MISC Berhad (MISC) Earnings Call Transcript & Summary
November 18, 2021
Earnings Call Speaker Segments
Operator
operatorLadies and gentlemen, welcome to MISC's Third Quarter of FY 2021 Analyst Briefing Conference Call. Navina from MISC Investor Relations team will run through the agenda for today's briefing. Navina, over to you.
Navina Shanker
executiveThank you, Dana. A very good evening, ladies and gentlemen. Thank you for participating in our third quarter financial year 2021 analyst briefing. We have with us today Encik Raja Azlan Shah Raja Azwa, Vice President, Finance; Cik Eslin Halimi, Head of Financial Reporting, Governance and Budget, Finance; Mr. Vincent Ng, General Manager, Corporate Planning; Ms. Serena Wee, General Manager, Corporate Planning. Before we start with the presentation, I would like to bring your attention to the disclaimer slide. During this presentation, we may make some forward-looking statements in our reference to our plans and expectations, whereby actual results could differ due to unknown risks, uncertainties and other factors that are, in many cases, beyond MISC's control. We will now proceed with the presentation on financial highlights for the quarter's performance, which will be presented by Cik Eslin followed by market outlook and business update by Mr. Vincent. At the end of the presentation, we will open the line for a Q&A session. Our event manager will later provide instructions on the Q&A process. With that, I pass the session to Cik Eslin for our first agenda, the update on MISC's third quarter financial year 2021 financial performance. Cik Eslin, over to you.
Eslin Halimi
executiveGood evening. Thank you, Navina. Thank you all to the participants for joining MISC Berhad's quarter 3 financial year 2021 analyst briefing. First, I would like to bring your attention to Page 3 of our AB pack. Higher revenue for the current quarter, mainly due to the higher revenue from Offshore segment due to the recognition of construction revenue for FPSO unit. Higher revenue also coming from KB Engineering segment, mainly coming from current ongoing projects as well as higher revenue also contributed from the LNG segment as a result of the higher earning days. However, the positive contribution for revenue this quarter was offset by the lower revenue from Petroleum segment, mainly due to the lower TCE rates as well as lower earning days. Lower profit before tax from operations during the quarter mainly due to the one-off compensation for a contract negotiation that we received for the Petroleum segment in the preceding quarter. For the nonrecurring items this quarter, we captured an impairment of noncurrent assets. In line with previous quarter also, we have an impairment of noncurrent assets. And in previous quarter, we have loss on deconsolidation of a subsidiary and disposal of noncurrent assets as the nonrecurring items. Moving on to Page 4 of our AB pack. Higher revenue coming from the revenue from Offshore segment due to the recognition of construction revenue for a FPSO unit. Higher revenue also coming from LNG segment due to the lease commencement of 6 VLECs. This positive contribution was affected by the lower revenue from Petroleum segment, mainly due to the lower TCE rates as well as lower earning days. And this higher profit from operations during the quarter in line with the revenue that I had explained earlier. Moving on to Slide 5 of our AB pack. Overall, our cash flow from operations continuously recorded a reasonable level comparing between preceding and corresponding quarter, mainly supported by the steady cash flow generated from the offshore business and LNG Asset Solutions segment portfolio of long-term contracts. On Page 7, our debt balances shows an increase mainly due to the drawdown that we had for the activities which is in the pipeline. Now we're moving on to financial performance by business segment. On Page 8, for LNG Shipping segment, revenue and profit before tax were quite stable between the comparative quarters, mainly coming from the higher earning days as well as the commencement of the 6 VLECs. On Page 10 of our AB pack, for Petroleum and Product Shipping, lower revenue recorded as compared to preceding and corresponding quarter mainly due to the lower TCE rates for midsized tankers and VLCCs as well as lower earning days. Higher PBT recorded in the preceding quarter mainly due to the one-off compensation for a contract negotiation that we received. On Page 11, for Offshore business segments, higher revenue recorded in current and preceding quarter, mainly coming from recognition of construction revenue and profit for a FPSO unit. The PBT recorded is actually in line with the revenue as we see now. And finally, in the last segment on Page 12 of our AB pack for Marine and Heavy Engineering segment, higher revenue recorded in the current quarter as compared to corresponding quarter mainly from higher revenue from an ongoing project. However, lower loss before tax as compared to preceding quarter, mainly due to higher profit from an ongoing project that [ has expensed ] now and higher loss before tax as compared to corresponding quarter, mainly due to lower revenue in Marine segment due to absence of conversion works during the quarter as well as lower profit from Heavy Engineering segment due to lower contribution from the [indiscernible] projects. Now I pass on to Vincent for the business update. Thank you.
