Thanks, Operator. Morning, everyone, and I appreciate you joining Newmont's Q2 2022 earnings call. With me today are Rob Atkinson and Nancy Buese, along with other members of our executive team. We'll open things up for your questions at the end. Before I begin, please note our cautionary statement and see our SEC filings, available on our website. Newmont delivered a solid second quarter, continuing to distinguish ourselves through our leading portfolio of assets and projects, our proven integrated operating model, and our balanced, disciplined approach to capital allocation. And above all, because of how our values drive our dedication to the mission of generating value and bettering lives via sustainable, responsible mining. Supported by these core strengths and steered by our straightforward, steady strategy, Newmont stays well placed to navigate safely the shifting and extraordinary difficulties confronting both our sector and the wider world. In the second quarter, Newmont turned out 1.5 million ounces of gold — a rise exceeding 150,000 ounces versus the first quarter, in line with expectations. Beyond that, our copper, silver, lead and zinc operations yielded over 330,000 gold equivalent ounces, which lifted the quarter's total from our balanced worldwide portfolio to well above 1.8 million gold equivalent ounces; operating cash flow came in strong at $1 billion, with free cash flow of $514 million — more than $260 million better than the first quarter; total liquidity stands at $7.3 billion, and our investment grade balance sheet remains intact with a net debt to EBITDA ratio of three times. All of this safeguards our financial flexibility as we keep funding our most profitable organic project and continuing to return cash to shareholders. Back in June, we wrapped up buying out Sumitomo’s stake in Yanacocha, which means Newmont now holds the entire operation and the promising sulfides project — a full 100%. Then last week, we announced a Q2 dividend of $0.55 per share, and that keeps our dividend yield in the appealing 3%–4% range, where it has sat for seven straight quarters. This second-quarter payout, set inside the industry-leading framework we’ve built and calibrated to a $1,800 gold price, reflects how confident we are that our portfolio and our operating model can keep generating sustainable value over the long term. Also, in May we released our second annual climate report, which is one of the reports covering our company’s non-financial performance. Tackling climate change and generating genuine impact will require us to draw on Newmont's industry-leading ESG practices, our integrated operating model, and the size and lifespan of our worldwide asset base. Each of these matters not just for building value over the long term, but also for tackling the essential problems our sector has to resolve — and none is more essential than putting an end to fatalities. Safety ranks among our core values as a company, and it sits at the center of running any business that can be sustained. My expectation is that this is the initial consideration on everyone's mind before any work begins at any Newmont location, ensuring our workforce returns home unharmed following each and every shift. Our commitment to safety has remained disciplined and dedicated, with a sharp focus on managing the critical controls that must always be in place to prevent fatalities. During the second quarter, field leaders held 155,000 conversations focused on those critical controls. Two years ago, we introduced mobile technology to gather consistent worldwide data on these important discussions, which we refer to as critical control verifications. I'm pleased to share that since that time, our leaders have now conducted more than 800,000 of those conversations. Over the last three years, Newmont has continued to change the way we handle safety across our worldwide operations, sharpening our fatality risk management program to make it as effective and as informative as possible. By combining insights from serious potential incidents with information gathered through critical control verifications, we are now able to grasp in depth the fatality risks at every site and, crucially, the steps required to reduce them. At Newmont, we have assembled a strong and varied portfolio of operations, along with a pipeline exceeding 20 organic projects possessing the size and mine life needed to produce solid results over the long term. Newmont is going to turn out over 6 million ounces of gold every year, plus close to 2 million gold equivalent ounces derived from copper, silver, lead and zinc. Put those together and you get roughly 8 million gold equivalent ounces annually for a minimum of the coming ten years — more than any other company in our sector. Through our 12 operating mines and two joint ventures, almost 9% of our attributable gold production originates in top tier jurisdictions. That's because we strongly hold the view that the locations where we invest and operate are important. And beneath our portfolio sits a solid base of reserves and resources that, paired with the gold industry's strongest organic project pipeline, opens the way to consistent output and cash flow far into the 2040s. We're going through a stretch of substantial reinvestment right now. We keep moving our near-term projects forward — the second expansion at Tanami in Australia's Northern Territory, Ahafo North in Ghana, and the Yanacocha Sulfides project, which is the next exciting chapter in Newmont's long and profitable journey in Peru. Beyond those three near-term projects, Newmont also holds a deep pipeline of longer-term projects, and those represent growth opportunities later this decade and beyond. A proven, integrated operating model governs these projects and operations, and that model has a strong track record of delivering long-term value to all of our stakeholders. At Newmont, there's a fundamental conviction underpinning how we operate: the collective result is greater than what each piece delivers alone. Strong evidence for this comes from our full potential continuous improvement initiative—over eight years in existence, and its relevance has never been higher. Lessons from the pandemic are now being put to use by our team to address the challenges facing our sector in the present day, including constrained labor availability, rising prices, and interruptions to supply chains. As the world grapples with these strains, we are busy deploying approaches that reduce what we're exposed to. Our worldwide supply chain group is drawing on our size and the robust relationships cultivated across many years with major suppliers and equipment makers. Being the industry leader gives us top-tier pricing, and our long-term agreements contain advanced rise-and-fall formulas that cut volatility and ease logistical constraints, which keeps disruption away from our operations. Although we're unable to talk about particular contracts, a number of our big equipment and parts suppliers have lately announced broad industry price hikes of 15% to 30%; even so, because of what our global supply chain team has done, we've secured smaller increases, in some instances just 3% to 5% for the year ahead. On top of that, we're pushing the gold sector forward by bringing in new tech that raises output and lowers exposure to workforce issues — for example, last year's shift at Boddington to a fleet of trucks that operate entirely autonomously.

Tom Palmer

executive
#2

Our full potential program is something we're leaning on, and it's played a key role in creating value during these unprecedented times, helping to counter the effects of current market conditions. We're also making use of real-time data, and our global team includes subject matter experts who share knowledge and talent across our worldwide portfolio, delivering critical insights and driving better performance than our operating teams could ever achieve alone. This is among the most tangible examples of that. We've designed and implemented three operational support networks spanning our core areas of mining, processing and asset management; these global networks unite technical experts from around the world, offering 24 hour monitoring, coaching and support through a consistent platform. On the mining side, the customary assumption is that frontline supervisors gather their own data and insights while juggling all the tasks that come with leading a crew safely through the beginning, middle and close of a shift. Our support networks assist these leaders by tracking how operations are performing and flagging the areas that require their focus — which saves time, sharpens attention, and cuts down on how many staff we need at our mine sites. And with a more flexible working setup in place, Newman can draw top talent both from inside and outside our industry, building a team that is more varied, driven and highly skilled — one that coaches and backs not just a single operation but every one of ours. Beyond our focused, disciplined cost-management efforts, you should also count on us to be open regarding what we're seeing now and what we expect ahead from this unprecedented environment. During the past eight months, we've seen cost pressures—among them the effects of Russia's invasion of Ukraine, a labor market that keeps growing more competitive, and worldwide inflation at its highest in almost 40 years. Because of that, we now expect an extra 7% of cost escalation this year, which comes on top of the 5% already baked into the full-year outlook we set last December. Roughly 1/3 of that increase stems from labor costs. Contracted services rates are running over 10% above where they were in December of last year. The main driver is intense competition for specialized labor, along with greater post-pandemic accretion that has pushed demand higher, plus the pass-through of increased commodity and transportation costs. Roughly another third of the impact stems from rising prices for global commodities and raw materials. For some items — cyanide and explosives among them — we're seeing escalation of 20% to 30%, which reflects higher natural gas prices and ammonia availability. Steel prices have also risen, and that steel goes into our grinding media and spare parts. Higher fuel and energy costs account for the last third of that effect. As just one illustration, diesel now costs more than $50 a barrel above where it was, and compared with the guidance we first put out, that pushes roughly $20 an ounce onto our all-in sustaining costs. I'll now turn it over to Rob and then Nancy, who will walk you through our operational and financial performance in more detail and explain how today's conditions shaped our second quarter results. After that, I'll close with a summary of what we expect for the rest of this year, since our attention stays on carrying out productivity gains and countering the effects of these tough market circumstances. Rob, over to you.

