Nexans S.A. (NEX) Earnings Call Transcript & Summary

April 30, 2025

Euronext Paris FR Industrials Electrical Equipment earnings 60 min

Earnings Call Speaker Segments

Operator

operator
#1

Morning, everyone, and thanks for joining Nexans' First Quarter 2025 Information Conference Call. Just a note that this conference is being recorded. <<operator_script>> At this point, I'll hand things over to your host for today's call, Mr. Christopher Guerin, Nexans' CEO. Sir, please go ahead.

Christopher Guérin

executive
#2

Thanks. Morning, everyone, and I appreciate you being with us today. Chris Guerin here, CEO of Nexans. Alongside me are Jean-Christophe Juillard, our Deputy CEO and CFO, and, naturally, Audrey Bourgeois from the Investor Relations team. I'll hand things over to Audrey, and from there we'll move into the conference call rooms.

Audrey Bourgeois

executive
#3

Thanks, Chris. Let me remind everyone on the call that any statements that aren't historical facts count as forward-looking statements under the Private Securities Litigation Reform Act of 1995. We strongly encourage readers and listeners to review the disclaimers, which form an integral part of our Universal Registration Document, as well as the audio replay of today's call, which will be posted on our website, nexans.com. I'll now hand things over to Chris, who will walk through the Q1 2025 highlights.

Christopher Guérin

executive
#4

Thanks. Let's move on now to Page 3. As you can see, the group has had a promising start to the year, showing structural strength and a lasting impact from Nexans' transformation, with organic growth of plus 4.1% for the group, reaching EUR 1.8 billion in Q1 sales. This performance, as you can notice, is driven by our Electrification businesses — PWR-Connect, PWR-Grid and PWR-Transmission — with very robust organic growth of 6.8%, reflecting excellence in operational execution on that, and a good trend as well for Q2 that we'll comment on during the Q&A session. Speaking of execution — a keyword in our transmission activities — we reached an adjusted backlog of EUR 8.1 billion at the end of March 2025, with a strong positioning in PWR-Transmission that you have seen as well. The RTE frame agreement that has been signed, which is a significant order of above EUR 1 billion, but as well — yesterday, Malta Sicily for a project that will be produced in Nexans Charleston in the U.S. In Q1, in terms of past M&A and the recent disposal, we continue to see good results in the successful integration of La Triveneta Cavi, which is delivering synergy as expected. And finally, as you are all aware, we have announced exclusive negotiation with Latour Capital for the divestment of Lynxeo, which is now expected to be completed in the course of Q3 2025.

Christopher Guérin

executive
#5

Naturally, this marks a significant milestone on the path toward becoming a pure player in electrification. Broadly speaking, 2025 is going to be a pivotal year for Nexans, and as you're aware, we have a very clear, well-defined strategy, a robust business model as a pure player of electrification, and, naturally, a very strong transformation program backed by SHIFT to keep delivering great results. Moving now to Page 4, let's examine the organic growth performance more closely. Naturally, you've noticed the very strong, I'd say, growth in the Electrification business. This quarter is particularly driven by PWR-Transmission, which delivered more than 20% organic growth in Q1. You'll get the details from JC. PWR-Grid was temporarily affected by a phasing effect that should recover with a very good, strong Q2. PWR-Connect stayed on a solid trajectory, naturally, with plus and minus lower demand in Europe and stronger in the other area, but we expect a good recovery in Q2 as well. The Metallurgy project is at 5.7%, and Non-Electrification has had a pretty slow start due to the automation and railway market, though not too negative in automotive this quarter.

Christopher Guérin

executive
#6

Regarding Page 5, every 2 years we conduct an employee survey that includes all Nexans employees, as has been our practice. What we observe is that, first, participation reached a record level in the group's history, with 92% of employees taking part in this survey. And what we see is that we are pleased to have fallen short of the 80% target in 2025 -- we hit 79%, and I can see there is a mistake on the slide. It is not '27, but 2025. We achieved a 79% engagement ratio this year, which is a very good result. Let me pass it to JC to present the business trends in the Q1 results.

Jean-Christophe Juillard

executive
#7

Thanks, Chris. Now if we go to Page 6, let's examine how PWR-Transmission performed in the first quarter of 2025. Organic growth came in at 21.7% — a very strong double-digit organic increase — driven mainly by the new capacity installation that began last year, not in Halden. We performed well on Celtic and Great Sea Interconnector during the first quarter, which partly explains that strong 21.7% organic growth. The backlog, as you can see, is evolving strongly, up almost 10% compared with the end of last year. Again, mainly, as Chris mentioned, this comes from the booking of the RTE frame agreement. Moving to Page 7, let's look at Charleston, just to answer your main question about the load of our plant in the U.S. So again, we reconfirm what we said at the end of last year: the plant is above 90% loaded in 2025 through 2028. Of course, during 2025, there will be a shift of the project between the completion of the U.S. project — mainly Empire Wind 1 and Sunrise — and the plant will be loaded with a new award we just announced yesterday, Malta-Sicily.

