operatorLadies and gentlemen, welcome to MISC's Q2 FY '2022 Analyst Briefing Conference Call. Azmir from MISC Investor Relations team will run through the agenda for today's briefing. Azmir, over to you.
Unknown Executive
executiveThank you, Diana. Very good evening, ladies and gentlemen. Thank you for participating in our second quarter financial year 2022 Analyst briefing. We have with us today, Encik Zahid Osman, Vice President of Corporate Planning; and Encik Raja Azlan Shah Raja Azwa, Vice President of Finance; Cik Eslin Halimi, Head of Financial Reporting, Governance & Budget from Finance; Mr. Vincent Ng, General Manager of Corporate Planning. Before we start with the presentation, I would like to bring your attention to the disclaimer slide. During the presentation, we may make some forward-looking statements in reference to our plans and expectations, whereby actual results could differ due to unknown risks, uncertainties and other factors that are in many cases, beyond MISC's control. We will now proceed with the presentation on financial highlights for the quarter performance, and it will be presented by Cik Eslin followed by market outlook and business update by Mr. Vincent. At the end of the presentation, we will open the line for Q&A session. Our event manager will later provide instructions on the Q&A process. With that, I pass the session to Cik Eslin, for our first agenda, the update on MISC's second quarter financial year 2022 financial performance. Cik Eslin, over to you.
Eslin Halimi
executiveGood evening, everyone. Thank you, Azmir. Thank you to the participants for joining MISC Berhad Quarter 2 financial year and 2022 analyst briefing. First of all, I would like to bring your attention to Page 3 of our AB pack. Higher revenue for the quarter, mainly due to the higher revenue contributed from the Petroleum segment as a result of higher freight rates from the midsized bankers. Also higher construction revenue from the completion of an FPSO. Lower profit before tax from operations during the quarter mainly due to the lower profit before tax from the offshore segment used with the increase in total construction costs for the FPSO due to global supply chain issues and China lockdown impact. However, this negative contribution was [indiscernible] but positive contribution i.e., higher profit before tax from operations from Petroleum segment due to the higher freight rates as mentioned above. In this quarter, in the nonrecurring items that are impairment losses for the noncurrent assets being captured at this quarter. Moving on to Page 4 of our EBITDA. Higher revenue for the quarter coming from higher revenue from petroleum segment mainly due to higher [indiscernible] on the midsized tanker segment. Higher revenue also coming from the offshore segment, is the direct addition of constructive revenue for the FPSO unit. Revenue also contributed a positive from the heavy engineering segment, mainly due to the higher activities for ongoing heavy engineering projects and higher dry-docking activities in the current quarter. Higher revenue also can be seen from the Gas segment due to the higher earnings days as a result of [indiscernible] in the current quarter. Moving on to lower profit before tax from operations during the quarter. Lower profit mainly coming from the offshore segment due to the increase in total construction costs due to global supply chain issues and China lockdown impact during the FPSO project that we have currently [indiscernible] lower profit before tax of operations offset by the higher profit before tax operations from heavy engineering segment due to the higher revenue during the quarter [indiscernible] as well as gas [indiscernible] provisions for [indiscernible] in the current quarter. At the same time, higher profit before tax from the operations was due to increase from the Gas segment due to the higher earning days [indiscernible]. Moving to Page 5 for cash flow and profit before tax from operations setup. Our cash flow from operation show a lower balance compared to the link quarter mainly due to the open expenses that we inject in the current quarter where [indiscernible] CFO as compared to the corresponding quarter was higher due to the collection that we've received from our clients. Moving on to Page 7. Cash and debt balances. Our cash balance as at 30 of June 2022 remains healthy, had a closing balance of about USD 1.9 billion. [indiscernible] debt balances decreased in quarter 1 2022 [indiscernible] of loans that [indiscernible] for the offshore segment. However, cash and tax balances [indiscernible] in quarter 2, typically to mainly coming from the recent USD 1 billion bond issuance that we had [indiscernible] Now we are looking at the financial performance by business segment. On Page 9, for Gas & Asset Solutions, our revenue that you can see fluctuating because of the dry-docking activities I mentioned earlier. However, I would like to bring the attention to the impairment that we capture in this current quarter. This impairment mainly gives an [indiscernible] that we do an impairment assessment as a result of the [indiscernible] the expiry. This environment also was done based on the market valuation, which [indiscernible] environmental regulations as well as technological advancements with EEXI and CII. As you all know, impairment is not new to MISC. It was done on a regular basis for the accounting standard. So normally, the drop in market value is market driven, and we also can see from the peers [indiscernible] they are also reporting impairments in the account. And we would like just to emphasize that this is purely an accounting statement. So most of the assets are actually close to the end of the [indiscernible] whereby we fully recovered the capital investment during the CapEx [indiscernible]. Not withstanding that from the asset that approaching [indiscernible], we normally acquire [indiscernible] and at the same time we also make sure we decline it for potential expansion. On Page 10, for Petroleum & Product Shipping segment. Our higher revenue was compared to preceding and corresponding quarter due to the higher TCE for midsized tankers. The profit before tax as compared to preceding quarter, also higher due to the blended TCE as mentioned above. As for the comparison against corresponding quarter, in the previous corresponding quarter, there has been one-off compensation that we received from contract negotiations with our clients . On Page 11, for offshore business segment, higher revenue that you can see here compared to preceding and corresponding quarter, mainly due to the revenue recognition as the projects progress every quarter. I would like also to bring attention to the loss that we have in this third quarter, mainly coming from the current situation, which is COVID-19 pandemic [indiscernible] for the past 2 years and which -- some countries have not started to ease the restriction. However, because [indiscernible] in China, China is still under district lockdown as of quarter 2 2022. Furthermore, Ukraine and Russia war, along with the worsening global [indiscernible] issues also impacted the project program and [indiscernible] several other projects progressing in China. So with the above situation, we [indiscernible] our project situation. And this quarter, we have incorporated the latest additional deals as well as booking additional provisional impact, which has resulted in negative [indiscernible] adjustments, which finally impact because I could [indiscernible] recognize during the quarter. To manage these challenges, we are actively looking at a few things. Firstly, coordinating the various parties to address and overcome the movement restriction in China to minimize the impact of projects [indiscernible] We're also working with suppliers to minimize the impact on projects scheduled. And at the same time, we are also monitoring China's easing of this COVID-19 restriction. Finally, despite these challenges, the overall project is still profitable. We will continue to closely monitor the cost, but believe whatever provision that we have at this quarter [indiscernible] for the time being. Finally, in the last segment on Page 12 for Marine and Heavy Engineering. Lower revenue [indiscernible] compared to 15% mainly due to lower revenue from ongoing projects and offset by the higher revenue from [indiscernible]. But for the profit before tax operation as compared to preceding and corresponding quarters, the increase is because of the reversal of cost provision [indiscernible] and higher [indiscernible] in the marine segment during the quarter. Thank you. And for now, I'll hand over to Vincent for the market environment and business update.
