New Fortress Energy Inc. (NFE) Earnings Call Transcript & Summary

August 4, 2022

NASDAQ US Energy Oil, Gas and Consumable Fuels earnings 53 min

Earnings Call Speaker Segments

Brett Magill

executive
#1

Thank you, Emma. Everyone, good morning, and it's a pleasure to have you join us for New Fortress Energy's Second Quarter 2022 Earnings Call. A recording of this session is being made, and a replay will be accessible in the Investors section of our website, listed under Events and Presentations. In that same location, you'll find the Q2 2022 investor presentation we'll be using as a reference during today's discussion. Inside that presentation, there are several significant disclosures regarding forward-looking statements as well as non-GAAP financial measures. We ask that participants take the time to go over these important disclosures, along with the risk factor description found in our SEC filings. Present with me today are Wes Edens, our CEO and Chairman of the Board, and Chris Guinta, our Chief Financial Officer. Other members of the team are also on today's call, among them Managing Directors Andrew Dete and Patrick Hughes. Having said that, I'll hand things over to Wes.

Wes Edens

executive
#2

Okay, thank you, Brett, and I appreciate all of you joining the call. Morning to everyone. Let's get right to it. We'll follow the same pattern as always, walking through the deck that was uploaded to our site yesterday evening, so I'll begin right at the start. Page four. By every metric, this was an extremely strong quarter for our company. EBITDA came in at $283 million. When you combine the previous four quarters, our trailing four-quarter EBITDA now stands at slightly more than a billion dollars — $1.05 billion — which is truly a landmark achievement. We are reaffirming our guidance for the rest of the year, expecting 2022 to produce roughly $1 billion in EBITDA; we're also giving guidance for 2023 of $1.5 billion, and we believe there is considerable upside there, contingent on when and how the FLNG installation takes shape. Looking at the financial metrics, it was an extremely productive quarter. Turning to page five, there are numerous important developments to call out for the quarter. I apologize for how crowded the text is. I tend to simplify things, and I prefer to keep them straightforward and clear. The truth is, we had so much happening during the quarter that even attempting to pare it down to this list proved somewhat difficult. Let me just run through the highlights, and later Andrew Dete and Chris Guinta will actually provide a bit more depth on these, but I'll begin at the top. Terminals and customers. Our dedication to our customers and our downstream terminals has never been stronger; this sits at the heart of what the company is trying to accomplish, helping tackle energy poverty and energy security globally, while simultaneously serving as a major participant in the shift toward a cleaner energy future. During the quarter, we essentially finished our Barcarena and Santa Catarina terminals and achieved meaningful headway on permits for Ireland. We've been at this for quite some time, but we are now more hopeful than at any point that we will reach a favorable outcome for the Irish terminal as well; on top of that, we chartered one of our FSRUs into the Netherlands, marking our first exposure to Europe. Europe clearly has experienced an extremely turbulent year following the February 24th invasion of Ukraine. There's a great deal of activity across various European nations to construct terminals and bring them into service, particularly with the coming winter on the horizon. We managed to lease one of our FSRUs into the terminal. In fact, I believe the christening date for that is September the eighth. This will be the first of the European terminals to be turned on. We now see Europe as a promising part of our future, and as we produce FLNG volumes, naturally we'll deliver them to all of our customers worldwide, but we believe European customers are going to represent a major portion of what lies ahead. Down the road, the energy crisis is going to ease, and the downstream customers and assets we have are the linchpin of how our business model works; across eight years, we put close to $9 billion into developing that infrastructure. That's the thing that will let us take the volumes we produce on our own, get them out across the globe to our customers, and play a real role in the shift that this energy transition represents. A couple of other quarter highlights. As we said before, our plan was to fund everything we do ourselves. The target we laid out was producing $2 billion-$2.5 billion in capital generated internally, which would spare us from returning to shareholders and spare us from doing corporate financings to get it done. Things in the financing markets have been a mess. With all the inflation and, you know, the financing difficulties in the market, the first half of this year has been really tough there. Even so, I'm glad to say we pulled off exactly what we set out to do, and we can now state that in our view, no incremental capital needs to be raised to fund our growth. For me, being self-financing in a market like this sits at the very top of the quarter's accomplishments. Andrew is going to talk about that in just a few minutes. It says a great deal about how essential our infrastructure assets are; it also says a great deal about the people who actually carried out this work for us. Really pleased with what was achieved there. Finally, we made major progress in the hydrogen business. On a side note, a press release went out this morning from Plug Power. We're glad to say we are partners with Plug, and on our first hydrogen plant, they're gonna be the equipment provider to us. The energy bill that Congress is currently considering, in our view, places the U.S. squarely in the crosshairs of becoming the world leader in producing hydrogen. You know, I think when you look at energy transition, you know, the way the discussion has gone so far has, in my view, been a bit of a false narrative. Put differently, that we're gonna somehow move seamlessly from dispatchable fossil fuels like gas, coal, etc., straight into non-fossil fuels, wind and solar, and that somehow that's gonna be a meaningful transition. That narrative is false. In my view it's a dangerous narrative, and one that has actually shown itself to be very perilous; given the dislocations that occurred in Europe this summer, we've now witnessed massive switches back to coal. We now expect coal use this year to match what was used in its peak year of 2013. We expect a higher amount for it next year. Obviously, in this particular case, energy security has trumped climate change. Assuming you accept the dangers that come with a changing climate—and naturally, every one of us does—then the only sensible conclusion is that you must put substantial money into hydrogen as well as nuclear. Having a nuclear piece within our operations isn't something we plan on. Hydrogen, though, is a topic we've been discussing for two and a half years now. What we announced this morning represents a significant step forward, since it truly gets our first venture in that space off the ground. So then, I'll hand things over to... I'll hand things over to Andrew.

