executiveI appreciate that, Jim, and good morning to all of you. I'm grateful you could be part of today's conference call, where our focus will be on the results we posted for the first quarter of 2023, along with recent developments at NFE, operational highlights, and the exceptionally promising outlook that lies ahead for our company. As Jim mentioned, a recording of this call is being made and can be accessed via replay in the Investors portion of our website, listed under the subheading Events and Presentations. Furthermore, at that very same spot on our site, there's a press release covering our first quarter 2023 results, plus the matching presentation we intend to go through during today's call. As we move forward with the discussion alongside Wes and the team, we will be referencing that presentation. Within that same presentation, you will additionally find a set of significant disclosures concerning forward-looking statements and non-GAAP financial measures; we urge participants to examine these important disclosures, together with the description of risk factors included in our SEC filings. So now let's begin the call. I'm Patrick Hughes, and with me today here at New Fortress Energy are Wes Edens, our Chairman and Chief Executive Officer; Chris Guinta, our Chief Financial Officer; and Andrew Dete along with other members of our senior leadership team. Wes, the floor is yours.
Wesley Edens
executiveOkay, thank you, Patrick, and hello everybody. There's quite a bit of positive news to cover today. As always, we'll begin with the deck. Please turn to Page #3, where we'll examine the financials from left to right — an excellent quarter and an excellent beginning to the year. Segment revenue came in at $601 million for the quarter, adjusted EBITDA was $440 million, and free cash flow reached $185 million. Moving toward the right side of that page, you'll see our full-year guidance, which we are reaffirming: segment revenues of $3.5 billion, adjusted EBITDA of $2 billion, net income of $1.2 billion as GAAP income, and projected free cash flow of $1.4 billion. Those represent meaningful gains over last year, and last year itself was a meaningful gain over the prior year. In the box on the right-hand side, we've basically included a few metrics that we track; so segment revenues, the $3.5 billion in 2023 against $2.6 billion in 2022, work out to roughly $16.50 per share in revenues. Our adjusted EBITDA target of $2.0 billion would come to approximately $10 per share, with free cash flow of $6.50. I'll get into this a bit more shortly. But the free cash flow margin, something I follow very closely, is projected at 37% for the year. Put simply, converting our revenues into free cash flow at a 37% rate is a remarkable ratio, and it speaks to the strength and wellness of the business. With that said, let's move to Page #4. What I'm attempting to do here is just lay out how I personally view the earnings, and how we in fact try to measure our own progress on our scorecard. We're making every effort to get the financial statements to align with this straightforward presentation. GAAP financials are ultimately how you level the playing field. So the GAAP numbers are, naturally, included; but we've put substantial effort in this quarter, and I believe you'll see it next quarter too, toward making this as clean and simple as the business truly is. And to go from top to bottom, the math of the business is — the terminals business, the gas and power we sell, our terminal operating margin, plus cargo sales since we do sell cargoes that are free volumes available for us to sell. We earn money on our ships; we have a ships portfolio that's financed, and there's some complexity in how that's accounted for, but the plain numbers show up in the financials minus the core SG&A, which gets you to adjusted EBITDA. Then, naturally, deducting interest and taxes and depreciation takes you down to GAAP net income. Adding back depreciation and amortization gets you to free cash flow. So I'm oversimplifying for the sake of example. Naturally, GAAP contains many subtleties that matter greatly for how we record things, yet this is the lens through which the business can be tracked. Over on the right side, a few guidelines that clearly emerge from the financial statements are these. Given an adjusted EBITDA target, the portion converted from revenue lands at roughly 50% to 60%, which means an extremely strong conversion of revenues into adjusted EBITDA. From there, naturally, a substantial share of that becomes free cash flow. That's how we look at the business, and that's the path we'll take as we work through the financials. So, moving on, let's turn to Page #6. Continued growth of the terminals business is what underpins this earnings growth. Organic growth has been significant, matching what we anticipated. Essentially, the business model involves going out and building terminals and operations in nations where we believe there's demand for energy, power, and clean energy, which is our line of work. Once a beachhead exists, the idea is to gradually scale those operations over time, expanding operations, volumes, and ultimately cash flows, and what you're witnessing right now in this first quarter, and subsequently across this year and beyond, is the effect of those efforts. We'll cover an example shortly in Puerto Rico that Brannen will take you through, but the figures are substantial. Over the past couple of years, upheaval in energy prices, driven mostly by the Russian invasion, has left customers paralyzed in numerous ways. TTF moved from reasonable prices to extraordinarily, extraordinarily elevated ones; and those prices truly could not be related to or used by people when making fresh energy commitments; so when you examine our volumes across that stretch, they stayed fairly flat. Energy prices have settled into what we regard as a new normal, one that's quite healthy for everybody, above where they previously stood, below where alternatives sit. Consequently, you've witnessed notable rises in customer activity and inquiries, along with notable rises in customer activity regarding what we've pushed through the terminals; we've done some highly effective hedging in cargo sales across the past couple of years; that has boosted our earnings somewhat, though we'll separate out for you how our terminals business performed versus some of our cargo activity. There's nothing incorrect about earning money the old-fashioned way, buying low and selling high. Yet the durability, the duration, and the quality of earnings generated by the terminals business is what draws most of our attention. If you turn to the next page, I'll go through those figures, and then hand things over to Brannen shortly. What this does is essentially review the historical results from 2021 and '22, along with the guidance for 2023 and what we estimate for 2024. Following the top line, you can observe our yearly estimates for the terminals P&L, and it has clearly shifted enormously. Terminals came in at $236 million during 2021, then $221 million during 2022. As I mentioned, elevated energy prices truly froze people at that moment. That situation has reversed dramatically. Our guidance right now for this year sits at $1.3 billion. That's an increase of more than $1 billion versus last year. Cargo sales have stayed fairly level across that stretch. Ships are also fairly level, slightly lower, a small decline. Core SG&A is about unchanged. Adjusted EBITDA goes from $605 million in 2021 to $1.071 billion in 2022. For 2023 our guidance is $2 billion. Clearly a huge jump versus last year, and last year was itself a large jump versus the prior year. Net income, dropping further down, was $97 million in 2021, $194 million in 2022, and $1.2 billion in 2023. Beyond the fact that there's far more economic activity, there's also plenty of noise stemming from past transactions, the noncontrol transactions, Heelys and the Brazil items, and so on — a variety of things that have essentially been cleaned out of it. During this quarter, some noise remains. Starting now, though, we anticipate that you'll see numbers that are highly normalized. Then free cash flow, which is of course the truest gauge of how healthy the business is. So $195 million in 2021, $337 million in 2022, and $1.4 billion is what we estimate for 2023. For 2024, these aren't official guidance figures, but I wanted to show what we're seeing in the business right now. The straightforward effect is that in the terminals business, where we see the business heading structurally, we expect that to carry on through this year and the next, particularly given the additional LNG volumes Chris will discuss, which come online later this year and next year; we believe there's a substantial amount of opportunity for us to expand our business on a core basis. So once more, not just the overall volume of earnings and cash flows rising, but the quality and the durability of those cash flows improving too. Nowhere has our business been affected more over the past 12 months; yet in Puerto Rico, there's been meaningful progress, all of it favorable. With that said, let me go through the example and then pass it to Brannen.