Rob Atkinson

executive
#3

Thanks, Tom, and good morning, everyone. Moving to the following slide. We'll begin our review of operations and projects in Africa. Higher ore grade and more tonnes mined, along with strong mill performance, gave our team a solid second-quarter result, and the team is working to finish an open pit layback; stripping should decline in the third quarter as we start to reach the ore and build future optionality for growth in both underground and open pit. Ahafo South turned in a strong second quarter, lifting gold production by over 25% versus the first quarter thanks to better ore grades, more underground and open pit ore tonnes mined, and steady mill performance. Despite first-quarter difficulties from supply chain disruptions and global border closures caused by COVID, the team keeps successfully ramping up mining rates at the Subika underground, which Tom will cover later. We expect Ahafo production to be weighted roughly 60% toward this year's second half as we keep raising underground tons through more development and reach higher grades, setting Ahafo up for a strong finish to the year. Lastly, the team keeps advancing engineering and procurement for Ahafo North. Permitting is entirely complete, and we're encouraged by recent discussions as we carry on important stakeholder engagement with local communities, traditional leaders, and regulators to secure full land access that is properly cleared of all structures and quarters. As I've noted in earlier updates, this will be a key milestone, giving us the chance to update the remaining costs and schedule for developing this prolific ore body and to properly incorporate the impacts of this land access delay. Because of working through this important activity, preliminary capital costs should come in roughly 15% above our original estimate. We also anticipate commercial production shifting from 2024 to mid 2025. We look forward to giving more detail later this year as we work to add profitable production from the best unmined gold deposit in West Africa. Now to South America, where Cerro Negro posted another strong second-quarter result on steady grade and continued gains in mining rates and mill performance. Work on the initial round of expansions at Cerro Negro continues, with the team making progress on the Marianas district expansion and on developing the Eastern district, which will carry existing operations beyond 2030. Development of the San Marcos decline is also proceeding, and this May we carried out the first blast in the Eastern district—a thrilling milestone as we continue exploring and developing the potential of that district in Argentina. At Marion, despite unusually heavy rain in the second quarter, the team delivered a steady performance; the rainfall disrupted mined sequencing, resulting in reduced ore tonnes mined and milled along with lower grades. We anticipate output will rise during Q3 and Q4 once the rainy season concludes, since mill performance should get better and ore grades are set to climb in the latter half of the year. Also, Yanacocha maintained steady output in Q2, boosting ounces via the re-leaching program and lifting recoveries by using a leaching solution that is richer. At Yanacocha, we anticipate roughly 55% of production will fall in the first half of this year, since the site is reducing ore tonnes mined and placed onto the leach pads while we pursue development of phase one of the Sulfide project. On the engineering side we're close to 60% done, procurement stands at about 45%, and roughly a third of the local contracts have already been handed out. The photo here shows the team moving ahead on camp construction and initial earth works according to plan—ensuring suitable housing is ready for both our construction crew and later mine operations. The project team is preparing to make an investment decision late in 2022. From the date of full funds approval, we presently anticipate capital spending of roughly $2.5 billion, with commercial production occurring in mid-2026. We look forward to providing an update near the end of the year, and we continue to be very enthusiastic about the chance to develop the Sulfide potential at Yanacocha. Now turning to North America: Penasquito turned in another strong quarter, since better gold and silver grades helped counterbalance the effects of planned mill maintenance along with elevated costs associated with the workforce negotiation that was announced earlier this month. With the new profit-sharing arrangement in place, Newmont Penasquito committed to an uncapped bonus tied to profits of as much as 10% from that operation, and there's a $70 million expense tied to 2021 results, which adds over $65 per ounce to North America's Q2 all-in sustaining costs for gold and more than $180 per ounce for co-product gold equivalent ounces. Looking at 2022, we anticipate that this profit-sharing bonus will bring roughly $15 million in additional costs assuming an $1,800 gold price, which adds about $4 per ounce to North America's all-in sustaining costs for gold and $10 per ounce for co-product gold equivalent ounces. We secured this deal with Penasquito's workforce while keeping the site running without any stoppage, and we keep fostering a cooperative, appreciated connection with union leaders to back safe and sustainable mining there for many years ahead. Going forward, expenses should level off as output of gold at this big polymetallic operation rises during Q3 thanks to richer ore coming from the Penasco pit, while grades of coal products from silver, lead and zinc start falling in the latter half of the year on schedule because of the order in which we mine. Moving to Canada, output and expenses remained under pressure from ongoing challenges tied to a labor market that is very competitive. Beyond those difficulties, Eleonore also dealt with COVID-linked absenteeism in the second quarter, since flight capacity restrictions and rigorous protocols stayed in effect to safeguard the health of our First Nation communities and our workforce. Both Musselwhite and Porcupine turned in better results than in the first quarter, with more ore tonnes mined and processed, and Musselwhite achieved its strongest monthly performance in more than 3 years. At both sites, productivity and ore grades should keep getting better during the second half of the year, as mining at Musselwhite moves northward into the PQ deeps area and Porcupine begins accessing higher grades from Hoyle and Borden starting in the third quarter. And finally, at CC&V, output came in stronger than during the first quarter, helped by higher volumes of ore both mined and put through our leach operations. Tom will go into detail afterward, but the operation is now functioning as a leach facility, delivering consistent results through improved work placement, while unit costs are expected to fall through the remainder of the year. Moving on to Australia.

Rob Atkinson

executive
#4

Like we said on the Q1 earnings call, Western Australia's border opened in early March, and that brought much higher case counts, continued testing obligations, and rigorous close-contact rules across the state. Roughly 1/3 of Boddington's workforce and half of the team at Tanami came down with COVID during the second quarter, and elevated absenteeism — driven by positive cases and close-contact isolation rules — is still weighing on productivity at both operations; on top of that, Australia's labor market keeps getting tighter, with competition for skilled workers and contracted services heating up over recent months. Even so, Boddington turned in a solid second quarter. The team posted gold and copper output up by over 25% versus the first quarter, since better mill throughput and grade more than made up for fewer tonnes mined because of bad weather. Results from Boddington's all-autonomous haul truck fleet keep getting better quarter after quarter. Looking at the rest of the year, Boddington's focus will be on hitting record mill throughput rates and pulling more tonnes from this cornerstone asset. At Tanami, production also improved — up by over 25% from the first quarter — on stronger ore grades, more tonnes mined, and better mill performance, which helped counter the effect of higher contracted services costs in a highly competitive labor market. Even with the persistent difficulty of locking in specialized labor and contracted services, the team keeps making successful progress on Tanami's second expansion, a project that pushes mine life past 2040. About 90% of engineering and procurement for the project is finished, which shields it from several inflationary pressures. In the third quarter, the team will finish reaming the shaft — 1.5 kilometers deep and 5.5 meters wide — and install the head frame and hoisting infrastructure, which, as you can see here, stands at almost 95% complete. As I've noted in earlier updates on this project, that's an important milestone as we work through the remaining schedule and cost to finish, with the main outstanding work being the concrete lining of this production shaft; that step also lets us properly factor in the big effects of COVID-related restrictions and protocols along with current market conditions for labor and materials; we're still operating in a very competitive labor market in the Northern Territory, with heavy demand from mining rivals and infrastructure initiatives across Australia. From our preliminary view, we anticipate capital costs around 25% above our earlier estimate, with commercial production moving from 2024 to early 2025. We look forward to sharing more detail later this year, and we're still excited about delivering substantial pounds, cost, and efficiency gains at this world-class asset. With that, I'll hand it to Nancy on the next slide.