Vincent Ng
executiveThanks, Eslin, and good evening to everyone. Thank you for joining us on this call. I will start with the market environment and starting on Page 14, LNG Shipping. Just looking at the graph there, although there was a surge in European gas demand in quarter 3 mainly due to lower wind and solar power generation over there, the LNG shipping rates -- spot rate has been relatively flat for the quarter, as you can see from the blue line. And on the other hand, short-term charter rate that's represented by the gray line has been strengthening over the period. This is mainly due to charterers jumping to secure tonnage ahead of the winter season. Post the third quarter in October, LNG charter rates actually have spiraled upwards above $100,000 a day given the energy shortage in a number of key consuming nations. Hence, we expect that the fourth quarter spot rates will be stronger for this year. On Page 15, we highlight the deliveries of LNG carriers, the projected deliveries for the next few years. And you can see that the order book for LNG carriers remains relatively high with approximately 20% of the fleet right now, with some 69 vessels expected to be ordered in 2021 as compared to 55 for 2020. This is to meet new tonnage requirements for upcoming LNG projects and higher demand. Turning now to the Petroleum Shipping market. As you can see from the graph as well, the market in the third quarter has continued to weaken, has been very, very low, especially for the VLCC rates. However, we are cautiously optimistic that there could be some moderate improvements in quarter 4 for -- on account of winter. We have seen that October spot rates have strengthened our [indiscernible] from a very low base. So although we don't expect a huge rally in this year, on the medium term, our -- we believe that the market prospects remain positive with likely improvements towards the second half of next year, whereby tanker demand is projected to return closer to 2019 levels on the back of OPEC+ phased supply increases as well as continued economic recovery. This is also supported by the order book on page -- the following page, Page 17. You can see that the order book is relatively moderate. We don't expect fleet growth to be very high for Petroleum segment. At the moment, the order book, as a percentage of the fleet size, is around 8% to 13% of the fleet depending on the type of ship. And at the same time, if you see the chart on the right, you can find that scrapping has been picking up pace quite a lot in the quarter. And so far, year-to-date figures for 9 months have exceeded the total for 2019 and 2020 by quite a far distance. So this is an encouraging sign for recovery of rates due to -- hopefully, it will reduce the tonnage oversupply over a period of time. Turning now to the Offshore segment on Page 18. Not much here to -- that's different from the last quarter. As you can see, because the oil prices have remained strong, with expectations of continued global economic recovery, the outlook for offshore CapEx continues to be positive. We expect that offshore CapEx levels would surpass pre-crisis levels by next year. And similarly, for FPSO prospects, it continues to be positive with awards coming from Latin America, Asia Pacific and Africa over the next 2 years or so. That concludes the market environment. And I will now move on to business updates, starting again with the LNG business. The LNG Shipping business, we have taken delivery of the second vessel that we have under the joint venture with NYK and Mitsubishi Corporation. This is the Diamond Gas Victoria in July. This will go under an 18-year time charter contract. At the same time, LNG business continues to explore new opportunities for both conventional and nonconventional solutions. For the Petroleum and Product Shipping segment on Page 21, the current portfolio mix is at 68:32 term to spot. This is a slight decrease from the second quarter of 72:28. The main reason for this is due to the Aframax fleet. There has been a lower volume of lightering activities during the quarter on the back of overall demand reduction during the quarter. And as a result, quite a number of charters have used to light their own excess tonnage to do lightering instead of employing our ships. During the quarter, we have also chartered in 2 Aframaxes, so increasing our fleet size by 2. Going over to Offshore business. Currently Offshore business is still focused very much on execution of our Mero-3 project, but at the same time, still selectively sourcing for opportunities in our targeted markets. As for the litigation cases for Gumusut Kakap, GKL and MOMPL, which are covered on the next few pages, I will not go through. But just suffice to say that we are still continuing the legal process to pursue both cases. The final segment I will cover is on Marine and Heavy Engineering. In terms of milestones for the quarter, we are up -- year-to-date completed the repair and maintenance of 73 vessels including 10 LNG carriers. On the sustainability front, MHB has installed solar panels on its rooftop, which will allow us to generate 8.3 megawatts peak of electricity. The order book backlog as of September is MYR 2.5 billion. And the tender book is MYR 9 billion to MYR 10 billion as of September. So I think that concludes the presentation from my side. I hand you back to Navina.
Navina Shanker
executiveThank you, Cik Eslin and Mr. Vincent, for the presentation on financial performance and business updates. With the completion of the presentation, I would now like to hand over the call to the event manager who will guide and manage the Q&A session. Dana, over to you.
Operator
operator[Operator Instructions] Mr. Kong Ho Meng from UOB.
Kong Ho Meng
analystMy name is Ho Meng from UOB Kay Hian. I have about 5 questions. If it's okay, I'll go through one by one. My first question is how much is the construction gain of the Mero-3 during the third quarter? Hello, can you hear me?
