Ladies and gentlemen, welcome to MISC's Quarter 1 FY 2022 Analyst Briefing Conference Call. Ausmal from MISC Investor Relations team will be -- will run through the agenda for today's briefing. Ausmal, over to you.

Ausmal Bin Kardin

executive
#2

Thank you, Anna. Very good evening, ladies and gentlemen. Thank you for participating in our first quarter financial year 2022 analyst briefing. We have with us today the Cik Raja Azlan,Vice President Finance; and Cik Zahid Osman, Vice President, Corporate Planning; Cik Eslin Halimi, Head of Financial Reporting, Governance and Budget, Finance; and Mr. Vincent Ng, General Manager, Corporate Planning. Before we start with the presentation, I would like to bring your attention to the disclaimer slide. During the presentation, we may make some forward-looking statements in reference to our plans and expectations, whereby actual results could differ due to unknown risks, uncertainties and other factors that are, in many cases, beyond MISC's control. We will now proceed with the presentation on financial highlights for the quarter's performance, which will be presented by Cik Eslin, followed by market outlook and business update by Mr. Vincent. At the end of the presentation, we will open the line for a Q&A session. Our event manager will later provide instructions on the Q&A process. With that, I pass the session to Cik Eslin for our first agenda, the update on MISC's first quarter financial year 2022 financial performance. Cik Eslin, over to you.

Eslin Halimi

executive
#3

Good evening. Thank you, Ausmal. Thank you to the participants for joining MISC Berhad's Quarter 1 Financial Year 2022 Analyst Briefing. I would like to bring your attention to Page 3 of our analyst briefing pack. Lower revenue for the quarter, mainly due to the lower construction revenue from the conversion of an FPSO. However, this was offset by the higher revenue from Petroleum segment mainly due to the higher freight rates for the midsized tanker segment. Lower profit before sales from operations during the quarter mainly due to lower share of profit recognized in the Offshore segment following the recognition of a gain from the contract extension that we had in the preceding quarter. This was offset by the higher profit before tax from operations from heavy engineering due to the additional cost provisions that were recognized for the ongoing project in the previous preceding quarter. Moving on to Page 4 of our AB pack. Higher revenue coming from higher revenue from Petroleum segment due to the higher blended rates in the midsize tanker segment. Higher revenue also coming from the Heavy Engineering segment due to the higher activities for ongoing heavy engineering projects and higher dry docking activities in the current quarter. Revenue also recorded a positive from Offshore segment due to the recognition of construction revenue for FPSO profit and higher revenue also recorded from the GAS segment due to higher earning days result of the lease commencement of VLEC. Lower profit before tax from operations during the quarter mainly due to lower profit before tax from operations coming from the Offshore segment due to the increase in total construction cost of an FPSO due to global supply chain issues and China lockdown impact. This was, however, offsetted by the higher profit before tax from operations from heavy engineering due to higher revenue during the quarter, as mentioned earlier, as well as in the previous corresponding quarter, there was an additional cost provision recognized for an ongoing project. Higher profit before tax also coming from GAS segments due to higher earning days, as mentioned in the revenue section earlier. On Page 5 of AB pack, our cash flow and profit from operations shows that it continuously recorded original level, especially our CFO, comparing between preceding and corresponding quarter, mainly due to the higher operating performance as well as improved collection that we had in the current quarter. On Page 7 for cash and debt balances, lower balances that can be seen in the current quarter, mainly due to the repayment of an existing loan that we had, and this is part of our financing plan taking into account the recent completion of the bond issuance program with [indiscernible]. Next, going on to the financial performance by business segment. On Page 9, for GAS & Asset Solutions, revenue and profit before tax were quite stable between the comparative quarters, mainly coming from higher earning days as well as commitment of 5 [indiscernible]. Next page, on Page 10 for Petroleum & Product Shipping segment. Higher revenue recorded as compared to preceding and corresponding quarter, mainly due to higher TCE rates for midsized tankers that I explained earlier. Lower PBT that you can see recorded in preceding quarters, a bit lower mainly due to reduced margin on freight rate due to higher voyage and operational costs that happened in this quarter. On Page 11, for Offshore business segment. Lower revenue recorded as compared to preceding and corresponding quarter, mainly due to the lower revenue recognition of construction revenue for the FPSO unit. Our profit before tax as compared to the preceding quarter was lower, mainly due to the lower share of profit from the JV that we earn again on contract session that we had in the previous preceding quarter in Q4 2021, whereas lower profit before tax as compared to the corresponding quarter is mainly due to increase in total construction costs of FPSO due to global supply chain issue and China lookdown impact. Finally, in the last [indiscernible] on Page 12, for Marine & Heavy Engineering, revenue recorded as compared to corresponding quarter, higher mainly due to the ongoing projects as well as by revenue that we earned from dry docking activities. For profit -- minimum profit shown as compared to the both quarters is because in the previous 2 quarters, there was an additional cost provision that were recognized for an ongoing project. With that, I'll pass to Vincent for the market update. Thank you.