Nancy Buese

executive
#5

Appreciate that, Rob. We'll start with a look at the financial highlights. Newmont delivered a strong second-quarter result: revenue came in at $3.1 billion, with a realized gold price of $1,836 per ounce, adjusted EBITDA of $1.1 billion, and healthy free cash flow of $514 million. That robust cash generation is what allows Newmont to provide top-tier returns to shareholders, primarily via our industry-leading dividend framework. Last week, we declared a regular quarterly dividend of $0.55 per share, set using a $1,800 per ounce assumption, reflecting both our confidence in the outlook ahead and our dedication to leading returns. And, as Tom noted earlier, we're currently in a phase of significant reinvestment — a key piece of expanding production, enhancing margins, and lengthening mine life. In Q2, over $600 million went toward capital, exploration, and advanced project spending, since we're still moving our near-term projects forward and putting money into our future. Back in July, we made a $34 million advanced project payment — that's a piece of the $100 million we initially pledged to Caterpillar — while we work on building autonomous battery electric haul trucks for our open pit CC&V operation and our underground Tanami mine. Relative to Q1, adjusted net income fell by over $0.20, reflecting the macro conditions Tom cited earlier as well as weaker realized prices across gold, copper, silver, lead and zinc. In June we moved 46% of our metal at an average gold price of $1,834 per ounce, which pulled our realized gold price for the quarter well below the LBMA figure of $1,871 per ounce. Realized metal prices also took a hit from $105 million of unfavorable mark-to-market adjustments on provisionally priced sales, driven by the steep drop in metal prices on June 30. On their own, those factors lowered net income by roughly $0.19 per share versus the first quarter, which mostly canceled out a 12% rise in gold sales volumes driven by greater output at our Australian and African operations. Beyond that, we saw costs climb by about $80 million due to higher labor and materials expenses, plus almost $50 million from increased diesel and energy prices relative to the first quarter. Also, as Rob noted, the second quarter included a $70 million charge tied to the Penasquito profit-sharing agreement. Taken together with some smaller, less significant items, those effects left us with second quarter adjusted net income of $362 million, or $0.46 per diluted share. Even with the market the way it is right now, how we allocate capital hasn't changed, and our strategy is clear: put money back into the business through exploration and organic growth projects; keep the balance sheet financially strong and flexible; and keep delivering industry-leading returns to shareholders. We delivered on all of those priorities in the first half of this year. We continued profitable reinvestment in the business by moving our near-term projects ahead and remaining dedicated to our robust exploration strategy. We also increased our ownership of world-class assets and proven mining jurisdictions by buying the remaining stake in Yanacocha and the Sulfides project. Our industry-leading dividend was sustained at an annualized $2.20 per share, and we kept the balance sheet strong — $7.3 billion of liquidity alongside a net debt-to-EBITDA ratio of 0.3x. That safeguards Newmont's financial flexibility and means nothing comes due on the debt side before 2029. As we look toward the second half, we're confident we can continue producing solid results and free cash flow, stay disciplined in how we allocate capital, and build long-term value for the business and for all our stakeholders. On that note, I'll pass things back to Tom, who will cover what to expect for the rest of 2022.

Tom Palmer

executive
#6

Thanks, Nancy. Moving on to the following slide. On our Q1 earnings call back in late April, we gave an update regarding how our managed operations had been affected by getting through the Omicron surge safely across the opening 4 months of 2022. We also talked about the new effects stemming from Russia's invasion of Ukraine, along with the continuing effects of the global pandemic on labor markets and worldwide supply chains — and, because of that, on input costs. We told you we were watching these issues carefully through the second quarter and would come back with an update alongside our Q2 earnings in July. Because of that work, we've decided to update our guidance for the full year to account for the following items. First, as we noted during the April earnings call, progress in bringing our new Subika underground mine at Ahafo South up to speed has been slowed by supply chain problems that delayed the arrival of the production drills we require, along with worldwide border closures that have reduced the availability of the essential personnel needed to construct this new mine and train our operators. As we also noted in April, I can now confirm that we are proceeding with the creation of a third production level at Subika, which will provide this mine with greater optionality and lessen disruptions in the future. We expect to reach first ore from the new third level around the middle of next year. Second, as we mentioned in April, since our agreements to provide concentrate from Cripple Creek & Victor to Nevada Gold Mines are nearing their end, we paused to reassess how we operate at Cripple Creek & Victor, to determine whether a more straightforward, higher-value operation with a longer life and leach-only processing could be feasible — one that avoids the complexity and cost of operating a mill to treat a relatively small portion of the mined ore. That review has wrapped up, and we've made the call to move the mill into care and maintenance while transitioning to an operation focused solely on heap leach, which means output will be reduced during the back half of this year and afterward as a consequence. Third, as Rob noted, we continue to experience the ongoing challenges of steering safely through the worldwide pandemic. Those challenges are particularly severe in Canada and Australia, where we still adhere to strict close-contact isolation rules and testing mandates that burden productivity and push costs up. And finally, as I mentioned before, input costs are being affected by rising prices in three main areas: labor, materials and consumables, and fuel and energy. We’ve factored these impacts on our managed operations into our second-half forecast as we work to address the major global challenges we face today and meet our updated guidance. So for 2022, we now expect gold production of 6 million ounces, which falls within our original guidance range but now reflects the changes stemming from the impacts I just outlined. The breakdown is 80,000 ounces out of Ahafo South, 50,000 ounces from Canada, 40,000 at Cripple Creek & Victor, and 30,000 from Australia. With those lower volumes plus inflationary pressure pushing input prices higher, our gold all-in sustaining cost for the year has risen to $1,150 per ounce. Sustaining capital is still within guidance. Even so, we anticipate about 55% of that spending landing in the back half of this year, which reflects both first-half global supply chain delays and elevated input costs. Market conditions have been unlike anything we've seen and keep shifting, and they've also shaped our development capital outlook since we issued guidance last December. Because of that, we've lowered our development capital estimate for this year to $1.1 billion, which incorporates spending delays tied mainly to Ahafo and Yanacocha sulfides. Beyond that, in the coming few months we will clear the land access milestone at Ahafo North and complete the Shaft Remy milestone for the Tanami expansion, which will put us in a position to clearly assess the remaining cost and schedule needed to finish both of these important projects. Building on the trends Rob just described, we'll be able to share additional detail on both projects later this year. As we look forward, we anticipate that inflationary pressures and the impacts of a competitive labor market will continue into 2023, with production levels and unit costs resembling those of this year. We are actively engaged in developing our 2023 business plan and look forward to providing greater detail on our long-term outlook when we issue annual guidance in early December; we will remain transparent regarding the challenges we are managing as a mining industry, and we stay firmly committed to advancing the initiatives that matter most to our business, including climate change. Back in May, we released our second annual climate report. It gives stakeholders a fuller picture of how we handle climate change impacts throughout our operations and projects. In our view, climate change ranks among the biggest existential threats to the way we live. That report lays out Newmont's climate-related risks and opportunities, our strategic planning across various climate change scenarios, and the concrete steps we're taking to shrink our carbon footprint. In addition to the climate report and the annual sustainability report that came out in April, we'll launch Newmont's first-ever tax transparency report in the third quarter. It will provide an overview of the taxes we paid as part of the value we create in the countries where we operate. To wrap up, there's a huge chance for us to tackle the problems of a world that's always shifting—everything from inflation and worldwide supply chain turmoil to climate change and cutting down deaths in mining. Our strategy remains clear and consistent as our guide, and we're sure Newmont possesses the size, scale, leadership, and experience required to get through these difficulties as we enter our next 100 years of sustainable and responsible mining. What's coming is something we're ready for and thrilled about; so with that, I'll pass it to the operator to open the line for questions. Thank you, operator.

Lawson Winder

analyst
#7

Let me begin with the dividend. Given all that's going on with cost inflation, plus what you've said and your plans to invest fairly heavily in capital projects across 2022, '3, '4 and maybe past that, during this stretch of significant investment when free cash flow might be somewhat squeezed by those 2 factors, I mean, can the current dividend be sustained? And second, Nancy, you've said before that dividend payout levels get reviewed every quarter; and I'm curious — in that review, as you work through it, are you looking at yield, or at the payout ratio?

Tom Palmer

executive
#8

Thank you, Lawson. I'll take that, and Nancy, feel free to jump in and I'll hand over to you. Lawson, gold price is the central piece of how our dividend framework works, and we consider gold price across a long stretch of time, not really any swings you might see in a given quarter, and we examine the gold price over a long stretch of time and then sit down with our Board for that discussion to ultimately settle the dividend we pay and establish the cash we've generated and our capacity to pay a dividend. If you look back across a 6-month, 9-month, 12-month period, gold price averages roughly between $1,850 an ounce over that stretch. So gold price is what drives how our dividend framework works. And then we consider our capacity to pay as a percentage of the free cash flow we generate on the basis of that gold price. Nancy, you may wish to speak to yields more gold price at Newmont.

