executiveA very good evening, ladies and gentlemen. Thank you for participating in our third quarter financial year of 2022 analyst briefing. I'm Navina from MISC's Investor Relations team. We have with us today Encik Zahid Osman, Vice President, Corporate Planning; Encik Raja Azlan Shah Raja Azwa, Vice President, Finance; Cik Eslin Halimi, Head of Financial Reporting, Governance & Budget, Finance; and Encik Azmir Feisal, Senior Manager, Corporate Planning. Before we start with the presentation, I would like to bring your attention to the disclaimer slide. During the presentation, we may make some forward-looking statements in reference to our plans and expectations, whereby actual results could differ due to unknown risks, uncertainties and other factors that are, in many cases, beyond MISC's control. We will now proceed with the presentation on financial highlights for the quarter's performance, which will be presented by Cik Eslin, followed by market outlook and business update by Encik Azmir. At the end of the presentation, we will open the line for a Q&A session. With that, I pass the session to Cik Eslin for our first agenda, the update on MISC's third quarter 2022 financial performance.
Eslin Halimi
executiveGood evening. Thank you, Navina. Thank you to the participants for joining MISC Berhad quarter 3 FY 2022 analyst briefing. I would like to bring your attention to Page 3 to our AB pack. Higher revenue for the quarter mainly due to the higher construction revenue from of an FPSO as well as higher revenue from Petroleum segment, we needed to high rates for midsized tankers as well as higher earning days. Higher profit before tax from operations during the quarter mainly due to the higher profit before tax from operations from Petroleum segment due to higher freight rates as mentioned above as well as one-off compensation for contract renegotiation received from client. Higher profit before tax from operations also higher for Offshore segment due to the recognition of construction revenue, where in the previous preceding quarter, the capture, the increase in total construction cost of FPSO due to global supply chain issues and China lockdown impact. Moving on to Page 4 of the analyst briefing presentation that higher revenue coming from -- the higher revenue from Petroleum segment, mainly due to higher [ blended ] rate, midsized tanker segment and higher earning days. Higher revenue also coming from Offshore segment due to the recognition of construction revenue for FPSO unit. For the PBT from operations, higher PBT from operations really coming from the Petroleum segment as a result of the higher revenue, as mentioned above. Moving on to Page 5. Higher cash flow operations, mainly due to the higher collection received that we received from customers in the current period. On Page 7, cash and debt balances maintain at USD 1.9 billion and USD 4.4 billion since last quarter, respectively, after the USD 1 billion bond issuance in April 2022. Moving on to Page 9 of the presentation deck. On Page 9, the revenue and profit before tax for Gas Assets & Solutions were much stable between the corresponding quarters, mainly coming from higher earning days as well as [ compensation of $6 billion ] since early 2021. As for the preceding quarter, profit before tax was lower due to the impairment of the vessel that we [ reconnected ] previously. On Page 10 for the Petroleum & Product Shipping segment, higher revenue recorded as compared to preceding and corresponding quarter, mainly due to the higher [ TCE ] rates for midsized vessels. Higher profit before tax from operation recorded as compared to preceding quarter, mainly due to higher benefits [ received ] and the one-off compensation that we received from clients. On Page 11 for Offshore business segment, higher revenue recorded as compared to preceding and corresponding quarter, mainly due to higher revenue recognition from the fleet FPSO following improved progress in each quarter as the profit from operations mix coming from recognition of construction gain following the total project cost adjustment that we have made in the last preceding quarter. Finally, the last segment on Page 12. For Marine & Heavy Engineering segment, the revenue are relatively stable as compared to preceding and corresponding quarters. The profit before tax was better as compared the corresponding quarter, mainly due to the recovery of public net [ incomes ] and the recovery of [ dry docking ] activities since the reopening of orders on April this year. Thank you. With that, I hand over to Encik Azmir for the business update.
