McEwen Inc. (MUX) Earnings Call Transcript & Summary

May 9, 2023

New York Stock Exchange US Materials Metals and Mining earnings 55 min

Earnings Call Speaker Segments

Rob McEwen

executive
#1

Thanks, Operator. Good morning, everyone, and welcome. I'll keep this brief—we've regained our momentum. Between September 1 of last year and this past Friday, May 5th, the price of our shares has climbed by 200%. That's an increase 4 times larger than the GDX and GDXJ indices, 11 times larger than gold's price, and 15 times larger than copper's price—and it's about time, plus we still have a lot to recover. A number of factors drove this outperformance, and you'll hear more detail on them as today's call proceeds. The major ones, though, were a ARS30 billion investment in McEwen Copper from Stellantis, the fourth largest automaker worldwide, along with an investment from the technology division of Rio Tinto, the number two mining company globally; they raised their investment from $30 million to $55 million. Also contributing were rising gold output and falling cost per ounce at our Fox and Gold Bar mines. We additionally saw encouraging drill results from Fox and Los Azules, and we gained from strengthening gold, silver, and copper prices; we'll be strengthening our balance sheet by deleveraging, cutting our debt by 38% this Friday, and I think the best is still ahead. Now I'd like Bill Shaver, our Director and Chief Operating Officer, to discuss our operations and growth projects for next year. And right before we begin, he will be—after Bill comes Stefan Spears, our VP Corporate Development, who'll cover our exploration progress, then Perry Ing, our CFO, and Jeff Chan, our VP, Finance, to discuss our finances, and we'll wrap up with Michael Meding, our VP and General Manager of McEwen Copper. Bill?

William Shaver

executive
#2

Thanks a lot, Rob, and good morning to everyone on the line. We're pleased this morning to share our Q1 operational and financial results, and those numbers have gotten much better compared with a year ago. Given the adjustments we're making in how we run things, we expect them to keep improving step by step. Where safety is concerned, it remains the foundation of everything we plan to do from here on. Across our three mining operations, no lost time incident occurred during Q1. There was one minor medical aid back in February — a contractor employee working on a diamond drill cut a finger on a sharp piece of metal — but beyond that, nobody, whether staff or contractors working for the company, suffered any injuries. Turning to operations, at the Fox Complex we've kept up our operational improvement process, and that delivered greater gold output alongside reduced costs in Q1. We put 17,500 tonnes of ore through the mill and came out with 12,929 ounces of gold during the first quarter, compared with 68,000 tonnes processed and 7246 ounces in Q1 of 2022. So that's a really substantial gain — 57% on tonnage and 78% on ounces. Costs likewise came down by roughly 30% relative to Q1 of 2022; our cash cost now stands at $1,088, with all-in sustaining cost of approximately $1,300 per ounce. Essentially, the Fox Complex is carrying on a trajectory of incremental improvement that started in Q2 of 2022, and things have moved ahead steadily ever since. We're hopeful that this progress will carry through the rest of the year. Over at Gold Bar, we finished switching to a new contractor in January, exactly as planned and on schedule; we also shifted the operation — the open pit run by that contractor — over to the Gold Bar South pit, which yielded the bulk of the ore in Q1. That transition happened partly because of the extremely heavy snowfall we got over the winter at the Pick pit, which sits at a higher elevation; during Q1, we put 578,600 tonnes of ore onto the leach pad, against a budget of 459,000 tonnes. Gold production came to 6,456 ounces, while our budget was 8,952 ounces. Cash cost per ounce sold was $1,491, which is a big improvement from 2022 of $284, and ASIC was $17.25 versus $26.33 in Q1 of last year. That 2,496-ounce shortfall stemmed partly from the slower beaching rate of the Gold Bar South ore, and partly from record snow through the winter plus an extremely wet, rainy spring. The exceptionally heavy snowfall during the winter caused high — very high — snow melt together with an extremely heavy spring range, and that diluted the gold grade in our solution as it cycles between the leach pad and the gold recovery plant. Our recovery took some hit from this. The very high spring runoff also disrupted production and site access for approximately three days during the quarter. Throughout that period, both of the routes we use for access ended up underwater, so reaching the site required boats and helicopters over several days. Thanks to the efforts of our own staff along with our contractors, we managed to reduce the effects of those atypical weather occurrences. We're making a diligent effort to bring production back to where it should be, and in the middle of April we resumed work in the Pick pit, where the ore displays significantly improved leaching kinetics, meaning gold can be liberated at a much faster rate. That should lift our gold output over the rest of the year. Turning to Mexico, at the El Gallo Phoenix project, the plant we bought last year has now been relocated to the site, and we're targeting production in early 2024. Right now we're focused on 3 key elements of this project. First, the permit amendments needed because of the updated plant configuration and production rate; second, construction, engineering and scheduling work for the project; and third, the financing for that construction. As you may recall, we intend to reprocess the heap leach pad, which carries a grade of 0.6 grams per tonne. To do that, we picked up a used gold processing plant with a capacity of 7,000 tonnes per day, which had been running recently at a different mining operation. That plant has been relocated to our site, and once we begin production we'll put together the front end of it — that is, the grinding cyclones and the leaching section — and make use of the existing El Gallo gold recovery circuit. This — buying this equipment brings the project's capital cost down to roughly $12 million, with the potential to let us boost output as we move into — as we transition toward production; we expect this plant to be running later this year or early in 2021. Across all our operations, we're keeping up our momentum in stabilizing and enhancing how we operate, so that we can achieve predictable results for gold production and cost in 2023 and beyond. Many thanks, and at this point I'll hand things over to Stefan Spears for an update on our exploration work.

