Nickel Industries Limited (NIC) Earnings Call Transcript & Summary

April 29, 2026

Australian Securities Exchange AU Materials Metals and Mining earnings 58 min

Earnings Call Speaker Segments

Justin Werner

executive
#1

Thanks. I'm grateful to everyone for joining the March quarterly results call for Nickel Industries. Moderator, please advance us to slide 2. I'll begin with safety and sustainability. Throughout entities controlled by Nic, the company-wide 12-month lost time injury frequency rate was 0, and there were no lost time injuries in the quarter, with 4.8 million safe man-hours worked; for the 12 months ending 31 March, 17.7 million man-hours were worked with no LTIs. At the end of March, company-wide TRIFR was 0.45. We had some sad news to share: a contractor working for PT Fajar Metal Industry, the company constructing the ENC HPAL, was involved in a fatal incident. It took place while transmission lines were being built to connect the ENC plant with the slurry plant and dry stack tailings facility, which sits at the company's Hengjaya Mine. The victim's family has received our full support. The relevant authorities carried out a thorough investigation, and now all activities at Hengjaya Mine operations have restarted, with the exception of transmission line work, which we anticipate will resume before long. Turning to other sustainability efforts, Hengjaya Mine is among just a small number of mines to have received a biodiversity area award. By quarter's end, construction across the different facilities in that biodiversity zone stood at 50% completion. Those facilities will make it possible to study native plants and animals, serve as a place for education, and, likely most crucially, help safeguard those species. Last, we're glad to have expanded our university scholarship initiative. This marks the program's 3rd year, and by year end we anticipate supporting 30 students. Let's turn to slide 3, if we may. We're happy to share that adjusted EBITDA from operations came in at USD 135.6 million. That makes this our best quarter since December '23, when we posted $135.4 million, an unadjusted figure. Yeah, this has been our best quarter in quite some time. Output at RKEF held firm, and margins improved substantially, which shows up in EBITDA climbing to $85.8 million for the March quarter, up from $35 million the prior quarter. HNC HPAL keeps running well above nameplate capacity — more than 40% — and EBITDA there grew, especially on a per-ton basis. Ore sales from mining are back where they stood before the RKAB was issued, and we were glad to report securing 14.3, roughly a 60% jump over the 9 million tonnes we had last year, even as many of our peers saw sizable reductions. Mining EBITDA came in at just about USD 30 million. Let's move on to slide 4, if we may. Turning to our RKEF operations, what really stands out is how much the NPI price has climbed. The sale price rose 19%, with the average going from $11,100 in the December quarter up to $13,201 in the March quarter. The good news is that costs only went up roughly 4% over that same period, which allowed our margins to grow by 155%, from $1,114 in December to $2,842 in the March quarter. Now let's go to slide 5, HPAL operations at HNC. Here too we posted a higher sale price, up 15%, from 17,110 to 19,690 in the March quarter. EBITDA rose, and EBITDA per tonne also increased. We are experiencing some cost pressure stemming from higher sulfur prices. Sulfur averaged roughly $570 a tonne for the quarter. On sulfur supply and security, we continue to hold healthy stockpiles, and right now there seem to be no problems obtaining sulfur supply. Let's go to slide 6, please. Commissioning at ENC is moving along very nicely. We have been pre-commissioning several of the major assets: power, water, the acid plant, Counter-Current Decantation, thickeners, precipitation tanks and autoclaves. That work prepares us to begin fully integrated commissioning in May. Next month. Our target is to reach 100% of nameplate by roughly the end of October in 2026. There was a brief hold-up, though overall performance remains strong. Now, on our approach to the sulfur issues: our inventories will last us until the close of September. Those were purchased at an average cost of $450 per ton—well below where the market stands right now, at $900 to $1,000 a ton. We're also pleased to share that, during the quarter, Sphere completed payment for the acquisition of 10% at a $2.4 billion valuation. Of the mere 3 accredited suppliers to SpaceX, Sphere is one—and the sole holder of a long-term contract. Additionally, we have started, or are on the verge of starting, the registration process with the LME for our nickel cathode. If that registration goes through, we expect our nickel cathode to earn a premium over the LME nickel price once it's registered. Please turn to slide 7. Returning to RKAB, we're glad to share that it rose by nearly 60% to 14.3 million, even as several peers recorded substantial reductions. The mine posted another solid quarter, with over 3 million tonnes of ore sold. Following the quarter, on 15 April, the Indonesian government announced revisions to the benchmark price, known as the HPM. Regarding saprolite pricing, the HPM will align prices more closely with prevailing market levels. It will, in fact, remain under the market price; no meaningful shift in saprolite pricing is expected on our side. Limonite pricing, though, will go up. As things stand right now, we do sell to third-party HPALs. Not one of the HPALs in Indonesia has adopted this new pricing regime; naturally, we'll continue monitoring it and observe how it unfolds. Please turn to the following slide — on the subject of new projects and development at Sampala, our progress has been quite strong. As you can see in the photograph at the top left of the haul road, we have finished 8 kilometers out of a required 24 kilometers, which appears at the bottom there, for that haul road into the IMIP. That work is moving along very well. As for the remaining 16 kilometers, we would love to begin construction today. We must wait for the required permits and approvals, which are currently in process. On the mining side, we are also well advanced with approvals of feasibility studies, especially at the ETL project. At our Siduarsi project in Papua, we are likewise well along in securing approval for a feasibility study. That feasibility study envisions a DSO operation processing 2 million wet metric tonnes of limonite each year. Of course, given the recent movements in nickel ore pricing, we remain highly focused on advancing these projects in the near term, since the economics of ore sales look so attractive right now. Turning to slide 9, I'll pass things to Chris, who will cover the following two slides on cash flow and the debt refinancing that was announced recently.