Vincent Ng
executiveThank you, Eslin. Good evening, everyone. Turning to Page 14, where we have the LNG shipping market rate. And just draw your attention to the blue color line, which is the spot rate for shipping. Historically, the second quarter of the year is usually the low season for LNG shipping, but this year has been exceptionally strong with rising 82% quarter-on-quarter. This has been driven by very high demand for LNG cargo, especially from the European Union as well as the restocking of gas for the upcoming winter in the Northern Hemisphere. As you may have read, the EU is aiming to get through the coming winter with more LNG imports to replace Russian pipe care. Contractor rates are also continue to rise due to some of the charterers taking on term charter positions to cover for geopolitical uncertainties. Going to the Page 15. This is on the supply side. You will notice that the deliveries of LNGC or LNG carriers will be relatively low this year. However, it would continue to rise [ and we show a ] new peak in 2024 of 75 vessels. A record 78 vessels have been ordered in the first half of this year compared to only 23 in the corresponding quarter in 2021. The global LNG market has been very tight due to lack of new supplies and reduced investments in recent years, with most major producers operating close to full capacity. Given the positive outlook for LNG, this is expected to result in accelerated sanctioning of planned LNG export projects, which will in turn create demand for new LNG carriers. For example, in this year alone, in the last few months, we have had several major sanctions of projects in the U.S. Plaquemines LNG in Louisiana has achieved FID of 13 million tonnes per annum and Corpus Christi expansion project by Cheniere energy has also reached FID. This has 10 million tonnes per annum. For the rest of the year, we expect even more projects to be also approved or sanctioned, including potentially [indiscernible] and some other North American projects. Such projects will provide new growth opportunities for our MISC Gas segment. Turning now to Petroleum Shipping on Page 16. This has been a mixed fortune for our petroleum fleet. On the one hand, VLCC market has remained in the doldrums with reduced oil demand from China due to the zero COVID policy lockdown and also changes in street routes arising from the Ukraine war that has favored a midsized tanker over VLCC. As for -- on the other hand, we see that for the midsized tankers, Suezmaxes and Aframaxes, rates have been very strong during the second quarter. As you know, Europe had shunned Russian oil, which has then been diverted to China and India, leading to higher tonne-mile demand for midsized tankers. This step is expected to continue as U.S. decided to ban most Russian oil imports by the end of 2022. In the near term, the demand outlook for tankers being positive with continued recovery in global oil demand and supply, particularly due to the some recent easing of China lockdown and the gradual increase of OpEx part of production, and as well as by the shifting in the [ trialing ] leading to longer hault. However, this is tempered by downside risk of inflation and economic slowdown. Turning to the supply sector for tanker market on Page 17. 2022 will see a relatively high volume of deliveries compared to the last few years, while [ demolition ] activity has been low so far. However, if we look forward, you can see that the fleet growth will be slow going forward as the order book is currently at a historic low. In this year alone, new orders have remained very low amid high newbuilding prices, lack of yard space, prevailing tonnage oversupply as well as uncertainty over environmental regulations. In the medium term, we expect that there will be gradual demand recovery coupled with slow peak growth that would support improvement in market conditions. In the meantime, our Petroleum unit will continue to build a long-term secure income primarily to our [indiscernible] and rejuvenation of the fleet, especially for LNG [indiscernible]. Moving on to the next segment, which is offshore. With the prevailing elevated oil prices and the return of the energy security agenda to the forefront, this is expected to create a surge in upstream capital investment over the next 5 years. The global offshore E&P CapEx spending is expected to increase 20% in 2022 compared to 2021, with Latin America and Asia Pacific accounting for nearly half of the total. Demand for FPSO expected to remain good with increasing [ awards ] over the next few years, most of which will be in South America, particularly in Brazil and Guyana. That tells us the market environment. I shall now take you through the business update. Firstly, on the Gas business, you would have read that we have recently announced that the MISC together with its consortium partners, NYK, K-Line and China LNG have been awarded long-term Charters by Qatar Energy for 7 newbuild LNG carriers to be built by Hyundai Heavy Industries. Each consortium members hold 25% stake in this venture. And this LNGC will be delivered starting from 2025. Going to Page 21. The portfolio mix for the petroleum segment is currently 72:28 term to spot for the second quarter, increased from the first quarter 65:35 ratio. In the second quarter, our petroleum segment took delivery of 3 vessels, 1 LNG dual-fuel VLCC for TotalEnergies, 2 DPSTs for Shell and Petrobras respectively. We -- turning to the next page. We also sold 1 Aframax in the second quarter. And subsequent to the quarter in July, we took delivery of another DPST for Petrobras. So all in all, for the year, we have [indiscernible] deliveries, 6 DPSTs and 2 dual-fuel VLCCs. This brings AET DPST fleet to a total of 17 vessels, making us one of the top DPST players in the world. On the offshore side, we continue to be focused on the execution of [indiscernible] updated just now. Moving on finally to Heavy Engineering. During the quarter, the Marine business completed repair and maintenance of 28 vessels. The order book backlog as of June is MYR 1.7 billion, while approximately MYR 18 billion to MYR 19 billion worth of heavy engineering tenders have been submitted as of end of June. I think that wraps it up for my presentation, and I now hand you back to Azmir.