Azmir Feisal
executiveThank you, Eslin. For market environment section, I will start off with the LNG Shipping side. From the chart, as you can see that LNG spot rates has further strengthened in Q3 2022, but then 46% in the quarter 3 from the previous quarter, was mainly driven by strengthening winter season demand towards year-end in Asia and Europe as well as higher European demand due to the prolonged Russia-Ukraine war. As a result, [ MISC ], among others, has accelerated its regasification project in the region in order to secure and cater more LNG imports. In line with the spot rate, time charter rates also increased due to [ some ] charter [ off taking ] term charter positions due to the push towards energy security, growing global demand for LNG and tight vessel availability. Moving on to the next slide. On the LNG new orders, a record high of new orders are expected from 2022, driven by Qatar's LNGC orders and surging European demand, where there were 124 vessels ordered as at mid Q3 2022 as compared to 78 in the first half of 2022. Ship building capacity and higher new building prices have also prompted ship owners to book slots for 2023, 2024 to 2026 delivery. We foresee shipping requirements in the future are expected to be robust by an increase in the FID of planned liquefaction projects, particularly in the U.S. and growing demand for LNG, especially in Europe. Moving on to the next slide. Petroleum shipping. In Q3 '22, all 3 segments of Petroleum tankers have shown further improvements in their rates due to changes in trade routes, ongoing recovery from COVID-19 impacts and supported by rebound in oil production. As you can see, VLCC earnings continued to rebound in Q3, mainly due to the increase in the U.S. crude flows to the Far East and South Asia. Similar situation in the midsized tanker segment, where the spot rate uptrend continues due to the reshuffling of trade routes prompted by EU’s ban on Russian imports as well as greater tonne-mile growth due to the Russian invasion of Ukraine. Notwithstanding this, the upcoming OPEC+ production restrictions are anticipated to keep oil supply tight this winter, capping any rise in freight rates. In addition, downside risk to the demand outlook means with a slowing global economy and the lack of improvement in Chinese oil demand. On the next slide is actually on tanker supply landscape. The order book trend for tanker market remained flat amid high newbuilding prices, lack of yard space, prevailing tonnage oversupply as well as uncertainty over decarbonization targets. Overall, scrapping activities remain low despite some slight pickup in the midsize tanker segment since last quarter. Moving on to the Offshore sector. There have not been any significant changes in the Offshore sector since the last quarter. Upstream CapEx investment is expected to remain high, driven by pickup in activity level, higher FIDs, renewed focus on the energy security agenda and the recovery of global economy despite impacts of inflation and supply chain disruptions. This is further apparent with an increase of 18% in 2022 from 2021 of global Offshore E&P CapEx spending, reaching an amount of USD 131 billion in 2022, the highest level since 2016, with Latin America and Asia Pacific accounting for nearly half of the total. Majority of the new FPSO projects over the next 12 to 24 months are expected to be mostly centered around South America, particularly in Brazil and Guyana. Next will be the business update for our core businesses. Gas business segment, MISC has signed long-term time charter contracts in September with SeaRiver Maritime, the wholly own subsidiary of Exxon Mobil for 2 more LNG carriers, extending its total to 4 LNG carriers. Additionally, MISC has also signed an agreement with Daewoo Shipbuilding & Marine Engineering of Korea for the construction of the newbuild in South Korea. In LNGC, we will be chartered by SeaRiver for a firm period of 10 years, and the charters for the vessels are expected to commence in 2026. Next slide. Recently, as you're aware, MISC through a consortium with NYK K-Line and CLNG in November has been awarded long-term Time Charter Party for 5 newbuild LNGCs by QatarEnergy, which together with the 7 long-term charter contracts secured in August, brings to a total of 12 newbuilding LNG carriers awarded by QatarEnergy to the consortium. As mentioned in the previous quarter, each consortium member will have equal interest of 25% in each awarded LNGC. This 5 newbuild had to be built by Hudong-Zhonghua Shipbuilding Group and expected to be delivered commencing in 2025 onwards and will serve the needs of QatarEnergy the transportation of LNG to various countries around the world. Moving on to the Petroleum business update. The current portfolio mix is at 72:28 term to spot, which is similar to the previous quarter. I shall now -- I'll share with you the breakdown of the portfolio mix for the 3 tanker segments as follows. For VLCC, it's 36 term and 64 spot, for Suezmax, 75 term and 25 spots and Aframax, 76 terms and 24 spots. Next, in September 2022, PTT and AET have signed a Memorandum of Understanding for the development and construction of two zero-emission Aframaxes to be powered by green ammonia. This is an initiative by both parties to encourage the use of green ammonia as main propulsion fuel. AET will select like a suitable shipyard and the two zero-emission dual-fuel tankers are to delivered to PTT for long-term charters in Q4 2025 and Q1 2026, respectively. This MoU illustrates PTT's and AET’s commitment to reduce greenhouse gas emissions from international shipping as energy efficiency improvement alone will not be sufficient. The next slide. Not long ago, AET has won Tanker of the Year award at the Tanker Shipping and Trade Conference Awards and Exhibition held in Greece on 10 November 2022. For its first LNG dual-fuel VLCC, which is Eagle Valence. The 2022 build vessel is on long-term charter to Total Energies. The award was open to tankers delivered since November 2021 and engaged in bulk liquid transport that sets new benchmark in design, environmental, operational, safety and technical performance. For Offshore business, the update will be they will still continue to focus on the execution of the new FPSO project in hand while selectively pursuing opportunities in targeted markets. Finally, in the Marine and Heavy Engineering business, the Marine Repair segment has completed repair and maintenance of 72 vessels of various categories, including 8 LNG carriers in Q3 2022. As for the Heavy Engineering, [ MISC ] was listed and subsequently awarded the provision of Front-End Engineering Design Competition for the Kasawari Carbon Capture & Storage project from PETRONAS Carigali Sdn Bhd. [ MISC ] has also supported another award, which is a contract from Sarawak Shell Berhad to undertake the engineering, procurement and construction, EPC, services of the Offshore platform for the Rosmari-Marjoram gas project, off the coast of Sarawak, offshore Malaysia. As of Q3 '22, the order book backlog is RM 2.2 billion and approximately RM 15 billion to RM 16 billion worth of Heavy Engineering tenders were submitted. That concludes my presentation. The remaining slides are advertisers for your reference. I will now pass back the session to Navina. Over to you, Navina.
