MISC Berhad (MISC) Earnings Call Transcript & Summary

February 18, 2021

KLSE MY Industrials Marine Transportation earnings 67 min

Earnings Call Speaker Segments

Operator

operator
#1

Ladies and gentlemen, welcome to MISC Fourth Quarter FY 2020 Analyst Briefing Conference Call. Rozanah from MISC Investor Relations team will run through the agenda for today's briefing. Rozanah, over to you.

Rozanah Hamzah

executive
#2

Thank you, Akadi. A very good evening, ladies and gentlemen. Thank you for participating in our fourth quarter financial year 2020 analyst briefing. My name is Rozanah Hamzah from MISC Investor Relations. And we have with us today Cik Raja Azlan Shah Raja Azwa, Vice President of Finance; Cik Eslin Halimi, Head of Financial Reporting, Governance and Budget, Finance; Cik Emran Othman, Vice President of Corporate Planning; Mr. Vincent Ng, General Manager of Corporate Planning; and Cik Suhaimi Saad, General Manager of Corporate Planning. We will now proceed with the presentation on financial highlights for the quarter's performance, which will be presented by Cik Eslin, followed by market outlook and business update by Mr. Vincent. At the end of the presentation, we will open the line for a Q&A session. Our event manager will later provide instructions on the Q&A process. Before we start with the presentation, I would like to bring to your attention to the disclaimer slide. During the presentation, we may make some forward-looking statements in reference to our plans and expectations, and actual results could differ due to unknown risks, uncertainties and other factors that are, in many cases, beyond MISC's control. With that, I pass the session to Cik Eslin for our first agenda, the update on MISC's fourth quarter financial year 2020 financial performance. Cik Eslin, over to you.

Eslin Halimi

executive
#3

Good evening. Thank you, Rozanah. Thank you to the participants for joining MISC Berhad Quarter 4 2020 Analyst Briefing. I'll start off with the Page 3 of our AB pack. Higher revenue for the quarter, mainly due to the higher revenue from Offshore segment due to the recognition of construction revenue for an FPSO unit. Higher revenue also contributed by the Heavy Engineering segment due to the increased activities in ongoing projects as well as higher revenue during the quarter contributed by the LNG segment following the delivery of one VLGC unit. However, the above positive contribution was offsetted by the lower revenue from Petroleum segment, mainly due to lower TCE rates as well as lower earning days due to lower number of vessels in operation. Higher PBT from operations during the quarter due to the higher revenue from Offshore segment as a result of higher share of profit recognized during the quarter from a joint venture contract extension, coupled with the recognition of construction profit for our FPSO unit. The above, however, was offset by lower profit before tax from Petroleum segment due to lower margin on trade rates. For the nonrecurring items during the quarter, there were write-back of trade receivables in quarter 4 2020 as well as impairment of LNG vessel and offshore assets in the current quarter. As compared to the preceding quarter, there was an impairment of an offshore asset. On Page 4 of our AB pack, higher revenue and profit before tax from operations were contributed by the reasoning that I explained as per the Slide 3 earlier. Moving on to Page 5 of our AB pack. Cash flow from operations continuously recorded a reasonable level as compared between the preceding and corresponding quarter, mainly due to the collection from our main segment, which is LNG, Petroleum, Offshore and Heavy Engineering segments. However, as we compare our current quarter CFO as well as the preceding CFOs versus the corresponding quarter CFO, the reduction was actually due to the nonpayment as a result of the ongoing legal case. On Page 6 of our AB pack, our debt balances at this juncture, hovering around $3.2 billion since December 2019. This is mainly due to quarterly repayment and drawdown for the project during the quarter. Now we're moving on to financial performance by business segment. On Page 7, for LNG Shipping, revenue and profit before tax were quite stable between the comparative quarters. However, we can see higher revenue in the current quarter, mainly due to the higher earning days from the delivery of VLEC that I mentioned earlier. On Page 8, for Petroleum Shipping segment, lower revenue recorded as compared to preceding quarter, mainly due to lower TCE rate for mid-sized tankers and VLCCs as well as lower earning days. This is also the same reasoning for the corresponding quarters. However, we can see lower profit before tax in the current quarter as compared to the preceding and corresponding quarters, mainly due to the lower reasoning for the revenue, as mentioned above. On Page 9 for Offshore business. For the current quarter, higher revenue was reported, mainly due to the recognition of a construction profit from our FPSO unit. Whereas our PBT during the quarter, higher profit before tax reported, mainly due to the recognition of the share of profit from joint ventures due to the contract extension as well as the condition of the construction profit for an FPSO unit. And finally, in the last segment, on Page 10 of the AB pack, Heavy Engineering recorded the current -- higher revenue in the current quarter, mainly due to the higher revenue earned from the ongoing projects. However, as you can see, Heavy Engineering segment recorded a loss before tax in the current quarter due to the provision made for COVID-19 impact, which was affecting Heavy Engineering results this quarter accordingly. I will now pass to Vincent for market environment and business updates. Thank you.