Vincent Ng

executive
#4

Thank you, Eslin, and good evening, everyone. Hello. Thanks for joining us on this call. I will take you through the market environment first. Starting with LNG on Page 14 on your slide. If you recall, after a record winter season, LNG spot rates have fallen quite steeply in the first quarter of 2022. As you know, towards the end of the quarter or the later part of the quarter, there was higher LNG imports by European countries who are seeking to reduce their reliance on Russian pipe gas arising from the Russia-Ukraine conflict. And this was partly offset by a lesser demand from Asia, mainly due to China lockdowns as well as high LNG prices. Net-net, as a result of this impact, there was a diversion of Asian-bound cargoes to Europe impacting tone-mile demand. On the other hand, if you look at the gray line, which is the time charter, the 3-year time charter rate, these have firmed over the same period. Going to Page 15. From the chart, you can see that there will be lower deliveries of LNG carriers this year in 2022. However, you can see the rising trend in 2023 and 2024 to a multiyear high. There has been very strong ordering activity in the first quarter of 2022 and is expected to remain high for the rest of the year. So we expect more higher deliveries in '24, '25 and '26. More LNG projects are expected to reach FID over the next 2 years due to a positive demand outlook. Europe's aim to diversify away from piped gas from Russia is also expected to support an even stronger LNG project sanctioning environment. And we noted that a number of U.S. projects have been advancing significantly in recent months. Moving on to the Petroleum segment. This has also been impacted by the Russian-Ukraine war. If you recall, the last quarter was quite a poor quarter in terms of the end of 2021. However, we noticed that the rates have risen in 2022 for the first quarter and particularly for the Suezmax and Aframax segments. And this has also been a result of the war in Ukraine, leading to changes in oil trade patterns and as a result of which they have longer-haul routes. With Western countries shunning Russian oil, more Russian crude has been shipped up to the Eastern areas of China and India, while Europe has been importing oil from other newer regions. This has supported the demand for midsized tankers. On the other hand, the VLCC rates have remained soft given that a lot of it has been employed in long-haul routes between U.S. and China. So China lockdown has also impacted the demand for VLCC, the cargoes. In the immediate term, there are still some risks on the global environment in terms of the weakening global economy and combined with elevated oil prices and continued China lockdown. Going to Page 17. As you can see on the chart on the left, although there will be more new build deliveries in 2022, the overall order book for tankers are relatively small. On the whole, the current tanker order book as a share of the fleet stood at a record low of about 6% for -- at the start of quarter 2, 2022. And on the other hand, if you look at the chart on the right, the demolition activity has remained limited. Although the short-term outlook remains quite uncertain, given the geopolitical situation in Europe, we expect that there will be gradual demand recovery over the medium term and coupled with the positive environment in terms of a slow fleet growth, and this should improve the conditions for the tanker market in the medium term. Moving on to the Offshore segment on Page 18. Despite headwinds, I think, the outlook for the offshore CapEx spending continues to be positive, supported by the reopening of economies and borders gradual return to more normal levels of activity and higher prices and recovering [indiscernible]. The growth for FPSOs was expected to come mainly from Latin America, Africa and Asia Pacific over the next 12 to 24 months. That concludes the business environment, and I will now move over to the business update on Page 20. For the Gas Solutions, Gas Assets & Solutions segment that we will continue to explore opportunities in the conventional and nonconventional market. The Petroleum segment for the current quarter, the portfolio mix is 65:35 term to spot, which is a decrease from last quarter. In the first quarter of 2022, we took delivery of 4 new vessels, 2 DPSTs for Shell; 1 LNG dual-fuel VLCC for Total Energy, which is the world's first LNG dual-fuel VLCC; and one DPST for Petrobras. Subsequent to the quarter, we took the delivery of the second dual-fuel VLCC for Total Energy. During the same quarter, if you look at the next page, we sold one Aframax and redelivered 3 LR2 and one chemical vessels. We also like to report that in April, MISC through AET has signed an MOU with Lloyd's Register and Samsung Heavy Industries for the development and construction of 2 VLCCs, which can be operated on zero-emission fuel, mainly via ammonia, and which is targeted to enter into service in 2025 and 2026. For the Offshore business, our focus will be on the execution of our FPSO project that is ongoing, while at the same time, selectively sourcing for other opportunities. Finally, on Heavy Engineering, which is on Page 22. During the quarter, our MHB was awarded the provision of the front-end engineering design competition for the Kasawari Carbon Capture & Storage project from PETRONAS Carigali. The order book backlog as of March is MYR 1.9 billion, and the ongoing heavy engineering tenders is MYR 18 billion to MYR 19 billion. On the business development front, MHE has signed a strategic agreement with clean technology company, Silverstream Technologies, to support the business in Silverstream and lubrication technology, which is for purposes of reducing emissions. And finally, MHE has also entered into an alliance with Singapore-listed Dyna-Mac for the purpose of mutual cooperation and joined bidding on targeted international projects relating to module fabrication, vessel conversion, integration work for projects in the energy space. So that concludes my presentation. And I will now pass you back to Ausmal.

Ausmal Bin Kardin

executive
#5

Thank you, Cik Eslin and Vincent, for the presentation on the financial performance and business update. With the completion of the presentation, I would now like to hand over the call to the event manager who will guide and manage the Q&A session. Anna, over to you.

Operator

operator
#6

[Operator Instructions] Your first question is from Steven Chan, who's from Kenanga.

Rui Chan

analyst
#7

Thank you for the call. I just have a couple of questions. I'll probably ask them one by one. The first question I have, can you remind us again, what happened in the last quarter, the share of it of joint ventures, was it unusually high? And what is the main reason for the decrease quarter-to-quarter?

