Nickel Industries Limited (NIC) Earnings Call Transcript & Summary

July 31, 2024

Australian Securities Exchange AU Materials Metals and Mining earnings 23 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line, and we're glad to have you at this webcast on Nickel Industries Limited's activities for the June Quarter. Everyone joining is currently in listen-only mode. A presentation will come first, and after that we'll hold a question and answer session. Should you want to pose a question, please press the star key and then the number one on your telephone keypad. At this point I'll pass the conference to Mr. Justin Werner, Managing Director. Over to you.

Justin Werner

executive
#2

Thank you, and welcome everyone to the Nickel Industries presentation on activities for the June quarter. Moderator, could you please advance to the next slide. On safety and sustainability, we had no LTIs during the quarter, across 2.18 million man hours worked. Across the company, the 12 months rolling total recordable injury rate at the end of June stood at 1.89%, which is significantly below the World Steel benchmark. We were proud to release our 2023 sustainability report during the quarter. That is our third sustainability report, and it really showcases the company's achievements and the role that we are playing in being a responsible and sustainable mining leader in Indonesia. We are also very proud to announce the establishment of a university scholarship program for 10 local indigenous students per year to attend a university in Sulawesi across fields of metallurgical engineering, environmental engineering, and mining engineering. And we are very pleased to have a role and provide support for future Indonesian leaders. The Hengjaya Mine participated in the World Environment Day campaign in various activities such as tree planting, beach cleanups, and also showcasing its proposed biodiversity conservation area. And we also received the top CSR award at the Indonesia Social Responsibility Awards.

Justin Werner

executive
#3

So once again, more recognition during the quarter, reflecting Nickel Industries' position as a recognized leader in ESG and responsible mining in Indonesia. If we could just advance to the following slide, please. The first half was challenging because of factors beyond our control, but on a pleasing note, our operations have stayed robust. EBITDA from operations came to $79.5 million, and nickel metal production was a touch above the March quarter. Our RKEF EBITDA declined slightly versus the March quarter, landing at $41.8 million. Unfortunately, that stemmed from unseasonably heavy rainfall, which I'll address a bit later on. As a result, we had to keep drawing down on stockpiles of lower grade ore. We also saw a bit of an increase in nickel ore pricing, which pushed costs slightly higher, and that came about because of the higher LME price during the quarter, when LME briefly spiked back above $17,000 a tonne. On a pleasing note, Hengjaya Mine recovered very well from its slow start to the March quarter, with EBITDA of $24.6 million, which is 63% above the March quarter, which had been affected by the delayed issuance of RKAB licenses.

Justin Werner

executive
#4

In the March quarter, production really only began at the end of February. I mentioned the above-average rainfall earlier — 1,373 mm, so more than a meter, for that quarter — and that figure came in 48% and 91% above the equivalent prior periods in 2022 and 2023. So a substantial volume of rain, as you can see, affected our operations, yet as I noted, the numbers remain very robust. We're happy to report the boost to our equity stake in the ENC HPAL project, where progress continues at a strong pace. In addition, we announced that commissioning of ENC's cathode and sulfate plants is now expected to be expedited, which pulls forward cash flows from that project. We announced a $250 million bank facility and the repayment of the $245 million April 2024 notes as they matured. Lastly, I'm pleased to announce the appointment of Emma Hall as an Independent, Non-Executive Director; she brings extensive global battery metals experience with companies including Tianqi Lithium, and we warmly welcome her to the Nickel Industries board. If we could move to the next slide, please. Here you can see NPI pricing has risen slightly since the March quarter.