Vincent Ng

executive
#4

Thank you, Eslin. If I may bring attention to slide -- Page #12. We'll start with LNG shipping. For LNG shipping, rates -- the rates for fourth quarter were very high. It was surging from third quarter to fourth quarter. This is due to a few reasons. There was a strong demand due to an extreme Asian winter. There were also some outages on LNG liquefaction facilities due to maintenance and outages as well as a shortage of available vessels, partly due to a congestion at the Panama Canal. So we see that in even -- this has extended into January, so we see January rates have also continued to rise. Going to the next page. When we look at the new building deliveries that have been contracted to the shipyard, we see that in 2021, there are going to be quite a large spike in delivery for the year, and this is expected to put some pressure on charter rates. This is also compounded by the fact that in 2021, it is expected that the liquefaction facilities that are supposed to come online this year will be substantially less than what it was in 2020. So there will be further pressure due to that as well. Having said that, I think most of our analysts will follow that most of our vessels are on long-term charters so they are not directly affected by this. Moving on to Petroleum. Petroleum, as mentioned by Eslin earlier, has been affected by low charter rates, and it's been quite poor in the fourth quarter due to the recovery in the oil demand has not been that quick as originally thought and as well as there has been supply restrained by the OPEC+ members to manage the oil prices. At the same time, there has been oversupply of vessels. A lot of the vessels that were originally on floating storage in the earlier part of the year have gradually been unwinding their position and coming back into the active market. So we see that this market is expected to remain challenging for large part of the coming year. But hopefully, we think that there could be some recovery towards the end, depending on how fast the economic recovery happens, including vaccination and so on. On Slide 15, looking at the supply of vessels from petroleum side. You can see that there were -- there's going to be a moderate level of newbuild deliveries in 2021, just slightly above what it was in 2020. There are some additional newbuilds that were ordered in the fourth quarter so there could be some anticipation of demand picking up in future years. On the demolition side, we can see that demolition in the last 2 years has been extremely low. Having said that, we think that there are sectors that will encourage more demolition in 2021 as a lot of the old vessels that were originally put out for floating storage are coming out of floating storage, and these old vessels are quite likely candidates for scrapping. Turning over to the Offshore segment. On Page 16, you can see that the 2020, there was a sharp drop in Offshore CapEx. And 2021 itself will be fairly subdued as well, not expected to do much. But then going up from '22 onwards, it will be rising. Having said that, we can see that for floating production systems, or FPS, there is still growth in there with -- you can see that is the dark -- represented by the dark blue bars. There is still expected to be growth in the FPS sector, and most of it will be in the Latin American segment. That wraps it up for the market development. I will now go to business update. On Page 18, business updates-wise on LNG side. We took delivery of our second VLEC, Seri Erlang, in the early part of the year. This will be the second of 6 VLECs that we are acquiring and -- on the charter to Zhejiang Satellite Petrochemical Co. Ltd. for 15years. We continue to explore opportunities for charters in this space as well. On the Petroleum & Chemical business, the portfolio mix remains at 65:35 in this quarter, which is the same as what it was in quarter 3. During the quarter, we took a delivery of a new DPST, Eagle Passos. And then after the quarter, we took delivery of Eagle Pilar. This is another DPST. One of them for Petrobras and the other one for Shell Brazil. During the quarter, we also sold one VLCC, which is Bunga Kasturi Tiga, and 2 Aframaxes. Going on to Page 19 on Offshore. During the quarter, we extended the charter for FPSO Espirito Santo by 5 years with Shell Brazil. And we also successfully delivered FSO Golden Star to offshore Vietnam. During the quarter, FSO Angsi was scrapped. The other update on offshore is on the legal update. On the case of the application for Gumusut Kakap, there is not a significant update on this one. The -- we are still pending expected hearing of the case in second quarter. So I won't go through in detail on the -- pages that we -- on the description that follows, which you can read for yourself. Similarly, on Page 21 onwards, for MOMPL case, there is also no development during the quarter. Finally, on Heavy Engineering on Page 23. Just to cover the year-to-date achievements of Heavy Engineering, we have completed the construction of the FSO Golden Star external turret, sail away of Bokor central processing platform, a sail away of Bergading Mercury Removal Unit and the completion and sail away of the Pluto Water Handling Module. Those are the key completions for Offshore. And for the Marine Repair side, completed repair and maintenance of 64 vessels and secured 61 jobs during the year, including the -- and the completion of a conversion work for FSO Golden Star. A notable accomplishment during the quarter was the completion and commencement of operations of MHB Dry Dock 3 in December, which will significantly expand its capacity in its Marine Repair business. The order book backlog is MYR 1.9 billion. And in terms of the engineering -- heavy engineering tenders submitted as at December is MYR 12 billion worth. So I think that covers it for my end. I will now pass it back to Rozanah.

Rozanah Hamzah

executive
#5

Thank you, Eslin and Vincent, for the presentation on financial performance and business updates. With the completion of the presentation, I would now like to hand over the call to the event manager, who will guide and manage the Q&A session. Akadi, over to you.

Operator

operator
#6

[Operator Instructions] Our first question is from UOB, Ho Kong Meng.

Ho Meng Kong

analyst
#7

Yes, I know I have a lot of questions. I sent some of the questions in my email earlier. But before I cover my other questions, can I just quickly ask, you mentioned in the offshore side, there is construction gains of the FPSO as well as the contract extension for Espirito Santo. May I know what is the amount for both of those items? Just quickly for those before I jump to my next question.

Raja Azlan Bin Raja Azwa

executive
#8

This is Azlan here. Okay. I mean for the Espirito Santo, we recorded, again, from the share of profit from joint venture about USD 50 million. And for the construction gain for the FPSO, the one that we're doing, it's about USD 20 million.

Ho Meng Kong

analyst
#9

Okay. Espirito Santo is 5-0, USD 50 million?

Raja Azlan Bin Raja Azwa

executive
#10

That's our share because this is a joint venture.

Ho Meng Kong

analyst
#11

Okay. Okay. All right. USD 50 million and Mero is -- how much in '20?

Raja Azlan Bin Raja Azwa

executive
#12

USD 22 million. USD 22 million to be precise.

Ho Meng Kong

analyst
#13

USD 22 million. Okay. All right. Got it. Okay. Okay. So I jump to my -- the questions in the email. Based on -- okay, assuming -- based on your projections -- I'm sure you've done your projections, right? Just assuming if industry tanker rates do not recover for 2021 -- let's assume that -- this kind of worse-case scenario. But in view that you have new projects coming in, are you able to at least maintain your dividend payout? Or is there a risk that you may have to cut your dividend for -- at least for this year? That's my first question.

Raja Azlan Bin Raja Azwa

executive
#14

Yes, we hope to maintain the dividend, Kong Meng.

Ho Meng Kong

analyst
#15

Okay. That means maintain the $0.33 or at least $0.30.

