Regarding industries, please note that this conference is being recorded as of today. At this point I would like to pass the call to today's host, Ms. Kristy Glasgow. Thank you. You may proceed.

Kristy Glasgow

executive
#2

Good morning, everyone, and thanks for joining the Monadelphous 2025 Half-Year Results Investor and Analyst Briefing. First, I want to acknowledge the traditional owners of the lands we're joining you from today here in Perth, Boorloo — the Whadjuk people of the Noongar Nation — and the traditional owners of Country. We pay our respects to Elders past, present, and emerging, and we extend that respect to all First Nations people. With us in Perth are Monadelphous Managing Director Zoran Bebic and Chief Financial Officer Philip Trueman, and our Chair, Rob Velletri, is also in the room. As we go through this presentation, the speakers will let you know when to click through to the next slide. This morning's presentation follows a structure similar to our previous results presentations, with some additional detail set out in the appendices, and copies of today's presentation and associated materials can be found on our website at monadelphous.com.au. I'll now hand over to our first presenter today, Zoran Bebic, who will begin on Slide 2.

Zoran Bebic

executive
#3

Thank you, Kristy, and hello everyone joining our 2025 Half-Year Results Briefing. Phil and I will walk you through how the business performed financially and operationally across the half-year that closed on 31 December 2024, and we'll cover the outlook too. After that, we'll take whatever questions you have. Starting on slide three, I'll cover group performance and highlights. Monadelphous posted revenue of AUD 1.05 billion for the half-year, matching the guidance we gave the market and marking a 4.2% rise over the prior corresponding period. Demand for maintenance services and sustaining capital works stayed strong overall in the Maintenance and Industrial Services Division, which delivered revenue of AUD 645.1 million for the six months. That figure came in roughly 9% lower than the prior period, as turnaround activity in the energy sector settled back toward more normal levels following the heightened activity seen this time last year. Revenue of AUD 405.4 million was reported by the Engineering and Construction Division for the half-year, an increase of 33.7% on the prior corresponding period and roughly in line with the second half of FY 2024. Net profit after tax reached AUD 42.5 million, 41.3% higher than the same time last year. Contributing to this result was a AUD 7 million after-tax variance in non-operating items versus the prior period, and operating margins also improved.

Zoran Bebic

executive
#4

For the period, earnings per share came in at AUD 43.3, and the board declared an interim dividend of AUD 0.33 per share, fully franked. We closed out the half-year holding a cash balance of AUD 272.5 million, backed by a very strong cash flow conversion rate of 145%. All told, since the 2025 financial year began, we've locked in roughly AUD 1.7 billion of new contracts and extensions spanning a range of industry sectors, including energy, iron ore, other minerals, and renewable energy. Let's move to Slide 4. On the energy side, we landed major construction and maintenance contracts with Woodside and Shell, worth approximately AUD 800 million in aggregate. That covers a multidisciplinary construction contract with Woodside for modifications needed at the Pluto LNG Train 1 facility and infrastructure, plus a seven-year contract to keep delivering maintenance and minor construction services tied to Shell Australia's Prelude FLNG facility. In WA's iron ore sector, we picked up several construction, maintenance, and minor project contracts across Rio Tinto's operations. Our civil business, Melchor, won a significant structural concrete construction contract with the Saipem Clough Joint Venture at Project Ceres, Perdaman Industries' urea plant near Dampier in WA. Alevro, our heavy-lift services joint venture with Fagioli, will also deliver heavy haulage services at that project.

Zoran Bebic

executive
#5

Zenviron, the joint venture we run in renewable energy, kept improving its standing in the market, winning a major contract to deliver CS Energy's Lotus Creek Wind Farm in Central Queensland. Let's turn to slide five. At year end, our workforce, subcontractors included, came to slightly below 7,300. On a positive note, retention across the company kept getting better, with staff turnover falling and retention of key talent still very strong at roughly 95%. We concentrate on strengthening our early careers and talent development pathways, adding a winter internship program alongside our existing Vac program, and broadening the development, mentoring, and upskilling journey that our future business leaders undertake. We introduced our refreshed onboarding and welcome hub, which improves the new employee experience for new starters and managers alike, and about 240 people took part in our graduate, undergraduate, apprenticeship, and traineeship programs. As part of our continued commitment to a safe, respectful, and inclusive workplace, we keep embedding our Respect at Monadelphous behavioural framework and we launched our Respect in Every Step program. That program is part of our mentally healthy workplace strategy and aligns with AREEA's workforce mental health framework. Turning to safety and well-being on slide six, our relentless focus on the health and safety of our people goes on, and our total recordable injury frequency rate stayed fairly steady at 3.34 incidents per million hours worked.