Unknown Executive
executiveThank you, Eslin and Vincent, for the presentation on the financial performance and business update. With the completion of the presentation, I would now like to hand over the call to the event manager, who will guide and manage the Q&A session. Diana, over to you.
Operator
operator[Operator Instructions] I have got [indiscernible] for the first question.
Unknown Analyst
analystHope, you guys can hear me. [indiscernible]. Thanks on the briefing here. I have a couple of questions. I will just ask them one by one. I'm not sure if this was mentioned earlier in the briefing or I probably missed it. But I would like to know what is the reason for the quarter-on-quarter drop in the gas and asset solution core profit, right? I think quarter-on-quarter on the revenue actually largely flattish, but there was actually a drop in the core profit, just want to know what [indiscernible].
Emran Othman
executiveOkay. Steven, thank you for your question. This is Emran here. So far as the gas solution, you are referring to the [indiscernible] or to the slides that were presented to you?
Unknown Analyst
analystBoth [indiscernible] similarly quarter-on-quarter earnings drop, but the revenue is largely flattish.
Emran Othman
executiveI see. Yes. I mean in the slide that was presented to you, we included the impairment as part of the PBT, the blue collar line.
Unknown Analyst
analystYes, yes.
Emran Othman
executiveBut if you look at the [indiscernible] announcement for the gas unit, the profit is actually -- has actually gone up, even at the core operating profile for the -- for your slide, even if I reverse the impairment [indiscernible] quarter-to-quarter drop. A slight [indiscernible] impairment, there's a drop of about MYR 20 million, right? MYR 15 million to MYR 10 million. Those will be because of drydocking days in the current quarter.
Unknown Analyst
analystOkay. Okay. Those will be drydocking data. And another question is on your Petroleum segment. You mentioned that year-on-year drop because last year, there was a recognition of a one-off [ game ] isn't it. I was just wondering what the amount is.
Emran Othman
executiveIt's about USD 40 million to USD 45 million. There was a one-off payment made in the corresponding quarter last year.
Unknown Analyst
analystOkay. USD 40 million to USD 45 million. Okay. My following question especially regarding your impairment here. I think you have mentioned earlier that the impairment was not -- was mainly done on the LNG vessels because of the assets being near contract expiry. If I didn't recall wrongly that during our [indiscernible] session with the CEO, there was a mention of actually impairments on your offshore business side because of the cost delays by [indiscernible] just wondering why is that not recognized this quarter and for guidance?
Emran Othman
executiveSo those are not specified as impairment. Those are captured as part of the operation. So we have captured the losses or the cost overrun and the delay impact in the operating line. Those are already picking up.
Unknown Analyst
analystSo those [indiscernible] reflected already in your reported numbers. It won't come off as provisions or impairment loss.
Emran Othman
executiveNo, no, it isn't. Because in the offshore segment, most of these are finance fees receivable. So there's hardly any impairment on them.
Unknown Analyst
analystOkay. Okay. Understood. And my last question is as far as I understand, I think for the next couple of years, until at least 2025, there is about more than 10 LNG carriers still nearing contract expiration. Just wondering what are the plans for these carrier vessels are? Are they being able to be redeployed? And if so, what sort of CapEx is required [indiscernible] for redeposit?
Emran Othman
executiveYes. I mean with these vessels, there's basically 2 core strategies that we are employing. Number one, we'll be trying to repurpose these vessels to floating storage or floating regas, FSU or FSRU, right? So in fact, given the Ukraine war, the demand for such units have suddenly increased. And we are currently working on 1 or 2 potential opportunities for these vessels. At the same time, we are also negotiating with the clients for potential extensions for some of these things because the client still need these [ vectors ] to serve the molecule. So those are certainly ongoing discussions.
Unknown Analyst
analystOkay, okay. If we deploying the vessels in let's say, [ the most out of ] the market, let's say, a 3-year charter contract or let's say even in the spot market. Is that a viable strategy you guys are pursuing?
Emran Othman
executiveYes. I mean -- the current market, I mean, is not -- recent [indiscernible] market has come down. And we will need to take a look at what exactly the additional investment required before we make that decision because there could be some life extension costs. And before we proceed to make such investment decision, we need to see whether the return makes sense or not. So we will look at that together with the discussions with the client.
Unknown Analyst
analystRight. Okay. So it is possible that some of these [indiscernible] if the life extension cost is [indiscernible] the cycle.
Emran Othman
executiveBetter possibility because some of these are very close to the -- I mean 4 to 5 years away from their end of life.
Operator
operatorWe have got Raymond next from CGS-CIMB.
Raymond Yap
analyst[indiscernible] you can [indiscernible]
Emran Othman
executiveI mean [indiscernible] working out of [indiscernible]. There is a echo. I mean there's quite a echo [indiscernible]
Raymond Yap
analystOkay. I think [indiscernible].
