Mount Gibson Iron Limited (MGX) Earnings Call Transcript & Summary

August 20, 2025

Australian Securities Exchange AU Materials Metals and Mining earnings 15 min

Earnings Call Speaker Segments

Operator

operator
#1

Thanks for being here on today's teleconference covering the release of Mount Gibson Iron's FY 2025 financial results. Leading the discussion will be Mount Gibson Chief Executive Officer Peter Kerr, and with him are Chief Financial Officer Jill Dobson and External Relations Manager John Phaceas. Mr. Kerr will give a short overview, and then there will be a chance to ask questions. Because of time limits, only institutional participants will be invited to ask questions at that point. Shortly after today's teleconference wraps up, a recording of the call will also be made available on the Mount Gibson website. Thank you — I'll now turn things over to Peter Kerr. Thanks, Peter.

Peter Kerr

executive
#2

Thanks, Lisa. Good morning, everyone, and thank you for joining us to discuss Mount Gibson Iron's earnings results for the 2025 financial year. As always, I'll provide a brief overview before handing it back to Lisa for questions. And as always, any dollar figures we mention refer to Australian dollars unless otherwise stated. Mount Gibson Iron delivered a reasonable underlying financial performance in fiscal 2025, building on its cash and investment reserves despite weaker prices and some challenging mining conditions at Koolan Island. As we reported last month, sales for the year came in one shipment below the guidance range at 2.61 million wet tonnes at an average grade of 64.5% Fe. That was down from the prior year's sales of 4.1 million t, when we benefited from substantial stockpiles to sell. As expected, processing and ore sales during fiscal 2025 were more closely aligned with pit ore production as we set up the main pit for its final full year of operation. Combined with substantially lower iron ore prices over the year, sales revenue totaled A$330.5 million FOB, so that's after shipping prices are deducted, and the lower sales volumes and the increased waste mining movement saw our cash operating costs increase and come in at A$101/WMT FOB that we shipped before royalties and capitalized waste mining costs.

Peter Kerr

executive
#3

When you factor capitalized waste mining costs into that cost base, the figure came to A$110/t shipped, versus A$74 a year earlier. I'll go into those costs in more depth shortly. Taking all of that together, gross profit before tax and impairments was A$20.2 million, and after non-cash accounting impairments of A$90.4 million in total — the large majority of which had already been recorded in the December 2024 half year — along with the related derecognition of deferred tax assets, the company posted a net loss after tax of A$82.2 million, compared with a net profit of A$6.4 million the year before. Those impairments are accounting adjustments to the carrying values of the Koolan Island non-current assets, reflecting recent volatility in iron ore prices and a more conservative outlook for the iron ore market. In effect, these charges pull forward depreciation and amortization that would have been incurred over the next year or so regardless. Turning to cash flow, which is our key focus, we built up our cash and investment reserves to almost A$485 million at year end, a balance equal to more than A$0.40 a share, and the company carries no bank borrowings.

Peter Kerr

executive
#4

What matters here is that the temporary spike in waste mining tied to reconfiguring the main pit is almost finished, so over the last 12 months to 18 months of operations at Koolan Island we're aiming for robust cash flow — subject, naturally, to the iron ore price and wet season weather. You'll know we also made a major corporate move recently by agreeing to buy a 50% stake in the advanced Central Tanami Gold Project in the Northern Territory, and we think we secured appealing terms there. In our view that asset brings considerable upside to Mount Gibson as a possible long-life gold operation, giving us a solid foundation for building a meaningful multi-commodity business. We face the 2025 to 2026 financial year with confidence. Turning to Koolan Island in a bit more depth, our central goal is still safely maximizing shipments and cash flow across the remaining life of the operation. As previously reported, ore production and sales came in slightly under target, largely because of a mix of difficult geotechnical conditions in the main pit plus notable weather-related disruptions. Those overlapped with what was always going to be a stretch of lower sales as we finished the in-pit works needed to maximize ore output from the pit's eastern end in the year ahead, and our site teams have performed really well, achieving some excellent results on that front.

Peter Kerr

executive
#5

That work has involved considerable remedial ground support in the central footwall, along with taking out the old eastern haul ramp so that access to the lower levels is maximized for mining. Taken together, those activities produced a higher average waste-to-ore strip ratio in fiscal 2025, at 3:1 (waste:ore t/t). By the close of the current September quarter, both programs will be finished, and we therefore expect a much lower stripping ratio across the rest of the mine life — roughly 1.3 tonnes of waste per tonne of ore on average. Obviously, that will bring a significant lift in quarterly iron ore sales once this quarter is past, plus a corresponding decrease in unit costs. Koolan Island generated operating cash flow of A$26.5 million in fiscal 2025 and a profit before interest, tax, and impairments of A$29.3 million. Once impairment expenses are included, the site posted a loss before interest and tax of A$61.1 million, versus a profit of A$22.2 million in the prior year. For fiscal 2026, we expect high-grade iron ore sales of 3 million t-3.2 million t, with an average unit cash operating cost of A$80-A$85/t shipped, and that is FOB, so it is after the shipping price and before royalties and any capitalized waste mining costs.