Andrew Dete

executive
#3

Thanks, Wes. It's good to be here with everyone this morning. NFE had a strong quarter. I'm looking at page nine, where I'd like to briefly bring you up to speed on a snapshot of our assets and portfolio; then on page ten, I'll walk through the commercial highlights for the quarter. Page nine essentially provides an update on where things stand. Across seven nations, we are operating and developing more than 37 MTPA of downstream regasification infrastructure. At our terminals, we own and are developing over 3,000 MW of power; we have 8 MTPA of FLNG production capacity that is under construction and under development. This map has been somewhat tidied up and refreshed compared with last quarter, and it sort of shows where we stand while giving a solid feel for how integrated the portfolio is. Turning to page ten, I want to repeat what Wes mentioned at the start. Serving customers is truly the heart of what NFE does. Our aim is to meet downstream LNG demand through long-duration contracts, which provide energy security and reduce emissions for our customers while also delivering stable, growing cash flows to investors over the long term. During this quarter, we've made progress toward that. Updated figures appear on the right side of page ten. Once you include the contracts signed during the last quarter — the volumes to the Jamalco refinery, the Barcarena PPA, and the increase and extension of our volumes with CFE — that brings us to 136 TBtu on a 2023 run rate basis across 65 contracts, and it raises the volume weighted average life to 15 years, up from roughly 12.5 years. That's significant progress in growing our overall portfolio in terms of volumes and actually lengthening the duration. That 15 years is something we believe speaks very well to the quality of our infrastructure and to the core long-term contracts at NFE; on the left side, I want to provide a bit more detail on several of the genuine commercial highlights for the terminals. We've separated this into terminals, power plants, and LNG vessels. Beginning at the top, the Barcarena terminal is finished. It's an offshore terminal, a 3-km pipeline, and a gas conditioning station that will first serve Norsk Hydro beginning next year in 2023; after that, we'll also serve our Barcarena 600-MW power plant starting in 2025. On just those two contracts alone, we have line of sight on more than $100 million of EBITDA, and Barcarena offers excellent growth prospects as we keep converting industrial customers to LNG from the HFO and oil-based use they currently rely on, and as we build and own additional power in the region. The Santa Catarina terminal is an offshore terminal as well, with a 33-km pipeline, and it will be connected into the Bolivia-Brazil pipeline and the whole interstate pipeline system in Brazil. It is over 90% complete today, and we will be completed in Q4. For NFE, this marks the initial terminal tied into a major interstate pipeline system, and commercial service should begin during 2023. After that, as previously disclosed—and as Wes mentioned—we boosted the amounts and lengthened the duration of our broader partnership with CFE at the La Paz terminal, and today we hold a 10-year agreement there. Turning to power plants, I'll begin with Sergipe. As you're aware, we disposed of our 50% interest in the 1.5 GW Sergipe power plant, with an enterprise value of $1.3 billion for that 50%, leaving NFE with $550 million in net proceeds once asset-level debt was repaid. In my view, this illustrates well what NFE can do; we assumed control of this facility roughly 18 months back, while it was still being built. We completed the construction. We brought stability to the team and the operations; we've accumulated more than 7,000 run hours. At this point we've managed to link that power plant as well to Brazil's primary interstate gas pipeline system. We're divesting it as a highly productive asset to Eneva, a Brazilian public company and an excellent long-term holder of this asset. To show how the downstream infrastructure flywheel keeps spinning for NFE, we've also, during the same quarter, broken ground on our Barcarena power plant. That's 605 MW under a 25-year PPA, which stands out both for how long it runs and because the gas pass-through within that PPA is in fact indexed to JKM. It delivers two things we genuinely want, namely exposure to LNG indexes such as JKM and contracted duration over the long term. We've executed an EPC contract, fixed price, and schedule with Mitsubishi and Toyo, an investment-grade consortium, and we're eager to begin construction on that power plant this quarter. Regarding our LNG vessels, we're thrilled about our partnership with Gasunie. We've chartered the Golar Igloo FSRU for a five-year term; that FSRU is headed to Eemshaven, Netherlands in early September and will launch the first new regas terminal in Europe. This facility, together with the Gate LNG terminal, will double regas capacity in the Netherlands and let them effectively fight gas shortages arising from their pipeline supply from Europe. Very excited and we've had a wonderful experience collaborating with Gasunie. At NFE, I'd say we see ourselves as lean and fast-moving, but it's been excellent to partner with a company like Gasunie that's driven to move equally fast and bring a terminal online in truly record time. Really excited about that and excited to inaugurate the terminal in September. I'll get into this a bit more later, but we've also signed and announced our $2 billion enterprise value JV with Apollo; we'll hold 20% of that JV, while Apollo holds 80%. We'll place our 11 LNG vessels into the portfolio and charter those back over a very long term. Control stays with us, we unlock capital from the balance sheet, and we've got an excellent partner to keep expanding our shipping portfolio as time goes on. Chris, I'll say more on that shortly — over to you for now.

