operatorThanks for holding, and welcome to the Nickel Industries Limited call on our 2022 half year results. <<operator_script>> At this point I'll turn the conference over to Mr. Justin Werner, Managing Director. Go ahead, please.
Justin Werner
executiveThanks, and welcome, everyone, to the first-half results call for Nickel Industries. Could I just ask the webcast operator to advance the presentation to Page 2? Sorry — the next slide. Thank you. So the half was a record one both operationally and financially. I'm pleased to report profit of USD 161 million, operating profit of USD 140 million, and profit after tax of USD 118.4 million. This really continues what we saw last year, with EBITDA still converting strongly into free cash flow, and that's largely because we currently pay no tax and have very little sustaining CapEx. On the tax breaks received during the half, both Angel Nickel and Oracle Nickel were granted tax holidays, 10 years in duration with a further 2 years after the 10 years at 50% of the Indonesian tax rate, which will be about 11% to 12%. I'm also pleased to declare another interim dividend of AUD 0.02 per share, which maintains the dividend from last year. It was a record half for production, 26,733, as we just caught Angel Nickel commissioning in the second quarter of this year. Nickel Industries attributable production came to 21,386 tonnes. RKEF sales revenue was USD 511 million, EBITDA at USD 158.6 million, and we'll look at how that compares with last year, but certainly a significant increase, and also a very strong EBITDA margin of USD 6,122 a tonne, so significantly higher than last year.
Justin Werner
executiveHengjaya Mine is genuinely beginning to make a meaningful contribution to cash flow at Nickel Industries. Output from the mine exceeded 2.3 million wet metric tonnes. EBITDA came in at USD 27.6 million for the half. In April, we restarted selling limonite ore to the HPAL plants that were recently commissioned next door. We are also benefiting from the cash flow those limonite ore sales generate. That lets us monetize part of the ore body that historically was simply regarded as waste or overburden. We are additionally building a haul road linking the HM mine to the IMIP. When that haul road is finished, we anticipate that roughly around the second quarter of a year, we will begin to see another significant ramp up at Hengjaya Mine and the corresponding substantial cash flow contribution. At the corporate level, we closed the USD 212 million capital raise, and we successfully commissioned and ramped up ANI, once again, ahead of schedule. We have picked up an initial 30% interest in Oracle Nickel, which is being built and is due for commissioning in October of this year. We completed the definitive agreement to acquire the Siduarsi Nickel-Cobalt project, and drilling is underway there at present.
Justin Werner
executiveWe were happy to publish our first sustainability report, and we signed 2 MoUs covering 2 solar projects, and 1 of those has now been turned into a binding term sheet. That solar capacity comes to roughly 440-megawatt peak in total. And that forms part of our decarbonization plan. And we renamed the company Nickel Industries, which better reflects what the business actually is. If we could just go to the next slide, please. So to sum up the first half, as I mentioned, strong and consistent RKEF production from both HNI and RNI, and we began to see some initial results from ANI. And you can see a significant improvement between the first half of 2021 and the first half of 2022. Revenue up 78%, profit up 73%, operating profit up 58%. And that really stems from increased margins. And those margins, I should note, were achieved despite cost inflation and elevated coal prices. And so we -- it really is a very, very strong result. As I said, we've had a material profit contribution from the Hengjaya Mine and we're happy to maintain the AUD 0.02 dividend. If we could just move to the next slide, please. On the balance sheet, it remains very conservatively structured, with significant flexibility for the future and for future growth opportunities as they come up.
Justin Werner
executiveOur total debt is roughly USD 550 million, and that includes USD 325 million in senior unsecured notes maturing in April 2024. We announced not long ago a USD 225 million debt package consisting of senior secured notes maturing in August 2025. So there is considerable runway regarding when that debt must be repaid. And as I noted, our gearing remains very conservative, which gives us the chance to take advantage of future growth opportunities when they come up. If we could turn to the next slide, please. Regarding the RKEF operations, once again, a record half-year result. We managed to raise total nickel production, or nickel tonnes, by 32.3%. And that was -- we have begun to see Angel Nickel, which came online in April, starting to add to our nickel tonnes. Happily, as I said, looking at the bottom line, RKEF EBITDA margin per tonne has risen to $6,122 in the first half of this year compared with $5,022 at the same time last year. So that is a 21% increase in the face of rising inflation and rising costs. So we consider that a tremendous result. If we could just move to the next slide, please.
