McEwen Inc. (MUX) Earnings Call Transcript & Summary
March 1, 2024
Earnings Call Speaker Segments
Rob McEwen
executiveThanks, operator. Morning, everyone, and welcome. I’m happy to report that 2023 was an excellent year for us. Our plan to unlock the worth of McEwen Copper and Los Azules, which is a very large copper project, produced significant benefits, and on top of that, our gold and silver operations raised output, hit their targets, and brought their cost per ounce down, moving nearer to typical industry levels. Beyond that, exploration gave us strong results at Los Azules and at our Timmins properties. Because of all this, we recorded net income of $54.7 million, or $1.15 per share, compared with a net loss of $81.1 million, or $1.71, in 2022. The main reason for these dramatic shifts in our bottom line is our stake in McEwen Copper and its full ownership of the enormous Los Azules property. Before last October, we held over 50% of McEwen Copper. Consequently, McEwen Mining’s financial statements included consolidation of McEwen Copper’s financials with our own, and we had been investing hundreds of millions of dollars to move Los Azules forward, initially reaching an updated preliminary economic assessment that came out in June of last year. At present, we are working toward finishing a bankable feasibility study during the first quarter of 2025. Last October, we closed our third financing for McEwen Copper. That transaction brought our ownership under 50%, down to 48%, which meant we stopped consolidating McEwen Copper’s financials and it created a sizable gain that shows up in our financials — exactly the plan from day one, to unlock value for McEwen Mining. Now, the biggest — in my view, we are trading at a major discount. I can look at a price that — even though we trade near $6 per share, and it is skewed. Management believes our value is somewhere from $7 to $29 per share. So I believe there is substantial upside potential; and the reason is that we essentially hold three groups of assets, and that is the sum of the parts: McEwen Copper, of which we own 48%, a royalty portfolio, and our gold and silver assets. That gives us values from $8 to $30 per share; so I think — you can examine it and conclude we are trading at a large discount relative to significant upside. It has been a tough couple of years for us and for shareholders. From September ’18 through the end of August ’22, our share price moved in a single direction, and it was never the direction I wanted. It went down. I refer to that period as the road to hell. As for right now, I’ll call it the road to redemption. So when we stack up our performance — and maybe this sounds like unwarranted optimism — but if you examine how we've done relative to gold's price, copper's price, the NASDAQ, and the Dow going back to September '22, when the initial McEwen Copper financing took place, McEwen Mining has gained 107%, while the NASDAQ rose 37%, silver climbed 27%, the Dow advanced 23%, gold went up 20%, GDX increased 14%, GDXJ gained 13%, and copper rose 12%. We are plainly beating the pack. There are, I believe, two things driving us. The first is our copper, which I've regarded for a long time as a possible copper unicorn and which we're now watching take form. The second is the reversal in our gold and silver operations, which are generating positive cash flow and funding our exploration work at those sites. We also have a couple of promising development efforts, one of them in Timmins, where we anticipate sinking a ramp and beginning output in '25 at a discovery we identified a number of years back. Stock West, Stock East. We recently released some results showing intriguing high grade in that area. The significance of the stock mine comes down to three things. First, it sits directly next to our mill. That means we'd remove the shipping expenses we presently incur of roughly $10 per ton. Second, there's no royalty attached to it, so we'll avoid that royalty of approximately $1,500 per ounce that we'd otherwise have to surrender. Third, the rock is softer, so we ought to be able to push a greater tonnage of material through the mill and in principle generate more gold from it, which would lower our costs. Over at Los Azules, within McEwen Copper, we issued a highly solid preliminary economic assessment in June. The project we have there — I can't resist doing this — I always take anything that isn't gold and try converting it into gold to grasp its magnitude. So applying that approach to Los Azules and its indicated and inferred resources, you arrive at a resource of 37.6 billion pounds of copper. If you took today's gold price and divided it by copper's price to determine how many pounds of copper equal 1 ounce of gold, you'd get roughly 536 pounds of copper per 1 ounce of gold; divide that into 36.7 billion pounds of copper, and what you have is a gold equivalent deposit of 70 million ounces. The average output of 321 million pounds of copper each year would convert to approximately 600,000 ounces annually; and at a cash cost of $1.07 per pound, the gold equivalent of that comes to just under $600 per ounce. In my view, that's a substantial gold equivalent deposit and it captures the scale and, I believe, the strength of Los Azules. This is — we're contemplating a 27-year life, and I think there remains considerable opportunity to enhance the value of that asset and thereby enhance the value of McEwen Mining. Now, when it comes to the gold and silver properties where we're conducting exploration, I'm pretty happy with the results we're seeing. It has taken some time, but we're definitely headed in the right direction. Our press release lays that out quite clearly. There's another project down in Mexico that we're hoping to move forward on later in the year; and I'd like to circle back to Los Azules briefly, since our approach there differs somewhat from what others in the market are currently doing. The mining sector is generally viewed unfavorably by much of the world. People see it as highly harmful to the environment and not essential to life. Yet I can tell you this: if every mine on the planet shut down tomorrow, modern civilization would come to a sudden stop. And we somehow need to get the word out that we're able to extract the earth's resources in a way that's seen as responsible and mindful of the environment. So at Los Azules, a number of years back, we brought on an architect who's highly regarded in the green living building field. We asked him to assist us in reimagining mining, to examine it in a way that might let us hopefully make progress toward changing how the public perceives our industry. And so our aim is to build the future. And to build the future, it needs to look like the future, both when it comes to the buildings. We've got some fantastic renderings, very cozy, safe, appealing living quarters for the workers, but also we're considering how we handle the world; and we're envisioning a project with a far smaller environmental footprint, at first putting out one third of CO2 emissions, consuming under one quarter of the water that a similarly sized, conventional copper mine would use, being powered by 100% renewable energy drawn from hydro water and wind and turning out a sustainable copper cathode. The majority of copper mines around the globe today turn out concentrate that must be sent to a smelter, then processed into something industry can use. With our copper cathode, it's able to go straight to industry and eliminate the transportation cost. And we believe that will draw a premium in the marketplace too. So with that said, I'd like to open things up for questions.