Nancy Buese

executive
#9

Yeah, it really comes down much more to the gold price and margins. We aren't trying to solve for any specific deal. I'd also point out that we've taken a rather conservative stance with the 40% payout at 1,800 as we moved into this reinvestment phase. Another thing worth mentioning: when we established the framework several years back, we began with — and have kept — fairly large cash balances. We said back then that this provides us a solid glide path should prices shift. So there's a substantial amount of conservatism embedded in the framework, along with the capacity to keep reviewing and assessing things using those cash balances and our current outlook.

Tom Palmer

executive
#10

Thanks, Nancy. Building on that point, we also understand that as a business with a long-term horizon, we will reinvest from time to time—so across a year or over a stretch of time, you'll see periods when reinvestment is heavier and periods when it is lighter; accordingly, when we examine how development capital is spent, we factor that long-term perspective in.

Lawson Winder

analyst
#11

Maybe I could add one more question for you about the dividend. In laying out your capital allocation framework, you bring up putting money back into the business, keeping the balance sheet strong, and third, industry-leading returns. Should we read those as 1, 2, 3 — meaning reinvestment ranks first, a solid balance sheet second, and then whatever capital is left over goes to the dividend? Or is there some flexibility there — say, could you push back certain projects so the dividend stays more competitive?

Nancy Buese

executive
#12

Yeah; so the long-term stability of the business is what we have going for us, and that absolutely requires us to reinvest in these significant capital projects. That will stay a top priority for us, no question. Our investment-grade ratings and the stability of our balance sheet also matter, so we'll work to hold our margins in order to deliver on all three of those priorities. Still, the long-term value of the business is very important to us. We'll keep calibrating and balancing across all three of those imperatives, though I'd say reinvestment is certainly quite critical.

Lawson Winder

analyst
#13

And then perhaps, conceptually speaking, maybe a somewhat longer-horizon question: but I mean, given the cost pressures you're up against and especially the labor challenges, does that make it imperative for you to speed up the automation program and do what you did at Boddington across more mines? And how much faster could you move on that?

Tom Palmer

executive
#14

Yes. Thanks, Lawson. Good question. I think technology is obviously one of the levers a mining company has to boost productivity and, ideally, lower costs. And Rob, you may want to weigh in. I think we've benefited considerably from having autonomous haulage running at Boddington — probably less because of cost pressure right now, a loss (ph), and more directly on the productivity side, given what West Australia saw with the virus arriving in that state during the second quarter; but Rob, I think if we still had conventional people operating trucks at Boddington, they would have had quite a significant impact through the second quarter. I think some mining companies with conventional fleets in Western Australia will have felt that through the second quarter of this year.

Rob Atkinson

executive
#15

Absolutely, Tom — and given how unpredictable the virus has been, with no way of knowing who would show up on any given day, having 36 trucks assured of operating every single day has genuinely provided certainty along with sustained productivity. So for us, that has been welcome news.

Tom Palmer

executive
#16

And Lawson — thank you, Robert. Lawson, we actually relocated — we have a control room that supervises this fleet of autonomous trucks, and that happened in the latter part of last year, since we knew borders in Western Australia would open up eventually. We actually set up a backup control room. So over in the village on the Boddington mine side, we had a number of rooms configured from which you could operate the Boddington mine, so that if we ultimately had a situation where some of the key operators tested positive, they could keep isolating and run the mine from the comfort of their room in the village. And so we're in a strong position to leverage technology in this particular case. But I think it will be a key driver in the mining industry when we consider how we can manage some of the cost and inflationary pressures that we're seeing in certain jurisdictions.

Lawson Winder

analyst
#17

There's one more thing I'd like to ask about. I apologize to my colleagues if I've been posing too many questions here, but I simply wanted to hear what you think regarding buying versus building. With the CapEx inflationary pressures we're seeing, does that create an incentive to perhaps look at additional M&A opportunities, and especially larger, more meaningful ones? That's all from me.

Tom Palmer

executive
#18

Thank you, Lawson. And for those still waiting in line, given the amount of information we've shared this quarter, we'll remain on the call and work through everyone's question. Lawson, our strategy doesn't change. We are very much focused on running our business and investing back in our business. Putting money into projects you already understand inside and out is the smartest move available. Delivering results through disciplined operations and advancing our own organic pipeline of projects is where we concentrate our efforts. Even so, we keep watching the market. Should something come along — an asset or a portfolio matching Newmont's standards for size, scale, cost profile and jurisdiction — we would give it a close look. Should we believe that holding that asset or portfolio inside our operation would let us create greater value — well, frankly, 99% of Newmont's employees have their attention fixed on generating value from the portfolio we run at present.

Fahad Tariq

analyst
#19

First off, about the labor shortage you're seeing, particularly in Australia and Canada: could you give a quick overview of what you're doing to address that shortfall going forward?

Tom Palmer

executive
#20

Thanks. I'll take the first part, and Rob, maybe you can chime in on both of those countries; so if you look at labor, it's the — our workforce, the folks who work for Newmont as employees, is pretty stable. Turnover, or voluntary attrition, is running higher than what we've perhaps seen in the past, on the upper end but still at manageable levels compared with what we've experienced before. So the inflationary pressure is really stemming from contracted services or the specific technical expertise that we're seeing. What that means is the labor required when you bring in people for major shutdowns, for fixing specialized equipment, or for certain contracted services. On top of that, there are extra costs we're beginning to observe as companies compete for the jobs we farm out that way, and that's something we're monitoring closely. Yet the factor that matters just as much to me—perhaps even more—is simply having the right personnel available to carry out the work. Take a scope of work tied to shutting down a mill, which you might take offline roughly twice annually. Beyond that, suppose we’re unable to bring in every person required—how are we approaching the work’s scope so that once that mill is closed up and brought back into service, it can operate dependably through to the following shutdown? So cost pressure exists, yet what matters more to me, likely, is making sure the correct individuals are assigned to the equipment so it stays maintained at the proper standard. Rob, would you like to add to that regarding Australia and Canada?

Rob Atkinson

executive
#21

Yes. I’ll give just one illustration, Fahad: at the most recent Bollington shutdown, we were 260 contracts short, and honestly, some companies were defaulting on whole packages of work. So that really means we are — we’re devoting far more time with our contractors and business partners to ensure we’re aligned with them, not only in the near term but over the longer term too, and to keep strengthening those relationships. And I think, returning to what Tom said regarding our own employees, the value proposition Newmont provides — with the safety dimension or environmental credentials, along with leadership and working conditions — is extremely, extremely appealing to a great many people, both within our company and beyond it; so it really is with our contracting partners that we’re putting in the most time and the most effort to deepen those relationships.

Tom Palmer

executive
#22

To add a bit more to what I said earlier, Fahad, during my remarks I mentioned that one of the steps we have taken to reduce some of these inflationary pressures involves our operational support networks — and one of those sits within asset management, which is clearly focused on how we carry out our maintenance work. Through that asset management program, we're currently reviewing our maintenance shutdowns at all 12 of our managed operations worldwide. We're also examining ways to even out the scheduling of those shutdowns and the timing of the various scopes of work. Since certain specialist skills are scarce globally, we're making sure we can balance how they're used across our different operations, so that we reduce the risk of that critical resource being unavailable when important maintenance work needs to be done.

Fahad Tariq

analyst
#23

My second question — shifting topics to Yanacocha Sulfide. In this press release, the CapEx estimate appears unchanged. I'm wondering whether a CapEx review happens quarterly or monthly, or whether we should look for something alongside the investment decision. And if a review was carried out and the figure stayed the same, how does the improved dynamic differ from other regions where labor and materials inflation are showing up?

Tom Palmer

executive
#24

Yes. Thank you, Fahad. Where things stand on the Sulfides project: we have moved beyond the 50% engineering mark, which for a project of this scale means a meaningful share of the engineering is finished at this point. We are extracting the quantities right now during this quarter as we work toward investment decisions, and those quantities will feed both the definitive schedule and the definitive estimate. The major remaining work — or material — for sulfides: as you may remember, we have already placed orders for several long lead time items. That covers the autoclave shells themselves, the specialized steel tied to them, oxygen plants, key electric mill miners and similar items. By ordering some of those critical components and managing their lead times, we have lowered risk on that project for both cost and schedule. Looking ahead, 2 key components remain. First, the — what we call the bulks, or stick still needed to build a plant, plus all the steel that goes into fabricating the tanks and pipes around this processing facility. That means the cost of steel — specialist steel and standard steel for that work — and labor. In the Peruvian context, directing higher labor is something we have considerable control over, and the workforce will be very much local. So the exposure lies in the escalations the world is seeing around steel cost. By giving an indication in this update of $2.5 billion from the point of full funds approval, we are factoring an early look at some of the steel escalation we are seeing into that go-forward number from full fund. So there is some consideration of that, Fahad, as we are right in the middle of completing our definitive estimate and schedule as we speak.