Justin Werner
executiveRegarding the RKEF operating performance, you can see the light blue contribution from Angel Nickel, especially in this year's second quarter. We're pleased to say that Angel Nickel has now fully ramped up and is running above nameplate capacity. So we anticipate hitting the 130% capacity that we've been reaching at both HNI and RNI. If you could move to the following slide, please. I referenced the record EBITDA per tonne margins, and an increase in the nickel tonnes we sold has also helped with that. We did see a substantial rise in realized contract prices. But as I mentioned, we're glad to report that on top of those higher realized prices, we were also able to capture an increased margin. Just go to the next slide, please. Here you can see NPI pricing across the year. That has obviously enabled us to deliver the record EBITDA per tonne margins we've been able to report. It has declined recently, and that's really a result of what's happened in Ukraine as well as some slowing in stainless consumption in China, which is largely being driven by their 0-COVID policy.
Justin Werner
executiveWe don't anticipate that policy lasting much longer, given the upcoming reelection. So even though we're in a stretch where NPI prices have come down, our margin is still pretty robust. If we could just advance to the next slide, please. I brought up the Hengjaya Mine. It's delivered a record half year, with output of more than 2.3 million wet metric tonnes, made up of 1.6 million wet metric tonnes of saprolite and 784,000 wet metric tonnes of limonite. EBITDA came in at USD 27.6 million. That's a 140% increase versus the same time last year, and with the LME nickel price strengthening and ore being linked to the LME, we're currently seeing higher realized oil prices. We're also enjoying the upside from selling our limonite ore and the margins we're earning on that limonite ore sale. As I said earlier on the call, the haul road is being built, and the plan is, once that haul road is running, to ramp up the Hengjaya Mine to well above somewhere in the range of 8 million to 10 million tonnes per annum. So it will be a material contributor to the business in terms of cash flow.
Justin Werner
executiveLet's move on to the following slide, if you don't mind. At the corporate level, we finished an equity capital raise. That had 2 parts to it. Through an institutional placement, we brought in USD 106 million, and it was strongly supported. We then wrapped up a placement to Shanghai Decent of the identical sum, USD 106 million, which came after FIRB approval and has since risen to 21%. And we're clearly quite pleased that Shanghai Decent is taking a substantial portion of the consideration in nickel mine shares. In our view, that's a strong endorsement of the company and of their confidence in Nickel Industries. We reported the successful commissioning and ramp-up of ANI significantly ahead of schedule. And a modest share of Angel Nickel's contribution showed up in our half year results, roughly 7,466 tonnes. As I said, it's now running above nameplate capacity at approximately 130%. So on an annual basis, we anticipate it operating well above something like 40,000 tonnes per annum. We also commissioned the power plant just recently, so we expect to see the cost structure for ANI improve going forward. The ownership interest in Oracle Nickel, which is currently under construction and scheduled for commissioning in October of this year.
Justin Werner
executiveThe money raised from the placement to institutional shareholders, and to Shanghai Decent as well, went toward buying an initial 30% stake in Oracle Nickel. Thanks to the debt package we finished not long ago, we'll be able to fund the increase to 70% ownership. And as I mentioned, we're expecting the first NPI production in October of this year. So that has been sped up too. When all 12 lines are running, our nickel output will exceed 130,000 tonnes per annum on a 100% basis, and that puts us solidly among the top 10 nickel producers worldwide. So we managed to get there in a very short stretch of time. Nickel matte strategy. We finished the modifications enabling us to produce nickel matte. CapEx came in quite low for that kind of thing — a bit over USD 1 million for both lines. We're watching the market at the moment, and if an opportunity appears where we believe nickel matte could earn a better margin, or where demand timing favors nickel matte, switching just 2 of our 12 lines makes sense, and then we'll take that decision.
Justin Werner
executiveSo that gives the company diversification. It provides exposure not only to the NPI or Class 2 NPI market — we'll also get direct exposure to Class 1 nickel and to current LME pricing. I brought up the acquisition of the Siduarsi Nickel-Cobalt project. That's a contracted work. Indonesia has just 3 other nickel contracted works, and Freeport and others explored these before, drawn there by the attractive cobalt values. We're drilling it right now, aiming to find what we believe could be a world-class limonite deposit. It's located on the Indonesian side, across from Papua New Guinea. On the other side sits <<inaudible>>, the lowest cost HPAL project anywhere in the world. So in our view Siduarsi is certainly showing that the ore body would line up with what exists today at <<inaudible>>. And finally, after shareholder approval, we renamed the company Nickel Industries, previously Nickel Mines. As I mentioned, we feel that better reflects the business and our operations ahead as we keep moving downstream and diversifying within the nickel industry. That's the last slide — with that, I'll hand things over for questions.