Eslin Halimi

executive
#8

In the previous quarter, preceding quarter, we had a contract extension for our JV. With that, with the extension, we recognized a gain from that contract extension. That is why in the preceding quarter, the number is much more higher than this quarter.

Rui Chan

analyst
#9

Okay. And also, my question -- second question is regarding the lockdowns in China. Just wondering how does it impact any of your operations, the Offshore business operations? Does it impact your -- the delivery of the narrow FPSO? And if so, will there be any penalties involved for any late deliveries or any changes to the project IRRs that we should be aware of?

Raja Azlan Bin Raja Azwa

executive
#10

Yes. Thank you, Steven. Azlan here. Yes, there has been some slippage as a result of the Ukraine conflict as well as the lockdown in China. And as a result, we have actually booked in some additional costs during this quarter. There's also been a slight slippage in the time as well. But nevertheless, the project still remains profitable, and it still is going to generate a decent return.

Rui Chan

analyst
#11

Can you just roughly guide us how -- roughly how long would the delays be? And how much has the cost risen? How much does this impact in total CapEx of the project?

Raja Azlan Bin Raja Azwa

executive
#12

Yes. I mean in terms of delay impact, today, we are looking at about 3 months delay. And in terms of cost impact between 5% to 7%.

Operator

operator
#13

Your next question is from Raymond Yap who's from CIMB.

Raymond Yap

analyst
#14

So just a following up from Steven's question on the Mero-3. Azlan, could you share with us what is the potential completion right now for the Mero-3 versus your schedule? And what -- how many percentage points in the completion rate are you behind?

Raja Azlan Bin Raja Azwa

executive
#15

Yes. There's about -- I think, we are now 40% or so. And we are probably about 3% or 4% behind schedule.

Raymond Yap

analyst
#16

Okay. Okay. All right.

Raja Azlan Bin Raja Azwa

executive
#17

But then again, Raymond, you will notice that we are not alone here. All the -- I mean, the majority of the FPSO players who are undertaking conversion projects in China at this time, most of them are facing the same problem now.

Raymond Yap

analyst
#18

Okay. Are you able to -- general expansion in your completion, have you started negotiations with Petrobras or is it too soon to do so?

Raja Azlan Bin Raja Azwa

executive
#19

So we are working on it. We have informed them. And at the moment, it's going to -- we're trying to find ways to resolve the issues on the ground. But definitely, we will be going through that process now.

Raymond Yap

analyst
#20

Okay. Has the lockdowns down already stopped?

Raja Azlan Bin Raja Azwa

executive
#21

It has improved, it has improved. I mean the lockdown in Shanghai has started to improve. We are seeing some improvement in terms of movement of people as well as equipment. But we are not completely out of the woods.

Raymond Yap

analyst
#22

Okay. Azlan, could you remind me which [ yard ] are you using in China again?

Raja Azlan Bin Raja Azwa

executive
#23

Mainly in the Yantai, the CMC, Yantai.

Raymond Yap

analyst
#24

Okay. Sorry, this is what [indiscernible] is it -- sorry what's the [ yard ] again?

Raja Azlan Bin Raja Azwa

executive
#25

CMC, Yantai.

Raymond Yap

analyst
#26

Okay, okay. Right. I understand. So Yantai is actually in Shandong province, it's not in Shanghai. Has it been affected by the lockdown directly? Or is it indirectly because of the logistical issues via the Shanghai region?

Raja Azlan Bin Raja Azwa

executive
#27

Yes, the Bohai Bay has also been affected as well. Yantai is on the Bohai Bay.

Raymond Yap

analyst
#28

Yantai is on the -- sorry, couldn't catch you?

Raja Azlan Bin Raja Azwa

executive
#29

Yes, you're right. It's in the Shandong province on the Bohai Bay.

Raymond Yap

analyst
#30

Right? So was it affected by the lockdown because I hear Shanghai has been affected?

Raja Azlan Bin Raja Azwa

executive
#31

There are other locations as well that are also affected because you need to get people through -- people and equipment will come in to Shanghai to a large extent.

Raymond Yap

analyst
#32

Okay. Okay. Sure. Okay. So one detailed question about the first quarter. How much was booking for construction revenue and profits?

Raja Azlan Bin Raja Azwa

executive
#33

Yes. I mean in terms of the first quarter, somewhere between MYR 100 to MYR 150 or so in terms of revenue.

Raymond Yap

analyst
#34

All right. How about profits?

Raja Azlan Bin Raja Azwa

executive
#35

Yes, profit, we -- basically, we needed to rebase our numbers because we had to account for that some of the adjustment to cost. So therefore, we did need to make some cost adjustment. Now that's why you can probably read into it as you see the movement in the numbers between the quarters.

Raymond Yap

analyst
#36

Okay. So it booked a loss, I mean, is it there was a negative contribution from the military construction?

Raja Azlan Bin Raja Azwa

executive
#37

Correct. Correct. But again, let me remind you, these are just finance lease accounting numbers, which are based on a set of assumptions. The cash flow is still intact. We will get the cash flow when the asset enters into surveys. So -- and then we have also been slightly taken a conservative approach in the assumptions for the finance lease accounting.

Raymond Yap

analyst
#38

Okay. So just if I'm looking at your decline in the Offshore profit, it looks like maybe about MYR 10 million loss, I don't know. Is that too much?