Zoran Bebic

executive
#6

We earned wide recognition across the industry for how we handle safety and innovation — Melchor picked up awards at the Mates in Construction WA Awards, and Alevro took home honors from the Crane Industry Council of Australia. On top of that, we're finalists for several other safety and innovation accolades at both national and state level. Our Fatal Risk Controls campaign keeps rolling out, with the goal of getting even better at spotting, cutting down, and removing fatal risks throughout the company. Health and well-being stayed a priority as well: we provided various employee support services and information sessions covering relevant health topics, and we introduced a new initiative under the resilience project called Authentic Connections. Moving on to slide seven. We kept pushing forward on the key areas of diversity and inclusion, community, and environment. Additional headway was made against our Stretch Reconciliation Action Plan commitments, and once again we beat our RAP targets for First Nations workforce participation as well as First Nations business spend. Career opportunity pathways went to current and future First Nations employees via traineeships, apprenticeships, and the Indigenous Pathways program run in partnership with Rio Tinto. We also added another two years to our long-standing partnership with the Polly Farmer Foundation. Through our community investment initiatives, we strive to strengthen the communities where we operate, and over the period we ran the Karratha Community Grants program for a second consecutive year and introduced comparable programs in Darwin and Bunbury.

Zoran Bebic

executive
#7

We moved forward on a number of efforts supporting our net zero targets — including trials with electric utes, solutions at our sites aimed at cutting diesel use, and electric forklifts that help lower LPG emissions. In addition, we kept up the shift of our facilities toward renewable power, installing a solar system at our Mackay workshop facility in Queensland. Now moving to our Engineering and Construction Division, on slide eight, that division posted revenue of AUD 405.4 million for the half-year, up 33.7% versus the prior corresponding period, and brought in roughly AUD 740 million in new construction contracts. Activity was strong: construction of the Wet Plant was successfully finished at Liontown's Kathleen Valley project, and work is moving ahead on the chemical-grade Plant 3 at Talison's Greenbushes site, where Melchor also finished civil and construction works. Progress continued on BHP's Car Dumper 3 renewal project at Nelson Point in Port Hedland, as well as on the construction contract tied to dewatering surplus water at BHP's Orebody 32 in Newman. Work additionally got underway at BHP's Prominent Hill Expansion project in Mount Eba, South Australia. On the energy side, we advanced construction at Chevron's Jansz-Io compression project, and Alevro provided specialist haulage and lifting services to Bechtel at Woodside's Pluto Train 2 project in Karratha.

Zoran Bebic

executive
#8

For Inteforge, the fabrication arm of our business, we obtained contracts covering supply and fabrication of structural steelwork plus pipe racks tied to Iluka's Eneabba Rare Earths refinery project in WA. Over in Mongolia, we finished building surface infrastructure at the Oyu Tolgoi underground project, and we came through with a strong safety record across the life of that project. Lastly, Zenviron carried work forward during the period at Tilt Renewables on the Latrobe Valley Battery Energy Storage System project, which sits south of Morwell in Victoria. Now let's turn to our Maintenance Division. Revenue for the half-year in our Maintenance and Industrial Services Division came in at AUD 645.1 million. Demand stayed high for maintenance services right across all sectors, and since 1 July 2024 the division brought in roughly AUD 950 million of new contracts and extensions. On the energy side, we performed a substantial amount of maintenance and minor construction work connected with Shell's Prelude FLNG facility, along with Woodside's onshore and offshore gas production facilities in WA's northwest region. Turnarounds wrapped up for Trains one and two at INPEX's Ichthys LNG onshore processing facilities in Darwin, and we likewise provided maintenance services for their processing and storage facilities offshore. Iron ore in WA kept driving significant activity levels, with fixed plant maintenance services and sustaining capital projects delivered to Rio Tinto, fixed plant services to Fortescue through our long-term panel agreements, and general maintenance services to BHP.