Raja Azlan Bin Raja Azwa

executive
#16

Thereabouts. Thereabouts. Because we believe that our recurring cash flow is still -- this year, we recorded about $1.25 billion of cash flow from operation. We hope that we will still be able to be at the level...

Ho Meng Kong

analyst
#17

Hello? Hello? Your line broke up. I can't hear you. Hello?

Raja Azlan Bin Raja Azwa

executive
#18

Yes. This year, we -- for the past few years, we have recorded a cash flow from operation of about USD 1.25 billion, yes?

Ho Meng Kong

analyst
#19

Yes. Yes.

Raja Azlan Bin Raja Azwa

executive
#20

Yes. So on that basis, we hope that we will still be able to maintain thereabouts. And because we feel that we are maintaining our cash flow from operation, we should maintain the dividend as well.

Ho Meng Kong

analyst
#21

Okay, got it. Okay. And just to jump quickly earlier, the construction gain from Mero, right, that will be an ongoing item in the next few quarters, right? Would it be a growing number as you progress in your construction?

Raja Azlan Bin Raja Azwa

executive
#22

Yes. Yes. Yes. We hope to make good progress this year so you should see, I mean, a sizable portion of our profits coming from that this year. But again, these are accounting profits.

Ho Meng Kong

analyst
#23

Got it. Okay. Okay. And jump quickly to the LNG, right, in the -- during the quarter for LNG, is the VLEC contribution sizable in the fourth quarter? Or is it quite small?

Raja Azlan Bin Raja Azwa

executive
#24

No. No. It's not very big because we just brought it on board. We should be able to see a more meaningful contribution this year as I think by first half of the year, we should be able to take delivery of all 6.

Ho Meng Kong

analyst
#25

How much was it in the fourth quarter? And how much do you expect after all 6 are delivered?

Raja Azlan Bin Raja Azwa

executive
#26

Not much. I think in terms of profit, maybe $1 million or $2 million in the fourth quarter as well.

Ho Meng Kong

analyst
#27

In US dollar, right?

Raja Azlan Bin Raja Azwa

executive
#28

Yes. Yes.

Ho Meng Kong

analyst
#29

Okay. Okay. And just to continue on the LNG side, I understand you have a number of expiries of contracts within the next 4 years. Are you able to break down by year how many of those expiries sit in this year, next year and the year after?

Raja Azlan Bin Raja Azwa

executive
#30

Yes. I mean without going into detail, you're right, there's going to be some assets up for expiry. Yes, I don't want to go into the detail yet because we are still working on backup plans of how to get these things to be utilized.

Ho Meng Kong

analyst
#31

Okay. But which year is the peak year of the expiries? Is it 2023, 2024?

Raja Azlan Bin Raja Azwa

executive
#32

Yes. If I'm not mistaken, we have one coming every year.

Ho Meng Kong

analyst
#33

Okay. Okay. All right. And among the -- and moving forward for the upcoming first quarter results, should we expect a better earnings base for your LNG centers overall because of the high demand for spot trade? And also for your spot vessels, any of them have paid tariffs -- were able to capture the high rates that happened in the past [indiscernible]?

Raja Azlan Bin Raja Azwa

executive
#34

Can our team members help out here about the Balhaf and Balqis? What's the situation?

Vincent Ng

executive
#35

Yes, Azlan, I will chip in here. For the 4 spot vessels that we have, 2 of them are able to take advantage of some of the upside from the increase in rates. We have variable rates in the charter vessels.

Ho Meng Kong

analyst
#36

When were they -- when were those 2 renewed? Was it the end of last year or early this year?

Vincent Ng

executive
#37

Well, some of them have been around for a while. Offhand, I think they have been extended for a few times. So I can't think of specific date, but they have -- we have had several extensions in Balhaf and Balqis during that period.

Ho Meng Kong

analyst
#38

Mero extension -- you mean throughout fourth quarter?

Vincent Ng

executive
#39

The previous year. I think the previous year.

Ho Meng Kong

analyst
#40

Okay. Okay. Okay.

Vincent Ng

executive
#41

The extensions are typically a few months at a go.

Ho Meng Kong

analyst
#42

Yes. Yes, I understand. And the next one will be when? The next -- when is your next spot renewal period?

Vincent Ng

executive
#43

Of the 4 vessels, 2 of them have expiry in the first half of '21, and the other 2 have expiry in the first half of '22.

Ho Meng Kong

analyst
#44

First half '22, okay. Okay. Okay. I'll move over to the crude tanker side. Okay. I want to cover the mix first. Okay. I understand that your spot mix in total is unchanged on a quarter-on-quarter basis. But if you go by build, between the 3, VLCC, Aframax, Suezmax, is it the same spot mix as well versus the third quarter mix?

Vincent Ng

executive
#45

Okay. I will -- let me go through the mix for -- one by one. For VLCC, in fourth quarter, it was -- term to spot is 94:6. For Suezmax, it's 68:32. And Aframax is 51:49.

Ho Meng Kong

analyst
#46

Okay, got it. All right. Okay. And among your spot contracts right now, in view that bunker cost has been growing very high in tender in oil prices, are you like not -- do you have any protection at all? Or are you 100% exposed to the bunker cost trends for your spot centers? Or is there some sort of degree of protection from -- in your -- and how much is that?

Vincent Ng

executive
#47

I don't have an exact figure. But typically, our bunker, we do have some forward purchases of bunker. I don't have an exact figure, but it's -- we do forward purchase of bunker on a rolling basis. So that may so-called moderate some of the spikes in the oil prices over time. But otherwise, we are -- basically have to contend with the market because -- based on market charter rate.

Ho Meng Kong

analyst
#48

Okay. And for the time charters, right, okay, the time charter is also going down as well. I think recently, some of -- one of your vessel was -- for the VLCC was renewed at $27,000. Okay. I know that your time charter risk -- your time charter contract has a pass-through mechanism and everything. But if we include the [indiscernible] finance cost, that $27,000, are you able to make profit on the VLCC level for the time charter? Is that a profitable rate after the [indiscernible] finance cost is [indiscernible].