Stefan Spears

executive
#3

Thanks a lot, Bill. First, I want to call attention to exploration findings from projects up in the Timmins area; right now we're running a sizable program of exploration and resource delineation at the Stock property, which is where our mill sits, along with the Stock Mine that produced in the past. So far during 2023, we've put in 42,800 meters, roughly 140,000 feet, of diamond drilling. On May 8th, which was yesterday, we put out an exploration update that you can look at for the full results and diagrams. Things came out favorably from our drilling close to surface, up plunge, following the historic Stock Mine trend. That mineralization sits only a short distance beneath the bedrock surface, quite near the planned ramp access point for Stock West and our mill, and we saw robust gold grades and widths across eight holes. A pair of highlights: 18.9 grams per tonne gold across 9.4 meters, which includes 103 grams per tonne across 0.9 meters. And in the second hole, 18.7 grams per tonne gold across 3 meters, which includes 53 grams per tonne across 1 meter; those results are true width and uncut. Our drilling likewise produced favorable results along the Stock Mine trend down plunge beneath the old mine workings, plus step-out drilling at Stock West, where further intersections containing visible gold are in the lab right now; we also hit what could be a new hanging wall zone sitting above Stock West, which gave us an intersection of 5.7 grams per tonne gold across 5.9 meters true width. Exploration drilling in Timmins is set to keep going all year at Stock, with drilling also earmarked for Grey Fox so we can follow up on favorable results we got last year. Now on to Nevada. Exploration is only now picking up speed following the winter and an especially wet spring stretch. We're eager to share progress on a number of near-mine exploration targets when we hold our next call. Over in Argentina, the McEwen Mining management team went to the San Jose joint venture mine during April to tour the site and got presentations covering the 2023 production plan and how exploration is advancing. Drilling aimed at defining new veins continues, with attention during 2022 and 2023 on a pair of veins north of the mine. The first one, known as Mora Northwest, sits roughly 750 meters north of the closest underground infrastructure and had an initial resource defined during 2022, with further potential along strike. Mora Southwest, located about 250 meters from the closest infrastructure, gave back encouraging drill results, for example 390 grams per tonne silver and 1.8 grams per tonne gold across 1.8 meters true width, and the local geological team thinks this vein holds solid potential for further resource growth. During this year's second half, drilling is scheduled at the Telken North target, which sits next to the Cerro Negro mine and aims at extending the Northwest trending vein system present on Newmont's property. Going forward, we plan to more actively feature exploration opportunities and results from San Jose in our disclosure. Last, turning to Los Azules. We've already published four drilling updates during 2023. A large portion of the drilling work has gone toward defining the deposit's shape and sharpening our understanding of the geologic controls, metallurgy, rock quality, hydrology, and so forth, all of which matters greatly as we advance toward more detailed engineering studies. Around the Los Azules deposit, the surrounding area is still underexplored, and there are many geophysical targets that drilling has never touched. On March 6th, we published results from one deep exploration hole that tested a geophysical anomaly located north of and beneath the deposit. That hole delivered excellent results, with an intersection of 1,052 meters at 0.29% copper, which included 480 meters grading 0.24% copper. Below 500 meters, copper grade in this hole rose, reaching as high as 1.46% copper across 26 meters in early mineral porphyry with coat stainless, a pattern typical of the resource's high grade core. Thank you. I'll now hand the call over to Perry Ing, CFO.

