National Atomic Company Kazatomprom JSC (KZAP) Earnings Call Transcript & Summary

August 19, 2022

Unknown / Unmapped KZ Energy Oil, Gas and Consumable Fuels earnings 59 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, ladies and gentlemen, and welcome to Kazatomprom 2022 1H Operating and Financial Review Conference Call. [Operator Instructions] I would like to remind all participants that this call is being recorded. I will now hand over to Director of Investor Relations, Cory Kos, to open the presentation. Please go ahead.

Cory Kos

executive
#2

Thank you, operator. Good afternoon, and welcome to Kazatomprom's conference call to discuss the company's 2022 first half operating and financial results. Thank you for taking the time to join us today. Our call will begin with a presentation by Chief Operations Officer and acting CEO, Mr. Yerzhan Mukanov, followed by an opportunity for questions. If you joined through the Kazatomprom website or through our company page in the London Stock Exchange website, note that there will be slides displayed during the remarks. These webcast slides are also available for download in PDF format called First Half Conference Call Slides. Note that our press release, full version of the 2022 first half operating and financial review, along with our reviewed 2022 financial statements for the first 6 months, are now available on Kazatomprom's website. Participating in today's call, we have Yerzhan Mukanov, Chief Operations Officer and Acting CEO; Kamila Syzdykova, Chief Financial Officer; and Askar Batyrbayev, Chief Commercial Officer. This call is open to all stakeholders with a question-and-answer portion intended to be an opportunity for members of the investment community to engage with the management team and ask their questions. Please note that the Q&A session will be conducted in English. The simultaneous translated Russian conference line is in listen-only mode and will include a translation of the Q&A. This conference call may include forward-looking statements. These statements include all matters that are not historical facts. By their nature, forward-looking statements involve risk and uncertainty, and they are not guarantees of future performance. The company does not make any representation, warranty or prediction that the results anticipated by such forward-looking statements will be achieved. I will now turn it over to Mr. Mukanov.