Raja Azlan Bin Raja Azwa

executive
#39

Maybe not as high as that, Raymond. you're talking about CMC, right?

Raymond Yap

analyst
#40

Yes.

Raja Azlan Bin Raja Azwa

executive
#41

No, not as high as that.

Raymond Yap

analyst
#42

Okay. Okay. Sure. Okay. Just moving on to the tanker performance. So the first quarter tanker profit didn't really show any impact from the higher spot rate? Is that because the center rates are sort of lag and therefore, you only see it in the second quarter? And on that note, how has the tanker profit performance been so far in the second quarter?

Raja Azlan Bin Raja Azwa

executive
#43

Yes. I mean we have got a huge channel of our business, which is on time charters and those are not affected by the spot rate. And if you look at the rates, it was more good rates for the MSP, but the VLCC was not really a good in -- so Afra has benefited. Suezmax also has slightly benefited towards the end of the first quarter, but the VLCC the rates remain depressed now.

Raymond Yap

analyst
#44

Okay. So were you impacted by the depressed spot rates by -- of the VLCCs in the first quarter? Or what is [indiscernible]

Raja Azlan Bin Raja Azwa

executive
#45

We were, to a certain extent, we were.

Raymond Yap

analyst
#46

Okay. So you have some of the VLCCs on the spot market then, right? That's why you were negative the first quarter.

Raja Azlan Bin Raja Azwa

executive
#47

Yes.

Raymond Yap

analyst
#48

Okay. Well, Vincent, you usually give us some breakdown of the spot exposure by tanker segment.

Vincent Ng

executive
#49

Yes, Raymond. I will do that now. Okay. Okay. Thank you, Anna. VLCC is 75% to 25%, which kind of answers your previous question. Suez is 58% to 42%. Aframax is 56% to 44%. So probably all the 3 segments have a higher spot exposure.

Raymond Yap

analyst
#50

Wow. Okay. For the 25% for VLCC is much higher than the previous quarter. Last quarter, you only told us 6% spot, now it's 25%. Okay. So is there something deliberate that you're doing in order to try and get exposure to the spot market?

Vincent Ng

executive
#51

Not entirely. I think it's also a circumstantial because at the time, the rates are quite poor generally across the board. So decisions have to be taken at the operating level, whether to keep them -- renew them on a time charter or spot. So it was also quite difficult to get a time charter during that period.

Raymond Yap

analyst
#52

Okay, sure. All right. So hopefully, your second quarter tanker performance will be better, yes, because it's just basically zero in the first quarter. So the last question I have is on LNG. So LNG profits did quite well in the first quarter compared to fourth quarter. So fourth quarter was about MYR 73 million, and the first quarter was MRY 84 million. So it's never been this high for a long time. What's the reason for the excellent LNG performance?

Raja Azlan Bin Raja Azwa

executive
#53

Yes, I think there were less dry docking days, number one. And I think in the previous quarter, there were some repairs.

Raymond Yap

analyst
#54

Okay. How does the LNG segment look like?

Raja Azlan Bin Raja Azwa

executive
#55

Sorry. And also in the -- you're talking about Q4 to Q1 2022 or Q1 '21 to Q1 '22?

Raymond Yap

analyst
#56

No. The last 6 months, so Q4...

Raja Azlan Bin Raja Azwa

executive
#57

Yes so that will be explained, as I said, by dry docking days and certain repairs that we incurred in the previous quarters.

Raymond Yap

analyst
#58

Okay. Okay. And how does the LNG performance were like going into the next 3 quarters? Can you still maintain 4 million times 4 something like that?

Raja Azlan Bin Raja Azwa

executive
#59

Yes. I mean the -- we hope that everything will be stable. But of course, we need to manage the situation with COVID and also potential of ideas and all that. But burying unforeseen circumstances, we think that is quite stable in the Gas business.

Operator

operator
#60

[Operator Instructions] Your next question is from Ho Meng from UOB Kay Hian.

Kong Ho Meng

analyst
#61

I have several questions. If you don't mind, I'll go one by one. The first is to follow up from a question earlier. So may we know what is for exposure of the tankers in the second quarter so far?

Vincent Ng

executive
#62

We don't have that information because it's -- yes, we mean provide the information is accumulative for the quarter. So we don't track it on a day-to-day basis. We don't have the information for you, unfortunately.

Kong Ho Meng

analyst
#63

But roughly, is the VLCC spot mix still as high as what it was in the third quarter for the month of April and May?

Vincent Ng

executive
#64

I think it's relatively high.

Kong Ho Meng

analyst
#65

What was the reason for the higher spot, what do you call it, the higher spot mix for VLLC?

Vincent Ng

executive
#66

I think the market is generally weak as for VLCCs at the moment. As I mentioned, there's been lower demand from China. As you know, there's been weakening phenomena, the lockdowns contribute to the debt as well as the lower demand for oil in China. So overall, demand for VLCCs is quite weak weather or not -- or whether for time charter or for spot. The market has picked up is on the shorter voyages for midsized tankers because of Europe.

Kong Ho Meng

analyst
#67

All right. Understood. Okay. On the second -- okay. My next question is in regards to -- I remember you mentioned earlier that you have repaid one loan, and this was refinanced and is also refinanced. May I know what loan is this? And what has happened there?