Emran Othman
executiveThat's better.
Raymond Yap
analystYes. Okay. So the first question I have is concerning the FPSO, so-called cost provisions. May I know what was the accounting entry that you passed [indiscernible] make a provision to [indiscernible] What kind of accounting actually did you actually pass in the second quarter?
Emran Othman
executiveI mean given the finance lease receivables, we shouldn't be going to detail into the accounting treatment revenue. But essentially, what happened is that we provide -- we increased the total project cost. And the way this construction profit calculation works is that we then need to adjust the percentage of completion under the input method. And as a result of this adjustment, the P&L has to take in an additional hit. So that's just how the profits were affected this quarter.
Raymond Yap
analystOkay. So you basically reversed the [indiscernible] that were booked in prior quarters?
Emran Othman
executiveYes, you could say that.
Raymond Yap
analystOkay. Because the potential completion is with you, so you can't be booking in the same amount of construction profit as you had booked before since the percentage of completion is now lower based on your total cost, which have bumped up the total CapEx of the project. May I know what's the revised CapEx for the project now?
Emran Othman
executiveAs I said to you, total CapEx is probably about 9% higher [indiscernible].
Raymond Yap
analyst9% higher from what base?
Emran Othman
executiveFrom the original estimate.
Raymond Yap
analystCould you remind what the original estimate?
Emran Othman
executiveOriginal estimate was maybe about MYR 1.8 billions to MYR 1.9 billions.
Raymond Yap
analystMYR 1.8 billions to MYR 1.9 billions. Alright.
Emran Othman
executiveIt is talking about all components.
Raymond Yap
analystYes.
Emran Othman
executiveThere are various components. There are operating components, financing components. There's a few components in this estimate.
Raymond Yap
analystOkay. And what is the revised completion date?
Emran Othman
executiveI think last time, in the first quarter, we said about 3 months delay. I think we are booking in -- we have made provisions to reflect -- we rebased our numbers now and provided for an additional 3 months.
Raymond Yap
analystOkay. So now it's a sixth [indiscernible]
Emran Othman
executiveCorrect. Correct. In addition to that, we have also put in additional contingency as well just to be on the safe side. And we believe that at this juncture, touchwood hopefully, there is sufficient provision to prevent against further surprises here.
Raymond Yap
analystOkay. So that contingency is part of the 9% increase, is it?
Emran Othman
executiveCorrect. Correct.
Raymond Yap
analystOkay. And when is this expected to be sail-away now?
Emran Othman
executiveI think in 2024, it will be operational in 2024, but we can't disclose the exact month for you.
Raymond Yap
analystOperation in 2024. So is it sail-away in 2023 or only after [indiscernible] January 2024?
Emran Othman
executiveI mean it takes some time to get to the site. So I think either the end of '23 or the -- sorry, the beginning of '24. All of that has been taken into account in this 6-month delay that we have provided for, Raymond.
Raymond Yap
analystOkay. Because I think the original [indiscernible] guidance for end '23 [indiscernible] '24. So your guidance today doesn't seem to be any different?
Emran Othman
executiveNo, no, [indiscernible] I think the original completion date was end of '23.
Raymond Yap
analystOkay. Sorry, I missed that. The original completion date was end of 2023.
Emran Othman
executiveYes, yes.
Raymond Yap
analystAnd now you're saying that the completion date is going to be middle of 2024?
Emran Othman
executiveI think so. I think that is, yes, 6 months should be mid-'24.
Raymond Yap
analystOkay. So mid-'24, sail-away on mid-'24 for the oil.
Unknown Executive
executiveRaymond, there will be some [indiscernible] I don't think we want to focus so much on the sail-away.
Emran Othman
executiveThe sail-away is part of the process to deliver.
Unknown Executive
executive[indiscernible] there are periods in the team where you will have to do the installation and commissioning. So those dates will kind of move. So I don't think we want to get into that kind of level of detail.
Unknown Executive
executive[indiscernible] on the sail-away. Yes.
Raymond Yap
analystOkay. So can I take you back to the original guidance what you saying was going to be so-called "ready" by late 2023, early '24. That guidance was promised on [indiscernible] or sail-away?
Emran Othman
executiveThe delivery.
Unknown Executive
executiveThere is a technical definition in the agreement [indiscernible] criteria. So it's specific to the agreement, but it's not for oil, It's prior to that.
Raymond Yap
analystOkay. So somewhere in [indiscernible], is that what you mean by delivery?
Emran Othman
executiveYes. Yes.
Raymond Yap
analystOkay, okay, okay. So -- looking at the OBU on the associate line, it's making a lot in the second quarter. What is that?
Emran Othman
executiveAssociate share, associate line.
Unknown Executive
executiveYes. I think it's -- it's a profit of [indiscernible] right.
Raymond Yap
analystYes, yes, that's right. Isn't that all of the offshore associates? Is there anything else in there that might have caused the loss?
Emran Othman
executiveYes, I mean, this relates to higher repair cost for one of our [indiscernible] under the joint venture.
Raymond Yap
analystHigher what?
Emran Othman
executiveHigher repair cost.
Raymond Yap
analystRepair cost. Okay, Okay. Next question going on to the petrol incentive side. Last quarter, you mentioned that the VLCCs were dragging us down. So I interpreted that the VLCCs in the first quarter actually made a loss due to the exposure in the spot market. Was it still not making in the second quarter?
Emran Othman
executiveYes, yes. That's right.
Raymond Yap
analystOkay. So it's still not making in the second quarter there which probably -- you have the profit on the estimate side?