Zoran Bebic

executive
#9

We kept delivering decommissioning work for Petrofac at the Northern Endeavour FPSO facility, which further builds our ability to support upcoming decommissioning activity in Australia's North West Shelf and the Bass Strait regions. Our long-standing presence in Papua New Guinea carried on, with sustaining capital projects and maintenance support activities provided at Newmont's gold operations on Lihir Island and at Santos's production and support facilities in the Southern Highlands region. In the southwest of WA, we landed a three-year contract for shutdown and maintenance services, plus a new three-year contract covering minor project works at South32's Worsley Alumina operations, where our services have been in place for 20 years. I'll now pass things over to Phil, who will give you more detail on our financial performance on Slide 10.

Philip Trueman

executive
#10

Thanks, Zoran. Morning, everyone. On Slide 10 you can see how we performed financially across the half-year versus the same period a year earlier. Revenue from contracts with customers came in at AUD 1.05 billion, which is 4.2% higher than the first half of FY 2024. Profit after tax reached AUD 42.5 million, up 41.3%, and that was helped by a variance in non-operating items of roughly AUD 7 million after tax. Happily, operating margins also got better. EBITDA was AUD 79.8 million, a rise of 30% over the prior corresponding period. Our EBITDA margin went from 6.08% a year ago to 7.59% for the six months ended 31 December 2024. Roughly half of that variance comes from a small number of material non-operating items, among them insurance proceeds and favorable foreign exchange movements, while the remainder of the increase relates to an improvement in the operating EBITDA margin. Earnings per share was AUD 43.30, and the board declared an interim dividend of AUD 0.33 per share fully franked, up from AUD 0.25 last year. We finished the half-year with a cash balance of AUD 272.5 million, which was bolstered by a number of advances received from customers and construction contracts. Cash flow from operations was AUD 93.1 million, giving us a very pleasing cash flow conversion rate of 145%.

Philip Trueman

executive
#11

With our solid balance sheet, we're well placed to pursue suitable strategic investments that back sustainable growth over the long term and generate shareholder value. And now I'll turn things back over to Zoran, who will walk you through an overview of the business outlook.

Zoran Bebic

executive
#12

Thanks, Phil. On Slide 11, you can see the current and forecast conditions in the Australian market that matter to our business, based on Oxford Economics. Happily, the sectors we operate in keep offering a positive outlook for capital investment and operating expenditure across the next few years. Now let's turn to our outlook on Slide 12. Over the long term, demand from resources and energy should stay strong, supported by sustained economic growth and rising investment in decarbonization activities. Notwithstanding some global uncertainty, economic forecasts worldwide see growth holding up resiliently, and the resources and energy sectors are expected to deliver a significant pipeline of prospects spanning a broad range of commodities. Ongoing high production levels across most commodities continue to drive demand for sustaining capital works and maintenance services. In Australia's iron ore sector, investment is projected to keep current production levels sustained, with attention on operational discipline and efficiency so as to maintain a position of global competitiveness. Following a stretch of significant price volatility in the energy transition metal sector, commodity prices have recovered slowly and modestly over the past year. Long-term fundamental indicators remain robust, and mining and mineral processing development in the energy transition metal sector is projected to rise over the long term.