Yerzhan Mukanov

executive
#3

Thank you, Cory. I'm delighted to welcome and thank everyone for joining our conference call today. Before we get started, I first wanted to congratulate the citizens of Kazakhstan and our entire team of thousands of employees on the 25th anniversary of Kazatomprom, a milestone we celebrated just last month. The success of any company is sitting in the hands of its people. And from our modest beginnings to becoming the world's largest producer and supplier of uranium, that will fuel a global transition to carbon-free energy generation. Marking 25 years of growth and strategic evolution is a significant achievement for everyone. Along with discussion on Kazatomprom's 2022 first half results, which were released earlier today, this call provides an opportunity to update stakeholders with our view on the recent market developments, including the notable risks and uncertainty that the industry has been managing over the past several months. Escalation of the Russian-Ukrainian conflict has been -- that began in February has obviously overshadowed other news for the past 6 months. Our hearts remind me that innocent victims are living through this dispute, and we continue to hope for peaceful resolution. The impacts of the conflict have touched every industry and every corner of the globe. The trade restrictions, sanctions and geopolitical risks have introduced uncertainty and global inflationary pressures, which seem to be pushing many economies into recessionary conditions that could take years to recover for all. And thus, the great actions and sanctions against Russia that have been put in place by various countries over the past 6 months have not been directed at the uranium and nuclear industries. Kazatomprom remains prepared for changes to the risk profile. As noted in March during our annual results call, the 4 key ideas we are carefully monitoring include Kazatomprom's partnership and joint project with Rosatom and its subsidiaries; financial risks and exchange rates fluctuation; supply chain challenges and the availability of key operating materials; and risks to our primary transportation routes through Russian territory. At this point, there has been no real change in the risk profile associated with our long-standing projects with Uranium One and the Rosatom Group. We jointly own 5 uranium mining assets with Kazatomprom in Kazakhstan. Rosatom and the Russian nuclear fuel cycle has not been sanctioned. So the risk of secondary sanctions impacting Kazatomprom remains well managed. The financial risks, particularly related to the fluctuation in exchange rates, have persisted since February. The Kazakhstan tenge, which is our operating currency, weakened by about 50% during the first quarter. Although [indiscernible] recovered in late May, it has since fallen back again, and it's down 10% compared to the start of 2022. As anticipated, we expect to see increased inflationary pressures that might offset much on the benefit from higher tenge-based revenue. With respect to the disruption of supply chains and our access to the materials, we need to develop wellfields and produce uranium. The situation continues to evolve. It remains very challenging for -- to our operations who have done an exceptional job of ensuring access to source materials and sourcing new suppliers. But the risk to both mine development and uranium production remains significant. And finally, the areas that saw the most attention throughout the second quarter of 2022 was transportation of our uranium products through the Russian port of St. Petersburg for transshipment to Western customers. We flagged that risk in March, but the route has not been significantly interrupted. And we have ensured and shipped on the primary route several times year-to-date. As we have reiterated in nearly every discussions with our stakeholder groups, should our access to the primary route become limited for any reason, we have a number of mitigation plans that are ready to deploy. They include the Trans-Caspian international transport route, an alternative route we first used in 2018 that does not enter Russian territory; the ability to negotiate swaps with partners and customers for material already at Western converters; and an existing inventory of uranium at various Western conversions facilities that can be book-transferred to customers should the need arise. To date, our risk management processes and mitigation plans to address the existing emerging risks have remained robust. And the company continues to monitor the overall situation. It is important to reinforce our message that we will continue to take all necessary measures to minimize potential risk and prevent any potential negative impact on our business and customers. Turning to the primary topic of today's call. I will touch on a few key market developments and briefly review our results for the first half of 2022. A key factor that has contributed to the improved uranium market conditions and the more bullish outlook for the nuclear industry over the past several years has been the international debate related to the social environmental impacts of energy infrastructure. Those discussions have become even more pronounced amid the growing focus on energy security and diversification in relation to the Russia-Ukrainian conflict, with a number of nations rolling back previous plans to reduce or phase out nuclear. One of the most notable headlines in the first 6 months has been the European Parliament's formal adoption of the sustainable finance taxonomy, which includes nuclear energy as a transitional green investment. The European Commission's proposal to classify investments in nuclear as a taxonomy compliant is expected to take effect in 2023. It represents a significant gain in support by identifying nuclear power as a carbon-free form of electricity generation, not to mention the potential complementary benefits related to heat production from a reactor. Lending further support to the nuclear sector, the International Energy Agency examined how nuclear energy could help resolve the world's energy security and climate crisis. The agency's report concludes that nuclear energy could play a significant role in a secure transition to low-carbon energy production, which would reduce fossil fuel imports and carbon emissions and allow nations to integrate more renewable energy sources into their power networks. In the U.S., the Department of Energy announced the rollout of the Civil Nuclear Credit Program, which includes USD 6 billion in funding to rescue nuclear power plants that are at risk