Emran Othman
executiveYes. I think the [indiscernible] is back in the [indiscernible] the midsize is back on track, is the VLCC, that is still in the risk. But we have [indiscernible] operational strategies to sort of minimize the losses.
Raymond Yap
analystOkay. What are those strategies?
Emran Othman
executiveI mean we are saying 2 arrangements with some partners to get a better charter rate and these charter rates are slightly higher than the current market [indiscernible]
Raymond Yap
analystOkay. Well, VLCC rates have done very well since the end of the second quarter, do you think that you'll be able to make a profit on the VLCCs in the third quarter?
Zahid Osman
executiveRaymond, Zahid here. See -- at the moment, it's very difficult to predict, but based on the current outlook, we do expect second half will be better than the first half [indiscernible] some of it [indiscernible] difficult to predict.
Raymond Yap
analystOkay. Could I know what kind of spot exposure do you have on your [indiscernible] in the second quarter?
Unknown Executive
executiveOne second. Let me give you the numbers, Raymond. Since I'm sharing that. I'll also share the term to spot ratio for the other quarters as well. For VLCC for second quarter is 70:30, term to spot. [indiscernible] is 42:58, and FMS is 69:31. Of course, we also have our DPST which is 100% on term.
Raymond Yap
analystOkay. So [indiscernible] because last quarter, I don't think [indiscernible] was 58%, was in the 40.
Unknown Executive
executiveYes, [indiscernible] gone down and VLCC has gone down, but Aframax is higher. But as you know, our Aframax still is the largest component, so the wastage will be higher on the Aframax and the DPST. Don't forget we have added 2 more DPSTs during the quarter.
Raymond Yap
analystOkay. Okay. But when you give the term to spot exposure for Aframax [indiscernible] you exclude the DPST [indiscernible]
Unknown Executive
executiveThe Aframax, there doesn't include DPST space or a separate category. So the DPST will add to the overall ratio of 72:28.
Raymond Yap
analystRight. Okay. Yes, I think [indiscernible] without the write-back in provisions for warranty in the second quarter, would MISC still make a profit?
Unknown Executive
executiveIt will be [indiscernible] there was [indiscernible] needed to absorb the corporate or the overhead. So there was still a loss before the [indiscernible].
Raymond Yap
analystOkay. But the losses are very marginal now compared to where we -- what we have seen in 2021, but this sort of run rate to be the case in the second half. So the overall full year results might be marginally loss making or marginally profitable. So somewhere plus/minus/breakeven kind of level?
Unknown Executive
executiveSo no, we expect to end the year more or less the same as you're reporting.
Raymond Yap
analystMore or less the same as...
Unknown Executive
executive[indiscernible] we're reporting MYR 20 million rebate of profits in the first half. You should hope for a double of them at the end of the year.
Raymond Yap
analystOkay, alright.
Unknown Executive
executiveRemember, we get a lot of kitchen thinking over the past few years, right, because of -- as we're trying to [indiscernible], we took a very prudent stance and we kitchen thinking the account. So there could be further write-backs. And also, we are pursuing a lot of COVID claims with our clients as well. So we are hopeful for some of these recoveries.
Raymond Yap
analystOkay. Yes. So in terms of the FPSO [indiscernible] the 6-month delay, have you agreed this with [indiscernible] imposing any [indiscernible] kind of penalties?
Unknown Executive
executiveYes, we have informed them. We have written to them, and we are starting the discussion with them. In fact, our head of the offshore unit just came back from Brazil and the discussion has started. And certainly, we will be pursuing all avenues to affect whatever recoveries that we are entitled to.
Operator
operatorOur next question is from [ Sean Lee, ] RHB.
Unknown Analyst
analystCan you guys hear me.
Unknown Executive
executiveYes.
Unknown Executive
executiveYes.
Unknown Analyst
analystOkay. I am going to ask a couple of questions, maybe I'll do one by one. First of all, may I know how many vessels -- how many LNG carriers have been [indiscernible] this quarter?
Unknown Executive
executiveAbout 10 [indiscernible]
Unknown Analyst
analystAbout 10. And the bulk order [indiscernible] said these vessels are going to expire in the next years and hence [indiscernible].
Unknown Executive
executiveYes. I mean we need to review the [indiscernible] for expiry, but at the same time, we're also seeking to account the stricter environmental regulation under the EEXI and CII. And this has resulted in the [indiscernible] in the value.
Unknown Analyst
analystOkay. [indiscernible] asking is just I'm just going to anticipate like moving forward, if there are more vessels closer to expiry. Can you expect a similar [indiscernible] impairment to be made on all these vessels?
Unknown Executive
executiveI mean we will continue to review our portfolio of assets. And based on the value adjustment, there could be some more. Maybe not as much as we have taken in this time around. But I believe there could be some more impairment in the year end.
Unknown Analyst
analystOkay. Okay. My next question is just regarding on the presentation of the data for your segment PBT, in the slide right. So all the blue color PBT line has already included in the nonrecurring item, right? So what I need to calculate the core is to strip the nonrecurring items, is that so?
Unknown Executive
executiveYes.
Unknown Executive
executiveYes.
Unknown Analyst
analystOkay. Okay. And my last -- I mean I have 2 more questions. The third question is what is the percentage of commission for [indiscernible]?
Unknown Executive
executiveI mean based on the accounting, the second quarter is about 48% or so, which is based on the improved [indiscernible]
Unknown Analyst
analystOkay. So 48% completed. And I remember in the [indiscernible] you guys mentioned about 2 force majeure events were being actually returned to Petrobras. One is the Russian-Ukraine and otherwise, China lockdown. Of which the China lockdown issue has been acknowledged. What about the Russian-Ukraine war discussions. Has it also been approved by Petrobras?
Unknown Executive
executiveI'll discussing [indiscernible].