Navina Shanker
executiveThank you, Azmir. [Operator Instructions] Firstly, we have Mr. Ben.
Ben Lim
analystCan you hear me?
Navina Shanker
executiveYes.
Azmir Feisal
executiveYes, we can.
Ben Lim
analystMy first question is around what I'm seeing is a big jump in your other income. It looks like 230 million there, please correct me if I'm wrong. And I just want to understand what's driving this? And I believe it's with the Petroleum tanker segment? And how should we think about this?
Azmir Feisal
executiveThanks for the question, Ben. This is relating to the Petroleum segment's one-off contract renegotiation relating to the midsized tanker. We did something like this in the past 1 or 2 years where we've been renegotiating for the short term. So at this time, we took the opportunity to renegotiate one of the clauses for the longer term. And we managed to get very good one-off payment, which went straight to the bottom line during this quarter.
Ben Lim
analystOkay. So if I understand correctly, you locked in with the customer for a longer period. And in order to do that, they have to pay you a one-off payment. Is that correct?
Azmir Feisal
executiveCorrect. Correct. It's a one-off -- it is basically the removal of what we call an adjustment to the charter contract, which in order to remove that clause, they made a one-off payment to us.
Ben Lim
analystOkay. Does this, in practice, just mean that they lock it in at a slightly lower charter?
Unknown Executive
executiveIf I can add, I think it's basically the charter contract, there's one portion of the charter is [ partly ] according to the market condition. And that is safe from now until the end of the contract. And the customer doesn't -- it doesn't like that. Once they [ believe ], we say we are fine with that. So we negotiated with some certain assumptions. So that's the compensation that we share for removing that uncertainty. It could be up. It could be down.
Ben Lim
analystOkay. Okay. Understood. How many vessels are involved, roughly? Just want to get a sense of the scope.
Azmir Feisal
executiveJust 1.
Unknown Executive
executiveJust 1.
Ben Lim
analystJust 1. Okay. Okay. My second question is just around the potential for impairments in the fourth quarter. I know you tend to review your assets then. Is there any risk that we will see many provisions for Mero-3? How is the work going there? And also, I think as you mentioned before that LNG segment could have more impairments coming in, in the fourth quarter.
Azmir Feisal
executiveSo far, as Mero-3, we are -- we hope that has no more. We are sort of -- the project is under control now. I believe that we have taken all the adjustments that we needed to take in second quarter. So I think we are not expecting to see any more for Mero for the rest of this year. And so far as the Gas division, yes, impairments is a fact of life for an asset-heavy company. Exactly how much? We're not sure because this is also dependent on the external valuation report for those vessels, which should be due for expiry over the next 3 years. So if you recall, during the second quarter, we booked in about close to 70 million of impairment. There could be a bit more in the fourth quarter.
Ben Lim
analystOkay. I mean, just a sense of scale, is it going to be another 70 million, its going to be 140 million? I just want to understand how big an impact we need to think about.
Azmir Feisal
executiveI think we have taken the bar of the impact in the second quarter. If anything, this will be the residual impact, maybe somewhere between 10 million to 20 million also. Again, it's subject to the final valuation report.
Ben Lim
analystOkay. And this affects the vessels expiring in the next 3 to 4 years. Did I hear that correctly?
Azmir Feisal
executiveThat's right. That's right.
Navina Shanker
executiveSecondly, we have .
