Ladies and gentlemen, welcome to MISC's Second Quarter FY 2021 Analyst Briefing Conference Call. Navina from MISC Investor Relations team will run through the agenda for today's briefing. Navina, over to you.

Navina Shanker

executive
#2

Thank you, Diana. A very good evening, ladies and gentlemen. Thank you for participating in our second quarter financial year 2021 analyst briefing. We have with us today Encik Raja Azlan Shah Raja Azwa, Vice President, Finance; Cik Eslin Halimi, Head of Financial Reporting, Governance and Budget; Ms. Serena Wee, Executive Assistant, PG CEO Office; Mr. Vincent Ng, General Manager, Corporate Planning; Encik Suhaimi Saad, General Manager, Corporate Planning. Before we start with the presentation, I would like to bring to your attention to the disclaimer slide. During the presentation, we may make some forward-looking statements in reference to our plans and expectations, and actual results could differ due to unknown risks, uncertainties and other factors that are in many cases beyond MISC's control. We will now proceed with the presentation on financial highlights for the quarter's performance, which will be presented by Cik Eslin, followed by market outlook and business update by Mr. Vincent. At the end of the presentation, we will open the line for a Q&A session. Our event manager will later provide instructions on the Q&A process. With that, I pass the session to Cik Eslin for our first agenda, the update on MISC's second quarter financial year 2021 financial performance.

Eslin Halimi

executive
#3

Good evening. Thank you, Navina. Thank you to the participants for joining MISC Berhad quarter 2 financial year 2021 analyst briefing. I would like to bring your attention to Page 3 of our AB pack, lower revenue for the quarter, mainly due to lower revenue from Offshore segment as a result of lower recognition of construction revenue for an FSO unit. Lower revenue also contributed from the Heavy Engineering segment as a result from the lower revenue from the ongoing project. Lower revenue from Petroleum segment mainly due to lower TCE rates as well as lower earning days. Higher PBT on operations during the quarter, mainly due to the higher PBT from Petroleum segment as a result of one-off compensation for a contract negotiation. Higher PBT from Heavy Engineering segment due to cost provision recognized from an ongoing project in the preceding quarter. This positive contribution offset by the lower PBT from Offshore segment due to lower construction gains coupled with repair and maintenance cost of net debt. As compared to this quarter and preceding quarters debts in nonrecurring items in both quarters, mainly due to the loss on deconsolidation of a subsidiary in current quarter and we have impairment of noncurrent assets as well as disposal of noncurrent assets in both quarters. Moving on to Page 4 of our AB pack. Higher revenue coming from Offshore segment due to recognition of construction revenue for a FSO unit. Higher revenue from Heavy Engineering segment due to increased in yard activity as prior period was impacted by the yard shutdowns during the MCO 1.0. Higher revenue also contributed from the LNG segment due to the lease commencement of the 6 VLEC vessels. This positive contribution for the revenue, offset by lower revenue from Petroleum segment mainly due to lower blended TCE rates and lower earning days. Higher PBT from operations during the quarter mainly due to higher PBT from operations from Heavy Engineering segment due to provision for costs associated with COVID-19 that we provided for in the corresponding quarter. PBT from Offshore segment also contributed to this positive numbers due to the construction gain recognized in the current quarter. On Page 5 of our AB pack. Kindly note, in this slide, we have presented the adjusted cash flow from operations as compared to the Bursa announcement. In this adjusted cash flow from operation, we have reflected the following. The first one that we consider all lease or charter investors and other assets as part of the operating activity. But for financial reporting purposes, payment of lease liabilities are classified in the cash flow from financing activities. Secondly, MRT considered the payment for construction conversion activities at capital expenditure payments. And internally classified them as an outflow from investing activities in measuring our performance and allocation of resources. However, for financial reporting purposes, this payment relating to construction or conversion of activities for offshore segment in key projects are required to be classified in the cash flow from operating activities. You may refer to the next slide for the detailed reconciliation. Overall, cash flow from operations continuously recorded a reasonable level comparing between preceding and corresponding quarters, mainly supported with its steady cash flow generated from offshore as well as LNG segments portfolio long-term contracts. On Page 7 of the slide, our debt balances shows an increase, mainly coming from the drawdown for the project which is in the pipeline. Now we're moving to the financial performance by business segment. On Page 9, increase in revenue for LNG segment since previous corresponding quarter, actually following the commencement of charter hire for the 6 VLECs. From the profit before tax perspective, profit before tax this quarter as compared to preceding quarter was lower mainly due to the impairment of receivables that we did in the current quarter. On Page 10, for Petroleum and Product Shipping segment, lower revenue recorded at comparing preceding and corresponding quarter, mainly due to lower TCE rates for midsized tankers and VLCC as well as lower earning days. Higher PBT record debt for this current quarter as compared to preceding quarter, mainly due to one-off composition for a contract negotiation. On Page 11, for Offshore business segment, higher revenue recorded in the current and preceding quarter mainly coming from recognition of construction revenue for a FSO unit. However, we can see lower PBT in the current quarter as compared to preceding quarter, mainly coming from lower construction fee recognized coupled with impaired maintenance cost of an asset. And finally, in the last segment on Page 12, higher revenue recorded in second quarter as well as previous quarter compared to the previous corresponding quarter, mainly coming from higher revenue from ongoing project as well as higher revenue from the Marine segment. Revenues recorded a lower loss before tax as compared to proceeding and corresponding quarter mainly due to cost provision recognized in the preceding quarter as well as impairment, the revenue impairment recognized recorded in the previous corresponding quarter. I will now pass to Vincent for market environment and business updates. Thank you.