Raja Azlan Bin Raja Azwa
executiveYes. Can you hear me, Ho Meng? Azlan here.
Kong Ho Meng
analystYes, yes. You've got my question, right? Yes.
Raja Azlan Bin Raja Azwa
executiveYes. I think year-to-date, we have recognized close to about USD 80 million or so.
Kong Ho Meng
analyst1-8, $18 million?
Raja Azlan Bin Raja Azwa
executive8-0, 8-0 year-to-date.
Kong Ho Meng
analyst8-0. That's on the P&L level, on the...
Raja Azlan Bin Raja Azwa
executiveThat's right.
Kong Ho Meng
analystYear-to-date or you mean for the 9 months last?
Raja Azlan Bin Raja Azwa
executiveThat's right.
Kong Ho Meng
analystOkay. All right. My second question is on the tax side, right? I noticed you updated in the Bursa tax where you've got the -- you continue to enjoy 100% shipping tax exemption up to 2023. So in relation to this, can I just double check with you whether that means your tax rate going forward will remain the same? And also do you also see -- in regard to the prosperity tax, do you see a negative impact? What is your final assessment on that?
Raja Azlan Bin Raja Azwa
executiveYes. In terms of the Section 54A shipping tax, we have actually been notified by the Mission Association of Shipowners who have been notified by MOT that the MOF has actually approved the extension to implement the tonnage tax by the end of 2023. So therefore, the existing exemption is still applicable up to the year-end of 2023. And in the event that we implement the tonnage tax, we hope that we'll be able to resolve this in the long term, whether the shipping tax [indiscernible] of the prosperity tax, which is actually a one-off tax in 2022, there is not going to be much impact for us.
Kong Ho Meng
analystIs it because of the shipping tax exemption so that's why you have -- you don't see any impact on the prosperity tax, nothing material?
Raja Azlan Bin Raja Azwa
executiveCorrect, correct. Because most of our entities, they are enjoying this or their [indiscernible] those kind of things.
Kong Ho Meng
analystOkay. Got it. I move forward quickly to my third question. I think previously, I did ask your team on -- because I noticed there are some -- PETRONAS has some issues with their cargoes exporting from the LNG terminal in [indiscernible]. But I do note that you have always guided that your long-term targets, regardless of whether the [indiscernible] terminal is exporting or not, it shouldn't be affected. But I just want to double check, because in your Bursa announcement, you did mention that the -- due to the pandemic, you did have some off-hire days in your LNG long-term charters. So I just want to check, are those off-hire days related to this issue? And also, yes, just -- can you comment on that?
Raja Azlan Bin Raja Azwa
executiveNo, no, they are not due to this issue. As my team has rightly guided you, they -- we enjoy the long-term contracts. So we will continue to benefit from the long-term contracts. Those off-hire days are due to COVID-19 cases or extended dry docking in 1 or 2 of -- a few vessels [indiscernible].
Kong Ho Meng
analystI see. How many days were the off-hire days for your LNG segment in the third quarter?
Raja Azlan Bin Raja Azwa
executiveIt was not much. I mean it was -- the impact was probably around USD 3 million to USD 4 million.
Kong Ho Meng
analystIn terms of earnings impact?
Raja Azlan Bin Raja Azwa
executiveYes. The total impact up to the 9 months was around $3 million to $4 million for all the vessels that were affected.
Kong Ho Meng
analystOff-hire due to -- related to COVID-19?
Raja Azlan Bin Raja Azwa
executiveOr extended dry docking.
Kong Ho Meng
analystOkay. All right. And moving over towards the fourth quarter, what is the outlook for the LNG side? Are you expecting a very full utilization because of the high gas demand worldwide?
Raja Azlan Bin Raja Azwa
executiveYes. I mean most of our vessels are on long-term contracts. So those will benefit. I mean, in terms of the ones on spot, correct me if I am wrong, team, I think roughly about 75% [indiscernible].
Kong Ho Meng
analystAnd the dry docking is probably close to 0 likely for the fourth quarter because of the demand -- because of the high demand, right?
Raja Azlan Bin Raja Azwa
executiveCan someone help me here on the dry docking?
Navina Shanker
executiveYes, we do have docking for this quarter.
Kong Ho Meng
analystThis quarter referring to third quarter or the upcoming fourth quarter?
Navina Shanker
executiveThird quarter -- I need help here. I think there are some, but not much. Because -- I don't have the number of days with me here. But of course, there's a plan docking around maybe 60 to 80 days for LNG.
Kong Ho Meng
analystIs that a [indiscernible] okay, right?
Navina Shanker
executivePlan, yes. Plan, yes.