Unknown Analyst
analystSo I am going to [ get ] quickly. Just want to double check, how do I -- in your fleet information schedule, you mentioned a total of 4 LNG newbuilds. But how do I tie back to all the contracts that you have announced, especially for the Qatar one, how do you divide over among this one?
Azmir Feisal
executiveI think this question -- the 4 vessels, there are 2 actually -- 2 for the first SRM, SRM 1, SRM 2. And the other 2 is actually the recent SRMs, SRM is SeaRiver Maritime. So together, it's 4 vessel of SRM [ builder ].
Unknown Analyst
analystOkay. So it means this fall in the table is only the SRM 1 and the one that you won in the consortium for the QatarEnergy one, it's not in the table. Why is that?
Azmir Feisal
executiveYes. I think we have shared with you, I mean, the [ version ] is actually included. It's -- in total, we have 11 for LNGC. But we haven't put a remark saying that 25% each actually.
Unknown Analyst
analystOkay, okay. Okay. To my second question. In terms of the update for your LNG contracts, how many of them could be renewed to spot or have already renewed the spot in the near term? And in terms of lease for the 11 [ newbuilds ] that we have won, are the time charter risk consistent with what your projected on the slide where the time charter right now, it's more than $100,000. Yes, I think if you can share that.
Azmir Feisal
executiveLet me just answer that. I think that the first one with regards to the new contract that we won, whether -- your question is whether the charter is consistent with the 100 over 1,000 [ EBIT ], that's the existing charter of our carbon [ unit ].
Unknown Analyst
analystWhat's in the market trajectory?
Eslin Halimi
executiveThe current market is based on the short-term sentiment demand and supply. So if you look at the table by any brokers, the near-term charter for all the LNG vessels is in the digit -- I mean, 6 digits, 100 to 120. But when you -- that's a different story when you go for a tender for long-term charter. So at the moment, what we are getting is based on the market for the long-term charter, either 10-year or 15-year stuff. So you shouldn't make comparison for a short-term fluctuation, where the vessel can be delivered now compared to the vessel going to be delivered in 2025, '26, '27.
Unknown Analyst
analystOkay. So for me to say, can I get a confirmation that the risk that you got is definitely below 100,000?
Eslin Halimi
executiveYes. I mean it's below 100,000. If you -- if anybody has a vessel now available for long-term charter, then you can go for the market and get [ 104,000 ]. But for newbuild, you know the earlier delivery is 2025 or 2026, 2027.
Unknown Analyst
analystNoted on that. And the kind of with higher CapEx now, I know that the CapEx for certain contracts like the Qatar may be still a bit of a discount, but CapEx is much higher now. And below $100,000 of charter rates that you still can get the high single-digit IRR, right, that you are guiding?
Raja Azlan Bin Raja Azwa
executiveI think yes, mainly because even with the higher CapEx, that will be translated into, I mean, the development charter really for the next 10 or 15 years, based on the separate [ acceptable IRR ] or in our case, is return on equity level that we have set ourself for that.
Unknown Analyst
analystAnd just to follow up on the spot. How many vessels you have now that could be renewed to spot?
Azmir Feisal
executiveYes, for the -- we have 4 actually on the short-term charter. The earlier that will be expired will be -- there will be 3 in the first half of the '23 and 1 in second half of 2023.
Unknown Analyst
analystSo far for this year, in the past few months, those 3, were they like 3 that were renewed in the past few months, spot rate to another spot?
Azmir Feisal
executiveYes. Sorry, I mean, how many, again?
Unknown Analyst
analystLike were they -- like in the past few months, how many were renewed from spot to another spot?
Azmir Feisal
executiveThere's none. Yes.
Unknown Analyst
analystOkay. Got it. So 3 for first half of '23?
Azmir Feisal
executiveYes.
Navina Shanker
executiveNext is [ Freeman ].
Unknown Analyst
analystOkay. So I have a couple of questions on the Mero-3. So just on the Offshore division. So I just grouped them all together. The first thing is the percentage of completion for Mero-3 stood at 48% at the end of June. May I know what it is at the end of September? And could you also share with me what the construction revenue and profit recognition was for the third quarter for the Mero-3? And also, again, on Offshore, there is a share of JV loss on the P&L amounting to MYR 26 million. May I know why the Offshore JVs are not earning a profit? This is -- this was the same situation in the second quarter as well.
Azmir Feisal
executiveSo what was the first question again, percentage of competition was about 10% to 11% during this quarter. That was the first question. And so far as you're asking me for the quarter, I'll tell you for the whole year. We will record maybe about -- revenues of 800 million or so, 800 million to 900 million for the whole year. And because we are adjusting the construction profit due to some of the estimated cost overruns. In so far as -- at the project level, we are looking at a high single-digit margin for the whole -- I mean for the whole project.