Jean-Christophe Juillard

executive
#8

So the U.S. backlog as of the end of March accounts for just 2.7% of PWR-Transmission's overall backlog, meaning American projects no longer pose exposure for Nexans. And to return briefly to the recent headlines regarding the halt of Empire Wind 1, should that project be stopped, it carries no material impact and no financial impact on how the company performs. Let me now turn to the following page. Turning to Page 8, PWR-Grid, organic growth of 1.7% in grid, which I'd describe as low single-digit percentage growth. There's a phasing effect tied to the second quarter of the year, when you'll see a rebound, so what we had was a timing phasing situation, chiefly in Europe, though we do have, I'd say, decent growth as the second quarter gets underway. So we'll make up for that phasing during the second quarter, and will deliver organic growth for the first half that aligns with the commitment we made at the CMD of mid-single-digit organic growth. So it really comes down to timing here in the first quarter, which is always somewhat slow because of weather conditions, mainly winter in Europe.

Jean-Christophe Juillard

executive
#9

We keep saying that North America, South America, and the Middle East have been doing quite well, especially compared with the phasing in Europe, and accessories are also performing nicely. Moving to the next page, Page 9, organic growth of 1.9% on PWR-Connect reflects pretty much the same picture, and we expect a rebound in PWR-Connect organic growth during the second quarter of the first half. So I'd describe it as a slower start to the year, but we clearly see good momentum today for the second quarter. That keeps us optimistic about hitting the growth target for the year that we committed to at the CMD in November '24. Once again, the gap here comes mainly from Europe and Asia Pacific, where organic growth has been negative, offset by very strong growth in the Middle East and Africa, very strong growth as well — double-digit growth — in South America, and strong growth in Canada. And again, the European picture — Europe, slightly negative organic growth of minus 4% — will be offset in the second quarter, largely because of a timing situation. Now I'll move on to Slide 10.

Jean-Christophe Juillard

executive
#10

Chris will walk you through a few specifics regarding PWR-Connect.

Christopher Guérin

executive
#11

Sure, absolutely. Thank you, JC. So as a quick reminder on PWR-Connect, the goal is to transition from a commodity business into a premium one. There are two key elements that make that journey a positive one. The first is technology — moving away from PVC standard cables toward fire safety technology. So this is a slide you've seen before. On the left-hand side, it expresses overall cable demand for what I'd call the building market. The second column explains the trend for wires and, of course, cables — electricity consumption, new construction, faster renovation, the safety regulation I'll comment on, and electrical network reliability. We know this is a major topic, particularly given the events Europe has witnessed in recent days, along with new electrical usages such as EV charging stations, solar panels installed on rooftops and, of course, strong demand for data centers. Then, moving to the third column, which covers adoption of safety technology, we see — in contrast with global building wire demand — that penetration of safety cable has risen 14%, and our revenue, as you can see on the graph, is a number twice as high versus 2020, with record revenue in Q1 2025 for this fire safety technology revenue.

Christopher Guérin

executive
#12

Turning to Page 11, technology isn't the sole factor driving our premiumization. Another element is the new standardized packaging that helps electricians use the product. MOBIWAY POP is off to a great start — it was introduced at our Capital Market Day in November 2024. As a reminder, this is a fully proprietary solution covered by numerous patents. We launched it in a single country last year. This year it will be in 5 countries, and later 8 and 12 countries. Adoption has been extremely high every time — whenever we've been able to roll out this packaging, the refill has performed really well. So think of PWR-Connect MOBIWAY POP as a Nespresso-style model: users get access to a machine, and then they recharge it with our patented capsule. It's a big success, and we're very pleased with it. Now let me hand things back to JC for the M&A portion.

Jean-Christophe Juillard

executive
#13

Now, regarding M&A and how we're rotating the portfolio — things are moving along nicely. First, on the M&A side, we're quite active in the same area of CMD, pursuing acquisitions in the core medium- and low-voltage cable business across various regions of the world. And I'd say we're fairly optimistic that we'll be able to share some favorable news in the months ahead. On the divestment side, you're well aware of the Lynxeo divestment, which is now very far along, and we're confident it should close early in Q3. That will, of course, be a major step toward completing our transformation into a pure player in electrification. The remaining asset, Auto Electric, is in the process of being divested as we speak, and we're confident we'll also reach a final outcome on that divestment by year-end, or very early next year. Moving now to Page 13 — just to confirm that the progress on the large acquisition we made in Italy last year, La Triveneta Cavi, is going well. We remain on track to deliver the synergies. As a reminder, we had targeted roughly EUR 20 million in recurring synergies, to be achieved after 3 years.

Jean-Christophe Juillard

executive
#14

We had a plan for making headway on those synergies, and that headway is coming along nicely. So this asset's contribution to Nexans' performance will be significant beginning in 2025. Lynxeo, as I just noted — again, you're familiar with the asset, you can see the size and the enterprise value that was signed with Latour Capital. There isn't much to add, except to confirm that things are on track, and that it will leave Nexans' portfolio at midyear 2025. And after this strong organic growth performance, I'll close by saying it's a good start to the year 2025. We're on course for a very strong first half of the year. And we confirm the guidance we announced in February of this year: EUR 770 million to EUR 850 million on adjusted EBITDA and EUR 225 million to EUR 325 million in free cash flow generation for the year 2025. With that said, that wraps up the presentation, and we'll now turn to the operator for Q&A.