Perry Ing

executive
#4

Appreciate it, Stefan. I'll give a quick rundown of what we saw in Q1 2023, picking up where Bill left off with his review of operating performance. After that, Jeff and I will go through our liquidity position along with how the Stellantis and Nuton Rio Tinto deals affected us — those transactions closed near the end of Q1. Beginning with the consolidated figures for McEwen Mining: we posted a GAAP net loss of $43 million, equating to $0.91 per share, versus a GAAP net loss of $20.7 million, or $0.45 per share, during the equivalent stretch in 2022. Since that reported loss largely stems from exploration spending at Los Azules under McEwen Copper, we've rolled out a fresh metric this quarter called adjusted net earnings loss — a non-GAAP figure that zeroes in on our wholly owned gold operations while leaving out results from McEwen Copper as well as the San Jose mine. On that basis, our adjusted net loss came to $6.4 million, or $0.14 per share, for the quarter, against $13.1 million, or $0.28 per share, in Q1 2022. Our adjusted net loss got considerably better even as spending accelerated across our wholly owned properties, essentially doubling from $3 million up to $6 million during this quarter. That shows meaningful operational gains, especially at the Fox Complex this quarter. You can see the same thing in how our reported gross profit and cash gross profit numbers improved quarter over quarter; so when we look at operations and characterize results, Bill did a thorough job walking through the operational wins and difficulties across our properties. I'll also pick up from Stefan's comments on San Jose by noting that production there during Q1 was broadly disappointing. It reached 23,000 gold equivalent ounces, which, though modestly above Q1 2022, fell well short of what we'd budgeted, and the resulting all-in sustaining costs exceeded realized gold equivalent sales prices by more than $200. That mostly traces back to lower-grade processing driven by heavy mining dilution, plus processing of lower-grade stockpiles owing to shortfalls from underground mining. Average gold and silver grades processed ran roughly one-third below the 2022 comparison period. Plant tonnage reached 108,000 tonnes, a touch above the 103,000 tonnes put through in the comparison period. Together with the team at San Jose and our partner Hochschild Mining, we'll keep watching how the drilling and recovery plan I described gets executed, aiming to better define mining resources and reach new ore zones outside the original mine plan, as Stefan laid out. San Jose ought to benefit from this in both 2023 and 2024. Combining results from all three operations gives us consolidated production of about 30,000 gold equivalent ounces this quarter, versus 25,000 ounces in Q1 2022. Once more, we're a bit ahead of where we stood a year ago, yet there's still considerable work remaining before we hit the guidance for this year. Still, given the plans Bill has laid out, we think we can get there and also produce those results at a profit, particularly with gold priced where it is now. On the liquidity side, the deals Rob described leave the business in far stronger condition when it comes to cash and working capital, as our balance sheet shows. Right now we're working through retiring $25 million of our debt with front lending, and per Rob's remarks, that ought to close within the next few days, which will take our balance sheet further down the deleveraging path. At this point I'll hand things to Jeff Chan, our VP Finance, who will walk through a <<inaudible>> highlights.

Jeff Chan

executive
#5

Thanks, Perry. In Q1, we brought in a total of $185 million through private placements as well as secondary sales of common shares. From FCA Argentina, which is a subsidiary of Stellantis, these transactions generated ARS30 billion, and from Nuton, Rio Tinto Venture, US$30 million. McEwen Mining, on a standalone basis, got $47.5 million as consideration for its 8.7% interest in McEwen Copper. McEwen Copper is going to use the remaining funds to move the Los Azules Copper project forward. Based on how the recent transaction was priced, the market value of our copper business comes to $550 million. Looking at it from an accounting standpoint, the cash raise shows up completely on our balance sheet, which is why we report a cash balance of $190 million. As we laid out in Note 4 to our financial statements, McEwen Copper held ARS29.5 billion as of March 31st, using an official exchange rate of ARS209 to $1. We're managing our Argentine peso balances carefully to reduce inflation and devaluation risks by putting money into low-risk liquid securities. Because of that, our investments in Argentina produced $9 million in interest income in Q1, compared with $7 million in devaluation impact on our peso balances. Now I'll turn it over to Michael Meding to talk about our Los Azules Copper project.