Unknown Analyst
analystOkay. I mean I'm looking for the third quarter specifically, just to understand your numbers a bit better.
Azmir Feisal
executiveYes. The contribution of Mero in the third quarter is negligible because we have to carry forward some of the adjustments into the third quarter as well. This is maybe about 30 million, 40 million at the project level for Mero. This is the quarterly profit.
Unknown Analyst
analystOkay. Because I think the Offshore pretax profit in your slide, it was put at around 26 million, 27 million, and that was much higher than the previous quarter.
Azmir Feisal
executiveThose figures that I put to you just now, before financing and overheads. So if you take into account financing over here, Mero will probably have made about 20 million during this third quarter.
Unknown Analyst
analystOkay. Yes. Because the -- I think on Slide 12, you put a PBT of $21 million, which includes the share of loss in the JV and associates. So on the subsidiary level, it should be around USD 26 million, USD 27 million. So that's quite a big swing from the second quarter, which was a loss. So does that mean that you're booking in a lot more construction profit for the Mero-3 because of the faster construction progress?
Azmir Feisal
executiveAnd the fact that we -- the most of the adjustment was booked in the first and second quarter.
Unknown Analyst
analystOkay. So you're saying that there were some cost adjustments in the third quarter as well?
Azmir Feisal
executiveAs we disclosed to you the last time, remember?
Unknown Analyst
analystNo, I'm sorry. I don't remember. Could you remind me, please?
Azmir Feisal
executiveYes. Remember, we said that because of the pandemic and the lockdown in China, we had certain problems in terms of getting equipment and people into site. And as a result, there was a delay in the project by 6 months, all right? So therefore, we had to bump up our costs, which then resulted in some cost adjustments in the first and second quarter. Those were -- because of those adjustments in those quarters, we have recorded losses for the project.
Unknown Analyst
analystOkay. And that carried over into the third quarter, did it?
Azmir Feisal
executiveBecause we have booked all the adjustments into the -- for the second quarter, the third quarter is profitable.
Unknown Analyst
analystOkay. So there were no provisions in the third quarter. So by reference to the second quarter, clearly, the third quarter will just show the pure construction profits without actually having been contaminated by any adjustments?
Azmir Feisal
executiveYes, there are some adjustments, but not as big as in the first and second quarter because you have to recognize the adjustment based on progress.
Unknown Analyst
analystOkay. And if the -- if -- just to double check, 48% completion rate 30th June, last 10%, 11%. So that will be about 58%, 59%. Would that be...
Azmir Feisal
executiveThat's right. That's right. It's 59%.
Unknown Analyst
analystOkay. And when -- sorry, when are you supposed to deliver this vessel again?
Azmir Feisal
executiveWithin 6 months, will be May 2024.
Unknown Analyst
analystMay 2024. Okay. So that's a 6-month delay from the original time frame that brings us to 2024. So that's about another 15 months, 16 months or so. Yes. Okay. 17 months, all right. Okay. Could I just ask Eslin a couple of financial questions?. If I go to the...
Navina Shanker
executiveSorry, we have to stop you because we have to give opportunity to the rest to ask questions. Yes, Ben.
Ben Lim
analystI'm sorry I didn't realize that. Maybe this wasn't publicly answered earlier. Your contract adjustment, I cited a figure 231 million. That's just from the other income line that I can see, but how much is the exact figure here that should be considered one-off? I don't think that was answered.
Azmir Feisal
executiveThe figure, Ben, is around there.
Ben Lim
analystOkay. So [ 231 ] million is nonrecurring portion. Okay. That's also an [ answer ].
Navina Shanker
executive, you can go ahead.
Unknown Analyst
analystOkay. Sorry, can I just ask for the number again that you told Ben just now, was that in ringgit or USD?
Azmir Feisal
executiveThat was ringgit.
Unknown Analyst
analystSo [ MYR 241 million ] was the one-off portion. Okay. Okay. Yes, just going back to the question on Offshore again before I proceed to Eslin. The share of JV was a loss of 26 million. May I know why there is a loss that was the situation in the second quarter as well for the share of JV loss?
Azmir Feisal
executiveYes. But this was one-off of repairs that we needed to incur on one of our assets, our FPSO assets, which is under a joint venture.
Unknown Analyst
analystOkay. And so the repair spread over second and third quarter, do we still expect the returns to continue into the fourth quarter? Could the share of JV turn back into profit?