Raja Azlan Bin Raja Azwa

executive
#68

Yes. I mean we repeat during the quarter, we repaid one of the project financing for one of the offshore projects, and we then subsequently refinanced that with the bond that we should.

Kong Ho Meng

analyst
#69

Okay. For the entire bond issuance, which was roughly MYR 3 billion, right -- sorry...

Raja Azlan Bin Raja Azwa

executive
#70

It was USD1 billion, USD1 billion.

Kong Ho Meng

analyst
#71

[indiscernible] Have you repaid this loan?

Raja Azlan Bin Raja Azwa

executive
#72

Correct. Correct. I mean we repaid the loan first then subsequently, we raised the bond. So there was about 2, 3 weeks [ gap ] in the time.

Kong Ho Meng

analyst
#73

Okay. Is this loan the one that -- where you mentioned in the annual report that they had the [indiscernible] quite enjoyment content?

Raja Azlan Bin Raja Azwa

executive
#74

Correct. You're right. You are right.

Kong Ho Meng

analyst
#75

So the bankers have decided to exercise the option to get out of this arrangement, is it?

Raja Azlan Bin Raja Azwa

executive
#76

Yes. Some of the bankers decided to do that. The other bankers were only willing to lend on a temporary solution, and we wanted a permanent solution. So therefore, we made a decision to refinance this loan and raise the bond so that we have a more long-term solution to this issue.

Kong Ho Meng

analyst
#77

Understood. Understood. Also in that sense, I noticed your finance cost in the quarter is a bit higher than normal. Are there any one-off items within the finance costs like one-off that will not recur in the next quarters? Or you know is level of finance cost, higher levels [indiscernible] yes.

Raja Azlan Bin Raja Azwa

executive
#78

Yes, there is about MYR 40 million due to the amortization of the upfront fees, which we had to write-off arising from the repayment of the project financing loan that we're talking about.

Kong Ho Meng

analyst
#79

Okay. MYR 40 million to MYR 50 million terms, right?

Raja Azlan Bin Raja Azwa

executive
#80

Up to -- I think, it's about MYR 35 billion to MYR 40 million.

Kong Ho Meng

analyst
#81

Okay. MYR 35 million to MYR 40 million. So that means subsequently, in second quarter, your next quarter onward is the finance costs should normalize back to low 100s.

Raja Azlan Bin Raja Azwa

executive
#82

Correct. You're right. Yes.

Kong Ho Meng

analyst
#83

Okay. Got it. And in terms of this particular project, is there -- I believe is linked to the litigation that you have with the client right. Any updates on the litigation so far? Is there a more complicated one at the moment? Yes.

Raja Azlan Bin Raja Azwa

executive
#84

Unfortunately, there is not a real concrete update. This is going to be a long run in fairyland.

Kong Ho Meng

analyst
#85

Okay. Okay. Because this particular project, the [indiscernible] has been giving issues now and then. So I don't know, any technical issues that come from these productions, do they use that to raise against you in the cost cases? Or it's nothing to do with any production issue at all?

Raja Azlan Bin Raja Azwa

executive
#86

No, no, no. It's -- basically, we are fighting on the arbitration issue, we disagree on the arbitration outcome.

Kong Ho Meng

analyst
#87

Right, right. So nothing to do with any technical issues that come up in recent times?

Raja Azlan Bin Raja Azwa

executive
#88

I mean, production is going on as usual.

Kong Ho Meng

analyst
#89

Okay. Noted on that. So -- okay. My next question is just to quickly ask. Petronas has been looking for LNG new -- better new built. And I think you were probably looking to bid for those, what's its outcome so far? Have they awarded? And are you -- are you expecting to get any new investments from -- for their new build program or not? Yes, just to get the correct concept there.

Zahid Osman

executive
#90

Zahid here. I mean I think I mean the tendering process is still ongoing. We understand that there is the final stage in the Petronas assessment. So hopefully, we should hear the outcome of that tendering very soon.

Kong Ho Meng

analyst
#91

Understood. In a sense, are you -- which year are you tying up with? Because from my understanding, all the bidders have to have some sort of tie-up with the yard of choice for particular process. So are you -- you're paying?

Zahid Osman

executive
#92

Petronas have identified all the 4 yet 3 in Korea, the Hyundai, the Samsung and [indiscernible] and as well as the one in China. So they have identified all these yards are okay for them for the owners to tie with. So depending on the owners' patent, then you can pick any of the [ yard ] for Petronas [indiscernible].

Kong Ho Meng

analyst
#93

I see. Are you able to share maybe I don't know, some color of how many vessels you can realistically secure?

Zahid Osman

executive
#94

I think we will -- I mean, I will not be able to comment certainly because the tendering process is still ongoing. And so any info from us will be very speculative. I don't think it's...

Kong Ho Meng

analyst
#95

Okay. Understood. [indiscernible] delivery date for the vessels, would it be around 2025, 2026, which would you expect to...

Zahid Osman

executive
#96

Yes, I think that is correct. That's a period where we acquired the vessels between 2025 and 2026.

Kong Ho Meng

analyst
#97

Okay. So that could be in time to replace some of your older vessels that may aspire then, right?

Zahid Osman

executive
#98

Certainly, that's one of the intention of Petronas when they came out with this standard. So first is to support the growing LNG business as well as try to see the replacement of the old [indiscernible] that they have.