Michael Meding

executive
#6

Thanks, Jeff. Over at McEwen Copper, we put up an outstanding quarter in 2024. Despite tough market conditions, and as Rob pointed out, we managed to secure backing and capital from Stellantis — the fourth-largest automaker worldwide — through an equity injection of ARS30 billion, which gave them a 14.2% stake in McEwen Copper. That's quite something, since as far as I know, no car manufacturer had ever put money into a copper developer before. It speaks to a shifting trend across the mining industry and confirms the worth that both Los Azules and Stellantis <<inaudible>> embody. Automakers now understand just how staggering the quantity of natural resources is that's needed for the transition to greener energy metrics and electromobility, along with the necessity of locking in supply. Los Azules offers a one-of-a-kind opening — a future mine intended to be a paradigm shift within the mining world. A mine designed entirely around minimizing environmental and carbon footprint, using little water, with the goal of producing copper cathodes that have direct industrial uses in Argentina too and look very appealing from an ESG standpoint. It's remarkable since it's strategic well past the essential but near financing. Stellantis turned out roughly 160,000 cars in Argentina, and half of those get exported; it has around 24,000 employees there, direct and indirect. That's 24,000 families relying on Stellantis, which manufactured in Buenos Aires and Córdoba. Urban centers that don't hold mining in the same regard as Argentina's more far-flung mining provinces do. Now we'll gain substantial exposure to our copper development, not just by sharing future tax income, but also directly via Stellantis's participation in McEwen Copper. Together with Stellantis, we're now bringing mining into those urban centers — a vital piece of our ESG strategy. Rio Tinto, the second-biggest mining company globally, through its copper technology arm Nuton, also seized the chance to put in another ARS30 million, acquiring a percentage that now puts them on equal footing with Stellantis as shareholders, holding 14.2% of McEwen Copper. As Jeff emphasized, taken together this means McEwen Copper's implied market value rose from about $260 million to $550 million, while McEwen Copper's share ownership fell from 68.1% to 51.9%; that works out to overall value accretion of 80% for McEwen Mining shareholders, going from $160 million to $290 million. Rio Tinto has affirmed the worth of McEwen Copper and how important our Los Azules project is. Up to now, in a setting where drill rigs were scarce, we've locked in 15 drill rigs; that includes four new Boart Longyear LF160 that we own outright, some of which we devoted to developing local supply. We've drilled 34.4 kilometers across 127 holes, or 11 to 111,500 feet, thus far, and have put out and reported strong inflow results in this year's press releases, with more still to come. Stefan covered this in the exploration update — we're getting encouraging results from the stepped-out drilling, and it points to the possibility of extending our already large deposits both sideways and deeper; we've also upgraded the roads we already had. Eighteen-wheelers can now use our exploration road, and we've run commercial loads into the site on it successfully for the very first time since this project began. Why does that matter? Because it makes logistics going forward far more economical. Relative to places like Chile or Peru, Argentina has grown comparatively more appealing. Along the Andes ridge, it shares a border stretching thousands of kilometers, and that's where major copper deposits sit. Proof of this growing appetite for Argentina, San Juan in particular, came from how many people showed up to our PDAC event, where we had invited San Juan's Vice Governor, its Mining Minister, Argentina's Ambassador to Canada, plus financial sector representatives — attendance was excellent. That, along with the Canadian Ambassador to Argentina's recent visit, during which we went with San Juan's Minister of Mines to tour our projects, we showed how far we've come at Los Azules in the Andes, the first project this Ambassador has visited in the province. Both are signs that Canada and Argentina want to collaborate on advancing mining projects that hold a central place in the coming energy transition; on the permitting front we've also achieved notable progress, submitting our environmental permit application for exploitation to San Juan authorities. And an event, with the Governor, the Minister of Mines, representatives of the National Secretary of Mines and Legislators there on the 14th of April, which is the key permit application moving our projects ahead. Another milestone: the Memorandum of Understanding we recently signed with YPF Luz. YPF is among Argentina's largest companies and is a majority state-owned national oil, gas and energy company. Through this memorandum between McEwen Copper and YPF Luz, a framework is set out for delivering suitable solutions so that Los Azules and San Juan operations get 100% renewable energy, with the goal of getting Los Azules ready for carbon neutrality by 2038. Our capable management team in Argentina, armed with strong local experience, stands ready to push the project forward under the banner Build Our Vision — a green, sustainable mine on a faster timeline. On the exploration side, meanwhile, Rio Tinto is expected to begin drilling at our Elder Creek properties sometime this month. Kennecott plans to put in $18 million across seven years so it can earn 60% of Elder Creek. Thanks for attending. I'll hand the conversation back to Rob.