Zoran Bebic

executive
#13

That also applies to copper and critical minerals, where meeting projected demand is going to take substantial capital spending. Opportunities keep coming from the energy sector as well, among them a number of gas construction projects and continued robust need for maintenance services. We are still strongly placed to assist with decommissioning work anticipated for oil and gas assets across the next decade. Further openings are emerging through customers' decarbonization investments, and that covers electrifying operations as well as energy storage. Within the next few years, Australia's net zero emissions goal is generating a pipeline of renewable energy prospects, with heavy investment activity predicted for generation, storage, and transmission. Monadelphous continues to be strongly placed to take advantage of the growth forecast in the wind farm and battery energy storage sectors. Substantial long-term investment is likewise predicted for the vital electricity transmission infrastructure that energy transition and grid stability depend on. Network constraints, supply chain pressures, and hold-ups in planning approvals are challenges the power sector is working through, and those will enlarge these opportunities further. General labor availability has improved a little and labor demand has eased, yet a shortage of skilled labor is still a challenge in Australia's resources and energy sectors. Our response remains to strengthen our workforce's capability and capacity via targeted initiatives for employee attraction, retention, and development.

Zoran Bebic

executive
#14

Our focus will remain on growing sustainably and on the quality of our earnings, achieved through a selective approach to new work, working closely with customers, maintaining high delivery standards, and allocating risk appropriately. With construction activity on the rise and the strong influx of new work so far in FY 2025, we expect high single-digit revenue growth for the full financial year, along with better operating margins. Our strong balance sheet lets us keep evaluating strategic acquisition opportunities that help expand services and capabilities as well as diversify our markets, which drives long-term sustainable growth. To close, I want to use this chance to thank the talented team at Monadelphous, whose loyalty and dedication underpin our continued growth. I also want to express my appreciation to our shareholders, our customers, and our many other stakeholders for their ongoing support. Thank you. I will now pass things to the operator for questions.

Operator

operator
#15

Thanks. We’re moving into the Q&A portion now. If you’d like to ask something, press star one one and hold until we call your name. To withdraw your request, just press star one one once more. We’ll take a moment before the first question. Our first question is from William Park at Citi. Please go ahead.

William Park

analyst
#16

Hello. Thank you, Zoran and Phil, for taking my question. Regarding your outlook, I appreciate that the outlook slide you provided is largely unchanged, except for the mention of energy transitions and electrification. Could you maybe give us some color on some of the meaningful opportunities that are up for grabs in the near term? Thank you.

Zoran Bebic

executive
#17

Apologies, Will — I didn't catch the beginning of your question. Are you asking about outside of energy transition, or within our core markets?

William Park

analyst
#18

Apologies, Zoran. Broadly speaking, what meaningful opportunities do you see that are up for grabs in the near term? Yes.

Zoran Bebic

executive
#19

At the full year, we talked about — I’d place this in the bucket of a larger program of sustaining capital opportunities, and I use “sustainment” to mean support for sustaining production levels at our key resources customers, especially in iron ore. So with BHP, Rio Tinto, and FMG, we keep seeing a program of work that will be awarded over the next 12 to 18 months. There’s quite a bit of work in that space. We still see some opportunities in oil and gas, including Shell Crux, the back end of Santos Barossa, Arrow work in the Surat Basin, brownfields upgrades, potentially for Chevron on Barrow Island, and the Ichthys project. And the other one I’d probably put in that category is stage two of the Waitsia project for Mitsui and Beach.

William Park

analyst
#20

Thanks. And regarding what you said about anticipating better operating margins, could you make clear whether you expect a sequential gain in the second half compared with the first half, or how should we be thinking about EBITDA margin as we head into the second half, given what you delivered in the first half? Thank you.

Zoran Bebic

executive
#21

The way it was written, Will, the intent was to compare against the prior full year — so full year. That means FY 2024 versus FY 2025, rather than one half against the next.

William Park

analyst
#22

That makes sense. So just a couple of quick questions. On the other income line, it seems there's some sizable volatility there that isn't tied to gains from selling PPE. Could you walk through what pushed that up? And on CapEx, it looks like it came down quite a bit in the first half. Could you take us through how you're viewing the CapEx level for the second half and maybe beyond? Thank you.

Zoran Bebic

executive
#23

The remaining piece within other income consists of insurance proceeds. And regarding CapEx, Will, over the full year — I mean, across a long stretch, CapEx has typically averaged roughly 2% of revenue, and we expect that same long-term average to hold. Yes, our CapEx spending was light during the first half of the year, but keep in mind that we made heavy CapEx investments last year. Still, I do believe we'll land somewhere approaching that 2%-of-revenue figure for the full year.