Vincent Ng

executive
#49

Can I get help from the finance team on this question? Are you able to compute?

Raja Azlan Bin Raja Azwa

executive
#50

Okay. You're talking about the VLCC. Is that right, Kong?

Ho Meng Kong

analyst
#51

Yes. Yes. I think one of the [indiscernible] report mentioned that your -- one your VLCC, Eagle Varna, has a 1 year contract, $27,000. So I just want to know at this rate, including the pass-through, but also if you assume on the property level after the [indiscernible] finance costs, are you able to make profit at this rate?

Raja Azlan Bin Raja Azwa

executive
#52

$27,000?

Ho Meng Kong

analyst
#53

Yes, dollars.

Raja Azlan Bin Raja Azwa

executive
#54

Yes, I believe we can.

Ho Meng Kong

analyst
#55

Okay. Okay. So it's still above your profit breakeven?

Raja Azlan Bin Raja Azwa

executive
#56

Yes, yes.

Ho Meng Kong

analyst
#57

Okay. Okay. Okay. And for the Aframax, right, with the recent storm that hit the U.S. site, that shut down their plants over there, has that been -- I mean, it's still early days, but has that been more positive or more negative to your Aframax business in the U.S. side moving forward?

Vincent Ng

executive
#58

Sorry, Kong Meng, could you repeat that again?

Ho Meng Kong

analyst
#59

With the reason weather that -- the harsh weather that hit the U.S. sites, their downstream plants and their production -- the crude production there. And I mean, you do have the Aframax -- your Aframax business in the U.S., right, that depends on import and export of crude. Has that been -- do you think that will be a net positive or net negative to your Aframax business there?

Vincent Ng

executive
#60

Okay. This is very recent so I don't have a specific update unless my colleagues can help me out. I don't have an update.

Raja Azlan Bin Raja Azwa

executive
#61

Maybe I will say, Kong Meng, it's going to be -- our first quarter for Petroleum is going to be a tough one. It's not going to be a rosy quarter for us.

Ho Meng Kong

analyst
#62

Yes. Yes. Okay. Okay. And moving forward to -- just to quickly touch on Mero-3. Congratulations for the [ development ] of your yard and also -- and I think according to another report, the -- I think initially, you were expecting up to 30-plus module for FPSO. But right now, it's confirmed at 36 modules, something like that. So overall, my question for Mero-3, are you still looking at a $2 billion CapEx? Or based on the current estimate, it is now lower than $2 billion.

Raja Azlan Bin Raja Azwa

executive
#63

I think our CapEx projection, $2 billion was on the high side. We hope that we'll be able to make some savings on that $2 billion.

Ho Meng Kong

analyst
#64

Okay. So $2 billion is [ max high ]. So depending on how you design, there's room to save on that?

Raja Azlan Bin Raja Azwa

executive
#65

Yes. Yes.

Ho Meng Kong

analyst
#66

Okay. Okay. And my last question on the new thing that IMO, they want to introduce additional carbon reduction clauses, which may be effective in 2022 with -- on all ships. I don't know whether you have studied it. But if you know, can you comment on whether all your ships are already compliant to the new upcoming rule that IMO will implement? And if not -- if you do have some ships that are maybe noncompliant, how much -- or percentage of those ships you may need to dispose?

Vincent Ng

executive
#67

I don't have a specific update for you on that. We'll have to come back to you, okay? It's still...

Ho Meng Kong

analyst
#68

Okay. It's a tough regulation. It's not implemented yet, but it is something -- yes.

Vincent Ng

executive
#69

Yes. It's still something being studied so I don't really have an answer for that.

Operator

operator
#70

Our next question is Alex Goh from AmBank Research.

Khir Goh

analyst
#71

I have got a few questions. Maybe I'll just run through one at a time. Regarding your construction gain from Mero, you've mentioned USD 22 million. Could you -- can I understand, what was your -- the profit margin on this? Basically, what was your revenue you recognized? And going forward, is this margin going to -- is it going up because depending -- following the S curve?

Raja Azlan Bin Raja Azwa

executive
#72

Yes, this is about around 20% margin, Alex.

Khir Goh

analyst
#73

I see. And going forward, how would be the shape of the trajectory going forward for this year?

Raja Azlan Bin Raja Azwa

executive
#74

In terms of progress, yes?

Khir Goh

analyst
#75

In terms of the profit margin. So should we be looking further towards a mid-20 level? Or should we still be on the same 20% level?

Raja Azlan Bin Raja Azwa

executive
#76

I think for this kind of project, we will land maybe in the high teens.

Khir Goh

analyst
#77

High teens, that may be lower than the 20% that you recorded in the fourth quarter. Is that right?

Raja Azlan Bin Raja Azwa

executive
#78

Yes, yes. Basically, I think if I'm not mistaken, based on the numbers that I saw, it will be high teens. But whatever it is, these are just accounting profit. We do not preoccupy ourselves with accounting profit. Just focused on the cash flow.

Khir Goh

analyst
#79

Okay, I understand that. And also your -- on a JV recognition on the 5-year extension for Espirito Santo, could you explain to us how -- why was this -- was there a one-off adjustment here? $50 million, how did it come about?

Raja Azlan Bin Raja Azwa

executive
#80

Okay. There's a few points here. Number one, we are extending the contract by 5 years, right, so there is some upside there. And number two, because of the extension of the contract, based on the accounting rules, we need to move from operating lease accounting to finance lease accounting. And this is where -- based on finance lease accounting, we normally will bring some upfront gain. And if you look at -- into the JV's account, as we move from operating lease accounting to finance lease accounting, we need to release a lot of the deferred income because when it was calculated -- when it was accounted for as an operating lease, the -- in order to straightline the profit loss account, there were some amounts which were booked in to the deferred income. So as we move to finance lease accounting, a huge deferred income needs to be released. And that's why there's this huge gain. At the JV level, it's a gain of more than USD 100 million. So our share is USD 50 million.