Vincent Ng

executive
#4

Thank you, Eslin, and good evening to all the participants. Thanks for joining this call. I will take you through first on the market outlook, and starting with the LNG Shipping segment. As you all know, the typical second quarter of the year is typically a low season. However, this year, we saw a substantial strength in the spot rates for a number of reasons. China's LNG is still strong. There was increase in demand from Brazil because they had a drop, and the LNG was to make up for the loss of power from the hydro bank. They also -- there was also a recovery in liquefaction utilization rates compared to the preceding quarter. So you will see that the rate for second quarter '21 is actually the highest since 2014 for the same period in the year. At the same time, we also see a little bit of pickup in the time charter rates. The number of charterers appear to be trying to book some vessels for the winter season early so that to reserve the slots before the rates go up even further. Overall, we think the shipping rate for LNG will be well supported going into the following quarter. Going into the next slide, which you will see is on the deliveries from LNG carriers. We see that the number of orders for 2021 is expected to be about the same as it was last year, which is about 55, so give or take 1 or 2. And we see that because there will be demand coming up from new projects that are expected to come online over the next few years. At the same time, we noted that there is a tightness in the shipbuilding berths due to some reservations by Qatar for its program. They have made some reservations for quite a number of slots. At the same time, there has been increase in steel prices over the last few months, and this has led to an increase in newbuilding cost. So some of the charters may want to lock in the vessel orders before the prices go up even further. Going over to the Petroleum segment, not much good news for the quarter. In terms of rate, pretty low, in some cases, even lower than the first quarter. Again, the story is due to oversupply. The global oil demand is improving but not that fast. At the same time, the OPEC+ production cuts are still having an impact on the market. We expect the market to remain difficult in the short term. However, there will be some optimism in the medium term as OPEC+ has recently agreed to increase its production by [ 400,000 ] barrels a day from August onwards and all the way to 2022. And at the same time, of course, we know that as vaccination rates are improving around the world, especially in the West. Looking at the -- on the next page, we see that the fleet growth is also quite moderate, rather low. We don't expect a huge number of orders to come in for the coming quarter -- current year due to as what we said, the limited shipyard slots and also higher new prices that I mentioned earlier. Demolition activity has been still quite slow, but you can see from the chart that it has actually picked up in the first half of 2021. And you can see that the first half 2021, demolition actually is higher than the whole of last year. So there is some optimism that there will be continued pickup. And therefore, reduce the oversupply situation in the market. Moving on to the Offshore segment. Offshore segment has been pretty stable. The high oil prices is a good sign. It works well for CapEx by all majors for them to support additional projects, on projects in the offshore and upstream sector. So we see that there is expected growth in this segment. And we expect more FSO awards over the next year and then coming years. This -- a lot of this will come out of Brazil and Africa. Now moving on to business updates, starting with the LNG business. Just to take everyone that we have taken delivery of the last VLEC out of the 6 that we ordered that we purchased from Zhejiang Satellite, so they are all now come into service. We have also taken delivery of the first of the 2 joint venture newbuild LNG carriers with NYK and Mitsubishi Corp., it's called Diamond Gas Crystal in the second quarter, which is in May. And after the quarter, we took delivery of the second vessel, which is Diamond Gas Victoria. So currently, we have taken delivery of both the vessels that we have entered into this agreement with NYK and Mitsubishi Corp. And this will be employed on the time charter for 18 years. During the quarter, we also concluded the sale of Puteri Firus, one of our old LNG carrier. And overall, the segment will continue to explore opportunities on a selective basis to support the growth of the LNG business. Going over to Petroleum and Product Shipping. The current portfolio mix is 72:28 term to spot, which is higher than the previous quarter, which was at 67:33. During the quarter, AET, our Petroleum segment, sold 2 Aframaxes and 1 VLCC. And we delivered 2 Aframaxes that we have been chartered. So there will be a total of 5 vessels. Moving on to the Offshore business. The current activities in the quarter are mainly on the focus on the execution of Mero-3 project. No new so-called award for this quarter. In terms of the litigation for GKL, things are still proceeding in the court. And similarly, for the PCPP and MOMPL, they are also proceeding in the court. So I will not go through in detail, which you can find all the details in the process of the litigation. Finally, I go over to Marine and Heavy Engineering. And during the quarter, the Marine division has completed the repair and maintenance on 50 vessels compared -- as of third quarter, cumulatively for the first half. The order book backlog at June is MYR 2.7 billion. This compares slightly lower compared to the previous quarter of MYR 3 billion. And the tender book is approximately MYR 8 billion to MYR 9 billion, which is slightly higher than what was in the preceding quarter. So I think that's it for the update from my end. I would like to pass it back to Navina.