Rob McEwen

executive
#7

Thanks, Michael. All right. Operator, we're moving into a Q&A session now. There are a couple of questions submitted online. The first comes from shareholder Glenn Wesure <<inaudible>>. His question is about the steps we're taking to reduce possible losses tied to a weakening Argentinian peso. I'll have Michael address that one.

Michael Meding

executive
#8

Right, so what we do is put money into Argentine instruments that carry little risk and are very easy to cash out. During the first quarter, interest income came to roughly $9 million, while the peso’s devaluation cost us $7 million. That left us ahead by around $2 million on the currency move, which counts as a solid result. On top of that, we place a smaller sum — about ARS4 billion — into CDRs, aiming to capture more upside against further weakening of the peso.

Rob McEwen

executive
#9

Thanks, Michael. Glenn had another inquiry regarding contractors; according to what we read in the 10-Q, drilling contractors are used, and the rationale is that they possess the know-how we don't have for exploration drilling. He was also curious about the contractor at Gold Bar, and that has consistently been a component of the Gold Bar strategy; it served as a means of lowering the upfront capital development costs. A new contractor is now in place there, and they're performing very effectively for us. Valeria Bittencourt <<inaudible>> from FP Wealth Management in London, England, sent in the following question on behalf of Brent Fitzgerald, her Managing Director. It has three parts; first, can a price target be obtained through a research or analyst report. Currently four exist, with a range spanning $9.50 per share to $11 — two at $11, one at $10.50, and one at $9.50. Those come from alliance partners H.C. Wainwright, ROTH, and Cantor Fitzgerald. Second, will additional capital be sought through issuing new shares during this year? No, that's the answer, provided gold and silver prices remain at their present levels. Nor have we explored going outside. M&A activity or other projects could occur; however, right now, every project Bill brought up will be funded through internally generated funds. Our share structure was the subject of the third question, which asked whether any restricted shares are scheduled to mature. None exist; as for warrants, every outstanding warrant — totaling 1.9 million — is currently out of the money, and options amount to roughly $0.4 million; no convertible debt or convertible financing has been proposed; and the most recent short position figure was 1.7 million shares. I think there aren't any further online questions right now. Operator, are there any — do you have questions waiting in the queue?

Jake Sekelsky

analyst
#10

Hi there, Rob, and everyone else. I appreciate you letting me ask something.

Rob McEwen

executive
#11

Jake, good to hear from you.

Jake Sekelsky

analyst
#12

You've had a bit of exploration luck at Fox lately, it seems. Could you remind us how large this year's exploration program is there? And also, perhaps, what remains in terms of flow-through dollars you still have available to spend during 2023?

Rob McEwen

executive
#13

Bill will likely need to give you the precise figure, but the flow-through commitment sits at roughly US$ 14 million, and out of that we've already used...

William Shaver

executive
#14

We’ve spent about…

Rob McEwen

executive
#15

$4 million.

William Shaver

executive
#16

Right. Five million dollars — roughly five million as of the close of April; therefore we've got ten million left, around ten million, to deploy across the rest of the year. And currently, seven rigs are running, and they're essentially adding about 10,000 meters each month.

Jake Sekelsky

analyst
#17

All right, that's useful. Now let's turn to Los Azules. In the release, you noted that the environmental impact report had been filed. Could you give us some big-picture detail on how that procedure unfolds and where it fits in the sequence of events?

Rob McEwen

executive
#18

Of course. Michael.

Michael Meding

executive
#19

Alright, Jake — kicking things off on April 14th. Here's what's going to take place from here. A commission is being put together by the Minister of Mines, and 14 additional entities are going to be part of it, assessing the report's various dimensions. After that, with some luck, it won't take too long before they grant us the approval, which would let us essentially get going on building and eventually running this mine. For comparison's sake, the evaluation at Josemaria, under Lundin Mining, ran about a year, and that project is somewhat more complicated than what we have. So that gives you a sense of the timeline.

Jake Sekelsky

analyst
#20

All right, that covers everything I had. Thanks once more, and congratulations on a solid quarter.

Rob McEwen

executive
#21

Thank you, Jake. Who's next?

Marcus Giannini

analyst
#22

Hey, guys; this is actually Marcus…

Rob McEwen

executive
#23

Hello, Heiko.