Heiko Ihle
analystHi there. My apologies — my line was muted. Hi Rob, and hello everyone on the team; I appreciate you fielding my questions. During this call, earlier on, the topic of reduced production costs came up, and as of now it is officially March, meaning we are two thirds of the way through Q1. In Q1 so far, how much additional savings on costs have you observed? And perhaps you could offer some detail regarding where those savings originate. I realize the release contains your guidance, but maybe you would like to share a little extra color with actual figures.
Rob McEwen
executiveHeiko, I am going to have Bill respond to that one.
William Shaver
executiveYes. Thank you for that question, Heiko. The factors behind those expenses are really quite basic when you look at what goes into them — what we pay for labor, what we pay for power, and the exposure tied to all of that. So the task before us in 2024 and beyond is that we must get more ounces out of the ground so that some of those monthly operating expenses come down, which lets us bring the total operating cost lower and, naturally, lift the margin as well. That is essentially where we are headed. When we shift from mining — from the mine into stock, we move from a work index somewhere between '21 and '23 to one sitting at, let's say, '14 to '17. That gives us the ability to push a greater number of tonnes per day through the plant. Grades stay largely the same. As a result, we can raise output from the current 50,000 ounces a year to 60; and over a longer horizon, I'd say we are also exploring options to lift that tonnage somewhat further by adding capacity to our grinding circuit. So those are, roughly speaking, the near-term and longer-term goals when it comes to bringing the operating cost per tonne and per ounce down.
Heiko Ihle
analystYeah, that was nice. Thanks. Moving to a completely separate topic. Back in December of last year, you completed a fairly sizable flow-through financing worth CAD22 million. At Fox this year, how much of that has been used so far? And how much — should we basically just assume it's spread evenly across each quarter?
William Shaver
executiveYeah. So yeah, out of that entire sum, roughly 50% is, or CEE for drilling. And if you take that and divide it by, let's say, around 10 or 11, that gives you what gets spent each month. The CEE covers building out the infrastructure at stock, and that will get — we'll kick off the spending, I suppose, when the second quarter begins. And so — and then it will be used up across the remainder of the year. So that's likely around slightly more than $1 million to $1.2 million per month.
Heiko Ihle
analystAll right, I'll rejoin the line later. Appreciate it, everyone.
Rob McEwen
executiveThank you, Heiko.
Joseph Reagor
analystHey, Rob and Team.
Rob McEwen
executiveHey, Joe.
Joseph Reagor
analystHi there. I appreciate you fielding my questions. So, to start with, given that Q4 included such a big gain, could you strip that out, and on a like-for-like basis, how would Q4 earnings have come in?
Rob McEwen
executiveJeff, your turn.
Jeff Chan
executiveAbsolutely, I'll handle that question. Our net income for the year came in at $54.7 million. To that, I'd add back the $224 million accounting gain, then subtract the $37 million in deferred tax accounting effects tied to it. So after backing those items out, I believe that would put the earnings from that accounting on a normalized basis.
Joseph Reagor
analystYeah, the taxes were what I needed there. Appreciate you clearing that up. All right. And then when you consider 2024, aside from putting out the copper, what are the major items you're focused on for growth during this year and perhaps into the next one? Is it the assets in Mexico? Is it advancing Stock and drilling it out further? What ought we to be watching?