Khir Goh

analyst
#81

Okay. That's great. And also I got one question regarding your delivery of vessels. You mentioned there's going to be 6 VLEC delivery in the first half. But I'm looking at your schedule of future deliveries. You've indicated only 5 deliveries for the first half. Was there one delayed from last year?

Raja Azlan Bin Raja Azwa

executive
#82

No. One was -- we took delivery of one vessel last year.

Khir Goh

analyst
#83

Oh, I see. Okay. So for 2021, there will be 5 vessel delivery, am I right?

Raja Azlan Bin Raja Azwa

executive
#84

That's right.

Vincent Ng

executive
#85

Correct. That's correct.

Khir Goh

analyst
#86

Okay. And could you give us -- is it -- will it be in the second quarter or first quarter that you're going to see in -- for the 5 deliveries?

Emran Othman

executive
#87

Most likely the first half. Emran here, by the way.

Khir Goh

analyst
#88

Okay. No, I'm sorry, is it going to be first quarter or second quarter, third quarter?

Emran Othman

executive
#89

It's a mix of first quarter and second quarter.

Khir Goh

analyst
#90

I see, okay. And for the LNG carriers, there's going to be 2 deliveries in 2021. Could you give us exactly -- could you give us the amount or maybe the quarter of when it is going to be delivered?

Vincent Ng

executive
#91

I think we will stick to what's on the schedule there, which is first half and -- first half of the year and the second half of -- first half '21 and second half '21, one each.

Khir Goh

analyst
#92

Okay. Okay, great. Okay. That's -- okay. My last -- one final question. Given the fact on your -- the legal case for your MOPU, the 2 MOPUs, it seems that the court have awarded about -- around $15 million to you. Should we be expecting any type of write-back from that -- from the legal case?

Raja Azlan Bin Raja Azwa

executive
#93

Yes, Azlan here. We are going to try to take this to the end. So at this juncture, we are sticking to our guns here, Alex. We are not going to back down at the moment.

Khir Goh

analyst
#94

No. No. What I mean is that it seems like the court have awarded you up to -- first of all, there was $10 million, and the other one is about USD 5 million. So all together, it was about $15 million awarded to you. So would there be any accounting entries in terms of write-back?

Raja Azlan Bin Raja Azwa

executive
#95

MOPU. Sorry. Team, do you know what he's talking about? Team, I don't see this $15 million plus $5 million.

Emran Othman

executive
#96

I'm not very sure which particular court case in regards to MOPU.

Eslin Halimi

executive
#97

Yes.

Emran Othman

executive
#98

Because as far as we are concerned, there is no any court case in regards to MOPU, unless I'm not aware of it.

Khir Goh

analyst
#99

Okay. No, because I'm looking at page -- on Page 21, on your Slide 21, you mentioned -- on the first and the second bullet point, you were awarded an entire claim of about USD 10 million, and the other one was about USD 5 million plus interest. So I'm just wondering, would there be any kind of gains that you could -- that you're going to recognize in the next quarter?

Vincent Ng

executive
#100

We're actually proceeding on our -- on a few other cases. So I think we don't have a legal advise as to comment on that at the moment. Can we come back to you on that?

Khir Goh

analyst
#101

Okay. Yes. Yes. No problem. That's all from me for now.

Operator

operator
#102

Next question is [indiscernible].

Unknown Analyst

analyst
#103

Just very quick 3 questions. First, on the LNG segment. It was mentioned that the fourth quarter EBIT was partly -- was lower partly due to higher vessel OpEx. Could you elaborate on this one?

Raja Azlan Bin Raja Azwa

executive
#104

Yes. This one is basically relating to a change in accounting treatment for our spare, where previously, we inventorized our spares. But because we are moving through the agency model and in order to be consistent with the ship owners and the ship management market, spares are actually expensed off. So we took the conscious decision to expense off the spares. So for LNG, it was -- in total, the company, it was about USD 12 million that we expensed off in the fourth quarter.

Unknown Analyst

analyst
#105

Okay. The next question, given the market dynamics of the anchor market now and your TCE to spot mix, do you expect the losses to continue from the fourth quarter for at least the first half of this year?

Raja Azlan Bin Raja Azwa

executive
#106

Yes. As I mentioned for the tanker market, in the near term, the prospects are quite uncertain. But with the vaccine rollout, we expect the refinery runs to improve and I think in the second of the half will be more promising.

Unknown Analyst

analyst
#107

And any color you can give in terms of how the first quarter has been so far for the Petroleum segment?

Raja Azlan Bin Raja Azwa

executive
#108

Yes. I mean we are expecting a loss now. I don't want to go into too much detail now, but the petroleum sector is likely to make a loss in the first quarter.

Unknown Analyst

analyst
#109

Okay. Understood. And just a final question on dividends. Was there a reason why the $0.12 -- why the additional $0.03 was packed into an interim dividend in sales aggregated into a special one? And is the signal that you're sending that the new norm is $0.33 instead of $0.30 before?

Raja Azlan Bin Raja Azwa

executive
#110

Yes. Because we -- I mean, in line with all our growth CapEx, we hope that we will be able to increase our sustainable and secure cash flow going forward. And we believe that we will want to provide some growth trajectory on our dividend in the medium term. In the short term, I mean, we hope to just maintain it.

Unknown Analyst

analyst
#111

Okay. So meaning, maintain at $0.30? And then in the future, there might be an increment when your cash flows are stronger?

Raja Azlan Bin Raja Azwa

executive
#112

Yes. If you go back to the numbers, in 2019 and 2020, we did pay out $0.33, yes. So hopefully, we can maintain it.

Emran Othman

executive
#113

So the word here is hopefully, yes.

Unknown Analyst

analyst
#114

It's hopefully, okay.

Emran Othman

executive
#115

Because we did not -- the thing is that we do not have any dividend policy. So it's very much dependent on the cash flow that we have on our hand.

Operator

operator
#116

Our next question is Ben from Macquarie.