Marcus Giannini

analyst
#24

Hi there. Marcus here, filling in for Heiko. Appreciate you taking my question. Regarding McEwen Copper, you cited an implied value of $550 million, and with your 52% stake, that works out to a $286 million value still held by the original McEwen, which is significantly more than half your market cap. The whole point of McEwen Copper was to unlock value, and one could easily say that's precisely what has occurred so far. So looking forward, I suppose, is there a price at which you would part with the remaining 52%? And once more, it represents a sizable portion of your market cap, so although you'd be giving up a key asset, you would simultaneously be in a position to give back a considerable sum of cash to shareholders?

Rob McEwen

executive
#25

That's a fascinating question. We haven't given thought to selling it, but we have speculated about what it's worth. Two public valuations exist for copper projects in the very same province where we operate in Argentina: the Josemaria property, which Lundin acquired for $485 million, and the Filo project, whose market cap exceeds $2 billion. We're bigger than either of those projects. Our copper grade beats both of those projects. We sit at a lower altitude than those projects, and we're nearer to infrastructure, power and highways. So from my perspective, the value falls somewhere between what we've just reached and the $2 billion — that should give you a range.

Marcus Giannini

analyst
#26

All right, that's reasonable. Yeah, those comps certainly make sense. Moving on to something different now. You mentioned gross profit and cash gross profit, and you brought up gains at Fox and Gold Bar, and we're basically at the midpoint of Q2 at this stage. Could you share some detail on what precisely produced those savings? Which improvements were carried out? What's still paying off in Q2, and what do you expect for the rest of the year? Is there anything additional you're looking to put in place?

William Shaver

executive
#27

This is Bill Shaver speaking. Yes. At Fox, we're currently developing a method that should raise the tonnes going through the mill by 2 — roughly 1,400 tonnes each day. And we're going about it in a highly methodical way. During last year's fourth quarter, we performed quite a bit of testing on crushing at the mine site and sending material to the mill that had already been crushed. That trial worked out well, and we've now, I suppose, brought in a contractor to crush every bit of ore we generate at Froome down to a size that's even a touch smaller than what we used during that testing, and we'll — therefore we can feed it to the mill at a somewhat greater tonnage; so only as of this month are we at the stage of beginning to implement that method, and the outcome will be whatever it ends up being; but our expectation is that this will boost mill throughput by around 10%, and some of our views are more bullish about what it could be. Still, I'd call 10% a fairly cautious figure; so that ought to lift gold output by, let's say, slightly more than 1,000 ounces each quarter. So even though that may not seem like a huge amount of money annually, it will add up to $10 million. So that's roughly the approach moving ahead. As for Gold Bar, we're discovering that leach times at Gold Bar South run a bit longer than we had expected. Even so, it's still early, since the initial ore from Gold Bar South went onto the leach pad midway through winter; so leaching always improves as the weather warms up, and naturally, we've received plenty of rain and snow, which caused our leaching capabilities to be diluted. Thus, our expectation is that once we get the Pick pit operational again, we can place material onto the pad that drains faster, and ideally get things back on track. Optimistically speaking, improvement should occur at both of those locations, and we are currently working through building Phoenix, after which we should generate roughly the cash flow from that operation—something we will not observe until next year—which is projected at approximately $10 million annually. Consequently, I believe there is considerable operational upside as we make incremental adjustments that carry minimal risk and require very little capital to implement. That essentially captures the direction our planning is taking.

Marcus Giannini

analyst
#28

All right. Great. Yeah. That response covered a tremendous amount of ground. I appreciate all the detail. I have nothing further. Thanks.

William Shaver

executive
#29

Thank you.

Rob McEwen

executive
#30

Appreciate that, Marcus.

Joseph Reagor

analyst
#31

Hello there, Rob, and hello to everyone on the team.

Rob McEwen

executive
#32

Hey, Joseph.

Joseph Reagor

analyst
#33

Hello, and thanks for fielding the questions. I suppose a number of the items I was hoping to get to have already been addressed, though a handful remain. To start with, regarding Los Azules, how much is the overall budget set at for this year?

Perry Ing

executive
#34

The figure stands at $132 million.

Joseph Reagor

analyst
#35

So I'm guessing that whole amount will hit the income statement as an expense, right?

Perry Ing

executive
#36

That's correct.

Rob McEwen

executive
#37

Yeah.

Joseph Reagor

analyst
#38

Okay. Now turning to Gold Bar — during Q1, throughput came in at roughly 580,000 tonnes, only a little under that figure. With the new contractor in place, do you believe that level can be maintained? Clearly it's substantially stronger than what the previous contractor delivered on a quarterly basis, but can it hold up, and were there any circumstances that pushed the processing rate higher in Q1? Is there room to improve on that? Any detail you can offer would be helpful.