William Park

analyst
#24

Much appreciated.

Operator

operator
#25

Thanks for those questions. The next question we have is from Nicholas Rawlinson at Morgans. Please go ahead.

Nicholas Rawlinson

analyst
#26

Hi, Zoran and Phil. Thanks for taking my questions. To build a bit on what Will asked about margin — operating margins clearly widened pretty substantially compared with a year earlier. Beyond the obvious mix effect, what were the main drivers, assuming execution holds up? And is there any reason we shouldn't carry that first-half margin forward into the second half, into FY 2026, and beyond?

Zoran Bebic

executive
#27

Okay, let me give a bit of color on a couple of items. First, as you'd have noticed, the mix of business shifted somewhat, so it carried a bit more weight toward EC revenue compared with earlier periods—that played a part. My other comment would be that, if you consider where the major projects, or our bigger EC projects, stood this half versus the prior half: in the prior half we won a lot of work—sorry, the prior half—at PCP we won a lot of work, and we were either mobilizing or only just ramping those projects up. In this six-month stretch, then, more of our projects were well underway, and we finished a number of them, so naturally we felt somewhat more confident about outcomes as they reached the back end—that was one factor. And the third factor, I'd say, looking across the whole business rather than just EC specifically, is that operational performance was really strong right across the business, which fed into the margin position too.

Nicholas Rawlinson

analyst
#28

All right, that's useful. Thanks, Zoran. It's been a while now, but during a conference call when you were assisting us with our FY 2025 and FY 2026 forecast for E&C, you said you were essentially targeting a return to FY 2021 levels of E&C revenue, which came in just under AUD 1 billion. Is that still the way you're thinking about FY 2026 at present?

Zoran Bebic

executive
#29

Honestly, I doubt we'll hit that AUD 1 billion figure again in FY 2026, though I'd like to believe we're on a path toward returning EC to AUD 1 billion in revenue.

Nicholas Rawlinson

analyst
#30

Alright, and then the final question comes from May. A major construction rival of yours mentioned it has been experiencing project delays, iron ore included. I appreciate the detail you gave William a moment ago regarding the bigger sustaining capital opportunities. But are any of those being pushed back? And could you say whether any are scheduled within the coming, let's say, 6 months as opposed to 12 to 18 months?

Zoran Bebic

executive
#31

Sure, I get why you'd ask that — I'd say across roughly the past three, four months, we have been seeing certain project awards slip. I mentioned sustainment work and the calibre of customers, so my expectation is that work still gets awarded. And on the subject of delays, I think back to sitting here at the close of FY 2023, 18 months back, having that very same discussion about the delays showing up in contract awards. So it isn't — yeah — I wouldn't class that as unusual. What I'd probably say is that maybe the difference on our side is that we sit in a fairly good spot, given that the order book we hold right now is quite solid. So yes, I back the view that some delay in contract awards is occurring. My expectation is those contracts do get awarded. It comes down to timing. The wider pipeline remains solid, and at this point we're in a position with a fairly solid order book.

Nicholas Rawlinson

analyst
#32

Yes. For sure. All right. Thank you so much, Zoran. I appreciate that.

Operator

operator
#33

Appreciate the questions. Give us a second while we line up the next ones. Our next question is from Jakob Cakarnis, who is with Jarden in Australia. Go right ahead.

Jakob Cakarnis

analyst
#34

Good morning, Zoran, and good morning, Phil. My main focus is on how you both see things regarding execution right now. Obviously, along with the mix you're discussing, that's one factor behind the margin gain. So what remains to play out during the second half? Yet even more significantly, when we look ahead to 2026, it sounds like the sequencing of contracts may work in your favor, but please just concentrate on the execution side—the piece you can control that could help some of the margin.

Zoran Bebic

executive
#35

When I consider the work we have already locked in and how that work ramps up, my expectation is that the execution phase ahead of us will look quite similar to this half. As I said earlier, 12 months ago we sat in a different position, with new contracts beginning and ramping up at nearly the same time, whereas I believe we are now in a different position. During the first half we were in a different position, and I think the second half will find us in a similar position. As for around FY 2026, that is still quite some distance off. We still have to keep winning work. But, as I mentioned, looking at the work secured so far in FY 2025, that is AUD 1.7 billion worth of work. A reasonable portion of it sits in engineering construction, roughly AUD 750 million. So our position is reasonable, but we must keep winning work.