Justin Werner
executiveI appreciate that.
Operator
operator<<operator_script>> Adam Baker from Macquarie has our first question today.
Adam Baker
analystThere's been a fairly large increase in receivables and inventory on the balance sheet over the past six months. I'm just curious whether you could comment on that — should we expect these to unwind in the second half?
Chris Shepherd
executiveAdam, Chris here. So, receivables are up. A major reason for that is clearly Angel coming online at more than twice the production size. Naturally, you're going to see that receivables rise. I'd like to point out to everybody that every one of our receivables sits within the payment terms — the contracted payment terms — as they have all year long, and they still do — so will it unwind? No; given that Angel is now online, you should really expect receivables to remain comparatively elevated. This is a comparison of 8 lines running against 4 lines in the prior year. So I think <<inaudible>> to keep that in mind.
Adam Baker
analystSure. Regarding inventory, do you anticipate those staying somewhat elevated now that Angel is online too? Is it basically the same situation? Or are you...
Chris Shepherd
executiveAbsolutely not. Once you go from 4 lines to 8 lines, inventory is clearly going to rise, and that trend will keep going. It's a defining feature of how we operate. As everybody is aware, we keep inventory both in the centralized stockpile and at every one of the RKEF lines, and we'll keep doing that.
Adam Baker
analystSure, great. So, that USD 100 million of contributions from the noncontrolling interest in the cash flows — is that a kind of prepayment from Shanghai Decent that comes ahead of the capital range? I'm just having trouble understanding what that is.
Chris Shepherd
executiveAdam, I'm afraid we just lost you.
Adam Baker
analystRegarding that USD 100 million of noncontrolling interest contributions in the cash flow — I'm just wondering whether that represents some kind of prepayment from Shanghai Decent ahead of the capital raise, or what exactly that figure is?
Chris Shepherd
executiveThat falls under the Oracle construction payments within Oracle Construction as Oracle comes online. Shanghai Decent is putting funding into it, and our payments for that have been made.
Richard Edwards
executiveApologies, Chris — Richard Edwards speaking, let me jump in here if I may. That particular contribution really relates to the construction at Angel Nickel, so at the point when...
Chris Shepherd
executiveMy apologies — was that Oracle I mentioned?
Richard Edwards
executiveCorrect.
Chris Shepherd
executiveMy apologies. Angel. My apologies.
Richard Edwards
executiveCorrect. Yeah. So after we reached 80% on 30 September, every cost tied to the Angel project now flows via our books, though Decent still had to put in — or <<inaudible>> — money to fund construction. That cash gets contributed by Decent and then disbursed by our Indonesian operator, which runs as Pte Angel Nickel Industry, so it all passes through the group accounts.
Chris Shepherd
executiveMy mistake, Adam—I meant Angel, not Oracle.
Adam Baker
analystThat's fine. And I was just curious whether you could say something about what's been reported in the media regarding Tsingshan potentially selling certain assets in Indonesia.
Chris Shepherd
executiveYes, I believe I'll hand that question over to Just.
Justin Werner
executiveYes, thanks, Chris. So, yes — no, what they're aiming to do is divest a portion of their stainless capacity, roughly 1 million tonnes out of their 4 million tonnes, to Baowu, a state-owned company. Baowu wants to grow its stainless steel capacity, and it also has <<inaudible>> a joint venture in Indonesia with Vale right now, building 8 RKEF lines north of IMIP. And part of why Tsingshan is selling down — it should be noted, I mean, this represents a small piece of the industrial park, sort of 8 RKEF lines and 1 million of 4 million tonnes of stainless capacity. There are currently 75 operating RKEF lines, with Tsingshan holding a majority across most of them. The rationale is that they want to diversify their business. They're seeking to become more involved in battery metals. They're listing — they do have a battery metals business in China, which is listing on the Hong Kong Exchange. They recently announced a deal with Eramet for a lithium project in South America. And we think they have fairly ambitious plans for HPAL and MHP and production within Indonesia. So we view it purely, as I said, as diversification, and we see Baowu entering the industrial park as a positive.