Navina Shanker

executive
#5

Thank you. Thank you to Eslin and Mr. Vincent for the presentation on financial performance and business updates. With the completion of the presentation, I would now like to hand over the call to the event manager, who will guide and manage the Q&A session. Ms. Diana, over to you.

Operator

operator
#6

[Operator Instructions] Mr. Raymond Yap from CGS-CIMB.

Raymond Yap

analyst
#7

So okay, I just want to ask a couple of financial questions first. In terms of the other income on the Bursa announcement at MYR 207.6 million, that must be in relation to the one-off compensation for the contract renegotiation for the Petroleum division. Am I correct? If that's correct, can you explain what this one-off compensation relates to?

Raja Azlan Bin Raja Azwa

executive
#8

Thank you, Raymond. Thank you for the question. Azlan here. That is strategically one-off compensation relating to our lightering business, where it's basically to remove the fluctuation under the lightering contracts. So we were...

Raymond Yap

analyst
#9

So basically, it's to compensating for the fluctuation in the rate, is it, so that your time charter equivalent rates do not actually fall by as much as the spot rate imply?

Raja Azlan Bin Raja Azwa

executive
#10

Yes, part of it is the rate. The other one is the volume. So there is a compensating adjustment that we are entitled to if -- due to volume variability. So this was to sort of give more certainty to our clients.

Raymond Yap

analyst
#11

Okay. So -- but if this is -- I understand the lightering business has performed on the basis of a contract -- a contract of affreightment, if I understand correctly. So it wasn't -- could I say that the reason why this materialized was because the terms were not properly set out in the COA, which is why you had to renegotiate it? Or what's the genesis of this?

Raja Azlan Bin Raja Azwa

executive
#12

Yes. Do you want to share the detail with Raymond, [indiscernible]. Basically, Raymond, the compensation is to fix available in the charter costs for 3 years so that the net charter payment are not subject to market fluctuation. And the net charter payments are dependent on the lightering activities in the U.S. Gulf. And the client has decided to make this one-off payment to fix the net charter payment. So the one-off...

Raymond Yap

analyst
#13

Okay. Charter...

Raja Azlan Bin Raja Azwa

executive
#14

Yes. Correct. Correct.

Raymond Yap

analyst
#15

Okay. So does this have an implication for future performance of the Petroleum tanker division? Will it be doing better going forward due to this inclusion of this contractual terms? Or is this just completely one-off and relate to the past solely?

Raja Azlan Bin Raja Azwa

executive
#16

There might be some minor effect over the next 3 years to the Petroleum sector.

Raymond Yap

analyst
#17

Okay. All right. So anyway, I'll move on to the next one, which is the impairment on assets in the Bursa announcement was set at MYR 42 million. And on Slide 8, where you have a negative $7.7 million nonrecurring item in the LNG division. Is that negative $7.7 million related to the impairment on assets? And is that related to the sale of the Puteri Firus which you had to make an impairment on?

Raja Azlan Bin Raja Azwa

executive
#18

Yes. If I'm not mistaken, the Puteri Firus, we already took the hit the last quarter. So these are other vessels.

Raymond Yap

analyst
#19

Okay. What other vessels are leased that you need to provide?

Raja Azlan Bin Raja Azwa

executive
#20

There's -- I mean a few vessels -- I mean, there are about 4 or 5 vessels from various classes from putting that to class to 3A and 3B.

Raymond Yap

analyst
#21

Okay. Why is there a need to provide the vessel? I mean the contracts are going on.

Raja Azlan Bin Raja Azwa

executive
#22

I mean we do our impairment segment every quarter. So given that some of these vessels are approaching expiry, based on the VIU calculations, there might be some changes to the numbers. So the impairments that were charged by vessel were not very big. We're talking about $2 million to $3 million per vessel. So it's not a big charge.

Raymond Yap

analyst
#23

Okay. Sure. Okay. And then in addition to this USD 7.7 million impairment on the LNG asset, you also have another impairment on receivables which amounted to MYR 44 million. Why do you have to impair your LNG receivables?

Raja Azlan Bin Raja Azwa

executive
#24

Okay. This one is again related to our YLNG contract, there was a further extension to 2024. So based on the time value of money, we need to make -- we need to revise the calculation, and this resulted in this about USD 8 million to USD 9 million of additional impairment.