Jakob Cakarnis

analyst
#36

Thanks, Zoran. Just to fill in quickly, we keep returning to that CapEx figure of 2% of revenue. It appears that ends up being fairly meaningfully different from depreciation. Could you help us understand what the sequence is, I suppose, or what the guidance is pointing to there, please, Phil?

Philip Trueman

executive
#37

Honestly, I'm not entirely certain where that question came from, but let me restate what I've been saying: over an extended stretch, we tend to put roughly the equivalent of 2% of our revenue into capital expenditure. In certain years it may exceed that level. In other years it may fall below it. It really depends on the economic conditions at the given moment, what the outlook for the business looks like, and how old your assets are. So this remark, which I've now responded to twice, ought not to surprise anyone, and it ought not to trigger any alarm bells. More specifically on depreciation — yes, I think we spent a considerable amount of money last year on our plant and equipment fleet, more than I can ever recall. As a result, we would anticipate depreciation rising this year. I hope that clarifies the question somewhat better.

Jakob Cakarnis

analyst
#38

Thanks, Phil.

Operator

operator
#39

Thanks for the questions. Give us a moment while we get to the next one. Our next question is from John Patel at Macquarie. Please go ahead.

John Patel

executive
#40

Hello, Zoran and Phil. Trust you’re both doing well. I’ve just got a few quick questions, if I may. First, on the maintenance side: clearly, over the last 2 years, we’ve had a fairly large first-half versus second-half skew, with more weight on the first half. Do you expect a more balanced revenue profile across the two halves this year, in which case maintenance revenue could increase in this year’s second half compared with last year?

Zoran Bebic

executive
#41

I don't think that assumption is unreasonable, given what we're observing. I mean, we pointed out the fact that during the first half of last financial year, an abnormal quantity of major turnarounds took place, especially within the energy market, and they happened to fall together in that same half. If I remember correctly, there were shutdowns at Shell, shutdowns at INPEX, and shutdowns at Woodside. So that was somewhat unusual. That said, I'd anticipate revenue in the second half being more consistent and rising slightly compared with the first half.

John Patel

executive
#42

Thanks. My second question is about the Albemarle project, which was demobilised during the period. Did that provide any material margin benefit in this result?

Zoran Bebic

executive
#43

We did pull back from Albemarle's Kemerton project, yes. The commercial and contractual arrangements were finalised, and those came in line with what we had expected. That outcome therefore shows up in the half-year results, though there was no material impact on the number from it.

John Patel

executive
#44

Thanks. And turning to the final question, which concerns the outlook for renewable energy — clearly, that sector is facing certain difficulties, whether you look at it from the angle of project economics or from the standpoint of government backing. So, given that, how do you view the prospects there?

Zoran Bebic

executive
#45

My view is that things still look fairly upbeat, especially when you zero in on — I mean, if you consider two specific segments within that renewables space, namely wind and battery energy storage projects, the prospects appear very robust. So our confidence remains firm on that front, John. Alongside the advances and the consideration some of our clients are giving in the markets that have long been our core — the resource sector — we are beginning to spot quite a few renewable openings in that area too. So on the whole, it comes across as fairly solid.

John Patel

executive
#46

Understood, thanks.

Operator

operator
#47

Thanks for the questions. Julian Mulcahy of E&P Financial Group is our next questioner. The floor is yours.

Julian Mulcahy

analyst
#48

Two questions from me. First, could you give us some kind of breakdown of that AUD 7 million after-tax benefit? In other words, should we take it that this was AUD 10 million pre-tax, and it appears AUD 3 million came via insurance? Where did the remaining amount originate?