Operator

operator
#15

<<operator_script>> Our initial question is from Eric Lemarie at CIC.

Eric Lemarié

analyst
#16

I have 3 questions, if you don't mind. My first one concerns Great Sea Interconnector. Can you tell us whether any notice to order or notice to proceed has come through yet? And perhaps you could share the sales as well as the gross margin or EBITDA that this project generated for you in H1? That's my first question. My second question relates to Germany. If I'm not mistaken, Nexans carries quite a bit of exposure to Germany, and I was wondering whether you think you might benefit down the road from the German investment plan? And my final question is about the United States. On Slide 24, you referred to a 19% exposure to North America, if I recall correctly. But I was wondering -- though those figures leave out our transmission and auto-harnesses. And I was wondering whether you could share with us your exposure to the United States in sales? And perhaps give us more details on the projects currently underway in the U.S., Sunrise, Empire Wind and maybe a word on Revolution Wind.

Christopher Guérin

executive
#17

Yes. So Eric, I’ll handle the first question. On GSI: naturally, we do not have the notice to proceed yet. There is still considerable discussion involving various stakeholders in that region, but we’re working closely with the clients to keep producing and to move production forward. We received the down payment again in April this week, and that puts us in a position to continue making the cables through the end of August. So on that front, things are going well. Of course, we monitor closely the issues affecting GSI in the event of a geopolitical, I’d say, event, but at this point we have no meaningful change in the project, and none in terms of production either. We got the down payment, and we continue producing in very close contact with the client. I can’t elaborate further because we are not — there is a great deal of political dimension in that contract, but we are not at the negotiating table. On the second question about the U.S., perhaps you take the U.S. one....

Jean-Christophe Juillard

executive
#18

Right. So that 19% isn't U.S. — it's North America. Which means it naturally takes in our flagship operation up in Canada for medium and low voltage, and that site contributes a meaningful share of the region's sales. On top of that, you've got the high voltage revenues out of Charleston. So the 19% reflects both of those together, though the larger portion comes from Canada.

Elyette Roux

executive
#19

Regarding Germany, as you’re aware, we’ve had a long-standing presence there for PWR-Grid and accessories. So naturally, with the German infrastructure investment plan—covering both grid renovation and grid expansion, plus the hookup of renewables—we’re positioned to capture that growth, including alongside our long-standing customers, whether that’s E.ON in Germany or major contractors. So for PWR-Grid in Germany, we anticipate positive growth ahead.

Christopher Guérin

executive
#20

That wasn’t Chris you heard — it was Elyette Roux.

Operator

operator
#21

Our following question is from Sean McLoughlin at HSBC.

Sean McLoughlin

analyst
#22

I'd like to circle back to what Eric asked about the U.S. offshore projects, since I don't think we fully got an answer there. Where do things stand on the rest of your committed backlog? And then, related to that, I'm trying to understand the mechanics of serving European projects out of the U.S. My assumption is that production costs are higher in the U.S., and vessel costs as well. So how does this end up margin neutral? Is it simply an offset from the factories staying very heavily loaded? I'm just wondering how we should think about the margin impact — the costs versus the benefits of this new model.

Christopher Guérin

executive
#23

Yeah, this is Chris. So on where things stand with producing the U.S. offshore wind farm project — Empire Wind has been produced. The cable is ready to be installed. So that's — it's all in Equinor's hands now. And we still have back-end production for Sunrise, and it will be very, very soon completed in the coming weeks, and we'll begin production of the Malta-Sicily interconnection project in Charleston in the coming months. As for the second question, JC, do you want to...

Jean-Christophe Juillard

executive
#24

To maybe take a step back for a second on the financial impact: as you mentioned, the cable is manufactured at Empire Wind 1. There isn't much revenue or margin to recognize on that project. And if the contract ends up confirmed as canceled due to the decision by U.S. authorities, then we will definitely receive a termination fee, and there will be no financial impact on us from this project. It's a very similar situation at Sunrise, where essentially we're at the end of production under the contract. And if that contract were to be terminated for the same reason as Empire Wind 1, the financial impact on Nexans would be extremely limited. So we aren't worried about financial consequences from the termination of those projects. And those 2 projects are the only ones, again, in Nexans' backlog for the U.S., and they represent less than 3% of Nexans' total backlog. So really, for us, we have no other contract in the backlog for the U.S. So no material, I would say, negative news flow impact really coming from the U.S. When it comes to the last part of your question regarding the cost of basically loading the plant in Charleston with non-U.S.