Unknown Analyst
analystOkay. Okay. So following -- in the next 2 quarters, we shouldn't be expecting any more corporations, right?
Unknown Executive
executiveWe hope so. We hope so. I mean we have been very conservative, just like in the case of MHB in the past, we will keep on seeing everything. We are -- I think we have been very conservative [indiscernible] And I believe that for the remainder of the year, we should start to see profit [indiscernible] these are all accounting profit. Yes. So I wouldn't be too excited what is done.
Unknown Analyst
analystOkay. Okay. Okay. My last question is, following the QatarEnergy LNG carriers [indiscernible] what kind of -- what's your current [indiscernible] book now? [indiscernible] and can we expect something similar in a gas asset in the next 12 months? Or we should expect more maturing from the offshore?
Unknown Executive
executiveThe opportunities that we're pursuing are in the range of MYR 2 billion to MYR 3 billion. So we can't give you any details about our expectation. But when we do bring something we are announcing. So -- but we are pursuing opportunities for this year and next year.
Unknown Analyst
analystOkay. Okay. So last quarter, you also guided [indiscernible] So I mean there were new tenders being [indiscernible] the Qatar, right, I suppose?
Unknown Executive
executiveYes, there are new tenders being looked at.
Unknown Analyst
analystOkay.
Unknown Executive
executiveThe gas shipping -- LNG shipping market is particularly active at the moment.
Unknown Analyst
analystAll right. All right. So that means you expect more if there is [indiscernible]
Unknown Executive
executiveWell, we hope not.
Operator
operatorOur next question is from Ben Shane Lim from Macquarie Capital Securities.
Ben Lim
analystCan you hear me?
Unknown Executive
executiveYes.
Ben Lim
analystOkay. So I had a bit of difficulty in my line. So I hope not repeating any questions, but I want to figure out like how much I should be adjusting for on your offshore segment. So what should we be taking out of this number for this quarter for the provisions? What [indiscernible] recurring?
Unknown Executive
executiveI mean this year, we booked in about USD 30 million to USD 40 million relating to the Mero project.
Unknown Executive
executiveUSD.
Ben Lim
analystIn this quarter, USD 30 million to USD 40 million?
Unknown Executive
executiveTo adjust all these things [indiscernible]
Ben Lim
analyst[indiscernible] your revenue reversal on that, I hear there's a few categories, is this the long term that you think about?
Unknown Executive
executiveYes, we firstly will adjust the total project cost and the construction impact of that is the $30 million to $40 million hit to the P&L.
Ben Lim
analystOkay, okay. And it is not recurring or is this going to be recurring the total project cost impact?
Unknown Executive
executiveThe additional total project cost will need to then be amortized based on the percentage of completion.
Ben Lim
analystOkay. So I just want to be clear, are you going to have a higher cost of about $30 million to $40 million every quarter?
Unknown Executive
executiveYes. I guess overall, the so-called construction profit for the Mero project will be lower than what we originally thought because of this cost provision. But these are just accounting provisions. The cash flow will come in, in 2024, and the cash flow will be a 22-year cash flow.
Ben Lim
analystOkay. I understand that. I'm trying to put some numbers to it. I'm trying to split it between what is maybe loaded into this quarter and what is going to be recurring over the subsequent quarters. So for this quarter, you're saying $30 million, $40 million was recognized, but in subsequent quarters, what is the additional cost that's going to be recognized from that drag?
Unknown Executive
executiveMaybe for another $40 million to $60 million. Based on the percentage of completion, I guess, maybe another $40 million or so.
Ben Lim
analystOkay. [indiscernible] every subsequent quarter until the project is completed, right?
Unknown Executive
executiveNo. No. No. It will be on the percentage of completion.
Ben Lim
analystYes. So your project cost has gone up by 9%. You're not recognizing all of it in this quarter, right? So this is spread out over the remaining quarters [indiscernible] And it would count to about $40 million per quarter, right?
Unknown Executive
executiveNo, depending on the progress of the project.
Ben Lim
analystYes. Yes. Yes. Depending on the project's progress report. We understand but...
Unknown Executive
executive[indiscernible]
Ben Lim
analystYes, okay. Okay. But you see the point there's going to be a recurring track from this higher cost. It's not just one-off in this quarter.
Unknown Executive
executiveBut the remaining part of the year, it'll be profitable overall fitting into account all of this, the Mero project will be profitable for the remaining part of the year.
Ben Lim
analystOkay. So this is the cost estimation part. If I understand [indiscernible] like a revenue reversal component or something in there -- that is -- is there anything as more one-off in this number?
Unknown Executive
executiveThe way the accounting works is that because it's the improved measure, which is based on cost incurred. As the total project cost increase, then we will need to revise our percentage completion down and then that will then affect the revenue line. And that's actually how the hit to the P&L takes place.
Ben Lim
analystOkay. Okay. And when I look at like your revenue or your cost increase [indiscernible] also construction in progress, right? It's running about [ 160, 140. ] That hasn't changed, right? But you're just speaking -- you're recognizing a lower revenue.
Unknown Executive
executiveYes, because of these one-off items, we had to adjust the revenue, so we took the hit this quarter.
Ben Lim
analystI apologize because it's a bit confusing. [indiscernible] hit this quarter but the cost will show up in a recurring basis as you progress the completion.
Unknown Executive
executiveBut we have taken the bulk -- we have taken the bulk of the adjustment -- I mean the simplest way to think about it is that the cost has gone up by 8% to 9%, and we will need [indiscernible] the cost base of strategic completion. There's a simple way to explain it to you because even I'm confused with this financial accounting for this construction profit.