Tom Palmer

executive
#25

Jackie, can you hear us?

Tom Palmer

executive
#26

Operator, let's move on to the following question. Jackie is with us, and we need to figure out how to get that line hooked up. So we'll go ahead with the next caller, and then we'll bring Jackie back in again.

Josh Wolfson

analyst
#27

Going back to capital allocation, Tom and Nancy, and on the dividend question: the policy we have in place, I think, spoke of $300 gold price increments as the key factor in determining what the payout would be. And Nancy, I believe you said there was some conservatism built into that; right now we're seeing gold prices pull back while cost inflation stays meaningful. So is that policy still relevant? Or are there additional considerations we should be thinking about instead of strictly that $300 increment deciding the payout?

Tom Palmer

executive
#28

Yes. Thanks, Josh. I might take that at the start, and Nancy, you can build on it. Our dividend policy, I believe, is intentionally built to remain steady and resilient across the longer term. So although the gold price has shown some ups and downs during the past few weeks, we need to watch how that unfolds going forward. And, I mean, plenty of knowledgeable authorities offer their opinions about what the gold price might or might not do; so we'll continue to follow that framework, reviewing the gold price across an extended stretch of time along with the cash we've generated and are generating, and then make judgments inside our framework. When we consider where the dividend framework is headed, the real question on the table is where the floor for gold sits. Beyond that, there's the matter of which gold price ultimately guides our mine planning and shapes how we set reserves and resources—this picks up on what we discussed during the previous earnings call and in conversations since. So, if we were—we remain in the middle of that discussion, evaluating all those elements. If we took out the gold price assumption we apply when planning mines and setting reserves, we would then revisit our dividend framework—specifically how that floor is structured relative to a gold price that has shifted. So, Nancy, I'd say that's likely the most significant point, Josh, when it comes to what you asked—but would you like to add to it?

Nancy Buese

executive
#29

Yes, Tom, that's precisely correct. So, going back to the framework we laid out, we had set out a dividend tied to dollars at a gold price of $1,200, and with inflationary pressures and what we're observing, as Tom mentioned, regarding reserve pricing and all the rest, the question now is what that floor looks like today. And so what you might ultimately see — and there's still a fair amount of work ahead on a modest adjustment to the framework — but certainly, we have the capacity, and we will keep the capacity, to pay a dividend going forward.

Josh Wolfson

analyst
#30

And on the buyback as well, I saw there's been limited activity so far this year, and obviously you look at today's move, but even prior to that, prices were largely under where the stock traded during 2021, when there was significant activity. What's the thinking right now regarding how cash gets allocated toward the buyback?

Nancy Buese

executive
#31

Yes. Thanks for asking, and that's something we keep assessing. As we've said before, it's a highly opportunistic instrument, so we'll deploy it at particular moments. Since we've spent the last quarter doing the work to assess how inflationary pressures affect our capital projects, especially, we've decided to consider where we want our dollars going, and that's really what has led us to pause for now. We'll keep evaluating our share price and how we use our cash. But yes, I'd view that as an opportunistic instrument that we will definitely use periodically. And we have just slightly less than $0.5 billion left on the current program.

Tanya Jakusconek

analyst
#32

Are you able to hear me?

Tom Palmer

executive
#33

Yes, loud and clear. Thanks, Tanya.

Tanya Jakusconek

analyst
#34

I've got a couple of questions. Maybe I'll aim the first one at Rob. I don't want to work out what's going on at Tanami Phase 2, because the capital increase to that extent of 25% caught me quite by surprise. It's mostly new projects that are coming in; so 25% was quite a big number for me, and the slippage of over a year was quite a slippage for me as well. So I'm trying to understand what exactly is happening there to have that amount of capital increase and slippage when we were quite advanced in that project?

Tom Palmer

executive
#35

Thanks, Tanya, I'll take that one and then hand over to Rob for more color. The major milestone involving that deep production shaft—1.5 kilometers, a mile down, and 5.5 miles across—is that we're now essentially weeks from having an opening at that width and depth, which lets us descend and examine the wall conditions throughout the full depth, and from that understand the work required for lighting the shaft, for whatever bolting and shop creating is needed, and then coming down to set up the formwork and install the concrete lining. We’ve been working toward the moment when we can inspect the shaft and determine the hours and supplies needed to finish the work. For context, if you’ve watched a high-rise go up and seen the elevator hoistway rise along with the signage of the company constructing it, you’ll notice that hoistway climbing by a handful of meters roughly weekly or every couple of days while crews assemble the formwork and raise that structure to create the core of the building. As you can see, completing that work requires a long stretch of time—many months, in fact. For this shaft, we're on the verge of launching that effort in reverse, descending to a depth comparable to stacking three Empire State Buildings, where we'll install the formwork. Yet daily we set forms, pour concrete, let it cure, advance, strip and reposition, and push ahead—plus additional actions feed into this demanding job—and we've pulled back. With the shaft nearly complete, we've completed a preliminary survey; a final survey still needs to be done, and after that we can meet with our contracting partners with full clarity regarding the shaft's condition and the timing of materials needed over the coming 18 to 24 months to line that shaft with concrete and install the other supporting infrastructure all the way down. We haven't given any update on Tanami 2 regarding cost or schedule since the start of last year. This is an update — a trend we're sharing with you — and as we wrap up the remaining work, it now captures the time and materials required to finish, since we have a clearer view of the shaft and a solid understanding of inflationary conditions in the Australian market. So the pricing is as of today, meaning cost and schedule, for a hole whose ground is now largely open, going 1.5 kilometers down. Increases like that are similar to the escalations seen throughout the industry, especially in Australia, across that 18-month period. But Rob, would you like to add anything on top of that?

Rob Atkinson

executive
#36

Yes. Thank you, Tanya. I'll pick up on a few points Tom made. Broadly speaking, apart from the fact that we're now at the point where we can pin down the specific quantities needed to line that shaft, the way I'd view the increase is this — roughly 60% of it is also because of COVID. Among the main reasons for that: half of our project team was located in WA, so simply getting them over there was an issue; we had that 2-week period when a COVID case occurred at Tanami, and we had to halt the entire operation, which in the end delayed the project by no less than 6 weeks. Then absenteeism, labor shortages, and logistics too have caused a substantial delay as well as added cost. And I think the last point, really just to reinforce what Tom said, is that early in the project we obviously have engineering that we assume. But only now, having actually done the work, can you truly see the geology, the overbreak, the actual specifics; and those engineering amounts, or the engineering maturity, have shifted quite markedly. So while roughly 60% of the capital increase stems from COVID, around 25% is really down to engineering maturity, among other things. But the final thing I'd certainly note, Tanya, is that, hopefully, you can see in the picture that a significant amount of work has been completed. It was done safely throughout a COVID pandemic. We're very, very proud of what we've achieved; but as Tom said, this is a point in time when we're able to assess what the last 18 months have really meant for that project, and this is the outcome.

Tom Palmer

executive
#37

Thanks, Rob. And Tanya remains a truly outstanding project. This production shaft, along with the crusher chamber beneath it, unlocks one of the world's great gold resources; so we're still enormously excited about this project now that we've hit this milestone and gained clearer visibility on the cost and schedule needed to bring it to completion.

Tanya Jakusconek

analyst
#38

And turning to the other projects — I believe it was Josh who raised the CapEx question at Yanacocha Sulfides. I'm just wondering: you said the costing has been done as of now, but you're still working through some steel and other items. So as we reach December, when the investment decision on that one has to be made, I just want to clarify — should we expect a further update on that, potentially including Cerro Negro and Pamour as well?

Tom Palmer

executive
#39

Let me take sulfides again, and Rob, could you cover off where things stand with Cerro Negro and Pamour. As we've examined some of the inflationary or escalation pressures, especially on steel, in giving that sulfides figure, the go-forward number of $2.5 billion from full funds is beginning to reflect some early views and trending views of what that number looks like. The definitive estimate still has to be done, which will actually give us some quoted numbers; but in that number we are starting to incorporate some of those items as part of this quarter's update. And Robert, would you like to cover Cerro Negro and Pamour?