Christopher Shepherd

executive
#2

Thanks, Justin. Morning, everyone. Like Justin mentioned, we had an exceptionally robust EBITDA from operations in this quarter—just above $135 million. The cash flow effect of that, though, across the operations, across the RKEF business, the mining business, and the HPAL business, didn't appear quite as strong, with roughly $10 million of cash outflow across those three operations. The main reason was the first item, a $72 million reduction in trade payables. We had a substantial amount of December inventory purchases that we paid for in January. We also incurred some fairly sizeable December contract standby costs at the mine while it was on standby, as everyone is aware, because of the RKAB issues in December. That was also paid by us in Q1. Trade receivables went up $38 million. The reason is straightforward: NPI prices rose, which Justin referenced during the quarter. The $16 million HNC EBITDA is excluded, since it's equity accounted and no cash has come in from HNC so far, as HNC keeps concentrating on cutting debt, which is almost at zero; at Xing Creation, our trading arm, we also moved the payment cycle to HNC forward. Every shareholder moved it forward. We got some late payments for March sales in April; a portion of that cash came back to us in April. Additional significant cash flow entries were the ENC payment—our last payment for 2% of ENC—amounting to USD 46 million. Principal repayments on bank loans totaled $25 million for the quarter. Interest on bank and bond facilities came to $44 million. We also had CapEx of $15 million, which covered the HNI line repairs at the HNI RKEF operation, along with some line repairs and contractor setup costs at the Hengjaya Mine following the standby. Operator, may I proceed to the next page, page 10? As we announced yesterday, we successfully refinanced our existing bank loans. We had $398 million of bank loans outstanding. On April 28, we announced a new unsecured facility of USD 450 million, which means all security has now been removed from our bank loans; that $450 million consists of a $350 million term loan plus a $100 million revolver. Our revolver has been raised from $50 million to $100 million. BNI led this refi, or financing. As is very clear, BNI has been with us from day one in our bank loans; six other banks also took part, a mix of Asian and European banks. We keep thanking all of these banks for the continuing support they provide to Nickel Industries. Right now, our rates sit at roughly 3.6%, plus 3.5% during the initial six months. That matches precisely what we're paying on the bank loans we already have. After that, the margin is tied to leverage. As that margin declines, cash builds, operations grow, and with ENC ramping up—and ideally Hengjaya as well—we move beyond the $14.3 million threshold and add Sampala. We expect leverage to fall naturally on its own. So our interest margin should decline too. On these new bank loans, we've set up a six-month amortization holiday. The charts on the right-hand side show how that works out. That's the reason we're paying 3.5% during the first 6 months. Based on our current leverage we'd sit below 2.5x, which would put us in a much lower margin. But we chose to pay that extra interest across the 6 months so we could capture the cash flow benefit from the principal reduction as ENC ramps up. These loans carry a final maturity of June 30, 2030, and we'll keep making quarterly principal repayments. The bottom chart on the right-hand side shows the new bank loan amortization. We think that's sound discipline—continuing to pay down the debt on the bank loans. Following the refinancing, net debt comes to slightly below USD 1 billion — USD 994 million specifically — consisting of USD 800 million in senior notes (the 144A notes due September 2030) plus USD 256 million in cash. On the covenants, we've made amendments. Previously, under our bank loans, headroom stood at 2.5x, i.e., net debt to EBITDA of 2.5x. That ceiling has been lifted to a maximum of 3.5x, reflecting once again the way the banks and their credit committees see our business getting stronger as ENC comes on and mining operations ramp up. A key point: we've included a covenant carve-out covering the Sphere Corp loan guarantee. Back at the end of January we provided credit enhancement to the Sphere Corp lenders, and there's a guarantee in place under which, given certain conditions, Nickel Industries would have to assume that loan if Sphere Corp were to default; that contingent liability clearly has covenant implications. So with these new bank loans, when we calculated our covenants, we excluded the contingent guarantee tied to the Sphere Corp loan. And I think this refinancing has truly handed the company meaningful added flexibility—through the cash flow benefit across the coming 2 to 3 years, thanks to lower principal amortization—and it gives us room to move without being boxed in by a 2.5x net debt to EBITDA covenant in an industry as cyclical as nickel is at the moment. And again, we see that as very—it's a very strong outcome for the company, and we're grateful to our banks—BNI in particular, but all of them—for their support. Justin?