Kong Ho Meng
analystOkay. Okay. Got it. Okay. Maybe I will quickly move forward to my next question. In terms of the PETRONAS outlook for your -- for the fourth quarter -- the upcoming fourth quarter, I think in the past few weeks, there were [indiscernible] where the Aframax fleet benefit because of the U.S. crude export price. So in the sense, do you see the same benefit to your Aframax fleet for both the lightering or any of the small contracts over there?
Vincent Ng
executiveYes...
Raja Azlan Bin Raja Azwa
executiveYes. Go ahead.
Vincent Ng
executiveYes. I think, as I mentioned during the call just now, there could be some benefit. In October, there is an increase, but because the increase is coming off a very low base. So even sort of a high percentage increase would not -- may not be such an impact in terms of dollar value because it's coming from a very low base, yes. So I think, because of that, I think not -- may not be that huge in terms of impact to our financials. [indiscernible], which I don't -- I'm not -- we will be very happy that happened, but may not happen.
Kong Ho Meng
analystYes. Okay. Okay. So just a [indiscernible], how much is the spot exposure in your Aframax fleet at the moment?
Vincent Ng
executiveI'll give you the normal split that we have, right, for quarter 3 just for everybody. VLCC is at 87:13 in terms of spot, Suezmax is 73:27 and Aframax is 54:46. So the balance -- actually, the Aframax fleet has been one that has gone down in terms of terms, has gone more into spot as for the reason I mentioned just now so -- due to the effective demand in the quarter. So if the spot rates go up, then theoretically, Afra fleet could theoretically benefit. It actually depends on how much the spot rate goes up for Afra, yes. But like I said, we've talked about percentage increase, it could be very high, but the absolute rates are not -- are quite low at the moment.
Kong Ho Meng
analystOkay. My last question here, I just want to check on assessing in terms of your cost base. I mean long time ago, you used to disclose the cost components of your Shipping segment. Right now, I just want to get some feel because now everybody is concerned on the inflation cost and everything, right? [ So cost of fuel is most obvious one ] because that may link to oil prices. But can you also comment on the other cost components of the Shipping segment? Do you see any pressures on that due to, say, higher material costs or higher crude costs or things like that?
Raja Azlan Bin Raja Azwa
executiveYes, I think there has been some increase in the bunker cost. Yes. So -- but I think we also are covered by our long-term charters. We only expose the bunker cost for our spot.
Kong Ho Meng
analystThe long-term charters, where your bunker cost is kind of like pass-through, right? If I'm not mistaken?
Raja Azlan Bin Raja Azwa
executiveThat's right. It is the claims cost for the term charters.
Kong Ho Meng
analystOkay. And how about the other cost components? Are there any material risk that you foresee?
Raja Azlan Bin Raja Azwa
executiveThere are some. There are some, but it's still largely under control. There could be maybe about 2% to 3% impact in some of the areas.
Kong Ho Meng
analystOkay. Okay. So nothing major for [ now ] at the moment?
Raja Azlan Bin Raja Azwa
executiveThat's right. That's right.
Operator
operatorOur next question, Mr. Alex Goh from AmBank Research [indiscernible] Berhad.
Khir Goh
analystA few questions. Well, let me run through first with the Heavy Engineering division. There is a mention of cost provisions for an ongoing project. Could you refresh us which project is this referring to? And is there any -- what was the actual additional costs in the third quarter? And what -- is there any potential for recovery from the client?
Raja Azlan Bin Raja Azwa
executiveYes. We don't want to mention the exact name of the project, but this cost provision was more a cost provision that was booked in, in the first quarter, where we booked in quite a big provision in the first quarter.
Khir Goh
analystIt happened in the first quarter and not in the third quarter. Is that right?
Raja Azlan Bin Raja Azwa
executiveNo. Yes, in the -- if you look at the quarter-on-quarter performance for MHB, the losses are actually reducing quarter-on-quarter.
Khir Goh
analystI see. Okay. Correct. And what about the potential of recovery from the client? Are you working on that? How much is the actual provision so far?
Raja Azlan Bin Raja Azwa
executiveI mean, again, we're not going to disclose exactly what the provision is, but there are substantial claims relating to COVID-19, which we are in the midst of discussion with our client. And our client has a knowledge, to a certain extent, some of those costs.
Khir Goh
analystOkay. Okay. Right. Coming back to the tax issue that Ho Meng mentioned. Okay, are we -- I want to come back to the part where the budget talks about the foreign income now being accessible, right, and where I think where dividend repatriation can be impacted. Internally, how would you assess the impact to MISC? Is there a way to mitigate that? I mean it may not just be 1 year, it maybe could be on an ongoing basis?