Raymond Yap

analyst
#25

Okay, okay. So Yemen LNG owes you money and the repayment date has been pushed to 2024. So this impairment on receivables is to account for the time value of money.

Raja Azlan Bin Raja Azwa

executive
#26

That's right. That's right.

Raymond Yap

analyst
#27

I see, okay. All right. And if I look into your slide on the cash flow, where you adjust your cash flow to factor in the Mero-3 CapEx. You mentioned that the slide -- on Slide 6, it mentions that as at 30th of June, the year-to-date payment was USD 131.9 million. What does that mean? Does that mean -- that is the payment on the CapEx? But...

Raja Azlan Bin Raja Azwa

executive
#28

That is the investment in the development cost of Mero-3 during the period. So the auditors have advised us that after looking at other companies like SBM and so on, that the proper accounting treatment is to capture -- because we are recording construction revenue and construction profit and all that, we have been advised that we need to take this CapEx outflow as an operating cash flow item. However, that is actually -- distorts our CFO figure, so we have made an adjustment. And likewise, if you look into SBM as well, management also talks about directional reporting and all that, where they do make similar adjustments as well.

Raymond Yap

analyst
#29

Sure. Sure. I understand. Okay. So this is the cash outflow. So what I'm interested in is the absolute amount that's been accrued into your Mero-3 fixed asset. And I'm looking at the Bursa announcement, it says that the construction work in progress amounted to about MYR 2.2 billion, which works out to be about USD 500-plus million. Can I take that as being entirely related to the FPSO Mero-3, about USD 500-plus million, not necessarily the amount that you have actually paid, but the amount that has been accrued in terms of your progress.

Raja Azlan Bin Raja Azwa

executive
#30

Where is that -- Raymond, I don't see that figure.

Raymond Yap

analyst
#31

There is a -- it's not in your slide. It is in your Bursa announcement. That would be on note A10, A-1-0, which is on Page 10.

Raja Azlan Bin Raja Azwa

executive
#32

Okay. So where is the figure you're talking about? I don't see that figure?

Raymond Yap

analyst
#33

It's on Page 10. It says on Note A10, it says that included in ships are construction work in progress of MYR 2,172.8 million. Is that...

Raja Azlan Bin Raja Azwa

executive
#34

Those would be others because the Mero balance is not captured under PPE. It's actually captured in the noncurrent asset.

Raymond Yap

analyst
#35

Noncurrent assets, yes, I'm trying to identify where there might be -- which line is it on the balance sheet?

Raja Azlan Bin Raja Azwa

executive
#36

Other noncurrent financial assets, 1.8 B.

Raymond Yap

analyst
#37

Okay. So that is the Mero, I see. Okay. Okay, sure. I got it. That was one of my questions as well. Okay, I got it. Okay. Great. Okay. In terms of the KPOC dispute. There's a $28 million in damages that you've been -- MMHE has been asked to pay. Has it been provided for? Or will it be provided for in the future quarters?

Raja Azlan Bin Raja Azwa

executive
#38

Sorry, Raymond, just to come back, right? The amount that you see on the asset side of the balance sheet, this is the construction revenue, yes.

Raymond Yap

analyst
#39

Yes. Yes. It includes the profit, yes, I understand. It includes the construction profit, yes. Okay.

Raja Azlan Bin Raja Azwa

executive
#40

Sorry, can you repeat your question on KPOC, please?

Raymond Yap

analyst
#41

Yes, the $28 million that MMHE has been asked to pay KPOC, has it been provided in the financial statements? Or will it be provided in the third quarter?

Raja Azlan Bin Raja Azwa

executive
#42

At the moment, we feel that we have got good grounds to argue the case out. We believe that there have been certain breach of natural justice and also breach of jurisdiction in this case. So we have not actually provided for that $28 million.

Raymond Yap

analyst
#43

Okay, sure. May I know what the construction revenue and profit, how much of that was booked in the second quarter for Mero-3 in terms of the volume of revenue from...

Raja Azlan Bin Raja Azwa

executive
#44

The profit was somewhere between $20 million to $25 million in the second quarter.

Raymond Yap

analyst
#45

Okay. How about revenue?

Raja Azlan Bin Raja Azwa

executive
#46

Revenue will probably be maybe 120 or so or 100.

Raymond Yap

analyst
#47

100 to 120.

Raja Azlan Bin Raja Azwa

executive
#48

Yes.

Raymond Yap

analyst
#49

Okay, sure. And in terms of the Diamond Gas vessel, one was delivered in the second quarter. I understand that this is an associate level, right? So that's -- am I right to say that it didn't contribute to revenues but it did contribute to profit?

Raja Azlan Bin Raja Azwa

executive
#50

Yes, it will be part of the JV line, share of profit from joint venture.

Raymond Yap

analyst
#51

Okay. Great. And just 2 more questions. Are there any of the -- you have 12 FSO or FPSO assets currently? Do any of these 12 contracts expire? Or have they any expire recently? Or are any expiring in the next year or so?