Brannen McElmurray
executiveThanks, Wes. That means a lot to me. Let me turn to Page 8. As Wes said, the Puerto Rico terminal is a great illustration of the value baked into our terminal assets — and of how we're positioned to meet what customers need. So, as you remember, we launched that terminal in 2020, aiming to deliver essential energy infrastructure to Puerto Rico and to help speed up the island's own energy transition goals. These days, the terminal supplies fuel to customers on the island across the power, industrial, commercial, and transportation sectors. When you look at what the infrastructure gives us, there's regas capacity, there are truck loading bays — those are what allow LNG to be delivered throughout the island to many kinds of customers, whether they're connected to the grid or not — plus, of course, an LNG supply chain that's both robust and able to grow, enabling us to move large volumes into the terminal. Taken together, this puts the terminal in an exceptionally advantageous spot with expansion potential already built in, so we're able to meet whatever customers need, at any time and in any form those needs arise. Let me turn now to Page 9. Here's what all of this has made possible: a request for extra supplemental power went out from Puerto Rico's government earlier in the year. And just to give you a feel for what's happening on the island, the energy system there runs about 750 megawatts short of power, which translates into a situation that makes the grid very unstable, leaving them roughly 55% more likely to experience an outage than, say, you or I would in the Mainland U.S. And economically speaking, each outage costs Puerto Rico $14 million in economic activity; so across the year, that's expected to produce about $700 million in lost economic activity. Obviously, this matters a great deal. On top of that, their exposure to catastrophes such as earthquakes and hurricanes makes things even worse, and we've seen plenty of instances of that within the past two years. In response, the government stepped forward and stated that more capacity is required to help steady things, particularly with hurricane season roughly 45 days away. That electricity would do two things: it would keep the grid stable, and it would fill in while upkeep is performed on the units they already have, which run about 30 to 35 years old on average. More than anything else, it guarantees we keep a sufficient cushion of spare capacity. That way, when units drop offline without warning, the operator can still deliver steady, dependable electricity to an economy where industry accounts for half of all output. Turning now to Page 10. To illustrate our progress: the request for power was issued at the start of this year. Come March 3, we executed our initial agreement covering 150 megawatts, drawing on a plant the utility already ran at Palo Seco. We added extra generation on top of the capacity already in place there. I'm pleased to report that we first fired up the generators yesterday evening, counting from the moment the contract was signed — that's about 60 days in. Then, roughly 45 days later, on April 19, we closed an additional deal for 200 megawatts at the San Juan terminal, a location where 200 megawatts of infrastructure is already established. That brings the combined figure to 350. We expect to energize that added power near June 10, and come June 15, full operations should be reached at both locations. Past that point, our view is that this specific approach has room to grow, going from 350 megawatts all the way to 600 megawatts, which would add further backing to the government's efforts around increasing the capacity that's available. On top of that, we believe this same approach could be replicated in other parts of the world facing an identical challenge, since they too struggle to navigate the energy transition. With that said, I think it's time for me to pass things along to Chris.