Raja Azlan Bin Raja Azwa
executiveYes. I think this is impacting almost everybody. Anybody who has got foreign operations, there will be some impact. I think this will mainly be a concern for our foreign investments. And we are looking into ways and means of how to mitigate this impact. But immediately in 2022, we don't see any big impact.
Khir Goh
analystYes. Okay. Okay. And coming back to your LNG. Could you -- I just want to be clear, how many percent of your vessels are currently on a fixed? And how many is actually on spot now currently?
Raja Azlan Bin Raja Azwa
executiveIt is 90% or so on long-term charter. Sorry, Vincent, please correct me if I'm wrong.
Vincent Ng
executiveYes, maybe I will go by the number of vessels. We have 4 vessels on what we call short-term charter. But all of them are currently on short-term charter. Means none of them are actually on spot and the short-term charters will extend until 2022 -- to some part of 2022.
Khir Goh
analystOkay. So basically, what I'm trying to ask is that if LNG tanker rates were to run up in the fourth quarter, the LNG division is unlikely to benefit from that. Would I be right in saying that?
Vincent Ng
executivePartially right. We do have some of those short-term charters where we have an arrangement with the charterer for a floating rate. So there is a floor and a ceiling. So we do have an arrangement where we do benefit from movements in the spot rates, but not to the extent of a full spot exposure for 2 of the vessels.
Khir Goh
analystI see. Okay. Only 2 of the vessels out of the entire LNG fleet has that?
Vincent Ng
executiveYes. For the long-term charters, those terms don't exist. These are only for the short-term ones. For the long-term charters, all the rates are fixed.
Khir Goh
analystOkay. Based on what you know now, we've actually gone into cross October. We only now have about 2 more months left to go. Can we safely say that your thought what overall should be at least be as strong as your third quarter, if not stronger? Would we be safe to say that?
Vincent Ng
executiveMaybe I have to seek my finance colleagues on this.
Raja Azlan Bin Raja Azwa
executiveOn balance, I think it will be slightly below the third quarter. But as a whole, for the whole year, I believe that will be comparable to last year if we strip out those normal provisions that we made for GKL.
Khir Goh
analystWhat would be causing fourth quarter to be slightly lower than third quarter?
Vincent Ng
executiveYour question is on LNG only or for the whole company, for the group?
Khir Goh
analystBasically, on overall, LNG and all divisions included.
Vincent Ng
executiveI see. Okay. I think that -- yes, just a clarification.
Raja Azlan Bin Raja Azwa
executiveWe will probably see a lower performance from the Offshore unit as we're booking some of the fuel cost and also some of the interest costs relating to the -- during construction for the Mero project.
Khir Goh
analystWhy would Offshore division weaken in fourth quarter? Shouldn't it be quite the same as well in the third quarter because you'll still be recognizing the construction side of the Mero-3 or unless you are looking at a slower construction progress?
Raja Azlan Bin Raja Azwa
executiveNo, no. You see the way that the costs need to be recognized. In the early part of the project, we have actually recognized a high margin, right? But as we make progress, then we're going to gravitate towards a lower margin as we bring in all the costs. But again, this is all just finance's accounting. Based on finance's accounting, we are supposed to recognize the construction profit and all those. But really we should be [indiscernible] with the cash flow.
Khir Goh
analystI see. Okay. The reason why I'm asking is traditionally your fourth quarter tends to be stronger, sir, right? I'm just wondering whether that is going to be replicated or under -- because under the new normal things have actually changed in such a way that it's going to skew your normal seasonal trends.
Raja Azlan Bin Raja Azwa
executiveYes, only for the Offshore segment. I think in terms of LNG and Petroleum, it would be more or less -- Petroleum -- I think Petroleum should be at least breaking even or recording a small profit, whereas LNG will continue to deliver the strong numbers. The Offshore will come in slightly lower.
Operator
operatorOur next question, Mr. Ben Shane Lim from Macquarie. I think Mr. Ben has left. Mr. Kong Ho Meng is the next question from UOB.
Kong Ho Meng
analystOne follow-up question. On the Offshore side, I also noted that recently, there are some news that mention that Gumusut Kakap has some production issue. Can you comment whether that is both your platforms? And should we expect any earnings impact over the fourth quarter in relation to the platform?
Raja Azlan Bin Raja Azwa
executiveNot that I'm aware of.
Kong Ho Meng
analystOkay. So whatever it is, it does not -- may not necessarily involve your platform?
Raja Azlan Bin Raja Azwa
executiveNot that I am aware of.
Operator
operatorOur next question, Mr. Raymond Yap from CGS-CIMB.
Raymond Yap
analystAzlan, I'd just like to ask about the Mero-3 construction revenue for the third quarter.