Jean-Christophe Juillard

executive
#25

On that project — I believe it's mostly a European one — the cost gap compared with manufacturing in Halden doesn't really differ. You're certainly aware that Norway is a country with high labor costs, and that's no different from South Carolina. So labor cost differences won't have any impact. Let me remind you that in a contract, total labor cost comes to roughly 7% to 8% of the contract's total value. So it isn't all that meaningful. This isn't what I'd call a labor-intensive business. And beyond that, we carry substantial contingencies on the project, averaging between 10% and 12% of the project's total value, so if any cost variances do materialize, the contingency will absorb them. Overall, whether production happens in Charleston or in Norway, there won't be any significant financial difference. And let me finish on transportation costs. I mean shipping the cable by vessel from the U.S. to, say, somewhere in Europe or the Mediterranean Sea, since we're very active right now in the Mediterranean Sea with a lot of projects. The transportation cost difference isn't significant, and when it comes to the timing of shipping the cable from Charleston versus from Halden, it's only a 1-day difference.

Jean-Christophe Juillard

executive
#26

To repeat, that figure carries no real significance. And once more — last point — returning to how transport costs fit into the overall project picture: normally it runs roughly in line with labor, somewhere around 7% to 8% of the total cost. So — and we do hold contingency. Whether we're talking about transportation, about labor, or manufacturing and shipping out of Halden, we don't view any of that as putting our supply chain or the project's margin at a disadvantage.

Operator

operator
#27

Our next question is from Jean-Francois Granjon at ODDO.

Jean-François Granjon

analyst
#28

Yes. Just a quick question about the new framework agreement with RTE for over EUR 1 billion. Could you share a bit more detail on the expected timing for this project? And you probably said probably over EUR 1 billion, so what's the potential amount expected?

Christopher Guérin

executive
#29

Yes, Jean-Francois, that one is a project worth more than EUR 1 billion. It involves DC cables, and naturally there may be some additional upside coming from that project. So it will land in '27, '28, '29 and beyond. It's a significant order, and production will take place in Halden. RTE also continues to hold a very, very robust pipeline of further orders of similar size that are due to be awarded over the next few years. That makes RTE a highly important customer for us to retain from '28 through 2032.

Operator

operator
#30

<<operator_script>> Our following question is from Chris Leonard, who is dialing in from UBS.

Chris Leonard

analyst
#31

I have just 2 questions, if I may. First, on low voltage exposure within Connect: you mentioned solid product momentum for new sales to premium customers and avenues. Do you still expect margins in Connect to improve this year, or have greater confidence in that than in the PWR-Grid segment? Second, on the buyback: I believe you started a buyback in April covering 750,000 shares, and I'm curious how far you've gotten with it. I also understand you're authorized to go beyond that potential level, up to EUR 175 million in share purchases. Do you have any time frame for when you might choose to increase the size of that buyback?

Christopher Guérin

executive
#32

You'll handle the second question, and I'll take the first one. Thanks, Chris. So on that first question: yes, our margin keeps getting better. I'd say there are two main drivers behind that improvement. Driver one is how far the fire safety technology has penetrated — obviously, that's very complex high-density polymers with very strong entry buyers. Only a handful of us can actually supply that to the market, and that gives us a premium effect on price. The second is all the ergonomics work, like MOBIWAY POP, which of course pushes the margin up. So that's element number one. Element number two is our transformation program. We like acquiring companies with a very high level of diversity, where our SHIFT program can deliver a significant level of synergy by cutting complexity. And we still have a significant spread in the Connect world, from low-performer units to high-performance units. So what we have to do, of course, is keep duplicating the best practices from the high-performing units — those above 18% EBITDA on sales — over to the others. So we have a great opportunity to lift the margin. And second, our transformation program plays a significant role in making sure our margin improvement isn't a contentual effect but a real structural effect.

Christopher Guérin

executive
#33

As for the complex — the second question?

Jean-Christophe Juillard

executive
#34

No, the second question. I'll go over again what we said about capital allocation at our CMD in November. I mean, the resources, the cash generation and also the proceeds from the divestment we're currently carrying out will go toward M&A. And as I mentioned in the presentation, we're very active on M&A. So I'm quite confident that we'll deploy that cash for M&A. We will do a share buyback, but at the moment the share buyback is only limited to avoiding dilution because of our share employee plan. This year we have an additional plan because every other year we have an employee plan where -- called ACT where employees can basically acquire a share of the company at a discount. So we'll have one specific plan on top of the regular LTI plan. So we'll just do share buyback to avoid dilution from those plans on our shareholder base. But so far, there's no other commitment on share buyback. Now if it happens that we are not, I would say, successful or the M&A plan is delayed and we are not against doing share buyback, if that would be the case. But right now, this is not the main objective and the main willingness for deploying our resources.

Chris Leonard

analyst
#35

If I could, I was actually just going to ask a third question about GSI and the seabed service getting back underway. I believe there was something in the press about the Greek government providing their own military vessels to help this continue. And I think there was also some commentary about backing from the Israeli Prime Minister as well. So when should we expect those surveys to restart? And do you have visibility on that? And earlier, I think you said you were maybe above halfway through those surveys. Is there any update on what percentage of the surveys you're through?