Chris Guinta
executiveOkay, thank you, Brannen. Morning, everyone. If you could all turn to Slide #12, I'll walk you through where things stand with our Fast LNG initiatives. Right from the start, our view has been that having the business fully integrated is the optimal route to unlocking the greatest value—both for those who hold our shares and for the buyers we serve. Fast LNG strengthens what we do in 3 essential respects: first, it gives us access to LNG supply in a marketplace that is competitive, and that is tight both physically and when it comes to credit. Second, it will give us more command over our LNG supply portfolio, which delivers useful flexibility for our logistics chain. And third, Fast LNG lets us capture incremental economics when we sell into our downstream assets or out into the global market. As the slide states, the real IP here, in our view, is the modules. We're able to deploy them on rigs, on ships or on land. Because we carry out the construction in a shipyard, with access to top quality craftsman and in a controlled environment, we can build them faster and cheaper than greenfield projects, which takes as much as twice as long. Now to Slide #13. Our first Fast LNG project is close to being finished. Right now, we're carrying out the final phases of our construction program while getting ready for offshore operations. The modules are done, they've been lifted and set on the rigs, and they're presently undergoing integration and testing. The pipelay and mooring anchor installation is finished and waiting for the rigs to show up on site. Our team anticipates the rigs will sail from Ingleside sometime in the next 30 to 60 days, with gas to be introduced into the system in the month of July. Last of all, we expect to announce COD in August. Our full commissioning team is on location in Ingleside as we speak, working to finish as much commissioning in the yard as they can so that the gap between first gas and COD gets shortened. And lastly, when it comes to operations, the full installation team is right now working from the rigs and going through simulator training, control room, competency drills and getting familiar with the asset. On to Slide 14, and let's just briefly cover modules. We've placed orders for all the critical long-lead procurement items, and construction is underway, obviously, on modules for FLNG 2 and 3. Both units should be done by Q2 2024; now, one new thing we're excited to share is that we've signed a letter of intent with the CFE to install them on land. Earlier versions of our FLNG had contemplated putting these modules on fixed jacket platforms offshore, but this new partnership would let us deploy the modules quicker and run them much more efficiently. Let's go to Slide 15, and I can give a bit more color. We're very excited about the onshore Altamira project for reasons similar to the one offshore. Our modular liquefaction design allows us and the CFE to operationalize an underutilized asset. For the last 5 years, that large onshore import facility has basically been doing nothing, yet the infrastructure still holds great worth when combined with an appropriate technical approach; thus, in a manner similar to what happened with Sabine Pass 10 years ago, NFE and CFE are going to transform the Altamira LNG import terminal into an LNG export terminal capable of 2.8 million tons. Today's terminal is a world-class asset possessing every key element a liquefier requires, among them two 150,000 cubic meter tanks that remain chilled, connections to gas networks plus power supply, and outstanding marine infrastructure. After visiting the site ourselves, I can share that personally, this is a remarkably impressive and well-kept facility. For the new export terminal, we made use of 2 of NFE's modular 1.4 MTPA trains along with all existing infrastructure at the terminal. Because of our considerable procurement and construction headway, together with the strategic alliance involving the CFE, NFE gains an enormous timing edge compared with beginning development from scratch right now. Construction, installation and operation of both trains will occur during 2024, well ahead of any other newly built liquefier; having said that, I'll hand things over to Andrew.
Andrew Dete
executiveAppreciate that, Chris. Morning, everybody. There are three things I'd like to cover today. First comes a brief update on the macro picture for gas markets worldwide. Second, we'll narrow the lens and connect that to our own operations and the conditions we're observing across our main regions; and third, we'll walk through how we see both the present year and 2024 for our LNG supply portfolio along with the volumes we've contracted to sell downstream. Moving now to Page 17. What stands out is a notable widening gap pitting U.S. domestic gas against international LNG. Up top, we've charted TTF, the European Gas Index, alongside Henry Hub, the U.S. Gas Index, across the past 12 months. Both have fallen very steeply. In Europe, easing supply worries following last winter pushed prices down considerably and cut volatility a great deal too. Wes touched on this — our view is that it amounts to a fresh normal, and a highly favorable one for us, with prices now sitting at a level where buyers feel comfortable transacting and discussing long-term agreements. We do believe upside risk lingers, given that Russian gas is still unavailable as a supply source for Europe. Heading into the coming winter, today's forward curve sits near $12, and we already see a curve reaching roughly $18 or $19 by December. So the market clearly has some of that risk baked in; even so, we're left with an undersupplied and fairly nervous backdrop at these price levels. Henry Hub has seen steep drops as well — in fact, even steeper ones. At this point last year, the figure stood at $8. Now it's in the low $2 per MMBtu. That projection stays level across the next couple of years, since you've got enormous U.S. gas output, mostly from associated gas in the Permian and elsewhere in the U.S., yet no significant export capacity actually starting up before 2026 and afterward. The upshot is that the Henry Hub to TTF spread, shown at the bottom of this page, stays very favorable for our business, which essentially takes U.S. gas and ships it to our growth markets. So as you can see, today that spread comes to roughly $10 per MMBtu. It grows to around $15 per MMBtu separating Henry Hub and TTF by the close of 2023 and holds roughly steady through 2024. To give a sense of scale, when it comes to the economics of 1 FLNG unit that Chris just walked everyone through, our payback period under this forward curve comes in at well under 3 years. Let me turn to 18 and relate that somewhat to our business; what we've attempted to show here is an illustrative portfolio cost for NFE at the bottom of the page. Then, mid-page, you have the global energy indices for gas and diesel, which is generally what we're competing against in our core geographies. To start off, near the top of the page, we've attempted to provide particular pricing figures reflecting Q1 averages for the areas where we conduct operations: Mexico at the La Paz terminal, along with Jamaica and Puerto Rico. What's evident from this is that the chance to speed up expansion at our downstream terminals has seldom looked stronger. We possess both the infrastructure and the supply needed essentially to link the bottom portion of this chart to its middle section—meaning we hold control over our own LNG supply—and afterward to link that middle portion to the top by possessing terminals plus downstream and midstream infrastructure capable of actually reaching end customers. Thus we stretch from a supply scenario of roughly $5 to $7 per MMBtu all the way into the low 20s per MMBtu. So let's attempt to convey a feeling for the total margin possibility, and then genuinely for how integration's strength into these downstream markets lets us serve customers instead of merely selling into those short-term global energy indices sitting at the page's center. I'll move on to Page 19. What we have here concerns growth. The figures on the left-hand side form a bit of an eye chart. My apologies for that, though I believe walking through it truly matters. During 2023, the LNG we supply in total will reach 152 TBtus, representing a rise of 75% over the 88 TBtus recorded in 2022. You're able to observe what our current supply contracts contribute, plus what comes from FLNG 1 coming online during this year; we hold contracted sales—meaning contracted as of now—amounting to 122 TBtus for 2023. That represents roughly 80% of the volumes. Meanwhile we have roughly 30 TBtus sitting as open volumes, an excellent base for conducting additional customer business across 2023 and afterward; during '24, we will experience ongoing growth. So 150 TBtus—actually we've got 217 TBtus; that marks a 150% increase versus 2022. Included in that are 82 TBtus coming from FLNG 1, followed by 2 and 3 per the timeline Chris presented before, which come online during 2024; we hold 180 TBtus of contracted sales for 2024. That results from bringing online the Barcarena terminal, the Santa Catarina terminal and the Nicaragua terminal during 2024—projects that are approaching construction's finish or have finished construction and essentially are just wrapping up what sits directly ahead of us regarding 2024. After that we're looking at 7 TBtus of open volumes plus 30 TBtus of contracts currently under discussion to sell out the full 217 TBtus. Past that point, the 82 we're displaying from FLNG 1, 2 and 3 during 2024 represents a partial-year figure; in '25, we'd anticipate that reaching close to 195 TBtus yearly once those assets are fully at run rate. Another thing I'd highlight is our organic growth during '23. So, an attempt was made to demonstrate this, yet essentially we've seen a rise of 34 TBtus—roughly 40% higher compared to a year ago when it comes to organic expansion across our terminals. Having said that, I'll hand things back over to Wes.