Rob McEwen
executiveThe first thing, after Los Azules, would be Timmins along with the advancement of the Stock property, which acts as the following source of production to come online. And there's a fair amount of exploration happening there. We've put out a couple of press releases lately discussing the growth in the resource at Stock, then the one at Stock East. Some high grade there has been interesting. And we're drilling as well at Grey Fox, where there's more than 1 million ounces; we're examining potential additions, if we can achieve them, from nearby areas that would complement our production base. Mexico would be second.
William Shaver
executiveYes. Mexico would be the second one. I believe we need to finish — well, the engineering must be finished, but what's really driving it is likely the permitting stage, and we're hoping to receive those permits at some point around the middle of this year. That said, securing permits is difficult everywhere in the world right now. So precisely where or when that will come through is uncertain. Still, it's included in the future plan. There's also an initiative we have to grow output at Gold Bar. As you're probably aware, Gold Bar is a site that has a leach pad. And at Gold Bar we have — there are sufficient distinct work areas for us to raise production. During the prior year, we managed to build our new leach pad. As a result, we now face no restrictions regarding the space available for placing material to be leached. Therefore, one strategy for this year involves boosting ore production at Gold Bar, getting that ore onto the pad, which will lead to a rise in the total ounces produced there. So I believe our aim is to enhance output across all three operations — or the two that are currently operating — and also in Mexico; that, I think, is what we're targeting this year. After that, as we continue ahead, the idea is to keep pursuing that type of growth and perhaps attempt to bring the entire Timmins complex along. So it would be generating, let's say, 25% or 30% improved tonnage as we head into 2025.
Joseph Reagor
analystAlright, that sounds fine. And then one last item, Rob — any perspective from you regarding the possible reversal of Mexico's new mining exploration legislation, and what kind of effect that could have on you folks should it actually be overturned.
Rob McEwen
executiveAll we're doing is keeping an eye on it. Permits have been obtained by us there; however, politics can be somewhat hard to forecast, Joe; therefore we're proceeding on the basis that the in-pit tailings disposal we received approval for is going to remain in place. It could — if it were to happen — have an effect six years afterward, since the initial six years involve reprocessing the tailings, or rather not the tailings, the heap leach.
William Shaver
executiveThat's right.
Rob McEwen
executiveYeah. So in the near term, there's time for us to find out whether it gets repealed.
Joseph Reagor
analystAlright, I appreciate the remarks. I'll hand things over now.
Rob McEwen
executiveThanks to you.
Rob McEwen
executiveHello, John.
John Tumazos
analystHi there, and thanks. So, I'm thinking about roughly 12 months from now, once the definitive fees have been fully settled.
Rob McEwen
executiveAll right.
John Tumazos
analystFor McEwen Copper, or perhaps what the Board generally agrees on, McEwen Mining, Rio Tinto, Stellantis, and so on — what does the road ahead look like? Is the following move to seek permits, or to carry out early construction work? That access road put in to support the detailed drilling program, I take it, counts as one of those early works that's already finished? Give us a sense of how things will unfold once the definitive fees are settled.
Rob McEwen
executiveThe feasibility study comes in Q1 of next year, and following that, roughly a year of engineering will be needed before we decide to put a shovel in the ground. As for — Mike has put together a team, a highly assured group of nationals with plenty of experience constructing in San Juan province, which is where Los Azules sits. And we're proceeding on the premise that we — they've constructed quite large mines, gold mines, down in that area. And they — here's a group capable of building it; we do have some major shareholders who might want to — who would rather operate. But right now, we're proceeding as if we could build it. Mike, is there anything you'd like to add to that?
Michael Meding
executiveHello, John. It's a pleasure to have this conversation with you. Our environmental permit application for both building and running the facility was submitted in April of last year. Right now, we're participating in a series of discussions with the various members of the ambulatory commission. We're anticipating receiving that environmental permit during the latter half of 2024. Following that, just as Rob mentioned, once the detailed engineering work has been completed and while simultaneously securing the other outstanding permits, that represents the route we'll take. No choice has been finalized at this point regarding the method we'll use for construction, which aligns with what Rob stated earlier. Nevertheless, in our view, Los Azules as a whole, especially when set against other ventures in the area, offers strong constructability paired with modest CapEx. That, I believe, ought to benefit us when it comes to financing as well as the construction work ahead.
John Tumazos
analystThank you.
Rob McEwen
executiveYou’re welcome.
Rob McEwen
executiveAppreciate it, operator. I want to express my gratitude to all of you for joining the call. In my view, what lies ahead for us appears considerably more promising than it did a few years back. Just a moment, we're climbing higher. Thanks.
Operator
operatorThat brings us to the end of today's call. Thanks to each of you for being here. You can go ahead and disconnect now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete McEwen Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to McEwen Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in McEwen Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.