Justin Werner

executive
#5

NPI has bounced back from its bottom, and our sense is that it's now stabilizing. You can see that reflected in the figures, or the average contract price for the June quarter. If we could just—sorry, RKEF production is holding steady across all our operations, even with the impact from RKAB licenses and the effect of the unusually heavy rainfall, and those charts there show that. If we could just move to the next slide, please. I'm getting ahead of myself here. I've covered NPI pricing, but as I said, we've seen it steady from the recent lows, and, you know, looking ahead our view is that NPI price should stay stable, with more upside than downside. If we could just move to the next slide, please. ENC construction progress—from the aerial photo there you can see that all the earthworks and footings are now finished. In the foreground there you can see we've finished building all the office and staff quarters. Long lead items, critical items, are still being fabricated in China and delivered to site progressively. Now that earthworks and footings are done, we're ready to begin pouring concrete and installing the slabs.

Justin Werner

executive
#6

Like I said before, we bumped up our stake by another 30.25% of equity, which lifted our ownership to 44%, and hopefully that lets us move the production or commissioning of the nickel cathode and sulfate plants earlier than the contracted October 2025 date. On timing, we think that's a good sign, since we saw better margins from the March to June quarter on our 10% interest in the HNC HPAL. So, you know, margins have risen strongly, and we think getting ENC production moved up is a good sign for what we hope will be a high-margin environment. If we could just go to the next slide, please. The Hengjaya Mine, as I said, put in a stronger performance despite the tough rainfall. Quarterly EBITDA came to $24.6 million. We're at a near record for July. August is traditionally when the dry season begins, and in fact it's traditionally the driest month. So, you know, we're looking forward to getting into the dry season now and, and really staying focused on continuing to ramp up production at the Hengjaya Mine and also EBITDA. If we could just go to the next slide, please. On the corporate side, I've mentioned the rise in equity in ENC to 44%, and that was secured through two payments totaling $695.8 million.

Justin Werner

executive
#7

The $250 term loan facility has been completed, and it was co-provided by two Tier-1 banks, PT Bank Negara Indonesia. That makes it the second facility we've completed alongside them, and DBS. Then lastly, the appointment of Independent Non-Executive Director Emma Hall. As I noted, more than 10 years of experience in the global battery metals industry, plus broad commercial and technical engagements with global manufacturers and OEMs throughout North America, Europe, and Asia. So to sum up, even with some challenges once again this quarter, and to repeat, our operations performed robustly. Set against the backdrop of continued production cuts elsewhere, which clearly reflected the announced closure by BHP of its Nickel West operation. So while other producers remain loss-making or others are shutting down, we're still recording, as I said, very robust and solid EBITDA. We believe these production cuts and closures will continue. We think we may see higher cost NPI producers potentially exiting the market, along with additional global producers. And so the current count of at-risk or closed nickel producers now stands at roughly 450,000 tonnes per annum. If you look at actual new Class 1 projects in Indonesia, only three projects are currently funded and under construction, and one of those is ENC.

Justin Werner

executive
#8

That comes to just about 300,000 tonnes, which means it's clearly 150,000 tonnes below the global closures. And look, we believe further potential growth in Indonesia is probably limited. I think that reflected the scrapping of the planned BASF Eramet HPAL plant. So I think it signals that any additional Indonesian HPAL capacity may be difficult to fund. So I think we're extremely well-placed, being fully funded for ENC. Construction is progressing very well. Now, we're expecting expedited cathode and sulfate production, and as I mentioned, growing margins, which are being evidenced through increased EBITDA from our 10% holding in HNC. So as we move into the second half of the year with the start of the dry season, we're now very focused on delivering a strong second half to the year. With that, I'll now hand over to Q&A.

Operator

operator
#9

Thanks. If you'd like to pose a question, hit star one on your phone and hold until your name is called. To withdraw that request, hit star two. Should you be using a speakerphone, kindly lift the handset before asking. Our first question is from Kate McCutcheon at Citi. Please proceed.

Kate McCutcheon

analyst
#10

Morning, Justin and Chris. Over at the RKEF, ANI and ONI turned in a solid print, though output at the first gens appears somewhat weaker, and those operations ran at a modest loss. Which levers would you pull to bring those first gen RKEFs back on track? And how are you weighing production against market conditions on those? Then, on the NPI volumes — are they take or pay, or is there any risk if pricing from those two assets doesn't improve?