Wesley Edens
executiveOkay, two more points before I hand it over to Chris to go through the financials. First, if you examine how our earnings are put together and how revenue turns into EBITDA and into free cash flow, those figures really stand out to me. We've spent a lot of time on this, trying to figure out what lets an industrial company like ours — one with heavy capital needs — produce free cash flow conversion of 30%, 35%, 40%. Across industrial companies generally, those rates are far, far smaller; and from where we sit, the clear explanation is the integration. Within our business, there are truly 4 separate sets of activities, and for each one you can find public and private market comparables — companies carrying out those activities well. Naturally, though, any company focused on just one piece of the business has its own profit model. So you've got liquefaction, you've got shipping, you've got terminals and terminal managers, and then, naturally, power providers. Free cash flow conversion in those areas generally runs, roughly, between 10% and 20%; so a 20% free cash flow outcome for any one of these industrial complexes would be a solid result. From our perspective, naturally, we don't see any one of those activities as having a process motive on its own. Instead, it's the combination of them all that we consider our business to be. And that, in a very simple way, I believe, explains why we can turn what are otherwise industrial operations with 10% to 20% free cash flow conversion into 30%, 35%, 40%; and I believe you'll observe this forenote as time goes on. We've done some internal work on this that we'll likely present during our next quarterly call to walk through it. But that genuinely is the backdrop here. There's one more incremental business update I want to give, and it concerns our hydrogen business. Last night the Board authorized the filing with the SEC for our company Zero Parks; and we expect to file that last night or this morning, I believe. Essentially, the filing is a separate registration statement for that entity as an enterprise, which will let us dividend that company out to shareholders sometime this summer. Registration is a fairly straightforward process. You file documents with the SEC describing the business, describing its accounting, giving a full picture of the company. They then comment on it. There's a back-and-forth period that — depending on how busy they are and how complex the businesses are — can run from 60 to 90 to 120 days. Anyway, we anticipate that at some point during this summer, an effective registration statement will be in place, and because of that, we'll be able to dividend this company out to shareholders. Put simply, my expectation is that a holder of NFE shares would receive this portion of the stock. I believe this is a significant development for that business. My optimism regarding the effect of green hydrogen, green ammonia, steel, cement, and their impacts has never been greater. What we've done is locate plants geographically right beside the people who use them. So, as I mentioned earlier, once you begin with an electrolyzer and green hydrogen, you're starting with a chemistry challenge of splitting the molecule apart and extracting the hydrogen, and that soon becomes a transportation challenge, since moving it has proven difficult. From where we sit, the most sensible method and strategy is essentially to site ourselves geographically adjacent to major consumers of ammonia, steel, cement, and so on; and as a matter of fact, the initial facility we are constructing sits in Beaumont, Texas, right in the middle of all that activity. Ammonia plants are everywhere there. Large petrochemical consumers are there. Refineries are there. There are plenty of consumers for it; so the bottom line is that once the registration process wraps up, we'll have plenty to say regarding this. The statements have been filed confidentially, so no information is currently available publicly about the company. Once information does become public, we'll clearly — we'll devote substantial time and effort to bringing you up to date on this. But my sense is that green hydrogen's impact on the world is probably going to be considerable. We believe it's among the primary methods for decarbonizing certain industrial activities. And we plan to play a major role in that; and I simply wanted to share this with you, and we look forward to speaking with you, we have more to tell you about it. Chris?