Raja Azlan Bin Raja Azwa
executiveYes. Sorry, exactly what was your question again, Raymond?
Raymond Yap
analystI wanted to know what the construction revenue for the Mero-3 was in the third quarter?
Raja Azlan Bin Raja Azwa
executiveFor the third quarter, the construction revenue was a bit -- slightly above $100 million.
Raymond Yap
analystOkay. All right. And may I know what is the percentage of completion for the Mero-3 project?
Raja Azlan Bin Raja Azwa
executiveI think by the year-end -- I think for this year alone, we would have achieved roughly, I think, about -- the movement this year about 25% or so.
Raymond Yap
analystOkay. 25% by December 2021, yes?
Raja Azlan Bin Raja Azwa
executiveThe movement this year, the movement for this year.
Raymond Yap
analystThe movement for this year, okay. So at the end of this year, what is the cumulative potential completion?
Raja Azlan Bin Raja Azwa
executiveI think last year was only less than 10%. So this year should be slightly above 30%, if I am not mistaken.
Raymond Yap
analystOkay. Just slightly over 30%, okay. All right. And in terms of the tanker sector, it was loss-making as a whole in the third quarter. And I would like to ask whether each of the different categories were also loss-making or -- like the VLCC, Suez and Afra, or was it mainly concentrated in the Afra side?
Raja Azlan Bin Raja Azwa
executiveYes. Mainly, it was the Afra side and minimal in the Suezmax. But mainly Afra because of the lightering shortfall.
Raymond Yap
analystOkay. Yes, Vincent mentioned about the lightering shortfall. Vincent, sorry, I didn't really understand what was happening. Could you explain it to me again?
Vincent Ng
executiveBasically, the lightering -- some of the lightering contracts fall into what we consider as our term, right? So during that period, there were less of those.
Raymond Yap
analystYou mean there was less volume?
Vincent Ng
executiveLess volume of lightering, yes.
Raymond Yap
analystOkay. But the contracts are still there. It's just that within the contract, there can be fluctuation in lightering volumes, is it?
Vincent Ng
executiveThat's correct.
Raymond Yap
analystRight. Okay. Right. Okay. And in terms of the LNG business, I'm referring to Slide #9. And you can see that in the third quarter, the profit was $64.9 million, but the profit in the second quarter was $54.6 million. But $54.6 million includes that nonrecurring provision of -- or impairment of $7.7 million. So if I add that back, and then I believe, in the second quarter, the LNG division also had a $10.6 million impairment on the receivable, which is due to the Yemen LNG receivable, which the recovery was pushed back. So there was a time value of money penalty there. So if I add back the $7.7 million impairment and the $10.6 million time value of money penalty on the Yemen LNG receivable, I basically get LNG profit for the second quarter of $73 million. So between $73 million and the third quarter's $65 million, there's quite a big drop. So I wanted to understand what was the reason for that.
Raja Azlan Bin Raja Azwa
executiveI mean there was some lower performance in the Puteri Satu class and the Tenaga class, if you're comparing Q3 to Q2.
Raymond Yap
analystOkay. What's the background of that?
Raja Azlan Bin Raja Azwa
executiveI think these were just -- go ahead, Eslin, go ahead.
Eslin Halimi
executiveIf I may, in quarter 3 includes some costs that we put in for certain [indiscernible] on repairs and maintenance.
Raymond Yap
analystOkay. What's the recurring maintenance costs with respect to the Puteri Satu and Tenaga class?
Eslin Halimi
executiveWe do not have Tenaga any more.
Raymond Yap
analystOkay.
Eslin Halimi
executiveSome vessel affected, like [ 3B ] if I'm not wrong.
Raymond Yap
analystOkay. And these vessels -- these repair costs, is there any way that you could have capitalized them and depreciated them? Or do they have to be charged off immediately?
Raja Azlan Bin Raja Azwa
executiveThese repair costs, we need to pick them up. Some of them relate to some insurance claims, which, if we are successful, we'll only book in the recovery 1 or 2 years down the road. I mean, if it's the dry docking, then we will capitalize and amortize, but some repairs we need to actually book it as incurred and then only reflect the recovery later on when the insurance is successful.
Raymond Yap
analystOkay. Sure. Okay. So my last question is on your assessment of your fleet compliance with EEXI and CII. Has your consultant finished the review? And are you in a position to discuss how your fleet is going to be able or not able to meet the IMO requirements from 1st January 2023?
Vincent Ng
executiveI'll take this question. The study is still ongoing because there were a number of items still outstanding as of the previous MEPC. So we're expecting further clarifications and numbers coming out of the MEPC -- post MEPC 77 in November. So the adjustment is still ongoing.
Operator
operatorOur next question is from Mr. Ben Lim from Macquarie.