Christopher Guérin

executive
#36

Chris, no, I can't comment on that part, because that falls at the end of the Greek government and IPTO. So I've committed to them that I won't provide any specific additional information beyond what has been officially released in the press. So what matters for us is that the project keeps moving forward, and we'll keep producing, and we receive down payment. That's the only thing I can comment on today, Chris.

Operator

operator
#37

Our next question is from Daniela Costa at Goldman Sachs.

Daniela Costa

analyst
#38

I've got 2 items, and I'll take them one by one. On the first, I wanted to revisit the Charleston facility and that European contract. It's an HVAC contract, and I think historically HVAC contracts perhaps weren't as profitable as HVDC, and there's a lot of demand on HVDC, so it's interesting to hear. Is there anything in particular about these contracts that makes them more attractive than usual? Or why are you prioritizing an HVAC contract over potential HVDC demand that could be handled there?

Christopher Guérin

executive
#39

Right, Daniela — technology wasn’t the issue at all. Lead time was the only consideration. In terms of lead time, that project lined up perfectly with production for late ’25 and the start of 2026. We’ve got additional HVDC-technology projects coming in Charleston. So technology wasn’t what mattered; lead time was. Given how abruptly U.S. offshore wind farm activity fell off, we didn’t want to be sitting idle — call it production idleness — for over 6 months at the factory. That project therefore matched up exactly, from the load perspective, for 2025 and the first semester of ’26.

Daniela Costa

analyst
#40

Is there room to add more before 2026 at that facility from additional contracts?

Christopher Guérin

executive
#41

Yes. There are additional projects slated for '26 that we'll be making official over the next few months.

Daniela Costa

analyst
#42

Understood. My second question relates more to how competition is playing out. I realize you aren't present in the U.S. on the low voltage side, but a considerable volume of, say, aluminum imports was headed into the U.S. under tariffs. Your biggest competitor has mentioned this on several occasions — those shipments may no longer be going to the U.S. I believe imports from outside accounted for as much as 40% or 50% of the aluminum market. Are we seeing any indication that this material is being redirected toward Europe? Is this a problem at all? I know some of it originates in India, some in Vietnam. So it covers quite a long distance to reach the U.S. Could that same distance be covered to reach Europe? And is doing so feasible? What are you observing? And what are the mitigators on that front?

Christopher Guérin

executive
#43

Yeah. Not a lot — aluminum is a big factor mostly in medium voltage. The U.S. runs a deficit in both aluminum and copper. For copper alone, U.S. capacity extraction comes to roughly 1.2 million metric tons, while consumption sits above 2.5 million and up to nearly 3 million metric tons. So copper has a deficit, and aluminum has a deficit too. On aluminum, I'd say that in Europe we don't require those varied sources from Asia. It arrives mainly from Europe or the Middle East. Europe has already moved forward, I'd say, and rethought its entire supply chain when the war in Ukraine began, since there was a fairly high level of dependency on aluminum sourced from Russia. So we have — every player has fully rethought their supply chain. So we don't have any particular tension in aluminum supply in Europe so far, nor in copper, but I don't know exactly what the dynamic is in the U.S. So...

Daniela Costa

analyst
#44

Perhaps I should frame it differently: could there be a dumping risk for aluminum in Europe — coming from Asia, from those locations — the ones that had been importing — now exporting into the U.S. — might they dump aggressively into Europe?

Christopher Guérin

executive
#45

Up to this point, that hasn’t happened. Still, I believe the point you’re raising matters a great deal, and we have to stay highly watchful about how things develop over the next few months.

Operator

operator
#46

Our next question is from Max Yates at Morgan Stanley.

Max Yates

analyst
#47

I just want to ask about the possible termination fees tied to Empire. Mechanically, how do those actually operate? Because I guess what you're saying is there's no financial impact, but would you still receive, let's say, the installation fee that would be attached to that contract? Because I think this concerned a contract worth EUR 200 million. So then you just get back the cost of producing the cable. So potentially, that's a somewhat lower EBITDA figure than you would have assumed on EUR 200 million of revenues. I'm just trying to understand how it actually works in practice.

Christopher Guérin

executive
#48

Yes. Thanks, Max. So the termination fee breaks into 2 parts. One is a contractual termination fee, amounting to 7% to 10% of the contract value. The other is a termination fee for convenience, and we need to examine precisely what that means under the contract, but essentially it covers any costs incurred that haven't been paid, plus exposure to whatever you might have left on the contract should it be canceled. So essentially, our analysis shows that the termination fee on both contracts, and particularly for Empire Wind 1, largely covers the missing margin and revenue, and margin and cash, I'd say, that remains on the project. For installation, for Sunrise and the installation, if canceled — which, again, is not the situation. Empire Wind has been notified as a stoppage by the U.S. authority. We've had no news on Sunrise. So as far as we're concerned, Sunrise is a contract progressing normally. We're simply taking a worst-case scenario here on Sunrise. We'll need to look at the installation, what that means. But essentially, the principle is somewhat the same as any — you get 8% to 10% termination fee.