Chris Guinta
executiveAlright, moving on to Slide 21, where we'll look at the financials from Q1. During the 3 months that concluded on March 31, revenue came in at $601 million, with adjusted EBITDA of $440 million. That adjusted EBITDA figure represents our best-ever quarter. Operating margin from the terminal segment reached $405 million, while the ship segment contributed $76 million. As you'd expect, the appendix and press release lay all of this out. Adjusted net income for the quarter totaled $187 million, equal to $0.90 per share once you exclude impairment charges. Total volumes sold this quarter were 25 TBtus, translating to an average EBITDA margin slightly above $17 per MMBtu. One more thing worth noting about Q1: we completed the Hilli transaction. To recap, we returned our 50% stake to Golar, receiving $100 million in cash plus 4.1 million shares — since retired — along with elimination of $325 million in off-balance sheet debt. Now flipping to Slide 22. This one's quite useful and speaks to questions we've fielded previously, showing that no outside financing is needed for us to carry out our near-term growth plans. We'd like to highlight that in the past, the company has financed its expansion by opting to divest noncore assets, arranging tailored asset-backed financings, and relying on cash flows generated internally; those very same sources will keep funding everything we're developing, including — every one of our development goals, FLNG included. On this page, we've laid out inflows alongside expenditures to show we've got plenty of liquidity across the coming 2 years. The 2023 figures combine Q1 actuals with what we expect for the rest of the year. To give a bit more granularity around CapEx, we've separated it by terminals — capturing both growth and maintenance CapEx, plus any CapEx tied to ships. Where FLNG is concerned, this reflects the total remaining spend for FLNG 1 through 3 and factors in costs already incurred for units 4 and 5. Lastly, as this page makes clear, no further dividends are being projected beyond the $0.10 a share we currently pay each quarter. Our thinking is that plowing cash flows back into development projects is accretive and represents the optimal path to keep growing earnings. Please turn to Slide 23; as everyone's aware, during 2022 we completed the Sergipe sale along with the Energos transactions; then in 2023, we sold our 50% Hilli interest back to Golar. Like Wes mentioned, these deals brought down our total debt and made the capital structure far simpler; over on the left, you can see the present balance sheet amounts to essentially three components: first, the corporate revolver at $742 million. Second, 2 tranches of bonds totaling $2.75 billion; and third, 2 to discrete asset-level financings adding up to more than — over $400 million. If you total it up, that's $4 billion in borrowings set against $2 billion of earnings, which works out to 2 turns of leverage. During the last 2 weeks, we went out and sat down with the rating agencies, asking them to kick off a formal review as we look to keep moving along our upgrade path. Like we've said on earlier calls, the long-term aim is to reach investment grade someday, though the initial move is to lift our notching inside the BB category. Toward that aim, the agencies laid out what an upgrade would require, such as predictability in earnings along with the duration of cash flows, keeping leverage modest, contracts with counterparties that are diverse and high quality, and a capital plan that's fully funded. And honestly, to say it plainly, that's precisely what we've accomplished. First, we have earnings visibility above $2 billion in adjusted EBITDA for this year, rising to roughly $2.3 billion in 2024. Second, on an LTM basis our leverage ratios sit below 3 turns, and below 2 for fiscal year 2023. Third, we figure more than 80% of our 2023 sales go to investment-grade counterparties. And fourth, as I noted, we're able to self-fund every one of our development activities. Turning to Slide 24, we've put together some fast credit metrics that have shifted over time and back up our argument for an upgrade. As you can see, we started at negative EBITDA when we received our first rating and have reached more than $2 billion this year, which has sharply reduced leverage. Combining higher EBITDA with the debt retirements tied to the asset sales brings us under 2 turns. And finally, our operating assets have grown from 3 to 20, and we now run operations in 11 different countries. Last, on Slide 25, this is a slide you've seen every quarter, yet it keeps demonstrating our operating prowess. With more than 700 employees working tirelessly so our customers have uninterrupted gas and power supplies, we delivered about 25 TBtu and kept reliability near perfect. Last and certainly not least, thanks to our collective focus worldwide, we experienced no safety incidents in Q1 and kept our 0.0 total recordable incident rate; with that, I'll hand the call back to Patrick.
Patrick Hughes
executiveAppreciate that, Chris. Jim, I believe we can move on to Q&A now — would you mind getting the queue set up?
Ben Nolan
analystThanks for making room in the schedule, everyone. Let me try to bundle several FLNG questions together. First off — or rather, here's what I want to ask as a bundle: is there anything new on what all this means for the Louisiana effort and the Marriott review, plus the Lakach review? And when it comes to Altamira, I'm wondering whether the operating economics could look different, first regarding OpEx for an onshore facility? And second, is there anything new on how we ought to view the profit sharing arrangement with CFE?
Chris Guinta
executiveBen, let's take them one at a time. Our application with Marriott for the Louisiana project remains pending. We keep engaging with them on Q&A and are seeking to secure a permit that could serve as an option for FLNGs down the road. On Lakach, engineering work is underway and we are in talks with Pemex about handing over equipment that would need to be put in place, and we'll handle that as time goes on. For the moment, though, our focus is the engineering and permitting work; as for operating economics at an onshore site, we do think there are meaningful efficiencies. I won't get into excessive detail, but at an offshore location you need standby tugs and more frequent ship-to-ship transfers. Crew boats are required to shuttle personnel out, and you must bring out supplies, consumables, water, and so forth. An onshore site requires none of that. On top of that — and this hasn't been negotiated — power could come to you at a much lower cost. After all, we have a partner in the CFE that holds power access plus more than 1 gigawatt of generation capacity in that region; so we believe some efficiencies could exist there. As for the profit share, that figure hasn't been made public, talks with the CFE are ongoing, and we anticipate sharing additional details with you and shareholders across the next several quarters.
Wesley Edens
executiveAbsolutely, and let me expand on that point a bit. The facility Chris mentioned — that import terminal they possess — is truly something remarkable, Ben. We've visited the location multiple times by now. There isn't a single weed or stone sitting where it shouldn't be. It genuinely is a superbly built import terminal. And it's quite ironic that this will end up tracing the same trajectory as U.S. LNG exports, which initially started with an import terminal, since so much of the existing infrastructure there can be repurposed. So, as Chris mentioned, those 150,000 cubic meter tanks, the wharfage along with the marine infrastructure, the pipeline operations, the power access — naturally, every one of those components can be used directly. And it just so happens that right beside the wharf there's a perfectly flat and flawless parcel of land that would be genuinely optimal for receiving the trains we intend to install. So it really is an ideal scenario. It's one where CFE currently underutilizes it in its present state. They've been an excellent partner for us, and our discussions on this have been very productive. The modular construction approach we've adopted essentially gives us the adaptability to place those modules. The liquefaction units, the gas treatment modules — they can be positioned anywhere. They can be mounted on jackup rigs. They can be placed onto a vessel, and they can likewise go on land. And given where this site is located, I believe it is without question the most dependable LNG terminal along the whole Gulf Coast. That's because you're genuinely outside the direct trajectory of the hurricane zone — Texas and Louisiana, naturally, get struck by hurricanes often. Sometimes those storms are severe, and that leads to downtime. This location sits to the south of all that; consequently, your reliability — both when measured against our offshore installation and, honestly, when measured against every other Gulf Coast liquefier — is going to be a major advantage. So we signed the LOI. We're putting in serious effort on the permitting process, the economics, and so forth, but we're feeling quite optimistic about this.