Justin Werner

executive
#11

Right. So those RKEFs don’t carry any take-or-pay obligation. The options available to us — and this is what we’re reviewing right now — essentially involve aiming to supply 100% of the ore, specifically the high-grade saprolite ore, from the Hengjaya Mine. That would let us feed a higher-grade ore with an improved silica-to-magnesia ratio and fewer iron units. So that’s one option under review at present, and our focus is broadly on being able to deliver that output straight from our Hengjaya Mine into those first-generation RKEF operations, which would offset the effect of the low-grade ore currently being fed through those operations. But I think — and just to speak briefly about those first-generation RKEF lines — plenty of them remain in Indonesia and beyond Indonesia. As you noted, very small losses, but we believe that we might see some NPI production leave the market from other competitors lacking the same cost base as ours. And so we remain, sort of... I think our perspective on NPI is that prices have stabilized and that margins remain robust in our ANI and ONI operations.

Justin Werner

executive
#12

And, you know, our attention right now is on ways we might, you know, boost margins at HNI and RNI.

Kate McCutcheon

analyst
#13

Right, that's clear. Then turning to the mine, it seems the guidance for the CY sits at 12 million tonnes. As I understand it, your permit now covers 22 million tonnes. How would that ramp-up profile look, and how would the split between saprolite and limonite break down?

Justin Werner

executive
#14

Right. So at the moment we're in the application process to go up to 22 million. As for hitting that ramp-up, it will likely happen alongside ENC coming online. Our goal, then, is that the extra 11 million tonnes of limonite—which will be supplied entirely from our own mine to the ENC HPAL—we're aiming for that increase to line up with ENC's commissioning. So it's during the second half of next year that we'll be looking to shift to that rate.

Kate McCutcheon

analyst
#15

All right. Then, if I could just slip in one quick question for Chris. Regarding that total drawn debt figure and the $358 million in cash — is any portion of it still held in a term deposit, or what will show up at your cash flow line?

Chris Shepherd

executive
#16

Yeah, thanks, Kate. Yeah, we're always shifting funds into and out of term deposits, continually rolling them over just to secure improved rates. The $350 million facility along with the $50 million from the first Indonesian bank clients — all of that has been fully drawn, so the revolver is now drawn too. And then the $250 million in new facilities that we entered into at the end of last quarter, we drew that down early July. So that's been drawn down. The full $650 million from those two bank facilities has been drawn.

Kate McCutcheon

analyst
#17

All right.

Chris Shepherd

executive
#18

Appreciate that, Kate.

Operator

operator
#19

Tim Hoff from Canaccord has the next question in the queue. Go right ahead.

Tim Hoff

analyst
#20

Hey, guys. My other question is kind of a housekeeping item here — the March tonnes at the Hengjaya Mine were reported differently this quarter than last. Could you maybe point us toward which of those is the correct figure?

Justin Werner

executive
#21

Yeah, Tim, I’ll get back to you on that one, and, uh, yeah. So it’s the ore tonnes mined, right?

Tim Hoff

analyst
#22

Yeah. That's right.

Justin Werner

executive
#23

All right, sure.

Tim Hoff

analyst
#24

Correct — that figure is in tonnes.

Justin Werner

executive
#25

I’ll need to get back to you on that.

Chris Shepherd

executive
#26

Apologies, apologies, Tim. We caught that, and thank you for asking. That's the one that applies right now.

Tim Hoff

analyst
#27

Alright.

Chris Shepherd

executive
#28

The figure for the June quarter is the right one.

Tim Hoff

analyst
#29

Great, great, and many thanks indeed.

Chris Shepherd

executive
#30

That’s not a problem at all.

Operator

operator
#31

If you'd like to pose a question, just press star one on your phone once more and hold until your name is called. Our next question is from Cameron Taylor at Bank of America. You may proceed.

Cameron Taylor

analyst
#32

Oh, good morning, Justin and Chris. My question concerns the offtake arrangement for the new ENC HPAL plant. You said during a few earlier quarterlies that you were talking with Western OEMs, or seeking one, about an offtake. Is there any update on that? And I was just wondering whether Tsingshan would be on board with selling HPAL nickel to Western OEMs.