Chris Guinta

executive
#4

All right, thank you, Andrew, and good morning, everyone. If you’ll go with me to page 12, we’ll discuss Fast LNG. From our May earnings call up to now, we have kept achieving significant strides with our FLNG efforts. Across the following three slides, we’ll lay out those advances — sorry — regarding where FLNG can be located and deployed, plus the construction headway achieved through collaboration with our partners. Please turn to slide 13, where we’ll begin by covering how and where our FLNG assets will be placed into service. During the past four months, the number of possible deployment sites has grown from one to three, and we are now actively permitting more than 8 million tons per annum of capacity. For our Louisiana alternative, we filed permits for 2.8 MTPA on March 30th, 2022. Our outstanding permitting group communicates routinely and actively with MARAD as well as the Coast Guard administration, working alongside them each week to ensure they possess all information required concerning our Fast LNG project; on July 15th, we got 97 total comments through our first full information request and answered every one of those requests within only two weeks. A second site involves an exciting partnership with the CFE in Mexico. That site sits offshore Altamira and is able to host as many as three FLNG assets. To make the background clear, a pipeline already exists that carries U.S.-sourced natural gas molecules from Brownsville, Texas, down to Altamira, Mexico. That pipeline can move 2.6 Bcf per day, yet currently only about 20% is used by the CFE, which pays a fixed transportation cost for the capacity it does not utilize; that’s the thick blue line shown on the map here. Last month, NFE signed an agreement with the General Director of the CFE and with Mexican President López Obrador to agree to an economic partnership in which NFE will enter into a GSA with the CFE to source feed gas and move the molecules to our FLNG assets on a firm basis. Additionally, the Mexican government agrees to speed up the permitting process. Sorry. In return, NFE will compensate the CFE for their cost of transportation, and the CFE will receive 10%, 15%, and 20% for the first, second, and third assets, respectively, which brings Mexico LNG cargoes for use as they continue to transition to gas-fired power; for the CFE, this deal represents hundreds of millions of dollars annually between the savings on unused pipeline tariffs and profits from FLNG cargo sales. As for NFE, this gives us quick access to existing permitted infrastructure and once operational, will provide us with over 60 TBtu annually of LNG per asset that we can either market or sell through our downstream terminals. A third location we’re excited to announce is another partnership with a Mexican state-owned company, in this case, Pemex, to develop an integrated upstream and floating liquefaction project offshore. On the map, you can see Lakach situated close to Veracruz, about 70 km out into the sea. It was first found back in 2007 and holds roughly 1 TCF of proven reserves, yet Pemex halted work on it partway through development. A great deal of the engineering work and procurement is finished already, and under the agreement that will be handed over to NFE. NFE will take charge of finishing seven offshore wells, building out the field along with subsea infrastructure, and getting a processing rig installed. What we get in return is about 70% of the cash flows, generated mainly by selling gas — both to NFE's Fast LNG unit and onshore to Pemex. That gives Pemex the gas it needs brought to shore, and gives NFE roughly 70 TBtu per year that we're able to sell or market. There's more upside in Mexico too: two gas fields close to Lakach, holding another 2 TCF of gas reserves. This model and this partnership with Pemex have us really enthusiastic, and we believe it can be replicated in many places around the world. Turning to page 14, here's a brief update on how execution of our FLNG assets is going. Pardon me. Two weeks back I was in Corpus and personally witnessed the tremendous progress the team has achieved, and it makes me very excited that our work to optimize both the design and the construction process is paying off. For FLNG 1, engineering and material procurement stand at 100% complete, and the project overall is about 70% done. Despite constraints in the global supply chain, critical long lead items have arrived and will keep arriving at Kiewit's shipyard, which lets us hold our aggressive timeline with no delays at all. That covers the photos shown on the left side of this page — Baker Hughes' MR compressor, the Chart cold box air coolers, gen sets from Siemens, plus other gas treatment equipment. Pardon me. To head off any possible supply chain problems, we made a deliberate choice, pardon me, to go after long lead items for FLNG units two through five, since the design specifications are already known. Conversion and refurbishment of the jack-up rigs is almost finished, so they'll be set for module installation in November, and module fabrication is moving forward on time and on schedule. The first Fast LNG assets should wrap up in Q1, after which they'll sail away to start commissioning offshore. Briefly on page 15, as I said a moment ago, NFE has been building out the Fast LNG using a shared design and equipment, but with differing types of marine infrastructure, so we have situational flexibility to put these units into varying environments. As a reminder, from the marine infrastructure angle, we have three jack-up rigs forming our operational asset base for FLNG one. Fabrication has begun on jackets and decks along the U.S. Gulf Coast, and those will constitute FLNG two and three. At the start of this year, we acquired a pair of semi-submersible drilling rigs — the Sevan units — which right now are being demolished and refurbished, and they'll get their modules at the Sembcorp yard located in Singapore. Those assets are going to be used as FLNG four and five. Since the design and layout being used is identical, the modu — meaning the modules, together with procurement work done by our partners, means the schedule for building modules has shrunk to roughly 14 to 16 months. After the modules are finished, we can begin placement, install, hookup, and commissioning work on the units, and that whole process takes about four to six months; over in the table on the page's right side, you'll notice FLNGs one, two and three are each mostly fabricated at Kiewit's yard in Corpus, with two of those units coming online next year and the third starting up in 2024. Both FLNGs four and five will be finished in Singapore, and we expect them to be operational during 2024. One last thing on commissioning and operations — we've already got the staff in place and have kicked off that work too. Procedures, training, sequencing, and so forth, will guarantee that once these assets show up on-site, commissioning timelines get minimized and operational uptime gets maximized. Andrew?