Devin McDermott
analystI appreciate all the useful information shared today. My first question follows up on that Altamira onshore LNG possibility. More specifically, could you walk us through which milestones remain ahead for converting this into a binding agreement, starting from an LOI? Also, does the permitting process differ at all between onshore and offshore? I'm attempting to frame this against the 2024 targeted service dates and what has to occur to reach them.
Chris Guinta
executiveSure; let me break that down a bit — construction on the modules is underway at present. Every long lead procurement item has been completed, and those will show up at the Ingleside yard, get kitted, and be assembled into a final module, and our expectation is that everything will be done — both 2 and 3 finished during the second quarter of 2024. Civil work makes up the onshore portion, and that essentially means balancing the plant, connecting those modules into the marine infrastructure that already exists as well as the existing gas infrastructure. So right now our teams are performing engineering and design alongside the terminal operators and with the CFE to make that efficient and to wrap up all the contracts for that scope. On the permitting side, we've enjoyed a strong partnership with the CFE in navigating all of their associated permit requirements. The President, the Secretary of Energy, the CFE — every one of them backs this strongly. Once again, this asset is underutilized by the CFE. So we're delivering savings to them both on pipeline transportation costs and on terminal usage. So my expectation is that several meetings with these individuals will be needed, but in our view, going from where we are now to a finalized agreement takes just a few weeks. After that, we're completing fixed price and fixed-term construction contracts so these modules can be installed onshore. I hope that addresses your question, Devin. I'd be glad to follow up on another call later today to discuss anything in greater detail.
Devin McDermott
analystYes, that's excellent. My next question — I value the extra specifics regarding how the guidance was built up; seeing those components is useful. Could you elaborate somewhat further on where the FLNG units fit into this, plus what assumptions you're applying for 2024 cargo sales in the upcoming year's guidance?
Wesley Edens
executiveThe FLNG essentially serves as a supply source feeding the portfolio; thus, as Andrew described, when you look at a blended cost for our LNG, it originates from both the third-party agreements we hold with suppliers such as Shell Energy and Venture Global. The FLNG will merely blend into that to produce a combined cost. Consequently, our approach economically is essentially to take a consolidated cost, distribute it across terminals, then rely on terminal-generated revenues to derive the approximate net spread. In our view, that's the most straightforward and equitable method; therefore, we don't consider the FLNG a profit center itself, instead just a supplier of goods sold, essentially, feeding into that.
Andrew Dete
executiveAnd as for the fourth item, we're simply taking the Henry Hub and TTF strip prices as they stand now, essentially marked for the quarter. And then, clearly, there's the transport cost embedded within our ships portfolio too. So for the forward, what we're relying on is market pricing.
Sam Margolin
analystWhat's going on here, in my view, is essentially vertical integration. You're looking to take part in power shortages rather than gas shortages, and you're looking to take part in what it costs to extract gas rather than what gas sells for on the market; within that framework, your returns beat anyone running a pure play somewhere along the supply chain. That said, what the market seems to be showing us is basically commercial uncertainty, since demand reacts so sharply to these prices, and regulators and policymakers appear to respond to tight power markets by pushing for additional renewables capacity, because that's still seen as sitting at the bottom of the cost curve. So as you carry out this plan across the entire value chain, from a commercial standpoint, what are you observing, and particularly in industrial markets rather than just power, where gas at this price is genuinely positioned to expand instead of merely facing curtailments and headwinds.
Wesley Edens
executiveWell, look, a few things come to mind. First, yes, there are certainly efforts underway by people around the globe to bring renewables into their systems, but I'll go back to the same example since it's a real one, which is that Jamaicans consume 10% as much electricity as Americans do, and Kenyans consume 10% as much electricity as Jamaicans do; so the typical person in East Africa uses in a year what you use in 3 days; so this isn't merely a question of a decarbonization trade, which, of course, the Western Europeans, Americans, other — or industrialized countries are engaged in. A lot of the places where we operate, clearly, are emerging countries, where power is genuinely so scarce. There is an enormous, enormous, enormous quantity of demand. So roughly 40% of the world's population lacks adequate electricity. So the gas and electricity required is extraordinary; and what you've witnessed when — as I mentioned, when prices were extremely high, nobody can truly afford $60 gas or $50 gas or $40 gas. Right now, and I thought the chart Andrew presented is actually a pretty effective one, gas at this price remains a substantial discount to diesel at this price; so if you need to switch on electricity anywhere else, natural gas is a bargain compared with diesel. And I think the idea that renewable power will somehow replace all of this instantaneously, that's simply a fiction. It's just like — it's obviously, we all support carbon-free energy everywhere. But there are also the matters of access to energy, energy stability, energy security. And I think the quantity you need for it is actually quite substantial; and the vertical integration point involves two things. First, economically, it's far better because 35% is more than 10% or 15%, and working that out isn't that complicated. If you examine the figures closely, that's exactly what the data shows. I'd be glad to discuss this with you or anyone else privately. But the real free cash flow conversion in our operations is much higher than what you'd see at industrial complexes that lean more toward being pure plays — that's point one. And point two, regarding what we do, we believe this is necessary since we must supply a logistics chain to everyone. There are major hurdles when it comes to delivering gas and power to communities — specifically, the infrastructure that must be built, plus the capital required for that and for any logistical undertaking. Suppose there are 10 tasks that need completing, and none is executed flawlessly while one is handled poorly — then the entire chain collapses. And considering how energy systems have evolved globally, once more, for nonindustrialized nations especially, insufficient capital access for infrastructure construction likely sits at the apex. Yet past that, you've got credit problems, supply problems. A whole range of additional problems exists, and that's precisely what generates the worth of these assets; and the final point I'll make, perhaps in a lengthy response to a quite brief question, is that the value proposition from establishing a terminal where substantial demand will exist is enormous. There's no superior illustration of that than what's present in Puerto Rico, though honestly, all of them will come about that way; we observe considerable additional demand in Barcarena. We observe considerable additional demand in Santa Catarina, considerable additional demand in Mexico, and so on and so forth. And we understand these are grounded terminals giving us a way into the nation; yet it's extremely straightforward. If you're able to construct infrastructure for a single purpose and it's economically viable, then employ it for 2, 3, or 4 purposes, the economics — really, the margins rise and go to the bottom line, and you deliver an improved product to your customers since you can now genuinely take your costs, distribute them across time, and outperform whoever enters next; so — but I believe the decarbonization aspect is an excellent observation; and naturally, we fully support it, yet it's nowhere near being achieved in numerous locations worldwide where we operate; it's simply that energy access is the decisive advantage.