Ben Lim

analyst
#117

A quick question from me. The first one is what is your CapEx guidance for this year?

Raja Azlan Bin Raja Azwa

executive
#118

Okay.

Emran Othman

executive
#119

Okay. Yes, go ahead.

Raja Azlan Bin Raja Azwa

executive
#120

Okay. I think we will need to slow down this year because we picked up last year. I think our total projects won last year was close to $3 billion. And this year largely will be a year of execution. If anything, maybe some smaller deals that we will go for, but we don't expect this year is going to be a big CapEx year because we need to be mindful of the rating, the restrictions as well in terms of the gearing ratios that we need to abide by.

Ben Lim

analyst
#121

Sorry, maybe my question wasn't clear. I think you are seeing how much jobs you are looking to win, right? I'm asking about CapEx spend this year. Is there a number for that?

Raja Azlan Bin Raja Azwa

executive
#122

Oh, you're talking about the actual CapEx cash outflow. Is that right?

Ben Lim

analyst
#123

Yes, yes.

Raja Azlan Bin Raja Azwa

executive
#124

Yes, yes. It's -- I don't have the number with me, but we will definitely be growing because of the Mero project.

Ben Lim

analyst
#125

Okay. And sort of a follow-up to that, how much revenue -- construction revenue contribution can we expect from Mero this year? It's sort of a subset of your CapEx, right?

Raja Azlan Bin Raja Azwa

executive
#126

The actual amount of construction revenue, I don't have it on hand. But if I'm not mistaken, over the total life of the project, more than $2 billion of construction revenue we'll be recording in the 3.5 years that we are going -- that we're doing this job.

Ben Lim

analyst
#127

All right. So just take the $2 billion CapEx divided by 3.5 years?

Raja Azlan Bin Raja Azwa

executive
#128

Yes. Yes. I mean, of course, it follows an S curve. There will be some years where it is a more steep curve and some years which are flat, yes?

Ben Lim

analyst
#129

Okay. Just moving on to the Petroleum Tanker savings. How -- you mentioned that some of your -- so your days operating was down. Was there a percentage of your fleet that was idle? Roughly how many idle days did you have for the Aframax fleet?

Raja Azlan Bin Raja Azwa

executive
#130

No. We took the opportunity to go for dry docking because the rates were quite low. So it was time to go for dry dock.

Ben Lim

analyst
#131

Okay. After that, can you expect -- yes, go ahead.

Vincent Ng

executive
#132

Sorry, can I just add to Azlan? I think other than the dry docking, the utilization rate was actually quite high, above 90 -- something like 99%.

Ben Lim

analyst
#133

Okay. And I think you last time mentioned that you're on a strategy of keeping the vessels available so that as and when the lightering work comes back, you can snap that up, right? How much of your fleet now is on lightering work? Can I just assume the time charter portion is on lightering work and the spot is not on lightering work?

Vincent Ng

executive
#134

That's about 10-plus percent.

Ben Lim

analyst
#135

Only 10% on lightering work.

Vincent Ng

executive
#136

In the fourth quarter, it was about 11%.

Ben Lim

analyst
#137

Okay. Okay. Okay. And what was the more BAU level percentage-wise?

Vincent Ng

executive
#138

I don't have a figure, but it would normally be higher than that. The lightering work has obviously declined due to the lower activity at the refinery and so on and the import and export from U.S. oil and gas.

Ben Lim

analyst
#139

Yes. Yes. That's fair. Okay. Next question, a quick one. I didn't quite catch it properly. Maybe I misheard, but you said that Heavy Engineering revenue is up, but it booked a loss because of provisions in the fourth quarter. I thought the provisions were taken in the previous quarter. Were there provisions in the fourth quarter?

Raja Azlan Bin Raja Azwa

executive
#140

Yes. There were some provisions for -- some provisions that we put into the project. I mean just to be conservative, some additional provision.

Ben Lim

analyst
#141

Is there a number to it?

Raja Azlan Bin Raja Azwa

executive
#142

The actual number, we can come back to you and give you -- I'm not sure whether we can release you the actual number, but it was a bit material.

Ben Lim

analyst
#143

Sorry, did you say it is material or it is immaterial?

Raja Azlan Bin Raja Azwa

executive
#144

It is not an immaterial number.

Ben Lim

analyst
#145

Okay. So sorry, the double negative. It is material?

Raja Azlan Bin Raja Azwa

executive
#146

Yes, it is, but not so material.

Ben Lim

analyst
#147

Okay. Okay. Yes, good to get that number.

Raja Azlan Bin Raja Azwa

executive
#148

That is material for content.

Ben Lim

analyst
#149

Okay. Okay. I appreciate that. Last one, quick one. How much payment are you not collecting because of your GKL dispute?

Raja Azlan Bin Raja Azwa

executive
#150

I think we're talking about 9 months or so, maybe around USD 170 million, USD 180 million.

Ben Lim

analyst
#151

Over 9 months. Okay, all right.

Operator

operator
#152

Next question is Raymond Yap from CIMB.

Raymond Yap

analyst
#153

So one by one, I'll ask 3 questions. First, on the Offshore side. For Teekay, the -- I believe the contract is ending in August '22. What's the prospect for renewal beyond next year, August?

Raja Azlan Bin Raja Azwa

executive
#154

Sorry, Raymond. Can you repeat your question, please, Raymond?

Raymond Yap

analyst
#155

Yes, it's about Teekay, FPSO Teekay. I believe that the contract is expiring in August next year. What are the prospects for renewal on Teekay?

Raja Azlan Bin Raja Azwa

executive
#156

Yes. I think we are working on that at the moment. It's a work in progress, Raymond. I don't want to say anything more than that at this juncture.

Raymond Yap

analyst
#157

Okay. Next question, Gumusut Kakap. If you do not win the case -- I think there's some injunction going on right now. But if you do not win the case, how much of cash do you actually need to forego on an immediate basis as soon as you know that the case has gone against you?