Raja Azlan Bin Raja Azwa
executiveYes. We -- I don't think that we will need to -- we've sort of arrested the problem and we've incurred the full repairs.
Unknown Analyst
analystOkay. Okay. So I'll just go on to Eslin. Sir, thank you so much for -- looking to being answering my questions. I want to bring you to Note 85 in the Bursa announcement. So it says the changes in accounting estimates, and there was a write-down of finance lease receivable for Gas floating assets and Offshore floating assets amounting to about MYR 55 million, and this began -- this was done on the 1st of September 2022. May I know what's the reason behind writing down the finance lease receivables?
Eslin Halimi
executiveIt's basically adjusting for the residual value. We have basically made a commitment to be sustainable. And therefore, we are now writing it down to green scrapping [ business ]. Yes. So therefore, the green scrapping business requires us to incur some towing costs or some green scrapping adjustment. And because of that, there was this one-off adjustment in the tune of 50 million to 55 million in the third quarter.
Unknown Analyst
analystOkay. So when you say green scrapping, are you saying that the vessel can only be scrubbed in a green yard rather than the typical Bangladeshi or Pakistani or Indian yard, it has to be green? So typically, the green [ yard ] offer you a lower demolition value?
Eslin Halimi
executiveThese are one of our initiatives to be a sustainable company.
Unknown Analyst
analystI see Okay, sure. Can I bring you to Note [ 810 ], where -- okay, Note [ 810 ] is just the breakdown of the revenue, and there is two separate categories of revenue. One is revenue from charter, which I understand. And then there's revenue from contracts with customers. And we had that revenue from contracts with customers for Petroleum and Offshore. How is it different from revenue from charter?
Eslin Halimi
executiveFor Offshore, the Mero project will be under revenue from contracts we customize. And the Petroleum, these are basically our [ electric ] contract. These are the [ lightering ] business in the U.S. is captured in this line.
Unknown Analyst
analystI see. I see. Okay. Sure. Okay. And maybe just one last question before I hand over to the ]. QatarEnergy LNG charters, may I know what's the duration of the charter?
Eslin Halimi
executiveIt's 15 years.
Unknown Analyst
analyst15 years, Okay. Any option period?
Azmir Feisal
executiveThere is an option period. I'm just not sure what is the option period by -- in total by the [ FPSO ].
Navina Shanker
executivego ahead.
Unknown Analyst
analystSo just to double check again on [ Raymond's ] question on the JV and associate line, Offshore assets, is this PSO?
Eslin Halimi
executiveIt's not.
Unknown Analyst
analystOkay. Is there any impact from PSO at all in your financial?
Eslin Halimi
executiveNo.
Unknown Analyst
analystLet's say, if tries to scrap the vessel or decommission the vessel or whatsoever, no impact to you. Is it -- let's say, like for future quarters?
Eslin Halimi
executiveIt's very much through the end of its life really in the .
Unknown Analyst
analystOkay. So I misread that the value in your books now is -- for is probably close to square value at a -- really, right? So because it's really end-of-life equity. So whatever will not have a financial impact.
Eslin Halimi
executiveCorrect.
Unknown Analyst
analystAlso when I go back to your Offshore, you know where your overall EBITDA for the quarter is that USD 21 million, right? How much of that is the Mero-3? And because now the 21 will also include your JV and associate line that loss. So what is pure PBT in U.S. dollar for Mero-3 itself for the quarter?
Eslin Halimi
executiveAs I mentioned, 20 million.
Unknown Analyst
analyst20 million. So the still have a 1 million profit elsewhere had in total, even including....
Eslin Halimi
executiveThere would be some profits, and there's going to be some loss that we'll offset against each other, like, for example the JV loss.
Unknown Analyst
analystOkay. Okay. Got it. Got it. So equally a JV loss. I mean the total is in 20 for Mero and the net 1 million from all the other operations, including JV?
Eslin Halimi
executiveCorrect.
Navina Shanker
executiveNext, we have Mr. [ Young ].
Unknown Analyst
analystJust a question regarding the Petroleum earnings. So by my calculation, your -- the day rates for your Petroleum tanker in third quarter is probably up about $3,000 or $4,000 Q-on-Q. But we know that the spot rates have been moving up much more than that. And also, we know that you guys obviously have terms. So there's some lag there. So my question is for the fourth quarter, should we expect a more significant increase in the day rate compared to the growth that we saw in the third quarter?
Eslin Halimi
executiveIf it's October, it's looking good. So it's even better than September. And we are hopeful that it will be better fourth quarter compared to the third quarter, which is already very, very good.