Ben Lim
analystCan you hear me?
Raja Azlan Bin Raja Azwa
executiveYes, we can hear you, Ben.
Ben Lim
analystOkay. My first question is on the petroleum tankers. I don't know if I heard or understood that correctly. You said something about the volumes being lower because your customers were finding -- they are using your own vessels, has made that to do the lightering. Did I hear that correctly?
Vincent Ng
executiveBen, Vincent here. Yes, that's right. Because I was just explaining the specific items, but the broad answer is that lightering volumes were lower due to volumes of [indiscernible] shipping in the Gulf being lower as a whole. So for lightering services, we provide the ship as well as services. But in some cases, what happens is that because the client themselves already have excess of ships from elsewhere of their own, so they are using their own ships for some of the lightering activities as well. So that's still a dual impact. It's a lower amount and also because of over tonnage supply, the clients themselves have ships on hand that they can use for the lightering. So rather than use ours -- yes.
Ben Lim
analystAnd is there some stickiness to that trend? Is this going to stay going forward? Or is that very circumstantial to the third quarter?
Vincent Ng
executiveIt's very much dependent on the activity levels in the Gulf because the lightering activity is principally there, although we have some -- a little bit in Latin America. I would also say that some of those lightering we do get involved, it's just that we provide the service without the ship, so we only earn a small amount of money because -- that is one part of it. So they may still involve us in the lightering, but using their ship instead of our ship.
Ben Lim
analystOkay. And roughly how significant is this particular impact? Is it affecting 5 vessels, 10 vessels? Just want to get maybe the scale?
Vincent Ng
executiveI'm not able to break it down to that level. But if you compare the spot -- term to spot for Aframax, I think that will give you the clue like roughly a big impact comes from there. The movement of the last quarter's ratio to this quarter is largely attributed to that.
Ben Lim
analystOkay. Understood. And you're also chartering in 2 more Aframax. Are those going straight to time charter?
Vincent Ng
executiveI think I don't have that information. Yes, it's dynamic because we charter in because of opportunities in market, Ben. So it's very much the chartering team to decide opportunistically whether they want to be put on for spot or for charter -- time charter. So I don't have specifically for those 2, whether it is or not.
Ben Lim
analystOkay. Yes. I was just trying to line up the 2 things that are happening. One, your customers have so much vessels that they are not using yours. And the second one being that -- yes, there's so much of vessels, you have been chartering extra ones, but I'm curious whether you're actually getting them to work. What's happening there?
Vincent Ng
executiveYes. I understand your question, but it is that I can't actually answer it because I don't know. But it makes sense that they wouldn't be put on lightering, for example. But they could be for other customers who have other needs. So -- but I don't have the precise specific answer for those 2 vessels. So I don't think we want to overplay it. But broadly, you would say that the market has weakened if you saw in the number. So I wouldn't want to attribute it to just that reason, but we're just pointing out one of the major reasons for that trend. It's not the only one, but it's one of the -- because overall, the market is still fairly weak.
Ben Lim
analystUnderstood. Understood. Okay. But let's say, looking for some total, should we expect the utilization rates to improve in line with the higher charter that you're seeing in the fourth quarter?
Vincent Ng
executiveI think we're going on the basis that OPEC is reducing its -- or rather it's releasing more supply every quarter. So -- and it also depends on winter demand for oil. So I guess those things will drive the demand side. And as long as there are no supply disruptions, then there should be an increase in shipment, yes. So that's what we're looking at. But whether it will materially affect the rate, not too sure about that.
Ben Lim
analystOkay. Understood. I mean, I just want to make sure that there's nothing structural that's changing like your customers not being dependent on you going forward. That sort of thing.
Vincent Ng
executiveNo, no, not due to that. It's purely market-driven.
Ben Lim
analystOkay. That's helpful. My next question is just on the sort of new contracts. It looks like there's a lot of demand for LNG new builds. Are you guys active in that space looking for more opportunities? And any bids that may be closing in the coming quarter or so?
Vincent Ng
executiveWe have bids outstanding, but we are not able to share because of commercial sensitivity, but there are opportunities in LNG that we are pursuing right now.
Ben Lim
analystWould you share just roughly the size of your bid book and sort of the time lines for that, when it's going to close?
Vincent Ng
executiveCould be end of the year or early next year. Size-wise, it's more than 1 vessel, I can say that.
Ben Lim
analystOkay. There could be anything. What if I rephrase the question I gave. What is your appetite for new projects, let's say, on a 12-month view? I know you used to say USD 1 billion new CapEx you want to win. Are you still aiming for that?