Justin Werner

executive
#3

Yes. Thank you, Chris. So to recap, we've had another quarter of strong production. To pick up on what Chris mentioned, keeping the balance sheet optimized clearly leaves us in a solid position, since there's a bit of market volatility right now. Beyond that, we're still concentrated on finishing the ENC, especially the commissioning work, and then on making sure we hit that ramp up at the end of October this year. With the big jump in the value of ore resources in Indonesia, our attention is firmly on delivering Sampala and Siduarsi in the near term. While we are feeling some cost pressures, it's worth noting that the LME nickel price has also risen considerably. It went from an average of $14,892 in the December quarter to $17,338 in the March quarter. The spot price right now is comfortably above $19,000 a ton. Even though cost pressures are climbing somewhat, the LME nickel price is going up alongside them. Because our operations are integrated, that puts us in a far stronger position than many of our peers. With that, I'll open it up for questions.

Richard Knights

analyst
#4

I'm on your team these days.

Justin Werner

executive
#5

Keep that between us.

Richard Knights

analyst
#6

Regarding cash generation, could you maybe go into a bit more detail specifically about how the RKEFs are generating cash? Given the $86 million of EBITDA, it seems a little strange to me that it came in so low, and I believe operating cash flow at the RKEFs was $3.5 million.

Justin Werner

executive
#7

Chris, would you like to handle that?

Christopher Shepherd

executive
#8

Yeah, I can handle that question. The main factor there is the drop in payables. Trade payables came down quite a bit. Richard, back in December, when the mine was on standby and there was uncertainty regarding the RKAB, we made a choice — we ended up accumulating a great deal, with December inventory purchases and a fairly sizable stockpile build; we paid for a substantial portion of that. Of course, those payments landed in Q1; that accounted for a very big chunk of it. Given that ore prices have kept climbing, I believe that has proven to be a quite prudent call. Buying it, making that purchase back then, was the right move, in my view. And we're very pleased that we took that decision together with Tsingshan.

Richard Knights

analyst
#9

All right. So would you anticipate that this would reverse, or do you plan to maintain inventories at a higher level?

Christopher Shepherd

executive
#10

Well, look, it's clear that we're in a very uncertain stretch right now. Under normal circumstances, I'd say yes, we anticipate it will reverse. I believe we truly need to keep a careful eye on how the market develops following the changes to the ore pricing formula. It won't make a big difference in the RKEF business, the saprolite. Yes, I would anticipate it to reverse, but the bigger point is that we simply have to watch how things develop over the coming couple of months.

Richard Knights

analyst
#11

Yeah. All right. Perhaps regarding the sulfur question, could you just jog my memory on what your cost sensitivity is in the HPALs — that is, how many tonnes of sulfur per tonne of nickel production?

Justin Werner

executive
#12

Chris, would you like to handle that one, or should I?

Christopher Shepherd

executive
#13

No, that's not a problem. On the sulfur side, I don't believe we've provided the exact tonnage, and with us being a 10% minority shareholder and ENC clearly not yet operational, I don't think we're in a position to share that, Richard. We have shared some detail on the impact: each $100 rise in the sulfur price lifts our operating cost by roughly $1,000, which is what we expect once ENC is up and running. So that's $1,000 per tonne of sulfur. Yes.