Raja Azlan Bin Raja Azwa

executive
#52

There are a few that have recently been extended of which some of those were 1-year extension. There was...

Raymond Yap

analyst
#53

Espirito Santo -- like Espirito Santo last quarter...

Raja Azlan Bin Raja Azwa

executive
#54

No. No. Espirito Santo has been extended right up to 2020, if I'm not mistaken.

Raymond Yap

analyst
#55

Okay. Okay. How about specifically looking at the DULANG, is that still operational? Or has this been expired...

Raja Azlan Bin Raja Azwa

executive
#56

No. That has been extended for another 3 to 4 years.

Raymond Yap

analyst
#57

I see. Okay. So it should expire in 2024, yes?

Raja Azlan Bin Raja Azwa

executive
#58

'24, '25, yes.

Raymond Yap

analyst
#59

Okay. Can you give me the exact date, if possible? And the last question is...

Raja Azlan Bin Raja Azwa

executive
#60

Q1 '25. You can take Q1 '25.

Raymond Yap

analyst
#61

Q1 '25. Okay. Okay. Last question is on your Bursa announcement, there's a couple of new companies called Magellan X, SOL-X, Chord X, Spares CNX. What are all these names? What -- how does this -- what is the relationship that you have with Boston Consulting Group?

Raja Azlan Bin Raja Azwa

executive
#62

Okay. These are start-up companies basically to actually provide services to vessels in the areas of Spares, in terms of repairs and one other area. And they are still in the startup phase. So they have yet to -- they have just begun to generate revenue but it is still not profitable. And Boston Consulting Group was -- joined us to take a small stake in these start-up companies.

Raymond Yap

analyst
#63

Okay. Yes. So you hold the vast majority of the equity stake, and these companies are going to be servicing your own vessels? Is it an in-house thing? Or will it also extend services to third-party ship owners?

Raja Azlan Bin Raja Azwa

executive
#64

Yes. It needs to service the broader market. So they will start off with our vessels, and we would benefit to operational efficiency in terms of lowering down our SOC. But the big chunk of the business case is to serve the wider market.

Raymond Yap

analyst
#65

Okay. And is BCG sort of just an investee or are they actually contributing operational knowledge into this venture?

Raja Azlan Bin Raja Azwa

executive
#66

Yes, they took 10% to 15% of each venture. And they certainly are contributing in terms of the innovation and also the expertise. They're also on the Board of the venture.

Operator

operator
#67

Our next question, Mr. Ben Lim from Macquarie Capital Securities.

Ben Lim

analyst
#68

Hi, can you hear me?

Raja Azlan Bin Raja Azwa

executive
#69

Yes. Loud and clear, mate.

Ben Lim

analyst
#70

Okay. I just want to go back to that one-off for your lightering. I just want to better understand what it means for your lightering revenue for the coming 3 years. It strikes me like you are potentially locking in rates in a way in the bottom of the cycle. So I want to understand how this benefits you. How many vessels are involved for this agreement?

Raja Azlan Bin Raja Azwa

executive
#71

The number of vessels -- can somebody help me here? Do we know how many vessels are there to go.

Unknown Executive

executive
#72

2 vessels.

Raja Azlan Bin Raja Azwa

executive
#73

Yes, 2 vessels.

Ben Lim

analyst
#74

Okay. And would we expect like the revenue to be locked for these vessels then for 3 years? Is it sort of fixed or...

Raja Azlan Bin Raja Azwa

executive
#75

No, the revenue will not be locked. But the cost will be minus an offsetting factor. We are removing an offsetting factor to the cost. So because we need to charter these vessels, where if there is a low volume, there will be some kind of adjustment that we would have been entitled to. So we took a position where we -- the client wanted to remove this adjustment over the next few years. So we agreed to this arrangement.

Ben Lim

analyst
#76

So it's actually -- you would otherwise have a more fixed contract. Now you are removing a term, so the client is basically bringing forward that compensation. Is that right?

Raja Azlan Bin Raja Azwa

executive
#77

Yes, yes, that's right.

Ben Lim

analyst
#78

That's much clearer. Okay. My other question is just on your LNG segment, I want to understand what the drydocking days were for this quarter, whether there was a big impact for this quarter? Because I believe you mentioned that you didn't move the numbers for the last quarter.

Raja Azlan Bin Raja Azwa

executive
#79

Yes. I mean this quarter, there was quite a significant amount of drydocking days I think in total, we had 100 to 250 drydocking days for LNG alone as compared to 90 in the previous quarter.

Ben Lim

analyst
#80

Okay. And would we expect this to drop off very sharply into the second half of the year? And would we then expect higher contributions from your LNG segment?

Raja Azlan Bin Raja Azwa

executive
#81

Yes, we should. In terms of the drydocking days for the second half of the year would roughly be maybe about, I would say maybe 60-40, 60% in the first half and 40% in the second half.