Kong Ho Meng

analyst
#99

Understood. Understood. But in the sense, you have around, I think, 10 vessels per [indiscernible] that was fire. Is that -- is all 10 vessels under this plan of Petronas to replenish or say they be only replenished and you have to take a initiative to replenish the others?

Zahid Osman

executive
#100

I think I mean that is a decision that we do not know what Petronas is going to do. But what we probably we will be at 2x [ asset ] that we have with Petronas that will expire later part of this year. And I think that -- and then there will be a subsequent of a few more expiry of the long-term charter in the next 4 to 5 years. So the new vessel will come in 2024 and 2025. So it could be -- it may not. So we're not sure yet.

Kong Ho Meng

analyst
#101

Sorry, you said earlier, there are some expiring this year. This is -- I'm a bit surprised how many vessels are that? These are the time charters, right?

Zahid Osman

executive
#102

Yes, they are the time charter, there are 2 vessels that are going to expire in later part of this year.

Kong Ho Meng

analyst
#103

Of this year, 2 vessels. Okay. What are they definitely, if you can name the?

Zahid Osman

executive
#104

This is part of the [indiscernible]

Kong Ho Meng

analyst
#105

Okay. All right. And in this case, do you have sense for [indiscernible] vessels? Are they like both spot? Or are they already been offered to bid for another long-term pattern of them?

Zahid Osman

executive
#106

Currently, I mean, from MISC perspective, we are looking at all options for these base either to extend it with Petronas. Hopefully, we can achieve a mutual agreement on that. We also explore conversion of these vessels due to other floating facilities as well as try to see whether it can compete in the spot market. So we -- all these options have been considered at the moment.

Kong Ho Meng

analyst
#107

Okay. Okay. And just to confirm again, aspiring, I know this is a bit of [indiscernible] particular quarters.

Zahid Osman

executive
#108

In quarter 4.

Kong Ho Meng

analyst
#109

Quarter 4. Okay, got it.

Operator

operator
#110

[Operator Instructions] Your next question is from Lim, Ben Shane from Macquarie.

Ben Lim

analyst
#111

Can you hear me?

Raja Azlan Bin Raja Azwa

executive
#112

Yes.

Ben Lim

analyst
#113

I think also the question on this has been asked, but if I can just follow up. You're staying in a discussion with Petrobras regarding the delays. I just want to check, have you factored in any penalties or anything that could be punitive in the contract for the delays? On the other side of it, are there no COVID-related clauses into this contract? Anything that you could use to get out of those penalties?

Raja Azlan Bin Raja Azwa

executive
#114

Yes. We have informed them and we have made the necessary provision today. And we are going to explore all avenues including the contractual avenues as well to try to claim for recoveries.

Ben Lim

analyst
#115

Okay. So you have avenue for recoveries.

Raja Azlan Bin Raja Azwa

executive
#116

There are some avenues. I mean it's not water time, but we will be exploring all avenues.

Ben Lim

analyst
#117

Okay. And are these COVID-specific provisions in that? Or are you having to lean on more general sort of provisions in a contract?

Raja Azlan Bin Raja Azwa

executive
#118

Yes. I believe more general provisions.

Zahid Osman

executive
#119

And just if I can add to that answer, Zahid here. It's just that some of these contracts to back to back with our own [ yard ] of vendors. So that's sort of an opportunity for MISC to explore in terms of to mitigate any impact on this either COIVD or the delay.

Ben Lim

analyst
#120

Okay. And do you have any sort of -- have you taken any provisions on potential cost overrun? Or are you just taking all of this on the chain in this quarter?

Raja Azlan Bin Raja Azwa

executive
#121

Yes. That's why you see the Offshore segment being impacted this quarter is because we are booked in some cost overruns.

Ben Lim

analyst
#122

Okay. My question is, do you take some general provision to buffer for this sort of cost overrun in previous quarters that you can sort of make use of in this quarter? Or are you only taking provisions in this quarter?

Raja Azlan Bin Raja Azwa

executive
#123

I mean upfront, we have some contingencies, but the bulk of the hit we took it in the chain this quarter.

Ben Lim

analyst
#124

Okay. And going forward, should we expect more of these sort of provisions? Or have you taken enough in this quarter to account for the delays?

Raja Azlan Bin Raja Azwa

executive
#125

Yes. I mean, as I said, friend, we are not completely out of the woods. There could be some additional impact going forward.

Ben Lim

analyst
#126

Okay. But I mean, do you expect it to get worse, similar or just less just trajectory-wise?

Raja Azlan Bin Raja Azwa

executive
#127

Definitely, we are not -- we're hoping for not as bad a provision. The situation is improving. So we hope that we will be able to solve some of the problems. But I can't guarantee you that there's going to be no more provisions.

Ben Lim

analyst
#128

Okay. My next question is on the tanker segment. I mean could you give a bit of color on the performance of the Aframax fleet because the market rates should suggest that this fleet should be performing quite well. There's a lot of demand. I just want to see whether you guys actually able to capture this upside just taking out some of the drag from the VLCC side that you sort of mentioned.

Raja Azlan Bin Raja Azwa

executive
#129

Yes. The first 2 months were not very good. There was a recovery in March onwards. So I guess, overall for the first quarter, the Aframax as a whole was impacted. It was a negative in the first 3 months.