Andrew Dete

executive
#5

Appreciate it, Chris. Really impressive movement. Page 17 is where we want to discuss how we're funding Fast LNG. Roughly 6 or 7 months back, we got together and, you know, reviewed the, you know, ambitious plans we have in FLNG, and we put forward what we believed a winning funding plan would look like. We understood there were likely 3 components to it. First, no fresh corporate financing, meaning no equity or debt issuance. Second, generating that capital ourselves by selling assets. Third, clearly setting out a schedule, a plan and a sequence that functions, so that when we brought assets online, we could take the cash flow from them and keep building out our program. I believe we can say with confidence that we, you know, are making headway. That's been accomplished. We've brought in more than $2 billion through asset sales. The major ones, notably, are the Sergipe power plant divestiture and the ships JV alongside Apollo; no financings are needed from us to support our Fast LNG program. This quarter we also boosted our letter of credit facility up to $250 million. That's really essential for us because it lets us put LCs against a lot of our, kind of, development and construction requirements and unlocks a lot of cash. Strong liquidity and truly, I think, you know, a win when it comes to our financing and funding strategy for FLNG. Page 18, I'd like to give a bit more detail on a few of our asset sales. These accomplish a couple of things for us beyond funding. They genuinely also streamline and sharpen our business model as, you know, we shift away from owning and running ships toward chartering in ships. You know, the Sergipe power plant is, kind of, a remarkable story for us, yet in the end one where we weren't the LNG supplier, so it turned non-core for us and was a fantastic opportunity to recycle balance sheet capital. Over on the left, our ships monetization brought in over $1.1 billion of proceeds. We keep long-term control over the shipping assets. We hold onto excellent upside through 20% ownership in the JV. Then, potentially, you know, most crucially, we have a terrific partner in Apollo for future growth; this is genuinely a platform we intend to grow as we require more ships for our operations; we truly believe Apollo is the right group to do that alongside. Now we anticipate this closing the week of August 15th, and plenty more good things to announce here. On the Sergipe front, you know, I think we've covered this one extensively, but truly a great result for us. This is a de-leveraging transaction where beyond receiving proceeds, we're also paying down a significant amount of debt sitting on our balance sheet. We're just genuinely pleased with how the last 18 months have gone in terms of, kind of, taking over that asset, steadying the operations and arriving at a great result. Wes, back to you.

Chris Guinta

executive
#6

Okay, I’ll move fairly fast through the financial results. Everyone please go to slide 20. During the quarter that closed on June 30, EBITDA came in at $283 million, and as Wes mentioned, that pushes us past $1 billion on a trailing 12-month view. Operating margin for the terminal segment was $238 million, with another $90 million contributed by the ship segment, and additional detail is available in the appendix and in the Q. SG&A stayed level versus the prior quarter, while we keep working on efficiencies involving third-party service providers and process automation, which should become visible near the end of the year. As also described in the Q and the press release, in the second quarter we recorded a one-time non-cash impairment charge tied to the CELSE and Savarre asset transactions; that write-down came to roughly $315 million. Once that non-recurring adjustment is removed, net income for the quarter was $146 million, and earnings per share came to $0.69. These quarterly results really lock in our run rate Adjusted EBITDA, which is above $1 billion and heading beyond 1.5 for 2023, even before factoring in FLNG cash flows, which, depending on pricing and timing, might add another $1 billion next year by themselves. On page 21, we wanted to compare what we told you at the IPO with where we stand today. At NFE, we are obsessive about capturing and measuring operational data, and the same applies to our financial results. This comparison reflects what we projected during the IPO roadshow in January of 2019 and shows how dramatically our business has evolved. If you went back to review the IPO materials, you would see that we have substantially beaten our expectations for fiscal year 2022. When we were at the IPO, we projected Adjusted EBITDA of about $500 million, and we will end up above $1 billion. EBITDA per share had been expected to be $3.30. Since the IPO, we issued new stock as part of the Golar transaction. With that included, we are still beating our EBITDA per share estimates by about 40%. Honestly, all of that looks quite small next to the cash flow generation we expect once our FLNG assets begin operating. We believe fully built out EBITDA figures might surpass $4 billion-$5 billion, or more than $24 a share.