Richard Knights

analyst
#14

Yeah. So, with the situation as it stands right now, I mean, what's your thinking around inventory levels, and at what point will you have to restock? I'd imagine it's something you're assessing day by day, and I doubt you'd want to take that 3 to 4 months of inventory all the way down to zero.

Christopher Shepherd

executive
#15

Look, we...

Richard Knights

analyst
#16

How do you view that?

Christopher Shepherd

executive
#17

Once more, it isn't just ore — the ore picture is in flux. The ore market is a changing situation. But as Justin said, we have — I believe inventory extends to August to September at present; and that inventory was bought, the sulfur was bought at $450 a tonne. Obviously, with a current spot price well above $1,000 a tonne, we're in a strong position. As you noted, we won't draw it down to zero, naturally. Should we need to enter the market and lock in additional sulfur at a later point, we'll make that call when the time comes.

Richard Knights

analyst
#18

Yeah. All right. I realize you might not be able to respond to this, but speaking about the wider industry, I mean, producers who aren't integrated have to be really hurting at the moment from these limonite price increases and clearly the higher sulfur prices. Can you point to any evidence or offer any comment about the wider industry and how it has reacted to, a, these price increases and the input, the limonite price increases, and b, the sulfur squeeze.

Christopher Shepherd

executive
#19

Yes, Justin, I'll pass that question to you.

Justin Werner

executive
#20

Yes. Thank you, Chris. Well, I think the response to the higher limonite price has been that the wider industry has not taken it up and appears reluctant to do so; we will see how that unfolds. What I mean is, you are seeing; not long ago there was an announcement from Huafei, a non-integrated HPAL producer. They are using this chance, while we have this kind of high volatility and elevated prices for ore and sulfur, to carry out some maintenance at their HPAL. Some tonnes will leave the market, and there are reports that other producers, again non-integrated, may either cut output or take the chance to perform maintenance too, as Huafei is doing. I think once more, what this brings out is the benefit of being a fully integrated producer, from mining through RKEF and HPAL projects, and of having our own captive power; but look, margins right now are still very healthy across both HPAL and RKEF. I think it really returns to your question: we hold substantial stockpiles at all of our operations, which I believe was the correct call, to enter the market and purchase, before much of this volatility arrived. We will of course keep watching the market for the right moment to step in and replenish our stockpiles of ore and sulfur and other key consumables for our operations.

Austin Yun

analyst
#21

I've only got 2 questions. The first is really just a follow-up on the sulfur exposure you have. I understand you're a minority stakeholder. What I'd like to get is some color: given that the price will double, is there any hedging, or some special mechanism for price protection or cost protection, in place? Should we simply assume that once you move to the spot market, the cost is going to rise? That's the first one. I'll come back with a second. Thank you.

Justin Werner

executive
#22

Well, thanks, Austin. As things stand, there's no hedging of sulfur. I'd also mention that we've been quite active in examining alternative supply sources for sulfur, and there are a number of alternatives to the Middle East. Well, right now, since we have ENC stockpiles lasting until almost the end of the year, we are, as we've said, continuing to monitor the situation. Well, depending on how things develop, we'll respond accordingly.

Austin Yun

analyst
#23

Alright. Moving to the second question about the new HPM regime. You said that it hasn't been implemented yet. I'd just like to get a sense of whether you have a view on how fast or how slowly this could roll out. And with that in mind, since Nickel Industries has some exposure, how should we think about that exposure from a royalty cost standpoint? Thank you.

Justin Werner

executive
#24

The government has implemented the HPM. It's simply that current HPAL producers within Indonesia haven't adopted it on limonite pricing. Based on what we've done so far, the overall impact on our business is that higher saprolite prices clearly translate into improved margins at Pangaiwa, where our stake is 80%, while they could create margin pressure in our RKEF operations, also 80% owned by us. Net-net, the difference isn't significant. We're essentially shifting margin from the RKEF side to the mining side, though we will forgo the tax holiday benefit that the RKEF operations currently give us. As for HPAL, as I mentioned, no HPAL producers have adopted the new pricing regime at this stage. If that policy remains, they currently possess the purchasing capacity, since limonite is plentiful. Several producers hold quite restricted RKABs and must be able to sell ore. My sense is that this could continue. Once more, clearly this is a highly fluid situation right now—not only regarding nickel prices, but also concerning worldwide volatility and events in the Middle East.