Unknown Analyst
analystOkay, okay. I'll leave it at that. Okay. My next question is just on the heavy engineering track, right? What would be some of the write-back?
Unknown Executive
executiveYes, some of it was reversal of warranty claims, provisions for warranty claims as well as successful acceptance by the client of some of our COVID-19 claims.
Ben Lim
analystHow much was it?
Unknown Executive
executiveI think overall, maybe about $30 million a year or so.
Unknown Analyst
analystOkay.
Unknown Executive
executiveWe're talking about year-to-date. Year-to-date, I think it was around $30-plus million.
Ben Lim
analystJust for this quarter, how much is it?
Unknown Executive
executiveThis quarter, MYR 10 million this quarter.
Ben Lim
analystOkay. Okay. And then I want to understand your petroleum tanker side. You are -- I does not understand your operational strategy. It seems like you're locking in a lot of your -- you're looking more Aframax [indiscernible] time charter. Would you just share [indiscernible] time charter roughly what level of rates are looking it in? Is it -- roughly, is it around the spot rate now? Or is it a [indiscernible] spot rate?
Unknown Executive
executiveI don't think we can share that kind of level of detail.
Ben Lim
analystOkay. how long in the franchise [indiscernible] Aframax then? Those are locking [indiscernible].
Unknown Executive
executiveI think they are all varying periods. So yes, because we are [indiscernible] Aframax. Yes, so I can't generalize that, but it could be sort of month to 1 year or 2 to 3 years even.
Unknown Analyst
analystOkay. All right. [indiscernible]
Unknown Executive
executiveI mean I think [indiscernible] operational level because they will look at particular -- the market -- every day that the market is developing. So it's not by following a specific strategy. They have to assess the market conditions. And based on that particular time that the ships are available for customers, they will take a decision whether it should a spot [indiscernible] factor and so on. It's less at the commercial to assess at that point.
Operator
operatorWe have got [indiscernible].
Unknown Analyst
analystI have a lot of questions. I'll go through one by one. You mentioned earlier [indiscernible] your offshore [indiscernible] associate line, like how much is that amount? And is that one off?
Unknown Executive
executiveWhat's that?
Unknown Executive
executiveDid you receive [indiscernible].
Unknown Analyst
analystYes. Yes. I think the impact of the offshore profit by -- under the [indiscernible] associate line.
Unknown Executive
executiveThe [indiscernible] associate is basically [indiscernible].
Unknown Analyst
analystHow much is that amount?
Unknown Executive
executiveYou can see that this quarter, we reported a hit of USD 10 million, right?
Unknown Analyst
analyst[indiscernible] US dollar?
Unknown Executive
executiveNo. For instance, the share of profit from JV for this quarter was USD 10 million.
Unknown Analyst
analystSo that USD 10 million is the [indiscernible] .
Unknown Executive
executiveNo, no, the [indiscernible] was about MYR 10 million to MYR 15 million -- so sorry, the repair cost is about USD 10 million to USD 15 million, the one-off cost.
Unknown Analyst
analystUSD. Okay. For one of your -- [indiscernible] if you can say?
Unknown Executive
executiveThis is one of our joint ventures in Brazil.
Unknown Analyst
analystOh! not Mero 3 [indiscernible] another one? The...
Unknown Executive
executiveYes, this will be one of the [indiscernible]
Unknown Analyst
analystI see. Okay. All right. And then for the -- okay, just to double check again, the -- when you mentioned the Mero 3 MYR 30 million to MYR 40 million additional cost provision [indiscernible] how much was recognized in the early process for [indiscernible] if you can recall, if you can recheck that.
Unknown Executive
executiveIt's about the correction, is it?
Unknown Analyst
analystYes, the correction. Yes, yes. [indiscernible] correction that you have [indiscernible], including the [indiscernible] MYR 30 million to MYR 40 million [indiscernible]
Unknown Executive
executiveEasily MYR 90 million correction.
Unknown Analyst
analystOkay. MYR 90 million. And then you mentioned that there could be another MYR 40 million to be recognized based on percentage of completion, so is it fair to say that this MYR 90 million in total is based on the 48% completion that you recognize now? And then when the project goes closer to 100% completion, you will recognize another MYR 40 million or another MYR 90 million. How does that work? Yes.
Unknown Executive
executiveYes. Maybe another MYR 70 million or MYR 80 million are [indiscernible]
Unknown Analyst
analystRight. I see that [indiscernible] the total MYR 90 million plus another MYR 70 million to MYR 80 million should effect in total the 5% to 10% uptake from the FX or [indiscernible]
Unknown Executive
executiveYes, yes.
Unknown Analyst
analystOkay. And just on [indiscernible] I think earlier you mentioned in your slide on the cash flow operations, right, you say something like that your operating cash flow increased year-on-year due to the payments you receive from the client, but it decreased on a quarter-to-quarter basis, that reflects the [indiscernible] So can I understand how much is the cash flow effect from the current payment receivable and how much is the [indiscernible]?
Unknown Executive
executiveSo you see, the reason why we are doing this investment is because essentially, it is a cash flow from investment. The money that we are putting into Mero is not an operating cash flow. It's actually an investing cash flow. So that's why we have adjusted our cash flow from operations to add back the investment that includes Mero, right.
Unknown Analyst
analyst[indiscernible] yes.
Unknown Executive
executiveYes. So yes, I mean, in terms of the other side, under the detail arbitration. [indiscernible] basically unilaterally offset some of the payment, [indiscernible] because they now -- they are fully offset [indiscernible] So not a [indiscernible]
Unknown Analyst
analystSo how much are you [indiscernible] share how much of the amount from [indiscernible] because I think this is a full quarter of the full -- of the resumption of the business of [indiscernible]? So how much is that on the cash flow level on a full quarter basis?