Wes Edens

executive
#7

Okay, let me jump in briefly here. I believe that reviewing our past performance is extremely valuable. Around this company, we often say that if something matters, it should be tracked and quantified. Naturally, the forecasts we provided when we went public reflected our best estimates of what lay ahead, based on the contracts we held at that moment; our IPO happened in January of 2019. Back then, like Chris mentioned, we estimated around $500 million in EBITDA for 2022 — that's three and a half years out. Clearly, we're thrilled to have surpassed that by twofold. Measured on a per-share basis, it's up roughly 50%. The right side of this is also worth some thought. As we stand now, we recognize that creating our own LNG supply and directing it to buyers via the terminals we're building globally offers enormous potential for us. We aren't ready to give detailed projections about how much that would affect things, except to note that compared to the $1.5 billion guidance we'll provide next year, once the FLNG facilities are in place, once they're truly running, and once we're actually converting those volumes into EBITDA, we believe it might boost our outlook by two to three times. For context, at the IPO, shares were $14. Now, they're about $50. That's roughly 3.5 times higher than where we began three and a half years back. On the right side, as Chris noted, our midpoint estimate for the potential effect from the Fast FLNG volumes is significant, rising from $4.75 to $24; these are just projections for now. As deployment begins, as we keep advancing on building and rolling out these projects, and then eventually marketing those volumes through Andrew and his group, you'll see these become real figures. Chris.

Chris Guinta

executive
#8

All right. Thank you, Wes. To wrap up, I'll make a brief remark about NFE's financial condition here on slide 22. As Wes and Andrew both indicated, it's in excellent shape. Our financial objectives have seen substantial advancement, and in our view, we're in a solid position to receive an upgrade from the ratings agencies. Looking at the first box: growth in earnings paired with reliability plays a key role in building a documented record of our financial and operational results. Next, the remarkable work done by the deal teams on the asset sale transactions guarantees that our business has all the funding it needs — and honestly, it's transformative. With those transactions set to close over the course of this quarter, our balance sheet will have been simplified and more than $1.4 billion of asset level debt will have been eliminated; this deleveraging carries on below 2.0 x as FLNG assets come online. In box three, we've concentrated our efforts and delivered on stabilizing and making our cash flow predictable. Our weighted average customer term has been stretched out to 15 years, and we've kept growing ties with investment-grade counterparties such as Norsk Hydro and the CFE. As Andrew noted, and as we hinted at during our prior earnings call, we managed to complete the upgrade of our letter of credit facility — and our thanks go out to the partners involved in that credit process — for $250 million alongside a $100 million accordion. This fine-tunes working capital requirements at an exceptionally appealing cost. Wes.

Wes Edens

executive
#9

Alright. I'm going to kick off the hydrogen portion now, and then hand things over to Patrick Hughes so he can bring us up to speed on what's happening in Washington. Like I said before, for a truly decarbonized future to become a reality, hydrogen has to serve an extremely significant function. Consider, you know, the foundational elements of industrial output across the globe — steelmaking, cement production, plastics manufacturing, and ammonia for fertilizer — every one of those sectors adds enormously to economic stability and growth. Every one of those sectors consumes a considerable quantity of fossil fuels. Coal is used to make steel, natural gas goes into ammonia and cement, and clearly, the oil sector is enormously important when it comes to plastics. Whenever the subject of a decarbonized future comes up, electricity tends to get most of the attention, and that's wonderful, yet a full 2/3 of greenhouse gases being released originate from industrial operations that simply cannot be electrified; that's the crucial takeaway here; on that front, hydrogen is obviously going to be an enormous piece of the puzzle. Given the bill that Senators Manchin and Schumer announced and that Congress is weighing at this very moment, the United States is really positioned to be squarely in the crosshairs as the global frontrunner in clean hydrogen output — green hydrogen, blue hydrogen, and so on — thanks to these production credits and other measures. Once more, I'll pass things to Patrick shortly so he can discuss this. The timing was honestly just a coincidence, but for quite a while we've been discussing reaching FID on our inaugural project in Texas on the green hydrogen side. If you turn to page 25, every one of the key pieces for that project is now secured, and we expect to declare FID within the next 30 days. We've acquired the site. Permits are in hand; we've actually secured renewable power. We have water available as a feedstock for production. We have water to handle the capacity. We have a pipeline that's accessible for it; and finally, we've chosen Plug as our electrolyzer technology provider and our partner for producing this. We're expecting a 120 MW project. Once again, I'll let Patrick walk through the financings or the terms involved. We think this is the first among many such projects that will be constructed because of this bill, assuming it passes as we anticipate over roughly the next 30 days. With that, I'll hand it to Patrick to speak more specifically about the project as well as what activities we foresee taking place in Washington. Patrick?