David Coates

analyst
#25

Those are genuinely helpful details from both of you regarding the results. Apologies in case I overlooked it earlier, but sulfur came up — what about diesel? Word is Indonesia is nearly self-sufficient there, and the government plays a role in price setting. Would you mind giving us some context on pricing and supply, plus how diesel looks going forward in Indonesia?

Justin Werner

executive
#26

Thank you, Dave. Just as you said, Indonesia does meet its own diesel needs. We don't expect any interruptions to supply down the line. Because the government heavily subsidizes it throughout the entire archipelago, diesel increases have been quite small. Regarding how we run things, diesel consumption is quite low across refining, RKEF, and HPAL. Mining is where the bulk of it gets used, and our contract miners handle fuel procurement for their machines themselves. Electric trucks make up more than 30% of our fleet. Rising diesel prices, which have clearly hit other operations around the world, haven't caused us any meaningful disruptions or notable cost pressure.

David Coates

analyst
#27

Great. That's good to hear. And just lastly, regarding the ENC HPAL commissioning, you mentioned some October dates for reaching full nameplate. Could you give us a bit of background on what the delays have been, and how that ramp-up looks from here?

Justin Werner

executive
#28

The truly unfortunate delay was the contractor fatality at FMI. That set us back roughly a couple of weeks. The challenge is that, prior to that, we had around 3,000 contract workers at Hengjaya Mine, working on the slurry pipeline, the dry stack tailings facility, and the transmission line; with work temporarily stopped and then restarted, it was obviously difficult to recruit and bring back that large workforce. That is essentially what has caused the commissioning delay. I think it is obviously a credit to Tsingshan that they have still managed to begin pre-commissioning of many of the key equipment pieces, and that is going very well; the key milestone for us now really is the slurry pipeline, which obviously will feed ore into the plant, and getting that completed, and it is now back on track. Although we have lost a small amount of time, Tsingshan remains extremely confident about the ramp-up profile and about reaching that nameplate capacity by the fourth quarter of this year, which is, you know.

David Coates

analyst
#29

Fantastic. Great.

Justin Werner

executive
#30

It's quite a rapid climb, if you examine it, though they have accomplished this in the past.

David Coates

analyst
#31

Yeah, well, that agency really is a great template.

Justin Werner

executive
#32

Yeah.

Mitch Ryan

analyst
#33

Just regarding the HPALs choosing not to pay the HPM or not adopting it, are they contesting it on legal grounds, or are they simply ignoring the government regulation outright?

Justin Werner

executive
#34

Yes. No, there's no legal challenge at all, they're just disregarding the government regulations. The burden gets pushed back onto the mining operations, because while the mine can sell below the HPM price, it will still owe royalty based on the HPM price. Tax will also still be payable on that deemed HPM price. On mining operations, that pass-through, instead of going on to the refineries at this point, is simply being pushed back to the miners. Look, that applies only to limonite. With saprolite, the HPM actually brings the price into line, or in fact still slightly below, but in line with what saprolite currently sells for on the market. Obviously the government collecting royalty on a $26 saprolite price when the market price right now sits around $40 means they miss out on that, on the royalty on that $40; that, I think, is roughly what drove the decision to revise that HPM pricing. I think they've probably overcooked the limonite pricing, and as I said, we'll see how that plays out over time.

Mitch Ryan

analyst
#35

All right. The government is still collecting its share from the limonite, on limonite pricing; it is simply coming from the miners now.

Justin Werner

executive
#36

That is right. Yes. Right now, the miners themselves are the ones bearing that change. I mean, look, I do believe the HPALs likely hold some pricing power in this situation, since mines have limited RKAB and very few customers to whom they can actually sell limonite.

Jit Ming Tan

analyst
#37

I've just got a single question. If you look at the operating costs for your mining unit during the quarter, they're much higher than they were 12 months back. Apart from the contractor standby costs, were there any other factors?

Justin Werner

executive
#38

No. See, the main driver is the contractor standby costs. You know, mining costs have gone up, pushed obviously by inflation as well, plus higher diesel prices. Standby costs mostly showed up last quarter. This quarter we had a modest level of standby costs tied to the temporary stoppage from the incident that happened. On the whole, costs at the mine are fairly stable, and we don't expect that to change.

Donavan Tan

analyst
#39

I think I've got a couple of questions here. Let me begin with the first one. I believe you guys said something on the sulfur side regarding ME supply, the Middle East supply. I was just kind of reading about China banning exports from May to December. Do you guys think that's going to have an impact on your margins?