Unknown Executive
executiveI mean you can do the calculation. You know what this calculation would be, right? [indiscernible] easily more than USD 200 million a year, cash flow from operation.
Unknown Analyst
analyst[indiscernible]
Unknown Executive
executiveUSD 200 million per year.
Unknown Analyst
analystUSD [indiscernible] million per year. Okay. Yes, yes, okay, that is on the bottom line level for the lease profit, right?
Unknown Executive
executiveThis is where the dividend comes from.
Unknown Analyst
analystOkay. [indiscernible] that question on the [indiscernible] when you do the adjustment from what you posted in your operating cash flow to your invested cash flow [indiscernible] you reported the offshore [indiscernible] progress line like that is where you [indiscernible] line, but you put that [indiscernible] cash flow, right? So as a [indiscernible] USD 2 million. And in your [indiscernible] disclosure, debt payment was USD 171 million. So total about 171 million -- USD 173 million of CapEx, I think is that all for Mero 3? Yes.
Unknown Executive
executiveSo I mean, from the commencement of the project, I think we are more than USD 800 million-plus. USD 800 million to USD 900 million already invested into [indiscernible]
Unknown Analyst
analyst[indiscernible] year-to-date, the CapEx [indiscernible] is already under the [indiscernible] USD 800 million to USD 900 million already recognizing of cash flow?
Unknown Executive
executiveCorrect. Correct.
Unknown Analyst
analystYes. And that correlates to your -- the device [indiscernible] completion progress, right?
Unknown Executive
executiveThat's right. That's right.
Unknown Analyst
analystRight, right. Okay. Okay. [indiscernible] Okay. For the -- sorry, the core NAV that I think even asked earlier, the core operating profit for LNG, regarding it was reported on quarter-on-quarter basis. Because of higher price of [indiscernible] how many [indiscernible]
Unknown Executive
executiveWhen you say quarter-on-quarter, you're talking about 2021 to 2022, is that right?
Unknown Analyst
analystThe early quarter in first quarter 2022, your energy profit was actually very good. Even if I add back the internal, it is [indiscernible] quarter. [indiscernible] dry-docking days was higher. So we would want to get a sense how [indiscernible]
Unknown Executive
executiveAbout 180 days versus only about 70 days in the last quarter.
Unknown Analyst
analyst[indiscernible] 160 days.
Unknown Executive
executive180.
Unknown Analyst
analystRight. Is that all 4 vessels or something?
Unknown Executive
executiveI think -- I mean those kind of details are too micro. I mean...
Unknown Analyst
analystAnd moving forward, what kind of [indiscernible] in the second half because [indiscernible] since last year has started that [indiscernible] second quarter, right but yet your LNG profit didn't really reflect because you [indiscernible] more of the vessels. So what was the outlook [indiscernible]
Unknown Executive
executiveYes, because [indiscernible] into time charters and we have to follow the schedule dry-docking, otherwise you have other problems.
Unknown Analyst
analystOkay. And based on your schedule now, should we see major dry-docking or lesser dry-docking versus the second quarter?
Unknown Executive
executiveOkay. I mean I don't have the data in front of me. We have [indiscernible]
Unknown Executive
executiveNo, we don't have that information now, yes. I mean all the rest [indiscernible] are scheduled dry-docking every 2.5 years. In 5 years, they will go for a major dry-docking. So every vessel has been scheduled. So we wouldn't be able to share that here [indiscernible]. And sometimes that is moved by a few months up and down based on the clients' requirement for the rest. So [indiscernible]
Unknown Analyst
analyst[indiscernible] life in the quarter? Or was there like a bit more offline base?
Unknown Executive
executiveFor which one, sorry, again?
Unknown Analyst
analystThe VLEC, the [indiscernible]
Unknown Executive
executiveI'm not aware of any of that kind. I think I believe they were all [indiscernible]
Unknown Analyst
analyst[indiscernible] last year event happening since the second quarter, right. And everything else -- all the geopolitical events [indiscernible] but it doesn't impact you on time factor for [indiscernible] more of the impact of the [indiscernible] on your core operating [indiscernible] segment.
Unknown Executive
executiveYes, we'll come back to you with details [indiscernible].
Unknown Analyst
analystOkay. Okay. And to [indiscernible] one more thing. Recently, in the tanker market, there are 2 [indiscernible] Eastern region does still have a lot. I'm not sure how whether this is going to be higher for longer. And also, very recently, the sector rate in the U.S. site went up a lot as well. We talk U.S. [indiscernible] the new benefit from both sides, any of the vessels?
Unknown Executive
executiveYes. I'm sorry, [indiscernible] we are actually over the hour. So we have to come to the end of the Q&A session. I will now hand the session back to Azmir for closing comments.
Unknown Executive
executiveI think just let me [indiscernible] I think just to share with our analyst community. I mean we just apologize to some of you that have questions that you want to ask but we're not able to take [indiscernible] period, so we will certainly try to do better in the arrangement of the question among the analysts going forward. So apologize for that.
Unknown Executive
executiveKeeping you today [indiscernible]. Anyway, ladies and gentlemen, this concludes today's conference call. On behalf of MISC Berhad, we would like to thank you for your participation. The PDF version of our presentation slide will be made available in our corporate website post this earnings call. So the sell side analysts, we would highly appreciate that you forward a copy of your published research report to MISC Investor Relations team for our reference. Thank you, once again, everyone, stay safe and have a good evening.
Operator
operatorThank you. Ladies and gentlemen, you may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete MISC Berhad transcript — plus 261,000+ transcripts from 13,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to MISC Berhad earnings transcripts and 261,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in MISC Berhad or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.