Justin Werner
executiveThere are quite a few partners across the industrial park. So it's not out of the ordinary for Tsingshan to sell equity stakes in its operations, which is what it did with Nickel Mines and what it has done with several other partners.
Operator
operatorPatrick Collier from Credit Suisse has the next question. Now we'll move on to the following question, from Mitch Ryan at Jefferies.
Mitch Ryan
analystFirst, on nickel matte and converting those lines — can you confirm what I understand, which is that all the infrastructure is already there? It's basically just a case of almost pushing a button to switch between the two. Is that right? And second, what's the timeframe before you'd see nickel matte coming out of those lines?
Justin Werner
executiveYou've got that right. The capital expenditure is already done, and the modifications are complete. So all that's left is to make that call. On timing, after the decision is taken, roughly 2 weeks are needed to get to a saleable nickel matte product in the interim. We turn out an off-spec product, which can still be sold, though it isn't on spec. So production isn't disrupted. But from making the decision to producing saleable on-spec nickel matte, it's around 2 weeks.
Mitch Ryan
analystMy second question has to do with Indonesia's government, which has been cited in press reports lately saying they're aiming to, I suppose, aiming to put out a tax policy meant to encourage domestic output of, I guess, more of a battery materials chain as well as nickel products of higher spec. Is there any commentary you're able to offer about that, or any perspective on where that might be headed?
Justin Werner
executiveYes. Look, that is accurate. My belief is that the government is going to put it into effect. The reason behind that choice, and it is highly logical, is that clearly we have witnessed enormous expansion in nickel pig iron ore and even stainless in Indonesia. Indonesia now ranks as the second biggest stainless steel producer worldwide, owing to Tsingshan. Because of that, the ore feeding all of those RKEF lines is saprolite, which is a higher-grade ore. Getting to that saprolite demands taking out lower-grade limonite ore. While that limonite ore is being removed, it is in fact sterilized. And we have now observed, with the successful commissioning and ramp-up of <<inaudible>> or the HNC HPAL project that we were visiting just this past weekend, the fastest construction time globally, the fastest ramp-up, the biggest HPAL plant running anywhere in the world, presently earning very good profits. The Indonesian government is eager to clearly witness additional development in that nickel space that applies to the EV-battery market. And really the main factor behind that choice is that, as I mentioned, there are hundreds of millions of tonnes of limonite currently being sterilized, which could be processed through HPAL plants. So the government is merely seeking to incentivize people to consider HPAL opportunities instead of NPI opportunities.
Justin Werner
executiveOne more point I’d add is that a great deal of NPI output is now produced in Indonesia. The government is aware of this and does not want an excess of NPI. So I believe it is at ease with the capacity that has already been constructed, and the next priority, as I mentioned, will really be nickel for the Class 1 EV-battery segment.
Operator
operatorThe following question is from Patrick Collier of Credit Suisse.
Patrick Collier
analystI was having some audio problems earlier. Are you able to hear me at this point?
Justin Werner
executiveAbsolutely.
Patrick Collier
analystTo start, I want to pick up on what Adam asked about working capital. With Oracle coming next in the pipeline, I'm curious what your thinking is on working capital as that ramps up, but then also presumably there's some unwind given NPI as well as input prices that seem to have come down — so how are those two factors likely to offset each other? Any thoughts on that?
Chris Shepherd
executiveAppreciate that, Patrick. Right — as you mentioned, once Oracle starts up, we'll clearly see a working capital buildup for Oracle, and it's just like Angel: how much that working capital is worth, or how it's priced, obviously hinges on nickel ore and coal prices — or rather the market prices at the moment we build it up. As you know, that's not a thing we can forecast with much precision, coal especially.
Patrick Collier
analystRight, that's clear. Now, regarding stockpiles—you brought up the centralized ones when discussing working capital. Just so we're clear, though, are there internal stockpiles recorded in your company's books, as opposed to stockpile...
Chris Shepherd
executiveStockpiles are held by us at HNI and RNI. In addition, an allocation of the stockpiles comes to us for Angel and Oracle too.
Patrick Collier
analystAll right. So those allocations—they do come through, then?
Justin Werner
executiveAbsolutely.