of closing before 2026. And earlier this week, the U.S. government indicated that support when its Inflation Reduction Act was signed into law, committing $370 billion to take an action on climate and energy, including provisions that are expected to benefit nuclear. Coupled with the international push for net-zero emissions by 2050 and the 2021 UN Glasgow Climate Pact that recognized the need to reduce global carbon dioxide emissions, these recent developments have highlighted the benefits and emphasizes the need to deploy more nuclear generation as an alternative to carbon generation sources. Kazatomprom recognized a significant role it plays in helping the world transition away from a reliance on fossil fuels. The renewed focus on nuclear has prompted new categories of stakeholders to closely examine this sector. It means that new attention that emphasizes the environment, social and governance practices across the nuclear fuel cycle has decreased. But unlike many other industries that are [indiscernible] to alter the course of their strategies and reassess their value proposition in ESG context, we, as a uranium miner, find ourselves as a -- in a unique position. ESG has always been well integrated into our business, with strong programs and high standards that reinforce ESG alignment and efficiency. Environmentally, all of Kazatomprom mines employs a best-in-class in situ recovery mining method, which is the most environmentally-friendly production method that minimize impacts on the environment, biodiversity, water resources and public health. From a social perspective, is all of our operation located in Kazakhstan. The country and the Kazakh people benefit from having a significant resource base that underpins our place as the largest producer with the lowest cost operations in the world. And in term of governance, we strive to implement international best practices. In line with our long-standing commitment to sustainable development and ESG, the company is continuing development of medium- and long-term ESG goals, with specific quantitative and qualitative targets. In March, Kazatomprom officially became a full member of United Nations Global Compact, the world's largest corporate sustainability initiative. Our membership confirms the company's commitment to the 10 principles of the UN Global Compact and support for the global agenda, goals, initiatives of the United Nations in the field of sustainable development. Company continues to work on obtaining an independent ESG rating. And we expect to have that rating in place by the end of this year. Moving into a brief look at the uranium market. Contracting activity and the spot and term uranium pricing gained strength in 2022, with market participants shifting their focus to security of supply in light of the Russia-Ukrainian conflict. Demand side interest drove a weekly spot price as high as $63.75 per pound, the highest level in the market has been since March of 2011. However, as risk and uncertainty in the market became more pronounced in the conversion and enrichment segments, utilities' focus shifted away from the uranium itself in order to evaluate future access to non-Russian processing services. The resulting lack of firm near-term uranium contracting activity in the market, coupled with the generally bearish equity market and global economic slowdown, eased the pressure on the spot price towards the end of the second quarter. Spot remained volatile. Through overall, the market is more positive than it has been in over a decade. Intermediaries were responsible for a large portion of the spot market activities through the first half of 2022. This volume is totaling about 33 million pounds U308 at an average weekly spot price of $50.3 per pound. That is about 2 million pounds lower than the first half of 2021 when the average weekly spot price was $29.95 a pound. In the term market, contracting activity increased significantly compared to the last year. with third-party data indicating that contracted volumes totaled about 72 million pounds U308, almost double last year's 6 months total of 38 million pounds. The increased term activity drove the average long-term price higher by $17.5 to $49.75 a pound at the end of the second quarter. The evolving market picture and the unprecedented global economic uncertainty to date in 2022 have presented an extraordinary challenge to the company's production planning and budgeting processes. In addition to aligning future production with market demand and our contractual commitments, we need to factor in the growing inflationary pressure and potentially supply chain delays that could affect our future production plans. Therefore, consistent with our market-centric strategy and accounting for evolving mine development and production constraints, we expect in our 2024 production volumes to remain below our total subsoil use contracts level. As disclosed within this first half news release today, our Board of Directors has approved a decision that will see Kazatomprom maintain market discipline and target production of about 25,000, 25,500 tonnes of uranium in 2024, which is roughly 10% lower than our total subsoil use contract levels. Although the uranium market has improved with an increase in long-term contracting interest, assuming near-term market and substantially improved pricing, we believe the fundamental shift in the supply-demand balance is still underway, with an illusion of endless secondary supply, which creates ongoing opportunities for Kazatomprom as a primary supplier that maintain a disciplined approach. Our 2023 production plans remain unchanged and 20% lower than our total subsoil use contract level. But even that 2023 target is currently subject to considerable supply chain and development risks. Moving into our first half results for 2022. Safety, environmental performance at our operation remained strong. We are proud to report that no accidents were registered during the first half within a zero lost time injury frequency rate. The company's production volume fell slightly on both as 100% and attributable basis compared to the first half of last year due to the supply chain issues that delayed welfare development works in 2021. That work in 2021 was required to support this year production plan. Therefore, as we have previously noted, the elevated risk that 2022 production volume could fall short of our expectations remains a concern. Development progress is still tracking slightly behind schedule compared to our plans. But at this point in the year, the operations team continues to make progress in