Christopher Guérin

executive
#49

And then beyond that, there’s termination for convenience, which essentially covers any exposure you’ve already incurred. But again, as we speak today, Sunrise has not been canceled, nor has it been stopped.

Max Yates

analyst
#50

Got it — that's useful. And perhaps just regarding medium voltage capacity in Europe: do you have any sense of what your competitors are up to, and what you're doing when it comes to adding medium voltage capacity? Because my understanding is that, I suppose, most people are bullish about distribution spending in the U.S. and in Europe. But how would you frame the capacity that's been added, the utilization across the industry, and whether there are shortages, excess capacity, or we're at roughly the right level when you look at the industry overall?

Christopher Guérin

executive
#51

Elyette?

Elyette Roux

executive
#52

Elyette here. So, as you're aware, there's no way for us to weigh in on the competition review regarding medium voltage capacity in the EU. What we can address is what we already shared at our CMD: we made early investments across a number of plants so we'd be positioned to handle the strong demand for medium voltage for PWR-Grid. That demand, as you know, is being propelled by the key trends of grid renovation, renewables connection, data centers, and factories. So we're keeping that going. And as you know, we've disclosed multiple investments, as I mentioned, in a number of countries. I hope that answers it.

Christopher Guérin

executive
#53

But at this point, I'd say our capacity utilization in Europe is quite thoroughly saturated, and that's something you'll notice in the Q2 growth we're going to generate over the next few months.

Operator

operator
#54

Uma Samlin from Bank of America has the next question.

Uma Samlin

analyst
#55

To start, I want to ask a follow-up question about your Charleston facility. How would things work with any possible U.S. tariffs if you manufacture in the U.S. yet ship to clients in Europe? Are you -- do you face any exposure when it comes to tariffs on raw materials?

Christopher Guérin

executive
#56

No. No, that was — in the U.S., there was a clearance for copper and aluminum supply. So I'd say the chemicals are local in the U.S., and the main question was about excess aluminum over copper, and they've been exempt from President Trump's new tariff policy.

Uma Samlin

analyst
#57

All right. But I’ve also been hearing from a few companies that local players have raised prices too after the tariffs. Is that something you’re seeing in the U.S.? Is there any kind of — yes — or for aluminum?

Christopher Guérin

executive
#58

On copper, we actually have our own supply source, since we have vertical integration of metallurgy up in Canada that feeds straight into Charleston.

Uma Samlin

analyst
#59

Alright, my second question concerns the GSI. So if I have this right, you said the notice to proceed hasn't arrived yet, but you'll keep producing ahead of it. So in a worst-case scenario, if the project doesn't go forward, what are your plans for the capacity currently reserved for the GSI? And what contingencies do you have in place?

Jean-Christophe Juillard

executive
#60

So GSI is MI technology—that's the mature one, and I'd also call it a technology that's fading. What I mean is, there are fewer and fewer awards and contracts for MI technology, since XLPE has taken over. Of Nexans' 6 high-voltage lines, 2 are production lines for us. And essentially, if GSI were to be canceled, we do have other projects in the pipeline that we're pursuing to secure awards that would take GSI's place. The reality is there could certainly be a stretch of time with a gap between winning the award and being able to fill the line. Something else we'd do is shut down our small shop facility in Japan, which runs on MI technology, so we'd be left with just one MI line, in Halden. And the financial hit from losing GSI, and from the gap before GSI gets replaced—I wouldn't call that especially large. And it definitely won't affect our 2028 target, even though GSI's contribution through 2028 was meaningful. You can picture it—every single day we're working on the plan B in case GSI gets stopped, and we've made progress on it, and we have a detailed plan for how to replace the project should it stop.

Christopher Guérin

executive
#61

Yeah, I believe you've got a point there, JC. That's a fundamental piece of it. If we'd tried consolidation 6 months ago, managing it would have been very, very complicated for us, but at this stage plan B is moving forward. So we're pursuing both at the same time. That means our confidence level when it comes to replacing, if that becomes necessary, keeps climbing with each month that goes by — it's higher and higher.

Operator

operator
#62

Our following question is from Lucas Ferhani, who is on the line from Jefferies.

Lucas Ferhani

analyst
#63

I've got 3, if that's alright. First, on what you've been seeing trend-wise in April, particularly for Grids and Connect — you mentioned a Q2 recovery, so I just want to check whether April is beginning to reflect that. Second, how are you viewing the possible second derivative effects stemming from tariffs — from the certainty side and any potential kind of macro slowdown? Are you picking up any signals of that in Connect specifically, or nothing thus far? And the last one concerns what took place in Southern Europe with the blackout. Do you see any sort of risk tied to kind of cable damage? And apart from that, how do you figure your portfolio in grids and accessories actually gains from kind of supporting grid resilience, which is now more of the topic?

Christopher Guérin

executive
#64

Thanks, Lucas, for those questions. So Elyette, perhaps you'd like to weigh in on Grid regarding what April's trend looks like?