Patrick Hughes

executive
#10

Okay, thank you, Wes. Let me begin by addressing the Washington developments. As Wes mentioned, last week we met with leaders in Washington, and that certainly included Senator Schumer and Manchin, who gave a significant and long-overdue endorsement of clean hydrogen as a crucial climate solution. In this legislation, known as the Inflation Reduction Act, there's a production tax credit under Section 45 of the federal tax code amounting to $3 per kilogram of clean hydrogen produced. I want to stress the word clean, because although it covers both green and blue hydrogen, we must remain very attentive to the life cycle emissions profile of what we produce. Fortunately, we've invested considerable time in Washington—Wes especially—and we've been expecting this legislation in exactly the form and with the specifics that have emerged. Over the past many months, we've been assembling the essential components of our projects that Wes just outlined; we expect voting on the bill to get underway soon. We believe a bill containing that $3 per kilogram credit is now very likely to pass. Broadly speaking, as Wes said earlier, this new tax incentive—and its scale and reach—we think dramatically changes the economics of hydrogen production in the U.S. and firmly positions our nation as the global leader in clean hydrogen production. Turning to the projects, as you heard, we announced a partnership with Plug Power this morning. We're very proud of that. They're a leader in PEM electrolysis technology, and they will supply a series of 12 so-called arrays for our 120-MW facility. Once operational, this should rank among the largest of its kind in North America. It's genuinely an industrial-scale facility that we see as a model likely to have a substantial influence on how this space develops going forward. We're proud to be at the very forefront of the sector, given how we've positioned ourselves and assembled all these elements, including our arrangement with Plug. We have much more to share on this front, including other participants in this project, some of the project economics, financing details, and our commercialization plans. I look forward to gathering again, probably with a similar group to those on today's earnings call, perhaps within a couple of weeks, to provide that additional information. Finally, on slide 26, just very briefly, we're also now underway on a blue hydrogen project in the Northeast. Naturally, this one differs a bit from what we're building in Texas, because the idea here is to take advantage of being close to stranded natural gas in the Marcellus, giving us plenty of inexpensive feedstock. Just as with our green hydrogen project, we're assembling the components right now, and we're setting that facility up to rank among the biggest of its type too. Once more, it's a somewhat different approach from the green hydrogen facility we're developing in Texas. There's a lot more to share on this front. And again, we're eager to provide some further details about the projects and about our hydrogen business as a whole very soon. Wes, over to you.

Wes Edens

executive
#11

As I've mentioned previously, in the hydrogen sector, what we set out to do was primarily build a project that made economic sense—one whose standalone financials stood on their own and were attractive for that specific endeavor. With the initial one we've just unveiled in Beaumont, we feel strongly that this is exactly what we've achieved. Second, we aim to offer clarity regarding every pertinent detail for investors. That's precisely what Patrick was referring to—not only the basic economics and per-unit figures for the facility, but also the commercial efforts, how it's financed, and what we anticipate that will mean in terms of returns on equity for us and our shareholders. Third, we intend to lay out a solid path to transform this from a single project into an entire company, meeting what we see as an enormous demand for hydrogen, done in an economically feasible way, so we can truly play a role in the climate transition that we believe it ought to and merits. Once all of that unfolds, as we've stated previously, we'll certainly take a close look at the idea of spinning off this operation from our other operations, giving it a distinct identity and appeal to investors, and allowing them to put money directly into this venture. Friends, investors, and others frequently ask me what I consider the optimal approach to putting money into the energy transition. Regarding our company's financial makeup, we think that linking natural gas and LNG production at the upstream stage with downstream operations on the other end forms the heart of our mission and our enterprise, and we're convinced we're adhering precisely to the plan we set forth 3.5 years back when we became a public company. When it comes to shifting toward a genuinely clean energy future, we think this segment—this company—might emerge as one of the genuine frontrunners in that shift. The US, thanks to the leadership of the congressional members supporting this, has, in our view, provided an exceptionally robust foundation for generating that potential and expansion; we're eager to engage with people, as Patrick mentioned, in far greater depth as this progresses.

Andrew Dete

executive
#12

Apologies. Let's move on to the Q&A portion now. Emma, please switch us over whenever you're ready.

Devin McDermott

analyst
#13

Morning. Appreciate you fielding my questions. To start, congratulations on the impressive strides made across every one of the initiatives this morning. That update was quite useful. My first question concerns Fast LNG. Specifically, I'd like to ask about the Louisiana permit process. You noted that you've refiled the permit, responding to some of the feedback received. Could you elaborate a bit on what was changed in that refiling, whether any design modifications accompanied it, and what that implies for the approval timeline?

Cameron MacDougall

executive
#14

Yeah, absolutely. Glad to. This is Cameron. I partner with Wes and assist in mapping out these efforts. The brief answer is, a highly productive round of initial questions plus standard further requests for information; we filed that back promptly on July 26th, and regulators are now reviewing it. A very encouraging first exchange.

Wes Edens

executive
#15

Regarding the initial batch of inquiries we received from the regulators, my recollection is that it amounted to 92 questions in total. Compared with what we've seen when obtaining permits for other projects, that actually represents a relatively gentle level of scrutiny. As I mentioned, we submitted an application running 8,000 pages, and Cameron, who serves as our general counsel, along with a sizable group of highly capable and seasoned colleagues, worked on it. What we turned in, in our view, was an extremely thorough application. When you look at the outcome in numerical terms — 92 comments — we consider that a pretty gentle level of scrutiny. As Cameron mentioned, we resubmitted that a couple of weeks ago. We fully anticipate continuing to achieve substantial forward movement. Nothing in the way of design alterations that mattered was either asked of us or made by us. It's similar to constructing a house — the very last thing you'd want is changes to the design. Those are what destroy timelines, those are what drive up expenses, and those are what create confusion for the people handling the permitting. With this unitary design, our aim was to sidestep every one of those problems. We devoted an enormous sum of money, along with considerable time and labor, toward developing a unitary design that we believe is sound, and ideally that is showing up in the headway we're achieving here, so.