Ben Lim

analyst
#82

I see. Okay. So still -- yes, it's still quite high in the second half compared to the first half. Okay. That's all the questions from me.

Raja Azlan Bin Raja Azwa

executive
#83

And also in the VLEC assets, it came in on the second basis, right? So by the second -- by April, we had all 3 vessels in place. So during the second half, you're going to see the full contribution of all the 6, I think, carriers now.

Operator

operator
#84

Our next question, Mr. [ Kong Ho Min ] from UOB Kay Hian.

Unknown Analyst

analyst
#85

I have a few questions. Firstly, I just want to double confirm the asset number for the one-off compensation you talked about earlier, is it around MYR 208 million?

Raja Azlan Bin Raja Azwa

executive
#86

It's about -- one minute. It's about MYR 170 million to MYR 180 million.

Unknown Analyst

analyst
#87

Okay. MYR 180 million, okay, all right. And the -- and how much is the construction gain for Mero-3 in your P&L for the second quarter alone here.

Raja Azlan Bin Raja Azwa

executive
#88

As I said to our friend, it's now USD 20 million to USD 25 million

Unknown Analyst

analyst
#89

In USD terms, okay. All right.

Raja Azlan Bin Raja Azwa

executive
#90

Yes.

Unknown Analyst

analyst
#91

Okay. And okay, so in the sense for the Petroleum side, if I strip out that one-off compensation, your overall Petroleum segment was actually loss making in the second quarter, that's why you guided earlier, correct, right?

Raja Azlan Bin Raja Azwa

executive
#92

Yes. Yes. Yes.

Unknown Analyst

analyst
#93

Okay, all right, all right. Sorry, one more question. Yes, as usual, in what we asked before in the past briefings, can we have the spot-based exposure by segment for the material side.

Raja Azlan Bin Raja Azwa

executive
#94

For the...

Unknown Analyst

analyst
#95

If I may speak next.

Vincent Ng

executive
#96

The term to spot, is that right, [ Ho Min ]?

Unknown Analyst

analyst
#97

Yes, correct. Yes.

Vincent Ng

executive
#98

Okay, I can share that. For VLCC, it is 82 term to 18 spot; for Suezmax, it's 75 to 25; and for Aframax, it's 60 to 40.

Operator

operator
#99

Next question is by [Audio Gap].

Unknown Analyst

analyst
#100

Yes. I have a few questions, and I think it may have been asked earlier because I couldn't hear some of the answers because for some reason, the line kept going in and out. I just want to go back on the Petroleum segment. Regarding the renegotiated contract, I just want to double check, the impact is MYR 170 million to MYR 180 million, and it is only going to be in this second quarter, right? If you were to extend it to third quarter, we should be looking at a loss for the Petroleum segment, am I right?

Raja Azlan Bin Raja Azwa

executive
#101

Yes, you're right. The -- what you call it the one-off effect of this contract is only in this quarter. However, this is only one component of the whole Petroleum business. So we hope that we will be able to at least break even in the third quarter for Petroleum segment.

Unknown Analyst

analyst
#102

The MYR 170 million to MYR 180 million, is that the same amount to revenue as well as to the profit line?

Raja Azlan Bin Raja Azwa

executive
#103

Yes, it goes straight to the profit line.

Unknown Analyst

analyst
#104

Okay. But you mentioned earlier that this lightering contract, which you have for the 2 vessels, it is going to have some impact over 3 years. I mean how do you quantify on the per quarter over the next 3 years? I mean, are we still going to see this effect over the next -- in third and fourth quarter as well?

Raja Azlan Bin Raja Azwa

executive
#105

You'll see a slight increase in the cost for these 2 vessels.

Unknown Analyst

analyst
#106

So this means that the profit may be slightly impacted in the third and fourth quarter, is that right?

Raja Azlan Bin Raja Azwa

executive
#107

Correct. That's right.

Unknown Analyst

analyst
#108

In the Petroleum segment? Can you tell us which of the 2 vessels are affected actually?

Raja Azlan Bin Raja Azwa

executive
#109

These are under the modular capture vessels.

Unknown Analyst

analyst
#110

Okay. All right. Okay. And I just want to move over to your Offshore division. There was a mention that your repair and maintenance expenses had gone up. How much did it -- was the increase? And could you quantify the effect.

Raja Azlan Bin Raja Azwa

executive
#111

This was, I think, about MYR 20 million to MYR 25 million relating to some turbine repair.

Unknown Analyst

analyst
#112

That's in U.S. dollars, is it?

Raja Azlan Bin Raja Azwa

executive
#113

No, no, no. It's -- in U.S. dollars, it"s just USD 5 million.

Unknown Analyst

analyst
#114

Okay. Okay. So this MYR 20 million to MYR 25 million. Is it kind of lumpy? Or how should we look at it in terms of the running -- run rate for the second half of the year?