Rob Atkinson

executive
#40

Yes, let me start with Pamour, Tanya — is it fair to say things are moving along nicely there right now? As you probably recall, a big chunk of that project centers on dewatering the existing pit, so we remain well on schedule to have the full dewatering system installed and mechanically complete before this year ends. That lets us bring it to the investment committee later this year for the actual layback, and once that happens we'll be in a position to share the assumptions and the estimate; the encouraging part about Pamour is that it's definitely moving forward well. And at Cerro Negro, certainly, plenty of activity is underway right now. We have 3 portals that we've established and are currently working on. So that's building nicely toward guidance. I also touched on the first blast. So we're progressing along quite well there, and again, from year-end onward we'll give updates, though it will mostly concern progress and possibly news on the development side. We're still looking at $300 million in total development CapEx for Cerro Negro. But once more, the main point I want to get across is the very solid progress we're achieving at Cerro Negro, especially when it comes to productivities.

Tanya Jakusconek

analyst
#41

Alright, and finally, one more technical question. From an operational perspective, how should we be thinking about CC&V going forward? I know you provided guidance on a reduction for this year, but I'm just keen to understand this asset over the longer term — how should we be thinking about it?

Tom Palmer

executive
#42

Thanks, Tanya. I'll take that one again, and Rob will add to it. CC&V is moving to a focus on open pit mining and heap-leach only; we'll be working to have CC&V running as simply as it possibly can and as efficiently as it possibly can, because it has a single-minded focus on mining efficiently and stacking on the heap-leach efficiently. And with that focus, we expect that we'll have a mine that's very long life because of that simplicity and that efficiency. Rob, do you want to add?

Rob Atkinson

executive
#43

That's really the crux of it. From my perspective, Tanya, the question is how much expense can we remove from that operation—especially the operating support networks—and how do we take advantage of that, along with being close to Denver and, clearly, the technology we're developing alongside Caterpillar. But what matters most here is the straightforward mining and leaching operation, which we genuinely anticipate will deliver a considerably extended life—a long-life asset that forms a significant piece of the Newmont portfolio.

Tanya Jakusconek

analyst
#44

Should I be thinking of this as a producer of 100,000 ounces? Is that the right way to look at it?

Tom Palmer

executive
#45

No, Tanya, it's more than that. Getting to 200,000 would be a stretch, in my view, but running as efficiently as possible somewhere between 150,000 and 200,000, leading into — as Rob put it — that proximity to the demo, that's the way we're approaching it, rather than trying to have something that perhaps creates between 200,000 and 250,000, with all the complexity involved in trying to produce concentrate and all the bandwidth that gets taken away from running a mill for a relatively small part of the operation's value.

Anita Soni

analyst
#46

One more thing on the dividend, and then I'll go down to Yanacocha Sulfides. But regarding the dividend, Nancy, you said 40% — you're currently applying a 40% figure and taking a conservative stance. When I run the numbers, it comes out at almost 80%, 90% of your free cash flow across the last few quarters. So I'd just like to get clear: when you're — are we talking about the same basis for how you're applying free cash flow to the dividend?

Nancy Buese

executive
#47

Yes. Thanks, Anita. So the way we approach it is that we look at our plan period and our forecasting, and we calibrate against the cash we believe we'll generate during our — for us, that's a 5-year planning period, and certainly over the much longer term as well. And so we — yes, in terms of our forecasting and our modeling, our view is that we're still around that 40% payout calibration at the $1,800 gold price.

Anita Soni

analyst
#48

All right. So you're taking into account maybe an improved outlook instead of what's close at hand and going on right now?

Nancy Buese

executive
#49

Well, I think that's what you're witnessing. We're putting money into our business and into what lies ahead for us, and those are the returns shown for these capital projects based on the cash flow they'll produce once finished.

Anita Soni

analyst
#50

All right, and the second question concerned Yanacocha Sulfides. To make sure we're clear, what amount are you intending to spend during this year, and that wouldn't be part of the $2.5 billion — the present $2.5 billion estimate, right?

Tom Palmer

executive
#51

We're considering — we're looking at roughly $300 million to $400 million during this year, Tanya, on that project, ramping up toward full funds approval; so there's capital we're putting into key critical path items that we're procuring. There's capital going toward using local contractors for some of the early earthworks, which is a critically important element of making sure there is meaningful work for the communities in and around Cajamarca and Yanacocha. We are constructing the construction camp, 4,000 beds, and you still saw that in the photo, how advanced it was. My experience with these mega projects is that they frequently fall behind in the very early days because they lack camp accommodation for your workforce. So we're derisking the project by building that camp this year. And the fourth key area for that spend is the engineering work we're doing with Bechtel and Hatch that enables us to derisk the project, because the level of engineering we have allows us to then be comprehensive with our definitive estimate and our definitive schedule as we move toward full funds. So those are the 4 key areas to which that $300 million to $400 million is being directed. And just in case you picked it up, we actually, as we thought — as we've looked through our development capital spend, we have adjusted our overall debt cap for this year down to $1.1 billion.

Anita Soni

analyst
#52

All right. My final question concerns the 2024 outlook. I appreciate that you’ve given us similar figures for 2023. So I take that to mean the $6 million at roughly $900 cash costs. When we look at 2024 — I mean, I think originally, with Yanacocha and that — the half — the Tanami expansion, that’s where you might have expected a bit of an increase in production — at this point, would you expect 2024 to be comparable to 2023 and 2022? Or are there other areas where you might potentially see improvement in 2024 beyond the 2 projects?

Rob Atkinson

executive
#53

Yes. Thanks, Anita. Yes, inevitably these projects have been impacted and affected by what’s been experienced over the last couple of years, and that timing is pushing out, so we’ll begin to see those ounces arrive in ’25 rather than ’24. So looking past ’23 to ’24, you’re going to see a fairly flat production profile year-on-year as those ounces then come in during ’25 and into ’26, and then you have Yanacocha Sulfides coming after that. So 2024 looks pretty consistent across 6 GOs; it’s going to be 7, 7.5 million ounces of gold and around about the 6%; and that’s really our aim — to be a steady gold producer at or around 6 to 6.5 million ounces of gold, 7.5 million to 8 million ounces of gold equivalents, all up, and ’24 being pretty stable, ’25 will start to kick up from Tanami, 2.5 and on.

Brian MacArthur

analyst
#54

A lot of you did ask, and I'd like to dig a little deeper on provisional pricing. Again, as I understand it when I look at this, you reported a zinc price of roughly $1.08. Relative to where it settled, that strikes me as quite low. Did you carry a substantial number of open pounds from one quarter to the next? You mentioned 46% was settled in June, yet even the June price came in well above that level. It looks like there's a heavy second-half weighting, so could you walk through the mechanics once more, particularly at Penasquito? And the second piece of your question is whether towns are open at this point. What I'm getting at is how much of this reflects cash versus accounting, because with all these questions we've been writing a fair amount on cash flow across the past few quarters, there appears to be a fairly substantial base metal effect here that varies somewhat from quarter to quarter.

Tom Palmer

executive
#55

Yes. Thanks, Brian. I think that's an important area to unpack regarding how the quarter unfolded, but I'll hand over to Nancy, and I have a Senior Officer with me, so I have Daniel Horton, who heads our commercial team and handles a lot of those sales. But perhaps you can give an answer, Nancy, and then Daniel is available as well.

Nancy Buese

executive
#56

Appreciate you joining in as well. So between March and June, we saw a substantial shift. That's one way to look at it. And really, our concentrate sales need 3 to 6 months before they're finalized. So that had a fairly meaningful effect, and then there's also our ounces outstanding when Q2 ended. So our mark-to-market adjustments came to roughly $40 million for zinc and $23 million for copper, gold was around $21 million and silver at $15 million. So that piece was the biggest one. But that's essentially what caused some of those provisional pricing adjustments. Daniel, is there anything more you'd like to add?

Daniel Horton

executive
#57

Correct, and Brian, perhaps the one other item I would mention is that the June average came to roughly $18.30 per ounce. That was considerably below the figure you had in mind for the quarter's average; and a further point worth making is the direction gold price is moving at present. Clearly, we might anticipate another comparable adjustment should prices keep falling in the third quarter.