Devin McDermott

analyst
#16

Understood. That's quite useful. For my follow-up, I want to ask about downstream terminals. You provided a really useful update on that front. According to what you said, further progress has been achieved, and you feel good about Ireland. My question is somewhat big-picture. Could you explain what makes you more confident about Ireland and how that process works? I'm aware you also mentioned South Africa on the map. An update on what's possible there would be excellent too.

Andrew Dete

executive
#17

Yes, of course. Appreciate it, Devin. In Ireland, there's simply a great deal of positive momentum when it comes to permitting. It's not really unlike the process we recently completed, except it's at a far later point. We've put in enormous effort on permitting in that country. Our conversations with the agency indicate that every question has been addressed and we're essentially at the finish line. A formal date is set for September when they will respond. All of that, combined with what we've seen in Ireland regarding the energy security picture, leads us to believe the project is well positioned to move ahead on or before that September date. That, I'd say, is the key point. Another item worth mentioning is that people sometimes overlook the fact that the permit application includes 600 MW of power as well. Beyond the gas-related energy security challenge, Ireland clearly faces a power shortage too. Much of the anticipated demand going forward, from data centers and other sources in Ireland, depends on additional power. Those two factors together give us growing confidence that the process will reach a successful outcome. Regarding South Africa, we highlighted it because development work is actively underway there. That's a nation we've identified for a very long time as possessing the core fundamentals we find highly appealing for LNG. Significant population growth, significant growth in power demand, and a country that today essentially relies on coal and oil-based fuels with virtually no gas penetration, though there is some LPG penetration. A development there is in progress. Among our developments, it's at the earliest phase, yet it resembles our other projects in being located in Richards Bay, an area with enormous industrial and power demand. We'd also intend to link it with our own power development. There will be more to share as things move forward, but I wanted to make it clear that as our downstream development work advances, South Africa is plainly on our radar as the next opportunity.

Devin McDermott

analyst
#18

Alright, I appreciate that. Thanks so much.

Ryan Levine

analyst
#19

Morning. Regarding the hydrogen venture you've got going, could you give us a bit of context on how this thing came about, and what does the IRA realistically mean for that specific project?

Wes Edens

executive
#20

Sure. As far as how it originated — about 2.5 years back, we saw hydrogen as the genuine clean transition fuel, and from there we kicked off a real effort to look at technologies, electrolyzer makers, and projects across the globe. What came out of all that work is the deal we announced with Plug yesterday, and that's the technology we chose for this initial project. On top of that, if you look at page 25, you'll see several other pieces of the development that needed to be resolved before it could become a genuinely FID-able, executable deal. The location we chose sits within the Port of Beaumont's jurisdiction. It's close to a site owned by our infrastructure fund. Our experience in that sector runs deep. This spot is perfect, in terms of both water access and being able to connect to a hydrogen pipeline. Along the Gulf Coast, there are petrochemical and downstream users who can plug into it directly. We needed to settle on an electrolyzer technology. The way this gets financed looks a lot like what we've structured for other infrastructure projects in that region. Our view is that we can secure financing that's affordable and highly actionable. When you stack it up, it carries all the key qualities we'd want for something to work economically. The final big item that still matters is the production credit itself, which shifts the economics away from a deal that's only modestly profitable to one we now view as compelling — and one that could serve as a model for many more like it. As Patrick mentioned, I believe, this stands to be the biggest green hydrogen project built anywhere in the United States. Even so, it represents just a tiny sliver of what's required. Whether we're talking green hydrogen or blue hydrogen projects, I see this bill as the start of a fresh industrial era for hydrogen here in America. I realize that comes across as a bold claim, but that's genuinely how I feel. Nothing ever gets done unless you take that first step. Having a single project that works economically, that's shovel-ready, financeable, and set to go — that's what gives us plenty of confidence we're on the right track. To build on that, when it comes to the financial upside the IRA delivers for this specific project, can you quantify the impact at all, and then also, regarding the alternative minimum tax provision in this proposed legislation, what would the effect be on New Fortress, and do you see any route to mitigating an alternative minimum tax restriction or implication? It's a $3 production credit. So the single figure to remember from the bill is $3. At $3 per kilogram, this goes — once again — from being modestly profitable to delivering very attractive returns, both on an unleveraged basis and on equity. Production credits of $3 are what the bill contains as it stands. That's what Patrick and our team in Washington figure will probably become law. Now it's just a matter of watching Congress do its thing through August and hoping it gets signed into law as currently drafted. That's the thing to watch next. As I mentioned, with this production credit, I believe it pushes the U.S. to the forefront as a green hydrogen production hub where everybody wants to operate. This first one we're doing — we think it sets a great example for others to follow and study, and we expect it's only the first of many. On the alternative minimum tax, do you expect that to hit New Fortress Energy? I don't. Alright, thanks. I don't. Not one bit. Thank you.

Craig Shere

analyst
#21

Good morning. These are exciting times. I have a couple of questions. Could you share more of your thinking about what vertical integration delivers over the long haul, given your upstream merchant plans along with your downstream assets? As an illustration, I have in mind the Barcarena plans, which sit under a 25-year JKM-linked PPA, plus any other opportunities connected to that. Then, turning to the near term, I wanted to ask whether anything has shifted since last quarter regarding how much of your pre-energy crisis contracted LNG supply has been redirected away from the downstream.