Ben Lim

analyst
#130

Okay. So the first 2 months hurt the quarter. So going into the second quarter, should we expect a much stronger performance from the Aframax segment, just given where the rates are at?

Raja Azlan Bin Raja Azwa

executive
#131

Yes. I mean if we maintain the current rates, which we hope -- we expect that it will be a lot better. I mean at least now it's in the blend.

Ben Lim

analyst
#132

Okay. I mean would you be able to share just roughly what sort of rates you guys are locking in, in the second quarter?

Raja Azlan Bin Raja Azwa

executive
#133

No, no. I don't think we can share that with you at this juncture, Ben.

Ben Lim

analyst
#134

Okay. But you are able to take advantage of the high rates is my point because I know sometimes you guys said you're focused on lightering work or some other work that may not fully capture those rates, but you are able to do that your spot fleet, right? Can I read into that?

Raja Azlan Bin Raja Azwa

executive
#135

So the next in -- yes, you're right.

Ben Lim

analyst
#136

Right [indiscernible].

Raja Azlan Bin Raja Azwa

executive
#137

Sorry?

Ben Lim

analyst
#138

I'm right in terms of you're not able to capture the rates or you're able to capture the rates?

Raja Azlan Bin Raja Azwa

executive
#139

No. We are, we are, we are. Because it's not fully locked up in long-term charters.

Ben Lim

analyst
#140

Okay. Okay. All right. And just one last question around the LNG expiries. Would you just give us a few of the kind of charters that they're on now, where does that stand relative to the spot rate? And in -- I'm trying to figure out whether you guys will be better off running those tankers on the current spot rates.

Raja Azlan Bin Raja Azwa

executive
#141

These are all very old rates that we got upfront. So it is a lot higher compared to the current spot level.

Ben Lim

analyst
#142

It is even better than the current spot level, okay. That's helpful.

Operator

operator
#143

Your next question is a follow-up question from Raymond Yap who's from CIMB.

Raymond Yap

analyst
#144

Right. Okay. I just wanted to double check that the production issues at the Kimanis field and the Gumusut Kakap fields. This has nothing to do with your semisoft and that your revenues have not been affected by these issues?

Raja Azlan Bin Raja Azwa

executive
#145

You are right. We are -- I mean, our assets have not been affected by these issues.

Operator

operator
#146

Your next question is another follow-up question. This is Ho Meng from UOB Kay Hian.

Kong Ho Meng

analyst
#147

Just to double check. Okay. So 2 Les aspiring this year. May I know how many are aspiring in 2023, '24 and '25 for the LNG vessels?

Zahid Osman

executive
#148

I think in 2023, we expect another 2 more to expire.

Kong Ho Meng

analyst
#149

Okay. And '24 and '25?

Zahid Osman

executive
#150

We don't have the data at the moment. I'm really sorry.

Kong Ho Meng

analyst
#151

Okay. But my understanding is there's at least 10 in total, right, or 10 to 13, I think, if my memory is correct.

Zahid Osman

executive
#152

Yes. Probably you are correct, but I just cannot confirm at the moment. I apologize for that.

Kong Ho Meng

analyst
#153

Okay. Noted on that. Okay. So -- and just a follow-up on the -- I think, an earlier question on the cost for Mero-3. So the cost is actual cost is booking, right, not provision, or are there provisions that you can potentially write back?

Raja Azlan Bin Raja Azwa

executive
#154

Yes. I mean we make provisions to increase the total project cost. And as a result of that, that will impact the accounts.

Kong Ho Meng

analyst
#155

Okay. But you can potentially claim back, right? So this is not actual cost that impact? Or how should we see it?

Raja Azlan Bin Raja Azwa

executive
#156

Yes. I mean is some actual costs, some committed costs and some projected cost to completion.

Kong Ho Meng

analyst
#157

Right, right. Okay. And what is the new deadline for the delivery of the FPSO? I mean [ I see that ] there's no more disruption?

Raja Azlan Bin Raja Azwa

executive
#158

Yes. I mean the deadline remains the same. It's just that we are in the midst of negotiating the new data. We have informed the client of the 3 months' delay.

Kong Ho Meng

analyst
#159

I see. All right, right. Okay. So you see a negotiation in terms of the data. Correct. And in terms of your bid book, right, are you being more active in terms of bidding for new FPSO business? How many projects you can follow it in 1 year or, yes, in terms of, let's say, CapEx size of $1 million for [indiscernible]

Raja Azlan Bin Raja Azwa

executive
#160

I think the focus now will be to make meaningful progress on the Mero project. That will be our focus for now.

Kong Ho Meng

analyst
#161

Okay. But you are shying away from bidding, right? You are still bidding for projects of that?

Raja Azlan Bin Raja Azwa

executive
#162

Yes. Yes, we are. But more selectiveness.

Kong Ho Meng

analyst
#163

Okay. Okay. Right.

Zahid Osman

executive
#164

Oh Meng, to answer your previous question about the LNG expiries. Over 2024 to '25, we have about another 6 in total.

Kong Ho Meng

analyst
#165

Across the both years, for '24, '25?

Zahid Osman

executive
#166

Yes.

Operator

operator
#167

Your next question is also a follow-up question from Lim, Ben Shane.