Sam Margolin
analystUnderstood. Then I have one brief additional question. This concerns upkeep, specifically regarding Louisiana. Is there any sort of natural gas buying or supply arrangement that could impact when that project gets done — whether it needs to be accelerated, or do you actually possess considerable leeway since you aren't obligated to buy gas via that pipeline?
Chris Guinta
executiveCorrect. There are zero purchasing duties on our end, and absolutely no obligations of that kind. Nor is there anything that would alter when the project is completed.
Chris Robertson
analystChris, could you give us a brief update on what permitting is still left for the first FLNG project, and also on the nonconstruction timeline for that project going forward?
Chris Guinta
executiveNo. What we're doing — the support we've gotten from the team at CFE and from the regulators has been excellent. Every construction permit is in hand. What we're waiting on are operating permits, and all of those should come in this month. Our FTA export license has come through, and from DOE as well, and by the end of next week the Mexican export license is expected.
Chris Robertson
analystAll right, understood. Yeah. And circling back to the second and third module with respect to the Altamira project. Could you discuss the point at which those conversations initially started, the way it shifted from an emphasis mostly on offshore toward one onshore, and the sort of process that drove that?
Chris Guinta
executiveAbsolutely. I mean, we touched on this briefly during the slide. I mean, the module matters a lot, correct? So the module represents the secret sauce, and it's deployable in any ship, rig, land-based opportunity. The straightforward response is that it costs less and moves quicker. Offshore infrastructure requires more time, based on whether it's a fixed jacket; this can leverage and take advantage of the marine infrastructure already in place, the tanks already there, for deployment at lower cost. And we've had conversations with the CFE regarding this. They've indicated strong backing for the project and a desire to get it running as fast as they can; we've been in discussions with them across the past 3 months; and this is something they're eager to see occur and to see us put to use the asset they can't get the most out of.
Cameron Lochridge
analystThanks as well for providing such helpful information. That means a lot to me. To kick things off, I'd like to move fast and simply inquire about the terminal segment's margins. If I examine the guidance you've given for downstream terminals in '24, it appears to suggest a margin of roughly $10, which is somewhat lower than the margin implied for '23, likely because Barcarena and Santa Catarina are starting operations. Still, I'm curious whether you might break that down a bit and assist us in grasping the various factors at play. Which elements will shape and set that margin for the terminals?
Andrew Dete
executiveCameron, this is Andrew. My sense is your understanding is fairly accurate. What I mean is that during 24, we are definitely bringing 3 new terminals into service, and each has a somewhat distinct set of characteristics. Once we take the average across all of them, your estimate is close to correct. I believe that covers it. From that angle, there isn't much complexity; our agreements are long-term, and over time we effectively blend toward them. And at this point, I think you can fairly clearly see how the whole picture works out when it comes to margin.
Wesley Edens
executiveHere's the thing you'll notice: whenever a terminal is brand new and you're bringing on baseload, that's typically when margins are at their weakest point, correct, since you're absorbing the majority of your costs while completing that initial terminal. So we examined the — I didn't run this as a standalone exercise, but we examined what the margins looked like for our Puerto Rico terminal 3 years back when we initially brought it online, which was roughly 3 years ago from now, and those margins compared with the current ones would clearly be weaker than what we see today, given that we're relying on a great deal of the same infrastructure; plus our capacity factor throughout our terminals runs approximately 25% to 30%. So clearly, we have an enormous amount of additional capacity available. And when you extend that to serve additional customers or other power solutions, your margins will improve as time goes on.
Andrew Dete
executiveYeah, Cameron, Barcarena really illustrates that well — we kick off with the baseload in the coming year, and then in 2025 the power plant will essentially flow straight into the bottom line, given the infrastructure we have.
Cameron Lochridge
analystThen moving to my second question — I'd like to raise this topic. If my understanding is right, those drilling vessels that had been designated — initially designated — for FLNG 2 and 3, since those two units will now be located onshore, that releases certain marine assets, whether those go to Lakach or Louisiana or whatever else. Regarding Louisiana, based on how the permitting review has proceeded up to now, I believe Marriott has had certain worries regarding the jack-up rigs and safety at the site. So might this decision to relocate those units onshore in Mexico release a few vessels, which could ease whatever worries come up and perhaps speed up that permitting review?
Wesley Edens
executiveTo that question, the response is — the marine assets for — the response is affirmative, correct? So our attention is squarely on 1, 2 and 3, and those are the ones where we've reached FID for putting capital into building. A considerable body of work has been carried out on the 2 Savon vessels to get them ready to receive the liquefaction and gas treatment modules. That work is still ongoing. As for the Marriott application, those filings are highly tailored to the particular product you intend to use; so clearly, the site preparation we've completed, much of the engineering, many elements of that would remain usable; however, were we to adopt a different solution, that would essentially mean starting the clock over, ideally in a shortened fashion since you'd retain the advantage of certain work already completed. Still, we don't expect to do that at this time. What we're aiming for at present is to complete the application with the infrastructure already there. And based on how we interpret the questions, the jack-up rigs draw more questions than they do worries. It's — I mean, jack-up rigs operate throughout the Gulf. So this isn't a novel practice. What is novel is merely putting them together and actually having liquefaction on them. So that's the character of their questions; all of them, in our view, are fair and sensible questions, and fair and sensible answers exist for them; therefore we're fairly confident we'll work through that in the normal course.