Brian MacArthur

analyst
#58

Sure. And here's the thing — I mean, you've got plenty of sites, but some of those aren't pushing things out 3 to 6 months. What's the typical timing lag you'd normally see on the gold side? On the base metal side, I can see how it could be 3 to 6 months, but what's the usual gold rule as well?

Daniel Horton

executive
#59

Yes, Brian. Most of the gold we produce comes as dore, and that settles in the near term, so that isn't where the biggest impact shows up — just a slight impact at Peñasquito and Boddington. The updated schedule for concentrate shipments means settlements take roughly 3 to 6 months, so those are on a longer timeframe, and Boddington sits more in that 3-month timeframe. So that's, call it, 20% to 30% of our total production being concentrate, and it does have a pretty significant impact on the realized price when prices are falling like we've seen in recent months.

Brian MacArthur

analyst
#60

That makes sense. Now, on the other point — all this talk about how you described it, I realize everyone zeroed in on the gold price for your gold dividend, and you're a gold company, but how do you begin to think about this? I mean, just this quarter, as you mentioned, you had roughly $90 million in adjustments from byproducts or whatever. How does that generally get factored into your long-term thinking when setting that dividend as well? And over time, you might grow other parts of the business too.

Nancy Buese

executive
#61

Yes. Thanks, Brian. We do consider the longer term when we look at it, and when we established the framework 2 years ago. So we definitely take those puts and takes into account, and we have our long-term economic guidelines that we rely on, and we do a fair amount of work regularly to examine that forward curve, where consensus is heading, and then the impact on our plan. So all of that is incorporated, and we do see some fairly significant disconnects from time to time. But I would say, over the long term, the trend line stays very much in line with our economic guidelines. So this is — I would say this quarter was a bit unusual in terms of just how the timing and the pricing lined up. But over the long term, we do sort of see those peaks and valleys flatten out.

Greg Barnes

analyst
#62

I've got a question about the inflationary pressures you're observing. Have they reached a peak at this point? Or is your sense that what we saw during the first half of this year will carry on through the second half?

Tom Palmer

executive
#63

Thanks, Greg. It's a good one to ask. What everything indicates to us is that at the commodity level, they've topped out and are leveling off; so looking ahead, that $20 an ounce which feeds into the rise in our all-in sustaining cost — that is fairly flat. Labor, I would say, is the tough one, meaning specialized labor. I believe there is — I believe around the world, things have been shifted on their axis regarding labor availability and the choices people are making about various things. The — so there is — to give you an illustration, in the Australian setting. Roughly $200 billion to $250 billion of infrastructure projects sit on the slate in Australia, usually around the major cities. Consider that specialized labor — do I go fly in and fly out to a mine site to work on a shutdown or to work on a project, or do I go and work on this bridge or this freeway extension? I think you're watching that unfold across the world in different locations. So I think there's still a question mark over labor; we've got $20 an ounce built in. I think we — as well as we can predict the year ahead, it's a fairly good estimate. And in fuel and energy, obviously, you've got the global impacts on fuel especially, diesel price. So in some cases, I would say commodity is probably the easiest to predict. There's still some volatility, and that's where we're going to lean into controlling those things we can control. So the work we're putting into those, as I've described previously, our operational support networks to make sure that we are leaning into our global supply chain, that we are making sure we've got inventories where they need to be, that we're maintaining those inventories. We have shifted more toward local or regional supply rather than trying to navigate a global supply network. So there are a number of things we're doing to mitigate — the work we've done with suppliers, leading into the relationship we've spent years building to ensure that we have got, one, supply and, two, price protection; so focusing on those things we can control in a world that's still volatile. So it's probably not the most satisfactory answer, but there are some levels of stability, yet still some levels of volatility.

Greg Barnes

analyst
#64

All right.

Brian MacArthur

analyst
#65

There might be a technical question here for Nancy, though I'd say we're not the only ones dealing with this. How come gold sales tend to be so heavily concentrated toward the tail end of the quarter?

Nancy Buese

executive
#66

Most miners probably see it the same way, but as a rule, we'll have a gold core planned for the final week of the quarter, and we make sure those are shipped out and sold at market. I'd say that's quite typical. At the close of each month, we follow the same practice. So for us that's a completely standard cycle. That said, the gold pours are timed really to line up with wrapping everything up at month-end and making sure we have the time to verify — to get the sales completed and that sort of thing, but in terms of sales, that's a very ordinary cycle for us.

Greg Barnes

analyst
#67

Yeah. And everyone else — doesn't 46% in June by itself look like quite a lot?

Nancy Buese

executive
#68

That's pretty typical. Plus, at times it relates to transport agreements, and there have been interruptions in those too. So just moving the dore to market can be difficult now and then. In this quarter specifically, I think that also played a role in some of the back-end weighting.

Adam Josephson

analyst
#69

Tom, sorry if this has come up already at other points on the call, but you said you expect gold cost to be roughly flat next year. On one hand, I think you mentioned that certain contracts have been signed that factor in some inflation for next year. On the other, there are the one-time costs at Penasquito in 2Q that won't happen again. And I think others have said that a lot of global commodity prices have fallen pretty sharply in recent weeks on expectations of a global recession being imminent. How do all those factors play into your preliminary view that gold cost will be roughly flat? What kind of upside or downside risk do you see around that roughly flat cost figure for next year?

Tom Palmer

executive
#70

Thanks, Adam. From where we sit, I'd say the starting point is how we look at it — production, I mean, is a major factor behind our costs. So with that production level holding at or near the same year over year, perhaps a touch better as we see improvements come through — that really turns into the number one cost driver for us, given production that's fairly steady. Right now we're in the thick of business planning, and as part of that we're reviewing, debating, and talking through what we're seeing on input costs and how the various contracts we hold are shaping up — whether that's contracted services label, our own workforce, the assumptions you make about diesel for the coming year, the assumptions we make about spare parts, the assumptions we make about explosives and cyanide, and the agreements we have in place with those suppliers. So we've got what's happening globally with inflation, and there's one more item affecting our cost structure. Regarding those expenses at those sites, given the agreements we hold, we factor everything into our melting segment and begin our planning, and for next year, with a production profile that's very similar, we're finding unit costs landing at or near the same levels as this year. To give you a sense of how 2023 is shaping up next to 2022, from our vantage point here in July, early in the planning process, that mix is pointing to roughly the same figure. Nancy, would you like to take that one?

Nancy Buese

executive
#71

Yes. In the past we've also kept — and we will keep on doing this — a strong focus on sensitivity around certain of our most important input costs. So as you look at the free cash flow our operations generate, you'll really be able to see in there what a further $10 move in the diesel price would do to free cash flow, along with other inputs; we'll keep offering that transparency, and all of it will form part of our guidance in December, once it has been updated for 2023. As Tom mentioned, right now it looks fairly comparable, but we haven't yet completed all of that work.

Adam Josephson

analyst
#72

Only 1 quick follow-up on that, Tom, before I move to a different question — this one about labor. How persistent do you expect that inflation to prove? You said, Tom, that certain global infrastructure projects are underway and those are arguably pulling some workers away from you. Then again, some believe that should the world economy tip into recession, a number of the people who had quit flying in and out to the mines might end up with no real option except returning to the jobs they held before.

Tom Palmer

executive
#73

Thanks. What I'd say is that we observe it most clearly in the United States, Canada and Australia. Looking at Canada and Australia, several major projects are creating demand for workers while the pool available to the mining sector keeps shrinking. My prediction, then, is that this stays fairly sticky at minimum through 2023, judging by the markets where we run operations in those countries. So Rob — and Dean, who oversees our supply chain, is here beside me — Rob and Dean, is there anything you would like to add?

Executive

executive
#74

I'd simply add my agreement to your point, Tom. In those particular nations, the revenue generated from mining isn't coming in to the same degree as previously, so we're leaning on the skill base already in place. Given that heightened competition, the chances are very slim that those wages and so forth would decline. So I'm in full agreement.

Rob Atkinson

executive
#75

And I think saying — Thanks, Adam.