Peter Kerr

executive
#6

Output will be lower for both production and sales during the quarter we're in now, and after that it will pick up speed across the rest of fiscal 2026. On the subject of market conditions and pricing, clearly those were softer through fiscal 2025, and that mirrored a variety of factors, from worldwide uncertainty tied to conflicts in Europe and the Middle East, along with the U.S. tariff regime, which clearly shifted a great deal across that stretch. The 62% Fe Platts Index came in at an average of US$101/dmt, and that figure includes shipping price, versus US$119/dmt a year earlier. For lengthy stretches it dropped well under US$100/t, among those a slide to US$89/t in September 2024. Importantly, the high-grade, or the price for high-grade 65% Fe fines, changed hands at a premium and have tracked a comparable path, averaging US$114/t in fiscal 2025 versus US$131/t the year before. The average grade adjusted premium for the 65 material relative to the benchmark 62 material climbed to 8% per contained metal unit, and that was up from 5% a year earlier. Right now it sits somewhat above 8%, in the region of 11% or 12%. Softer prices through fiscal 2025 were also partly countered by a weaker Australian dollar, which averaged US$0.648 in the year versus US$0.656 the year before.

Peter Kerr

executive
#7

That pricing environment led to negative provisional pricing adjustments for us, which came to A$15.3 million in total, or roughly US$4/t across fiscal 2025, since the way our sales contracts work means the final price we get is set by monthly averages extending as much as two months past the shipment date. Koolan Island fines came in at 64.5% Fe for the period and fetched an average of US$83/t FOB — that figure is net of the shipping price — versus US$110/t FOB for somewhat higher-grade material at 65.3% a year earlier. On a brighter note, freight rates for voyages between Koolan Island and Chinese ports held fairly stable through fiscal 2025 relative to the previous year, coming in at an average of about US$11/t. Turning to business development, setting Koolan Island aside for a moment, fiscal 2025 was a busy year, and we have advanced in laying out a route toward growth that goes past the Koolan Island operation. That headway came along three principal lines. First, we have increased our emphasis on organic exploration and broadened our exploration efforts across Western Australia's Midwest and the Murchison-Gascoyne regions, where, based on some of the ground we have examined through our business development work, we see solid prospectivity for gold and base metals.

Peter Kerr

executive
#8

Second, we keep reviewing and putting money into outside chances in the minerals space. Beyond the 9.8% stake we hold in Phoenix Resources, a Midwest mining and logistics company — a position valued at nearly A$21 million when the period closed — we have increased our investments in development firms where we perceive scope for later funding or strategic possibilities. The biggest one is a 5.4% interest in AIC Mines, a Queensland copper producer, worth roughly A$11.5 million at balance date. All our remaining corporate investments sit under the 5% substantial shareholding reporting threshold, with a combined value of around A$9 million at period end. Third, naturally, came the deal we announced last month to pick up a 50% stake in the Central Tanami Gold Project from Northern Star Resources for A$50 million, equivalent to an acquisition price of A$61/oz of JORC 2012 Gold Resources. I won't run through every detail of that transaction again, since they appear in our ASX release of 16 July, but we regard this as a highly appealing chance to build a meaningful gold business, given the project's considerable current high-grade resources of 1.6Million oz, a merit average grade of 3.7g/t gold, plus solid upside to grow resource ounces fast, the extensive infrastructure already in place, and a strong wish from the other joint venture partner — ASX-listed Tanami Gold NL — to get the project into production alongside us as soon as possible.

Peter Kerr

executive
#9

What matters here is that Tanami Gold, last week, gave up its pre-emptive right under the joint venture agreement that's already in place, and we're now eager to meet the rest of the outstanding conditions for the acquisition, in particular the further approvals expected over the coming months. Broadly, we're aiming to finish and push the project forward to a development decision inside 12 months-18 months, and we can't wait to get the keys and start unlocking value from it. With the extra cash flow we expect from the final phase of mining at Koolan Island, which gives us the firepower to put money into other opportunities as well as the Central Tanami Gold Project, we're very much looking forward to what's ahead. That leads me to my last point before I wrap up, our capital management plans. In September last year, we started an on-market share buyback of as much as 5% of our issued capital, and we widened that buyback to 10% in February this year. We did this largely because of how much cash backs the business and because there aren't franking credits available to distribute. That's still true, and the board has chosen not to declare a dividend for the 2024 to 2025 financial year, preferring to concentrate on the share buyback and especially on the capital growth tied to the Central Tanami Gold Project acquisitions and other investment initiatives.

Peter Kerr

executive
#10

The share buyback program kept moving forward at a steady pace up until April, when it had to be paused as a result of how the Central Tanami negotiations with Northern Star Resources were progressing. As of today, 38.8 million shares have been bought back, which works out to 3.2% of the company's share capital, at an average price of $0.313 per share. That program is currently set to run until mid-September, and the board will reevaluate it at that time. To sum up, Mount Gibson continues to focus on safely maximizing production and cash flow from Koolan Island across its remaining life, especially following the current September quarter, during which we expect to finish the final waste mining push and position the mine for a stretch of strong shipping and cash flow generation. Second, we are clearly working toward completing the recently announced acquisition of the Central Tanami Gold Project and to collaborating closely with our joint venture partner in promptly pursuing the activities needed to reach a development decision. Third, we continue to hold and review strategic investments for future growth potential beyond the existing portfolio. We look forward to an exciting fiscal 2026 financial year ahead. With that, Lisa, I'll hand it back to you for any questions anyone may have.

Operator

operator
#11

Thanks, Peter. Anyone who wants to ask something should press star one on their phone at this point. Press star one if you’d like to pose a question. Thank you, Peter. There aren’t any questions.

Peter Kerr

executive
#12

All right, Lisa, thanks. And thanks to everyone who joined us — the recording is, of course, available on the website. Should anyone have questions, feel free to reach out to us directly using the numbers included in today's release. Beyond that, enjoy the rest of your day. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Mount Gibson Iron Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Mount Gibson Iron Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Mount Gibson Iron Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.