on a 100% basis for the year so far comes to $9.4 million. You folks have received under $300,000 in dividends. When do you expect your partner will begin distributing more cash from that entity? I realize the first half of the year proved difficult, yet it has remained profitable in spite of that.
Rob McEwen
executiveUp to now, they have not indicated any desire to make a dividend payment this year; that could shift since they currently face some issues in Peru involving 2 of their properties. However, as things stand, Joe, we have not observed anything suggesting they will distribute anything additional this year.
Joseph Reagor
analystIs it possible that next year brings a shift on that?
Rob McEwen
executiveTheir fiscal close isn't the usual one, you know. December 31 isn't the date. March, as I recall. So the first quarter is where you might see it happen.
Mike Kozak
analystI have a single question for you. You reported $55 million in cash at the close of the third quarter — what portion of that sits inside the McEwen Copper subsidiary? And what portion consists of any flow-through dollars remaining from the raise you completed, I believe, in March?
Rob McEwen
executiveMike, at present the overwhelming bulk of it is held at McEwen Copper. So I would put it at a touch above $50 million. Right, so the rest, I mean, would be the cash balance belonging to McEwen Mining, and that figure is under the net flow-through raise.
John Tumazos
analystRob, everyone knows how deeply committed you are to these properties—otherwise you wouldn't run this business the way you do or put capital to work like you do. If those projects weren't so compelling, you could be enjoying retirement and hitting the slopes somewhere. Now, when it comes to McEwen Mining's risk profile, is this a sensible way to think about it: you'll keep funding the projects, and that exploration budget of $20 million might grow, though it likely won't shrink. Should some obstacle appear, or should gold prices drop, or copper prices drop, Rob probably wouldn't be fazed if the company came up $10 million or $20 million short—you'd simply write a check. You aren't concerned, and if outsiders are concerned, well, that just means an opportunity to buy. Does that capture it fairly?
Rob McEwen
executiveNo. John, that's one good way to frame it—and it matches how I see things.
John Tumazos
analystI'm not asking for a promise, but my guess is folks outside the firm likely fret far more about this than you do. We're the ones getting grey hair, not you.
Rob McEwen
executiveI'm not so sure about that. No, I can see a clear shift happening in our precious metal operations, and I can see really substantial upside for our share price from the Los Azules asset, which keeps picking up more attention out there. It seemed to me that this was heavily overshadowed by the operational difficulties we went through across the past several years. And at this point, with copper moving to center stage because of the electrification of transportation. I feel quite a bit of optimism about that.
Rob McEwen
executiveThanks very much, operator. Thank you, everyone, for joining the call.
Operator
operatorEveryone, that brings us to the end of today's conference call. We appreciate you taking part. You're free to hang up now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete McEwen Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to McEwen Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in McEwen Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.