Patrick Collier
analystAll right, and as a follow-up — you talked about margins being robust and, obviously, some decline in NPI prices, but I'm just wondering whether you could say a bit more about where you expect margins to go during the quarter, based on what we've discussed throughout the quarter at this point. Any thoughts on that?
Justin Werner
executiveYeah. No, clearly we posted record EBITDA margins in the last quarter. As you noted, NPI pricing has contracted, and that's going to bring margins down this quarter, though it's partly offset by Angel Nickel ramping up, which, like I said, is moving ahead from essentially this month at roughly 130% of nameplate capacity. So yes, margins are contracting this quarter, but increased output from Angel Nickel is offsetting that.
Patrick Collier
analystAll right, then — is it fair for us to also expect that unit costs will come down?
Justin Werner
executiveUnit costs are beginning to come down a little, though not as quickly as the drop we're seeing in NPI costs. What's interesting, however, is that we're seeing a delay before those costs show up. That said, it let us capture a very high margin last quarter and the one before it. So there is some lag working its way through, yet those costs are coming down too — simply not at the same rate.
Operator
operator<<operator_script>> David Coates from Bell Potter Securities is our next person with a question.
David Coates
analystTo follow up on a few things people have already raised. First, regarding nickel matte and how costs flow through as it ramps up — should we expect any nickel matte output during this calendar year? That's my first question.
Justin Werner
executiveYeah, Dave, I believe that's right — absolutely, we are definitely keeping an eye on pricing and also watching margins. So my sense is that we'll probably aim to generate a nickel matte at some point prior to year-end, for sure.
David Coates
analystAnd as far as how that affects revenues — I think the simplest way to think about it is as mainly a higher payability rate, along with a certain amount of nickel production, I'd say.
Justin Werner
executivePart of the rationale for shifting into nickel matte comes from the margin gap—either the actual difference or our estimate of it—between nickel pig iron and nickel matte. Another factor is simply gaining diversification and beginning to build a presence in that Class 1 market. A number of inbound inquiries have already come to us from various end users. As I believe everyone is aware, Tsingshan consumes our nickel pig iron. Nickel matte goes to third parties, and demand for that nickel matte is robust. So the move is driven in part by the margin decision, and also by diversification and possibly exploring new buyers, or to take that nickel matte?
David Coates
analystAnd going by how you think the Indonesian government's export tax on nickel products might be structured, would nickel matte fall under it?
Justin Werner
executiveIt's not clear at this stage. It might, though I should note, I mean, I think we're potentially looking at NPI at around 5%. The government has said that this will also be a sliding scale depending on NPI pricing or LME pricing, as well as costs. So yes, we still haven't received clarity on it. But given that we have a 10-year tax holiday, it's a small amount. And I mean, I think if you look at what's happening here in Australia, with the Queensland government imposing 40% royalties on coal, it's going to be very modest. So -- and really, it's -- as I said, it's really to encourage the development of battery nickel Class 1. So we've obviously seen rapid development of stainless steel in NPI. The government would now like to see a similar sort of trajectory for those battery metals. We obviously had Tesla signing MoUs with Tsingshan and a number of automakers BMW, Ford to name a couple, battery makers such as LG and BASF breaking ground on battery plants in Indonesia. So that's really where I think the next wave of growth the government is looking to will come from.
David Coates
analystYes. Great. And last thing, you mentioned the margin compression we expect this quarter, partly offset by certain cost reductions. Could you remind us what sort of percentage, or in power cost savings, you expect once the new power plant is fully ramped up?
Justin Werner
executiveYes. From Angel Nickel, we anticipate roughly a 20% reduction in what we pay for power. So the effect of that on this quarter ought to be modest. We won't enjoy the entire quarter's worth of benefit as that power plant ramps up, but the impact should begin showing this quarter. <<inaudible>>
Operator
operator<<operator_script>> We'll take a short pause so any remaining questioners can sign up. At present, we see no additional questions. I'll now return the floor to Justin Werner for closing remarks.
Justin Werner
executiveThanks, everyone, for joining us today. As I mentioned, we had record half-year results, both operationally and financially. For the second half of this year, we anticipate continued strong operational results as Angel Nickel ramps up and Oracle Nickel comes online. That higher production will, of course, translate into further strong financial results. So thank you all for your time. I appreciate the questions, and thank you.
Operator
operatorI appreciate it. That brings today's conference to a close. Thanks to everyone for joining in. You're welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Nickel Industries Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Nickel Industries Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Nickel Industries Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.