Ben Lim

analyst
#168

Just a follow-up on the bid book question. So can we assume that best case you win a bid, it's 5 vessels for Petronas. That's the best case that you can bid for? Or were you bidding for less than 5?

Zahid Osman

executive
#169

I think I mean because the tender is still ongoing. I don't think we -- there's anything I can comment on that question for now.

Ben Lim

analyst
#170

Okay. I mean maybe it's more to get a sense of your appetite, right? Like when you go for -- generally, would you just go for all 5? Or are you like stop holding back, this is sort of where I'm coming from.

Zahid Osman

executive
#171

Okay. It's not a big question to answer because depending on either you are going in on your own or you're going in at a consortium with other owners. So if you're going in with other partners, then for me your appetite and your affordability to be more better is certainly higher compared if you are on your own.

Ben Lim

analyst
#172

Okay. And you are bidding on your own, yes?

Zahid Osman

executive
#173

I mean -- sorry, you said -- okay. For Petronas, is that you say?

Ben Lim

analyst
#174

Yes, I mean it is Petronas. You're bidding on your own?

Zahid Osman

executive
#175

We are bidding on our own, but we're always open for bringing partners at a later stage if we need to.

Ben Lim

analyst
#176

Okay. And just to gauge your appetite another step when you used to say about $1 billion wins a year is sort of your target USD1 billion. Are you still aiming for that this year?

Zahid Osman

executive
#177

I think probably -- at the moment, I mean, in terms of opportunity that we are looking at across the 4 businesses, we are looking around $5 billion. And yes, so $1 billion, that is what we are targeting, are we going to get it? Yes. Hopefully, the market condition will support our inspiration.

Ben Lim

analyst
#178

I wouldn't ask you to forecast that. I'm just trying to get a feel for whether you have the potential to surprise on the upside. If you get more wins, like more than $1 billion, you take it, I mean, you're not going to hold back, right? Or the balance sheet constraints that you're worried about, given the state of Mero-3?

Zahid Osman

executive
#179

I mean, certainly, there's a decision that we need to make internally. I mean, first of all, it will be a good problem to have in question is that what's our appetite to pursue all these and to try to secure all that. I mean we know that our commitment on Mero-3 is always at the top to make sure that we can deliver the project as per schedule as much as we can as well as the cost that we promised to our shareholders.

Ben Lim

analyst
#180

Okay. I supposed to tie it up, I'm trying to figure out whether -- because of the issues at Mero-3 could affect the monetization that you guys were hoping to do. And in turn, it affects your ability to go out there and tender competitively. And as a result, you kind of missed the board with the current big pickup in demand for LNG carriers. Is that a risk we should worry about?

Zahid Osman

executive
#181

I mean at the moment, no, because we are still going on and participate in tenders for LNG vessels. But as you know, the LNG industrial sectors is very competitive. There's a lot more players out there that hungry for this kind of asset. So we just need to compete. Our LNG has been a very big portion of our business historically, and I think it's going to remain so for the foreseeable future. So we are -- we still have an appetite to pursue tendering for LNG vessels.

Ben Lim

analyst
#182

Even if you don't, if you're not able to monetize Mero-3, right?

Zahid Osman

executive
#183

I mean, at the moment, as far as our capital capabilities, we have taken into account Mero-3. It's not a Mero-3 we just get it yesterday. So we already know what kind of commitment and obligation that we have in our book. But we also mean have allocation for other businesses that we can pursue.

Ben Lim

analyst
#184

Okay. Fair, fair. And so just one final bit on this. What is the highest you're willing to go for your net gearing?

Raja Azlan Bin Raja Azwa

executive
#185

I mean we take the S&P guide and the Moody's guide. I mean S&P talks about net debt to EBITDA of 3x. So that is a good guide to follow on.

Operator

operator
#186

Your next question is from -- your line is now open Andrew.

Unknown Analyst

analyst
#187

Just a quick one from me. Can you remind me what's the contract duration for the upcoming LNG renewals? And are there any fleet left on the spot market?

Vincent Ng

executive
#188

Could you repeat the question again?

Unknown Analyst

analyst
#189

Yes. What's the typical contract duration for your upcoming renewals for the LNG? And do you have any vessels that are left on the spot market?

Vincent Ng

executive
#190

LNG was the renewals are usually to be negotiated. There's no fixed renewal period. We have 4 vessels on...

Unknown Analyst

analyst
#191

Okay. Okay. So those which are on term, the durations tend to differ from contract to contract.

Vincent Ng

executive
#192

Yes.

Operator

operator
#193

Thank you. As we have come to the end of the Q&A session, I will now hand the session back to Navina for closing comments. Over to you.

Navina Shanker

executive
#194

Thank you, Anna. Ladies and gentlemen, this concludes today's conference call. On behalf of MISC Berhad, we would like to thank you for your participation. The PDF version of our presentation slides will be made available in our corporate website post this earnings call. To the sell-side analysts, we will highly appreciate that you forward a copy of your public research report for the MI Investor Relations team for our reference. Thank you once again, everyone. Stay safe and have a good evening. Bye.

Operator

operator
#195

Ladies and gentlemen, this concludes our conference for today. Thank you all for your participation. You may all now disconnect your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete MISC Berhad transcript — plus 261,000+ transcripts from 13,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to MISC Berhad earnings transcripts and 261,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in MISC Berhad or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.