Wes Edens

executive
#22

Hi there. Absolutely, Craig. Appreciate it. I'll kick things off. Yeah, I believe you've zeroed in on the Barcarena PPA correctly. It's extremely appealing to us because it offers that really distinctive blend of a 25-year term along with pricing tied to JKM. That's a fantastic contract for us. Regarding what you brought up about vertical integration, that's a solid illustration, since it's wonderful that we're able to supply from a third-party arrangement where we purchase LNG; it's equally wonderful that we can supply from our FLNG facility in the Gulf Coast. The commencement date for that PPA is mid-2025. In fact, shipping from the Gulf Coast over to Barcarena works out quite favorably. I believe that serves as a nice illustration of the sort of potential vertical integration, plus the adaptability we possess within the portfolio. It demonstrates well what we're aiming to create: lengthy terms at favorable pricing. Yeah. The matter of — this might not be what you're actually asking, but a connected matter regarding vertical integration is that this quarter is a highly significant one for us involving the Pemex partnership, because this marks the first occasion we've truly secured molecules underground; we aren't assuming ownership of them, mind you. Essentially, we're going to finish the wells and deliver them to shore, partly to our liquefier, alongside Pemex. In practice, we're genuinely receiving the advantage of the molecules just as though we held title to them. That represents an extremely, extremely sensible progression for us at present. Fundamentally, we launched our company by moving downstream toward customers, and have progressively across the past, well, several years, pushed ourselves backward more and more toward the upstream side of things. You've got downstream terminals, you've got logistics, you've got the shipping, you've got liquefiers, and now with this Pemex deal, this is the initial one of what we believe could be numerous significant deals over the long haul for us, enabling us to pursue acquiring our very own molecules. To genuinely finish off that integration. Since, as I remind our team constantly around here, the industry we operate in involves purchasing gas within our portfolio. We hold an extremely large portfolio, one that's expanding thanks to the added FLNG volumes. We subsequently sign contracts to sell those molecules, whether as power or gas, over an extremely lengthy span, an extremely long duration on the far side. We handle all the logistics plus all the shipping and every bit in between, and we retain whatever remains. In that regard, we're highly vertically integrated at present, and this Pemex deal represents a significant move toward the sensible endpoint of truly securing your own molecules to finish off that cycle. It's simply a spread business. It's a spread business featuring extremely, extremely long duration. We believe that's the most appealing profile across the whole investment universe. That is the enterprise we've built in this space, and we're going to keep going after it. Appreciate the question.

Craig Shere

analyst
#23

Appreciate it. For any additional LNG that's already under contract and getting rerouted away from your own downstream operations, will the term be shorter this year?

Wes Edens

executive
#24

Take a look at our portfolio — specifically those two slides I went past earlier. If you compare how much gas Europe requires against what's actually being supplied today, and look at storage usage sitting at just under 70% against the 90% required for this year, that's Europe alone. Obviously, that situation combined with everything happening elsewhere globally means the world faces a severe natural gas shortage, and in my view it will remain short for a number of years as everyone now shifts, you know, quite rapidly toward both building out more supply and seeking out other energy sources. Not much marketable supply exists in the market at present. We feel fortunate to hold the portfolio we do. We feel fortunate that it largely aligns with what our customers need. We're really just, like, operating within whatever boundaries the market permits us at this moment. One added upside from that clearly will be, you know, once those FLNG volumes come online, you know, at some point next year and on through 2024; we'll gain incremental, you know, supply we can work with then. At present, we're in a very solid spot of being long on what we're long on. We have customers we supply. Our customers haven't experienced disruptions, which is excellent; we don't expect any disruptions. That's the reason the emphasis on FLNG will let us subsequently expand that portfolio and thereby generate incremental supply for all those downstream terminals.

Craig Shere

analyst
#25

Thanks.

Wes Edens

executive
#26

All right, thank you everybody. So, just to run through it — clearly, this was quite a quarter. Starting with earnings, that's item one. Item two, the headway we've made on terminals — and that shouldn't be understated — the big terminals in Brazil, the potential big one in Ireland, South Africa; we believe all of those have advanced enormously, and we're feeling terrific about that. Item three, on the FLNG side, building keeps going right on schedule. We aren't seeing any genuine supply shocks. In fact, all of it is unfolding exactly as we anticipated. When it comes to where we can deploy those initial units, we've moved from a single option to 3, and that's a significant gain when it comes to securing permits and finding locations to site it. The Louisiana site, where we've made strong headway, plus now Altamira and also the Lakach field; that gives us 3 distinct locations altogether to site it where gas can be accessed. Clearly, 3 beats 1 by a lot. That gives us considerable reassurance that we truly will be able to deploy these units the moment they're finished and built. Finally, and definitely not least, we've genuinely crossed off the goal of funding our own operations, without having to return to shareholders or the market to raise more capital. However you measure it, we believe this was a fantastic quarter and, well, the outlook for the remainder of the year appears promising. Many thanks. I look forward to talking with you next quarter. Thank you.

Operator

operator
#27

Ladies and gentlemen, we'll conclude today's conference. You may now all disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete New Fortress Energy Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to New Fortress Energy Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in New Fortress Energy Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.