Adam Josephson

analyst
#76

Yeah. All right. Sorry to jump in there, Tom. On the output side, it looks like gold production will be roughly flat this year and next, and from what you're saying that continues into '24 as well. And obviously your peers are running into the same sorts of limits on their ability to grow output — supply chain issues, labor, COVID challenges, all of it. What's your take — it's almost as if no matter how high the gold price goes, and it's still pretty elevated compared with history, the industry just can't increase production, and that doesn't seem likely to change anytime soon. Would you agree, disagree, any thoughts on that?

Tom Palmer

executive
#77

Yeah. Thanks, Adam. Absolutely, from Newmont's standpoint, when we restructured the business 3 years ago, the plan is to hold 6 to 6.5 million ounces of gold each and every year, plus another 1.5 to 2 million gold equivalent ounces from copper, silver, lead and zinc. Some years may find us — as you move toward the top of that range and other years toward the bottom of that range, our plan is centered on that consistent delivery of metal over the long term, and our focus on reinvesting back into the business is meant to bring on lower-cost gold ounces and the other metals, but also to extend mine life. So as far as how we see growth, it's as much about growing margins as growing mine life, rather than focusing on trying to grow ounces. It's margin and mine life; so these projects Tanami, Ahafo North sulfides will deliver lower-cost ounces that help reinforce our cost base, but they — even more importantly, they extend our mine life, and our story of being a highly reliable, long-life gold producer at those levels stays intact.

Adam Josephson

analyst
#78

Tom, one final question from me, Tom, on that same theme. Regarding the jurisdictional risks that you and others are contending with — I mean, social unrest is increasing around the world, and not only in major mining nations. How does that shape your thinking when it comes to long-term production planning and your capacity to expand output down the road, considering the prospect of higher taxes, more disruptions, and so on?

Tom Palmer

executive
#79

Yes. Thanks, Adam. I mean, a really important element of our strategy is, as I mentioned, scale, the cost base, mine life — and another crucial piece is that the places where we decide to operate matter; so we devote a great deal of time and attention to understanding the jurisdictions we're in, to maintaining and building relationships with the jurisdictions we're in, and we've been in all of those jurisdictions for a very long period of time. And if we were to decide to enter a new jurisdiction, we would put a lot of time and attention into that to make sure we could operate in those locations over the long term. So in every location where we operate, we're very comfortable with the relationships that we have and the relationship we can sustain to support our business going forward. And we believe that is a differentiator for Newmont in the gold industry today — our very clear focus on the fact that where we choose to operate matters.

Mike Parkin

analyst
#80

You sort of covered part of what I was asking with the contractor service labor competition, which appears to be mostly government-linked infrastructure builds. My second question concerns concentrate processing: are you noticing any pressure there regarding that group's capacity — the smelters group's capacity — to process con, or the cost to process con climbing because, as you hinted at, input commodity costs are going up? Are your smelter relationships showing you anything about pressure when it comes to processing the con?

Tom Palmer

executive
#81

Yes. Thanks, Mike. Right before I hand that over, Daniel is probably in the best position to give you some color on that question; but on your — but on your remark about the first one, certainly, government-related infrastructure is there, and I think we'll keep seeing it in some of those jurisdictions even in a recessionary environment; but a number of those jurisdictions also have fairly significant demand for mining projects — mining works and mining projects; so I think a couple of dynamics are at play there. Daniel, would you like to talk about the concentrate?

Daniel Horton

executive
#82

Absolutely, and thanks, Michael, for asking. The approach we take with our customers is really long-term by nature. So even if we do encounter occasional interruptions in our smelting operations and in smelting costs, those relationships remain very strong and very long term. A lot of these partners have been with us across our various sites for decades. So we aren't seeing anything we'd flag at this point, and our concentrates, particularly for Penasquito, are quite unique material that smelters are in high demand for; so nothing notable at this point.

Bob Brackett

analyst
#83

Regarding the delayed land access at Ahafo North, can you tell us where those concerns from local stakeholders stand, how hard or easy they might be to resolve, and how fast or slowly you expect them to be addressed?

Tom Palmer

executive
#84

Bob, we enjoy very strong ties with every one of the key stakeholders involved in that process. So there are — the government has a central role across all the important branches of government, whether that's the Regional Minister, the EPA, or the Mining Minister; our relationships with those key stakeholders are very, very good. The Asantehene—the King of the Ashanti and the traditional leader—plays a tremendously significant role as a stakeholder in this process, and our ties with him are strong. Beyond that, five communities sit in and around Ahafo North, each with its own chief, and we're working hand in hand with them to settle every remaining issue, which will let us clear the crops and structures and get started. So what this process is really about—and I'd say this is a defining feature of Newmont and how we approach ESG—is making sure we join forces with every stakeholder and stay in alignment with one another before we take the next step. We don't want to rush in and begin constructing a mine unless everyone is collaborating on this project, because after 100 years of experience, we've learned that if that isn't handled properly, you'll pay for it down the road. So we don't want to commence work until all parties are aligned. I believe the work we're doing is going extremely well, and I'm very pleased with how it's coming together, but we want to ensure that each of those stakeholders supports this project as we begin to break through it. Rob, would you like to add to that?

Rob Atkinson

executive
#85

The one more point I'd make, Bob, is that for Ghana, a project like this matters enormously to keep the region's economy going — delivering training and jobs, plus the other gains the community receives. So most people clearly recognize that and definitely want it. What matters most on our side, though, is simply confirming we have complete alignment on this final piece of securing access before we actually start the first saw on site. Even so, backing for the economic development is extremely strong in Ghana too.

John Tumazos

analyst
#86

I want to thank the Newmont team for their service and for delivering such strong results during a difficult period. Is it fair to read that, in terms of the background macro picture, you aren't responding to the July 25 coefficients, and specifically that your expectation for the long run is probably normal? And given that the balance sheet is so strong, if you borrow a bit for CapEx or to fund the dividend or share buybacks, that's fine at a 0.3 debt-to-EBITDA ratio. And I'm thinking specifically about how hard things are right now, with the gold price dropping and costs up 12%, and with the spot gold market facing a bad climate for jewelry demand as disposable incomes and Central Bank purchases are lower and the ETFs are selling. And for all we know the euro goes to 50%, because many of these European governments are broke and the dollar is inadvertently strong; so you're looking through these things because who knows, maybe the Ukraine war ends. And by the way, the dividend is tagged to price, but costs are moving the wrong way; and I'm not sure there's a natural ceiling or floor in the gold market, because we don't know what the natural ceiling or floor is for inflation, interest rates, the euro exchange rates, all that stuff, please?

Tom Palmer

executive
#87

Thank you, John. I think you described very nicely how we think about our business over the long term; and it's one reason why we devote a lot of time and attention to keeping a very strong balance sheet that gives us strength when there's some volatility. But we do take a long-term view, and the long-term view, our view on gold price is still robust over the long term. But you characterized our approach quite nicely. Nancy, do you want to build on that?

Nancy Buese

executive
#88

Yes. Thank you, Tom. I’d add as well that gold’s price moves in cycles over time, so what we aim to do is make sure margins are protected when gold is high and that we’re putting cash onto the balance sheet — which is precisely what we did over this most recent period of rising gold prices. Who knows where it goes from here today, but that is the reason we wanted to be in the position we are in. A very strong production profile for decades ahead, plus a lot of cash available. So we will keep assessing all of those factors, but we really have built the business to steer through every part of the cycle.

John Tumazos

analyst
#89

So when you look at the different capital projects aimed at making the company stronger for 5, 10, 20 years down the road, would you say those are the top priority?

Tom Palmer

executive
#90

Precisely, John. And I'd say the strength we've built over the last several years stems from the capital investments we made across the prior 5 years, straight through the cycle. Take Merian at Suriname — we put money in there at the bottom of the cycle, back in 2014, '15. So it comes down to taking a long-term view, working through the cycle, and making sure you've always got a robust base plus reinvestment in the business, so that you can stay strong for a very long period of time.

John Tumazos

analyst
#91

And congratulations on coming through everything as well as you have.

Tom Palmer

executive
#92

Thanks, John. And operator, is that everyone, as far as people go?

Tom Palmer

executive
#93

Thanks, operator, and thanks to all of you for the questions today, as well as for spending the time to sit through our recap of the second quarter and a conversation about where things stand for the remainder of this year — and please enjoy the rest of your week. Thank you, everyone.

Operator

operator
#94

Everyone, that brings us to the end of this call. We appreciate your participation in today’s presentation. You can go ahead and hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Newmont Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Newmont Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Newmont Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.