Vincent Ng
executiveWe are aiming for CapEx, but we are allocating it across the unit. So LNG is only one of them. So we have also Offshore. Principally, LNG and Offshore will be the main focus for CapEx rather than AET. AET will be more rejuvenation and DPSTs also. But for the big-ticket items will be Offshore and LNG.
Operator
operatorWe've got one question from Mr. Kong Ho Meng of UOB.
Kong Ho Meng
analystSorry, just 2 follow-ups regarding the discussion on the lower lightering demand. I was under the impression because during the third quarter, the U.S. side, they were affected by the hurricane, so everything was down. But I am surprised that you mentioned that, yes, [indiscernible] -- you also mentioned that the -- some of the players actually use their own Aframax for lightering or something like that. So I'm really surprised because I thought you were always a market leader there, and there's not many players that does lightering aside from you guys. So...
Vincent Ng
executiveThere are other players, but that's why I mentioned also the -- for some of those lightering. See, lightering provides -- it's actually a service because we actually transfer the oil from a large ship to a smaller ship, right? So there are 2 components of that. One is the actual service of doing it or providing that service of helping to transfer the oil. But the other service is actually provide that tanker itself. So the clients can actually employ us to do the lightering activity, but using their ships. So -- but I mean [indiscernible] but that's one part of the business. So we could still be involved, but it's just that we are involved in a smaller scale. But I'm not saying that it's all of our ships are like that. It's just that some of them, there may be such instances where the clients says use my ship instead of yours, but you are still providing the service.
Kong Ho Meng
analystIs that considered a contract?
Vincent Ng
executiveNo, no, it's not. It's not. But it's one aspect of the business, it's just that it just so happened -- but it does happen from time to time. It's not something new. It's just that, in the current market where there's a bit of an oversupply, then such instances may happen a little bit more often than they normally would. Because in normal circumstances, it makes sense to just provide the service and the best together with the vessel. It's a full, what we call a full-service lightering. So -- but I don't want to over say that everything is going that way either. I'm just giving an example to address your question.
Kong Ho Meng
analystGot it. Got it. So is it possible that -- I know you mentioned it's going to be too optimistic, but is it possible that say, like post the hurricanes and all, you get the pent-up demand for -- production is coming back and U.S. crude [ exports ] have also been surging quite a lot. So the pent-up demand on lightering side, there could be quite a lot of demand for you to do lightering services without using your vessels?
Vincent Ng
executiveI think if demand comes back, they will probably use -- I mean the tonnage demand adjusts itself and therefore, we should get our fair share of using our own vessels. I don't think that's an issue because of the overall weakness. But to answer your question, before that, it's -- it really depends on the U.S. exports. I think the -- currently, the exports from the U.S. are fairly limited because the shale producers are not exporting that much. So if they change their stance and they start to export more aggressively, that would be a main change for lightering because most of U.S. exports come out of the U.S. Gulf. So there will be a demand for lightering in that event for export lightering. So that's one of the drivers. But at the moment, it's fairly muted on the U.S. side, as I understand it from reading news.
Kong Ho Meng
analystOkay. Cool. And the next follow-up question is on the Offshore side. So I think, Azlan you mentioned that the fourth quarter is going to be weak. But assuming if you exclude the lower -- if you assume the Mero-3 construction gains, right, basically, the profit from all the other Offshore fleet, are you expecting a lower number as well on a quarter-on-quarter basis?
Raja Azlan Bin Raja Azwa
executiveExcluding Mero, we should be more or less...
Kong Ho Meng
analystYes. Mero-3.
Raja Azlan Bin Raja Azwa
executiveYes, the Mero-3 is quite low.
Kong Ho Meng
analyst[indiscernible]
Raja Azlan Bin Raja Azwa
executiveYes.
Kong Ho Meng
analystOkay. Because I remember you mentioned earlier something like there would be some cost pricing or something like in the fourth quarter, which I don't quite understand. So I'm not sure whether that refers to Mero only or the other Offshore fleet?
Raja Azlan Bin Raja Azwa
executiveNo, this is mainly for Mero. I mean it is basically some of the engineering relating together with some of the financing [ rentals ], which are time sensitive.
Operator
operatorWe have come to the end of the Q&A session. I will now hand the session back to Navina for the closing comments. Over to you, Navina.
Navina Shanker
executiveThank you. Ladies and gentlemen, this concludes today's conference call. On behalf of MISC Berhad, we would like to thank you for your participation. The PDF version of our presentation slides will be made available in our corporate website post this earnings call. To the sell-side analysts, we would highly appreciate that you forward a copy of your published research report to the MISC Investor Relations team for our reference. Thank you once again, everyone. Stay safe, and have a good evening.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete MISC Berhad transcript — plus 261,000+ transcripts from 13,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to MISC Berhad earnings transcripts and 261,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in MISC Berhad or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.