Justin Werner

executive
#40

China has banned the export of sulfuric acid. We've got our own sulfuric acid plant, so we produce our own sulfuric acid. Obviously, we purchase sulfur. The Chinese ban relates purely to the end product, sulfuric acid, which we don't buy or consume.

Donavan Tan

analyst
#41

Understood. Okay. The second item is really a point of clarification. Regarding your covenant cover for the Sphere loan guarantee, what does that cover look like? My assumption is that if you take on the loan, it wouldn't be counted in the leverage calculation — is that right, if my understanding is correct?

Christopher Shepherd

executive
#42

Yes. Thanks for asking, Donavan. The covenant I'm really watching is net debt to EBITDA. We have a maximum net debt to EBITDA of 3.5x, which is up from 2.5x. Right now, since it's a contingent obligation, it isn't counted in the net debt to EBITDA calculation. Should it be exercised, it will come in, and we'll need to — if Sphere defaults and it turns out they can't cure and Nickel Industries takes over that loan, and it gets put to us, then it will be counted in the calculation, and we'll deal with that when and if we reach that situation. One thing we did when we entered the agreements on the Sphere loans and provided that credit enhancement was start those discussions in late 2025. For that same reason, we began looking to refinance our bank loans in 2025 to accommodate this; we've worked with our existing bank loans over the last five months to give us as much flexibility as possible regarding that Sphere loan guarantee.

Donavan Tan

analyst
#43

Understood. One last thing from me about getting your products registered on the LME site. Is that pretty much almost a confirmed kind of thing, or?

Justin Werner

executive
#44

Sorry, could you repeat that?

Christopher Shepherd

executive
#45

I believe Donavan is asking whether it's just a formality. After we make the cathode from the ENC project and begin working toward qualifying it with the LME, is that a formality? Is that right, Donavan?

Donavan Tan

analyst
#46

Yes, that is right.

Justin Werner

executive
#47

I mean, look, there is definitely a process involved. It is not a formality in the sense that registration is guaranteed. We are extremely confident, given that we have passed a significantly extensive and exhaustive testing process from Sphere and SpaceX regarding cathode quality. That is not a formality, but we are very confident of being able to meet those LME requirements for registration.

Aman Aggarwal

analyst
#48

I’ve got a couple of things I wanted to ask, and the first one is about the payables. Do those reductions in payables mostly go to Xinxian, or are they to third parties? Broadly speaking, how does that split look?

Christopher Shepherd

executive
#49

Sorry, Aman. The line dropped out there partway through when you were talking about the payables. Could you ask that question again, please?

Aman Aggarwal

analyst
#50

Yeah, absolutely. On those payable reductions, do they go to Xinxian or to third parties? How does that split break down?

Christopher Shepherd

executive
#51

Mostly it relates to the ore. The payables aren't owed to Xinxian as such; they're owed to HNI, RNI, and ONI, which buy ore from Hengjaya Mine; and also payables to... The bulk of those payables comes from the industrial parks. It originates with the industrial park rather than with Xinxian.

Aman Aggarwal

analyst
#52

Got it. Would it be fair to describe these as mostly third party?

Christopher Shepherd

executive
#53

Oh, yes. Yes.

Aman Aggarwal

analyst
#54

Right, okay. And you mentioned this is largely RKEF. So why do the HPAL operations show a fairly large cash outflow?

Christopher Shepherd

executive
#55

The HPAL operations work a bit differently, and there are a few points worth examining. Payments to HNC have been brought forward. By "we," I mean all the shareholders. HNC has three shareholders: Wanlu Cobalt, CMOC Group and Xing Creation, which is Nickel Industries. Under an agreement among all the shareholders and the board, the payment cycle was shortened. In the end, payments were moved forward. Tsingshan moved payments forward; we've seen cash go out from Nickel Industries, or from Xing Creation. There's also our Xing Creation trading division. In March we had some shipments from our sales where the cash didn't actually arrive until the first of April. You'll see a fair amount of that cash come in during the next quarter. HNC, the HPAL HNC, is a 10% minority interest. We present the EBITDA so you can see an overall adjusted EBITDA figure, but at present we aren't receiving cash flows directly from holding a 10% stake in HNC. HNC is concentrating on paying down debt first, which, frankly, we're very pleased about in this environment. With luck, over the course of this year we'll see that debt actually reach zero and begin receiving cash dividends from HNC.

Aman Aggarwal

analyst
#56

Okay, so you anticipate that HNC will begin paying out cash dividends, possibly as soon as next year.