mitigation-related risks, and annual production guidance is unchanged for now. At June 30, our inventory of finished uranium increased slightly compared to the inventory level we held at the end of 2021, remaining near the bottom of our target for about 6 to 7 months of attributable production. To manage risk and ensure we have uranium at the right place and time, we did make some small purchases and swaps in the market during the first half. Our first half C1 cash costs rose as expected due to higher payroll costs and inflationary pressure, increasing 11% from just under $9 per pound this time last year to now just under $10. All-in sustaining costs rose even more by 22% from $12.58 per pound to $15.3 due to near 50% increase in capital costs resulting from the deferral of some CapEx spending from 2021 into 2022. As we communicated to our quarter 2 trading update for short-term deliveries to end user utilities, the spot price can vary significantly between the time, contract pricing and, as established according to Kazakh transfer, pricing regulations, and the spot price in the general market when the actual delivery takes place. In addition, some long-term contracts incorporate a proportion of fixed pricing that was negotiated prior to the sharp increase in spot price. As a result, both the group's and KAP's average realized prices for the first half of the year were below the average month's end uranium spot price over the period. Many deliveries for the first 6 months of 2022 were based on contract pricing mechanism that established a price per pound prior to the increase in September 2021. As you can see on the slide, which is also now included in the investor handout, given the time allotted by Kazakhstani transfer price legislation, the delivery date at which the sales revenue is recorded could be up to 10 months from the offer day. In the current volatile environment, that means our realized price lags several months behind the rising market price. Similarly, we would expect the opposite when pricing could potentially be higher than the market for certain periods if the market price was falling. Regardless of such lagging effect between spot price and our realized price, our financial results for the first half of 2022 were very strong. Kazatomprom is continuing to optimize sales based on the current market conditions, with a focus to end-user utility contracts linked to spot and term prices in order to benefit from the strengthening market. Revenue doubled compared to the first 6 months of 2022 to nearly KZT 500 billion in 2022, driving a rise in operation profit of 182% and the near tripling of adjusted net profit to about KZT 167.4 billion. These impressive results reflect the considerable improvement in the uranium market over the past year. So higher sales due to an increase in first half customer delivery requests compared to 2021 contributed significantly in the increase as well. Beyond the operational and financial result, several corporate developments are worth highlighting. First, Mr. Mazhit Sharipov, Kazatomprom CEO up until July 4, decided to resign from his roles with the company for personal reasons. The search to fill the company's top job continues, and we have no updates to provide at this time. Today, we have also announced that our Chief Strategy and Development Officer made a personal decision to resign from his position to pursue a master's degree. The Board has decided to reduce the number of senior management positions and not fill the vacancy, instead, redistributing the position's responsibilities among other company officers. In July, we completed the payment of dividends. The 52% increase in the dividend payment compared to the last year included the receipt from the sale of Ortalyk to CGN Mining last July and higher operating cash flow. Beyond the company developments, the government of the Republic of Kazakhstan also announced the expected changes to the country's tax regime as part of its post-January event reforms. In early July, additions and amendments to the Kazakh tax cut were adopted, which will change the calculation of the mineral extraction tax base and rate starting from 2023. According to the changes, the MET of uranium will be based on market prices, multiplied by the amount of uranium mined and a rate of 6%. MET expense, its absolute terms is therefore expected to increase due to the incorporation of the spot price into the formula. However, the exact impact cannot be estimated at this time as the new formula will only be applied beginning January 2023. And finally, as discussed, we are maintaining our production and sales discipline. Reviewing our outlook for the remainder of 2022, we have kept all annual guidance metrics unchanged at this time. While we remain confident that we can deliver on expectations based on our current trends and production, sales and costs, we do assume supply chain and wellfield development risk will not increase significantly through the second half, which may or may not be the case. Production and sales remain aligned with our market-focused strategy. And we may, again, be purchasing material on the spot market when we see opportunities or need to manage our inventory. The target inventory level remains unchanged and approximately 7 to -- 6 to 7 months of the company's attributable production volume. The challenging situation with the supply of raw materials, including inflationary pressure on production materials and reagents, is expected to continue, which could affect the company's financial and operating performance. With the announcement of our 2024 production strategy that we'll keep volumes below subsoil use level, we maintain our market-centric strategy and focus on long-term value. As always, we are committed to the highest standards of health, safety, environmental stewardship and corporate governance in all aspects of our business. Open and constant communication is crucial during the time of ongoing uncertainty and elevated regional geopolitical risks. And we remain committed to business continuity. Over the company's 25-year history, Kazatomprom has established itself as a reliable supplier and partner in the industry. Along with our now proven commitment to building long-term value for stakeholders through continued production and sales discipline, we are eager to keep working with new and existing global customers to provide the fuel required to meet the anticipated demand growth and help the world achieve it net-zero objectives. Thank you for your interest and attention. We will now be happy to answer questions from today's call participants.