Elyette Roux

executive
#65

Yes, definitely. As for what we’re seeing in April, we’re already full and are indeed executing with the momentum that JC has announced. Essentially, as you know, it’s a phasing effect. So we will fully deliver not only April but the entire Q2, in line with the mid-single digit we announced before the CMD.

Christopher Guérin

executive
#66

On Connect, April was solid, though I can't say with 100% certainty that June will be, since we only have one month of visibility. That said, we're watching closely what Rexel, Sonepar and West Coast have announced, and they're seeing pretty healthy momentum in the months ahead. So I'd call us confident for Q2, for both Connect and Grid. On the second question — are we seeing any macro slowdown in Connect? I think some regions are already in recession, and that's been true since Q3 for Europe and since the start of 2024 in Oceania. We've had a very strong rebound in Canada, a very strong rebound in South America, and a very strong rebound in Middle East, Africa. And we believe that — even though visibility on Oceania is limited at the moment — in Europe, let's say, we believe we've already hit the low point and that we'll see a strong improvement, a good improvement, I'd say, over the coming months. On Element 3, Elyette?

Elyette Roux

executive
#67

Yes. On that last point, at this stage I think nobody can determine whether it has anything to do with a network cable issue. By the way, typically in networks, the problem does not originate with the cable. As you know, in Europe and also in the U.S., we have very old, aging cable systems. During our CMD we explained that the problem usually stems from the connection point, where the accessories are located. So certainly, what we have announced in terms of having a smart portfolio and advanced offers, for both grid and accessories, will help with grid resiliency as it already stands today. And we have loyal customers in Spain and Portugal who are indeed buying from our portfolio for the underground network. So we are pleased to say that we contribute to grid resiliency, and we look forward to learning what the reasons behind this blackout are, because maybe we will be able to contribute with our offers.

Christopher Guérin

executive
#68

Yeah, absolutely, Elyette — I'd call it an unfortunate situation. Still, incidents like that serve as a reminder to everyone that the electrical grid forms the backbone of a nation's economy. And whenever a blackout hits, the harm isn't limited to physical damage to equipment — daily life grinds to a halt, transportation grinds to a halt. Quite suddenly, many of us have come to realize just how heavily we rely on electricity. So naturally, that — this morning we heard the TSO announce, from every corner of the globe, that they intend to focus on making their grid backbone more resilient, on strengthening the power grid network, and that they'll continue putting money in, since that will, of course, be a major growth driver for us over the years ahead.

Operator

operator
#69

Alasdair Leslie from Bernstein has the next question.

Alasdair Leslie

analyst
#70

Okay, a handful of things still to cover. First, a quick follow-up about transmission. Thanks for laying out the transportation costs and the transit times from the U.S. into Europe — Charleston, I believe. How does Asia stack up on that front? Take Japan, in your case, shipping to Europe — what are the costs and the timing there? And perhaps a bit more broadly on transmission: could you help us calibrate what you now expect for full-year growth in that business? Q1 was obviously very strong. Consensus, as I understand it, sits near 6% for the full year. What growth range should we have in mind, factoring in, I suppose, the GSI risk that's still there for the full year? Then one last question, if I can squeeze it in, on Connect. You mentioned that Europe has lagged in residential. Did you see any sequential deterioration in particular markets there? And you spoke about improved momentum in Connect in Q2 — I wasn't clear whether that reflects a rebound in Europe or is driven more by other regions.

Christopher Guérin

executive
#71

I’ll begin with that final question about Connect. Across the residential market, conditions are extremely weak — extremely weak in North America and extremely weak in Europe. Most of the growth we’re generating comes from commercial infrastructure — commercial and industrial, sorry — and from data centers as well. Even so, residential stayed a very soft market. We also saw fairly strong demand for building renovation. As for question number 1 or 2, JC?

Jean-Christophe Juillard

executive
#72

Regarding your first question, producing in Asia and Japan is somewhat pricier in terms of cost compared with making things in Halden and Charleston, that's for certain. The timing runs a bit longer too. Still, let me remind you that we only have MI technology, and it's a small — the production level, speed, and quantity aren't on par with the line we run in Halden. At most, I'd say it's 50 to 60 people, more than its full — I'd call it full capacity, full production like ours. That said, the cost does come in somewhat higher. But when you've got a project such as GSI, for instance, which carries a very strong margin with a very high level of contingency, the gap in speed and timing for shipping the cable to the Mediterranean Sea doesn't make the difference, for the reason I laid out about the low portion of cost that shipping, logistics, and labor represent within the total magnitude of the project cost. So I mean, on a project like GSI, it definitely doesn't move the needle, and whatever difference exists gets absorbed inside the contingencies and is built into the project's cost structure.