Christopher Shepherd

executive
#57

That's correct.

Aman Aggarwal

analyst
#58

Meanwhile, your trading division would continue to bring in cash.

Christopher Shepherd

executive
#59

That's right.

Aman Aggarwal

analyst
#60

Okay, got it. For my second question, I wanted to ask about the RKAB cut at Weda Bay; when it comes to ANI, how do you source feedstock there, and would you expect any margin impact should ore prices rise?

Justin Werner

executive
#61

Yes. Weda Bay sources from third party suppliers. The saprolite HPM change has actually had no impact on the actual market price. The HPM actually remains still below the saprolite market price. At ANI, we've been paying that market price for a number of months now. We don't expect any change in ore pricing. The only thing that will impact ore pricing is obviously changes in the LME nickel price.

Aman Aggarwal

analyst
#62

Okay, and just very briefly, I believe your grade — the NPI grade — has fallen this quarter. Is there any particular cause for that? And where do you expect it to trend from here?

Justin Werner

executive
#63

Well, that simply reflects lower-grade saprolite ore being fed into the operations. I don't believe we'll see it keep falling much further. What has happened over the last couple of years is that we've gone from an average grade of roughly 1.8 to an average grade of about 1.4, 1.5. There are substantial resources at 1.4, 1.5 still remaining in Indonesia. We expect it will likely stay around these levels for quite a while. Again, this simply underlines the benefit of our Hengjaya Mine and our ANI project, since they contain significant high-grade saprolite resources. With the Sampala project being developed, our aim is to become entirely self-sufficient, meaning we could supply higher grade to our ANI operations should it be needed.

Bharat Shettigar

analyst
#64

I've got a few questions of my own. First, regarding the mining quota, what would the ideal quota be that you'd need for next year, if we assume ENC runs at 100% and you also have the RKEF requirements to cover? What quota would you ideally want?

Justin Werner

executive
#65

Ideally, that quota would come in at roughly 12 million to 14 million tonnes of limonite. If we kept our saprolite supply profile as it stands now, at approximately 6 million tonnes, we'd land somewhere near that 19 million tonnes figure, which was the number we targeted for this year; we didn't receive it, since obviously we won't have a full year of ENC this year. Assuming nothing else shifts, the RKAB we currently hold of 14.3 million means we are fully self-sufficient for ENC, and that's key. We will be submitting, and we're entitled to submit, an application for an increase midway through this year, which we'll go ahead and do. I think success in raising the RKAB is probably more likely for us at the end of the year, when we resubmit for next year, once we can show that ENC has ramped up and is running at nameplate capacity, and we can show the ore requirements there.

Bharat Shettigar

analyst
#66

Sure. Then there's another question: there's been quite a bit of chatter regarding possible export taxes on minerals. Have you heard anything when it comes to nickel? Might NPI be subject to an export tax at some point down the road?

Justin Werner

executive
#67

Yes, there has been talk. If it were applied to nickel pig iron, most of our nickel pig iron gets consumed in country within Tsingshan's stainless steel operations. There wouldn't be, it wouldn't be applied to ONI, HNI, RNI. If it were to apply to ANI, where we do export some of that, we'd simply look, given that Tsingshan is our largest shareholder, to just divert that NPI in country. I think we're well-shielded from any potential export tax on NPI. The talk has been around the possibility that the tax would be applied to MHP. Again, given how integrated our operations at ENC are, we actually go through to nickel cathode and nickel sulfate, a higher value product, which at this point in time the government has said they don't want to tax because they want to encourage further downstream value-adding, which is exactly what we're doing by taking MHP through to nickel cathode and nickel sulfate.

Bharat Shettigar

analyst
#68

Okay, got it. My last question concerns the loan covenants. There are a few things I'd like to raise about that. First off, is that net debt to EBITDA covenant of 3.5 worked out on the basis of fully consolidating ENC? Or does it instead rest on a proportional 46% consolidation of ENC?