William Shaver

executive
#39

Yeah; I'd say that — well, in all honesty, I haven't examined that specific matter. That said, Q1 brought a considerable amount of snow and rain, and naturally, running operations through winter presents somewhat more difficulty compared with other times of the year. So I'd say our team performed really well during Q1. At present, in this quarter, we're more or less on track to keep going at somewhere above 100,000 tonnes each month up to 120,000 tonnes each month. So I don't view that as being at much risk. There's a bit more stripping required as we advance with Gold Bar South, simply because it's sort of a — the ore body located there sits partly within what's kind of a fairly tall hill, meaning stripping during the early portion of the mine life is quite minimal, and the deeper you go, the more stripping you need. On the flip side, the waste material being stripped travels only something like — roughly around a quarter of a mile. So it isn't hauled very far. Meanwhile, the ore at Gold Bar South sits about 5 miles from the mill. So that distance is considerable. However, the road is mostly fairly flat. As a result, truck speeds are quite strong. That road measures roughly 50 meters across. So traffic control poses no problem whatsoever, and there's nothing — aside from trucks plus utility vehicles and so on, no other traffic uses that road; so my view is that you should anticipate future performance staying the same.

Joseph Reagor

analyst
#40

All right. Appreciate it; and the final item, Rob, regarding MSC — it feels like every year lately there's a tough quarter, and it turned out to be Q1 last year too; it looks like that's blocking any cash dividends from being paid out. Do you have any longer-range views on that asset, or on how you could begin actually extracting some cash from it?

Rob McEwen

executive
#41

That's a good question, Joe. Since the mine began, Q1 has typically been the hardest quarter, because of holidays and ramp-up. We were there. Several of us visited last month, examining their operations. Their land package is big. New veins are still being discovered by them; and with silver priced where it sits now, we're optimistic. They ought to be capable of producing appealing earnings. We're hoping a dividend will emerge from it. We've made a few observations and are giving them comments on ways they could assist with that or make the operations better, simply by having another set of eyes on it; so I believe it still has — an intriguing future lies ahead for it. We've inquired whether they'd like to sell it. Their response was, not at a price we were prepared to, leap at. And we inquired whether they'd like to purchase our stake, and no price they offered was appealing enough for us to want to jump on. So right now, it's as it is. Newmont sits just beneath it, with a processing facility at a bigger mine, and certain of their veins seem to reach right to the edge of our property. And they may believe that, that could be an operation worth adding to their package. But currently, nothing is in the works.

Joseph Reagor

analyst
#42

Alright, I appreciate the details. I'll hand things over now.

Rob McEwen

executive
#43

Hello there, Bill.

Analyst

analyst
#44

Yes. Hello, Rob. I appreciate you taking my question, and congratulations to everyone on what was a pretty strong quarter. I came away quite impressed. However, what I really want to ask about is the Stock development — the ramp that appeared in the latest presentation and in the news release. So I suppose what I'd like to know is whether you could give us some sense of when that ramp happens, what it costs, and what total production at the Fox Complex could reach if — Froome keeps producing once — it begins production at the Stock Mine?

William Shaver

executive
#45

Yeah. Thank you so much for asking. I suppose this answer is somewhat complicated, but let me try to tackle it; so, to begin with, there's the Froome mine, which in time will be depleted of ore. And right now we're carrying out a thorough review of the Froome operation to definitively determine the point at which ore at the Froome mine will be exhausted. And so given the gold price we see today, the tonnage that Froome will yield will exceed what our resources and reserves currently contain; so our effort is really to navigate carefully between the changeover from Froome and the changeover to Stock. And simultaneously, we're enhancing the milling process now in place at Stock so that, without large expenditures and with a contractor's assistance in crushing the material, we can raise that tonnage as high as possible; so after that it becomes a matter of handling cash flow and spending. But at this moment we're in the middle of assembling a study regarding the capital and operating cost of the Stock Mine. And we're hoping to begin that ramp at Stock in — as soon as late in the third quarter, so that we could potentially get underground before winter arrives. And then we've been lucky enough to locate some ore quite near surface. And there's also some ore in the old sections of the Stock Mine where potential ore exists; and naturally, we're discovering ore all the way down to 400 meters and 600 meters below surface; so that's roughly the changeover we're looking at. So it's enhance the Stock mill, extract as many tonnes from Froome as possible, begin mining at Stock as soon as it makes sense and keep our cash flow positive throughout all of it. And I believe we see a path to accomplish that, one that checks all the boxes and gets us transitioned without any ore production. To put it another way, no gap is going to occur from when Froome wraps up until Stock begins operating. So plenty of things are up in the air at once, yet I believe we've reached a point where we're in the process of turning that into a plan with more concrete shape, one we can bring back to the shareholders at some point, likely late in Q2.