Justin Werner

executive
#33

Yes, we're seeing solid progress on that front. So we've been talking closely with several Western OEMs and battery manufacturers. Some indicative offtake bids have come in, and right now we're working our way through them. Regarding the—I mean, Tsingshan's priorities line up quite well with our own, since they want ENC to serve as a supplier of what we see as Indonesia's highest-quality nickel to everyone outside China. So that remains very much where our attention is, and those offtake discussions are moving forward.

Cameron Taylor

analyst
#34

Alright, thanks. Turning to the negative EBITDA per tonne at Hengjaya and Ranger — you brought up levers but didn't bring up matte. Is matte still a possibility? If they were still making matte, would you see positive EBITDA margins, or is there really not much difference between the two products?

Justin Werner

executive
#35

See, right now our thinking is that matte, if it isn't losing money currently, with all that new supply arriving on the market, it could well end up in loss-making territory. So yeah, at this point there are no plans to return to matte again. And honestly, what we're after is getting our Class 1 and battery exposure through HPAL instead of matte. There are a number of reasons behind that. You know, HPAL delivers significantly higher margins and carbon intensity that's much lower.

Cameron Taylor

analyst
#36

Yes. Got it. I’m with you on that—I share that view. So does that mean the ANI plans for matte are also essentially paused for now?

Justin Werner

executive
#37

Right now, yeah, we don't have any plans at this point to switch that over to nickel matte.

Cameron Taylor

analyst
#38

All right, thank you, Justin, and thank you, Chris.

Justin Werner

executive
#39

Appreciate that, Cam.

Operator

operator
#40

Dim Ariyasinghe from UBS has the next question. Go right ahead.

Dim Ariyasinghe

analyst
#41

Thanks, everyone. I have two things. First, a number of news stories came out last week. I believe I wrote a piece on Indonesia possibly seeking to restrict additional investment, or Chinese investment, in Indonesian nickel capacity. I'm just curious whether you saw that article and what your perspective is. Is it a threat or could it be an opportunity? Yeah, if you could say a bit more on that, please.

Justin Werner

executive
#42

No, thank you, Dim. Yeah, we've read those articles, and in our view our position is very strong, since we're the sole majority-owned Western HPAL operating in Indonesia. And, you know, we're exploring bringing Tsingshan's stake down to roughly 25% to 20%. Even so, you know, our share will sit at 55%, with them holding a minority. From where we stand, as I mentioned, no other HPAL in Indonesia today has Western majority ownership. We're really the only one that faces toward the West as well, when it comes to working with Western OEMs and battery manufacturers. And so the Indonesian government has regarded that very favorably.

Dim Ariyasinghe

analyst
#43

Yeah. Yeah. Great. Okay, good. Thanks. And then just one thing — could you remind us of the most recent guidance on the buyback? What do you… Yeah, where things stand with it.

Justin Werner

executive
#44

Right, so as we put out in the company update on 4 July, we're obviously past the blackout period now. But the share count will depend on — or rather, the buyback will hinge on — the share price at the time and market conditions, which we'll be watching every day.

Dim Ariyasinghe

analyst
#45

Alright, great. Appreciate it. Great.

Operator

operator
#46

That brings us to the end of the question-and-answer session. I'll now return the floor to Mr. Werner, who will offer some closing comments.

Justin Werner

executive
#47

Alright, once more, I appreciate all of you taking the time. As I mentioned, we're looking ahead — the dry season is about to begin now — and we're highly focused on hopefully delivering a solid second half of the year. So thanks again, everyone, for your time, and we'll speak again before long. Thank you.

Chris Shepherd

executive
#48

Appreciate it, everyone.

Operator

operator
#49

That brings today’s conference to a close. Thanks for taking part. You’re welcome to disconnect now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Nickel Industries Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Nickel Industries Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Nickel Industries Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.