Jean-Christophe Juillard

executive
#73

On the second part of your question, which concerned the forward-looking organic growth picture for transmission: we expect a solid year for transmission where organic growth is concerned. For the full year, transmission organic growth will be in double digits. Our first quarter was strong for the reason I laid out in my presentation — last year we only captured the full benefit of the new production lines ramping up midway through that quarter, whereas this year we have them from day one of the quarter. Even so, our second quarter will come in at double -- low double digit, followed by a strong H2 with, I would say, organic growth more in line with, I would say, above 15% in H2. So overall, it will be a rather good year for organic growth in our transmission business, which obviously makes sense given the larger backlog we need to execute and the ramp-up of the new big contract sitting in that backlog. And as you rightly pointed out in your question, this of course also hinges on how GSI is confirmed or not.

Operator

operator
#74

Our following question is from Miguel Borrega at BNP Paribas Exane.

Miguel Borrega

analyst
#75

I'd like to get a clearer picture of your EBITDA guidance. You said before that even if GSI were canceled, the range's low end could still be reached. Up to now, that project hasn't been canceled. At this point you're telling us the following milestone comes in August. That means you'll likely recognize all revenues and profits during the first half. So does this mean the low end of the range is now locked in, and that we're really looking at somewhere between the midpoint and the top end of the guidance?

Jean-Christophe Juillard

executive
#76

Well, I mean, I haven't — basically, the expectation for hitting the guidance for the year hasn't moved or changed. You're right to point out, Miguel, that if GSI, as I said in February, if GSI had been canceled right at the start of the year, then we'd be more toward the low part of the range. That's definitely the case. And it's becoming less and less likely, because as we've received payments and cash since then, obviously, we're securing the year more and more. And now most of the — I mean, at least 50% or 60% of the year is behind us. So definitely, I'm — we're not likely to get to the low part of the range, but more around the mid part of the range. And again, if the organic growth is confirmed in the second quarter, the way we see it, both in terms of Connect and Grid, especially more in Connect, which has less visibility, then definitely, we should be shifting to the higher part of the range. So that's how we see it. Right now, the momentum is quite good. And don't forget that this does not include the divestment of Lynxeo, because the guidance excludes any change of perimeter.

Jean-Christophe Juillard

executive
#77

Just keep in mind that Lynxeo is being divested—that's about EUR 45 million of EBITDA over 6 months—and it should leave the company's perimeter as of July. Obviously, that has to be restated inside the guidance, because the scope is changing, and also potentially—though the timing of when M&A lands during the year is more uncertain, whether it comes in the second, third, or fourth quarter—there will be some contribution from that. But that's essentially how I see it. With scope unchanged from today, we should now be, I'd say, in a normal-case situation, more toward the middle part of the range, and confirming organic growth in the second quarter, we should be moving toward the upper part of the range—I confirm that.

Miguel Borrega

analyst
#78

Okay, and just to wrap things up on PWR-Grid — I recall that in the back half of last year, the margin came in somewhat softer on a sequential basis. Is there any reason for concern this year? Or do you still believe you can exceed the prior year's full-year guidance — a full-year margin of 13.7%?

Jean-Christophe Juillard

executive
#79

No. What I mean is, as we look at it right now, grid should be delivering a solid margin level. We ought to be right at the level we saw in 2024, without question. We don't see anything significant changing.

Operator

operator
#80

And our final question is from Philipp Schweneke, who is on the line from DWS.

Philipp Schweneke

analyst
#81

One — two questions, please. First, regarding Autos, you mentioned a possible disposal as soon as early next year. That seems to differ from what was communicated previously, when you said a settlement in Ukraine was needed first. So what's changed? Second, in the United States there's a lot of tendering for onshore networks — is your Charleston factory able to compete for those deals, as you used to do onshore cables in the past, I believe.

Christopher Guérin

executive
#82

Perhaps I should address the second question. Yeah. Naturally, Charleston can handle both land-based and subsea interconnection. Still, whenever possible, we favor utilizing our Charleston facility for subsea interconnection, since we have what I'd call balanced capacity in both installation and production. And with land interconnection, you're no longer using your vessel. Naturally, the margins we currently observe on subsea interconnections are somewhat superior to those we see for land in the U.S. market. As for the first question, JC, would you like to take it?

Jean-Christophe Juillard

executive
#83

Yeah. So on auto electric, perhaps we haven't been clear, but an end to the Russia-Ukraine conflict isn't necessary for us to divest the asset. I mean, I'd remind you that this asset has not been affected at all from when the war began in 2022. It has been producing at full capacity, fully operational, and even carrying more load than expected thanks to some other competitors such as Leoni — if you recall, Leoni went bankrupt. So in fact, the asset has been performing very well. I mean — so even for the divestment, the war ending wasn't a trigger. And today, we're making progress on that front. And even though the war isn't over yet, it isn't stopping the business or the divestment process, nor does it have any impact on either.

Operator

operator
#84

That brings us to the end of the question-and-answer portion. I'll now return the call to your host, who will wrap up today's conference. Thank you.

Christopher Guérin

executive
#85

I appreciate it very much. Many thanks for everyone's focus, and I'll see you when we report Q2 and the half-year results in July. Thank you.

Operator

operator
#86

Thanks for being on today's call. You can go ahead and disconnect now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Nexans S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Nexans S.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research