Analyst

analyst
#46

That sounds great. Thanks so much, Bill.

William Shaver

executive
#47

Absolutely.

Rob McEwen

executive
#48

Hi there, John.

John Tumazos

analyst
#49

Thanks. I'm picking up where the last caller left off with Bill. I've got the Odyssey ramp in mind — the one Agnico is advancing during this year — where reserves stand at 98,000 ounces, yet they're saying output will come in around 50,000 ounces. And when you push ahead on that ramp with limited documentation, you still anticipate reaching ore based on the drilling results you've gotten. In which month could gold ounces appear, and what tonnage each month do you figure will be hauled from the ramp to the mill? I'm not requesting that you forecast the gold output or the grade. If you simply say what tonnage will be pulled from the ramp that could be ore, then we can form our own estimates?

William Shaver

executive
#50

Yeah. The truth is, we can't give a definitive figure for how that will shape up; partly that's because we're still in the middle of taking diamond drill results and turning them into resources and reserves, then applying mine plans to those. So what I'd say we hope for is that we can at minimum keep going, without interruption, at the tonnage currently being processed through the mill, which is roughly a bit more than 100,000 tonnes per quarter. And as I mentioned a little earlier, we're carrying out significant work attempting to grasp what upside exists in the processing plant. If we crush down to a final — smaller size, thereby optimizing what the crushing plant can accomplish, while simultaneously easing some of the load being handled in the ball mills, we could push more tonnes through the mill. Another piece of this, one that isn't apparent from anything we've stated thus far, is that ore at Stock is somewhat softer than Froome. The work index at Froome sits somewhere between 21 and 23, and we anticipate the work index at Stock landing in the neighborhood of 16 or 17; that should give us a mill whose tonnage runs a bit higher than what we're currently contemplating. So that's the process we're working through as we try to determine what the optimum ultimately looks like.

John Tumazos

analyst
#51

Bill, regarding Stock 3, what are the dimensions of that ramp — 3 meters by 3 meters, or 5 meters by 5 meters? Give us some detail on its size.

William Shaver

executive
#52

At this moment, there isn't any ramp being advanced at Stock. The current plan calls for a ramp measuring roughly 4.8 meters by 4.8 meters. It can be somewhat smaller than a typical ramp because the old Stock mine sits right there, letting us link up with the historic workings to provide ventilation while we push the ramp downward. Essentially, that means the vent tubes we must haul along as the ramp is developed don't need to be 2-foot, 4-foot diameter vent tubes. They will be smaller, so the heading can be somewhat smaller as well.

John Tumazos

analyst
#53

So, what number of stopes are you planning to attempt to develop, and what daily tonnage could the ramp produce — 200 tonnes per day, or 400 tonnes per day?

William Shaver

executive
#54

No. I think…

John Tumazos

analyst
#55

What's your estimate?

William Shaver

executive
#56

Right. So my sense is we expect similar volumes to what Froome is producing right now. Essentially, Froome likely has 3 stopes engaged in work continuously at various stages of the mining cycle — drilling, blasting, marking, and so forth. So I figure you'll see roughly 1,200 tonnes per day emerging from the Stock each year.

John Tumazos

analyst
#57

Great. Great. That’s really thrilling. And I’m sorry for putting these granular questions to you a few months ahead of when you’ll be in possession of every answer.

William Shaver

executive
#58

Well, every answer isn’t something we have. What we do have is every question. So — regarding all those figures I provided, stick a small question mark next to each one and — yet that’s simply part of what must be done during this stage, which is attempting to grasp what an optimization resembles. And once more it will hinge on the resources we uncover and how quickly we’re able to push the ramp along and all those wonderful things.

John Tumazos

analyst
#59

Thank you.

Rob McEwen

executive
#60

Thanks, John.

William Shaver

executive
#61

You're welcome.

Rob McEwen

executive
#62

Thanks, Operator. I appreciate all of you for being here, and there's more still ahead. Thank you.

Operator

operator
#63

And this concludes today’s conference call. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete McEwen Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to McEwen Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in McEwen Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.