Raja Azlan Bin Raja Azwa

executive
#115

No, no. These are one-offs, and this is basically the excess. The balance is basically insured.

Unknown Analyst

analyst
#116

Okay. Then one thing -- okay. There's also one thing on -- regarding the construction revenue recognized for Mero-3, it seems to be kind of lumpy. I mean, in the second quarter, it's kind of high. And the second -- and it needs -- sorry, first quarter is high, and in the second quarter, it kind of dropped. Could you explain why was there such a variation in terms of the construction revenue and profit recognized for Mero-3?

Raja Azlan Bin Raja Azwa

executive
#117

It's not very far off between the 2 quarters. Yes, it's -- I think if you look at the first quarter -- sorry, sorry. I think if you look at the first quarter, it was for 120. In the second quarter, it was 100. It's based on the percentage of completion.

Unknown Analyst

analyst
#118

I see, okay. And regarding your heavy equipment on MMHE, could you run through again what was the cost of the additional cost provision in the first quarter of this year? Which project was this?

Raja Azlan Bin Raja Azwa

executive
#119

I mean it's one of the projects, we don't want to mention which project it is because that's confidential. But it's one of those projects which are really at the tail end.

Unknown Analyst

analyst
#120

Is there any potential for you to recruit this provision?

Raja Azlan Bin Raja Azwa

executive
#121

Yes, we could because we are still claiming some of those costs to the client because some of those costs we deem to be COVID-19-related, and we want to try to recover those costs from the client.

Unknown Analyst

analyst
#122

Could you quantify how much was the -- this additional provision in the...

Raja Azlan Bin Raja Azwa

executive
#123

If I'm not mistaken, somewhere between MYR 40 million to MYR 50 million, if I'm not mistaken, in the first quarter.

Unknown Analyst

analyst
#124

Okay. And regarding your CapEx for this year and for next year, could you give some kind of guidance of what should we expect given your delivery schedule?

Raja Azlan Bin Raja Azwa

executive
#125

Well, it depends.

Unknown Analyst

analyst
#126

Yes.

Raja Azlan Bin Raja Azwa

executive
#127

The CapEx figure for -- it will be on our plan because you're going to see that there is going to be more progress on Mero. And we are also going to make progress on our 2 new LNG vessels. The ones that we have signed up with the SeaRiver. And then also there is the various shuttle tankers and also the dual-fuel vessels under [ AC ]. So we expect that the CapEx for 2021 will be higher than the CapEx for 2020.

Unknown Analyst

analyst
#128

Okay. How much would the increase be? 20%, 30% kind of range?

Raja Azlan Bin Raja Azwa

executive
#129

I mean you can say maybe around 20% to 30% kind of thing.

Unknown Analyst

analyst
#130

And how about next year?

Raja Azlan Bin Raja Azwa

executive
#131

2022 level will be slightly higher than 2021.

Operator

operator
#132

[Operator Instructions] Our next question is Mr. [ Kong Ho Min ] from UOB Kay Hian.

Unknown Analyst

analyst
#133

Just additional question from me. Just to confirm the view that Mr. Yee highlighted in an earlier briefing, with the incoming -- the ESG and greener shipping requirements, so we noticed that we have been disposing your older ships. Have you so -- in a sense, and I remember Mr. Yee said before, it doesn't make sense to retrofit the old ships, and it makes more sense to dispose older ships and replace them with the new ones and better technology. So I just wonder whether -- aside from disposal that you've made, have you been doing any retrofitting? Or you have totally not retrofitting any further older ships or just more likely you would continue to dispose them, especially, I think, especially, for example, in Puteri class, you have 4 other Puteri vessels, which I [indiscernible] Puteri but at the time the contract ends, you also set disposal for [indiscernible] vessels.

Raja Azlan Bin Raja Azwa

executive
#134

Yes. If we can't find a proper use for these vessels, we will have to dispose them.

Unknown Analyst

analyst
#135

Okay. Okay. So in the past few quarters, retrofitting spending is minimized like, I guess, right?

Raja Azlan Bin Raja Azwa

executive
#136

Yes, you're right. You're right.

Operator

operator
#137

Next question, Mr. Raymond Yap, CGS-CIMB.

Raymond Yap

analyst
#138

Azlan, just wanted to double confirm again on the compensation for the AET, the lightering vessels. So basically, you said that this is an agreement that you signed with the client who is using these 2 vessels for lightering purposes, is that right? Although they're MCVs. And it's basically something to do with the fact that the client doesn't want that much volatility in the rates that it's being asked to bear in the future, so he is paying you compensation. And in the future, the revenues from these 2 vessels will be reduced. Am I understanding this correctly?

Raja Azlan Bin Raja Azwa

executive
#139

Okay. Let me try one last time because it's not so straightforward. It's actually to fix a variable in our charter costs for 3 years.

Raymond Yap

analyst
#140

Okay. Hang on. Okay. So you mean your charter revenue, right, not charter costs because these vessels belong to you.