Operator

operator
#4

[Operator Instructions] Our first question comes from Aaron Armstrong of Ashmore Group.

Aaron Armstrong

analyst
#5

First question would be on the MET charge. So could you talk about how it's changed versus what we used to up until this year? So the introduction of a market price-based MET charge, is that incremental? So that's on top of what we're used to paying, the 6%? Or will what we currently pay, which is based on OpEx, will that be reduced? Or is it entirely incremental?

Kamila Syzdykova

executive
#6

Aaron, thank you very much for your question. Regarding MET tax, so basically, MET tax, the new application, which will be implemented since the 1st of January 2023, and it will completely replace the old formula. So we have changed -- I mean the tax authority changed the approach from a cost base to spot -- I mean, spot-related base. And overall, as we have indicated several times during our calls, we expect that overall tax burden for the holding will -- might increase as high as 30%. Taking into account current strengthening of the spot, the ultimate impact cannot be estimated, but we think it will be higher. And as soon as it will be applied in 2023, then probably, we can be -- we will be able to make like annual to annual comparison. But it will not be incremental tax. It will be the all-new framework where the new cost tax base will be introduced.

Aaron Armstrong

analyst
#7

That's great. That's great. And then perhaps just on cash costs, please. Can you talk about some of the key factors around that, so sulfuric acids, other kind of consumables or the different components that go into cash costs, and the kind of inflation that you're seeing there and what kind of trend you would expect, say, this year looking into next year? And then similarly, as we go from minus 20% versus subsoil to minus 10% and production increases, could you talk about which assets will be contributing to the higher level of production? And would you expect those assets to come with a cash cost similar to the current average? Or do you think there will be higher cost or lower cost assets that you bring on stream?

Kamila Syzdykova

executive
#8

Yes. Thank you, Aaron. So basically, that current C1 cost increase has several drivers behind it. As we have also indicated during our calls this week, company took very serious measures to increase overall payroll for our personnel. So that contributed some significant part on the overall increase. Also, there has been higher prices for our key reagents, such as sulfur acids. I mean for some of the joint ventures, which blended all together, gave us this -- some input to the overall increase. And also, we see growing prices for metal-based components and pipes. So I would say that like at least 1/3 of the increase came from the revision of our payroll team to make sure our employees are better protected against current inflationary trends. And the rest would come up from the overall higher prices for the sulfur, sulfuric acid, and the pipes and other metal-based components. It also -- the impact of MET because of the higher cost base has also contributed to the overall increase. And regarding your question on the production levels, like we expect had that additional supply to come from the existing mines within that flexibility given to us under subsoil use agreement. So basically, it would require joint ventures to do more intense CapEx programs in terms of wellfield maintenance cost, drill and [indiscernible] more reserves to make sure we are ready by 2024 to do minus 10 from the subsoil use contract level. As for the cash -- as for the cost level, like basically, it should have not been very much different in those too because on one hand, the minus 10 gives us higher volumes, which give lower cost per unit. On the other hand, it also requires more intense CapEx and some like ramp-up in CapEx because we have been doing minus 20 for quite some time. So I think it basically would be comparable for the 2 scenarios in terms of the cost, again, provided that we don't see any outrageous trends in the inflation.

Aaron Armstrong

analyst
#9

Great. One final question, if I may, please. Could you talk a little bit about the management team and some of the changes that we've had in personnel in a couple of years? There's obviously been a number of changes and another one fairly recently. Can you talk about any kind of overarching themes that are driving that? Are they very kind of idiosyncratic issues? Is there any kind of directive that's coming from the government or parent entity around management structure and kind of any kind of comments that you can share? And particularly kind of looking forward, would you expect things to stabilize from here?

Yerzhan Mukanov

executive
#10

Regarding the latest changes in the management team, I would comment that Mazhit Sharipov left by personal reasons as well as Yerlan Tuleugozhin, our Strategy Officer, he left -- he has decided to left also by personal reason. As we already said, he is going to obtain his master's degree. So as this study will last quite long, so he decided to leave.

Aaron Armstrong

analyst
#11

Is there maybe any kind of theme among some of the departures? Could it potentially be the attractiveness of the country as a place to work? Is that an unfair assessment?

Yerzhan Mukanov

executive
#12

No. In nearest future, we do not expect following changes with the management team. For the moment, we assume that the current management team are able enough to manage the company. So we do not expect changes. Expect -- we are waiting for nomination of new CEO this year.

Aaron Armstrong

analyst
#13

And is that imminent?

Yerzhan Mukanov

executive
#14

Well, we do not know as the choice is under the decision of our Board of Directors. So we have no update on this.

Operator

operator
#15

The next question comes from Chintan Khamar with Crédit Suisse.

Chintan Khamar

analyst
#16

I just have 2 questions. Firstly, we've seen some shipments to North America already delayed than that were expected earlier in the year because of the risk of the Russian transport route. But why has the Trans-Caspian route not been utilized here already? And do you have any idea on the additional costs of this route?

Askar Batyrbayev

executive
#17

Thank you for the question. Well, first of all, no deliveries have been delayed by our usual route, which we are using through St. Petersburg. So still open. We're still using it. And secondly, I mean, Trans-Caspian route is being utilized from 2018. Once we first faced difficulties to access the St. Petersburg when there was a World Cup 2018 in Russia, we started to develop an alternative route. And actually, by the end of 2018, we've made the first delivery by Trans-Caspian route. So currently, we made several more deliveries, up to [indiscernible]. So each year, we're having at least one delivery by an alternative route, which is now kind of seems like timely measure for ourselves in terms of risk mitigation. In terms of cost, it's hard to say, and it's more like closed commercial information. What we can see is it might slightly be more costly than the normal route which we are using through St. Pete.