Zoran Bebic

executive
#49

So we took a hit there. What drove the gap between the two years was the insurance proceeds I mentioned earlier. There was also a difference from foreign exchange movements across the two periods. And on top of that, interest revenue came in AUD 2 million higher than in the prior period, which obviously reflects the larger cash balance and the elevated interest rates we currently have. Still, there are pluses and minuses throughout. Those three, though, are what drove the non-operating variance.

Julian Mulcahy

analyst
#50

So your pre-tax figure is 10, is that right?

Zoran Bebic

executive
#51

Yeah, the pre-tax figure comes to 10.

Julian Mulcahy

analyst
#52

Oh, okay. And then, Zoran, regarding what you said about the energy transition — does that factor in the possibility of a change in government?

Zoran Bebic

executive
#53

A lot still has to fall into place — first, a new administration, and second, a different policy direction. Even so, I'd say that regardless of those factors, given what we know at this point, and even in the event of a change in government, we remain fairly confident about the wider outlook for the renewable market.

Julian Mulcahy

analyst
#54

Okay. At what point do you expect you'll be bidding on some of that additional offshore platform decommissioning work?

Zoran Bebic

executive
#55

Decommissioning? Well, there are several smaller opportunities here in WA, but I'd say the more meaningful decom opportunities are likely three years or more away. A bigger share of them, I would argue, ties to decom activity in Bass Strait.

Julian Mulcahy

analyst
#56

Appreciate it, everyone.

Operator

operator
#57

Appreciate the questions. Rohan Sundram from MST Financial has our next one.

Rohan Sundram

analyst
#58

Thanks, Zoran and Phil. I’ve just got one question, really about how inflation pressures are showing up in your business and the extent to which those are easing. And maybe just one more around whether you expect any indirect effects from tariffs, particularly on China, or anything along those lines. Thank you.

Zoran Bebic

executive
#59

When it comes to inflationary pressures, we are still observing a bit of wage growth pressure in certain pockets, but the reality is that it has eased compared with the levels we witnessed, I would say, 2 or 3 years back, especially regarding the inflationary effects from supply chains. What I mean is that those have come down more substantially.

Rohan Sundram

analyst
#60

Thanks. And, yeah—sorry—do you have any views on the tariffs, plus whatever indirect effects they might have?

Zoran Bebic

executive
#61

I don't really have any particular opinions or perspective on that. I think at this point our customers are likely still trying to figure out what that means, or what it might mean.

Rohan Sundram

analyst
#62

That's fine. Thanks.

Operator

operator
#63

Thanks for those questions. Our next question is from Richard Aplin at CLSA. Richard, please go ahead.

Richard Aplin

analyst
#64

Afternoon, everyone. I have a couple of brief questions. First, I wanted to verify the incremental revenue that Melchor contributed during this half. My understanding, given that the acquisition closed at the end of October 2023, was that you received roughly two months of added contribution amounting to around AUD 50 million, and that this came within the engineering construction sector. Is that a segment? Is my figure correct?

Zoran Bebic

executive
#65

My recollection is that for the two months it came to roughly AUD 25 million in the past year. The acquisition, I believe, closed at the end of October. As for the six months, I'd say it's broadly comparable when scaled pro rata, perhaps slightly lower.

Richard Aplin

analyst
#66

So that's 25 million Australian dollars per month, is that right?

Zoran Bebic

executive
#67

No, no, no, no. For those 2 months.

Richard Aplin

analyst
#68

Okay. So there’s an additional AUD 25 million. That works. I just wanted to confirm that.

Zoran Bebic

executive
#69

Yeah.

Philip Trueman

executive
#70

That is really where we stand out.

Richard Aplin

analyst
#71

Yeah. Then there was one more thing I wanted to ask about: with those engineering construction awards at AUD 750 million — a solid, healthy figure — could you give us some sense of the timeframe over which that's expected to come through? Is that roughly a two-year order book, notionally? Shorter than that, longer than that? Just a broad framework would help.

Zoran Bebic

executive
#72

I mean, I'd have to dig into it a bit more, but it's likely 15 months to 18 months, roughly in that ballpark. A portion of that effort is already well underway, and another portion is just getting started. So if I look—well, I won't claim a specific figure since I haven't examined it closely, but just to size it up, it's likely somewhere between a year and two years. So intuitively, 15 months to 18 months feels about right.