Sam Burwell
analystI'd like to pose something regarding CapEx, with attention on Slide 22. When you total up the terminal amount for the FLNG, the 2023 CapEx number comes to roughly $1.2 billion. During 1Q you used $560 million, which suggests a fairly significant decline in CapEx across the remaining months. So I simply want confirmation that this is in fact what's happening; and then one more thing I'd like clarified — regarding the '25 figure and the 1.3 in '23 and '24, respectively, for FLNG, we're talking only about units 1, 2 and 3, right?
Chris Guinta
executiveYes, both of those questions get a yes for a short answer. A drop off is indeed what we're expecting. And yes, this covers finishing units to 1, 2 and 3, plus funds already out the door on #4 and 5.
Sam Burwell
analystAll right, got it. Now I want to ask something else about how margins might move over the remaining months. It seems no specific per MMBtu margin for the quarter was shared by you folks, yet I have to assume cargo sales played a part in 1Q. My guess is those likely decline as the year goes on, while Puerto Rico ought to build up across the year. So I'm just wondering, how should a blended — what's the right way for us to think about blended margins on a sequential basis? Will they hold fairly flat from one quarter to the next? Or is there any reason to expect margin improvement in upcoming quarters?
Chris Guinta
executiveYes. The brief response, I'd say, is that margins came in at an implied level near 17, and for the rest of the year we anticipate remaining roughly at that level. Your point is spot on that cargo sales made during the first 2 quarters will run somewhat above what we'd anticipate for the third and fourth quarters. Even so, you'll see better profit margins flowing from the downstream terminals.
Wesley Edens
executiveAnalysts and investors raised quite a few questions regarding how the terminals business stacks up economically against cargo sales. This is a direct answer to that. In our view, it's the proper manner of addressing it. With that being said, we're quite cautious when it comes to revealing the particular performance of any individual terminal or a customer, for reasons that are plain — customers wouldn't appreciate it, terminals wouldn't appreciate it, and countries wouldn't appreciate it. So by taking this approach and putting it out yearly, we believe we offer a very transparent picture of what we see as the business's economics. And ideally, that proves useful to you as well as to other investors. And that's — but, as Chris mentioned, the figures displayed there are typical of the entire year. So there could be fluctuations from quarter to quarter, yet they do capture, in a sense, the activity over the year. We believe that gives an extremely, extremely clear view, and we hope you all feel the same way.
Sean Morgan
analystThank you. Here's what I'd like to ask — if we look back at May 2021, I realize a good amount of time has passed since Zero Parks was introduced. Back then, the company was definitely discussing blue hydrogen. A lot has shifted since that point, I'd say. Natural gas, the feedstock for blue hydrogen, has gotten considerably more expensive. Meanwhile, generation costs have come down somewhat. So perhaps you could share your perspective, since judging by what was presented today, our approach seems to have moved somewhat from blue toward green hydrogen. And staying on the hydrogen topic, I'd also like to hear your view regarding the anticipated treasury ruling about hourly matching for green renewable power generation as opposed to annual — and where your company lands in that discussion.
Wesley Edens
executiveOur attention has remained on green hydrogen from the start. We have certainly examined various solutions, and based on the pro formas we've reviewed, we believe the economics for blue hydrogen look appealing. However, blue hydrogen and blue ammonia represent a completely distinct business trajectory compared with the green hydrogen electrolyzer route. To be specific, the project we're involved with sits on a parcel of land in Beaumont, Texas, where a balance of plant will be built along with electrolyzers, and the capacity is 120 megawatts. We believe it would be among the largest green hydrogen projects in the nation, possibly the largest. Local demand for the product is enormous, so we anticipate finalizing sales of our product soon. All of that is laid out in the filing we're preparing, so I'd rather not go into further detail on it. Two years back, the IRA was not around. Clearly, then, its rollout is something people are watching closely. From where we sit, the key point is the $3 per kilogram production credits for green hydrogen — in our view, that transforms a business that's neutral or slightly unprofitable into one that generates money, and that matters greatly. Looking ahead, we believe technology will keep advancing and make those economics increasingly favorable. I think many of the comparisons people draw involve how renewable efficiencies have evolved over time, which has clearly been striking as solar, wind, and other renewables have seen sharp price declines and sharp efficiency gains. We expect similar developments as capital floods into this sector. Also, we're constantly sitting down with businesses that bring fresh, compelling perspectives on boosting efficiency. As for the IRA, the straightforward response is that we believe we'll capture the entire advantage of the production credit, and it will reach the bottom line. Our view is that this makes those projects extremely economically sound; and once more, we possess additional specifics on that, and we'll pass them along to you at the point when the filing is made public.
Sean Morgan
analystAll right. Then a quick follow-up regarding the earlier question about procuring gas for Louisiana. I simply wanted to get some clarity. At present, there aren't any outstanding purchase obligations. What's the timeframe to sort of match up supply from upstream E&Ps? And what kind of lead time is required before, let's say, you receive regulatory approval in Louisiana to sort of arrange that gas for sale out of the terminal?
Chris Guinta
executiveWe can reach, from pipe back to a 500 pool and back, gas supplies readily available that run throughout South Louisiana. So we aren't — as of today, we have no purchase commitments. Sourcing the molecule isn't something we're concerned about. These volumes are small, correct? That is, roughly 200 million cubic feet per day, so nothing committed at this point. Looking ahead, we don't view this as a problem.
Patrick Hughes
executiveJim, I believe that covers everything. We appreciate all of you being with us today. As always, we're still here for you folks to address any further questions that might come up, and we hope your day goes well. Thanks.
Operator
operatorEveryone, that brings this call to a close. We appreciate your joining us. You're welcome to hang up now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete New Fortress Energy Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to New Fortress Energy Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in New Fortress Energy Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.