Chintan Khamar

analyst
#18

And if possible to give a little bit more color, if a customer wanted to arrange delivery through the Trans-Caspian route today, do you have an idea of what kind of volumes would be possible to transport today?

Askar Batyrbayev

executive
#19

Well, we made a lot of discussions with the transiting countries. And uranium is not that big portion or that big part in the deliveries. I mean if you take the full volume of Kazatomprom, it will be not more than 1,000 containers per year as a total delivery. And these are all different locations, I mean, like China, where we don't need to use a sea transportation. So in that sense, I mean, 1,000 containers is a very small drop in terms of delivery through the whole ports in Caspian Sea or at the Black Sea. So it doesn't really impact if we even turn all our shipments to Trans-Caspian route. And it will not affect this route in terms of filling their capacities or -- that way. But in terms of the nature of the cargo, I mean we definitely expect that our cargo will have a priority when we will be passing the route in comparison with general cargo.

Chintan Khamar

analyst
#20

And one final question, if I might. Do you foresee any infrastructural investment in addition to additional wellfield development to increase the production by 2024?

Kamila Syzdykova

executive
#21

In 2024, there are some expansion projects that we are carrying on. They are not specifically related to the decision to ramp up by 10%. We've been planning them along the way that, for example, for our sellers because they are launching new mine. There is also another couple of expansion projects at our old mines where we need to replace the capacities and somehow enlarge them. So specifically, to go up to 10%, we don't need any incremental CapEx that we have not been planning.

Operator

operator
#22

There are no further questions on this line. I will now pass on to Cory to read out the written questions received via the webcast.

Cory Kos

executive
#23

Thank you, Joanna. We do have a few questions coming in from the webcast line. First one here is coming from [ David ]. He's asking, have we shipped any U308 on the Caspian route to date this year? And do we envisage that to change in 2022 and 2023?

Askar Batyrbayev

executive
#24

Yes. Thank you, Cory. Well, as of today, we haven't shipped the material through Trans-Caspian route. It's been on our plan. Before today or in the first half of this year, we were shipping through the Russian route, but Caspian route was always available, and we are keeping it always ready to make the shipment. So the shipments would be in the second half of this year. But again, we are not closing the Russian route completely, so we will be utilizing both deliveries. And actual kind of distribution for '23 or '24 in terms of which route we will be using more, I mean, it's hard to plan now. But I guess we will be using Caspian route a little bit more frequently than we did it before. And again, that will all depend on kind of geopolitics and how the situation will resolve.

Cory Kos

executive
#25

Perfect. Thank you. So the next question coming from [ Borja ]. The question is centered around security of supply, noting that the company has a number of projects sitting in the wings. There's a number of other companies looking at increasing production or bringing new supply on. But the question is whether we believe the market is perhaps overestimating the future availability and the confidence in future security of supply and what our view on that is.

Askar Batyrbayev

executive
#26

Well, again, thank you, Cory. Very good question. In terms of security of supply that we are discussing and delivering to the market, we had seen a decade before this period where we had an oversupply. And that was the reason why Kazatomprom had to go for the kind of production discipline along with other producers to change the supply and demand picture. So the people who are working during that decade are -- got used to the availability of the material on the market. So with the time changing, with the market already entering to the balance and slight deficit because of the shortfalls in production, we are seeing more and more interest in future periods, in '25 to '35 period. But I guess there's still a little bit more time for utilities that will need to kind of -- to understand that the supply at the current price levels is not actually available at the amount that will be needed by the industry. And again, after 2030, we will have a bunch of new projects that will come online in different geographical locations, like Eastern Europe, maybe in Middle East, a couple of more in Egypt. We're expecting Turkey is coming online very soon. So all these new additions to demand side will definitely provide concerns about security of supply, which we are talking about and kind of Kazatomprom is ready to be a partner of choice for everyone who will look forward to have a contract with us.

Cory Kos

executive
#27

Thank you. A second question from [ Borja ] is, noting the fact that we did comment, an additional sulfuric acid plant is currently under consideration. So maybe, Kamila, if you could indicate the level of study, how advanced that is right now. Mr. Yerzhan can also comment on this, that what's the cost like and how advanced is that consideration.