Richard Aplin

analyst
#73

Nope, that clears things up nicely. I'm all set on my end. Thanks.

Operator

operator
#74

Thanks for those questions. Our next question is from Nathan Reilly at UBS. Go ahead, please.

Nathan Reilly

analyst
#75

Hi Zoran. I've just got one question. I'm looking at what you said about a solid project pipeline and bidding activity across the resources and energy markets, and then tying that together with your remarks on the skilled labour shortage you're seeing in certain pockets. I'm curious whether you're noticing any shift in the way you approach project delivery models given that environment?

Zoran Bebic

executive
#76

I haven't been around for the past six months. I wouldn't claim there's been zero change when it comes to delivery models. Regarding what I said about the skilled labor shortage — the reality, I think, is that a few more people are out there, but quality is the problem. What matters is how deep the quality goes in the labor pool. Certain classifications, or grade classifications, spanning both blue collar and white collar roles, remain fairly tight.

Nathan Reilly

analyst
#77

Could you give me a read on what general productivity levels look like across the industry right now? From where you sit, I'm interested in the timing of awards, the processes for approving projects, and overall labor productivity industry-wide?

Zoran Bebic

executive
#78

I think the timing question on awards ties back to what we said about some delays showing up in getting approvals through for awards. Over the coming six months, I'd anticipate additional delays. But as I mentioned, I'm confident that work will be awarded and executed by someone. On the productivity side, I noted that operational performance is one of the contributors to our margin results. And beneath that, part of it is our capacity to carry out the work we've had in hand at a reasonably productive level. So you could argue productivity overall has picked up somewhat during this period. But I wouldn't take that as a macro view necessarily. I think our operational performance is really strong. And as I said, not only in the engineering construction business, but across the business.

Nathan Reilly

analyst
#79

Understood. And for the last question, are you noticing more early contractor involvement in the tendering processes?

Zoran Bebic

executive
#80

Would it go up? Probably not, though right now we are involved in a certain amount of ECI activity.

Nathan Reilly

analyst
#81

That’s great. Thank you so much.

Operator

operator
#82

Thanks for those questions. Give us a moment while we line up the next ones. We have a follow-up coming from Nicholas Rawlinson at Morgans. You have the floor.

Nicholas Rawlinson

analyst
#83

Hey, everyone. Just a fast follow-up question. Could you give us some color on how the E&C book breaks down — specifically, what share is cost plus versus schedule of rates as a proportion?

Zoran Bebic

executive
#84

Honestly, at this exact moment, I can't give you a firm answer. I'd likely describe it as a blend — perhaps roughly 60/40, split between some form of reimbursable rates and work that's more fixed price. Even so, there are subtleties inside that split: reimbursable contracts and fixed price contracts each carry their own nuances when it comes to the components making up the overall pricing. Still, I'd put it at 60/40, roughly in that vicinity.

Nicholas Rawlinson

analyst
#85

Like the 60 schedule of rates?

Zoran Bebic

executive
#86

I'd say probably — or closer to a schedule of rates, yeah, instead of just straight rates.

Nicholas Rawlinson

analyst
#87

Yeah. Are you seeing that? I mean, a year or two back it was probably 50/50. Do you expect that shift to keep growing when it comes to fixed price versus schedule of rates?

Zoran Bebic

executive
#88

As for whether that keeps climbing, I can't really say. Still, right now, what I'd anticipate is roughly the same kind of split or allocation.

Nicholas Rawlinson

analyst
#89

All right, I’ll leave it there. Thanks.

Operator

operator
#90

Thanks for those questions. There are no further questions coming in from the line. I’ll now return the call to management for their closing remarks.

Kristy Glasgow

executive
#91

Thanks to each of you for joining us today. That brings our briefing to an end.

Zoran Bebic

executive
#92

I appreciate it, everybody.

Philip Trueman

executive
#93

I appreciate that.

Operator

operator
#94

I appreciate everyone joining this conference call. Thanks for taking part. The system is now connected.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Monadelphous Group Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Monadelphous Group Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Monadelphous Group Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.