Raja Azlan Bin Raja Azwa

executive
#158

Okay. As I said in the first quarter, we -- our provision is, based on what we believe, is our liability level.

Raymond Yap

analyst
#159

Is that all a cash liability per se? Or is it some sort of impairment against the finance lease receivable? So I'm trying to distinguish the immediate cash impact and the sums that you're not going to be able to collect in the future, which is represented by an impairment on the finance lease receivable.

Raja Azlan Bin Raja Azwa

executive
#160

Yes. So if you just look at outcomes up to 31st December, in USD terms, there's USD 200 million of impairment, and there's USD 250 million of provision for litigation, yes.

Raymond Yap

analyst
#161

Okay. Okay. So the cash impact is the $250 million, is it?

Raja Azlan Bin Raja Azwa

executive
#162

That's our -- we feel that that's fair.

Raymond Yap

analyst
#163

Okay, sure. Okay. Understood. Okay. On the Mero-3, you started spending some CapEx already. How is your funding negotiations happening? And give us some time line and some strategy you have on the financing of this project.

Raja Azlan Bin Raja Azwa

executive
#164

Yes. Yes. I mean we will do the normal bridger for the construction of 3.5 years. And after -- so we will -- we are currently in the discussion with the banker. And hopefully, in third quarter, we hope that we will be able to sign the relevant document and commence the drawdown.

Raymond Yap

analyst
#165

Okay. Then when does the project finance actually kick in?

Raja Azlan Bin Raja Azwa

executive
#166

That will be -- project financing normally will be later on. It depends on the market. I mean if the market is very confident with the project and with the due diligence and all that, then it could come in towards the tail end of construction. Otherwise, it will be only upon commencement of operation.

Raymond Yap

analyst
#167

Okay. Okay. So typically, you will negotiate the project finance as the construction nears the end and the project finance itself is -- the cash is disbursed. When is the -- usually, the cash is disbursed. I mean will the bankers have to wait for the project to be actually signed off for final acceptance by Petrobras? Is that the sort of the milestone before the project finance can be disbursed?

Raja Azlan Bin Raja Azwa

executive
#168

Yes. I mean -- as you know, I mean, you come from a bank yourself. Project financing is very water tight. It will be -- they will need to lock up and make everything conditional on the client acceptance and all those things.

Raymond Yap

analyst
#169

Okay. Understood. Okay. Okay. So I'd just like to circle back to the question about the construction revenue. So you mentioned that the $22 million profit, 20% margin, that works out to be $110 million in revenue. If I back that out of your Offshore revenue, I get a revenue -- residual revenue, which is lower in the fourth quarter compared to the immediately preceding third quarter. So I need to understand why the offshore revenue fell in the fourth quarter relative to the immediately preceding third quarter. And also just to check, whether $110 million is the figure that we should be actually looking at.

Raja Azlan Bin Raja Azwa

executive
#170

Well, actually -- the budget actually for the first -- for this quarter is actually higher than 20%, right, and the revenue is lesser than $100 million.

Raymond Yap

analyst
#171

The revenue is less than $100 million. Okay. Okay. Could you give us a figure so that we don't guess and write the wrong thing in our report?

Raja Azlan Bin Raja Azwa

executive
#172

If I'm not mistaken, it's $95 million. If I'm not mistaken.

Raymond Yap

analyst
#173

Okay. Okay. Sure. All right. There is a MYR 23 million write-off of ships and PPE in your Bursa release, MYR 23 million, MYR 23.5 million. May I know what this relates to? I don't think it's an impairment so this seems to be a write-off.

Raja Azlan Bin Raja Azwa

executive
#174

Can the team help Raymond here please?

Eslin Halimi

executive
#175

Repeat your question, Raymond?

Raymond Yap

analyst
#176

Okay. So on the Bursa release, there is an item called write-off of ships and PPE, property, plant and equipment, amounting to MYR 23.5 million. May I know what this is with respect to?

Eslin Halimi

executive
#177

Those are the normal maintenance spend that we -- are normally written off, being the replacement of the spare parts.

Raymond Yap

analyst
#178

Okay, sure. Okay. I understand. All right. Okay. And just 2 more questions. The tonnage tax, which is supposed to be implemented next year, failing which your tax rate might go up to -- well, you'll get a tax. You won't be exempted 100%, only 70%. What is your strategy to deal with this issue? And if the MOT comes up as a tonnage tax, how much is that expected to impact your earnings?

Raja Azlan Bin Raja Azwa

executive
#179

Yes. The tonnage tax is very small compared to the corporate tax, and it is basically used in all these top maritime countries. So it is -- hopefully, it's going to be a very much smaller sum than what the corporate tax would be. And I think whatever it is, as we have stated in our annual report -- I mean, if the -- if we don't get -- if we don't implement it, then we have to look at potential reflagging to more a favorable jurisdiction.

Raymond Yap

analyst
#180

Okay. Okay. So that involves your LNG that of -- your tankers are mostly not flagged in Malaysia, right? It's mostly your LNG tankers?

Raja Azlan Bin Raja Azwa

executive
#181

Yes. Yes. I mean mostly LNG tankers and a few of the tankers -- the petroleum tanker.

Raymond Yap

analyst
#182

I see. I mean if you reflag it, will Petronas allow you to reflag it as it's charted to Petronas?

Raja Azlan Bin Raja Azwa

executive
#183

Yes. Whatever it is going to be, we have to see the concern of the clients, to do that first thing.

Raymond Yap

analyst
#184

Okay. See the consent of the charterer to reflag the rest, right?

Raja Azlan Bin Raja Azwa

executive
#185

I don't see us going down that route, Raymond, because it will be against the interest of the nation, and we will have to work on tonnage tax. Because the tonnage tax is actually what will be a win-win situation for the players as well as the government. The government will be able to boost GDP, and players will be able to generate sustainable returns. So I don't think we will be going to the reflagging scenario. We will just need to make the tonnage tax thing work.