Kamila Syzdykova

executive
#28

So basically, we have considered that project internally. It has gone through several stages, like defining that this is an investment case. We have conceptually agreed with that -- with the Board and discussed it, that this project should go along. Now we're at the stage of entering into contract to do the project design. So we are not able to specifically indicate volumes and the expected CapEx at this stage. As soon as we will -- we see some preliminary project design results, we will be sharing this information.

Cory Kos

executive
#29

Thanks, Kamila. Another additional question from the webcast is from Ildar, Wood & Company, asking how do we plan to achieve our 25,000 to 25,000 tonne production level in 2024. If it's -- we're launching new assets or ramping up CapEx at existing assets. We kind of answered that, but we could follow up again.

Kamila Syzdykova

executive
#30

Yes. Sure. Thank you for the question. As I answered before, we are not expecting to launch new mines in order to reach this plus 10% -- I mean minus 10% from the contractual levels as stated in the CPR report. That will come within this -- our flexibility given in our subsoil use right.

Cory Kos

executive
#31

And an additional question here from Ildar is, what is the CapEx trajectory for the next 2 to 3 years? And just questioning how much higher can it go relative to 2022, so this year's production.

Kamila Syzdykova

executive
#32

In terms of the CapEx trajectory, I also commented briefly that there are like offsetting trends in terms that cost per unit with higher volumes like the ones that we have announced for 2024, will be like slightly lower, but because of the higher CapEx that will be required next year in order to maintain some extensive CapEx, onetime CapEx ramp up to maintain that the levels in -- sufficient levels for the reserves of consistent preparation, it was basically canceled out. Overall, we think that in 2, 3 years' time, we might see that another, well, 20%, 25% increase from today's base based on that cumulative factors and the mainly higher prices for the input materials.

Cory Kos

executive
#33

Thank you. Final question coming from the webcast, from [ Thomas ]. He is asking, does Kazatomprom buy any uranium from the spot market in the first half of the year in order to fulfill our contractual obligations?

Askar Batyrbayev

executive
#34

Well, we did buy some material in the first half. We don't disclose what was the amount. But generally, I mean, we did it when we sold the arbitrage opportunity or misplay -- mispriced material. But additionally, I mean, we were doing this only in case we have tried to mitigate the risks of late delivery. But we've never experienced that. So yes, we did buy some of the material, but it was mostly for trading purposes.

Cory Kos

executive
#35

Excellent. The second question from [ Thomas ], he's asking, related to the latest update from KATCO JV announcing -- getting the permit to extend one of the mines there, one of the orebodies, what is the estimated increase of Kazatomprom production and -- related to this new permit? And is it rather to keep existing supply? Or is it new production?

Kamila Syzdykova

executive
#36

So KATCO, regarding JV KATCO, so we have released our latest CPR report, verified by independent consultant, where the volume stated as a contract volume for JV KATCO was 3,400 tonnes. So basically, we -- all of these volumes are accounting for in our production plan. And whenever we expect that KATCO will just return to its project capacity of 4,000 tonnes, we will be just back to -- on our line with the CPR with the 1 or 2 year of -- 1 just -- 1 or 2 years of delay. So basically, it's needed to maintain or not new.

Cory Kos

executive
#37

Excellent. Thank you. Another question from [ Daniel ], asking when the construction of sulfuric acid plant at KATCO JV that's now -- when it would go and what the projected cost would be. So I think we've answered that one, and...

Kamila Syzdykova

executive
#38

Just maybe add that we have no specific plans yet, whether it will be sulfuric acid with JV KATCO, just to clarify.

Cory Kos

executive
#39

Okay. And another from [ David ], asking, are there any contracts yet with the Chinese Alashankou-boarded -- bonded warehouse? And how much extra production is required to fill this facility over the next few years?

Askar Batyrbayev

executive
#40

Well, good question, but I guess it should be directed to maybe Chinese counterparties or contracting this warehouse. Generally, what we know is they completed the first stage. It's about 3,500 tonnes of -- on the storage area, which is, I guess, already filled. So that's their product which they brought into China -- imported to China. So the second stage will expand that facility up to 10,000 tonnes. And there might be already some ideas to set up some trading hub. But there is no clear structure how it will work and who will be filling that hub. And so we should kind of wait a little bit more and see what China will communicate in that sense and what could be the final outcome of that warehouse.