Christopher Shepherd

executive
#69

Yes. Thanks for asking, Bharat. No, ENC is not being consolidated. For covenant purposes, it's clear that we aren't consolidating ENC. We don't intend to consolidate ENC at all; it won't be included on a 100% basis. There was plenty of discussion around how we'd handle this; what we've settled on is that instead of consolidating the entire 100%, we'll take on the 46% proportionally for both, obviously, the earnings, since the earnings sit there at ENC; we have a fair amount of flexibility in that respect, which is great. Once again, that's something we were able to negotiate with the banks across the last five months, and we're very supportive of them on it. That said, Bharat, we've raised it from 2.5x to 3.5x. I want to state very clearly to everyone, all of you on the call, equity and debt investors alike, we do want to bring our leverage down to a level significantly below where it stands now, at just under 2.5x as of December 31. I'd like to see it at half that level, so roughly 1 to 1.25x net debt to EBITDA. I think the margin grid we have makes clear that it incentivizes us to get there.

Bharat Shettigar

analyst
#70

Right, so in the annual report there was a part where you stated that come 2026 you wouldn't be compliant with the earlier covenants. I'm just trying to get a handle on it — was that tied to net debt to EBITDA, or to some of the other covenants under the earlier loans?

Christopher Shepherd

executive
#71

Yes, that was in the earlier loans. It didn't say we wouldn't be in compliance. There was a possibility we wouldn't be at June 30. That was entirely related. Well, not entirely related. It had a great deal to do with the Sphere. Had we included the Sphere guarantee at the full $210 million loan, there was a possibility — depending on how margins went in Q1 and Q2, that is, how EBITDA came in during Q1 and Q2 — that we could have breached our covenants at June 30. That is entirely the reason I commenced. Well, it's not entirely. It's, it's one of the, it's a very key reason we sought to refinance those two bank lines into a single bank loan and accommodate the Sphere guarantee, so that we wouldn't have any issues come the middle of the year.

Bharat Shettigar

analyst
#72

Okay, so if we use the new covenant definition, what would net debt to EBITDA be as of, say, December or March?

Christopher Shepherd

executive
#73

We haven't put out March yet, so clearly I won't claim it remains at 2.3x.

Cindy Huang

analyst
#74

Just a couple of quick questions. I believe you said something about stockpiling for ENC through the end of the year. What I'd like to get clear on is what sort of working capital we should expect for ENC. Once you've built the stockpile through September, does that cover only HNC, or have you also begun — do you have the stockpile in place for ENC too?

Christopher Shepherd

executive
#75

Yes. I'm happy to field those, Justin. When we discuss our stockpiles, the figures we gave earlier refer purely to ENC. On HNC again — and I realize this is awkward — as a 10% minority investor, there's a limit to what we can put out, and we wait for HNC to publish their numbers, after which we can report on them in effect. I'm not able to share any advance discussion of their stockpiles. ENC, which is clearly the main one for investors, runs out at the close of Q3. On your other question, working capital. Yes. There will clearly be some working capital buildup at ENC, borne by all shareholders, with our share at 46%. It plainly depends. You have sulfur continuing; we already purchased a great deal of the sulfur, obviously. Sulfur will be needed for Q4. I can't tell you how large that will be, because I don't know the price; and then obviously we're waiting, as we said earlier, on the ore price — the limonite ore price right now is highly fluid in terms of what we'll be paid by ENC or any of the HPALs in the market; but across this coming period, let's call it six months, there will be a working capital buildup, with Nickel Industries' share somewhere in the range of $50 million to $75 million.

Cindy Huang

analyst
#76

Somewhere between $50 million and $75 million. All right.

Christopher Shepherd

executive
#77

My apologies — I'm unable to give you a tighter figure. With the way sulfur prices and limonite ore prices are moving, that's really hard to do.

Cindy Huang

analyst
#78

All right, got it. This is my last question. You brought up the cathode registration. Could I just verify what portion of the ENC will consist of nickel cathode? Is it only for that 10% Sphere offtake, or will we be turning out more than that 10%?

Christopher Shepherd

executive
#79

Right, our capacity allows us to produce 40,000 tonnes of cathode annually.

Cindy Huang

analyst
#80

All right. You said there'd be a premium over the LME price. Can you give any indication of how big a premium above the LME price we might expect for our nickel cathode?

Christopher Shepherd

executive
#81

Right now, the premium for LME-registered material sits at roughly $200 to $300 a tonne over the LME price.

Justin Werner

executive
#82

Yes. Well, thanks to all of you. I offered a few closing comments before this; we'll wrap up the call at this point. Thanks once more for joining us and for your questions. I think, well, we're eager to concentrate on turning in another solid second quarter for this year and on delivery of ENC. Thanks, everybody.

Operator

operator
#83

That brings today's call to a close. We appreciate everyone joining us. You can go ahead and disconnect your lines now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Nickel Industries Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Nickel Industries Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Nickel Industries Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.