Unknown Analyst
analystDo you think the rate of the growth will be higher in fourth quarter versus third quarter, if October trends continue?
Eslin Halimi
executiveI think it will hold firm because we are seeing that the demand for the tonnage is very strong because of the Ukraine crisis. And there have been changes to the routes, where the European demand is now taking crude from Africa and Middle East and all that. And the demand for the midsized tankers are really booming now, right? So we are hopeful that this will go into next year as well.
Unknown Analyst
analystOkay. So I guess if there's any way -- because this is all very hard to see from the outside. So I guess my question really is if October rates continue for the remainder of fourth quarter, how much revenue growth can we expect in Petroleum segment for fourth quarter?
Eslin Halimi
executiveI mean I don't have the numbers in front of me, but I think hopefully, it should be better or if not the same compared to the third quarter. So maybe just -- the basis you can do your financial model accordingly.
Unknown Analyst
analystIt can't be the same, right? It's much higher.
Azmir Feisal
executiveIt's difficult to make the vision for the last 2 months. I mean, I think for October, I think that the range shows is very still, et cetera in ARPU plan, but now we see that with the OPEC decided to [ cut ] in their indication. I think the current rate will stabilize. Is it going to grow further? Probably a bit more, but I mean, difficult to say whether it's going to be the overall quarter 4 revenue are going be high, a lot higher or the same. Our indication or our expectation is going to be about the same or probably slightly higher.
Unknown Analyst
analystI mean I guess if October continues in November, December, right, it should be reasonable to assume that it should be significantly higher?
Azmir Feisal
executiveYes. That's true.
Navina Shanker
executiveNext we have Sean.
Unknown Analyst
analystI have two questions. First question is regarding your deep books, it was guided around $2 billion to $3 billion last quarter, predominantly Gas related -- Gas Assets-related contracts. So I just want to know, after the QatarEnergy contract win, what is your current -- what kind of -- how many maybe new LNG contracts should we expect probably next year? That's my first question. Second question is regarding FPSO. I think based on previous communications, you guys probably wouldn't look at any big-size FPSO contracts but might be focusing on meeting some EPCC contracts, if not mistaken. So is this strategy still intact? Or is there any change in your FPSO strategy? That's all for me.
Azmir Feisal
executiveI think for the first question, what is the expected ordern book, I think for the beginning of this year for the Gas -- we're talking about the Gas business, right, Sean? So for the Gas business, for the remaining obviously, we don't expect anything. But for next year, we are certainly between 750 [ million ] potential. What we also expected that Qatar [ apparently ] will come back for the second phase of the newbuild that will be required for to support the expansion of the LNG [ plan ]. But we do not know how much or how many vessels they require. So they're going to be healthy, so from the new requirement next year for Gas -- for the LNG vessels. So that's what we can say for the LNG [ capital ] segment. The second question is related again -- sorry, Sean. Do you mind just repeating it?
Unknown Analyst
analystIt's regarding the FPSO. But before that, I just want to clarify 750 million to 1 billion. This is a potential target of CapEx you want to spend on new projects or potential. What is this? Just to clarify this.
Azmir Feisal
executiveThat is not what I see. I think that is related to potential opportunity that we can see now for next year. The one that we probably [ are interested ] to participate. But what exactly how much we're going to spend next year probably, that's a different story.
Unknown Analyst
analystOkay. Okay. So this is the contract value, right, 750 million to 1 billion, potential contract value that is out there.
Azmir Feisal
executiveYes.
Unknown Analyst
analystOkay. Okay. My second question is regarding your FPSO space. I mean what kind of strategy are you looking to be for any midsized or large size or just for EPCC jobs, what kind of strategy are you adopting at this point of time?
Eslin Halimi
executiveOkay. I think for the FPSO business for the next 12 months, our focus is to execute and deliver Mero-3. That's our main focus. But at the same time, we are going to work with the partners on a new FPSO opportunity. And currently, is the EPCIC where we are looking at because there we require less capital for us. And then together with our partners, probably we have a better chance. But again, the focus for next year or for the next 12 months is to deliver Mero safely and within the budget that we have currently set.
Navina Shanker
executiveNext up we have again.
Unknown Analyst
analystSorry, just on the [ double ] check, this is the question I want to ask. I know you regularly review the charter rate markets for the rates for the tankers. But from my understanding, we know that the ESI regulations is coming already. And my understanding is the market is soon to be [ formed ] now, where the compliance ships are probably getting higher rates compared to the noncompliance ships. So my question is, out of the 58 vessels in your fleet, how many of them are already compliant without you having to do any adjustments or has to [ sail ] slower? And in your view, what kind of premium you can get over for the compliance ships [ if it doesn't have ] the rates?