Raja Azlan Bin Raja Azwa

executive
#141

Yes. But we need to in -- Kok Yap, can you help me in charter expense, right, Kok Yap?

Raymond Yap

analyst
#142

I think the 2 MCVs are listed in your annual reports as well.

Unknown Executive

executive
#143

Yes. The 2 vessels are owned vessels. The thing is these vessels are earmarked for long-term charter, but they are only utilized by the client when there is an oil spill. And when there is no oil spill, these vessels are chartered back to MISC for lightering business. As MISC makes more lightering business, the client we have to pay -- sorry, we will have to pay higher charter costs.

Raymond Yap

analyst
#144

I see. Okay.

Unknown Executive

executive
#145

That's what the cost offsetting is -- yes. Yes.

Raja Azlan Bin Raja Azwa

executive
#146

It's a cost -- we are removing a cost offsetting, Raymond.

Unknown Executive

executive
#147

Correct. Yes.

Raja Azlan Bin Raja Azwa

executive
#148

We are removing the cost offset. Yes.

Raymond Yap

analyst
#149

Okay. Sorry, can you go back on that. What is this cost -- cost offset, okay . So basically, you charter the vessel to the client and the client pays you, but only if the vessel is being used for MCV operations. If it isn't being used for MCV operations, the client charters it back to you, so it goes back 360 degrees. And you have to pay for the charter to the client, which offsets the charter hire that the client had to pay to you for the MCV?

Raja Azlan Bin Raja Azwa

executive
#150

Yes. Yes. So we have to pay for the -- in charter back. And then there is a cost offsetting mechanism, which is dependent on the actual volume of lightering, right? So this arrangement is to remove this cost offsetting mechanism over the next 3 years.

Raymond Yap

analyst
#151

Why would you want to do that? Or why does the client want to do that? What's the purpose...

Raja Azlan Bin Raja Azwa

executive
#152

So that the client -- nobody is taking a call on the volume lightering over the next 3 years.

Raymond Yap

analyst
#153

Okay. So in that case, do you -- okay -- all right. So basically -- okay. So basically, the client no longer has to pay you to charter the vessel for MCV operations, and you don't have to pay the client for the lightering as well? You don't have to pay the charter cost when you use the vessel for lightering purposes, okay? But -- so if it's a mutual offset, how does that result in a net inflow to you?

Raja Azlan Bin Raja Azwa

executive
#154

Okay. Let me try to explain again, Raymond. We charter out long term, right? Then when it's not being used, we charter invest. And of course, there's a margin that we will make between our long-term charter and our short-term in charter back, right? Okay? On top of that, there is this cost offsetting mechanism, which is linked to the actual lightering volume.

Raymond Yap

analyst
#155

Okay, I understand.

Raja Azlan Bin Raja Azwa

executive
#156

So the client has requested to remove this cost offset.

Raymond Yap

analyst
#157

Okay.

Raja Azlan Bin Raja Azwa

executive
#158

Yes. So in the event that there is a lower lightering volume, then our in-charter cost back will be a lot lower. If there's a high lightering volume, then the in-charter costs will be higher at least.

Raymond Yap

analyst
#159

Yes, correct. Yes, because you need to use the vessel for lightering, so you have to charter more days. So you have to pay the client more money when you charter in.

Raja Azlan Bin Raja Azwa

executive
#160

Yes.

Raymond Yap

analyst
#161

Okay. So when the client pays you 118 million, what is this payment meant to compensate you for?

Raja Azlan Bin Raja Azwa

executive
#162

Because this cost offset is basically a reduction of a future costs. So we are removing the reduction of a future cost. So our future costs now will be slightly higher over the next 3 years.

Raymond Yap

analyst
#163

Okay. Okay. Let me think about it. Yes. Okay.

Raja Azlan Bin Raja Azwa

executive
#164

Yes, you can call me -- Raymond, if you want further details, you can call me. You have my number, right?

Raymond Yap

analyst
#165

I think so. Yes. Okay.

Raja Azlan Bin Raja Azwa

executive
#166

Great.

Operator

operator
#167

We have come to the end of the Q&A session. I will now hand the session back to Navina for closing comments. Over to you, Cik.

Navina Shanker

executive
#168

Thank you. Ladies and gentlemen, this concludes today's conference call. On behalf of MISC Berhad, we would like to thank you for your participation. To those who have not received our presentation slides, please do contact us, and we'll gladly provide you with a PDF version. To the sell-side analysts, we would appreciate that you forward a copy of your published research report to the MISC Investor Relations team for our reference. Thank you once again. Stay safe, and have a good evening.

Operator

operator
#169

Ladies and gentlemen, this concludes today's conference call. Thank you for your participation. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete MISC Berhad transcript — plus 261,000+ transcripts from 13,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to MISC Berhad earnings transcripts and 261,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in MISC Berhad or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.