Cory Kos

executive
#41

Excellent. We have one more here that actually, I think I can answer from [ Daniel ], asking if any foreign companies from Turkey, U.K., UAE, Korea that may consume Kazakh uranium expressed interest in purchasing stakes in KAP's JVs. That would be we just have to follow our typical corporate line that we don't comment on M&A activity. What I can do here, we have no more questions coming from the conference call line -- or sorry, from the webcast line. But I'm told there is another couple coming from the conference call. And so I'll hand back to the operator at this point.

Operator

operator
#42

So this additional audio question comes from Anna Antonova with JPMorgan.

Anna Antonova

analyst
#43

Just 2 questions from our side. First, could you please comment on the CapEx guidance for this year? I remember that you haven't changed any of the 2022 guidance, while the -- your mining CapEx in H1 is tracking at less than 40% of the full year target. And previously, if I remember correctly, you highlighted that there are downside risks to the full year spend. So what are currently your thoughts on this CapEx number for the full year? And this is the first question. And I'll ask the second question after that.

Kamila Syzdykova

executive
#44

So for the capital expenditures, we are not revising our guidance yet because there are very intense CapEx programs being implemented now, and we had a delay that was just kind of came to us from the last year's delay. But now our programs are intensified. And we have added additional drilling rigs into our overall fleet. So with all of that, we still expect to meet it. And we also should know that current CapEx includes that expansion at our -- one of our mines. So basically, once all the costs are accepted, we think within closer to Q4, we will maintain the guidance. However, we still think that subject to how works go in Q3, we might review the guidance a bit downwards in Q3. As of now, based on the current intensified trend for the capital expenditures and adding drilling rigs to our fleet, we are not changing our guidance.

Anna Antonova

analyst
#45

Much appreciate it. And the second question is on the ANU Energy physical uranium fund, I see in the presentation that Kazatomprom has priority right to repurchase uranium from the plant. So going forward, how should we think about the potential relationship between Kazatomprom and this uranium fund? Do you plan to sell the material to the fund in the next couple of years? Or do you view it as more kind of a -- or do you have a more like opportunistic approach and we're selling and repurchasing the material to inform the fund, if and when needed? So how should we think about this going forward?

Askar Batyrbayev

executive
#46

Yes. Thanks, Anna. So regarding ANU, so as we announced, we've completed the first stage. So we've sold the material based on the first feed investments from our side and from National Investment Corporation of National Bank. So that stage is completed. So they are moving for the second stage, which is attracting additional investments, up to $500 million in total, which is -- which does not involve any other investments from Kazatomprom. So in that second stage, Kazatomprom would be just seller of the material -- or priority seller of the material. So that's on that side. We -- there are some kind of mechanisms in place to make sure that the material will have to stay at the fund for a certain period of time. And there is a limitation on how much they could be selling annually. And in case they will, then the priority right is with Kazatomprom to make sure that -- we will look at the general picture of the supply and demand. And kind of then we will make a decision on whether we should be buying it back and putting on our existing contracts. That will also help us with some production volumes that we will be having. So that actually kind of leaves us with a choice -- with a priority choice whether the market can already absorb that material if fund decides to sell or we still need to work as a responsible player on the market and make sure that these volumes would kind of impact the market and return us to the situation of 2015 and '16. So that's the arrangement that we have now. If you have more detailed questions, I mean, ANU Energy is a completely self-sustainable company and fund. So they have corporate website and contacts of the people who can answer any additional comments on how the fund will operate, who will be the investors. So we are not aware of that details at the moment.

Cory Kos

executive
#47

And then maybe I'll just chip in as well because there was a very subtle change in the communication within the OFR. When we were mentioning OFR, I knew that we opted not to have a Board seat so we are not involved in the decision-making of a new either.

Operator

operator
#48

There are no further questions on this line. Ladies and gentlemen, that concludes the question-and-answer session for today. I will now hand over the presentation to the management team for closing remarks.

Cory Kos

executive
#49

Thank you. That concludes our side as well. There are no further written questions. So I can turn the conference back to Mr. Mukanov for a very brief close.

Yerzhan Mukanov

executive
#50

Ladies and gentlemen, thank you for your attention. Thank you for your questions. Thank you for your interest to our company. So I wish you a good end of the day. So thanks.

Cory Kos

executive
#51

Thank you all. That concludes the call. So I guess from the operator side, you may disconnect.

For developers and AI pipelines

Programmatic access to National Atomic Company Kazatomprom JSC earnings transcripts and 32,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.