Raymond Yap

analyst
#186

And can you give us a sense of how much in your estimate will the tonnage tax be on your LNG vessels and the product tankers? How much is it coming up to, USD 10 million, USD 50 million, USD 100 million? I have no idea. How do you calculate this thing?

Raja Azlan Bin Raja Azwa

executive
#187

Yes. Yes. I -- hopefully, it will be no more than MYR 10 million.

Raymond Yap

analyst
#188

MYR 10 million, okay.

Raja Azlan Bin Raja Azwa

executive
#189

Hopefully. Hopefully. Okay. I -- again, don't quote me because this thing is still in the -- cooking in the oven.

Raymond Yap

analyst
#190

Okay. The MOT, right?

Raja Azlan Bin Raja Azwa

executive
#191

So if you just -- yes. If you just look at other jurisdictions and you extrapolate that to Malaysia, it looks like that kind of number.

Raymond Yap

analyst
#192

Okay. Sure. All right. Okay. MYR 10 million. We can live with MYR 10 million.

Raja Azlan Bin Raja Azwa

executive
#193

Again, the government needs to recover the value through revenue from other businesses as GDP increases because the increase in GDP will also create jobs and all that.

Raymond Yap

analyst
#194

Okay. So last question is circling back to Vincent. Vincent, you mentioned just now for the LNG vessels of the fall on spot market. You have 2, which are -- which enjoy variable rates. Could you give us some idea what that is? This is the first time I've heard of variable rate.

Emran Othman

executive
#195

It's Emran. Variable rate, while we have land-based rates with the charterer, is that both parties will also enjoy the upside and the downside depending what the market is at that point of time. It's very much like an S curve. There is a floor, there is a sort of ceiling.

Raymond Yap

analyst
#196

Is this common? Or is this kind of like a special arrangement? I mean is it common among charterers to agree to such?

Emran Othman

executive
#197

I'm not so sure it's common, but it's a negotiated commercial contract.

Operator

operator
#198

The last question from Kong Ho Meng from UOB.

Ho Meng Kong

analyst
#199

Just one more question from me. I think you mentioned just now about your debt rating limitation. Could you maybe elaborate more on that? What kind of ratios that they're -- the rating agencies or your bankers are looking at as a key concern? Because your net gearing and your net debt to EBITDA is still quite healthy. But what is preventing you from winning more jobs? What are the reasons that -- can you elaborate on that?

Raja Azlan Bin Raja Azwa

executive
#200

Yes. I mean there are particular hurdles that the rating agencies are sensitive to. And because we have signed up for 2 very big projects, the VLEC project as well as the Mero-3 project, this will put a strain on some of these ratios in the later years. And we need to be careful that we do not breach these ratios. So it just needs to...

Ho Meng Kong

analyst
#201

And what -- yes. Are you able to say what are the limits -- ratio limits? Is it on the net debt to EBITDA level? What is the maximum that you can achieve? Is it 2x, 3x, that kind of thing? Yes.

Raja Azlan Bin Raja Azwa

executive
#202

Yes. I think for Moody's, it's 5x.

Ho Meng Kong

analyst
#203

5x.

Raja Azlan Bin Raja Azwa

executive
#204

And for S&P -- that's for Moody's, yes. It's net debt to EBITDA, 5x. Whereas for S&P, it's about 3x, I think.

Ho Meng Kong

analyst
#205

Okay. There's a lot of room for you, isn't it, because you net debt to EBITDA is nowhere near 5x at the moment?

Raja Azlan Bin Raja Azwa

executive
#206

No. No. The S&P one.

Ho Meng Kong

analyst
#207

Okay.

Raja Azlan Bin Raja Azwa

executive
#208

The S&P one is the most stringent ratio.

Ho Meng Kong

analyst
#209

Okay. Understood. Understood. So in terms of projects that you are bidding, obviously, you're bidding for Limbayong. And I think you mentioned that just not that you're maybe looking at more -- or more maybe [indiscernible] tankers. Any others that you are still considering to bid? Are you still looking at more LNG vessels? [indiscernible] is extending their projects. Or are you just focusing on these 3 segments so far to keep your CapEx in control?

Emran Othman

executive
#210

I think in terms of opportunity, we are not saying that we are totally putting -- applying our brakes on growing our asset portfolio, right, but to be very selective, put it that way. So I think in terms of the 3 main businesses of MISC, we are not giving any of the 3 separately for as long as they meet our investment criteria. And we're also mindful of the -- of some of the limitations or restrictions that we have to be mindful of, like what Azlan mentioned just now.

Ho Meng Kong

analyst
#211

Okay. And just to double check on the -- of course, not immediate year, but let's say towards 5 years later, where we're assuming all your LNG vessels that are fired -- were fired and assuming, presumably, if they are not going to a new contract, [indiscernible], are your VLEC projects and your Mero-3, are they able to offset the loss from those LNG vessels? Yes, just to double check.

Raja Azlan Bin Raja Azwa

executive
#212

Yes. That was to mitigate the cliff that was impending with the expiry of these LNG vessels. So we've got the SRM, we've got the VLEC and the Mero, which it -- we hope to mitigate it.

Ho Meng Kong

analyst
#213

Is it enough? Or do you need to win more based on your projections?

Vincent Ng

executive
#214

Well, it's enough to expand the period of the cliff. If we do not include those in our financial, definitely, our fall will be a lot earlier.

Operator

operator
#215

As we have come to the end of the Q&A session, I will now hand the session back to Rozanah for closing comments. Over to you.

Rozanah Hamzah

executive
#216

Thank you, Akadi. Ladies and gentlemen, this concludes today's conference call. On behalf of MISC Berhad, we would like to thank you for your participation. To those who have not received our presentation slides, please do contact us, and we will gladly provide a PDF version. To the sell-side analysts, we would appreciate that you forward a copy of your published research reports to the MISC Investor Relations team for our reference. Thank you once again. Stay safe, and have a good evening.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete MISC Berhad transcript — plus 261,000+ transcripts from 13,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to MISC Berhad earnings transcripts and 261,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in MISC Berhad or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.