Azmir Feisal
executiveOkay. We are not sure whether you get compliance, you get a better rates or not. If you're noncompliant, you cannot pay a full stock. I think that's how we understand the regulation. So you do need some compliance. We have done the assessment of all our vessels. And currently, if your vessel is noncompliant, there is a grace period for you to go and face -- do a modification on the vessel. That is an important side with the vessel next schedule of either dry docking or the scheduled maintenance So that's what it is. We have done all the assessment. We know what we need to do for all our vessels. The question is that we do need to find the time for the vessel to go to dry dock and do the necessary adjustment.
Unknown Analyst
analystOkay. But I mean, you can still get charters for those ships, right? But maybe need to [ sail ] slower so that they could still be compliant in a sense. I mean that's my understanding, right?
Eslin Halimi
executiveYes. That's correct. The vessel need to comply with the regulation. That is number one. Second, in the market before top one of the fastest or the easier solution is to comply is to slow down the vessels. So certainly, that is one of the options that we are looking at. But we do not the sense as well.
Unknown Analyst
analystUnderstand. I mean what I was talking about earlier, there could be a scenario where there could be ships that are still allowed to sail but maybe still slower. So in a sense, those kind of ships will be getting charter [ rebate ] at a discount to the ships that can sail at a normal pace because they are already compliant and therefore, the charter rate will be a premium over those -- over the other category of ships, so the kind of a 2-tier market that some [ consortium ] out there is talking.
Azmir Feisal
executiveOkay, mainly -- we are not aware of that kind of 2-tier markets that the brokers are talking, our charters are certainly referring to. So as far as you're concerned, our open vessels next year, we know what needs to be done for compliance so that they can continue to trade. And also have the mitigation plan on now for each of these vessels. So it's just a matter of scheduling the repair or the modification for each side with the normal dry docking.
Eslin Halimi
executiveThe regulation is now at some time period, so that the owner can do modification according with vessels scheduled dry docking.
Unknown Analyst
analystIn a sense, are you able to say again how many of your vessels are already fully compliant as of today? And how many that you may have -- you missed that for modification in the next 1 year or so? Yes.
Azmir Feisal
executiveI mean I don't have the numbers here.
Navina Shanker
executiveOur last question for today's call will be from [ Raymond ].
Unknown Analyst
analystI think when had an engagement session with us in June, he spoke about talking to Petrobras about waiving the liquidated damages for the delays in the Mero-3 due to various unexpected events like the Ukraine crisis and the China lockdowns. Could I get a sense of what were the outcomes of those negotiations?
Eslin Halimi
executiveThe discussion is ongoing, Raymond. It's going to be an ongoing discussion, and it's going to take a bit of time. I mean we have submitted some claims and it takes time for us to get to the end of that.
Azmir Feisal
executiveYes. So we also have submitted the duties for extension of time as result of this so-called [ cost mature ]. So I think those other things are what as I mentioned, it will take time, Petrobras. They acknowledge the notice that we have given them, but it will take some time for us to agree a resolution with Petrobras.
Unknown Analyst
analystIn the worst case scenario, how much would that add to your overall CapEx?
Eslin Halimi
executiveWe booked in the worst case already, Raymond. So the recoveries will be upside.
Unknown Analyst
analystOkay. So you assume that there will be liquidated damages that you already provided for it?
Eslin Halimi
executiveYes. We have both -- what we believe to be a reasonable estimate on these. And if we recover those, then we will able to see some write-backs towards the end of the project in '24.
Unknown Analyst
analystOkay. And the guidance for the Mero-3 CapEx in the past was about USD 2 billion, including financing costs. Has that changed?
Eslin Halimi
executiveYes. So as we said the last time, we are looking at a cost overrun by 7%.
Unknown Analyst
analyst7%, okay. So that's another 140 million?
Eslin Halimi
executiveYes, [ longer ].
Navina Shanker
executiveThis concludes conference call. On behalf of MISC Berhad, we would like to thank you for your participation. The PDF version of our presentation slides will be made available in our corporate website post this earnings call. To the sell-side analysts, we would highly appreciate that you forward a copy of your published research report to the MISC Investor Relations team for our reference. Thank you once again, everyone. Stay safe and have a good evening.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete MISC Berhad transcript — plus 261,000+ transcripts from 13,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to MISC Berhad earnings transcripts and 261,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in MISC Berhad or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.